CN109323407A - Air conditioner, server, air-conditioning system and control method - Google Patents

Air conditioner, server, air-conditioning system and control method Download PDF

Info

Publication number
CN109323407A
CN109323407A CN201811161617.6A CN201811161617A CN109323407A CN 109323407 A CN109323407 A CN 109323407A CN 201811161617 A CN201811161617 A CN 201811161617A CN 109323407 A CN109323407 A CN 109323407A
Authority
CN
China
Prior art keywords
air conditioner
out capability
capability value
fan
operation phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811161617.6A
Other languages
Chinese (zh)
Inventor
罗羽钊
吴楠
刘燕飞
王侃
徐振坤
李金波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201811161617.6A priority Critical patent/CN109323407A/en
Publication of CN109323407A publication Critical patent/CN109323407A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/54Control or safety arrangements characterised by user interfaces or communication using one central controller connected to several sub-controllers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • F24F2110/12Temperature of the outside air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/20Humidity
    • F24F2110/22Humidity of the outside air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/60Energy consumption

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Human Computer Interaction (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses air conditioners, server, air-conditioning system and control method, wherein, the control method of air conditioner is the following steps are included: in air conditioner into after determining electricity operational mode, determine the object run power and the status information of each operation phase of each operation phase, and the object run power of status information and corresponding operation phase are sent to server, to determine target fan-out capability value and current fan-out capability value, air conditioner determines the operating parameter of air conditioner according to the target fan-out capability value and current fan-out capability value that receive, and it is run according to determining operating parameter.Thus, the power consumption of each operation phase is determined to realize that air conditioner determines electricity operation, to, family can be used to go to accurately control the operating parameter of air conditioner from the angle of power consumption, reach more energy-efficient purpose simultaneously, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.

