CN109214690A - A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method - Google Patents

A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method Download PDF

Info

Publication number
CN109214690A
CN109214690A CN201811072190.2A CN201811072190A CN109214690A CN 109214690 A CN109214690 A CN 109214690A CN 201811072190 A CN201811072190 A CN 201811072190A CN 109214690 A CN109214690 A CN 109214690A
Authority
CN
China
Prior art keywords
plan
maintenance
repair
management module
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811072190.2A
Other languages
Chinese (zh)
Inventor
张靖之
张艳青
金秋乐
韦伟
赵自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Cloud Rail Information Technology Co Ltd
Original Assignee
Anhui Cloud Rail Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Cloud Rail Information Technology Co Ltd filed Critical Anhui Cloud Rail Information Technology Co Ltd
Priority to CN201811072190.2A priority Critical patent/CN109214690A/en
Publication of CN109214690A publication Critical patent/CN109214690A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of multi-factor evaluation car inspection and repair plans to balance scheduling system and method, belongs to car inspection and repair technical field.The planning management module of program system of the invention, for carrying out layout and management to the annual plan of car inspection and repair, monthly plan, week plan;Thread management module is repaired, for Cheng Jinhang digitization is repaired, formation 12 is variable to repair journey;Vehicle health state evaluation module, health status used for vehicles are evaluated, and from vehicle reliability, critical component detection parameters, life prediction and defect hidden danger various dimensions constitute vehicle health evaluation, provide foundation to formulate maintenance plan scheduling and part replacement;Job management module, for being managed to according to the upkeep operation task of final maintenance plan formation.The present invention adjusts repair Cheng Shunxu and repair time according to the actual situation, scientific and rational plan layout, is conducive to improve the online rate of train, while improving the reliability and safety of vehicle.

