CN109413141A CN201811041608.3A CN201811041608A CN109413141A CN 109413141 A CN109413141 A CN 109413141A CN 201811041608 A CN201811041608 A CN 201811041608A CN 109413141 A CN109413141 A CN 109413141A
Authority
CN
China
Prior art keywords
data
substation
service request
service
main website
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811041608.3A
Other languages
Chinese (zh)
Other versions
CN109413141B (en
Inventor
张鸿
黄海峰
左娟
姚志强
于芳
尹爱辉
李晓露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
State Grid Chongqing Electric Power Co Ltd
State Grid Jibei Electric Power Co Ltd
Shanghai University of Electric Power
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Jiangsu Electric Power Co Ltd
State Grid Chongqing Electric Power Co Ltd
State Grid Jibei Electric Power Co Ltd
Shanghai University of Electric Power
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Jiangsu Electric Power Co Ltd, State Grid Chongqing Electric Power Co Ltd, State Grid Jibei Electric Power Co Ltd, Shanghai University of Electric Power, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811041608.3A priority Critical patent/CN109413141B/en
Publication of CN109413141A publication Critical patent/CN109413141A/en
Priority to PCT/CN2019/103689 priority patent/WO2020048395A1/en
Application granted granted Critical
Publication of CN109413141B publication Critical patent/CN109413141B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to the access method and system between a kind of power grid boss station, method includes: that the transparent access server of substation in advance registers provided service on global service manager;The service of transparent access server registration based on substation, the transparent access server of substation receive control centre and access the data service request that server is sent by the real-time transparent of main website;The transparent access server of the substation is according to the data service request received, returns to main website from the data of virtual data pond search request, and by the data found, while the transparent access server of the main website returns data to control centre's service application.Access method and system between a kind of power grid boss station provided by the invention, the content for solving substation's transmission is only limitted to " four is distant " data, the problem of causing the bottleneck that data use between upstream substation and downstream hub provides universal class type data supporting for enough complex large power grid operating analyses and crash analysis.

