CN109165032A - A kind of baseboard management controller BMC setting method, device and storage medium - Google Patents
A kind of baseboard management controller BMC setting method, device and storage medium Download PDFInfo
- Publication number
- CN109165032A CN109165032A CN201810964535.9A CN201810964535A CN109165032A CN 109165032 A CN109165032 A CN 109165032A CN 201810964535 A CN201810964535 A CN 201810964535A CN 109165032 A CN109165032 A CN 109165032A
- Authority
- CN
- China
- Prior art keywords
- server
- bmc
- upgrade
- version information
- escalation policy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Security & Cryptography (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a kind of baseboard management controller BMC setting method, device and storage mediums, can be realized the automatic upgrading of server B MC.The described method includes: obtaining the escalation policy of the server after timed task of the server reaches timing;The current BMC version information for obtaining the server if necessary according to the judgement of the escalation policy of the server, then obtain the current BMC version information of the server;According to the judgement of the upgrade file version information of the current BMC version information of acquisition and the server of preservation if necessary to upgrade, then upgrade command and the BMC upgrade file are issued to the server.Using the embodiment of the present invention, by different servers being arranged different escalation policies, it may be implemented upgrade according to the concrete condition automatic batch of different server, reduce O&M cost, the intelligence of the BMC upgrading of promotion.
Description
Technical field
The present invention relates to computer technology, espespecially a kind of baseboard management controller BMC setting method, device and storage are situated between
Matter.
Background technique
Baseboard management controller (Baseboard Management Controller), BMC support the IPMI of professional standard
Specification.The specification describes the management function being built on mainboard.These functions include: local and remote diagnosis, control
Platform support, configuration management, hardware management and troubleshooting.
In the information age, server is managed and is become more and more important, being managed by BMC to server becomes
It is more and more common, with the increase of BMC function and perfect, it is often necessary to carry out updating operation to BMC;Traditional upgrading mode,
It needs that artificially the interface game server BMC is uploaded upgrade file and upgraded.In the more situation of server, one is needed
Platform platform operate, and upgrading is got up very troublesome.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides a kind of baseboard management controller BMC setting method, device and
Storage medium can be realized the automatic upgrading of server B MC batch.
In order to reach the object of the invention, the present invention provides a kind of baseboard management controller BMC setting method, the methods
Include:
The BMC upgrade file and upgrade file version information for saving server, when the timed task of the server reaches
After timing, the escalation policy of the server is obtained;
Obtain the current BMC version information of the server if necessary according to the judgement of the escalation policy of the server,
Then obtain the current BMC version information of the server;
Judged according to the upgrade file version information of the current BMC version information of acquisition and the server of preservation
If necessary to upgrade, then upgrade command and the BMC upgrade file are issued to the server.
Further, the escalation policy is optional escalation policy.
Further, the method also includes: according to the escalation policy of the server judge if you do not need to obtain institute
The BMC version information of server is stated, then issues upgrade command and the BMC upgrade file to server, the escalation policy is
Mandatory upgrade strategy.
Further, the timed task is created by Quartz frame.
In order to reach the object of the invention, the present invention also provides a kind of baseboard management controller BMC, and device, the dress is arranged
It sets including obtaining module and judgment module, in which:
Acquired storing module, for saving the BMC upgrade file and upgrade file version information of server, when the service
After the timed task of device reaches timing, the escalation policy of the server is obtained;
The judgment module, for obtaining the server if necessary according to the judgement of the escalation policy of the server
Current BMC version information, then obtain the current BMC version information of the server;According to the current BMC version letter of acquisition
The judgement of the upgrade file version information of breath and the server saved then issues upgrading to the server if necessary to upgrade
Order and the BMC upgrade file.
Further, the escalation policy is optional escalation policy.
Further, the judgment module further include: the judgment module judges according to the escalation policy of the server
If you do not need to obtaining the BMC version information of the server, then the judgment module issues upgrade command and institute to server
BMC upgrade file is stated, the escalation policy is mandatory upgrade strategy.
Further, the timed task is created by Quartz frame.
In order to reach the object of the invention, the present invention also provides a kind of computer readable storage mediums, are stored thereon with meter
Calculation machine program, which is characterized in that the step of above method is realized when the program is executed by processor.
In order to reach the object of the invention, the present invention also provides a kind of computer equipment, including memory, processor and
Store the computer program that can be run on a memory and on a processor, which is characterized in that the processor executes the journey
The step in the above method is realized when sequence.
Compared with prior art, the present invention includes the BMC upgrade file and upgrade file version information for saving server, when
After the timed task of the server reaches timing, the escalation policy of the server is obtained;
Obtain the current BMC version information of the server if necessary according to the judgement of the escalation policy of the server,
Then obtain the current BMC version information of the server;
Judged according to the upgrade file version information of the current BMC version information of acquisition and the server of preservation
If necessary to upgrade, then upgrade command and the BMC upgrade file are issued to the server.In the embodiment of the present invention, towards
Server B MC upgrade method based on Quartz frame, by different servers being arranged different escalation policies, Ke Yishi
Now upgrade according to the concrete condition automatic batch of different server.It, can be with compared to the conventional method individually upgraded manually
Upgrade in the time automated intelligent of server no one, reduce O&M cost, the intelligence of the BMC upgrading of promotion improves warp
Ji benefit.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification
It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention can be by specification, right
Specifically noted structure is achieved and obtained in claim and attached drawing.
Detailed description of the invention
Attached drawing is used to provide to further understand technical solution of the present invention, and constitutes part of specification, with this
The embodiment of application technical solution for explaining the present invention together, does not constitute the limitation to technical solution of the present invention.
Fig. 1 is the flow chart of the baseboard management controller BMC setting method of the embodiment of the present invention one;
Fig. 2 is another flow chart of the baseboard management controller BMC setting method of the embodiment of the present invention two;
Fig. 3 is that the structural schematic diagram of device is arranged in the baseboard management controller BMC of the embodiment of the present invention three;
Fig. 4 is the structural schematic diagram of the computer equipment of the embodiment of the present invention three.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention
Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application
Feature can mutual any combination.
Step shown in the flowchart of the accompanying drawings can be in a computer system such as a set of computer executable instructions
It executes.Also, although logical order is shown in flow charts, and it in some cases, can be to be different from herein suitable
Sequence executes shown or described step.
Embodiment one
A kind of baseboard management controller BMC setting method is present embodiments provided, as shown in Figure 1, this method includes S11-
S12:
S11, the BMC upgrade file and upgrade file version information for saving server, when the timed task of server reaches
After timing, the escalation policy of server is obtained;
S12, the current BMC version information according to the judgement of the escalation policy of server if necessary to obtain server, then obtain
Take the current BMC version information of server;According to the upgrade file version of the current BMC version information of acquisition and the server of preservation
The judgement of this information then issues upgrade command and BMC upgrade file to server if necessary to upgrade.
In the embodiment of the present invention, by different servers being arranged different escalation policies, it may be implemented according to difference
The concrete condition automatic batch of server upgrade, and reduces O&M cost, the intelligence of the BMC upgrading of promotion.
In one alternate embodiment, the escalation policy is optional escalation policy.
Escalation policy be optional upgrading when, when the upgrade file version be higher than the current BMC version of server, then judge
As a result it needs to upgrade for the server;When the current BMC version of the not high server of the upgrade file version, then judging result is
The server does not need to upgrade.
Further, it when judging the current BMC version of the not high server of the upgrade file version, can also be risen
Whether grade FileVersion with the equal judgement of the current BMC version of server can according to need setting when the two version is equal
Upgrade to need or is set as not needing to upgrade.
In one alternate embodiment, this method further include: judged according to the escalation policy of server if you do not need to obtaining
The BMC version information of server is taken, then issues upgrade command and BMC upgrade file to server, escalation policy is mandatory upgrade
Strategy.
Version is different before not upgrading on different server, and Provisioning Policy is also different, therefore be can be and realized different clothes
The batch that business device difference needs upgrades automatically.
In one alternate embodiment, the timed task is created by Quartz frame.
Timed task is created by Quartz frame, comprising: the service can be identified according to the upload of the information of server
The version information of the information of device and the server sets gradually the update time and escalation policy of multiple servers.
Quartz is the frame of an open source task schedule, operation timing operation rule is arranged by trigger, control is made
The runing time of industry.Wherein Quartz cluster passes through the function of failover and load balance, can bring High Availabitity to scheduler
Property and retractility.It is mainly used to execute timed task, such as: periodically sending information, timing generate report.
The BMC upgrade file and upgrade file version information that server is saved in the embodiment of the present invention, when the server
Timed task reach timing after, obtain the escalation policy of the server;Sentenced according to the escalation policy of the server
The disconnected current BMC version information for obtaining the server if necessary, then obtain the current BMC version information of the server;
If necessary according to the judgement of the upgrade file version information of the current BMC version information of acquisition and the server of preservation
Upgrading, then issue upgrade command and the BMC upgrade file to the server, compared to the conventional method individually upgraded manually,
It can upgrade in the time automated intelligent of server no one, reduce O&M cost, the intelligence of the BMC upgrading of promotion mentions
High economic benefit.
Embodiment two
A kind of server B MC upgrade method based on Quartz frame, may be implemented BMC and upgrades automatically, when BMC has new edition
Upgrade file is uploaded under system upgrade catalogue after this, upgrading task is created based on Quartz frame, can be set will upgrade
Server, update time, upgrade parameter, after having configured task, BMC can be upgraded to rule in the time set by system
Fixed version;User can star BMC and upgrade task automatically, when user uploads new BMC upgrade file, upgrade task automatically
It is proceeded as follows setting the time: obtaining the current BMC version of server, be compared with BMC upgraded version, if risen
When the edition comparison of grade is new, the BMC of server is upgraded automatically.
Mainly comprise the following steps:
(1) the BMC mirror image that will upgrade uploads to upgrading catalogue;
(2) timed task is created;
Timed task is created by Quartz frame, sets the information for the server that will upgrade, such as the BMC of server
IP, user, password, BMC image file and job start time to be upgraded, it is also necessary to which input will upgrade the server of BMC
The catalogue of information and upgrade image.
Preset strategy includes two kinds of situations of mandatory upgrade and optional upgrading, when preset strategy is mandatory upgrade,
Then upgrade command and the BMC upgrade file are issued to server;
When preset strategy is optional upgrading, the upgrade file and current BMC version height are needed;
1) when comparison result be the upgrade file version be higher than the current BMC version of server, then need to upgrade;
2) when comparison result BMC version current not higher than server for the upgrade file version, it need to judge upgrading text
Whether part is equal to the current BMC version of server, when judging equal, the strategy of setting be it is equal there is still a need for upgradings, then need
Upgrade this server;Otherwise, this upgrading of this server is abandoned;Alternatively, when judging equal, the strategy of setting be it is equal not
It needs to upgrade, then then abandons this upgrading when judging equal;
When comparison result BMC version current not higher than server for the upgrade file version, can be set to abandon
This time upgrade, or continues to judge whether upgrade file is equal to the current BMC version of server and then puts when judging unequal
Abandon this upgrading.
As shown in Fig. 2, when to judge that upgrade file version is equal to the current BMC version of server, the case where need to upgrading;
Mandatory upgrade is set as when passing through Provisioning Policy, it is BMC editions current no matter whether upgrade file version is higher than server
This, is required to upgrade, and can overcome the problems, such as that the server current version since installation exists, is reinstalled by person and retracts it
Preceding version, the problem of overcoming current version;
It is set as optional upgrading when passing through Provisioning Policy, needs further exist for judging whether upgrade file version is higher than service
The low BMC batch upgrade of version in current server can be upgraded version by the current BMC version of device;
Further, judge whether upgrade file version is equal to the current BMC version of server, BMC, energy can be reinstalled
Enough overcome the problems, such as last because installation causes BMC of problems.
(3) upgrading task is executed automatically;
Upgrade procedure can execute automatically in the time trigger task of setting, judge whether to need to carry out based on preset strategy
Upgrading;
System task triggers upgrading task, by calling upgrade procedure to be upgraded;Automatically server B MC is upgraded to finger
Fixed version, and the image file that task obtains upgrading catalogue automatically can be created simultaneously, when the file of upgrade image updates,
Automatic trigger server B MC upgrades task.
The present invention realizes that user needs the BMC image file that will upgrade to upload to system liter first using JAVA mode
Under grade catalogue, user creates timed task, when setting will upgrade the server info of BMC and the catalogue of upgrade image, upgrading
Between, BMC upgrading configuration etc. information.Task is created based on Quartz frame.After creating timed task success, task can be in setting
Time, triggering task obtain the version of file to be upgraded, when upgrade file BMC version more current than server is new, compare two
BMC version, if server B MC version be higher than the image release to be upgraded, can according to setting whether mandatory upgrade, if
Mandatory upgrade is not needed not upgrade then;Upgrade BMC automatically if mandatory upgrade;Server B MC version is lower than the mirror to be upgraded
As version, then upgraded according to the strategy of configuration, when the server task of upgrading in need, calls upgrade procedure according to configuration
Strategy upgraded, and record upgrading log for upgrading after check.
Embodiment three
A kind of baseboard management controller BMC setting device is present embodiments provided, describes also to fit in above method embodiment
With in this present embodiment, shown in Fig. 3, which includes obtaining module 31 and judgment module 32, in which:
The acquisition storing module 33 works as service for saving the BMC upgrade file and upgrade file version information of server
After the timed task of device reaches timing, the escalation policy of server is obtained;
The judgment module 32, for obtaining the current of server if necessary according to the judgement of the escalation policy of server
BMC version information then obtains the current BMC version information of server;According to the clothes of current the BMC version information and preservation of acquisition
The upgrade file version information judgement of business device then issues upgrade command and BMC upgrade file to server if necessary to upgrade.
In one alternate embodiment, the escalation policy is optional escalation policy.
In one alternate embodiment, the judgment module 32 further include: judgment module is according to the escalation policy of server
Judgement is if you do not need to obtain the BMC version information of server, then the judgment module issues upgrade command and BMC to server
Upgrade file, escalation policy are mandatory upgrade strategy.
In one alternate embodiment, timed task is created by Quartz frame.
The embodiment of the present invention also provides a kind of computer storage medium, and the computer storage medium is stored with computer journey
Sequence;After the computer program is performed, the baseboard management controller BMC setting method of previous embodiment offer can be realized,
For example, executing method as shown in Figure 1.
The embodiment of the present invention also provides a kind of computer equipment, can be structure as shown in Figure 4, including processor
41, memory 42 and storage on a memory and the computer program that can run on a processor, processor execution institute
Part or Overall Steps in embodiment one or embodiment two can be realized when stating program.
Although disclosed herein embodiment it is as above, the content only for ease of understanding the present invention and use
Embodiment is not intended to limit the invention.Technical staff in any fields of the present invention is taken off not departing from the present invention
Under the premise of the spirit and scope of dew, any modification and variation, but the present invention can be carried out in the form and details of implementation
Scope of patent protection, still should be subject to the scope of the claims as defined in the appended claims.
Claims (10)
1. a kind of baseboard management controller BMC setting method, which is characterized in that the described method includes:
The BMC upgrade file and upgrade file version information for saving server, when the timed task of the server reaches timing
After time, the escalation policy of the server is obtained;
The current BMC version information for obtaining the server if necessary according to the judgement of the escalation policy of the server, then obtain
Take the current BMC version information of the server;
If judged according to the upgrade file version information of the current BMC version information of acquisition and the server of preservation
It needs to upgrade, then issues upgrade command and the BMC upgrade file to the server.
2. the method according to claim 1, wherein the escalation policy is optional escalation policy.
3. the method according to claim 1, wherein the method also includes: according to the upgrading of the server
Strategy judgement then issues upgrade command and the BMC to server if you do not need to obtain the BMC version information of the server
Upgrade file, the escalation policy are mandatory upgrade strategy.
4. the method according to claim 1, wherein the timed task is created by Quartz frame.
5. device is arranged in a kind of baseboard management controller BMC, which is characterized in that described device includes obtaining module and judging mould
Block, in which:
Acquired storing module, for saving the BMC upgrade file and upgrade file version information of server, when the server
After timed task reaches timing, the escalation policy of the server is obtained;
The judgment module, for obtaining the current of the server if necessary according to the judgement of the escalation policy of the server
BMC version information then obtains the current BMC version information of the server;According to the current BMC version information of acquisition and
The upgrade file version information judgement of the server saved then issues upgrade command to the server if necessary to upgrade
With the BMC upgrade file.
6. device according to claim 5, which is characterized in that the escalation policy is optional escalation policy.
7. device according to claim 5, which is characterized in that the judgment module further include: the judgment module according to
The escalation policy of the server judges if you do not need to obtain the BMC version information of the server, then the judgment module
Upgrade command and the BMC upgrade file are issued to server, the escalation policy is mandatory upgrade strategy.
8. device according to claim 5, which is characterized in that the timed task is created by Quartz frame.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor
The step of any one of claim 1-4 the method is realized when row.
10. a kind of computer equipment, can run on a memory and on a processor including memory, processor and storage
Computer program, which is characterized in that realize that any one of claim 1-4 right such as is wanted when the processor executes described program
Seek the step in the method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810964535.9A CN109165032A (en) | 2018-08-23 | 2018-08-23 | A kind of baseboard management controller BMC setting method, device and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810964535.9A CN109165032A (en) | 2018-08-23 | 2018-08-23 | A kind of baseboard management controller BMC setting method, device and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109165032A true CN109165032A (en) | 2019-01-08 |
Family
ID=64896411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810964535.9A Withdrawn CN109165032A (en) | 2018-08-23 | 2018-08-23 | A kind of baseboard management controller BMC setting method, device and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109165032A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110427199A (en) * | 2019-06-26 | 2019-11-08 | 苏州浪潮智能科技有限公司 | A kind of method, equipment and the readable medium of the mating upgrading of BMC and BIOS |
CN111240708A (en) * | 2019-12-24 | 2020-06-05 | 北京威努特技术有限公司 | Industrial control system host, industrial control system and method for upgrading industrial control system host software |
CN112083939A (en) * | 2019-12-31 | 2020-12-15 | 蓝桥赛维科技(北京)有限公司 | Batch upgrading method, device, system and medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101192988A (en) * | 2006-11-30 | 2008-06-04 | 中兴通讯股份有限公司 | Software version self management device |
CN102779057A (en) * | 2012-06-29 | 2012-11-14 | 浪潮(北京)电子信息产业有限公司 | Base board management controller and automatic upgrade system and method thereof |
CN104598262A (en) * | 2014-11-25 | 2015-05-06 | 深圳市腾讯计算机系统有限公司 | Method and device for updating mobile application |
CN107426342A (en) * | 2017-09-26 | 2017-12-01 | 四川长虹电器股份有限公司 | A kind of method of the Android phone application upgrade of reusable extension |
CN107844311A (en) * | 2017-10-25 | 2018-03-27 | 郑州云海信息技术有限公司 | A kind of server firmware upgrade method and device |
US20180101376A1 (en) * | 2016-10-12 | 2018-04-12 | Samsung Electronics Co., Ltd. | Method and apparatus for using bmc as proxy for nvme over fabrics device firmware upgrade |
