CN109342100A CN201811445886.5A CN201811445886A CN109342100A CN 109342100 A CN109342100 A CN 109342100A CN 201811445886 A CN201811445886 A CN 201811445886A CN 109342100 A CN109342100 A CN 109342100A
Authority
CN
China
Prior art keywords
pressure
line
fracturing device
preset
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811445886.5A
Other languages
Chinese (zh)
Other versions
CN109342100B (en
Inventor
王庆群
彭平生
王云海
李莉莉
肖勇
石权
刘灼
范杰
陆英娜
赵萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petrochemical Corp
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Original Assignee
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Equipment Corp, Sinopec Siji Petroleum Machinery Co Ltd filed Critical Sinopec Oilfield Equipment Corp
Priority to CN201811445886.5A priority Critical patent/CN109342100B/en
Publication of CN109342100A publication Critical patent/CN109342100A/en
Application granted granted Critical
Publication of CN109342100B publication Critical patent/CN109342100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The present invention provides a kind of frac system pressure testing control method, comprising the following steps: S1, closes the valve of the discharge line of fracturing device;S2, controller export one section of pulse signal, drive the motor of fracturing device to rotate, make the pressure rise of discharge line, the pressure sensor output pressure signal of discharge line;S3, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to exporting one section of identical pulse signal again, drive the motor of fracturing device to rotate, make the pressure rise of discharge line, until reaching preset pressure value;The pressure testing operation of frac system is realized by above step.The present invention can greatly improve the safety of pressure testing operation, improve pressure testing efficiency.