Description

Access method and system between a kind of power grid boss station
Technical field
The invention belongs to technical field of power dispatching automation, and in particular to access method between a kind of power grid boss station with System.
Background technique
Reliable data interaction is the important leverage of scheduling, field of power transformation system stable operation between power grid boss station.With Intelligent substation construction propulsion and deeply, intelligent substation use more new technologies, new equipment, boss station between number It is to be direct transferred with remote browse, alarm as the collection numerous types of data of representative from initial simple " four is distant " development according to interaction demand The mode being integrated;Meanwhile the data interaction between control centre also develop into from simple data forwarding with remotely have access to for The complicated data exchange mode of representative.
Traditional electric network data is forwarded step by step using specification, and main website and transformer substation end all need to do library to point, leads to transmission Content is only limitted to " four is distant " data, causes the bottleneck that data use between upstream substation and downstream hub, substation removes Mass data is detained in station except " four is distant ", it is more difficult to provide enough data supporting complex large power grid operating analyses and crash analysis It uses.
Summary of the invention
" four is distant " data are only limitted to solve the content of above-mentioned traditional substation's transmission, cause upstream substation and downstream The bottleneck that data use between control centre, substation's mass data in addition to " four is distant " are detained in station, it is more difficult to provide enough numbers The problem of using according to support complex large power grid operating analysis and crash analysis, the present invention provides the visits between a kind of power grid boss station Ask method, which comprises
The data service request of acquisition control centre, main website;
Service request based on the data obtains substation's servicelocation information, and the data service request is sent The substation being related to the location information;
Main website receives substation and determines the data returned according to the service request, and sends said data to described in initiation The control centre of data service request.
Preferably, the data service request of main website acquisition control centre includes:
The main website obtains the data service request of control centre by being set to the service access interface of main website.
Preferably, before the data service request that the main website obtains control centre, further includes:
Substation is registered by service provided by itself on global service manager.
Preferably, service request based on the data obtains substation's servicelocation information, and the data service is asked It asks and is sent to the substation that the location information is related to, comprising:
Service request carries out the inquiry of registered service to global service manager based on the data for main website, described in acquisition The corresponding substation of data service request, and the substation is sent by data service request.
Preferably, the substation determines that the data returned include: according to the service request
Substation is based on the service request and inquires whether to have the data service request corresponding in virtual data pond Data, if so, then returning to the data result of request to main website;
Otherwise, substation by data communication gateway machine from substation's station level or wall service acquisition data, will be described Return to main website after the object-oriented data processing of acquisition, while the objectification treated data buffer storage is to virtual data pond In.
It is preferably, described to send said data to before the control centre for initiating the data service request, further includes:
When the data service request is file, processing mode is to be transmitted with flow data in generic service agreement;
When the data service request is transmission metric data collection, remote control remote regulating operation, event and unit state, processing Mode is to be transmitted with object-oriented data collection in generic service agreement;
When the data service request is remote browse plant stand, processing mode is while including transmission plant stand graphic file Flow data, and transmission plant stand metric data object-oriented data collection.
Preferably, described send said data to initiates the control centre of the data service request and includes:
When it is flow data that main website, which receives data, the received flow data is packaged as file reverse and is fed to control centre's industry Business application;
When the received data of main website are object-oriented data collection, the data set is fed directly to control centre's business Using.
Preferably, the service access interface of the main website includes:
Substation model is obtained, plant stand figure is obtained, obtains plant stand digital & analog signal data, remote control remote regulating plant stand, obtains plant stand The information that direct transfers, remote browse plant stand are alerted, plant stand historical data and alarm is obtained, obtains plant stand protective relaying device information data The application service access interface of service.
A kind of access system between power grid boss station, comprising:
Transparent access client: the transparent access client is set to main website, comprising: service access interface module;
The service access interface is used for: obtaining the data service request of control centre;
Data obtaining module: service request based on the data obtains substation's servicelocation information, and by the data Service request is sent to the substation that the location information is related to;
Data acquisition module: main website receives substation and determines the data returned according to the service request, and by the data It is sent to the control centre for initiating the data service request.
It preferably, further include transparent access server end;
The transparent access server end is set to substation, comprising: application service interface module.
Preferably, data obtaining module includes information on services positioning unit;
The information on services positioning unit is used for main website, and service request is carried out to global service manager based on the data The inquiry of registered service obtains the corresponding substation of the data service request, and sends the son for data service request It stands.
Preferably, the data acquisition module includes data query unit and data return unit;
Whether the data query unit is based on the service request for substation and has inquired in virtual data pond The corresponding data of data service request are stated, if so, then returning to the data result of request to main website;
Otherwise, substation by data communication gateway machine from substation's station level or wall service acquisition data, will be described Return to main website after the object-oriented data processing of acquisition, while the objectification treated data buffer storage is to virtual data pond In;The data return unit is used to that the received flow data to be packaged as file when it is flow data that main website, which receives data, It feeds back to control centre's service application;
When the received data of main website are object-oriented data collection, the data set is fed directly to control centre's business Using.
Moreover compared with the immediate prior art, the application is also had the following beneficial effects:
1, the access method and system between a kind of power grid boss station provided by the invention, main website obtain the data of control centre Service request, service request, obtains substation's servicelocation information, and the data service request is sent based on the data The substation being related to the location information, main website receive substation and determine the data returned according to the service request, and will be described Data are sent to the control centre for initiating the data service request, and the content for solving traditional substation's transmission is only limitted to " four It is distant " data, the problem of causing the bottleneck that data use between upstream substation and downstream hub, for enough complicated big electricity Analysis of Isolated Net Running and crash analysis provide universal class type data supporting;
2, the access method and system between a kind of power grid boss station provided by the invention, changes between substation and regulation center The mode of the Point-to-Point Data interaction, traditional specification transmission " four is distant " and the warning information that use for a long time, realizes substation Grid operation data and monitoring of tools data " need to then can be used ";
