CN109083621A - A kind of horizontal well coiled tubing composite blockage relieving method - Google Patents

A kind of horizontal well coiled tubing composite blockage relieving method Download PDF

Info

Publication number
CN109083621A
CN109083621A CN201810849946.3A CN201810849946A CN109083621A CN 109083621 A CN109083621 A CN 109083621A CN 201810849946 A CN201810849946 A CN 201810849946A CN 109083621 A CN109083621 A CN 109083621A
Authority
CN
China
Prior art keywords
coiled tubing
foam
acid
horizontal well
blockage relieving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810849946.3A
Other languages
Chinese (zh)
Inventor
江智强
巨亚锋
罗有刚
李旭梅
白小佩
刘忠能
梁万银
刘江波
张雄涛
赵鹏玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810849946.3A priority Critical patent/CN109083621A/en
Publication of CN109083621A publication Critical patent/CN109083621A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • E21B37/06Methods or apparatus for cleaning boreholes or wells using chemical means for preventing or limiting, e.g. eliminating, the deposition of paraffins or like substances
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Cleaning In General (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The invention discloses a kind of horizontal well coiled tubing composite blockage relieving methods, this method uses coiled tubing, is crushed pit shaft casting bed using the impact force of rotating-spray tool and borehole wall dirt, the tamper of nitrogen foam acid dissolution near wellbore zone and foam negative pressure return the methods of row's dredging oil flow channel and carry out composite blockage relieving.This method comprises: 1) coiled tubing and underground tool string installation;2) configuration of foam (acid) liquid and debugging;3) pit shaft sand washing scale removal is sprayed;4) foamed acid dragging acidification de-plugging;5) foam gas negative pressure is returned to clear and be washed, and carries out composite blockage relieving, realizes that oil well productivity restores.The present invention is strong using the broken impact force of rotating-spray, foam acidizing plugging removal effect is good, negative pressure is returned and arranges thorough, easy to operate, short construction period.