Description

Frac system pressure testing control method
Technical field
The present invention relates to oil drilling and extracting equipment field, especially a kind of frac system pressure testing control method.
Background technique
Fracturing work is a kind of main volume increase stable yields measure in oilfield prospecting developing, utilizes more powerful pressure breaks Equipment forms frac system, as shown in fig. 1, carries out pressure break to reservoir rock and forms flow-guiding channel.With ultradeep well, level The power of the development of well technology, required Frac unit is increasing, and the weight and volume of separate unit pressure break equipment is also increasing.Example If the output pressure of existing equipment reaches 175Mpa, since pressure is higher, needed before each shutdown is put back into setting It is standby to carry out pressure testing, it is ensured that equipment working state is good.Under the lower operating condition of pressure, generallys use manual control and carries out pressure testing, The program is higher to the risk of equipment and personnel under high pressure operating condition, and existing operation scheme is difficult to meet the requirements.Existing skill There is not yet related record in art.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of frac system pressure testing control methods, can be improved high pressure work Under condition, the safety of pressure testing operation.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of frac system pressure testing control method, The following steps are included:
S1, the valve of the discharge line of fracturing device is closed;
S2, controller export one section of pulse signal, drive the motor of fracturing device to rotate, make the pressure rise of discharge line, arrange The pressure sensor output pressure signal of pipeline out;
S3, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, drives the motor of fracturing device to rotate, makes the pressure rise of discharge line, until reaching pre- If pressure value;
The pressure testing operation of frac system is realized by above step.
In preferred scheme, the pulse signal is the pulse signal in one section of preset time, when it is 0.1 ~ 3 second a length of.
It is further comprising the steps of in preferred scheme:
After S4, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports fault alarm;
The pressure testing operation of frac system is realized by above step.
It is further comprising the steps of in preferred scheme:
S5, each fracturing device discharge line connect with trunk line by tap line, trunk line and bus pipeline company It connects, branch line valve and branch line pressure sensor is equipped in tap line, main line valve and main line pressure are equipped on trunk line Force snesor is equipped with bus valve and total line pressure sensor on bus pipeline;
Branch line valve is closed, pressure testing operation is carried out to each fracturing device;
The pressure testing operation of each branch line is completed, then is sequentially completed the pressure testing operation of main line and bus.
In preferred scheme, the pressure testing operation of each branch line is synchronous to carry out.
It is further comprising the steps of in preferred scheme:
S6, faulty fracturing device is disconnected, closes main line valve, opens branch line valve corresponding to each fracturing device, closed Close main line valve;
Controller one section of pulse signal of output of S7, any one or more fracturing devices, drive the motor of fracturing device to rotate, Make the pressure rise of discharge line, mains pressure sensor output pressure signal;
S8, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, drives the motor of fracturing device to rotate, makes the pressure rise of discharge line, until reaching pre- If pressure value;
After S9, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then main line pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports the fault alarm of trunk line;
S10, bus valve is closed, opens main line valve;
Controller one section of pulse signal of output of S11, any one or more fracturing devices, drive the motor of fracturing device to revolve Turn, makes the pressure rise of discharge line, total line pressure sensor output pressure signal;
S12, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, drives the motor of fracturing device to rotate, makes the pressure rise of discharge line, until reaching pre- If pressure value, pressure maintaining;
After S13, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then bus pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value, then the fault alarm of output bus pipeline;
The pressure testing operation of the frac system with multiple fracturing devices is completed by above step.
The preset pressure value is 145 ~ 175Mpa.
In the case of the confirmation of a set of fracturing device is reliable, with fixed pulse signal, pressure buildup curve is obtained, and with The pressure buildup curve of the more reliable fracturing devices of confirmation is modified;
The pressure buildup curve of the pressure testing operation of subsequent equipment is recorded, is compared with the pressure buildup curve of standard It is right, quickly to confirm the current equipment for carrying out pressure testing with the presence or absence of failure or potential faults.
A kind of frac system pressure testing control method provided by the invention, can greatly improve the safety of pressure testing operation, mention High pressure testing efficiency in the preferred scheme, being capable of quick positioning failure using the scheme of grouping and nominal pressure growth curve Point.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 is the overall structure diagram of frac system of the invention.
Fig. 2 is the structural schematic diagram of single fracturing device in the present invention.
Fig. 3 is the pressure testing flow diagram of fracturing device in the present invention.
Fig. 4 is the pressure buildup curve synoptic diagram of frac system in the present invention.
In figure: fracturing device 1, double extension shaft motor 101, clutch 102, multicylinder pump 103, discharge line 104, tap line 2, branch line valve 21, branch line pressure sensor 22, trunk line 3, main line valve 31, mains pressure sensor 32, bus pipeline 4, bus valve 41, total line pressure sensor 42, surge tank 5, well head 6.
Specific embodiment
The structure of fracturing device 1 is as shown in Figure 2, and two output shafts of double extension shaft motor 101 pass through clutch 102 and more Cylinder pump 103 connects, multiple piston pumps that multicylinder pump 103 is driven using crankshaft, and the position of pump head by feed liquor check valve and enters Piping connection is connect into pipeline with mixing device, and the position of pump head is connect by drain check valve with discharge line 104, is arranged Pipeline 104 is equipped with valve and pressure sensor out.
Embodiment 1:
In Fig. 3, a kind of frac system pressure testing control method, comprising the following steps:
S1, the valve of the discharge line 104 of fracturing device 1 is closed;
S2, controller export one section of pulse signal, and the motor rotation of driving fracturing device 1 makes the pressure liter of discharge line 104 Height, the pressure sensor output pressure signal of discharge line 104;Preferably, the pulse signal is in one section of preset time Pulse signal, when it is 0.1 ~ 2 second a length of.Command signal of the pulse signal as motor inverter, motor inverter control motor Rotation.
S3, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to One section of identical pulse signal is exported again, and the motor rotation of driving fracturing device 1 makes the pressure rise of discharge line 104, directly To reaching preset pressure value;In preferred scheme, the preset pressure value is 145 ~ 175Mpa.175Mpa is used in this example.
After S4, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is carried out with preset pressure value Compare, if current pressure values, in the setting range section of preset pressure value, then pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports fault alarm;
The pressure testing operation of frac system is realized by above step.By using short-time pulse plus the side for implementing pressure feedback Case, present invention ensures that the safety and reliability of fracturing device pressure testing process.The probability for personnel, equipment loss occur is dropped to It is minimum.
It is further preferred that in the case of a set of fracturing device 1 confirms reliable, with fixed pulse signal, by upper The method stated obtains pressure buildup curve, as shown in Figure 4.And it is bent with the pressure buildup of the more reliable fracturing devices 1 of confirmation Line is modified, and is recorded to the pressure buildup curve of the pressure testing operation of subsequent fracturing device 1, the pressure buildup with standard Curve is compared, so as to quickly confirm the current fracturing device 1 for carrying out pressure testing with the presence or absence of failure or potential faults.
Embodiment 2:
On the basis of embodiment 1, further comprising the steps of in preferred scheme:
The discharge line 104 of S5, as shown in figure 1, each fracturing device 1 are connect by tap line 2 with trunk line 3, main line pipe Road 3 is connect with bus pipeline 4, branch line valve 21 and branch line pressure sensor 22 is equipped in tap line 2, in trunk line 3 It is equipped with main line valve 31 and mains pressure sensor 32, bus valve 41 and bus pressure sensing are equipped on bus pipeline 4 Device 42;Preferably, each trunk line 3 is connect with surge tank 5, and surge tank 5 is connect with bus pipeline 4.Multiple silos and mulling Device connection, multiple flow containers are connect with mixing device, and the mixing device is one or more.Mixing device passes through low-voltage tube The management that enters of road and each fracturing device 1 connects.
Branch line valve 21 is closed, pressure testing operation is carried out to each fracturing device 1;
The pressure testing operation of each branch line is completed, then is sequentially completed the pressure testing operation of main line and bus.
In preferred scheme, the pressure testing operation of each branch line is synchronous to carry out.
S6, faulty fracturing device 1 is disconnected, closes main line valve 31, opens branch line corresponding to each fracturing device 1 Valve 21 closes main line valve 31;
Controller one section of pulse signal of output of S7, any one or more fracturing devices 1, the motor rotation of driving fracturing device 1 Turn, makes the pressure rise of discharge line 104,32 output pressure signal of mains pressure sensor;
S8, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, the motor rotation of driving fracturing device 1 makes the pressure rise of discharge line 104, until reaching To preset pressure value;
After S9, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then main line pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports the fault alarm of trunk line 3;
S10, bus valve 41 is closed, opens main line valve 31;
Controller one section of pulse signal of output of S11, any one or more fracturing devices 1, the motor rotation of driving fracturing device 1 Turn, makes the pressure rise of discharge line 104, total 42 output pressure signal of line pressure sensor;
S12, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, the motor rotation of driving fracturing device 1 makes the pressure rise of discharge line 104, until reaching To preset pressure value, pressure maintaining;
After S13, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then bus pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value, then the fault alarm of output bus pipeline 4;
The pressure testing operation of the frac system with multiple fracturing devices 1 is completed by above step.
Embodiment 3:
In another optional scheme, a kind of frac system pressure testing control method, comprising the following steps:
S01, each fracturing device 1 discharge line 104 connect with trunk line 3 by tap line 2, trunk line 3 with always Spool road 4 connects, and branch line valve 21 and branch line pressure sensor 22 are equipped in tap line 2, is equipped on trunk line 3 dry Line valve 31 and mains pressure sensor 32 are equipped with bus valve 41 and total line pressure sensor 42 on bus pipeline 4;
Bus valve 41 is closed, master controller, which provides signal, makes branch controller control 1 output pressure of fracturing device of a part;
42 output pressure signal of total line pressure sensor, master controller receive pressure signal, are compared with preset pressure value;
S02, it is grouped again, master controller, which provides signal, makes the branch controller output pressure of a part;
42 output pressure signal of total line pressure sensor, master controller receive pressure signal, are compared with preset pressure value;
S03, it is grouped again again, master controller, which provides signal, makes the branch controller output pressure of part;
S04, step S02 ~ S03 is successively executed, the fracturing device for controlling all branch controllers both participates in output pressure;
S05, when total line pressure sensor 42 feedback pressure reach setting value, pressure maintaining;
After pressure maintaining for a period of time, the current pressure signal that total line pressure sensor 42 exports is read, is carried out with preset pressure value Compare, if current pressure values, in the setting range section of preset pressure value, then pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports fault alarm, startup separator positioning step Suddenly;
The Quick-action pressure-testing operation of frac system is realized by above step.In pressure testing operation process, additionally it is possible to quickly positioning event Barrier point.
In preferred scheme such as Fig. 4, the pressure in pressure testing operation process, after recording packet conditions and each pressure testing operation Value, obtains actual pressure growth curve;
Actual pressure growth curve is compared with preset pressure buildup curve, according to the note of differential position and packet conditions Record, quick fault location.
In preferred scheme, every time after grouping, the quantity of the fracturing device 1 of output pressure is consistent, and is exported every time Pulse signal is consistent.Group technology in this example is grouped scheme using formula on duty by turns, for example, 10 sets of fracturing devices 1 are organized into groups It is 01 ~ No. 10, with 2 for one group of carry out pressure testing, first group is 01, No. 02, and second group is 02, No. 03, and so on.Ensure every A set of fracturing device 1 both participates in the output of pressure testing at least once, it is preferably ensured that there is 2 times or more pressure testing output.
In preferred scheme, if actual pressure growth curve and preset pressure buildup curve are in the position that each pressure testing exports It sets and has differences, then fault location is in bus pipeline 4.
In preferred scheme, corresponding packet conditions are inquired according to discrepancy and are recorded, occur more pressure break in a packet The probability of failure of device 1 is higher.Such as had differences in the position for the pressure testing output for thering is No. 03 fracturing device 1 to participate in every time, Then fault location is in No. 03 fracturing device 1 and its tap line 2 connected, by No. 03 independent pressure testing of fracturing device 1, then Fault point can be found quickly, after finding fault point, is opened the tables of equipment of fault point is arbitrary, such as by certain in fracturing device 1 One or two clutch 102 disconnect, re-start more than step, until all fault points exclude.When the number of fracturing device 1 Amount is greater than the quantity for the group member being grouped every time, and can ensure that every suit fracturing device 1 both participates in pressure testing output at least once, The actual pressure growth curve then obtained is unrelated with the quantity of fracturing device 1.
In preferred scheme, preset pressure buildup curve using trouble-free frac system by identical number of packet and The pulse measure of output obtains.In preferred scheme, the preset pressure value is 145 ~ 175Mpa.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this hair Bright protection scope should be with the technical solution of claim record, technical characteristic in the technical solution recorded including claim Equivalents are protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.Cause The length of record is limited, and fails to be illustrated all assembled schemes in this example, and therefore, the technology in above-described embodiment is special Sign, under the premise of not conflicting mutually, can be combined with each other to generate more technical solutions.

Claims (8)

1. a kind of frac system pressure testing control method, it is characterized in that the following steps are included:
S1, the valve of the discharge line (104) of fracturing device (1) is closed;
S2, controller export one section of pulse signal, and the motor rotation of driving fracturing device (1) makes the pressure of discharge line (104) It increases, the pressure sensor output pressure signal of discharge line (104);
S3, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, the motor rotation of driving fracturing device (1) makes the pressure rise of discharge line (104), directly To reaching preset pressure value;
The pressure testing operation of frac system is realized by above step.
2. a kind of frac system pressure testing control method according to claim 1, it is characterized in that: the pulse signal is one Section preset time in pulse signal, when it is 0.1 ~ 3 second a length of.
3. a kind of frac system pressure testing control method according to claim 1 or 2, it is characterized in that further comprising the steps of:
After S4, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports fault alarm;
The pressure testing operation of frac system is realized by above step.
4. a kind of frac system pressure testing control method according to claim 3, it is characterized in that further comprising the steps of:
S5, each fracturing device (1) discharge line (104) connect with trunk line (3) by tap line (2), main line pipe Road (3) is connect with bus pipeline (4), and branch line valve (21) and branch line pressure sensor (22) are equipped on tap line (2), Trunk line (3) is equipped with main line valve (31) and mains pressure sensor (32), and bus valve is equipped on bus pipeline (4) (41) and total line pressure sensor (42);
It closes branch line valve (21), pressure testing operation is carried out to each fracturing device (1);
The pressure testing operation of each branch line is completed, then is sequentially completed the pressure testing operation of main line and bus.
5. a kind of frac system pressure testing control method according to claim 4, it is characterized in that: the pressure testing of each branch line is made Industry, it is synchronous to carry out.
6. a kind of frac system pressure testing control method according to claim 4, it is characterized in that further comprising the steps of:
S6, faulty fracturing device (1) is disconnected, closes main line valve (31), opens branch corresponding to each fracturing device (1) Line valve (21) is closed main line valve (31);
Controller one section of pulse signal of output of S7, any one or more fracturing devices (1), drive the electricity of fracturing device (1) Machine rotation, makes the pressure rise of discharge line (104), mains pressure sensor (32) output pressure signal;
S8, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, the motor rotation of driving fracturing device (1) makes the pressure rise of discharge line (104), directly To reaching preset pressure value;
After S9, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then main line pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value then exports the fault alarm of trunk line (3);
S10, bus valve (41) are closed, opened main line valve (31);
Controller one section of pulse signal of output of S11, any one or more fracturing devices (1), drive the electricity of fracturing device (1) Machine rotation, makes the pressure rise of discharge line (104), total line pressure sensor (42) output pressure signal;
S12, controller receive pressure signal, are compared with preset pressure value, the pressure maintaining if reaching, if not up to again One section of identical pulse signal is exported, the motor rotation of driving fracturing device (1) makes the pressure rise of discharge line (104), directly To reaching preset pressure value, pressure maintaining;
After S13, pressure maintaining for a period of time, the current pressure signal of pressure sensor output is read, is compared with preset pressure value Compared with if current pressure values, in the setting range section of preset pressure value, then bus pressure testing is completed;
If current pressure values, the setting range section beyond preset pressure value, then the fault alarm of output bus pipeline (4);
The pressure testing operation of the frac system with multiple fracturing devices (1) is completed by above step.
7. according to claim 1 ~ 2,4 ~ 6 described in any item a kind of frac system pressure testing control methods, it is characterized in that: described Preset pressure value is 145 ~ 175Mpa.
8. according to claim 1 ~ 2,4 ~ 6 described in any item a kind of frac system pressure testing control methods, it is characterized in that: a set of In the case of fracturing device (1) confirmation is reliable, with fixed pulse signal, pressure buildup curve is obtained, and can with more confirmations The pressure buildup curve of the fracturing device (1) leaned on is modified;
The pressure buildup curve of the pressure testing operation of subsequent equipment is recorded, is compared with the pressure buildup curve of standard It is right, quickly to confirm the current equipment for carrying out pressure testing with the presence or absence of failure or potential faults.
CN201811445886.5A 2018-11-29 2018-11-29 Fracturing system pressure test control method Active CN109342100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811445886.5A CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811445886.5A CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Publications (2)

Publication Number Publication Date
CN109342100A true CN109342100A (en) 2019-02-15
CN109342100B CN109342100B (en) 2021-08-06

Family

ID=65318606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811445886.5A Active CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Country Status (1)

Country Link
CN (1) CN109342100B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112000042A (en) * 2020-08-26 2020-11-27 中石化四机石油机械有限公司 Multi-electric fracturing device equal network control system and method

Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2302520Y (en) * 1997-05-24 1998-12-30 郑福余 Reversed flow type on-site voltage-measuring apparatus for high-voltage construction
US20070157707A1 (en) * 2006-01-10 2007-07-12 Benteler Automobiltechnik Gmbh Apparatus for testing a rupture strength of a pipe
US20070172357A1 (en) * 2005-12-28 2007-07-26 Kazuhiro Saito Generator rotor crack propagation prediction system and operation conditions determination support system, method, and program, and operation control system
CN201355302Y (en) * 2008-12-29 2009-12-02 中国石化集团江汉石油管理局第四机械厂 Fracturing operation pressure testing device
CN102419257A (en) * 2011-12-16 2012-04-18 中国石化集团江汉石油管理局第四机械厂 Sand conveying test device of sand fracturing and mixing vehicle
CN102818680A (en) * 2012-08-20 2012-12-12 珠海格力电器股份有限公司 Pressure testing device
CN102944414A (en) * 2012-12-04 2013-02-27 中国石油大学(华东) Erosive abrasion test device for fracturing tool
CN103196762A (en) * 2013-04-25 2013-07-10 重庆地质矿产研究院 Experimental device and method for reforming shale gas reservoir through pulse hydraulic fracturing
US20140048158A1 (en) * 2012-08-17 2014-02-20 S.P.M. Flow Control, Inc. Automated relief valve control system and method
CN104153752A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic jetting tubing sand filling stratified multi-stage fracturing technology for horizontal well
CN104568405A (en) * 2014-12-25 2015-04-29 中国石油天然气集团公司 Slips strength test device and system
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN105181251A (en) * 2015-09-22 2015-12-23 山东康迪泰克工程橡胶有限公司 Pulse segmented pressure testing device and pressure testing method
CN104975852B (en) * 2015-06-25 2016-06-08 中国石油大学(北京) The diagnostic method of multistage frac water horizontal well oil-producing gas position and system thereof
CN205353793U (en) * 2015-12-31 2016-06-29 武汉博汇油田工程服务有限公司 Fracturing unit proving ground pipeline pressure control system
CN105735943A (en) * 2010-04-30 2016-07-06 S.P.M.流量控制股份有限公司 System and method TO TEST AND CERTIFY OIL AND GAS EQUIPMENT
CN205400702U (en) * 2016-02-25 2016-07-27 青岛地质工程勘察院 Hard strata shallow layer geothermal well fracturing unit
US9500068B2 (en) * 2010-11-12 2016-11-22 Ut-Battelle, Llc Cavitation-based hydro-fracturing simulator
CN205958188U (en) * 2016-08-19 2017-02-15 中国水利水电第三工程局有限公司 Pressure testing device
US9650882B2 (en) * 2014-12-16 2017-05-16 Caterpillar Inc. System for detecting leakage in a pump used in hydraulic fracturing
CN106677756A (en) * 2017-03-07 2017-05-17 库尔勒金川矿业有限公司 Active fracturing device for coal rock softening and coal rock fracturing construction process
US20170212535A1 (en) * 2012-08-17 2017-07-27 S.P.M. Flow Control, Inc. Field pressure test control system and methods
US20180024000A1 (en) * 2010-02-01 2018-01-25 Aps Technology, Inc. System and method for monitoring and controlling underground drilling
CN107764652A (en) * 2016-08-20 2018-03-06 王东玉 A kind of 210MPa production trees device for detecting water pressure
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
CN207194878U (en) * 2017-07-27 2018-04-06 中石化石油工程机械有限公司第四机械厂 A kind of electricity of single-machine double-pump structure drives pressure break equipment
CN107905776A (en) * 2017-12-04 2018-04-13 中国石油天然气股份有限公司 A kind of gas well fracturing drainage system and method
US10017374B1 (en) * 2014-09-16 2018-07-10 Roy Malcolm Moffitt, Jr. Refueling system for supplying fuel to fracturing equipment
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well
RU2667561C1 (en) * 2017-10-12 2018-09-21 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of multiple hydraulic fracturing of formation in open inclined well hole
CN108845038A (en) * 2018-07-04 2018-11-20 荆州市世纪派创石油机械检测有限公司 A kind of valve water test unit and test method