3, the access method and system between a kind of power grid boss station provided by the invention, is that multiple regulation centers are direct simultaneously It provides and meets the physical data service ability of business demand, support any main website to the free access demand of any substation, from And regulation center is promoted to the online awareness ability of power grid and equipment running status, for safe and reliable, the economic fortune for ensureing power grid Row provides strong support, and has significant economic benefit and social benefit for dispatching of power netwoks operation.
Figure of description
Fig. 1 is method flow schematic diagram of the invention;
Fig. 2 is technical schematic diagram of the invention;
Fig. 3 is that the use diagram after transparent access system is implemented in the main and sub station deployment that the present invention arrives.
Specific embodiment
In order to better understand the present invention, below with reference to specific embodiment the present invention will be further explained explanation:
Embodiment 1
A kind of access method between power grid boss stands as shown in Figure 1::
Step 1: the data service request of acquisition control centre, main website;
Step 2: service request based on the data obtains substation's servicelocation information, and the data service is asked It asks and is sent to the substation that the location information is related to;
Step 3: main website receives substation and determines the data returned according to the service request, and sends said data to hair Play the control centre of the data service request.
Above-mentioned steps are explained in detail below with reference to Fig. 2, Fig. 3
Explanation between step 1: real-time transparent access tool utilizes Internet technology power grid boss stands, and realizes that boss stands and takes The transparent access of businessization, so that the station level of substation, cell device, and the types of applications at regulation center, as state is estimated Meter, SCADA etc. can provide its data resource serviceization publication, arbitrary node in dispatch data net, if safely with Permission license, can be to substation and regulation center random access.
Real-time transparent access tool is deployed in main station side and substation end simultaneously between power grid boss station, wherein substation end is real When transparent access server end, main station side be real-time transparent access client, real-time transparent access server end incited somebody to action Service provided by it is registered on global service manager.In this framework, there is a global service manager, each Main website disposes a real-time transparent service client, and a real-time transparent service server end is disposed in each substation.
Explanation to step 2:
The real-time transparent access tool for being deployed in main website, which provides, to be obtained substation model, obtains plant stand figure, obtains plant stand Digital & analog signal data, remote control remote regulating plant stand, acquisition plant stand alert the information that direct transfers, remote browse plant stand, obtain plant stand historical data With the application service access interface for alerting, obtaining the data services such as plant stand protective relaying device information.Control centre's service application It is required according to secondary safety protection, a data is initiated by the application service access interface of real-time transparent access tool client Service request.
The application service interface of real-time transparent access tool client judges the type of data service request, respectively with distribution Formula business datum stream process and the mode of object-oriented data collection are handled:
If a) data service request is to obtain substation model, obtain plant stand figure, the data for needing to transmit are file, with Flow data unit is transmitted in generic service agreement;
If b) data service request is to obtain plant stand digital & analog signal data, obtain plant stand historical data and alarm, acquisition Plant stand protective relaying device information, remote control remote regulating plant stand, acquisition plant stand alert the information that direct transfers, and the data for needing to transmit are to measure number According to collection, remote control remote regulating operation, event, unit state, transmitted with object-oriented data collection in generic service agreement;
It simultaneously include the flow data list of transmission plant stand graphic file if c) data service request is remote browse plant stand Member, and the object-oriented data collection of transmission plant stand metric data.
The transparent access data acquisition module of real-time transparent access client carries out the clothes of universe to global service manager Business inquiry, obtains substation's servicelocation information corresponding to the data service request of scheduling station service application, data is taken Business request accesses server end by the real-time transparent that the transparent access data acquisition module of client is dealt into corresponding substation.
Explanation to step 3:
After being deployed in the real-time transparent access received server-side to data service request at substation end, then inquiry first is by supervising Whether has the object of inquiry in the virtual data pond that control backstage resource pool, smart machine resource pool form, if so, then returning The data result of request;If it is not, being obtained by data communication gateway machine from substation's station level service or wall service Take required data.From the data buffer storage of substation's station level service acquisition in monitoring backstage resource pool, obtained from wall service The data buffer storage taken is in smart machine resource pool, in case follow-up data access uses.It is obtained from station level service, wall service The data taken need to carry out objectification processing before entering virtual data pond, are wanted with meeting the Compatible object modeling of dispatching terminal It asks.Data into virtual data pond have life cycle, when which reaches life cycle terminal, delete from virtual data pond It removes.Objectification data in virtual data pond are returned to the transparent access data of real-time transparent access client by substation service module Module.
The transparent access data module of real-time transparent access client receives the clothes that real-time transparent access server end returns Business data.If what is returned is flow data, it is packaged as file by data are received by flow data processing mode, returns to file to tune Spend center service application;If what is returned is object-oriented data collection, data set is returned into control centre's service application.
Embodiment 2
The invention further relates to the access systems between a kind of power grid boss station, comprising:
Transparent access client: the transparent access client is set to main website, comprising: service access interface module;
The service access interface is used for: obtaining the data service request of control centre;
Data obtaining module: service request based on the data obtains substation's servicelocation information, and by the data Service request is sent to the substation that the location information is related to;
Data acquisition module: main website receives substation and determines the data returned according to the service request, and by the data It is sent to the control centre for initiating the data service request.
It further include transparent access server end;
The transparent access server end is set to substation, comprising: application service interface module.
Data obtaining module includes information on services positioning unit;
The information on services positioning unit is used for main website, and service request is carried out to global service manager based on the data The inquiry of registered service obtains the corresponding substation of the data service request, and sends the son for data service request It stands.
Data acquisition module includes data query unit and data return unit;
Whether the data query unit is based on the service request for substation and has inquired in virtual data pond The corresponding data of data service request are stated, if so, then returning to the data result of request to main website;
Otherwise, substation by data communication gateway machine from substation's station level or wall service acquisition data, will be described Return to main website after the object-oriented data processing of acquisition, while the objectification treated data buffer storage is to virtual data pond In;The data return unit is used to that the received flow data to be packaged as file when it is flow data that main website, which receives data, It feeds back to control centre's service application;
When the received data of main website are object-oriented data collection, the data set is fed directly to control centre's business Using.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The above is only the embodiment of the present invention, are not intended to restrict the invention, all in the spirit and principles in the present invention Within, any modification, equivalent substitution, improvement and etc. done, be all contained in apply pending scope of the presently claimed invention it It is interior.