Description

Air conditioner, server, air-conditioning system and control method
Technical field
The present invention relates to air conditioner technical field more particularly to a kind of control methods of air conditioner, a kind of control of server Method, a kind of air conditioner, a kind of server and a kind of air-conditioning system processed.
Background technique
Relevant air-conditioning system communication is controlled accordingly air conditioner, specifically according to temperature set by user Air conditioner power and other relevant parameters can be adjusted according to temperature set by user.
When user when the air conditioner is used, top-priority is the electricity consumption of air-conditioning system, and such case causes a lot to install empty The use demand of the user of tune reduces.
But present inventor has found at least the foregoing technology has the following technical problems: first, user, which can not be arranged, determines electricity Amount controls air conditioner operation.Second, air conditioner can not be according to self-operating status information to own power and other phases It closes parameter and carries out corresponding adjusting.
Summary of the invention
The present invention is directed to solve at least some of the technical problems in related technologies.For this purpose, of the invention First purpose is to propose a kind of control method of air conditioner, and this method can be realized air conditioner and determine electricity operation, and be promoted The accuracy and controllability of control.
Second object of the present invention is to propose a kind of control method of server.
Third object of the present invention is to propose a kind of air conditioner.
Fourth object of the present invention is to propose another air conditioner.
5th purpose of the invention is to propose a kind of computer readable storage medium.
6th purpose of the invention is to propose a kind of server.
7th purpose of the invention is to propose another server.
8th purpose of the invention is to propose another computer readable storage medium.
9th purpose of the invention is to propose a kind of air-conditioning system.
In order to achieve the above objectives, the control method for the air conditioner that first aspect present invention embodiment proposes includes: described Air conditioner determines the power consumption of multiple operation phase and each operation phase, and root into after determining electricity operational mode The object run power of each operation phase is determined according to the power consumption of each operation phase;In each operation rank Section also obtains the status information of the air conditioner, and the object run power of the status information and corresponding operation phase are sent out Give server, wherein the status information and corresponding object run power are used to indicate the server by prestoring Data determine target fan-out capability value and current fan-out capability value;Receive the target fan-out capability that the server is sent Value and the current fan-out capability value, determine the air-conditioning according to the target fan-out capability value and the current fan-out capability value The operating parameter of device, and run according to determining operating parameter.
The control method of the air conditioner proposed according to embodiments of the present invention, in air conditioner into after determining electricity operational mode, Firstly, determining the power consumption of multiple operation phase and each operation phase, and determined according to the power consumption of each operation phase The object run power of each operation phase, in addition, also obtain the status information of air conditioner in each operation phase, and by state The object run power of information and corresponding operation phase are sent to server, wherein status information and corresponding target fortune Row power is used to indicate server and determines target fan-out capability value and current fan-out capability value, and then basis by the data prestored Target fan-out capability value and current fan-out capability value that the server that air conditioner receives is sent determine the operating parameter of air conditioner, And it is run according to determining operating parameter.Determine the power consumption of each operation phase as a result, with realize air conditioner determine electricity operation, It is thus possible to which user is made to go to accurately control the operating parameter of air conditioner from the angle of power consumption, while reaching more energy-efficient Purpose, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
In addition, the control method of air conditioner according to the above embodiment of the present invention can also have following additional technology special Sign:
According to one embodiment of present invention, the power consumption of the determination multiple operation phase and each operation phase Amount includes: the target total power consumption for obtaining object run period and the object run period;To the object run Period carries out segment processing with the determination the multiple operation phase;Each operation is determined according to the target total power consumption The power consumption in stage.The power consumption of each operation phase is determined according to the target total power consumption of object run period as a result, with That realizes air conditioner determines electricity control.
According to one embodiment of present invention, by the object run period with equal part model split be the multiple fortune Row order section, and the target total power consumption is evenly distributed to the multiple operation phase, with determination each operation phase Power consumption.Target total power consumption is evenly distributed to multiple operation phase with equal part model split as a result, it is each to determine The power consumption of operation phase.
According to one embodiment of present invention, described according to the target fan-out capability value and the current fan-out capability value Determine the air conditioner operating parameter include: the current fan-out capability value and the target fan-out capability value difference it is exhausted When being greater than preset threshold to value, the current operating parameter of the air conditioner is adjusted, and run according to the operating parameter of adjustment.By This adjusts working as air conditioner when the absolute difference of current fan-out capability value and target fan-out capability value is greater than preset threshold Preceding operating parameter, and run according to the operating parameter of adjustment, to promote users'comfort.
According to one embodiment of present invention, described according to the target fan-out capability value and the current fan-out capability value Determine the operating parameter of the air conditioner further include: in the difference of the current fan-out capability value and the target fan-out capability value When absolute value is less than or equal to the preset threshold, the current operating parameter for controlling the air conditioner is remained unchanged, and according to institute Current operating parameter continuous service is stated, until meeting the termination condition of corresponding operation phase.As a result, in current fan-out capability value When being less than or equal to preset threshold with the absolute difference of target fan-out capability value, the current operating parameter for controlling air conditioner is kept It is constant, and according to current operating parameter continuous service, until meeting the termination condition of corresponding operation phase, to realize energy conservation Purpose.
According to one embodiment of present invention, the data prestored include being used to indicate operation power and fan-out capability value The table of relationship or history data including the air conditioner or include identical with the model of the air conditioner The history data of more air conditioners or include air conditioner model machine identical with the model of the air conditioner experiment test Data.Server determines target fan-out capability value and current fan-out capability value by the data prestored as a result, and is sent to air-conditioning Device, further to be controlled air conditioner.
In order to achieve the above objectives, the control method for the server that second aspect of the present invention embodiment proposes includes following step It is rapid: to receive the status information and object run power that the air conditioner was sent in each operation phase, wherein each fortune The object run power of row order section enters the consumption determined after electricity operational mode according to each operation phase by the air conditioner Electricity determines;According to the data prestored and the object run power and status information that receive determine target fan-out capability value and Current fan-out capability value, and the target fan-out capability value and the current fan-out capability value order are sent to the air conditioner, Wherein, the target fan-out capability value and the current fan-out capability value are used to indicate the air conditioner and determine operating parameter.
The control method of the server proposed according to embodiments of the present invention, firstly, receiving air conditioner in each operation phase The status information and object run power of transmission, wherein it is fixed that the object run power of each operation phase is entered by air conditioner It is determined after electricity operational mode according to the power consumption of each operation phase, in turn, according to the data prestored and the mesh received Mark operation power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and work as Preceding fan-out capability value is sent to air conditioner, wherein it is true that target fan-out capability value and current fan-out capability value are used to indicate air conditioner Determine operating parameter.Server determines mesh according to the data prestored and the object run power and status information that receive as a result, Fan-out capability value and current fan-out capability value are marked, and target fan-out capability value and current fan-out capability value are sent to air conditioner, To indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
In addition, the control method of server according to the above embodiment of the present invention can also have following additional technology special Sign:
According to one embodiment of present invention, the status information of the air conditioner includes indoor environment parameter and outdoor environment Parameter, wherein data that the basis prestores and the object run power and status information that receive determine that target exports energy Force value includes: after receiving the object run power, the indoor environment parameter and the Outdoor Air Parameters, according to described Indoor environment parameter and Outdoor Air Parameters and the data prestored determine the corresponding target output energy of the object run power The target fan-out capability value is simultaneously sent to the air conditioner by force value.Joined as a result, according to indoor environment parameter and outdoor environment Number and the data prestored determine the corresponding target fan-out capability value of object run power, and are sent to air conditioner, to air-conditioning Device carries out the control into one.
According to one embodiment of present invention, the status information of the air conditioner includes current sensor data, wherein institute It states and determines that current fan-out capability value includes: to connect according to the data prestored and the object run power and status information that receive After receiving the current sensor data, the current fan-out capability of the air conditioner is calculated according to the current sensor data Value, and the current fan-out capability value is sent to the air conditioner.Air conditioner is calculated according to current sensor data as a result, Current fan-out capability value, thus, combining target fan-out capability value further controls air conditioner, promotes user and uses Comfort level.
According to one embodiment of present invention, the data prestored include being used to indicate operation power and fan-out capability value The table of relationship or history data including the air conditioner or include identical with the model of the air conditioner The history data of more air conditioners or include air conditioner model machine identical with the model of the air conditioner experiment test Data.Server determines target fan-out capability value and current fan-out capability value by the data prestored as a result, and is sent to air-conditioning Device, further to be controlled air conditioner.
In order to achieve the above objectives, the air conditioner that third aspect present invention embodiment proposes includes: the first determining module, is used for In the air conditioner into after determining electricity operational mode, the power consumption of multiple operation phase and each operation phase are determined It measures, and determines the object run power of each operation phase according to the power consumption of each operation phase;Module is obtained, For also obtaining the status information of the air conditioner in each operation phase, and by the status information and corresponding operation The object run power in stage is sent to server, wherein the status information and corresponding object run power are for referring to Show that the server passes through the data prestored and determines target fan-out capability value and current fan-out capability value;Control module, for connecing Receive the target fan-out capability value and current fan-out capability value that the server is sent, according to the target fan-out capability value and Current fan-out capability value determines the operating parameter of the air conditioner, and is run according to determining operating parameter.
The air conditioner proposed according to embodiments of the present invention, in air conditioner into after determining electricity operational mode, really by first Cover half block determines the power consumption of multiple operation phase and each operation phase, and is determined according to the power consumption of each operation phase The object run power of each operation phase, and also pass through the state letter for obtaining module and obtaining air conditioner in each operation phase Breath, and the object run power of status information and corresponding operation phase are sent to server, wherein status information and phase The object run power answered is used to indicate server and determines target fan-out capability value and current fan-out capability by the data prestored Value, and the target fan-out capability value and current fan-out capability value that server is sent are received by control module, it is exported according to target Ability value and current fan-out capability value determine the operating parameter of air conditioner, and are run according to determining operating parameter.It determines as a result, The power consumption of each operation phase, to realize that air conditioner determines electricity operation, and by server Real-time Feedback, so as to adjust operation Parameter promotes the accuracy and controllability of control.
In order to achieve the above objectives, fourth aspect present invention embodiment proposes a kind of air conditioner, wherein the air conditioner packet Include memory, processor and the control method journey for being stored in the air conditioner that can be run on the memory and on the processor Sequence.