Description

A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method
Technical field
The present invention relates to car inspection and repair technical fields, more specifically to a kind of multi-factor evaluation car inspection and repair Plan balance scheduling system and method.
Background technique
Urban rail transit vehicles be with, service work Rail Transit System important component.With city The development of rail traffic, gradually forms Rail traffic network, and this requires the utilization of urban rail transit vehicles and service works It must adapt to the overhaul management system of urban mass transit network, improve car inspection and repair quality and overhaul efficiency, guarantee vehicle fortune With efficiency and safety.
Existing urban rail transit vehicles maintenance plan is according to traveling mileage or with the time come layout, by operation Subsequent " breakdown maintenance " that mileage and service time carry out preventative " planned maintenance " and train breaks down, to vehicle arrangement into Row regularly preventative maintenance, including daily test, double all inspections, monthly test, three monthly tests, periodical repair and un-wheeling repair etc., the maintenance of each rank is made Hold in the industry it is many and diverse, maintenance content degree of redundancy it is larger, and ordinary maintenance can only train exit operation after carry out, maintenance activity Process occupies the excessive service time, causes vehicle utilization rate low.Simultaneously with the continuous improvement of metro operation level, expose Following problem.
(1) maintenance task is completed in order to guarantee the quality, it has to take interim measures, not only increase workload, but also imitate work Rate is impacted, also causes the waste of human and material resources to a certain extent.
(2) contradiction of capacity and freight volume becomes increasingly conspicuous.With along the development of urban economy and subway infrastructure it is complete Kind, metro passenger flow demand is continuously increased, and proposes very high requirement to vehicle in use operational percentage, and railcar quantity without Increase accordingly, how the needs of further satisfaction Rail traffic network operation, improve the operational percentage of train, promote capacity, delay Solve the contradiction of increasingly serious capacity and freight volume.
(3) existing maintenance instruction is not able to satisfy vehicle maintenance requirements under existence conditions.It arranges and carrys out maintenance plan and execute again When do not change flexibly, do not account for the situation of vehicle, be equivalent to periodical repair, will cause the generation for repairing or owing phenomena such as repairing.
Through retrieving, Chinese Patent Application No. 201611222420.X, the applying date is on December 27th, 2016, innovation and creation name Referred to as: based on the Transit Equipment year maintenance plan pre- discharge method automatically for repairing journey;The year maintenance plan of this application is automatically pre- Discharge method: step 1, input year overhaul planning chart template, facility information table, history record of examination and repair journey table;Step 2 recalls Year maintenance planning chart template;Step 3, filling year overhaul planning chart template;It is filtered out from facility information table and belongs to certain route All repair apparatus of profession, and the corresponding service information of each repair apparatus is read in journey table from repairing, by repair apparatus and correspondence Service information be filled into year maintenance planning chart template;Step 4 establishes objective function and constraint condition;Step 5, will filling after Year maintenance planning chart template initial year maintenance plan is generated according to objective function and constraint condition, by annual maintenance task It is assigned to 12 middle of the month;Step 6 audits initial year maintenance plan, is intended to be with year maintenance after the approval Final year maintenance plan.This application improves the maintainability and economy of overhaul of the equipments, avoids artificial walkthrough annual test meter Working efficiency caused by drawing is low, arranges phenomena such as not reasonable, but this application is just for the annual test plan of Transit Equipment Automatic walkthrough is carried out, there is no this most important equipment is independent by vehicle;Walkthrough the result is that year maintenance plan, does not have Related variation is made to the maintenance task of every month according to the actual conditions that equipment is run.
Summary of the invention
1. technical problems to be solved by the inivention
It is an object of the invention to overcome above-mentioned problems of the prior art, a kind of multi-factor evaluation is provided Car inspection and repair plan balances scheduling system and method, and the present invention is by commenting from repairing the multi-factor comprehensives such as journey modularization, vehicle condition Estimate maintenance plan, so that adjustment is repaired Cheng Shunxu and repair time according to the actual situation, scientific and rational plan layout, favorably In the raising online rate of train, while improving the reliability and safety of vehicle.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of multi-factor evaluation car inspection and repair plan balance program system of the invention, including planning management module, Repair thread management module, vehicle health state evaluation module and job management module, in which:
The planning management module, for the annual plan of car inspection and repair, monthly plan, week plan carry out layout and Management;
Described repairs thread management module, for Cheng Jinhang digitization is repaired, formation 12 is variable to repair journey;
The vehicle health state evaluation module, health status used for vehicles are evaluated, from vehicle reliability, Critical component detection parameters, life prediction and defect hidden danger various dimensions constitute vehicle health evaluation, to formulate maintenance plan scheduling Foundation is provided with part replacement;
The job management module, for carrying out pipe to according to the upkeep operation task of final maintenance plan formation Reason.
Further, thread management module, planning management module and the job management module of repairing is sequentially connected, and completes number According to interaction;The planning management module is connected with vehicle health state evaluation module, completes data interaction.
Further, the program system further includes multiple station billboard and hand-held maintenance terminal, station billboard Using touching display screen, mode is connected system with hand-held maintenance terminal by wireless communication, realizes with hand-held maintenance eventually The information exchange at end is intended to variation and is presented to related service personnel.
A kind of multi-factor evaluation car inspection and repair plan of the invention balances scheduling method, the steps include:
Step 1: the annual maintenance total amount of train it is constant, do not change the maintenance cycle of each component and repair depth feelings Under condition, the maintenance content of traditional plan and control originally is split in monthly test, new maintenance procedure is formed;
Step 2: annual plan, monthly plan and week plan are worked out according to journey is repaired;
Step 3: comprehensively utilizing the support of multi-source monitoring data, and vehicle operation data is relied on to establish commenting for automation collection Valence index carries out logical operation, evaluates vehicle health state;
Step 4: according to step 3 data processed result, variation is made an amendment to Strategies of Maintenance;
Step 5: institute's layout is planned to be presented to related maintenance people on station billboard and/or hand-held maintenance terminal Member, maintenance personal repair operation according to plan.
Further, it is that drivers' cab is electrical that the division of teaching contents repaired is intended in step 1, and guest room is electrical, guest room, driver Indoor dress, car door is electrical under vehicle, bogie, hitch, car body, run-through channel, and braking system and air gas circuit, drivers' cab function are surveyed Commissioning examination is moved in examination, guest room functional test, and it includes several overhauling projects in each maintenance task that special project, which repairs 12 maintenance tasks, It the time between overhauls(TBO) for determining each overhauling project according to train maintenance instruction manual, was allocated by 12 months, makes to concentrate maintenance originally Mode be converted to by it is monthly divide equally, make full use of the window time of car operation peak Hui Ku to be overhauled.
Further, annual plan in annual October carries out rolling volume according to the plan of previous year in step 2 System, each repaired the time interval controls of journey at 30 days, positive and negative deviation 15%;To each monthly maintenance task amount and this year The maintenance task amount of degree is counted.
Monthly plan is worked out according to annual plan, and plan time is not across the moon when establishment, to the maintenance task of every train Amount and this monthly maintenance task amount are counted, monthly plan include maintenance in need train;
Week plan carries out layout according to monthly plan, plans in week comprising overhauling train number, repairs journey title, maintenance teams and groups, inspection Repair personnel's number, inspector, technology rectification.
Further, monitoring data described in step 3 include the body system, built in system, hitch system of train System, run-through channel system, door device, bogie system, air-conditioning and heating system, lighting system, low-voltage power supply system, air system Dynamic system, passenger information system, fire alarm system, main circuit system, trailer system, secondary power system and network-control system The operating status of system, malfunction, runing time.
Further, in step 3 vehicle health evaluation state objective function are as follows:
Wherein xijKey characterization parameter j, the count (x of expression system iij) it is counting function, system is alerted Number adds up, Δ parameter (yij) it is parameter fluctuation function, indicate the parameter fluctuation value of system, yijIt is to pass through system Parameter logistics operation obtains, and F (x) is evaluation result value, and the health status for being worth bigger expression vehicle is poorer, is worth smaller expression vehicle Health status it is better.
Further, step 4 does following variation to Strategies of Maintenance:
1) three vehicles minimum to comprehensive score, maintenance plan of giving priority in arranging for;
2) five low vehicles of comprehensive score time are wanted the time advance of car inspection and repair no more than the time in step 2 It asks;
3) it according to the accumulative alarm number of system in step 3, related journey task of repairing will be overhauled in advance with the system.
3. beneficial effect
Using technical solution provided by the invention, compared with existing well-known technique, there is following remarkable result:
(1) a kind of multi-factor evaluation car inspection and repair plan of the invention balances program system, planning management module Layout and management are carried out to the annual plan of car inspection and repair, monthly plan, week plan, repair thread management module to repairing Cheng Jinhang data Change, formation 12 is variable to repair journey, and vehicle health state evaluation module evaluates the health status of vehicle, to formulate inspection It repairs plan scheduling and part replacement provides foundation, job management module is appointed to according to the upkeep operation of final maintenance plan formation Business is managed, and four module cooperative cooperations reduce the inspection of single vehicles using new maintenance model, while using the empty window phase The time is repaired, the service time of train is increased, improves vehicle utilization rate;
(2) a kind of multi-factor evaluation car inspection and repair plan of the invention balances program system, in many ways in real time Notify related service personnel comprising be shown by station billboard, real-time informing correlation service personnel, which can Using touching display screen, easy access personnel's is operated with, and mode and hand-held maintenance terminal phase by wireless communication Even, the information exchange for realizing system and hand-held maintenance terminal is intended to variation and is presented to related service personnel;
(3) a kind of multi-factor evaluation car inspection and repair plan of the invention balances scheduling method, has carried out maintenance plan Optimization, improve vehicle utilization rate, improve the operational percentage of train, promote capacity, alleviate increasingly serious capacity and freight volume Contradiction;
(4) a kind of multi-factor evaluation car inspection and repair plan of the invention balances scheduling method, to rail traffic vehicles The multi-factor evaluations such as maintenance procedure and vehicle condition, provide maintenance plan strategy, not only increase overhaul efficiency, compensate for The deficiency of scheduled overhaul mode also greatly improves the online rate of train, the reliability of vehicle and safety.
Detailed description of the invention
Fig. 1 is a kind of module diagram of multi-factor evaluation car inspection and repair plan balance program system of the invention;
Fig. 2 is a kind of flow diagram of multi-factor evaluation car inspection and repair plan balance scheduling method of the invention.
Specific embodiment
To further appreciate that the contents of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.
Embodiment 1
In conjunction with Fig. 1, a kind of multi-factor evaluation car inspection and repair plan of the present embodiment balances program system, including plan Management module, to repair thread management module, vehicle health state evaluation module, job management module, multiple station billboard (touch aobvious Display screen) and hand-held maintenance terminal (PDA).Wherein, system real-time informing correlation service personnel in many ways comprising logical It crosses station billboard to be shown, touching display screen, easy access can be used in real-time informing correlation service personnel, the station billboard Personnel's operates with, and mode is connected with hand-held maintenance terminal by wireless communication, realizes system and hand-held maintenance eventually The information exchange at end is intended to variation and is presented to related service personnel.Station billboard (touching display screen) can show the work Essential information, maintenance task and the job instruction of position, failure propose report, the submission of work order.Hand-held maintenance terminal (PDA) can Inspection is put in task push.It is described repair thread management module, planning management module is connected with job management module, planning management mould Block is connected with vehicle health state evaluation module.
The planning management module, for the annual plan of car inspection and repair, monthly plan, week plan carry out layout and Management.
Described repairs thread management module, for Cheng Jinhang digitization is repaired, formation 12 is variable to repair journey.
The vehicle health state evaluation module, health status used for vehicles are evaluated, from vehicle reliability, Critical component detection parameters, life prediction and defect hidden danger various dimensions constitute vehicle health evaluation, to formulate maintenance plan scheduling Foundation is provided with part replacement.
The job management module, for carrying out pipe to according to the upkeep operation task of final maintenance plan formation Reason.
In conjunction with Fig. 2, a kind of multi-factor evaluation car inspection and repair plan of the present embodiment balances scheduling method, including following Step:
Step 1: the annual maintenance total amount of train it is constant, do not change the maintenance cycle of each component and repair depth feelings Under condition, scientifically and rationally the maintenance content of traditional plan and control originally is split in monthly test, forms new maintenance procedure.Specifically such as Under:
Being intended to the division of teaching contents repaired is that drivers' cab is electrical, and guest room is electrical, and guest room, drivers' cab are built-in, car door, Che Xia electricity Gas, bogie, hitch, car body, run-through channel, braking system and air gas circuit, drivers' cab functional test, guest room functional test are moved Commissioning examination, special project repair 12 maintenance tasks, include several overhauling projects in each maintenance task, according to train maintenance instruction manual It the time between overhauls(TBO) for determining each overhauling project, was allocated by 12 months, makes to concentrate the mode of maintenance to be converted to by monthly originally Respectively, the window time of car operation peak Hui Ku is made full use of to be overhauled.
Step 2: annual plan, monthly plan and week plan are worked out according to journey is repaired.It is specific as follows:
Annual plan carries out rolling establishment according to the plan of previous year in annual October, each repairs the time interval of journey Control was at 30 days or so, positive and negative deviation 15%.To each monthly maintenance task amount and the maintenance task amount in the current year There is statistics.
Monthly plan is worked out according to annual plan, and plan time not appoint the maintenance of every train across the moon when establishment Business amount and this monthly maintenance task amount have statistics, to prevent omitting, monthly plan include maintenance in need train.
Week plan carries out layout according to monthly plan, plans in week comprising overhauling train number, repairs journey title, maintenance teams and groups, inspection Repair personnel's number, inspector, technology rectification.
Step 3: comprehensively utilizing the support of multi-source monitoring data, and vehicle operation data is relied on to establish commenting for automation collection Valence index carries out logical operation, evaluates vehicle health state.
In above-mentioned steps, the multi-source monitoring data include the body system of train, built in system, coupler system, Run-through channel system, door device, bogie system, air-conditioning and heating system, lighting system, low-voltage power supply system, air damping System, passenger information system, fire alarm system, main circuit system, trailer system, secondary power system and network control system Operating status, malfunction, runing time.If pantograph, wheel are to, battery, operation milimeter number.
By the parameter of each system more than acquiring, the fluction analysis of multi-parameter is carried out:
Failure is calculated using cumulative alarm number, accumulation calculating such as is carried out to the alarm number of door device.Its In, system core characteristic parameter determines: key characterization parameter refers to that this feature parameter has particularly important influence in the system, such as should Characteristic parameter up to standard cannot will seriously affect the normal work of the system.The confirmation of key characterization parameter needs administrative staff, skill The personnel such as art personnel, technologist, maintenance personal discuss to the parameter of system monitoring.
The objective function of vehicle health evaluation state are as follows:
Wherein xijKey characterization parameter j, the count (x of expression system iI, j) it is counting function, system is alerted Number adds up, Δ parameter (yij) it is parameter fluctuation function, indicate the parameter fluctuation value of system, yijIt is to pass through system Parameter is obtained by logical operation, and F (x) is evaluation result value, and the health status for being worth bigger expression vehicle is poorer, is worth smaller table Show that the health status of vehicle is better.
The key characterization parameter x of vehicle health evaluation model identification train systemijWith other parameters aij.To train system The number that whether alerts of key characterization parameter counted.There is no alarms to believe for the key characterization parameter of train system Breath carries out the operation about parameter fluctuation to key characterization parameter and system other parameters.Parameter is normalized, if The intrinsic range of quantitative shape parameter i is [Mmin, Mmax], the normalization formula of the parameter index for being the bigger the better isNormalization formula for the smaller the better parameter index isTo normalized number According to standard deviation calculation process is carried out, the formula of standard deviation is calculatedIt indicates to join with last standard deviation result Several fluctuation situation, wherein the average value of μ expression parameter fluctuation.
Step 4: according to step 3 data processed result, there is following variation to Strategies of Maintenance:
1) three vehicles minimum to comprehensive score, maintenance plan of giving priority in arranging for;
2) five low vehicles of comprehensive score time are wanted the time advance of car inspection and repair no more than the time in step 2 It asks, i.e., the time overhauled in advance is no more than the 15% of 30 days;
3) it according to the accumulative alarm number of certain system in step 3, related journey task of repairing will be overhauled in advance with the system.
A kind of multi-factor evaluation car inspection and repair plan of the present embodiment balances scheduling system and method, by track The multi-factor evaluations such as vehicular traffic maintenance procedure and vehicle condition, provide maintenance plan strategy.Not only increase maintenance effect Rate compensates for the deficiency of scheduled overhaul mode, also substantially increases the online rate of train, the reliability of vehicle and safety.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution Similar frame mode and embodiment, are within the scope of protection of the invention.

Claims (9)

1. a kind of multi-factor evaluation car inspection and repair plan balances program system, it is characterised in that: including planning management module, Repair thread management module, vehicle health state evaluation module and job management module, in which:
The planning management module, for carrying out layout and pipe to the annual plan of car inspection and repair, monthly plan, week plan Reason;
Described repairs thread management module, for Cheng Jinhang digitization is repaired, formation 12 is variable to repair journey;
The vehicle health state evaluation module, health status used for vehicles are evaluated, from vehicle reliability, key Component detection parameters, life prediction and defect hidden danger various dimensions constitute vehicle health evaluation, to formulate maintenance plan scheduling and portion Part replacement provides foundation;
The job management module, for being managed to according to the upkeep operation task of final maintenance plan formation.
2. a kind of multi-factor evaluation car inspection and repair plan according to claim 1 balances program system, feature exists In: thread management module, planning management module and the job management module of repairing is sequentially connected, and completes data interaction;The plan Management module is connected with vehicle health state evaluation module, completes data interaction.
3. a kind of multi-factor evaluation car inspection and repair plan according to claim 1 or 2 balances program system, feature Be: the program system further includes multiple station billboard and hand-held maintenance terminal, and station billboard uses touch display Screen, mode is connected system with hand-held maintenance terminal by wireless communication, realizes the information exchange with hand-held maintenance terminal, will Planned change is presented to related service personnel.
4. a kind of multi-factor evaluation car inspection and repair plan balances scheduling method, which is characterized in that the steps include:
Step 1: the annual maintenance total amount of train it is constant, do not change the maintenance cycle of each component and maintenance depth in the case where, Originally the maintenance content of traditional plan and control is split in monthly test, new maintenance procedure is formed;
Step 2: annual plan, monthly plan and week plan are worked out according to journey is repaired;
Step 3: comprehensively utilizing the support of multi-source monitoring data, and the evaluation for relying on vehicle operation data to establish automation collection refers to Mark carries out logical operation, evaluates vehicle health state;
Step 4: according to step 3 data processed result, variation is made an amendment to Strategies of Maintenance;
Step 5: by institute's layout plan be presented to related maintenance personal on station billboard and/or hand-held maintenance terminal, tie up It repairs personnel and repairs operation according to plan.
5. a kind of multi-factor evaluation car inspection and repair plan according to claim 4 balances scheduling method, feature exists In: it is that drivers' cab is electrical that the division of teaching contents repaired is intended in step 1, and guest room is electrical, and guest room, drivers' cab are built-in, car door, under vehicle Electrically, bogie, hitch, car body, run-through channel, braking system and air gas circuit, drivers' cab functional test, guest room functional test, Dynamic commissioning examination, special project repair 12 maintenance tasks, include several overhauling projects in each maintenance task, according to train maintenance instruction Book determines the time between overhauls(TBO) of each overhauling project, is allocated by 12 months, makes to concentrate the mode of maintenance to be converted to monthly originally Degree is divided equally, and the window time of car operation peak Hui Ku is made full use of to be overhauled.
6. a kind of multi-factor evaluation car inspection and repair plan according to claim 5 balances scheduling method, feature exists In: annual plan carries out rolling establishment according to the plan of previous year in annual October in step 2, each repairs the time of journey Separation control was at 30 days, positive and negative deviation 15%;To each monthly maintenance task amount and the maintenance task amount in the current year into Row statistics.
Monthly plan is worked out according to annual plan, when establishment plan time not across the moon, maintenance task amount to every train and This monthly maintenance task amount is counted, monthly plan include maintenance in need train;
Week plan carries out layout according to monthly plan, plans in week comprising overhauling train number, repairs journey title, maintenance teams and groups, maintenance people Member's number, inspector, technology rectification.
7. a kind of multi-factor evaluation car inspection and repair plan according to claim 6 balances scheduling method, feature exists In: monitoring data described in step 3 include the body system, built in system, coupler system, run-through channel system, car door of train System, bogie system, air-conditioning and heating system, lighting system, low-voltage power supply system, Pneumatic brake systems, Customer information system The operating status of system, fire alarm system, main circuit system, trailer system, secondary power system and network control system, failure State, runing time.
8. a kind of multi-factor evaluation car inspection and repair plan according to claim 7 balances scheduling method, feature exists In: the objective function of vehicle health evaluation state in step 3 are as follows:
Wherein xijKey characterization parameter j, the count (x of expression system iij) be counting function, the number that system is alerted into Row is cumulative, Δ parameter (yij) it is parameter fluctuation function, indicate the parameter fluctuation value of system, yijIt is to be patrolled by system parameter Collect what operation obtained, F (x) is evaluation result value, and the health status for being worth bigger expression vehicle is poorer, is worth being good for for smaller expression vehicle Health state is better.
9. a kind of multi-factor evaluation car inspection and repair plan according to claim 8 balances scheduling method, feature exists In: step 4 does following variation to Strategies of Maintenance:
1) three vehicles minimum to comprehensive score, maintenance plan of giving priority in arranging for;
2) five vehicles low to comprehensive score time, by the time advance of car inspection and repair, no more than the time requirement in step 2;
3) it according to the accumulative alarm number of system in step 3, related journey task of repairing will be overhauled in advance with the system.
CN201811072190.2A 2018-09-14 2018-09-14 A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method Pending CN109214690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811072190.2A CN109214690A (en) 2018-09-14 2018-09-14 A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811072190.2A CN109214690A (en) 2018-09-14 2018-09-14 A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method

Publications (1)

Publication Number Publication Date
CN109214690A true CN109214690A (en) 2019-01-15

Family

ID=64984010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811072190.2A Pending CN109214690A (en) 2018-09-14 2018-09-14 A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method

Country Status (1)

Country Link
CN (1) CN109214690A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210782A (en) * 2019-06-12 2019-09-06 中国神华能源股份有限公司 Formulate the method and apparatus and machine readable storage medium of components time between overhauls(TBO)
CN110210161A (en) * 2019-06-12 2019-09-06 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of rail vehicle health status
CN110222436A (en) * 2019-06-12 2019-09-10 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of Train Parts health status
CN110222437A (en) * 2019-06-12 2019-09-10 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of train car team health status
CN110232452A (en) * 2019-06-12 2019-09-13 中国神华能源股份有限公司 Repair method and system based on track car team state of the art
CN111489071A (en) * 2020-03-30 2020-08-04 上海电气集团股份有限公司 Maintenance method and system for rail transit vehicle
CN111598269A (en) * 2020-05-26 2020-08-28 上海烟草集团有限责任公司 Equipment maintenance plan scheduling method, system, medium and device
CN112132422A (en) * 2020-09-07 2020-12-25 明阳智慧能源集团股份公司 Wind field intelligence operation and maintenance scheduling system
CN112215418A (en) * 2020-10-12 2021-01-12 苏州大学 Method and device for automatically generating multi-rail vehicle washing and checking arrangement scheme and storage medium
CN112561096A (en) * 2020-12-23 2021-03-26 上海地铁维护保障有限公司 Full-life maintenance method for subway vehicle equipment
CN112966842A (en) * 2021-03-29 2021-06-15 卡斯柯信号(成都)有限公司 Subway vehicle maintenance plan automatic generation method based on time slice segmentation
CN114493066A (en) * 2020-11-11 2022-05-13 中核核电运行管理有限公司 Automatic scheduling method based on overhaul of nuclear power plant
CN115320676A (en) * 2022-07-26 2022-11-11 中国铁路工会中国铁路乌鲁木齐局集团有限公司乌鲁木齐西车辆段委员会 Railway freight car tool car shunting management system
CN115719221A (en) * 2022-11-22 2023-02-28 北京思维实创科技有限公司 Vehicle bogie overhauling method, system, terminal equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN107766971A (en) * 2017-09-29 2018-03-06 深圳供电局有限公司 A kind of excellent discharge method of power equipment O&M plan based on maintenance risk

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN107766971A (en) * 2017-09-29 2018-03-06 深圳供电局有限公司 A kind of excellent discharge method of power equipment O&M plan based on maintenance risk