Claims (12)

1. the access method between a kind of power grid boss station, which is characterized in that the described method includes:
The data service request of acquisition control centre, main website;
Service request based on the data obtains substation's servicelocation information, and sends institute for the data service request State the substation that location information is related to;
Main website receives substation and determines the data returned according to the service request, and sends said data to and initiate the data The control centre of service request.
2. the access method between a kind of power grid boss station as described in claim 1, which is characterized in that the main website obtains scheduling The data service request at center includes:
The main website obtains the data service request of control centre by being set to the service access interface of main website.
3. the access method between a kind of power grid boss station as described in claim 1, which is characterized in that obtain and adjust in the main website Before the data service request at degree center, further includes:
Substation is registered by service provided by itself on global service manager.
4. the access method between a kind of power grid boss station as claimed in claim 3, which is characterized in that service based on the data Request obtains substation's servicelocation information, and sends the substation that the location information is related to for the data service request, Include:
Service request carries out the inquiry of registered service to global service manager based on the data for main website, obtains the data The corresponding substation of service request, and the substation is sent by data service request.
5. the access method between a kind of power grid boss station as described in claim 1, which is characterized in that the substation is according to Service request determines that the data returned include:
Substation is based on the service request inquires whether have the corresponding data of the data service request in virtual data pond, If so, then returning to the data result of request to main website;
Otherwise, substation passes through data communication gateway machine from substation's station level or wall service acquisition data, by the acquisition Object-oriented data processing after return to main website, while the objectification treated data buffer storage is into virtual data pond.
6. the access method between a kind of power grid boss station as described in claim 1, which is characterized in that described to send out the data It is sent to before the control centre for initiating the data service request, further includes:
When the data service request is file, processing mode is to be transmitted with flow data in generic service agreement;
When the data service request is transmission metric data collection, remote control remote regulating operation, event and unit state, processing mode To be transmitted with object-oriented data collection in generic service agreement;
When the data service request is remote browse plant stand, processing mode is while including the stream for transmitting plant stand graphic file Data, and the object-oriented data collection of transmission plant stand metric data.
7. the access method between a kind of power grid boss station as claimed in claim 6, which is characterized in that described to send out the data It is sent to and initiates the control centre of the data service request and include:
When it is flow data that main website, which receives data, the received flow data is packaged as file reverse it is fed to control centre's business answering With;
When the received data of main website are object-oriented data collection, the data set is fed directly to control centre's business and is answered With.
8. the access method between a kind of power grid boss station as claimed in claim 2, which is characterized in that the service of the main website is visited Ask that interface includes:
Substation model is obtained, plant stand figure is obtained, obtains plant stand digital & analog signal data, remote control remote regulating plant stand, obtains plant stand alarm Direct transfer information, remote browse plant stand, acquisition plant stand historical data and alarm, acquisition plant stand protective relaying device information data service Application service access interface.
9. the access system between a kind of power grid boss station characterized by comprising
Transparent access client: the transparent access client is set to main website, comprising: service access interface module;
The service access interface is used for: obtaining the data service request of control centre;
Data obtaining module: service request based on the data obtains substation's servicelocation information, and by the data service Request is sent to the substation that the location information is related to;
Data acquisition module: main website receives substation and determines the data returned according to the service request, and the data are sent To the control centre for initiating the data service request.
10. the access system between a kind of power grid boss station as claimed in claim 9, which is characterized in that further include transparent access Server end;
The transparent access server end is set to substation, comprising: application service interface module.
11. the access system between a kind of power grid boss station as claimed in claim 9, which is characterized in that data obtaining module packet Include information on services positioning unit;
The information on services positioning unit for main website, infused to global service manager based on the data by service request The inquiry of volume service, obtains the corresponding substation of the data service request, and send the substation for data service request.
12. the access system between a kind of power grid boss station as claimed in claim 9, which is characterized in that the data acquisition mould Block includes data query unit and data return unit;
The data query unit is based on the service request inquires whether have the number in virtual data pond for substation According to the corresponding data of service request, if so, then returning to the data result of request to main website;
Otherwise, substation passes through data communication gateway machine from substation's station level or wall service acquisition data, by the acquisition Object-oriented data processing after return to main website, while the objectification treated data buffer storage is into virtual data pond;Institute Data return unit is stated for the received flow data being packaged as file reverse and is fed to when it being flow data that main website, which receives data, Control centre's service application;
When the received data of main website are object-oriented data collection, the data set is fed directly to control centre's business and is answered With.
CN201811041608.3A 2018-09-07 2018-09-07 Access method and system between main station and sub-station of power grid Active CN109413141B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811041608.3A CN109413141B (en) 2018-09-07 2018-09-07 Access method and system between main station and sub-station of power grid
PCT/CN2019/103689 WO2020048395A1 (en) 2018-09-07 2019-08-30 Method and system for access between main station and sub-station of power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811041608.3A CN109413141B (en) 2018-09-07 2018-09-07 Access method and system between main station and sub-station of power grid

Publications (2)

Publication Number Publication Date
CN109413141A true CN109413141A (en) 2019-03-01
CN109413141B CN109413141B (en) 2022-03-18

Family

ID=65464564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811041608.3A Active CN109413141B (en) 2018-09-07 2018-09-07 Access method and system between main station and sub-station of power grid

Country Status (2)

Country Link
CN (1) CN109413141B (en)
WO (1) WO2020048395A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020048395A1 (en) * 2018-09-07 2020-03-12 中国电力科学研究院有限公司 Method and system for access between main station and sub-station of power grid
CN111447180A (en) * 2020-03-04 2020-07-24 国电南瑞科技股份有限公司 Security access control strategy for power Internet of things edge access management system
CN112291091A (en) * 2020-10-26 2021-01-29 积成电子股份有限公司 Resource sharing method for substation data communication gateway machine
CN114157691A (en) * 2021-11-30 2022-03-08 国网安徽省电力有限公司 Data customization system and method for information transparent interaction between main stations and sub stations
CN115047819A (en) * 2022-05-17 2022-09-13 北京万昇智能科技有限公司 PLC system, PLC data transmission method and device

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111782221A (en) * 2020-06-29 2020-10-16 中国电力科学研究院有限公司 Automatic deployment system and method of power grid dispatching control system
CN111914518A (en) * 2020-08-11 2020-11-10 广东电网有限责任公司广州供电局 Ticket name list file updating method applied to programmed operation of transformer substation
CN112383138A (en) * 2020-10-14 2021-02-19 北京四方继保工程技术有限公司 Relay protection data service method and master station system thereof
CN114095492A (en) * 2021-11-16 2022-02-25 许昌许继软件技术有限公司 Data transmission method and system for main and sub-stations of power system and electronic equipment
CN114089972A (en) * 2021-11-16 2022-02-25 上海许继电气有限公司 Intelligent configuration and checking device and method for main substation and substation of information protection system based on SpringCloud
CN114355809A (en) * 2021-12-28 2022-04-15 国网天津市电力公司营销服务中心 Special transformer user data acquisition master station system based on novel ammeter and transformation method
CN115065702B (en) * 2022-06-17 2024-03-26 国电南瑞科技股份有限公司 New energy data access system and method suitable for new generation scheduling master station
CN116743618B (en) * 2023-08-14 2023-10-24 武汉华瑞测智能技术有限公司 Data acquisition and analysis method, equipment and medium of station remote equipment
CN117436671B (en) * 2023-12-20 2024-03-29 山东信诚同舟电力科技有限公司 Relay protection reconstruction method and system for cooperation of main station and sub station of grid-connected power plant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104600849A (en) * 2015-02-25 2015-05-06 国电南瑞科技股份有限公司 Smart power grid master station and substation depth anti-misoperation system implementation method
CN106953918A (en) * 2017-03-23 2017-07-14 国电南瑞科技股份有限公司 Boss's station programming control system and method based on generic service agreement
CN107071013A (en) * 2017-03-30 2017-08-18 国网福建省电力有限公司 A kind of the service response method and service system of intelligent substation access regulation and control main website
CN108345618A (en) * 2017-01-24 2018-07-31 中国电力科学研究院 A kind of scheduling station service data access and treating method and apparatus