CN108363583A (en) * | 2018-02-05 | 2018-08-03 | 华勤通讯技术有限公司 | A kind of chip update method, equipment and storage medium based on BMC |
-
2018
- 2018-08-23 CN CN201810964535.9A patent/CN109165032A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101192988A (en) * | 2006-11-30 | 2008-06-04 | 中兴通讯股份有限公司 | Software version self management device |
CN102779057A (en) * | 2012-06-29 | 2012-11-14 | 浪潮(北京)电子信息产业有限公司 | Base board management controller and automatic upgrade system and method thereof |
CN104598262A (en) * | 2014-11-25 | 2015-05-06 | 深圳市腾讯计算机系统有限公司 | Method and device for updating mobile application |
US20180101376A1 (en) * | 2016-10-12 | 2018-04-12 | Samsung Electronics Co., Ltd. | Method and apparatus for using bmc as proxy for nvme over fabrics device firmware upgrade |
CN107426342A (en) * | 2017-09-26 | 2017-12-01 | 四川长虹电器股份有限公司 | A kind of method of the Android phone application upgrade of reusable extension |
CN107844311A (en) * | 2017-10-25 | 2018-03-27 | 郑州云海信息技术有限公司 | A kind of server firmware upgrade method and device |
CN108363583A (en) * | 2018-02-05 | 2018-08-03 | 华勤通讯技术有限公司 | A kind of chip update method, equipment and storage medium based on BMC |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110427199A (en) * | 2019-06-26 | 2019-11-08 | 苏州浪潮智能科技有限公司 | A kind of method, equipment and the readable medium of the mating upgrading of BMC and BIOS |
CN110427199B (en) * | 2019-06-26 | 2022-08-02 | 苏州浪潮智能科技有限公司 | Method, equipment and readable medium for upgrading BMC and BIOS in matching manner |
CN111240708A (en) * | 2019-12-24 | 2020-06-05 | 北京威努特技术有限公司 | Industrial control system host, industrial control system and method for upgrading industrial control system host software |
CN111240708B (en) * | 2019-12-24 | 2023-04-28 | 北京威努特技术有限公司 | Industrial control system host, industrial control system and industrial control system host software upgrading method |
CN112083939A (en) * | 2019-12-31 | 2020-12-15 | 蓝桥赛维科技(北京)有限公司 | Batch upgrading method, device, system and medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10452524B2 (en) | Application programming interface for providing access to computing platform definitions | |
US10826792B2 (en) | Updating electronic devices using a push model | |
US9075633B2 (en) | Configuration of life cycle management for configuration files for an application | |
US9146726B2 (en) | System and method for firmware update for network connected storage subsystem components | |
US10409622B2 (en) | Orchestration pipeline for providing and operating segmented computing resources | |
CN103067484B (en) | A kind of method and system of auto-update application program | |
US10469315B2 (en) | Using computing platform definitions to provide segmented computing platforms in a computing system | |
US9485151B2 (en) | Centralized system management on endpoints of a distributed data processing system | |
US9940598B2 (en) | Apparatus and method for controlling execution workflows | |
US20190066018A1 (en) | Business process decomposition and modular reusable process automation system | |
CN109165032A (en) | A kind of baseboard management controller BMC setting method, device and storage medium | |
CN109862101B (en) | Cross-platform application starting method and device, computer equipment and storage medium | |
US10649765B2 (en) | Systems and methods for preventing service disruption during software updates | |
CN113569987A (en) | Model training method and device | |
US11469944B1 (en) | Techniques for migrating worker nodes to a new manager instance | |
US20150039946A1 (en) | Method and system for a high availability framework | |
WO2009089746A1 (en) | Method, device and system for realizing task in cluster environment | |
US9923806B2 (en) | Network traffic routing tool | |
US8924947B2 (en) | Direct deployment of static content | |
US9380000B2 (en) | Deploying and modifying a service-oriented architecture deployment environment model | |
CN107463390B (en) | Software upgrading method and upgrading server | |
US9207928B2 (en) | Computer-readable medium, apparatus, and methods of automatic capability installation | |
CN104090805B (en) | A kind of method, equipment and system for updating terminal operating system | |
US10635454B2 (en) | Service management method and the device | |
US20190303383A1 (en) | Systems and methods of providing graphical relationships of disparate data object formats |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |