CN109284924A - Visual scheduling method and device based on Gantt chart - Google Patents
Visual scheduling method and device based on Gantt chart Download PDFInfo
- Publication number
- CN109284924A CN109284924A CN201811102261.9A CN201811102261A CN109284924A CN 109284924 A CN109284924 A CN 109284924A CN 201811102261 A CN201811102261 A CN 201811102261A CN 109284924 A CN109284924 A CN 109284924A
- Authority
- CN
- China
- Prior art keywords
- personnel
- work order
- schedulable
- allocated
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
Abstract
The present invention provides a kind of visual scheduling method and device based on Gantt chart, and the method for the invention includes handling duration and work order base station geographic position to be allocated needed for obtaining work order to be allocated;Obtain available work duration, kinds of skill and the current geographic position of schedulable personnel;Based on handling duration needed for work order to be allocated and the work order base station geographic position, the available work duration of schedulable personnel, schedulable personnel kinds of skill and current geographic position, at least one personal scheduling strategy is generated according to preset schedule strategy generating rule, so that management and running personnel confirm or select;If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, then show work order to be allocated, and be shown the available work duration of schedulable personnel in the form of a gantt chart, so that work order to be allocated is distributed to corresponding schedulable personnel by drag-and-drop operation by management and running personnel.
Description
Technical field
The present invention relates to communications field O&M operating technology fields, more particularly, to the visualization tune based on Gantt chart
Spend method and device.
Background technique
In communication network field, network O&M personnel are mainly responsible for the upper station O&M of each base station network, guarantee network just
Often operation, also needs the processing for taking into account emergency while Daily Round Check.And system is used to take simultaneously and opens personal management, clothes are opened
What personnel were mainly responsible for client traffic opens work, and the routine work of the personnel is many and diverse to be needed to carry out good allotment.
Following problem is primarily present when safeguarding two class personnel.Firstly, since network maintenance staff is usually substantially carried out day
Normal computer room, but also need to take into account carry out troubleshooting, since the priority for different grades of troubleshooting is different, need
Good scheduling strategy is timely and effectively distributed, and dispatcher is needed to be handled in time according to the workload of personnel.Pass through
Automatic dispatching strategy and manual intervention scheduling, both ensure that the timeliness of worksheet, the personnel of in turn ensuring are not in work
Measure excessively high situation.Meanwhile clothes open the daily responsible heavy workload of personnel, and according to the various subscription time situations of client, work
There is the case where modification in single time, such as will cause without timely and effective scheduling and take the prominent situation of one-shot that goes into operation, reduce client's
Satisfaction.
Summary of the invention
To solve the above-mentioned problems, present invention offer overcomes the above problem or at least is partially solved the side of the above problem
Method and device.
According to a first aspect of the embodiments of the present invention, the visual scheduling method based on Gantt chart is provided, comprising:
Handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;Obtain schedulable personnel can
With operating time, kinds of skill and current geographic position;
Available work based on handling duration needed for work order to be allocated and the work order base station geographic position, schedulable personnel
Duration, schedulable personnel kinds of skill and current geographic position, generated according to preset schedule strategy generating rule at least one
Personal scheduling strategy, so that management and running personnel confirm or select;
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, work order to be allocated is shown, and
The available work duration of schedulable personnel is shown in the form of a gantt chart, for management and running, personnel pass through drag-and-drop operation
Work order to be allocated is distributed into corresponding schedulable personnel.
Further, the method also includes:
When generating a variety of personal scheduling strategies, while based on preset schedule strategy marking rule to everyone's tune of generation
Degree strategy carries out recommendation marking, so that management and running personnel are according to the choosing of everyone's scheduling strategy progress personal scheduling strategy
It selects.
Further, the pre-generated scheduling strategy includes:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable people of target
Handling duration needed for the available work duration of member has to be larger than target work order to be allocated;
Calculate the distance in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated
Value, preferentially distributes to the schedulable personnel of target for the corresponding target of lowest distance value work order to be allocated.
Further, the method also includes: obtain the processing priority of schedulable personnel;
Correspondingly, the pre-generated scheduling strategy further include: when needing a work order to be allocated distributing to two
When one in the schedulable personnel of obstructed processing priority, one work order to be allocated and each schedulable personnel are calculated first
The distance value in geographical location;When the corresponding distance value of schedulable personnel of high disposal priority is more than the adjustable of reduction process priority
When the corresponding distance value preset threshold of degree personnel, one work order to be allocated is distributed into the adjustable of the reduction process priority
Degree personnel.
Further, the method also includes:
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, show work order to be allocated on ground
Position on figure, and show on map the position of the schedulable personnel in work order periphery to be allocated, for management and running personnel
Work order to be allocated is distributed into corresponding schedulable personnel by drag-and-drop operation.
According to another aspect of an embodiment of the present invention, a kind of visual scheduling device based on Gantt chart is provided, comprising:
Module is obtained, for handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;It obtains
Available work duration, kinds of skill and the current geographic position of schedulable personnel;
Scheduling strategy generation module, for based on handling duration and work order base station geographic position needed for work order to be allocated
Set, the available work duration of schedulable personnel, schedulable personnel kinds of skill and current geographic position, according to preset schedule plan
Slightly create-rule generates at least one personal scheduling strategy, so that management and running personnel confirm or select;
Display module is shown if any of the above-described personal scheduling strategy is not selected or confirmed for management and running personnel
Work order to be allocated, and the available work duration of schedulable personnel is shown in the form of a gantt chart, for management and running people
Work order to be allocated is distributed to corresponding schedulable personnel by drag-and-drop operation by member.
Further, described device further include:
Scoring modules are used for when generating a variety of personal scheduling strategies, while right based on preset schedule strategy marking rule
Everyone's scheduling strategy of generation carries out recommendation marking, so that management and running personnel carry out personnel according to everyone's scheduling strategy
The selection of scheduling strategy.
Further, the pre-generated scheduling strategy includes:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable people of target
Handling duration needed for the available work duration of member has to be larger than target work order to be allocated;
Calculate the distance in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated
Value, preferentially distributes to the schedulable personnel of target for the corresponding target of lowest distance value work order to be allocated.
Further, the acquisition module is also used to: obtaining the processing priority of schedulable personnel;
Correspondingly, the pre-generated scheduling strategy further include: when needing a work order to be allocated distributing to two
When one in the schedulable personnel of obstructed processing priority, one work order to be allocated and each schedulable personnel are calculated first
The distance value in geographical location;When the corresponding distance value of schedulable personnel of high disposal priority is more than the adjustable of reduction process priority
When the corresponding distance value preset threshold of degree personnel, one work order to be allocated is distributed into the adjustable of the reduction process priority
Degree personnel.
Further, described device further include: the second display module, if not selecting or confirming for management and running personnel
Any personal scheduling strategy is stated, then shows position of the work order to be allocated on map, and shows the work to be allocated on map
The position of the schedulable personnel of single perimeter, for management and running personnel by drag-and-drop operation work order to be allocated is distributed to it is corresponding adjustable
Degree personnel.
The present invention provides a kind of visual scheduling method and device based on Gantt chart, and the method for the invention includes obtaining
Handling duration needed for work order to be allocated and work order base station geographic position to be allocated;Obtain schedulable personnel available work duration,
Kinds of skill and current geographic position;Based on handling duration needed for work order to be allocated and the work order base station geographic position, adjustable
The available work duration of degree personnel, schedulable personnel kinds of skill and current geographic position, according to preset schedule strategy generating
Rule generates at least one personal scheduling strategy, so that management and running personnel confirm or select;If management and running personnel do not select
Select or confirm any of the above-described personal scheduling strategy, then show work order to be allocated, and by the available work duration of schedulable personnel with
The form of Gantt chart is shown, so that work order to be allocated is distributed to corresponding schedulable by drag-and-drop operation by management and running personnel
Personnel.The present invention guarantees the accurate and effective distribution of work order by being based on gunter diagram technology combination worksheet process mechanism.
Detailed description of the invention
Fig. 1 is the overall flow schematic diagram of the visual scheduling method based on Gantt chart of the embodiment of the present invention;
Fig. 2 is the general frame schematic diagram of the visual scheduling device based on Gantt chart of the embodiment of the present invention;
Fig. 3 is the structural block diagram of the electronic equipment of the embodiment of the present invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below
Example is not intended to limit the scope of the invention for illustrating the present invention.
By analyzing daily communication maintenance work, there are the following problems: most of net in existing communication maintenance work
There is the unbalanced state of workload for oneself maintenance work usually in network operation maintenance personnel, it is worked to will cause some of the staff
Weight;Dispatcher can not can effectively assign work in the presence of to oneself subordinate's O&M or the clothes personnel of holding, and can not improve whole work
Efficiency;Lack visual friendly interface, the distance of personnel and the amount of meeting are made and timely and effectively determined, carries out manual intervention
Adjustment.
To solve at least one above-mentioned technical problem, the visual scheduling method and device based on Gantt chart is provided.
Such as Fig. 1, a kind of overall flow schematic diagram of the visual scheduling method based on Gantt chart of the embodiment of the present invention is shown,
The following steps are included:
S1, handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;Obtain schedulable personnel
Available work duration, kinds of skill and current geographic position;
S2, based on handling duration needed for work order to be allocated and the work order base station geographic position, schedulable personnel it is available
Operating time, schedulable personnel kinds of skill and current geographic position, according to preset schedule strategy generating rule generate at least
A kind of personal scheduling strategy, so that management and running personnel confirm or select;
S3 shows work order to be allocated if management and running personnel do not select or confirm any of the above-described personal scheduling strategy,
And be shown the available work duration of schedulable personnel in the form of a gantt chart, so that management and running personnel are grasped by drag and drop
Make work order to be allocated distributing to corresponding schedulable personnel.
Wherein, this tool shows duration used in the existing work order amount of personnel and every worksheet by Gantt chart, provides each
The free time length of personnel adjusts the time used in each worksheet by the way that drag and drop of the work order on Gantt chart are carried out worksheet processing.
Further, work order is shown in work order operating space:
Task list is divided into four CM task, PM task, PLM task, Others task bookmarks, fixes in each bookmark
Include following task list:
" unscheduled " list: summarize all tasks that task status is " unscheduled " or " pre-scheduling ".
" scheduled " list: summarize task status be " having issued ", " receiving ", " in processing " all tasks.
" returned " list: summarize all tasks that task status is " returned ".
" being completed " list: summarizing task status is " being completed " all tasks.
Note: when thering is job order quantity to change in " returned " list in non-present task type bookmark, then should
Task type bookmark is highlighted, and is highlighted and is removed after clicking.
Note: ' Required Started Time ' ' Required Complete two fields of Time ' are directed to different works
Single extraction following respectively: CM work order: the create Time of work order is as the necessary time started suggested, required
Finished time is as the necessary end time;PM work order: (such as it is with week at the beginning of periodically to plan internal definition
Granularity, start work order in the 9 points of the morning on every Tuesdays of definition), calculating according to baseline must the end time;PLM work order: with filling
Task necessary time started and end time are standard.
Can be done as follows in task list: inquiry work order is inquired according to " time " " Title " " Site Name ".
And it can choose work order inquiry details;Work order arrangement: the Unscheduled&Rejected page carries out work order arrangement
(Schedule);The Scheduled page carries out work order arrangement and withdraws (Unschedule) and work order schedule (Dispatch);
The Dispatched page carries out work order and withdraws (Cancel Task).Note:, can only be to " having issued " when progress work order is withdrawn
Work order is withdrawn, and the work order of " reception " and " in processing " cannot be withdrawn.
Still further, including Gantt chart operating space so that management and running personnel operate Gantt chart.
Gantt chart operating space includes service engineer's list and Gantt chart.In Gantt chart: with white indicia maintenance engineering
Teacher's working time section (normal working period and overtime work period), with grey mark service engineer's non-working time section (when asking for leave
Section and be normally absent from duty the period).Note: Gantt chart need to dock duty management, will be shown in work order to the information of arranging an order according to class and grade of FME,
And it records.Work order timeline is selected in Gantt chart, can select withdraw work order with right button, it can be with when work order is not by accept
Withdraw is not allowed to withdraw by the work order of FME accept, carries out pop-up box prompt.Taskbar exhibition method: all
No matter work order auto form delivering, manual worksheet processing, arranged in order in Gantt chart according to the sequencing of worksheet processing.The of the same day
One work order distributed is since the working time.Auto form delivering WO: being calculated as dispatched, is put into job order.Automatic group
Necessary time started, the end time that hair work order is required according to work order are shown on Gantt chart and (can have superposition situation).
Note: increasing status field in job order, and whether display work order has carried out arrangement of time.It is distributed manually for what is charged to
Work order has scheduled field.Automatically the work order distributed does not carry out before arrangement of time as Unscheduled, and yellow is highlighted
Display.Manual worksheet processing WO: it checks the workload situation of FME in Gantt chart, distributes WO, WO is become from Unscheduled
scheduled.At the beginning of WO initial default is shown and the end time is this two information that work order has, and is allowed in gunter
Dragging modification is carried out on figure.WO is formally distributed in ' scheduled ' page.Vertical red line indicates current time.Gantt chart
Mission bit stream of the default display in relation to yesterday, today and tomorrow.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the method also includes:
When generating a variety of personal scheduling strategies, while based on preset schedule strategy marking rule to everyone's tune of generation
Degree strategy carries out recommendation marking, so that management and running personnel are according to the choosing of everyone's scheduling strategy progress personal scheduling strategy
It selects.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the pre-generated scheduling strategy include:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable people of target
Handling duration needed for the available work duration of member has to be larger than target work order to be allocated;
Calculate the distance in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated
Value, preferentially distributes to the schedulable personnel of target for the corresponding target of lowest distance value work order to be allocated.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the method also includes: obtain the processing priority of schedulable personnel;
Correspondingly, the pre-generated scheduling strategy further include: when needing a work order to be allocated distributing to two
When one in the schedulable personnel of obstructed processing priority, one work order to be allocated and each schedulable personnel are calculated first
The distance value in geographical location;When the corresponding distance value of schedulable personnel of high disposal priority is more than the adjustable of reduction process priority
When the corresponding distance value preset threshold of degree personnel, one work order to be allocated is distributed into the adjustable of the reduction process priority
Degree personnel.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the method also includes:
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, show work order to be allocated on ground
Position on figure, and show on map the position of the schedulable personnel in work order periphery to be allocated, for management and running personnel
Work order to be allocated is distributed into corresponding schedulable personnel by drag-and-drop operation.
Such as Fig. 2, a kind of overall flow schematic diagram of the visual scheduling device based on Gantt chart of the embodiment of the present invention is shown,
The following steps are included:
A1, handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;Obtain schedulable personnel
Available work duration, kinds of skill and current geographic position;
A2, based on handling duration needed for work order to be allocated and the work order base station geographic position, schedulable personnel it is available
Operating time, schedulable personnel kinds of skill and current geographic position, according to preset schedule strategy generating rule generate at least
A kind of personal scheduling strategy, so that management and running personnel confirm or select;
A3 shows work order to be allocated if management and running personnel do not select or confirm any of the above-described personal scheduling strategy,
And be shown the available work duration of schedulable personnel in the form of a gantt chart, so that management and running personnel are grasped by drag and drop
Make work order to be allocated distributing to corresponding schedulable personnel.
Wherein, this tool shows duration used in the existing work order amount of personnel and every worksheet by Gantt chart, provides each
The free time length of personnel adjusts the time used in each worksheet by the way that drag and drop of the work order on Gantt chart are carried out worksheet processing.
Further, work order is shown in work order operating space:
Task list is divided into four CM task, PM task, PLM task, Others task bookmarks, fixes in each bookmark
Include following task list:
" unscheduled " list: summarize all tasks that task status is " unscheduled " or " pre-scheduling ".
" scheduled " list: summarize task status be " having issued ", " receiving ", " in processing " all tasks.
" returned " list: summarize all tasks that task status is " returned ".
" being completed " list: summarizing task status is " being completed " all tasks.
Note: when thering is job order quantity to change in " returned " list in non-present task type bookmark, then should
Task type bookmark is highlighted, and is highlighted and is removed after clicking.
Note: ' Required Started Time ' ' Required Complete two fields of Time ' are directed to different works
Single extraction following respectively: CM work order: the create Time of work order is as the necessary time started suggested, required
Finished time is as the necessary end time;PM work order: (such as it is with week at the beginning of periodically to plan internal definition
Granularity, start work order in the 9 points of the morning on every Tuesdays of definition), calculating according to baseline must the end time;PLM work order: with filling
Task necessary time started and end time are standard.
Can be done as follows in task list: inquiry work order is inquired according to " time " " Title " " Site Name ".
And it can choose work order inquiry details;Work order arrangement: the Unscheduled&Rejected page carries out work order arrangement
(Schedule);The Scheduled page carries out work order arrangement and withdraws (Unschedule) and work order schedule (Dispatch);
The Dispatched page carries out work order and withdraws (Cancel Task).Note:, can only be to " having issued " when progress work order is withdrawn
Work order is withdrawn, and the work order of " reception " and " in processing " cannot be withdrawn.
Still further, including Gantt chart operating space so that management and running personnel operate Gantt chart.
Gantt chart operating space includes service engineer's list and Gantt chart.In Gantt chart: with white indicia maintenance engineering
Teacher's working time section (normal working period and overtime work period), with grey mark service engineer's non-working time section (when asking for leave
Section and be normally absent from duty the period).Note: Gantt chart need to dock duty management, will be shown in work order to the information of arranging an order according to class and grade of FME,
And it records.Work order timeline is selected in Gantt chart, can select withdraw work order with right button, it can be with when work order is not by accept
Withdraw is not allowed to withdraw by the work order of FME accept, carries out pop-up box prompt.Taskbar exhibition method: all
No matter work order auto form delivering, manual worksheet processing, arranged in order in Gantt chart according to the sequencing of worksheet processing.The of the same day
One work order distributed is since the working time.Auto form delivering WO: being calculated as dispatched, is put into job order.Automatic group
Necessary time started, the end time that hair work order is required according to work order are shown on Gantt chart and (can have superposition situation).
Note: increasing status field in job order, and whether display work order has carried out arrangement of time.It is distributed manually for what is charged to
Work order has scheduled field.Automatically the work order distributed does not carry out before arrangement of time as Unscheduled, and yellow is highlighted
Display.Manual worksheet processing WO: it checks the workload situation of FME in Gantt chart, distributes WO, WO is become from Unscheduled
scheduled.At the beginning of WO initial default is shown and the end time is this two information that work order has, and is allowed in gunter
Dragging modification is carried out on figure.WO is formally distributed in ' scheduled ' page.Vertical red line indicates current time.Gantt chart
Mission bit stream of the default display in relation to yesterday, today and tomorrow.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the method also includes:
When generating a variety of personal scheduling strategies, while based on preset schedule strategy marking rule to everyone's tune of generation
Degree strategy carries out recommendation marking, so that management and running personnel are according to the choosing of everyone's scheduling strategy progress personal scheduling strategy
It selects.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the pre-generated scheduling strategy include:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable people of target
Handling duration needed for the available work duration of member has to be larger than target work order to be allocated;
Calculate the distance in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated
Value, preferentially distributes to the schedulable personnel of target for the corresponding target of lowest distance value work order to be allocated.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling side based on Gantt chart is provided
Method, the method also includes: obtain the processing priority of schedulable personnel;
Correspondingly, the pre-generated scheduling strategy further include: when needing a work order to be allocated distributing to two
When one in the schedulable personnel of obstructed processing priority, one work order to be allocated and each schedulable personnel are calculated first
The distance value in geographical location;When the corresponding distance value of schedulable personnel of high disposal priority is more than the adjustable of reduction process priority
When the corresponding distance value preset threshold of degree personnel, one work order to be allocated is distributed into the adjustable of the reduction process priority
Degree personnel.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling dress based on Gantt chart is provided
It sets, the method also includes:
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, show work order to be allocated on ground
Position on figure, and show on map the position of the schedulable personnel in work order periphery to be allocated, for management and running personnel
Work order to be allocated is distributed into corresponding schedulable personnel by drag-and-drop operation.
On the basis of any of the above-described specific embodiment of the invention, a kind of visual scheduling method based on Gantt chart is provided
Electronic equipment, comprising: at least one processor;And at least one processor being connect with processor communication, wherein Fig. 3 be
The structural block diagram of electronic equipment provided in an embodiment of the present invention, comprising: processor (processor) 310, memory (memory)
320 and bus 330, wherein processor 310, memory 320 complete mutual communication by bus 330.Processor 310 can
To call the logical order in memory 320, to execute following method: handling duration needed for obtaining work order to be allocated and to be allocated
Work order base station geographic position;Obtain available work duration, kinds of skill and the current geographic position of schedulable personnel;Based on wait divide
With handling duration needed for work order and the work order base station geographic position, the available work duration of schedulable personnel, schedulable personnel
Kinds of skill and current geographic position, at least one personal scheduling strategy is generated according to preset schedule strategy generating rule, with
It is scheduled for administrative staff's confirmation or selection;If management and running personnel do not select or confirm any of the above-described personal scheduling strategy,
It shows work order to be allocated, and the available work duration of schedulable personnel is shown in the form of a gantt chart, to be scheduled for pipe
Work order to be allocated is distributed to corresponding schedulable personnel by drag-and-drop operation by reason personnel.
The embodiment of the present invention discloses a kind of computer program product, and computer program product includes being stored in non-transient calculating
Computer program on machine readable storage medium storing program for executing, computer program include program instruction, when program instruction is computer-executed,
Computer is able to carry out method provided by above-mentioned each method embodiment, for example, when obtaining processing needed for work order to be allocated
Long and work order base station geographic position to be allocated;Obtain available work duration, kinds of skill and the current geographic position of schedulable personnel
It sets;Based on handling duration needed for work order to be allocated and the work order base station geographic position, schedulable personnel available work duration,
The kinds of skill and current geographic position of schedulable personnel generates at least one personnel's tune according to preset schedule strategy generating rule
Degree strategy, so that management and running personnel confirm or select;If management and running personnel do not select or confirm any of the above-described personnel's tune
Degree strategy, then show work order to be allocated, and the available work duration of schedulable personnel is shown in the form of a gantt chart, with
It is scheduled for administrative staff and work order to be allocated is distributed to by corresponding schedulable personnel by drag-and-drop operation.
The embodiment of the present invention provides a kind of non-transient computer readable storage medium, non-transient computer readable storage medium
Computer instruction is stored, computer instruction makes computer execute method provided by above-mentioned each method embodiment, for example, obtains
Handling duration needed for taking work order to be allocated and work order base station geographic position to be allocated;When obtaining the available work of schedulable personnel
Long, kinds of skill and current geographic position;Based on handling duration needed for work order to be allocated and the work order base station geographic position, can
The available work duration of dispatcher, schedulable personnel kinds of skill and current geographic position, it is raw according to preset schedule strategy
At least one personal scheduling strategy is generated at rule, so that management and running personnel confirm or select;If management and running personnel do not have
It selects or confirms any of the above-described personal scheduling strategy, then show work order to be allocated, and by the available work duration of schedulable personnel
Be shown in the form of a gantt chart, for management and running personnel by drag-and-drop operation work order to be allocated is distributed to it is corresponding adjustable
Degree personnel.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program
When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: ROM, RAM, magnetic disk or light
The various media that can store program code such as disk.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can
It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on
Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should
Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers
It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation
The method of certain parts of example or embodiment.
The present invention guarantees the accurate of work order and effective point by being based on gunter diagram technology combination worksheet process mechanism
Match.
Finally, the method and apparatus being described in detail in present specification are only preferable embodiment, it is not intended to limit this
The protection scope of inventive embodiments.All spirit in the embodiment of the present invention within principle, equally replace by made any modification
It changes, improve, should be included within the protection scope of the embodiment of the present invention.
Claims (10)
1. a kind of visual scheduling method based on Gantt chart characterized by comprising
Handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;Obtain schedulable personnel can recruitment
Make duration, kinds of skill and current geographic position;
Based on handling duration needed for work order to be allocated and the work order base station geographic position, schedulable personnel available work when
The kinds of skill and current geographic position of long, schedulable personnel generates at least one people according to preset schedule strategy generating rule
Member's scheduling strategy, so that management and running personnel confirm or select;
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, work order to be allocated is shown, and can
The available work duration of dispatcher is shown in the form of a gantt chart, so that management and running personnel will be to by drag-and-drop operation
Distribution work order distributes to corresponding schedulable personnel.
2. the method according to claim 1, wherein the method also includes:
Plan is dispatched when generating a variety of personal scheduling strategies, while based on everyone of the preset schedule strategy marking rule to generation
Recommendation marking is carried out, slightly so that management and running personnel are according to the selection of everyone's scheduling strategy progress personal scheduling strategy.
3. the method according to claim 1, wherein the pre-generated scheduling strategy includes:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable personnel's of target
Handling duration needed for available work duration has to be larger than target work order to be allocated;
The distance value in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated is calculated, it is excellent
The corresponding target of lowest distance value work order to be allocated is first distributed into the schedulable personnel of target.
4. according to the method described in claim 3, it is characterized in that, the method also includes: obtain the processing of schedulable personnel
Priority;
Correspondingly, the pre-generated scheduling strategy further include: obstructed when needing to distribute to a work order to be allocated two
When one in the schedulable personnel of processing priority, one work order to be allocated is calculated first and each schedulable personnel are geographical
The distance value of position;When the corresponding distance value of schedulable personnel of high disposal priority is more than the schedulable people of reduction process priority
When the corresponding distance value preset threshold of member, one work order to be allocated is distributed to the schedulable people of the reduction process priority
Member.
5. the method according to claim 1, wherein the method also includes:
If management and running personnel do not select or confirm any of the above-described personal scheduling strategy, show work order to be allocated on map
Position, and show on map the position of the schedulable personnel in work order periphery to be allocated, personnel pass through for management and running
Work order to be allocated is distributed to corresponding schedulable personnel by drag-and-drop operation.
6. a kind of visual scheduling device based on Gantt chart characterized by comprising
Module is obtained, for handling duration needed for obtaining work order to be allocated and work order base station geographic position to be allocated;It obtains adjustable
Available work duration, kinds of skill and the current geographic position of degree personnel;
Scheduling strategy generation module, for based on handling duration needed for work order to be allocated and the work order base station geographic position, can
The available work duration of dispatcher, schedulable personnel kinds of skill and current geographic position, it is raw according to preset schedule strategy
At least one personal scheduling strategy is generated at rule, so that management and running personnel confirm or select;
Display module is shown if any of the above-described personal scheduling strategy is not selected or confirmed for management and running personnel wait divide
It is shown in the form of a gantt chart with work order, and by the available work duration of schedulable personnel, so that management and running personnel are logical
It crosses drag-and-drop operation and work order to be allocated is distributed into corresponding schedulable personnel.
7. device according to claim 6, which is characterized in that described device further include:
Scoring modules, for giving a mark rule to generation when generating a variety of personal scheduling strategies, while based on preset schedule strategy
Everyone's scheduling strategy carry out recommendation marking, for management and running personnel according to everyone's scheduling strategy carry out personal scheduling
The selection of strategy.
8. device according to claim 6, which is characterized in that the pre-generated scheduling strategy includes:
The kinds of skill of the schedulable personnel of target must be completely corresponding with target work order to be allocated;The schedulable personnel's of target
Handling duration needed for available work duration has to be larger than target work order to be allocated;
The distance value in the schedulable personnel geographical location of the target and target work order base station geographic position to be allocated is calculated, it is excellent
The corresponding target of lowest distance value work order to be allocated is first distributed into the schedulable personnel of target.
9. device according to claim 8, which is characterized in that the acquisition module is also used to: obtaining schedulable personnel's
Processing priority;
Correspondingly, the pre-generated scheduling strategy further include: obstructed when needing to distribute to a work order to be allocated two
When one in the schedulable personnel of processing priority, one work order to be allocated is calculated first and each schedulable personnel are geographical
The distance value of position;When the corresponding distance value of schedulable personnel of high disposal priority is more than the schedulable people of reduction process priority
When the corresponding distance value preset threshold of member, one work order to be allocated is distributed to the schedulable people of the reduction process priority
Member.
10. device according to claim 6, which is characterized in that described device further include:
Second display module is shown if any of the above-described personal scheduling strategy is not selected or confirmed for management and running personnel
Position of the work order to be allocated on map, and show on map the position of the schedulable personnel in work order periphery to be allocated, with
It is scheduled for administrative staff and work order to be allocated is distributed to by corresponding schedulable personnel by drag-and-drop operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811102261.9A CN109284924A (en) | 2018-09-20 | 2018-09-20 | Visual scheduling method and device based on Gantt chart |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811102261.9A CN109284924A (en) | 2018-09-20 | 2018-09-20 | Visual scheduling method and device based on Gantt chart |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109284924A true CN109284924A (en) | 2019-01-29 |
Family
ID=65181710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811102261.9A Pending CN109284924A (en) | 2018-09-20 | 2018-09-20 | Visual scheduling method and device based on Gantt chart |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109284924A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111462873A (en) * | 2020-03-02 | 2020-07-28 | 心医国际数字医疗系统(大连)有限公司 | Inter-yard dispatch management system and method |
CN113642924A (en) * | 2021-08-30 | 2021-11-12 | 北京沃东天骏信息技术有限公司 | Service resource matching method and device |
CN115936385A (en) * | 2022-12-16 | 2023-04-07 | 广东诚誉工程咨询监理有限公司 | Power grid engineering intelligent supervision and control platform system and method |
CN117114366A (en) * | 2023-10-23 | 2023-11-24 | 天津中新智冠信息技术有限公司 | Work order distribution method and device, electronic equipment and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030115088A1 (en) * | 2001-12-18 | 2003-06-19 | Crossmark, Inc. | System and method of routing, scheduling, and monitoring a workforce |
CN103955770A (en) * | 2014-05-04 | 2014-07-30 | 广东怡创科技股份有限公司 | Dispatching command system |
CN103955771A (en) * | 2014-05-04 | 2014-07-30 | 广东怡创科技股份有限公司 | Cost optimizing calculation method for on-site operation |
CN105160453A (en) * | 2015-07-16 | 2015-12-16 | 北京中亦安图科技股份有限公司 | Task allocating method, device, and system based on location service |
CN106022628A (en) * | 2016-05-27 | 2016-10-12 | 内蒙古自治区民航机场集团有限责任公司 | Airport work distributing, monitoring and scheduling system based on mobile terminals, and method thereof |
CN108133321A (en) * | 2017-12-21 | 2018-06-08 | 广州供电局有限公司 | Specially become O&M trustship work management method, system, medium and computer equipment |
-
2018
- 2018-09-20 CN CN201811102261.9A patent/CN109284924A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030115088A1 (en) * | 2001-12-18 | 2003-06-19 | Crossmark, Inc. | System and method of routing, scheduling, and monitoring a workforce |
CN103955770A (en) * | 2014-05-04 | 2014-07-30 | 广东怡创科技股份有限公司 | Dispatching command system |
CN103955771A (en) * | 2014-05-04 | 2014-07-30 | 广东怡创科技股份有限公司 | Cost optimizing calculation method for on-site operation |
CN105160453A (en) * | 2015-07-16 | 2015-12-16 | 北京中亦安图科技股份有限公司 | Task allocating method, device, and system based on location service |
CN106022628A (en) * | 2016-05-27 | 2016-10-12 | 内蒙古自治区民航机场集团有限责任公司 | Airport work distributing, monitoring and scheduling system based on mobile terminals, and method thereof |
CN108133321A (en) * | 2017-12-21 | 2018-06-08 | 广州供电局有限公司 | Specially become O&M trustship work management method, system, medium and computer equipment |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111462873A (en) * | 2020-03-02 | 2020-07-28 | 心医国际数字医疗系统(大连)有限公司 | Inter-yard dispatch management system and method |
CN113642924A (en) * | 2021-08-30 | 2021-11-12 | 北京沃东天骏信息技术有限公司 | Service resource matching method and device |
CN115936385A (en) * | 2022-12-16 | 2023-04-07 | 广东诚誉工程咨询监理有限公司 | Power grid engineering intelligent supervision and control platform system and method |
CN117114366A (en) * | 2023-10-23 | 2023-11-24 | 天津中新智冠信息技术有限公司 | Work order distribution method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109284924A (en) | Visual scheduling method and device based on Gantt chart | |
CN105354762B (en) | Power customer service work order identification and distribution system and method | |
CN111126748A (en) | Dynamic production plan scheduling method for discrete manufacturing industry | |
US20100257015A1 (en) | Graphical client interface resource and work management scheduler | |
CN106779308A (en) | A kind of System and method for of the shop Planning scheduling towards discrete manufacture | |
CN106681291A (en) | Production scheduling method and system | |
Lin et al. | Graduation manufacturing system: synchronization with IoT-enabled smart tickets | |
CN104318386B (en) | A kind of aviation MRO industry Manufacture Execution method and system | |
AU2021290248A1 (en) | System for intelligent work order based on graphical strategy programming engine and working method thereof | |
DE102010004192A1 (en) | Process for the construction of industrial plants | |
CN110110978A (en) | A kind of MES system for cabinet automatic assembly line | |
US7421372B1 (en) | Maintenance scheduling method | |
US10410178B2 (en) | Method for graphical pull planning with active work schedules | |
Barlatt et al. | Ford motor company implements integrated planning and scheduling in a complex automotive manufacturing environment | |
CN103136611A (en) | Digitization generation method for emergency plan | |
US20040068427A1 (en) | Four-dimensional resource allocation system | |
CN102467690A (en) | Method and device for controlling shipbuilding production flow | |
DE102008053274A1 (en) | Method for controlling a plurality of production processes | |
JP2006146530A (en) | Scheduling support system | |
JP2012118654A (en) | Personnel assignment support system and method for process planning | |
Vernon | Lingering amongst the lingerie: An observation-based study into support for scheduling at a garment manufacturer | |
Crawford | Making sense of scheduling: the realities of scheduling practice in an engineering firm | |
JP2003280728A (en) | Production scheduling control method and production scheduling control program | |
JP2004145591A (en) | System and method for distributing production capacity | |
EP1352348A1 (en) | Interactive implementation and representation of state of operative planning processes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190129 |