Patent Citations (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2302520Y (en) * 1997-05-24 1998-12-30 郑福余 Reversed flow type on-site voltage-measuring apparatus for high-voltage construction
US20070172357A1 (en) * 2005-12-28 2007-07-26 Kazuhiro Saito Generator rotor crack propagation prediction system and operation conditions determination support system, method, and program, and operation control system
US20070157707A1 (en) * 2006-01-10 2007-07-12 Benteler Automobiltechnik Gmbh Apparatus for testing a rupture strength of a pipe
CN201355302Y (en) * 2008-12-29 2009-12-02 中国石化集团江汉石油管理局第四机械厂 Fracturing operation pressure testing device
US20180024000A1 (en) * 2010-02-01 2018-01-25 Aps Technology, Inc. System and method for monitoring and controlling underground drilling
CN105735943A (en) * 2010-04-30 2016-07-06 S.P.M.流量控制股份有限公司 System and method TO TEST AND CERTIFY OIL AND GAS EQUIPMENT
US9500068B2 (en) * 2010-11-12 2016-11-22 Ut-Battelle, Llc Cavitation-based hydro-fracturing simulator
CN102419257A (en) * 2011-12-16 2012-04-18 中国石化集团江汉石油管理局第四机械厂 Sand conveying test device of sand fracturing and mixing vehicle
US20140048158A1 (en) * 2012-08-17 2014-02-20 S.P.M. Flow Control, Inc. Automated relief valve control system and method
US20170212535A1 (en) * 2012-08-17 2017-07-27 S.P.M. Flow Control, Inc. Field pressure test control system and methods
CN102818680A (en) * 2012-08-20 2012-12-12 珠海格力电器股份有限公司 Pressure testing device
CN102944414A (en) * 2012-12-04 2013-02-27 中国石油大学(华东) Erosive abrasion test device for fracturing tool
CN103196762A (en) * 2013-04-25 2013-07-10 重庆地质矿产研究院 Experimental device and method for reforming shale gas reservoir through pulse hydraulic fracturing
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN104153752A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic jetting tubing sand filling stratified multi-stage fracturing technology for horizontal well
US10017374B1 (en) * 2014-09-16 2018-07-10 Roy Malcolm Moffitt, Jr. Refueling system for supplying fuel to fracturing equipment
US9650882B2 (en) * 2014-12-16 2017-05-16 Caterpillar Inc. System for detecting leakage in a pump used in hydraulic fracturing
CN104568405A (en) * 2014-12-25 2015-04-29 中国石油天然气集团公司 Slips strength test device and system
CN104975852B (en) * 2015-06-25 2016-06-08 中国石油大学(北京) The diagnostic method of multistage frac water horizontal well oil-producing gas position and system thereof
CN105181251A (en) * 2015-09-22 2015-12-23 山东康迪泰克工程橡胶有限公司 Pulse segmented pressure testing device and pressure testing method
CN205353793U (en) * 2015-12-31 2016-06-29 武汉博汇油田工程服务有限公司 Fracturing unit proving ground pipeline pressure control system
CN205400702U (en) * 2016-02-25 2016-07-27 青岛地质工程勘察院 Hard strata shallow layer geothermal well fracturing unit
CN205958188U (en) * 2016-08-19 2017-02-15 中国水利水电第三工程局有限公司 Pressure testing device
CN107764652A (en) * 2016-08-20 2018-03-06 王东玉 A kind of 210MPa production trees device for detecting water pressure
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
CN106677756A (en) * 2017-03-07 2017-05-17 库尔勒金川矿业有限公司 Active fracturing device for coal rock softening and coal rock fracturing construction process
CN207194878U (en) * 2017-07-27 2018-04-06 中石化石油工程机械有限公司第四机械厂 A kind of electricity of single-machine double-pump structure drives pressure break equipment
RU2667561C1 (en) * 2017-10-12 2018-09-21 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of multiple hydraulic fracturing of formation in open inclined well hole
CN107905776A (en) * 2017-12-04 2018-04-13 中国石油天然气股份有限公司 A kind of gas well fracturing drainage system and method
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well
CN108845038A (en) * 2018-07-04 2018-11-20 荆州市世纪派创石油机械检测有限公司 A kind of valve water test unit and test method

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
A.M.RAAEN: "Stress determination from hydraulic fracturing tests:the system stiffness approach", 《INTERNATIONAL JOURNAL OF ROCK MECHANICS & MINING SCIENCES》 *
AMNIEH、HASSAN BAKHSHANDEH AND MAJID MASOUDI: "Estimating of Water Pressure to Avoid Hydraulic Fracturing in Water Pressure Test", 《COMPUTERS AND CONCRETE》 *
代海洋: "压裂砂堵实时监测与预警系统研究与应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》 *
吴志义: "《修井工程》", 31 March 1991, 石油工业出版社 *
张兴华: ""APR测试工艺在压裂测试井中的技术创新"", 《油气井测试》 *
张自印、韦红术,张俊斌等: "半潜式平台压裂测试技术创新与实践", 《长江大学学报(自然版)》 *
牟全斌: "井下穿层水钻孔水力压裂强化增透技术", 《中国安全生产科学技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112000042A (en) * 2020-08-26 2020-11-27 中石化四机石油机械有限公司 Multi-electric fracturing device equal network control system and method
CN112000042B (en) * 2020-08-26 2024-03-12 中国石油化工集团有限公司 Equal network control system and method for multi-electric fracturing device

Also Published As

Publication number Publication date
CN109342100B (en) 2021-08-06

Similar Documents

Publication Publication Date Title
WO2022222518A1 (en) Fracturing apparatus and control method therefor, and fracturing system
US7934562B2 (en) Hybrid control system and method
CN203431460U (en) Nuclear power plant electric main feed pump system, electric lubrication pump and control circuit of electric lubrication pump
CN103256015A (en) Wellhead back pressure controlling system of managed pressure drilling and wellhead back pressure controlling method
CN104454748A (en) Reliable comprehensive energy-saving hydraulic test device for gear pumps, overflow valves and one-way valves
CN109342100A (en) Frac system pressure testing control method
CN107327304A (en) TBM cutterheads are pressurized hydraulic control system of getting rid of poverty
CN104454791A (en) Parallel-energy-saving-technology-based hydraulic device for testing durability of hydraulic pumps and overflow valves
CN106194857A (en) Hydraulic lifting and automaton
CN203164663U (en) Intelligent protection device for oil extraction equipment
CN108006013B (en) Online detection system and detection method for hydraulic hoist
CN110219610B (en) Shale gas horizontal well high-pressure pumping bridge plug device
CN109632353A (en) Frac system pressure testing failure fast positioning method
CN204312437U (en) The synthesis energy saving experimental liquid pressure device of gear pump, relief valve and one-way valve reliability
CN204312460U (en) Based on the oil hydraulic pump of parallel power-saving technology and the endurance test hydraulic pressure installation of relief valve
CN103129919B (en) Electro-hydraulic control system of disc type braking device of mine belt conveyor
CN103899509A (en) Mining intelligent frequency-converting unattended emulsion pump station system
CN205721158U (en) A kind of underground coal mine automatic drainage control device
CN204716676U (en) Hydraulic power system
CN205101298U (en) Water base solution preventer controlling means
CN210798899U (en) Shale gas horizontal well high pressure pumping bridging plug device
CN210422597U (en) Pressure test nipple
CN105201932A (en) Water-based solution blowout preventer control device
CN202417908U (en) Stand press safety protection system of slurry pump
CN207212694U (en) A kind of control valve for water pump with overpressure alarm function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210930

Address after: 434020 Longshan Temple Street, Jingzhou District, Jingzhou, Hubei

Patentee after: SINOPEC SIJI PETROLEUM MACHINERY Co.,Ltd.

Patentee after: SINOPEC Group

Patentee after: SINOPEC OILFIELD EQUIPMENT Corp.

Address before: 434020 Longshan Temple Street, Jingzhou District, Jingzhou, Hubei

Patentee before: SINOPEC SIJI PETROLEUM MACHINERY Co.,Ltd.

Patentee before: SINOPEC OILFIELD EQUIPMENT Corp.