Description

A kind of horizontal well coiled tubing composite blockage relieving method
Technical field
The invention belongs to oil/gas well block releasing technique fields, and in particular to a kind of horizontal well coiled tubing composite blockage relieving method.
Background technique
During oil/gas well long-term production, usually there is stratum and spit sand, wax, colloid in crude oil, asphalitine are precipitated, knot Dirty phenomenon inevitably results in pit shaft sand setting, side-wall begriming and the blocking of near wellbore zone seepage channel, forms compound blocking, sternly Ghost image rings Oil & Gas Productivity.
For compound blocking horizontal well, the prior art mainly uses mechanical type sand washing scale removal, conventional acidulation etc. single Form de-plugging.The defect of these techniques is as follows: strata pressure is low, and lost circulation is serious when pit shaft sand washing, and water consumption is big, causes Oil well productivity restores slow after measure, or even can not restore;Oil pipe, which bores, to be abraded dirty long construction period and is easily damaged casing;It is horizontal Residual acid returns row not in time after well acidizing construction time length, conventional acidulation, be easy to cause the secondary injury to reservoir;To sum up, existing There are above-mentioned many defects for solution in technology, not can effectively solve horizontal well complex form blockage problem.
Summary of the invention
It is to utilize coiled tubing the purpose of the present invention is to provide a kind of horizontal well coiled tubing composite blockage relieving method, Rotating-spray tool is carried, is crushed pit shaft casting bed and borehole wall dirt using impact force, while using the nearly well of nitrogen foam acid dissolution The tamper of band, foam negative pressure return row's dredging oil flow channel, carry out composite blockage relieving method, achieve the purpose that restore to produce.
The present invention adopts the following technical scheme that realize:
A kind of horizontal well coiled tubing composite blockage relieving method, this method use coiled tubing, utilize rotating-spray tool Impact force is crushed pit shaft casting bed and borehole wall dirt, the tamper of nitrogen foam acid dissolution near wellbore zone and foam negative pressure return row's dredging oil The methods of circulation road carries out composite blockage relieving, specifically includes the following steps:
1) coiled tubing is installed: installation coiled tubing reel, coiled tubing injection head, coiled tubing preventer and well head dress It sets, it is qualified to coiled tubing spraying-preventing system, testing pressure of well head as required, coiled tubing and rotating-spray work in down-hole casing are installed Near tool string to kickoff point (KOP);
2) foam solution configuration and debugging: foam washing fluid and foam acid solution have been configured by recipe requirements, and in ground face handle liquid Tank, pump truck are successively connected with one end of foam maker import threeway, nitrogen vehicle processed, note nitrogen vehicle successively with foam maker import three The logical other end is connected, and foam maker outlet is connected with coiled tubing, formation foam liquid supply system, and debugged pump truck and Infuse the discharge capacity of nitrogen vehicle;
3) rotating-spray sand washing scale removal: decentralization coiled tubing and rotating-spray tool string, until the place above 20m in sand face or so Pump truck, note nitrogen vehicle and foam maker direct circulation injection foam solution are opened, coiled tubing is transferred on marginal not foam solution side, by continuous The rotating-spray tool string of oil pipe bottom end is crushed sill and borehole wall dirt, carries out sand washing, scale removal operation;
4) it foamed acid dragging acidification de-plugging: after pit shaft sand washing, scale removal to artificial bottom of a well, above mentions to horizontal well bottom and penetrating At hole section, acid solution is replaced, closes wellhead assembly sleeve gate after acid solution is replaced to perforated interval, acid is just being squeezed to design flow, is above mentioning Coiled tubing to remaining perforated interval, squeezes acid respectively, carries out acidification de-plugging operation;
5) foam gas negative pressure is returned to clear and be washed: after acid liquid reaction, decentralization coiled tubing to artificial bottom of a well opens casing Gate is just injecting foam gas by coiled tubing, and marginal not nitrogen side above mentions coiled tubing, and formation fluid is flowed out through oil jacket annulus, It returns and drains into waste liquid tank, realize lasting shaft bottom negative pressure, drain observation is returned in taking-up, and when returning drain without containing sediment, foam is negative The pressure row of returning terminates, complete well production.
A further improvement of the present invention lies in that rotating-spray tool string include sequentially connected interior coiled tubing connector, it is double Valve ball-and-seat, safety are given up and rotating-spray syringe pipe.
A further improvement of the present invention lies in that rotating-spray syringe pipe includes the master with hollow cavity and both ends open Body is set with bearing and bearing holder (housing, cover) in the circumferential direction of the main body from the inside to the outside, and the end of bearing holder (housing, cover) is connected with syringe pipe, opens up thereon There are several nozzles being connected to the hollow cavity of main body.
A further improvement of the present invention lies in that offer two groups of 6 nozzles on syringe pipe, every group of nozzle angle respectively with The axial angle of main body is 45 ° and 90 °.
A further improvement of the present invention lies in that the ingredient of foam washing fluid is by mass percentage are as follows: 0.2% foam stabilizer, 0.5% foaming agent, remaining is clear water, and foam gas is nitrogen, air or CO2
The ingredient of foam acid solution is by mass percentage are as follows: 1.2%YGJD descaling agent, 0.012%MH-16 corrosion inhibiter, The acidproof foaming agent of 0.3%SDS, remaining is clear water, and foam gas is nitrogen, air or CO2
A further improvement of the present invention lies in that foam gas enables to foam washing fluid and foam acid solution in well head condition Under density be 0.5-0.85g/cm3, keep cementing truck discharge capacity 0.15m3/min-0.30m3/ min, nitrogen vehicle discharge capacity 20-22m processed3/ Min can return drain situation according to scene and freely adjust pump truck and nitrogen vehicle discharge capacity, to keep liquid to have enough half-life period.
A further improvement of the present invention lies in that in step 3), is shaked out situation, carried out extremely according to the length of horizontal well and pit shaft Few primary circulation sand washing processing, to keep pit shaft clean.
A further improvement of the present invention lies in that during coiled tubing drags acidizing treatment, carrying out just squeezing acid in step 4) It operates simultaneously, and coiled tubing is carried out to the operation that lifts from the top and puts down at least once in perforated interval, distance is perforated interval or more 0.5m or so.
A further improvement of the present invention lies in that oil pipe squeezes after the completion of acid, and the closing well for carrying out 20-30min is anti-in step 4) It answers.
A further improvement of the present invention lies in that coiled tubing is in straight well section and lower curved section lowering velocity and upward strain speed 10-15m/min carries out jet flow sand washing scale removal, acidification de-plugging and foam negative pressure in horizontal segment and returns in row's operation process, lowering velocity It is 2-4m/min with upward strain speed.
The present invention has following beneficial technical effect:
1, coiled tubing can continuously play lower tubular column with Operating Pressure, by by high-pressure rotary jet physics sand-removing unblocking, acid Change soluble chemistry cleaning de-plugging and foam negative pressure returns and mediates stifled combination together, de-plugging range is more extensive, greatly improves Plugging removal effect.
2, using rotation sand washing injector, impact force is strong, it is easier to which the hard resistance such as dirt on the sand and the borehole wall of broken consolidation increases Add the passability and wellbore treatments effect of coiled tubing.
Acidification can release the reservoir pollution of near wellbore zone, link up oil flow channel, restore oil well productivity.Row is returned with foam negative pressure It combines, foam liquid surface tension is big, and diffusion coefficient is big, it is easy to enter in micro-pore and crack, carry and remove residual acid Equal impurity reduce residual acid to the secondary injury degree of reservoir.
Detailed description of the invention
Fig. 1 is process flow diagram of the invention.
Fig. 2 is coiled tubing ground installation and down-hole string schematic diagram of the invention.
Fig. 3 is rotating-spray tool string schematic diagram of the invention.
Fig. 4 is rotating-spray syringe pipe schematic diagram of the invention.
Description of symbols: 1, flow container;2, pump truck;3, nitrogen vehicle processed;4, nitrogen vehicle is infused;5, foam maker;6, coiled tubing; 7, coiled tubing reel;8, coiled tubing injection head;9, coiled tubing preventer;10, wellhead assembly;11, waste liquid tank;12, it revolves Turn spraycan string;13, casing;14, interior coiled tubing connector;15, bivalve ball-and-seat;16, safety is given up;17, rotation spray Penetrate syringe pipe;17-1, main body;17-2, bearing holder (housing, cover);17-3, bearing;17-4, syringe pipe;17-5, nozzle.
Specific embodiment
The present invention is made further instructions with reference to the accompanying drawing.
As shown in Figures 1 to 4.A kind of horizontal well coiled tubing composite blockage relieving method provided by the invention, this method use Coiled tubing 6 is crushed pit shaft casting bed and borehole wall dirt, nitrogen foam acid dissolution near wellbore zone using the impact force of rotating-spray tool Tamper and foam negative pressure return row's dredging the methods of oil flow channel and carry out composite blockage relieving, comprise the following steps that:
1) coiled tubing is installed: installing coiled tubing reel 7, coiled tubing injection head 8,9 and of coiled tubing preventer Wellhead assembly 10, it is qualified to coiled tubing spraying-preventing system, testing pressure of well head as required, the coiled tubing 6 in down-hole casing 13 is installed And near underground rotating-spray tool string 12 to kickoff point (KOP).The rotating-spray tool string 12 includes sequentially connected interior continuous oil Pipe fitting 14, bivalve ball-and-seat 15, safe give up 16 and rotating-spray syringe pipe 17.Rotating-spray syringe pipe 17 includes in having The main body 17-1 of cavity body and both ends open is set with bearing 17-3 and bearing holder (housing, cover) in the circumferential direction of main body 17-1 from the inside to the outside 17-2, the end of bearing holder (housing, cover) 17-2 are connected with syringe pipe 17-4, offer several hollow cavities with main body 17-1 thereon and are connected to Nozzle 17-5.Offer two groups of 6 nozzle 17-5 on syringe pipe 17-4, every group of nozzle 17-5 angle respectively with main body 17- 1 axial angle is 45 ° and 90 °.
2) foam solution configuration and debugging: flushing fluid and acid solution have been configured by recipe requirements, and in ground face handle flow container 1, pump truck 2 are successively connected with one end of 5 import threeway of foam maker, nitrogen vehicle 3 processed, note nitrogen vehicle 4 successively with 5 import threeway of foam maker The other end be connected, foam maker 5 outlet is connected with coiled tubing 6, formation foam liquid supply system.Turn on pump has debugged pump truck 2 and infuse nitrogen vehicle 4 discharge capacity.
The ingredient of foam washing fluid is by mass percentage are as follows: and 0.2% foam stabilizer, 0.5% foaming agent, remaining is clear water, Foam gas is nitrogen, air or CO2
The ingredient of foam acid solution is by mass percentage are as follows: 1.2%YGJD descaling agent, 0.012%MH-16 corrosion inhibiter, The acidproof foaming agent of 0.3%SDS, remaining is clear water, and foam gas is nitrogen, air or CO2
3) rotating-spray sand washing scale removal: decentralization coiled tubing 6 and rotating-spray tool string 12, until above 20m in sand face or so Place opens pump truck 2, note nitrogen vehicle 4 and 5 direct circulation of foam maker injection foam solution, marginal not foam solution side and transfers coiled tubing, lead to The rotary spray sprinkler 17 for crossing 6 bottom end of coiled tubing is crushed sill and borehole wall dirt, carries out sand washing, scale removal operation.
4) it foamed acid dragging acidification de-plugging: after pit shaft sand washing, scale removal to artificial bottom of a well, above mentions to horizontal well bottom At (first segment) perforated interval, acid solution is replaced, 10 sleeve gate of wellhead assembly is closed after acid solution is replaced to perforated interval, just squeezes acid To design flow.Coiled tubing is above mentioned respectively to remaining perforated interval, squeezes acid, carries out acidification de-plugging operation.
5) foam gas negative pressure is returned to clear and be washed: after acid liquid reaction, decentralization coiled tubing 6 to artificial bottom of a well opens set Pipe closer door above mentions coiled tubing 6 by coiled tubing 6 just injection foam gas, marginal not nitrogen side, and formation fluid is through oil jacket annulus stream Out, it returns and drains into waste liquid tank 11, realize lasting shaft bottom negative pressure, drain observation, when returning drain without containing sediment, bubble are returned in taking-up Foam negative pressure, which returns row, to be terminated, complete well production.
Preferably, foam gas can be nitrogen, air or CO2, it is necessary to it is close under the conditions of well head to control foam solution (acid) Degree is 0.5-0.85g/cm3, keep cementing truck discharge capacity 0.15m3/min-0.30m3/ min, nitrogen vehicle discharge capacity 20-22m processed3/ min, can Drain situation is returned according to scene and freely adjusts pump truck and nitrogen vehicle discharge capacity, to keep liquid there are enough half-life period.
Preferably, in the step 3), can shake out situation according to the length and pit shaft of horizontal well, carry out following at least once Ring sand washing processing, to keep pit shaft clean.
Preferably, it in the step 4), during coiled tubing drags acidizing treatment, carries out just squeezing acid operation simultaneously, and The coiled tubing is carried out to the operation that lifts from the top and puts down at least once in perforated interval, distance is perforated interval 0.5m or so up and down.
Preferably, coiled tubing is 10-15m/min in straight well section and lower curved section lowering velocity and upward strain speed, in level The scale removal of Duan Jinhang jet flow sand washing, acidification de-plugging and foam negative pressure return in row's operation process, and lowering velocity and upward strain speed are 2-4m/ min。

Claims (10)

1. a kind of horizontal well coiled tubing composite blockage relieving method, which is characterized in that this method uses coiled tubing (6), utilizes rotation The impact force for turning spraycan is crushed pit shaft casting bed and borehole wall dirt, the tamper of nitrogen foam acid dissolution near wellbore zone and foam are negative The methods of the row's of returning dredging oil flow channel is pressed to carry out composite blockage relieving, specifically includes the following steps:
1) coiled tubing (6) is installed: installation coiled tubing reel (7), coiled tubing injection head (8), coiled tubing preventer (9) It is qualified to coiled tubing spraying-preventing system, testing pressure of well head as required with wellhead assembly (10), it is continuous in installation down-hole casing (13) Near oil pipe (6) and rotating-spray tool string (12) to kickoff point (KOP);
2) foam solution configuration and debugging: foam washing fluid and foam acid solution have been configured by recipe requirements, and in ground face handle flow container (1), pump truck (2) is successively connected with one end of foam maker (5) import threeway, nitrogen vehicle (3) processed, note nitrogen vehicle (4) successively with bubble The other end of foam generator (5) import threeway is connected, and foam maker (5) outlet is connected with coiled tubing (6), forms foam solution Feed system, and debugged pump truck (2) and infused the discharge capacity of nitrogen vehicle (4);
3) rotating-spray sand washing scale removal: decentralization coiled tubing (6) and rotating-spray tool string (12), until above 20m in sand face or so Place opens pump truck (2), note nitrogen vehicle (4) and foam maker (5) direct circulation injection foam solution, the continuous oil of marginal not foam solution side decentralization Pipe is crushed sill and borehole wall dirt by the rotating-spray tool string (12) of coiled tubing (6) bottom end, carries out sand washing, scale removal operation;
4) it foamed acid dragging acidification de-plugging: after pit shaft sand washing, scale removal to artificial bottom of a well, above mentions to horizontal well bottom perforated interval Place replaces acid solution, closes wellhead assembly (10) sleeve gate after acid solution is replaced to perforated interval, is just squeezing acid to design flow, is above mentioning Coiled tubing to remaining perforated interval, squeezes acid respectively, carries out acidification de-plugging operation;
5) foam gas negative pressure is returned to clear and be washed: after acid liquid reaction, being transferred coiled tubing (6) to artificial bottom of a well, is opened casing Gate above mentions coiled tubing (6) by coiled tubing (6) just injection foam gas, marginal not nitrogen side, and formation fluid is through oil jacket annulus Outflow, returns and drains into waste liquid tank (11), realizes lasting shaft bottom negative pressure, and drain observation is returned in taking-up, does not contain sediment when returning drain When, foam negative pressure, which returns row, to be terminated, complete well production.
2. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that rotating-spray work Tool string (12) includes sequentially connected interior coiled tubing connector (14), bivalve ball-and-seat (15), safe give up (16) and rotation spray Penetrate syringe pipe (17).
3. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 2, which is characterized in that rotating-spray punching Hair washing (17) includes the main body (17-1) with hollow cavity and both ends open, is covered from the inside to the outside in the circumferential direction of the main body (17-1) Equipped with bearing (17-3) and bearing holder (housing, cover) (17-2), the end of bearing holder (housing, cover) (17-2) is connected with syringe pipe (17-4), offers thereon The nozzle (17-5) that several hollow cavities with main body (17-1) are connected to.
4. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 3, which is characterized in that syringe pipe (17- 4) two groups of 6 nozzles (17-5) are offered on, axial angle of every group nozzle (17-5) angle respectively with main body (17-1) is 45 ° and 90 °.
5. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that foam washing fluid Ingredient by mass percentage are as follows: 0.2% foam stabilizer, 0.5% foaming agent, remaining is clear water, and foam gas is nitrogen, air Or CO2
The ingredient of foam acid solution is by mass percentage are as follows: 1.2%YGJD descaling agent, 0.012%MH-16 corrosion inhibiter, and 0.3% The acidproof foaming agent of SDS, remaining is clear water, and foam gas is nitrogen, air or CO2
6. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 5, which is characterized in that foam gas energy Enough so that the density of foam washing fluid and foam acid solution under the conditions of well head is 0.5-0.85g/cm3, keep cementing truck discharge capacity 0.15m3/min-0.30m3/ min, nitrogen vehicle discharge capacity 20-22m processed3/ min, can be returned according to scene drain situation freely adjust pump truck and Nitrogen vehicle discharge capacity, to keep liquid to have enough half-life period.
7. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that in step 3), It is shaked out situation according to the length of horizontal well and pit shaft, circulation sand washing processing at least once is carried out, to keep pit shaft clean.
8. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that in step 4), Coiled tubing drag acidizing treatment during, carry out just squeeze acid operation simultaneously, and by coiled tubing (6) carried out in perforated interval to Lack the primary operation that lifts from the top and puts down, distance is perforated interval 0.5m or so up and down.
9. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that in step 4), Oil pipe squeezes after the completion of acid, carries out the closing well reaction of 20-30min.
10. a kind of horizontal well coiled tubing composite blockage relieving method according to claim 1, which is characterized in that coiled tubing (6) it is 10-15m/min in straight well section and lower curved section lowering velocity and upward strain speed, carries out jet flow sand washing scale removal, acid in horizontal segment Neutralizing is stifled and foam negative pressure returns in row's operation process, and lowering velocity and upward strain speed are 2-4m/min.
CN201810849946.3A 2018-07-28 2018-07-28 A kind of horizontal well coiled tubing composite blockage relieving method Pending CN109083621A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810849946.3A CN109083621A (en) 2018-07-28 2018-07-28 A kind of horizontal well coiled tubing composite blockage relieving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810849946.3A CN109083621A (en) 2018-07-28 2018-07-28 A kind of horizontal well coiled tubing composite blockage relieving method

Publications (1)

Publication Number Publication Date
CN109083621A true CN109083621A (en) 2018-12-25

Family

ID=64830955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810849946.3A Pending CN109083621A (en) 2018-07-28 2018-07-28 A kind of horizontal well coiled tubing composite blockage relieving method

Country Status (1)

Country Link
CN (1) CN109083621A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671085A (en) * 2019-11-19 2020-01-10 成都北方石油勘探开发技术有限公司 Horizontal well acidizing process based on composite acid system
CN110700777A (en) * 2019-10-22 2020-01-17 东营汇聚丰石油科技有限公司 System and method for flushing coal ash in coal-bed gas well by using nitrogen foam flushing fluid
CN110965962A (en) * 2019-11-29 2020-04-07 中国石油集团川庆钻探工程有限公司 Method for recovering production and deblocking of sealed gas well
CN111021970A (en) * 2019-12-27 2020-04-17 东营汇聚丰石油科技有限公司 Operation device and method for cleaning near-well polluted zone of coal-bed gas well
CN111502598A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN111502599A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN111500271A (en) * 2020-03-19 2020-08-07 克拉玛依新科澳石油天然气技术股份有限公司 Horizontal well sand washing foam liquid and preparation method thereof
CN112227986A (en) * 2020-10-20 2021-01-15 克拉玛依新科澳石油天然气技术股份有限公司 High-leakage well drilling plug sand washing liquid, and use method and application thereof
CN112627774A (en) * 2019-10-08 2021-04-09 中国石油天然气股份有限公司 Foam acid ground injection system and use method thereof
CN112832702A (en) * 2021-02-04 2021-05-25 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof
CN112983325A (en) * 2019-12-16 2021-06-18 中国石油天然气股份有限公司 Horizontal well blockage removal and yield increase integrated process and system
CN114562231A (en) * 2020-11-27 2022-05-31 中国石油天然气股份有限公司 Wellbore descaling method, system, device and computer storage medium
CN114961599A (en) * 2021-02-24 2022-08-30 中国石油天然气集团有限公司 Descaling device for hydraulic jet casing
CN115573880A (en) * 2022-11-11 2023-01-06 成都西南蜀华能源科技有限公司 Oil stain blockage removal cleaning agent pumping system and method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016828A (en) * 2007-02-02 2007-08-15 中国石油大学(华东) Foam negative pressure mixed discharging plug removal method
US20080171669A1 (en) * 2004-12-28 2008-07-17 Conocophillips Company Method and composition for removing filter cake from a horizontal wellbore using a stable acid foam
CN101806203A (en) * 2010-03-31 2010-08-18 重庆大学 High-pressure hydraulic rotary plug-removing device
CN102777138A (en) * 2011-11-14 2012-11-14 中国石油大学(北京) Method combining coiled tubing with supercritical CO2 for jet-flow sand washing plugging removal
CN103696720A (en) * 2013-12-26 2014-04-02 中国海洋石油总公司 Composite unblocking method
CN103740353A (en) * 2013-12-16 2014-04-23 中国石油化工股份有限公司 Composite blocking remover and method for removing blockage of compact sandstone reservoir pressing crack commissioning horizontal well in composite manner
US20140374112A1 (en) * 2012-09-06 2014-12-25 Bear Creek Services, Llc Fluid composition for wellbore and pipleline cleanout and method of use thereof
RU2599156C1 (en) * 2015-09-24 2016-10-10 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of interval treatment of bottom hole zone of horizontal well shaft
CN107143296A (en) * 2017-05-09 2017-09-08 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of horizontal gas well negative pressure drags for sand method, horizontal gas well negative pressure and drags for sand system
CN206987796U (en) * 2017-07-12 2018-02-09 东营汇聚丰石油科技有限公司 A kind of foam fracturing fluid takes sand constructing device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080171669A1 (en) * 2004-12-28 2008-07-17 Conocophillips Company Method and composition for removing filter cake from a horizontal wellbore using a stable acid foam
US7514391B2 (en) * 2004-12-28 2009-04-07 Conocophillips Company Method and composition for removing filter cake from a horizontal wellbore using a stable acid foam
CN101016828A (en) * 2007-02-02 2007-08-15 中国石油大学(华东) Foam negative pressure mixed discharging plug removal method
CN101806203A (en) * 2010-03-31 2010-08-18 重庆大学 High-pressure hydraulic rotary plug-removing device
CN102777138A (en) * 2011-11-14 2012-11-14 中国石油大学(北京) Method combining coiled tubing with supercritical CO2 for jet-flow sand washing plugging removal
US20140374112A1 (en) * 2012-09-06 2014-12-25 Bear Creek Services, Llc Fluid composition for wellbore and pipleline cleanout and method of use thereof
CN103740353A (en) * 2013-12-16 2014-04-23 中国石油化工股份有限公司 Composite blocking remover and method for removing blockage of compact sandstone reservoir pressing crack commissioning horizontal well in composite manner
CN103696720A (en) * 2013-12-26 2014-04-02 中国海洋石油总公司 Composite unblocking method
RU2599156C1 (en) * 2015-09-24 2016-10-10 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of interval treatment of bottom hole zone of horizontal well shaft
CN107143296A (en) * 2017-05-09 2017-09-08 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of horizontal gas well negative pressure drags for sand method, horizontal gas well negative pressure and drags for sand system
CN206987796U (en) * 2017-07-12 2018-02-09 东营汇聚丰石油科技有限公司 A kind of foam fracturing fluid takes sand constructing device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
常泽亮等: "塔里木油田水平井酸化工艺技术研究及应用", 《油气井测试》 *
李秋燕等: "连续油管技术在冲砂作业中应用效果", 《石油矿场机械》 *
杨旭等: "水平井连续油管酸化及效果评价", 《天然气工业》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502599B (en) * 2019-01-31 2022-08-30 中国石油天然气股份有限公司 Acidification blockage removing method
CN111502598A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN111502599A (en) * 2019-01-31 2020-08-07 中国石油天然气股份有限公司 Acidification blockage removing method
CN112627774A (en) * 2019-10-08 2021-04-09 中国石油天然气股份有限公司 Foam acid ground injection system and use method thereof
CN110700777A (en) * 2019-10-22 2020-01-17 东营汇聚丰石油科技有限公司 System and method for flushing coal ash in coal-bed gas well by using nitrogen foam flushing fluid
CN110700777B (en) * 2019-10-22 2021-08-31 东营汇聚丰石油科技有限公司 System and method for flushing coal ash in coal-bed gas well by using nitrogen foam flushing fluid
CN110671085A (en) * 2019-11-19 2020-01-10 成都北方石油勘探开发技术有限公司 Horizontal well acidizing process based on composite acid system
CN110965962A (en) * 2019-11-29 2020-04-07 中国石油集团川庆钻探工程有限公司 Method for recovering production and deblocking of sealed gas well
CN110965962B (en) * 2019-11-29 2022-05-06 中国石油集团川庆钻探工程有限公司 Method for recovering production and deblocking of sealed gas well
CN112983325A (en) * 2019-12-16 2021-06-18 中国石油天然气股份有限公司 Horizontal well blockage removal and yield increase integrated process and system
CN112983325B (en) * 2019-12-16 2022-12-02 中国石油天然气股份有限公司 Horizontal well blockage removal and yield increase integrated process and system
CN111021970B (en) * 2019-12-27 2022-03-22 东营汇聚丰石油科技有限公司 Operation device and method for cleaning near-well polluted zone of coal-bed gas well
CN111021970A (en) * 2019-12-27 2020-04-17 东营汇聚丰石油科技有限公司 Operation device and method for cleaning near-well polluted zone of coal-bed gas well
CN111500271A (en) * 2020-03-19 2020-08-07 克拉玛依新科澳石油天然气技术股份有限公司 Horizontal well sand washing foam liquid and preparation method thereof
CN112227986A (en) * 2020-10-20 2021-01-15 克拉玛依新科澳石油天然气技术股份有限公司 High-leakage well drilling plug sand washing liquid, and use method and application thereof
CN114562231A (en) * 2020-11-27 2022-05-31 中国石油天然气股份有限公司 Wellbore descaling method, system, device and computer storage medium
CN114562231B (en) * 2020-11-27 2024-05-28 中国石油天然气股份有限公司 Wellbore descaling method, system, device and computer storage medium
CN112832702A (en) * 2021-02-04 2021-05-25 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof
CN112832702B (en) * 2021-02-04 2022-04-08 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof
CN114961599A (en) * 2021-02-24 2022-08-30 中国石油天然气集团有限公司 Descaling device for hydraulic jet casing
CN115573880A (en) * 2022-11-11 2023-01-06 成都西南蜀华能源科技有限公司 Oil stain blockage removal cleaning agent pumping system and method
CN115573880B (en) * 2022-11-11 2024-05-24 成都西南蜀华能源科技有限公司 Oil stain blocking removal cleaning agent pumping system and method

Similar Documents

Publication Publication Date Title
CN109083621A (en) A kind of horizontal well coiled tubing composite blockage relieving method
CN103696720B (en) A kind of composite blockage relieving method
CN108979569A (en) A kind of method of three layers of de-plugging of fixed tubular column
CN106894783B (en) The method of continuous tubing drill milling tamper
CN104285029B (en) Inflatable collar and downhole method for moving a coiled tubing string
CN109630083A (en) A kind of abrasive perforating annular fracturing ground control system and method
CN110984130B (en) Slurry stopping system and method for preventing blockage and slurry return outside hole of crushing belt
CN104806219B (en) Oil and gas reservoir increased permeation and blocking removal device and increased permeation and blocking removal method thereof
CN110952953A (en) Pressure-maintaining plugging device for horizontal directional drilling hole and water burst treatment method using same
CN202560130U (en) Rotary jet-flow well flushing device
CN111140200A (en) Positive-negative coupling pulse chemical physical blockage removal system and blockage removal method
CN108086963A (en) The low Additional pressure differential sand-preventing process method of oil well
CN111472739A (en) Staged fracturing production-increasing transformation method for 3-inch semi-solid well completion shaft of sidetracking horizontal well
RU2652412C1 (en) Method of acidizing bottomhole formation zone with carbonate reservoir
CN107143296B (en) A kind of horizontal gas well negative pressure fishing sand method, horizontal gas well negative pressure fish out sand system
CN208137872U (en) A kind of jet stream de-plugging tubing string
CN106988693A (en) Concentric tube double-jet aeration negative pressure sand pumping device and method
CN107654207B (en) Section method for fixed-point preset sand plug of coiled tubing horizontal well
CN110106884A (en) A kind of grouting construction method
CN105401918A (en) Oil well cavitation method physicochemical heat blockage relieving technology
CN106639997B (en) Device and method for reducing viscosity of heavy oil by injecting agent through high-pressure water jet of continuous oil pipe
CN110153904B (en) Abrasive hydraulic punching system and method capable of continuously adding sand
CN211819330U (en) Coiled tubing negative pressure blockage relieving device for water injection well
CN103225496A (en) Profile control method for immobile string of injection well
CN206220937U (en) Coiled tubing high-pressure water jet injecting reducing thick oil viscosity device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225