The air conditioner proposed according to embodiments of the present invention, the control method program for storing air conditioner on a memory are located The step for realizing the correspondence of the control method such as above-mentioned air conditioner when device executes is managed, enters in air conditioner and determines electricity operational mode Afterwards, firstly, determining the power consumption of multiple operation phase and each operation phase, and it is true according to the power consumption of each operation phase The object run power of fixed each operation phase, in addition, also obtain the status information of air conditioner in each operation phase, and by shape The object run power of state information and corresponding operation phase are sent to server, wherein status information and corresponding target Operation power is used to indicate server and determines target fan-out capability value and current fan-out capability value, Jin Ergen by the data prestored The target fan-out capability value and current fan-out capability value that the server received according to air conditioner is sent determine the operation ginseng of air conditioner Number, and run according to determining operating parameter.Determine the power consumption of each operation phase, as a result, to realize that air conditioner determines electricity Operation, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
In order to achieve the above objectives, fifth aspect present invention embodiment proposes a kind of computer readable storage medium, thereon It is stored with the control program of air conditioner, which realizes the control method of above-mentioned air conditioner when being executed by processor.
The computer readable storage medium proposed according to embodiments of the present invention storing with above-mentioned air-conditioning by executing thereon The corresponding program of the control method of device, after air conditioner enters and determine electricity operational mode, firstly, determination multiple operation phase and The power consumption of each operation phase, and determine according to the power consumption of each operation phase the object run function of each operation phase Rate, in addition, also obtain the status information of air conditioner in each operation phase, and by status information and the mesh of corresponding operation phase Mark operation power is sent to server, wherein status information and corresponding object run power are used to indicate server and pass through The data prestored determine target fan-out capability value and current fan-out capability value, and then are sent according to the server that air conditioner receives Target fan-out capability value and current fan-out capability value determine the operating parameter of air conditioner, and transported according to determining operating parameter Row.The power consumption of each operation phase is determined as a result, to realize that air conditioner determines electricity operation, and passes through server Real-time Feedback, So as to adjust operating parameter, the accuracy and controllability of control are promoted.
In order to achieve the above objectives, the server that sixth aspect present invention embodiment proposes includes: receiving module, for receiving The status information and object run power that the air conditioner was sent in each operation phase, wherein each operation phase Object run power entered by the air conditioner determine it is true according to the power consumption of each operation phase after electricity operational mode It is fixed;Second determining module, for determining target according to the data prestored and the object run power and status information that receive Fan-out capability value and current fan-out capability value, and the target fan-out capability value and current fan-out capability value are sent to the sky Adjust device, wherein the target fan-out capability value and current fan-out capability value are used to indicate the air conditioner and determine operating parameter.
Server according to an embodiment of the present invention receives the shape that air conditioner is sent in each operation phase by receiving module State information and object run power, wherein the object run power of each operation phase is entered by air conditioner determines electricity operation Determined after mode according to the power consumption of each operation phase, and according to the data prestored and the object run power received and Status information determines target fan-out capability value and current fan-out capability value by the second determining module, and by target fan-out capability Value and current fan-out capability value are sent to air conditioner, wherein target fan-out capability value and current fan-out capability value are used to indicate sky Device is adjusted to determine operating parameter.Server is according to the data prestored and the object run power and status information that receive as a result, It determines target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value is sent to sky Device is adjusted, to indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
In order to achieve the above objectives, seventh aspect present invention embodiment proposes a kind of server, wherein the server packet Include memory, processor and the control method journey for being stored in the server that can be run on the memory and on the processor Sequence.
The server proposed according to embodiments of the present invention, the control method program for storing server on a memory are located The step that the correspondence of the control method such as above-mentioned server is realized when device executes is managed, firstly, receiving air conditioner in each operation rank The status information and object run power that section is sent, wherein the object run power of each operation phase is entered by air conditioner Determine to be determined according to the power consumption of each operation phase after electricity operational mode, in turn, according to the data prestored and receive Object run power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and Current fan-out capability value is sent to air conditioner, wherein target fan-out capability value and current fan-out capability value are used to indicate air conditioner Determine operating parameter.Server is determined according to the data prestored and the object run power and status information that receive as a result, Target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air-conditioning Device, to indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
In order to achieve the above objectives, eighth aspect present invention embodiment proposes a kind of computer readable storage medium, thereon It is stored with the control program of server, which realizes the control method of above-mentioned server when being executed by processor.
The computer readable storage medium proposed according to embodiments of the present invention storing with above-mentioned service by executing thereon The corresponding program of the control method of device, firstly, receiving status information and target fortune that air conditioner is sent in each operation phase Row power, wherein the object run power of each operation phase is entered by air conditioner to be determined after electricity operational mode according to each fortune The power consumption of row order section determines, in turn, is determined according to the data prestored and the object run power and status information that receive Target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air-conditioning Device, wherein target fan-out capability value and current fan-out capability value are used to indicate air conditioner and determine operating parameter.Server as a result, Target fan-out capability value and current output are determined according to the data prestored and the object run power and status information that receive Ability value, and target fan-out capability value and current fan-out capability value are sent to air conditioner, to indicate that air conditioner determines operation ginseng Number, to promote the accuracy and controllability of control.
In order to achieve the above objectives, ninth aspect present invention embodiment proposes a kind of air-conditioning system comprising air conditioner and Server, wherein the air conditioner determines multiple operation phase and each operation into after determining electricity operational mode The power consumption in stage, and determine according to the power consumption of each operation phase the object run function of each operation phase Rate;The air conditioner also obtains the status information of the air conditioner in each operation phase, and by the status information with And the object run power of corresponding operation phase is sent to the server;The server is according to the data and reception prestored To object run power and status information determine target fan-out capability value and current fan-out capability value, and the target is exported Ability value and current fan-out capability value are sent to the air conditioner;The air conditioner is according to the target fan-out capability value and currently Fan-out capability value determines the operating parameter of the air conditioner, and is run according to determining operating parameter.
The air-conditioning system proposed according to embodiments of the present invention, air conditioner determine multiple into after determining electricity operational mode The power consumption of operation phase and each operation phase, and each operation phase is determined according to the power consumption of each operation phase Object run power, and also obtain in each operation phase the status information of air conditioner, and by status information and mutually meet the tendency of The object run power of row order section is sent to server, and in turn, server is transported according to the data prestored and the target received Row power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and current defeated Output capacity value is sent to air conditioner, so that air conditioner determines air conditioner according to target fan-out capability value and current fan-out capability value Operating parameter, and run according to determining operating parameter.Determine the power consumption of each operation phase, as a result, to realize air conditioner Determine electricity operation, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
In addition, air-conditioning system according to the above embodiment of the present invention can also have the following additional technical features:
According to one embodiment of present invention, the air conditioner into after determining electricity operational mode, transport by also acquisition target The target total power consumption of row period and the object run period, and the object run period is carried out at segmentation It manages with the determination the multiple operation phase, and true according to the time span of the target total power consumption and each operation phase The power consumption of fixed each operation phase.Each operation is determined according to the target total power consumption of object run period as a result, The power consumption in stage, to realize that the electricity of determining of air conditioner controls.
According to one embodiment of present invention, the air conditioner is further by the object run period in a manner of equal part It is divided into the multiple operation phase, and the target total power consumption is evenly distributed to the multiple operation phase.As a result, will Multiple operation phase that target total power consumption is evenly distributed to equal part model split, with the power consumption of determination each operation phase Amount.
According to one embodiment of present invention, the status information of the air conditioner includes indoor environment parameter, outdoor environment Parameter and current sensor data, wherein the server is receiving the object run power, the indoor environment parameter After the Outdoor Air Parameters, according to the indoor environment parameter and Outdoor Air Parameters and the data prestored determination The corresponding target fan-out capability value of object run power, and the target fan-out capability value is sent to the air conditioner;It is described Server calculates the current of the air conditioner after receiving the current sensor data, according to the current sensor data The current fan-out capability value is sent to the air conditioner by fan-out capability value.As a result, according to indoor environment parameter and outdoor ring Border parameter and the data prestored determine the corresponding target fan-out capability value of object run power, and are receiving current sensor After data, the current fan-out capability value of air conditioner is calculated according to current sensor data, in turn, according to current fan-out capability value and Target fan-out capability value determines target fan-out capability value and current fan-out capability value, thus according to the reality output ability of air conditioner Air conditioner is controlled.
According to one embodiment of present invention, the air conditioner exports energy in the current fan-out capability value and the target The absolute difference of force value adjusts current operating parameter when being greater than preset threshold, and is run according to the operating parameter of adjustment.As a result, The current fortune of air conditioner is adjusted when the absolute difference of current fan-out capability value and target fan-out capability value is greater than preset threshold Row parameter promotes users'comfort so that current fan-out capability value be made to be close to or up to target fan-out capability value.
According to one embodiment of present invention, the air conditioner exports energy in the current fan-out capability value and the target Control current operating parameter remains unchanged when the absolute difference of force value is less than or equal to the preset threshold, and is worked as according to described Preceding operating parameter continuous service, until meeting the termination condition of corresponding operation phase.As a result, in current fan-out capability value and mesh When marking the absolute difference of fan-out capability value less than or equal to preset threshold, the current operating parameter of air conditioner is remained unchanged, real Existing energy-efficient purpose.
According to one embodiment of present invention, the data prestored include being used to indicate operation power and fan-out capability value The table of relationship or history data including the air conditioner or include identical with the model of the air conditioner The history data of more air conditioners or include air conditioner model machine identical with the model of the air conditioner experiment test Data.Server determines target fan-out capability value and current fan-out capability value by the data prestored as a result, and is sent to air-conditioning Device, further to be controlled air conditioner.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Fig. 1 is the flow diagram according to the control method of the air conditioner of the embodiment of the present invention;
Fig. 2 is the flow diagram according to the control method of the server of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram according to the air conditioner of a specific embodiment of the invention;
Fig. 4 is the block diagram according to the air conditioner of one embodiment of the invention;
Fig. 5 is the block diagram according to the air conditioner of another embodiment of the present invention;
Fig. 6 is the block diagram according to the server of one embodiment of the invention;
Fig. 7 is the block diagram according to the server of another embodiment of the present invention;
Fig. 8 is the block diagram according to the air-conditioning system of the embodiment of the present invention;
Fig. 9 is the flow diagram according to the control method of the air-conditioning system of a specific embodiment of the invention.
Specific embodiment
Technical scheme realizes that air conditioner determines electricity operation, and pass through clothes according to the power consumption of each operation phase Business device Real-time Feedback promotes the accuracy and controllability of control so as to adjust operating parameter.
In order to better understand the above technical scheme, the exemplary reality of the disclosure is more fully described below with reference to accompanying drawings Apply example.Although showing the exemplary embodiment of the disclosure in attached drawing, it being understood, however, that may be realized in various forms this public affairs It opens and should not be limited by the embodiments set forth herein.It is to be able to thoroughly understand this on the contrary, providing these embodiments It is open, and the scope of the present disclosure can be fully disclosed to those skilled in the art.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper Technical solution is stated to be described in detail.
Embodiment one
Fig. 1 is the flow diagram according to the control method of the air conditioner of the embodiment of the present invention.
As shown in Figure 1, the control method of air conditioner the following steps are included:
S101 determines multiple operation phase and each operation phase after air conditioner enters and determines electricity operational mode Power consumption, and determine according to the power consumption of each operation phase the object run power of each operation phase.
That is, air conditioner enter determine electricity operational mode after, can be according to the target time section T of user setting with mesh Total power consumption Q is marked, determines power consumption Q1~Qi of multiple operation phase T1~Ti and each operation phase, and according to each fortune Power consumption Q1~Qi of row order section determines 1~Pi of object run power P of each operation phase.
S102 also obtains the status information of air conditioner in each operation phase, and by status information and accordingly runs rank The object run power of section is sent to server, wherein status information and corresponding object run power are used to indicate service Device passes through the data prestored and determines target fan-out capability value and current fan-out capability value.
That is, in each operation phase T1~Ti, the status information of air conditioner can be obtained, and by status information and 1~Pi of object run power P of corresponding operation phase T1~Ti is sent to server, and server can be according to status information, corresponding 1~Pi of object run power P and the data that prestore determine target fan-out capability value and current fan-out capability value, and will determine Target fan-out capability value and current fan-out capability value be sent to air conditioner.
It should be noted that the current fan-out capability value of air conditioner, Yi Jigen can be determined according to the status information of air conditioner The target fan-out capability value of air conditioner is determined according to 1~Pi of object run power P of corresponding operation phase T1~Ti.
S103 receives target fan-out capability value and current fan-out capability value that server is sent, according to target fan-out capability Value and current fan-out capability value determine the operating parameter of air conditioner, and are run according to determining operating parameter.
That is, air conditioner is in the target fan-out capability value determined by the data prestored for receiving server transmission After current fan-out capability value, the operating parameter of air conditioner is determined also according to target fan-out capability value and current fan-out capability value, And it is run according to determining operating parameter.
Specifically, according to one embodiment of present invention, the data prestored may include being used to indicate operation power and output The table of ability value relationship or history data including air conditioner or include identical with the model of air conditioner more The history data of platform air conditioner or include air conditioner model machine identical with the model of air conditioner test data of experiment.
That is, server can be by instruction operation power with the table of fan-out capability value relationship or including air-conditioning The history data of device or include more air conditioners identical with the model of air conditioner history data or packet The test data of experiment for including air conditioner model machine identical with the model of air conditioner determines target fan-out capability value and current output energy Force value, and determining target fan-out capability value and current fan-out capability value are sent to air conditioner, to carry out air conditioner into one The control of step.
Determine the power consumption of each operation phase as a result, with realize air conditioner determine electricity operation, it is thus possible to make user from The angle of power consumption goes to accurately control the operating parameter of air conditioner, while reaching more energy-efficient purpose, and pass through server Real-time Feedback promotes the accuracy and controllability of control so as to adjust operating parameter.
Specifically, according to one embodiment of present invention, the power consumption of multiple operation phase and each operation phase are determined Amount includes:
S201 obtains the target total power consumption of object run period and object run period.
Optionally, it can be instructed by user by the setting that remote controler issues, such as the runing time section of user setting With the expectation power consumption of user setting etc., to obtain object run period T and the total power consumption of the target of object run period Measure Q.
S202 carries out segment processing to the object run period with determination multiple operation phase.
That is, segment processing is carried out to it, when the object run period of acquisition is T with the multiple operations of determination Stage T1~Ti.
S203 determines the power consumption of each operation phase according to target total power consumption.
It is understood that determining power consumption Q1~Qi of each operation phase T1~Ti according to target total power consumption Q, i.e., Target total power consumption Q is assigned to each operation phase T1~Ti, so that it is determined that the power consumption Q1 of each operation phase T1~Ti ~Qi.
That is, can determine each operation phase T1~Ti's according to the target total power consumption Q of object run period T Power consumption Q1~Qi, to realize that the electricity of determining of air conditioner controls.
It further, according to one embodiment of present invention, is multiple with equal part model split by object run period T Operation phase T1~Ti, and target total power consumption Q is evenly distributed to multiple operation phase T1~Ti, with each operation rank of determination Power consumption Q1=Q2=...=Qi=Q/i of section.
Target total power consumption is evenly distributed to multiple operation phase with equal part model split as a result, it is each to determine The power consumption of operation phase.
Further, according to one embodiment of present invention, true according to target fan-out capability value and current fan-out capability value The operating parameter for determining air conditioner includes:
When the absolute difference of current fan-out capability value and target fan-out capability value is greater than preset threshold, air conditioner is adjusted Current operating parameter, and according to the operating parameter of adjustment run.
That is, working as, air conditioner receives the target fan-out capability value of server transmission and current fan-out capability value is greater than When preset threshold, the current operating parameter of air conditioner is adjusted, and run according to the operating parameter of adjustment, so that current fan-out capability Value is close to or up to target fan-out capability value, to promote the usage comfort of user.
It should be noted that the current operating parameter of air conditioner may include frequency, air quantity and aperture of air conditioner etc..
Further, according to one embodiment of present invention, true according to target fan-out capability value and current fan-out capability value Determine the operating parameter of air conditioner further include: be less than or wait in the absolute difference of current fan-out capability value and target fan-out capability value When preset threshold, the current operating parameter for controlling air conditioner is remained unchanged, and according to current operating parameter continuous service, until Meet the termination condition of corresponding operation phase.
That is, being less than or equal to default threshold in the absolute difference of current fan-out capability value and target fan-out capability value When value, the current operating parameter for controlling air conditioner is remained unchanged, and according to current operating parameter continuous service, until meeting corresponding Operation phase termination condition.
Wherein, the termination condition of corresponding operation phase can be divided in a manner of equal part according to object run period T Multiple operation phase T1~Ti are demarcated accordingly.
In addition, air conditioner kept the current operating parameter of a upper operation phase to enter when entering each operation phase In next operation phase.
For example, it is less than or equal to default threshold in the absolute difference of current fan-out capability value and target fan-out capability value When value, it can determine whether that current fan-out capability value is close to or up to target fan-out capability value, keep the current operating parameter of air conditioner not Become, until current operation phase time interval T1 terminates, and is entered with the current operating parameter of the air conditioner of the operation phase Next operation phase, and the absolute difference and preset threshold of current fan-out capability value and target fan-out capability value are judged again Size relation, until all time operation phase T1~Ti's reaches object run period T total time, then air conditioner, which is reminded, uses Family " determining electricity operational mode " terminates, and exits the mode.
Determine that the operation of different air conditioners is joined according to different target fan-out capability values and current fan-out capability value as a result, Number, and run according to determining different operating parameters, to realize energy-efficient purpose and promote users'comfort.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The control method of the air conditioner proposed according to embodiments of the present invention, in air conditioner into after determining electricity operational mode, Firstly, determining the power consumption of multiple operation phase and each operation phase, and determined according to the power consumption of each operation phase The object run power of each operation phase, in addition, also obtain the status information of air conditioner in each operation phase, and by state The object run power of information and corresponding operation phase are sent to server, wherein status information and corresponding target fortune Row power is used to indicate server and determines target fan-out capability value and current fan-out capability value, and then basis by the data prestored Target fan-out capability value and current fan-out capability value that the server that air conditioner receives is sent determine the operating parameter of air conditioner, And it is run according to determining operating parameter.Determine the power consumption of each operation phase as a result, with realize air conditioner determine electricity operation, It is thus possible to which user is made to go to accurately control the operating parameter of air conditioner from the angle of power consumption, while reaching more energy-efficient Purpose, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
Embodiment two
Fig. 2 is the flow diagram according to the control method of the server of the embodiment of the present invention.
As shown in Fig. 2, the control method of server the following steps are included:
S301 receives status information and object run power that air conditioner was sent in each operation phase, wherein each The object run power of operation phase entered by air conditioner determine it is true according to the power consumption of each operation phase after electricity operational mode It is fixed.
S302 determines target fan-out capability according to the data prestored and the object run power and status information that receive Value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air conditioner, wherein target is defeated Output capacity value and current fan-out capability value are used to indicate air conditioner and determine operating parameter.
Server determines that target is defeated according to the data prestored and the object run power and status information that receive as a result, Output capacity value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air conditioner, to refer to Show that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
Specifically, according to one embodiment of present invention, the status information of air conditioner may include indoor environment parameter and room External environment parameter, wherein determine that target exports according to the data prestored and the object run power and status information that receive Ability value includes:
S401, after receiving object run power, indoor environment parameter and Outdoor Air Parameters, according to indoor environment parameter The corresponding target fan-out capability value of object run power is determined with Outdoor Air Parameters and the data prestored.
Wherein, air conditioner obtains indoor environment parameter and Outdoor Air Parameters and object run function in each operation phase Rate, and it is sent to server, thus by server according to indoor environment parameter and Outdoor Air Parameters and the data prestored It determines the corresponding target fan-out capability value of object run power, and target fan-out capability value is sent to air conditioner.
It should be noted that indoor environment parameter and Outdoor Air Parameters may include the outer temperature of current indoor and indoor exogenous damp Degree etc..
Further, according to one embodiment of present invention, the data prestored may include be used to indicate operation power with it is defeated The table of output capacity value relationship or the history data including air conditioner or include identical with the model of air conditioner The history data of more air conditioners or include air conditioner model machine identical with the model of air conditioner experiment test number According to.
That is, server can be by instruction operation power with the table of fan-out capability value relationship or including air-conditioning The history data of device or include more air conditioners identical with the model of air conditioner history data or packet The test data of experiment of air conditioner model machine identical with the model of air conditioner is included, for example, server can be by running power With the table of fan-out capability value relationship, target fan-out capability value W corresponding to object run power is determined in a manner of tabling look-up.
Wherein, operation power can be right according to each actual motion power institute of air conditioner with the table of fan-out capability value relationship The fan-out capability value answered is formulated accordingly, in other words, right when the operation power of air conditioner is P1 among table Answering fan-out capability value is O1;When the operation power of air conditioner is P2, corresponding fan-out capability value is O2;When the operation function of air conditioner When rate is Pi, corresponding fan-out capability value is Oi, and so on, wherein the corresponding fan-out capability value of an operation power.
S402 calculates the current output of air conditioner according to current sensor data after receiving current sensor data Ability value, and target fan-out capability value and current fan-out capability are determined according to current fan-out capability value and target fan-out capability value Value.
Wherein, air conditioner also obtains current sensor data in each operation phase, and is sent to server.
It should be noted that current sensor data may include temperature data or humidity data.
It is understood that server calculates the current output of air conditioner according to the current sensor data that air conditioner is sent Ability value, and current fan-out capability value is sent to air conditioner.
Specifically, as shown in figure 3, multiple temperature sensors 1~12 and humidity sensor can be arranged in portion in the air conditioner 13, for example, the temperature data of compressor A and four-way valve B can be obtained by temperature sensor 1~2 and temperature sensor 11~12, Perhaps the temperature data of outdoor fan 31 and outdoor heat exchanger 32 is obtained by temperature sensor 3~5 or passes through temperature sensing Device 6~9 and humidity sensor 13 obtain the temperature data and humidity data and air-conditioning of indoor fan 51 and indoor heat exchanger 52 The compressor horsepower M of device is sent to server, and server is calculated according to temperature data or humidity data in conjunction with compressor horsepower M It obtains the current fan-out capability value W1 of air conditioner, and is sent to air conditioner, wherein multiple temperature sensors and humidity sensor Quantity can be set accordingly according to control accuracy requirement.
It should be noted that server is according to the Current Temperatures of air conditioner or humidity etc., in conjunction with the compressor work of air conditioner Rate M calculates the current fan-out capability value of air conditioner, this is techniques known, and details are not described herein.
Specifically, being greater than default threshold in the absolute difference Wc of current fan-out capability value W1 and target fan-out capability value W Value △ W, that is, Wc=| W1-W | when > △ W, it can determine whether the current fan-out capability miss the mark fan-out capability of air conditioner, at this point, adjustment The current operating parameter of air conditioner, and run according to the operating parameter of adjustment.
In addition, being less than or equal in the absolute difference Wc of current fan-out capability value W1 and target fan-out capability value W default Threshold value △ W, i.e. Wc=| W1-W | when≤△ W, it can determine whether that the current fan-out capability of air conditioner has reached target fan-out capability, at this point, The current operating parameter of control air conditioner remains unchanged, and according to the current operating parameter continuous service, until meeting corresponding Operation phase termination condition.
The current operating parameter of air conditioner is adjusted by current fan-out capability value and target fan-out capability value as a result, thus So that current fan-out capability value is close to or up to target fan-out capability value, promotes users'comfort.
As described above, when air conditioner enters the first time operation phase T1 of multiple operation phase T1~Ti, it will be indoor Environmental parameter and Outdoor Air Parameters and object run power are sent to server, and server is according to indoor environment parameter and room External environment parameter and object run power, and air conditioner is combined to run power M, for example, by instruction operation power and output energy The table of force value relationship, calculates the target fan-out capability value W1 of air conditioner, and is sent to air conditioner.
Further, it when air conditioner enters the first time operation phase T1 of multiple operation phase T1~Ti, also obtains Current sensor data, and it is sent to server, server calculates the current output of air conditioner according to current sensor data Ability value W, and it is sent to air conditioner.
For air conditioner according to the current fan-out capability value W and target fan-out capability value W1 received, the difference for finding out them is exhausted It is compared to value Wc, and by absolute difference Wc and preset threshold △ W, if absolute difference Wc is less than or equal to default threshold Value △ W, i.e. Wc=| W1-W |≤△ W then can determine whether that the current fan-out capability of air conditioner reaches target fan-out capability, control air conditioner Current operating parameter remain unchanged, and according to the current operating parameter continuous service, until meeting the corresponding operation phase Termination condition;If absolute difference Wc is greater than preset threshold △ W, i.e. Wc=| W1-W | > △ W then can determine whether that air conditioner is worked as Preceding fan-out capability miss the mark fan-out capability adjusts the current operating parameter of the air conditioner, and is joined according to the operation of adjustment Number operation, so that current fan-out capability value W is close to or up to target fan-out capability value W1.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The control method of the server proposed according to embodiments of the present invention, firstly, receiving air conditioner in each operation phase The status information and object run power of transmission, wherein it is fixed that the object run power of each operation phase is entered by air conditioner It is determined after electricity operational mode according to the power consumption of each operation phase, in turn, according to the data prestored and the mesh received Mark operation power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and work as Preceding fan-out capability value is sent to air conditioner, wherein it is true that target fan-out capability value and current fan-out capability value are used to indicate air conditioner Determine operating parameter.Server determines mesh according to the data prestored and the object run power and status information that receive as a result, Fan-out capability value and current fan-out capability value are marked, and target fan-out capability value and current fan-out capability value are sent to air conditioner, To indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
Based on the same inventive concept, the embodiment of the invention also provides the corresponding air conditioner of method in embodiment one, see reality Apply example three.
Embodiment three
Fig. 4 is the block diagram according to the air conditioner of one embodiment of the invention.
As shown in figure 4, air conditioner 100 includes: the first determining module 1, obtains module 2 and control module 3.
Wherein, the first determining module 1 is used in air conditioner 100 into after determining electricity operational mode, determines multiple operation ranks Section T1~Ti and power consumption Q1~Qi of each operation phase, and according to power consumption Q1~Qi of each operation phase T1~Ti Determine 1~Pi of object run power P of each operation phase;Module 2 is obtained to be used to also obtain air conditioner in each operation phase 100 status information, and 1~Pi of object run power P of status information and corresponding operation phase T1~Ti are sent to clothes It is engaged in device, wherein status information and 1~Pi of corresponding object run power P are used to indicate server to pass through the data prestored true The fan-out capability that sets the goal value and current fan-out capability value;Control module 3 is used to receive the target fan-out capability value of server transmission With current fan-out capability value, the operating parameter of air conditioner 100 is determined according to target fan-out capability value and current fan-out capability value, and It is run according to determining operating parameter.
Wherein, the fan-out capability value that sets the goal really in above-described embodiment three and current fan-out capability value, and according to target Fan-out capability value and current fan-out capability value determine the operating parameter of air conditioner, and the side run according to determining operating parameter The control method of air conditioner in method, with above-described embodiment one corresponds, and details are not described herein.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The air conditioner proposed according to embodiments of the present invention, in air conditioner into after determining electricity operational mode, really by first Cover half block determines the power consumption of multiple operation phase and each operation phase, and is determined according to the power consumption of each operation phase The object run power of each operation phase, and also pass through the state letter for obtaining module and obtaining air conditioner in each operation phase Breath, and the object run power of status information and corresponding operation phase are sent to server, wherein status information and phase The object run power answered is used to indicate server and determines target fan-out capability value and current fan-out capability by the data prestored Value, and the target fan-out capability value and current fan-out capability value that server is sent are received by control module, it is exported according to target Ability value and current fan-out capability value determine the operating parameter of air conditioner, and are run according to determining operating parameter.It determines as a result, The power consumption of each operation phase, to realize that air conditioner determines electricity operation, and by server Real-time Feedback, so as to adjust operation Parameter promotes the accuracy and controllability of control.
By the air conditioner that the embodiment of the present invention three is introduced, sky used by the method to implement the embodiment of the present invention one Device is adjusted, so based on the method that the embodiment of the present invention one is introduced, the affiliated personnel in this field can understand the specific of the air conditioner Structure and deformation, so details are not described herein.Air conditioner used by the method for all embodiment of the present invention one belongs to this hair The bright range to be protected.
Based on the same inventive concept, the embodiment of the invention also provides the corresponding another air-conditionings of method in embodiment one Device is shown in example IV.
Fig. 5 is the block diagram according to the air conditioner of another embodiment of the present invention.
As shown in figure 5, air conditioner 200 includes: memory 201 and processor 202.
Wherein, the control program for the air conditioner that can be run on processor 202, processor 202 are stored on memory 201 When executing the control program of air conditioner, the control method of the air conditioner of embodiment one is realized.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The air conditioner proposed according to embodiments of the present invention, the control method program for storing air conditioner on a memory are located The step for realizing the correspondence of the control method such as above-mentioned air conditioner when device executes is managed, enters in air conditioner and determines electricity operational mode Afterwards, firstly, determining the power consumption of multiple operation phase and each operation phase, and it is true according to the power consumption of each operation phase The object run power of fixed each operation phase, in addition, also obtain the status information of air conditioner in each operation phase, and by shape The object run power of state information and corresponding operation phase are sent to server, wherein status information and corresponding target Operation power is used to indicate server and determines target fan-out capability value and current fan-out capability value, Jin Ergen by the data prestored The target fan-out capability value and current fan-out capability value that the server received according to air conditioner is sent determine the operation ginseng of air conditioner Number, and run according to determining operating parameter.Determine the power consumption of each operation phase, as a result, to realize that air conditioner determines electricity Operation, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
Based on the same inventive concept, it computer-readable deposits the embodiment of the invention also provides method in embodiment one is corresponding Storage media is shown in embodiment five.
Embodiment five
The computer readable storage medium proposed according to embodiments of the present invention storing with above-mentioned air-conditioning by executing thereon The corresponding program of the control method of device, after air conditioner enters and determine electricity operational mode, firstly, determination multiple operation phase and The power consumption of each operation phase, and determine according to the power consumption of each operation phase the object run function of each operation phase Rate, in addition, also obtain the status information of air conditioner in each operation phase, and by status information and the mesh of corresponding operation phase Mark operation power is sent to server, wherein status information and corresponding object run power are used to indicate server and pass through The data prestored determine target fan-out capability value and current fan-out capability value, and then are sent according to the server that air conditioner receives Target fan-out capability value and current fan-out capability value determine the operating parameter of air conditioner, and transported according to determining operating parameter Row.The power consumption of each operation phase is determined as a result, to realize that air conditioner determines electricity operation, and passes through server Real-time Feedback, So as to adjust operating parameter, the accuracy and controllability of control are promoted.
Based on the same inventive concept, the embodiment of the invention also provides the corresponding server of method in embodiment two, see reality Apply example six.
Fig. 6 is the block diagram according to the server of one embodiment of the invention.
As shown in fig. 6, server 300 includes: receiving module 4 and the second determining module 5.
Specifically, receiving module 4 is used to receive the status information and target fortune that air conditioner is sent in each operation phase Row power, wherein the object run power of each operation phase is entered by air conditioner to be determined after electricity operational mode according to each fortune Power consumption Q1~Qi of row order section is determined;Second determining module 5 is used for according to the data prestored and the object run received Power and status information determine target fan-out capability value and current fan-out capability value, and target fan-out capability value is exported with current Ability value is sent to air conditioner, wherein target fan-out capability value and current fan-out capability value are used to indicate air conditioner and determine operation Parameter.
Wherein, the object run power of determination each operation phase in above-described embodiment six, and according to the number prestored Accordingly and the object run power and status information that receive determine target fan-out capability value and current fan-out capability value, and by mesh The method that mark fan-out capability value and current fan-out capability value are sent to air conditioner, the control with the server in above-described embodiment two Method corresponds, and details are not described herein.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
Server according to an embodiment of the present invention receives the shape that air conditioner is sent in each operation phase by receiving module State information and object run power, wherein the object run power of each operation phase is entered by air conditioner determines electricity operation Determined after mode according to the power consumption of each operation phase, and according to the data prestored and the object run power received and Status information determines target fan-out capability value and current fan-out capability value by the second determining module, and by target fan-out capability Value and current fan-out capability value are sent to air conditioner, wherein target fan-out capability value and current fan-out capability value are used to indicate sky Device is adjusted to determine operating parameter.Server is according to the data prestored and the object run power and status information that receive as a result, It determines target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value is sent to sky Device is adjusted, to indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
By the server that the embodiment of the present invention six is introduced, taken used by the method to implement the embodiment of the present invention two Business device, so based on the method that the embodiment of the present invention two is introduced, the affiliated personnel in this field can understand the specific of the server Structure and deformation, so details are not described herein.Server used by the method for all embodiment of the present invention two belongs to this hair The bright range to be protected.
Based on the same inventive concept, the embodiment of the invention also provides the corresponding another services of method in embodiment two Device is shown in embodiment seven.
Fig. 7 is the block diagram according to the server of another embodiment of the present invention.
As shown in fig. 7, server 400 includes: memory 401 and processor 402.
Wherein, the control program for the server that can be run on the processor 402, processor 402 are stored on memory 401 When the control program of execute server, the control method of the server of embodiment two is realized.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The server proposed according to embodiments of the present invention, the control method program for storing server on a memory are located The step that the correspondence of the control method such as above-mentioned server is realized when device executes is managed, firstly, receiving air conditioner in each operation rank The status information and object run power that section is sent, wherein the object run power of each operation phase is entered by air conditioner Determine to be determined according to the power consumption of each operation phase after electricity operational mode, in turn, according to the data prestored and receive Object run power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and Current fan-out capability value is sent to air conditioner, wherein target fan-out capability value and current fan-out capability value are used to indicate air conditioner Determine operating parameter.Server is determined according to the data prestored and the object run power and status information that receive as a result, Target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air-conditioning Device, to indicate that air conditioner determines operating parameter, to promote the accuracy and controllability of control.
Based on the same inventive concept, it computer-readable deposits the embodiment of the invention also provides method in embodiment two is corresponding Storage media is shown in embodiment eight.
Embodiment eight
The computer readable storage medium proposed according to embodiments of the present invention storing with above-mentioned service by executing thereon The corresponding program of the control method of device, firstly, receiving status information and target fortune that air conditioner is sent in each operation phase Row power, wherein the object run power of each operation phase is entered by air conditioner to be determined after electricity operational mode according to each fortune The power consumption of row order section determines, in turn, is determined according to the data prestored and the object run power and status information that receive Target fan-out capability value and current fan-out capability value, and target fan-out capability value and current fan-out capability value are sent to air-conditioning Device, wherein target fan-out capability value and current fan-out capability value are used to indicate air conditioner and determine operating parameter.Server as a result, Target fan-out capability value and current output are determined according to the data prestored and the object run power and status information that receive Ability value, and target fan-out capability value and current fan-out capability value are sent to air conditioner, to indicate that air conditioner determines operation ginseng Number, to promote the accuracy and controllability of control.
In order to achieve the above object, the embodiment of the present invention also proposed a kind of air-conditioning system, with reference to the accompanying drawings of the specification It is further detailed with specific embodiment.
Embodiment nine
The block diagram of Fig. 8 air-conditioning system according to an embodiment of the present invention.
As shown in figure 8, air-conditioning system 1000 includes air conditioner 1001 and server 1002,
Wherein, air conditioner 1001 enter determine electricity operational mode after, determine multiple operation phase T1~Ti and each Power consumption Q1~Qi of operation phase, and each operation phase is determined according to power consumption Q1~Qi of each operation phase T1~Ti 1~Pi of object run power P;Air conditioner 1001 also obtains the status information of air conditioner in each operation phase, and by state The object run power of information and corresponding operation phase are sent to server 1002;Server 1002 according to the data prestored with And the object run power and status information received determines target fan-out capability value and current fan-out capability value, and target is defeated Output capacity value and current fan-out capability value are sent to air conditioner 1001;Air conditioner 1001 is according to target fan-out capability value and current defeated Output capacity value determines the operating parameter of air conditioner 1001, and is run according to determining operating parameter.
The power consumption of each operation phase is determined as a result, to realize that air conditioner determines electricity operation, and it is real-time by server Feedback, so as to adjust operating parameter, promotes the accuracy and controllability of control.
Specifically, according to one embodiment of present invention, air conditioner 1001 is also obtained into after determining electricity operational mode The target total power consumption Q of object run period T and object run period T, and object run period T is segmented Processing is and long according to the time of target total power consumption Q and each operation phase T1~Ti with the multiple operation phase T1~Ti of determination Degree determines power consumption Q1~Qi of each operation phase T1~Ti.
Determine the power consumption of each operation phase, according to the target total power consumption of object run period as a result, to realize Air conditioner determines electricity control.
It is understood that according to one embodiment of present invention, air conditioner 1001 is further by object run period T With equal part model split for multiple operation phase T1~Ti, and target total power consumption Q is evenly distributed to multiple operation phase T1 ~Ti.
Target total power consumption is evenly distributed to multiple operation phase with equal part model split as a result, it is each to determine The power consumption of operation phase.
It should be noted that according to one embodiment of present invention, the status information of air conditioner 1001 may include indoor ring Border parameter, Outdoor Air Parameters and current sensor data.
Wherein, server 1002 is after receiving object run power, indoor environment parameter and Outdoor Air Parameters, according to room Interior environmental parameter and Outdoor Air Parameters and the data prestored determine the corresponding target fan-out capability value W of object run power; Server 1002 calculates the current fan-out capability of air conditioner according to current sensor data after receiving current sensor data Value W1, and target fan-out capability value and current fan-out capability are determined according to current fan-out capability value W1 and target fan-out capability value W Value.
It is understood that determining object run according to indoor environment parameter and Outdoor Air Parameters and the data prestored The corresponding target fan-out capability value of power can determine that target corresponding to object run power exports by way of tabling look-up Ability value W.
Further, according to one embodiment of present invention, the data prestored may include be used to indicate operation power with it is defeated The table of output capacity value relationship or the history data including air conditioner or include identical with the model of air conditioner The history data of more air conditioners or include air conditioner model machine identical with the model of air conditioner experiment test number According to.
That is, server can be by instruction operation power with the table of fan-out capability value relationship or including air-conditioning The history data of device or include more air conditioners identical with the model of air conditioner history data or packet The test data of experiment for including air conditioner model machine identical with the model of air conditioner determines object run function by way of tabling look-up Target fan-out capability value W corresponding to rate.
And multiple temperature sensors can be set in portion in the air conditioner, and combine the compressor horsepower M of air conditioner, it calculates Obtain the current fan-out capability value W1 of air conditioner, wherein the quantity of multiple temperature sensors can be carried out according to control accuracy requirement Corresponding setting.
It should be noted that air conditioner calculates the current output of air conditioner according to the Current Temperatures of air conditioner or pressure etc. Value, this is techniques known, and details are not described herein.
Specifically, according to one embodiment of present invention, server 1002 is exported in current fan-out capability value W1 and target The absolute difference Wc of ability value W adjusts the current operating parameter of air conditioner 1001 when being greater than preset threshold, and according to adjustment Operating parameter operation.
That is, being greater than default threshold in the absolute difference Wc of current fan-out capability value W1 and target fan-out capability value W Value △ W, that is, Wc=| W1-W | when > △ W, it can determine whether the current fan-out capability miss the mark fan-out capability of air conditioner 1001, at this point, The current operating parameter of air conditioner 1001 is adjusted, and is run according to the operating parameter of adjustment.
In addition, according to one embodiment of present invention, server 1002 exports energy in current fan-out capability value W1 and target The current operating parameter of control air conditioner 1001 is kept not when the absolute difference Wc of force value W is less than or equal to preset threshold △ W Become, and according to current operating parameter continuous service, until meeting the termination condition of corresponding operation phase.
That is, being less than or equal in the absolute difference Wc of current fan-out capability value W1 and target fan-out capability value W Preset threshold △ W, i.e. Wc=| W1-W | when≤△ W, it can determine whether that the current fan-out capability of air conditioner 1001 has reached target output energy Power, at this point, the current operating parameter of control air conditioner 1001 remains unchanged, and according to current operating parameter continuous service, until Meet the termination condition of corresponding operation phase.
It is understood that meeting the termination condition of corresponding operation phase, i.e. 1001 operation phase of air conditioner reaches State object run stage T.
It for example, can be according to the controlling party of air conditioner 1001 as shown in figure 9, after air-conditioning system 1000 is switched on and runs Method and the control method of server 1002 perform the steps of
S1, user select to enter " determining electricity operational mode ".
S2, user input plan consumption total electricity Q in runing time section and the section.
The traffic coverage of user setting is equally divided into n etc. and divides T1-Ti by S3, and total power consumption is distributed evenly over each In time interval, i.e., the power consumption in each time interval is Q/i.
It is (fixed to calculate the operation power of the air conditioner in the time interval according to the power consumption Q/i in each time interval by S4 Value).
When S5, entry time section T1, the temperature and humidity of indoor and outdoor surroundings at this time is detected, in conjunction with air conditioner in the section Power, server obtains the target fan-out capability value W1 of air conditioner in the time interval by way of tabling look-up.
S6, the parameter of related sensor, is uploaded to server, server calculates the sky when real-time detection air conditioner is run Adjust the current fan-out capability value W of device.
S7 judges whether to meet | W1-W | > △ W.If so, thening follow the steps S8;If not, thening follow the steps S10.
S8 adjusts operating parameter of air conditioner, including frequency, air quantity, aperture etc., makes W close or equal to W1.
S9 judges whether to meet after being spaced the △ t time | W1-W | > △ W.If so, thening follow the steps S8;If not, Then follow the steps S10.
S10, air conditioner are run according to this parameter, until time interval T1 terminates.
S11, entry time section T2 repeat step S5-S10, until having run all time interval T1-Tn.
S12, reminding user to determine electricity runing time terminates, and air conditioner exits " fixed point amount operational mode ".
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The air-conditioning system proposed according to embodiments of the present invention, air conditioner determine multiple into after determining electricity operational mode The power consumption of operation phase and each operation phase, and each operation phase is determined according to the power consumption of each operation phase Object run power, and also obtain in each operation phase the status information of air conditioner, and by status information and mutually meet the tendency of The object run power of row order section is sent to server, and in turn, server is transported according to the data prestored and the target received Row power and status information determine target fan-out capability value and current fan-out capability value, and by target fan-out capability value and current defeated Output capacity value is sent to air conditioner, so that air conditioner determines air conditioner according to target fan-out capability value and current fan-out capability value Operating parameter, and run according to determining operating parameter.Determine the power consumption of each operation phase, as a result, to realize air conditioner Determine electricity operation, and the accuracy and controllability of control are promoted so as to adjust operating parameter by server Real-time Feedback.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
It should be noted that in the claims, any reference symbol between parentheses should not be configured to power The limitation that benefit requires.Word "comprising" does not exclude the presence of component or step not listed in the claims.Before component Word "a" or "an" does not exclude the presence of multiple such components.The present invention can be by means of including several different components It hardware and is realized by means of properly programmed computer.In the unit claims listing several devices, these are filled Several in setting, which can be, to be embodied by the same item of hardware.The use of word first, second, and third is not Indicate any sequence.These words can be construed to title.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from this hair by those skilled in the art
Bright spirit and scope.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its Within the scope of equivalent technologies, then the present invention is also intended to include these modifications and variations.

Claims (23)

1. a kind of control method of air conditioner, which comprises the following steps:
In the air conditioner into after determining electricity operational mode, the consumption of multiple operation phase and each operation phase are determined Electricity, and determine according to the power consumption of each operation phase the object run power of each operation phase;
Also obtain the status information of the air conditioner in each operation phase, and by the status information and corresponding operation The object run power in stage is sent to server, wherein the status information and corresponding object run power are for referring to Show that the server passes through the data prestored and determines target fan-out capability value and current fan-out capability value;
The target fan-out capability value and the current fan-out capability value that the server is sent are received, it is defeated according to the target Output capacity value and the current fan-out capability value determine the operating parameter of the air conditioner, and are transported according to determining operating parameter Row.
2. the control method of air conditioner according to claim 1, which is characterized in that the determination multiple operation phase and The power consumption of each operation phase includes:
Obtain the target total power consumption of object run period and the object run period;
Segment processing is carried out with the determination the multiple operation phase to the object run period;
The power consumption of each operation phase is determined according to the target total power consumption.
3. the control method of air conditioner according to claim 2, which is characterized in that wherein, by the object run time The target total power consumption, for the multiple operation phase, and is evenly distributed to the multiple operation with equal part model split by section Stage, with the power consumption of determination each operation phase.
4. the control method of air conditioner according to claim 1, which is characterized in that described according to the target fan-out capability Value and the current fan-out capability value determine that the operating parameter of the air conditioner includes:
When the absolute difference of the current fan-out capability value and the target fan-out capability value is greater than preset threshold, institute is adjusted The current operating parameter of air conditioner is stated, and is run according to the operating parameter of adjustment.
5. the control method of air conditioner according to claim 4, which is characterized in that described according to the target fan-out capability Value and the current fan-out capability value determine the operating parameter of the air conditioner further include:
It is less than or equal to the default threshold in the absolute difference of the current fan-out capability value and the target fan-out capability value When value, the current operating parameter for controlling the air conditioner is remained unchanged, and according to the current operating parameter continuous service, until Meet the termination condition of corresponding operation phase.
6. the control method of air conditioner according to claim 1, which is characterized in that the data prestored include for referring to Show operation power and fan-out capability value relationship table or history data including the air conditioner or including with The history data of the identical more air conditioners of the model of the air conditioner or include identical as the model of the air conditioner Air conditioner model machine test data of experiment.
7. a kind of control method of server, which comprises the following steps:
Receive the status information and object run power that the air conditioner was sent in each operation phase, wherein described each The object run power of operation phase is entered by the air conditioner to be determined after electricity operational mode according to each operation phase Power consumption determines;
Target fan-out capability value and current is determined according to the data prestored and the object run power and status information that receive Fan-out capability value, and the target fan-out capability value and the current fan-out capability value are sent to the air conditioner, wherein institute It states target fan-out capability value and the current fan-out capability value is used to indicate the air conditioner and determines operating parameter.
8. the control method of server according to claim 7, which is characterized in that the status information of the air conditioner includes Indoor environment parameter and Outdoor Air Parameters, wherein data that the basis prestores and the object run power received and Status information determines that target fan-out capability value includes:
After receiving the object run power, the indoor environment parameter and the Outdoor Air Parameters, according to the interior Environmental parameter and Outdoor Air Parameters and the data prestored determine the corresponding target fan-out capability value of the object run power, And the target fan-out capability value is sent to the air conditioner.
9. the control method of server according to claim 8, which is characterized in that the status information of the air conditioner includes Current sensor data, wherein the data that the basis prestores and object run power and the status information determination received Currently fan-out capability value includes:
After receiving the current sensor data, the current defeated of the air conditioner is calculated according to the current sensor data Output capacity value, and the current fan-out capability value is sent to the air conditioner.
10. the control method of the server according to any one of claim 7-9, which is characterized in that the number prestored According to including the table for being used to indicate operation power and fan-out capability value relationship or including the history run number of the air conditioner According to or include more air conditioners identical with the model of the air conditioner history data or including with the sky Adjust the test data of experiment of the identical air conditioner model machine of model of device.
11. a kind of air conditioner characterized by comprising
First determining module, for the air conditioner enter determine electricity operational mode after, determine multiple operation phase and often The power consumption of a operation phase, and determine according to the power consumption of each operation phase the mesh of each operation phase Mark operation power;
Module is obtained, is believed for also obtaining the status information of the air conditioner in each operation phase, and by the state Breath and the object run power of corresponding operation phase are sent to server, wherein the status information and corresponding target Operation power is used to indicate the server and determines target fan-out capability value and current fan-out capability value by the data prestored;
Control module, the target fan-out capability value and current fan-out capability value sent for receiving the server, according to The target fan-out capability value and current fan-out capability value determine the operating parameter of the air conditioner, and are joined according to determining operation Number operation.
12. a kind of air conditioner, which is characterized in that on a memory and can be on a processor including memory, processor and storage The control program of the air conditioner of operation, the processor realize that claim 1-6 appoints when executing the control program of the air conditioner Method described in one.
13. a kind of computer readable storage medium, which is characterized in that be stored thereon with the control program of air conditioner, the air conditioner Control program claim 1-6 any method is realized when being executed by processor.
14. a kind of server characterized by comprising
Receiving module, the status information sent in each operation phase for receiving the air conditioner and object run power, Wherein, the object run power of each operation phase entered by the air conditioner determine after electricity operational mode according to it is described often The power consumption of a operation phase determines;
Second determining module, for determining target according to the data prestored and the object run power and status information that receive Fan-out capability value and current fan-out capability value, and the target fan-out capability value and the current fan-out capability value are sent to institute State air conditioner, wherein the target fan-out capability value and current fan-out capability value are used to indicate the air conditioner and determine operation ginseng Number.
15. a kind of server, which is characterized in that on a memory and can be on a processor including memory, processor and storage The control program of the server of operation, the processor realize that claim 7-10 appoints when executing the control program of the server Method described in one.
16. a kind of computer readable storage medium, which is characterized in that be stored thereon with the control program of server, the server Control program claim 7-10 any method is realized when being executed by processor.
17. a kind of air-conditioning system, which is characterized in that including air conditioner and server, wherein
The air conditioner determines the consumption of multiple operation phase and each operation phase into after determining electricity operational mode Electricity, and determine according to the power consumption of each operation phase the object run power of each operation phase;
The air conditioner also obtains the status information of the air conditioner in each operation phase, and by the status information with And the object run power of corresponding operation phase is sent to the server;
The server determines that target exports energy according to the data prestored and the object run power and status information that receive Force value and current fan-out capability value, and the target fan-out capability value and the order of current fan-out capability value are sent to the air-conditioning Device;
The air conditioner determines the operating parameter of the air conditioner according to the target fan-out capability value and current fan-out capability value, And it is run according to determining operating parameter.
18. air-conditioning system according to claim 17, which is characterized in that the air conditioner determines electricity operational mode in entrance Afterwards, the target total power consumption of object run period and the object run period are also obtained, and to the object run Period carries out segment processing with the determination the multiple operation phase, and according to the target total power consumption and each operation The time span in stage determines the power consumption of each operation phase.
19. air-conditioning system according to claim 18, which is characterized in that the air conditioner is further by the object run The target total power consumption and is evenly distributed to the multiple with equal part model split for the multiple operation phase by the period Operation phase.
20. air-conditioning system according to claim 17, which is characterized in that the status information of the air conditioner includes indoor ring Border parameter, Outdoor Air Parameters and current sensor data, wherein
The server is after receiving the object run power, the indoor environment parameter and the Outdoor Air Parameters, root The corresponding target of the object run power is determined according to the indoor environment parameter and Outdoor Air Parameters and the data prestored Fan-out capability value, and the target fan-out capability value is sent to the air conditioner;
The server calculates the air-conditioning after receiving the current sensor data, according to the current sensor data The current fan-out capability value of device, and the current fan-out capability value is sent to the air conditioner.
21. air-conditioning system according to claim 20, which is characterized in that the air conditioner is in the current fan-out capability value Current operating parameter is adjusted when being greater than preset threshold with the absolute difference of the target fan-out capability value, and according to the fortune of adjustment The operation of row parameter.
22. air-conditioning system according to claim 21, which is characterized in that the air conditioner is in the current fan-out capability value Control current operating parameter is kept when being less than or equal to the preset threshold with the absolute difference of the target fan-out capability value It is constant, and according to the current operating parameter continuous service, until meeting the termination condition of corresponding operation phase.
23. air-conditioning system described in any one of 7-22 according to claim 1, which is characterized in that the data prestored include Be used to indicate operation power and fan-out capability value relationship table or history data including the air conditioner or History data including more air conditioners identical with the model of the air conditioner or include type with the air conditioner The test data of experiment of number identical air conditioner model machine.
CN201811161617.6A 2018-09-30 2018-09-30 Air conditioner, server, air-conditioning system and control method Pending CN109323407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811161617.6A CN109323407A (en) 2018-09-30 2018-09-30 Air conditioner, server, air-conditioning system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811161617.6A CN109323407A (en) 2018-09-30 2018-09-30 Air conditioner, server, air-conditioning system and control method

Publications (1)

Publication Number Publication Date
CN109323407A true CN109323407A (en) 2019-02-12

Family

ID=65265773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811161617.6A Pending CN109323407A (en) 2018-09-30 2018-09-30 Air conditioner, server, air-conditioning system and control method

Country Status (1)

Country Link
CN (1) CN109323407A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111002784A (en) * 2019-12-03 2020-04-14 珠海格力电器股份有限公司 Intelligent electric quantity control method, computer readable storage medium and air conditioner
CN112366822A (en) * 2020-11-02 2021-02-12 珠海格力电器股份有限公司 Control method, device and system of photovoltaic equipment and photovoltaic air conditioner
CN112667020A (en) * 2020-12-11 2021-04-16 珠海格力电器股份有限公司 Output power control method and device of air sterilizer and air sterilizer
CN113251584A (en) * 2021-04-13 2021-08-13 Tcl空调器(中山)有限公司 Air conditioner operation control method, device, equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105222266A (en) * 2014-06-26 2016-01-06 广东美的制冷设备有限公司 The electric quantity controlling method of air-conditioner, Apparatus and system
CN108151233A (en) * 2017-12-25 2018-06-12 广东美的制冷设备有限公司 Electricity consumption amount control method, device, computer equipment, air conditioner and storage medium

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105222266A (en) * 2014-06-26 2016-01-06 广东美的制冷设备有限公司 The electric quantity controlling method of air-conditioner, Apparatus and system
CN108151233A (en) * 2017-12-25 2018-06-12 广东美的制冷设备有限公司 Electricity consumption amount control method, device, computer equipment, air conditioner and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111002784A (en) * 2019-12-03 2020-04-14 珠海格力电器股份有限公司 Intelligent electric quantity control method, computer readable storage medium and air conditioner
CN111002784B (en) * 2019-12-03 2021-05-07 珠海格力电器股份有限公司 Intelligent electric quantity control method, computer readable storage medium and air conditioner
CN112366822A (en) * 2020-11-02 2021-02-12 珠海格力电器股份有限公司 Control method, device and system of photovoltaic equipment and photovoltaic air conditioner
CN112667020A (en) * 2020-12-11 2021-04-16 珠海格力电器股份有限公司 Output power control method and device of air sterilizer and air sterilizer
CN113251584A (en) * 2021-04-13 2021-08-13 Tcl空调器(中山)有限公司 Air conditioner operation control method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109323407A (en) Air conditioner, server, air-conditioning system and control method
CN103069223B (en) Air conditioning control device, air conditioning control method and program
CN104676996B (en) The generation method of electric expansion valve initial opening and device
CN109323399A (en) Air conditioner, server, air-conditioning system and control method
CN104110799B (en) The integrated control method of air-conditioner electric expansion valve and circuit
CN102901180B (en) A kind of method and system controlling air-conditioning
KR102488347B1 (en) Apparatus and method for controlling air conditioner in air conditioning system
CN104956154B (en) Air handling system
US20180031261A1 (en) Environmental setpoint for hvac system control
CN109341013A (en) Air conditioner and its control method, device
JP6005304B2 (en) Ventilation control device and ventilation control method
US7871014B2 (en) System for controlling demand of multi-air-conditioner
CN108679800B (en) Control method and device of air conditioner
US20130014927A1 (en) Air-conditioning controlling system and air-conditioning controlling method
CN107014037B (en) Intelligent air conditioner control system and air conditioner
Raustad A variable refrigerant flow heat pump computer model in EnergyPlus
CN109323414B (en) Air conditioner, control method and control device thereof and electronic equipment
CN109323419A (en) The method and apparatus and air-conditioning system and equipment of peak of power consumption control air-conditioning
CN109579236A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN108644968A (en) Control method for air-conditioning system
CN104279717B (en) Air conditioner and control method and device thereof
JP2019163885A (en) Air-conditioning control device, air-conditioning control method and computer program
CN109974096A (en) Control method, air conditioner and the computer readable storage medium of air conditioner
CN109114750A (en) Control method, device and the computer readable storage medium of air-conditioner outdoor unit
CN108592353A (en) Control method for air-conditioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212