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
戴峻: "基于工作流技术的动车组检修作业管理", 《第六届中国智能交通年会暨第七届国际节能与新能源汽车创新发展论坛优秀论文集(上册)——智能交通》 *
王长庚 等: "车辆均衡修检修模式在广州地铁的应用与探讨", 《电力机车与城轨车辆》 *
谭鸿愿: "地铁车辆设备单元健康状态评估与维修决策", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110210782B (en) * 2019-06-12 2021-03-02 中国神华能源股份有限公司 Method and device for formulating repair cycle of parts and machine readable storage medium
CN110210161B (en) * 2019-06-12 2021-04-06 中国神华能源股份有限公司 Method and device for evaluating health state of train and storage medium
CN110222436A (en) * 2019-06-12 2019-09-10 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of Train Parts health status
CN110222437A (en) * 2019-06-12 2019-09-10 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of train car team health status
CN110232452A (en) * 2019-06-12 2019-09-13 中国神华能源股份有限公司 Repair method and system based on track car team state of the art
CN110210161A (en) * 2019-06-12 2019-09-06 中国神华能源股份有限公司 Appraisal procedure, device and the storage medium of rail vehicle health status
CN110222437B (en) * 2019-06-12 2021-05-11 中国神华能源股份有限公司 Method and device for evaluating health status of train, and storage medium
CN110222436B (en) * 2019-06-12 2021-04-20 中国神华能源股份有限公司 Method and device for evaluating health state of train parts and storage medium
CN110210782A (en) * 2019-06-12 2019-09-06 中国神华能源股份有限公司 Formulate the method and apparatus and machine readable storage medium of components time between overhauls(TBO)
CN111489071A (en) * 2020-03-30 2020-08-04 上海电气集团股份有限公司 Maintenance method and system for rail transit vehicle
CN111598269A (en) * 2020-05-26 2020-08-28 上海烟草集团有限责任公司 Equipment maintenance plan scheduling method, system, medium and device
CN112132422A (en) * 2020-09-07 2020-12-25 明阳智慧能源集团股份公司 Wind field intelligence operation and maintenance scheduling system
CN112215418A (en) * 2020-10-12 2021-01-12 苏州大学 Method and device for automatically generating multi-rail vehicle washing and checking arrangement scheme and storage medium
CN112215418B (en) * 2020-10-12 2024-04-16 苏州大学 Method, device and storage medium for automatically generating washing inspection arrangement scheme of multi-rail vehicle
CN114493066A (en) * 2020-11-11 2022-05-13 中核核电运行管理有限公司 Automatic scheduling method based on overhaul of nuclear power plant
CN112561096A (en) * 2020-12-23 2021-03-26 上海地铁维护保障有限公司 Full-life maintenance method for subway vehicle equipment
CN112966842A (en) * 2021-03-29 2021-06-15 卡斯柯信号(成都)有限公司 Subway vehicle maintenance plan automatic generation method based on time slice segmentation
CN115320676A (en) * 2022-07-26 2022-11-11 中国铁路工会中国铁路乌鲁木齐局集团有限公司乌鲁木齐西车辆段委员会 Railway freight car tool car shunting management system
CN115719221A (en) * 2022-11-22 2023-02-28 北京思维实创科技有限公司 Vehicle bogie overhauling method, system, terminal equipment and storage medium
CN115719221B (en) * 2022-11-22 2023-09-19 北京思维实创科技有限公司 Method, system, terminal equipment and storage medium for overhauling bogie of vehicle

Similar Documents

Publication Publication Date Title
CN109214690A (en) A kind of multi-factor evaluation car inspection and repair plan balance scheduling system and method
CN109835375B (en) High-speed railway train automatic driving system based on artificial intelligence technology
Ning et al. An introduction to parallel control and management for high-speed railway systems
CN108116455A (en) Urban track traffic comprehensive energy-saving system and the comprehensive energy-saving method based on the system
CN110329319A (en) A kind of fully automatic operation system towards wisdom urban rail
AU2472801A (en) Optimal locomotive assignment for a railroad network
CN113415322A (en) High-speed train operation adjusting method and system based on Q learning
CN113554193A (en) Intelligent operation and maintenance management platform and method for full-automatic running train
CN109272158A (en) A kind of city railway vehicle frame overhaul system and method
CN113978515A (en) Centralized dispatching command system for transportation production operation of railway vehicle service section
CN108791368A (en) Rail traffic crewing management system
Krueger et al. Simulation within the railroad environment
Ignatyevs et al. Economic feasibility of modifications to the design of transport aircraft
RU2541551C1 (en) Control over scheduled freight train traffic in railway communication
RU2501697C1 (en) Computer-aided system for control over railway system routing train service under conditions of repair
CN113569412A (en) Railway vehicle service professional simulation system and simulation method
RU136780U1 (en) MOBILE MONITORING SYSTEM
Valentinovic et al. Railway line capacity methods analysis and their application in" Lithuanian Railways" justification
Liu Optimization of Computer-aided Decision-making System for Railroad Traffic Dispatching Command
RU86925U1 (en) SYSTEM FOR COLLECTING INFORMATION AND PLANNING REPAIR OF ROAD PART
Wang Preparing the public transportation workforce for the new mobility world
Lv et al. Demand Analysis of Comprehensive Dispatching System Based on RITS
Åhrén A study of maintenance performance indicators for the Swedish railroad system
RU2738778C1 (en) Railroad network direction control system based on cars virtual sorting
Bosi et al. The Shunt-In Shunt-Out Problem in Rail Freight Transport: an Event-Based Simulation Framework for Sustainable Rolling Stock Management

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115

RJ01 Rejection of invention patent application after publication