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0444207B1 (en) * 1989-09-19 1996-12-27 Fujitsu Limited Multiple access system for a communication network
CN104580223A (en) * 2015-01-13 2015-04-29 国电南瑞科技股份有限公司 SOA-based real-time communication method between dispatching center and transformer substations
CN107515741A (en) * 2017-07-11 2017-12-26 中国电力科学研究院 The lightweight transmission method and device of data between a kind of transformer station and main website
CN109413141B (en) * 2018-09-07 2022-03-18 中国电力科学研究院有限公司 Access method and system between main station and sub-station of power grid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104600849A (en) * 2015-02-25 2015-05-06 国电南瑞科技股份有限公司 Smart power grid master station and substation depth anti-misoperation system implementation method
CN108345618A (en) * 2017-01-24 2018-07-31 中国电力科学研究院 A kind of scheduling station service data access and treating method and apparatus
CN106953918A (en) * 2017-03-23 2017-07-14 国电南瑞科技股份有限公司 Boss's station programming control system and method based on generic service agreement
CN107071013A (en) * 2017-03-30 2017-08-18 国网福建省电力有限公司 A kind of the service response method and service system of intelligent substation access regulation and control main website

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020048395A1 (en) * 2018-09-07 2020-03-12 中国电力科学研究院有限公司 Method and system for access between main station and sub-station of power grid
CN111447180A (en) * 2020-03-04 2020-07-24 国电南瑞科技股份有限公司 Security access control strategy for power Internet of things edge access management system
CN112291091A (en) * 2020-10-26 2021-01-29 积成电子股份有限公司 Resource sharing method for substation data communication gateway machine
CN114157691A (en) * 2021-11-30 2022-03-08 国网安徽省电力有限公司 Data customization system and method for information transparent interaction between main stations and sub stations
CN115047819A (en) * 2022-05-17 2022-09-13 北京万昇智能科技有限公司 PLC system, PLC data transmission method and device
CN115047819B (en) * 2022-05-17 2023-05-09 南京昇榕智能科技有限公司 PLC system, PLC data transmission method and device

Also Published As

Publication number Publication date
CN109413141B (en) 2022-03-18
WO2020048395A1 (en) 2020-03-12

Similar Documents

Publication Publication Date Title
CN109413141A (en) Access method and system between a kind of power grid boss station
US11825547B2 (en) System, method and apparatus for virtual building management
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN102227122B (en) Platform-independent protocol modularized system
CN106506670B (en) A kind of cloud platform virtual resource high speed dispatching method and system
CN103700031A (en) Electric power warning information publishing method in regulation and control integration mode
CN110347694B (en) Equipment monitoring method, device and system based on Internet of things
CN106054766A (en) Remote monitoring, detection, maintenance and management method for fire control facilities and information system
WO2020052133A1 (en) Gateway communication method, gateway, and energy system
CN112613024A (en) Data interaction method, device and system and storage medium
CN111526193B (en) Distributed weather station system based on fog calculation and block chain platform and working method
CN104009887A (en) Automatic speed testing method applied to network resource optimization
CN107608272A (en) A kind of workshop appliance monitoring system based on Powerlink
CN113572257B (en) Protocol and model matching-based power distribution Internet of things side-end interaction method and system
CN110932393B (en) Substation information protection master station system and data initialization method thereof
CN105245579A (en) Power distribution network system massive data communication processing method and system
CN109783064A (en) A kind of intelligent use integrated development system based on big data
CN104993970A (en) Centralized monitoring method of distributed system key operation index data
KR101614208B1 (en) Agent system for operating intelligent system of digital substation and method for operating the same
CN103152786A (en) Method of uplink and downlink message routing of service gateway of internet of things
CN109149637A (en) Open monitoring management grid-connected system and its monitoring management method
CN101650565B (en) Automatic stereoscopic warehouse management system and method based on B/S framework
CN104113454A (en) Gasoline station intelligent controller and communication system based on the same
CN108345618A (en) A kind of scheduling station service data access and treating method and apparatus
CN115730780A (en) OMS (operation management system) ticket overhauling system and method of comprehensive scheduling terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant