CN108921430A - A kind of acquisition methods and system of project work amount - Google Patents

A kind of acquisition methods and system of project work amount Download PDF

Info

Publication number
CN108921430A
CN108921430A CN201810712639.0A CN201810712639A CN108921430A CN 108921430 A CN108921430 A CN 108921430A CN 201810712639 A CN201810712639 A CN 201810712639A CN 108921430 A CN108921430 A CN 108921430A
Authority
CN
China
Prior art keywords
project
work
amount
value
history
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810712639.0A
Other languages
Chinese (zh)
Inventor
胡石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Micro Business Circle Mdt Infotech Ltd
Original Assignee
Hefei Micro Business Circle Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Micro Business Circle Mdt Infotech Ltd filed Critical Hefei Micro Business Circle Mdt Infotech Ltd
Priority to CN201810712639.0A priority Critical patent/CN108921430A/en
Publication of CN108921430A publication Critical patent/CN108921430A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention discloses the acquisition methods and system of a kind of project work amount, it is related to computer software technical field, current project can be split according to project activity type, the workload of projects Activity Type is sufficiently calculated in conjunction with history item data sample again, each stage work amount, and entire project amount of work can be calculated accordingly.Therefore the acquisition work of project work amount can be fine to project activity rank, each activity of project can be refine in the assessment of project work amount using the embodiment of the present invention, then it is refine to each stage, can accurately then get the size of entire project work amount.Further, during project work amount obtains, it is specific to calculate weighted sum using to history similar terms amount of work, item code amount of work and current project amount of work reference value, obtain the mode of current project amount of work, the case where fully taking into account various software workload assessment algorithm further increases the precision of workload acquisition.

Description

A kind of acquisition methods and system of project work amount
Technical field
The present invention relates to computer software technical field, in particular to a kind of the acquisition methods and system of project work amount.
Background technique
Objective, accurate, the easy estimation of software development amount is a global problem, with the development of software information technology, The influence of software industry is increasing, and the investment of software development is also increasing.But it is general in actual software development process All over problems such as there is projects to exceed the time limit, cost overruns and low quality, the reason is that software project early stage is to project Estimation is not efficient enough and accurately.It, can be in software project early stage item although having some software project workload evaluation schemes at present Mesh workload is assessed, but generally existing considerations are limited, leads to the problem that assessment result is not accurate enough.Such as function Point estimation algorithm, is to compare one that has technology content in the numerous knowledge of current software project management.
Specifically, Function Point Analysis(FPA)Process and rudimentary algorithm:
1) software systems may include multiple software subsystems, and software subsystem can contain several software functions, software function (Software systems)It is all counted as being input from the outside processing(EI), it is external output processing (EO), external inquiry processing (EQ), interior Portion's logical file (ILF) and external interface file(EIF)Five kinds of element compositions.
2) type of identification function point.
3) boundary and the range of application program to be evaluated are identified.
4) unadjusted function point quantity provided by data type function point is calculated.
5) unadjusted function point quantity provided by human-computer interaction function is calculated.
6) Dynamic gene is determined.
7) function point quantity adjusted is calculated.
This method advantage:Based on client visual angle, it is readily appreciated that and receive, it is unrelated with computer technology and language, simply, It is easy to calculate.This method disadvantage:The complexity for only considering visible part considers very little, to some the complexity of internal system Complicated function, statistical error is larger, does not also consider integrated bring overhead.
It is urgent since the superiority and inferiority of the project plan in software project management is directly related to the success or failure of project Need one kind that can be capable of the objective and accurate reasonable solution for assessing software related work amount in software project early stage, with Just substantive directive significance is played to software project.Improve enterprise software project management efficiency and reduce software project management at This.
Summary of the invention
In view of the above problems, the embodiment of the present invention provides the acquisition methods and system of a kind of project work amount, can be soft Part project early stage being capable of objective and accurate reasonable evaluation item related work amount.
The embodiment of the present invention uses following technical solution:One embodiment of the invention provides a kind of project work amount and obtains Method is taken, the method includes:Current project is split according to project activity type;It is obtained using history item data sample Take the workload of all kinds of project activities in current project;For current project each stage, project activity included by each stage is obtained Workload adduction, obtain each stage amount of work;For current project, the adduction of each stage amount of work is obtained, is obtained Current project amount of work reference value;
History similar terms amount of work, item code amount of work and the current project amount of work reference value are calculated Weighted sum obtains current project amount of work;The history similar terms amount of work be history item data sample in The amount of work of the similar history item of the current project;The item code amount of work is root in the current project The project amount of work obtained according to total code line number.
It is described to obtain the workload of all kinds of project activities in current project using history item data sample and include:For every Intermediate item activity:In history item data sample, the workload parameter metric and the category of such project activity are obtained The movable demand points of mesh, obtain the historical evaluation factor of such project activity;And obtain the intermediate item in current project The demand of movable workload parameter metric and such project activity points, obtain the evaluation of such project activity because Son;The evaluation factor is for identifying the movable synthetic operation figureofmerit of project;
According to the movable workload of all kinds of history items, the historical evaluation factor and the evaluation factor, current project is obtained In all kinds of project activities workload.
The workload parameter metric includes:The urgent angle value of demand stability value, project, technical ability value, technical difficulty value And complexity value;It is using the method that workload parameter metric and demand points obtain evaluation factor:Demand points * demand is steady Determine the urgent angle value * technical ability value * technical difficulty value * complexity value of angle value * project, obtains evaluation factor;
Wherein, the degree of demand stability value mark deviation demand stability criterion value, deviation it is more, demand stability It is worth bigger;The urgent angle value mark of the project deviates the degree of degree of urgency standard value, deviation it is more, the urgent angle value of project is got over It is small;Technical ability value mark deviates the degree of technical ability standard value, deviation it is more, technical ability value is bigger;The technical difficulty value mark Know deviate technical difficulty standard value degree, deviation it is more, technical difficulty value is bigger;The complexity value mark deviates complicated Spend standard value degree, deviation it is more, complexity value is bigger.
It is described according to the movable workload of all kinds of history items, the historical evaluation factor and the evaluation factor, obtain The workload of all kinds of project activities includes in current project:Every movable workload of intermediate item=(the evaluation factor/history is commented Estimate the factor) the every movable workload of class history item of *;The acquisition methods of the movable demand points of project are in current project:It obtains Take one or more groups of demand point informations, including minimum essential requirement points, possible demand points and greatest requirements points;For every Group demand point information, calculates, and demand points=(V1* minimum essential requirement points+v2* may demand points+v3* greatest requirements point Number)/N;
Wherein, v1 is minimum essential requirement points weighted value, and v2 is possible demand points weighted value, and v3 counts for greatest requirements and weights Value;And v1+v2+v3=N;It is averaging to obtained multiple groups demand points, obtains the movable demand point of project in current project Number.The acquisition methods of the history similar terms amount of work are:In history item data sample, obtain and current project phase As history item;Screening obtains the project activity split with the current project in the similar history item The corresponding workload parameter metric of the project activity of same type;For project activities all kinds of in current project, basis respectively The workload parameter degree of the demand points of such project activity and such project activity obtained through the screening in current project Magnitude obtains the history similar operation amount of such project activity;For current project each stage, item included by each stage is obtained The adduction of the movable history similar operation amount of mesh obtains the similar amount of work of each stage history;For current project, obtain each The adduction of the similar amount of work of stage history obtains current project history similar terms amount of work;
The acquisition methods of the item code amount of work are:In history item data sample, obtain similar to current project History item;The amount of work and total code line number of the history item similar with current project are obtained respectively;Using total Workload obtains unit line number workload divided by total code line number;Again by unit line number workload multiplied by current project total code row Number, obtains item code amount of work;It is described to history similar terms amount of work, item code amount of work and described current Project amount of work reference value calculates weighted sum:M1* current project amount of work reference value+M2* history similar terms are total Workload+M3* item code amount of work;
Wherein, M1 is the weighted value of current project amount of work reference value;M2 is history similar terms amount of work weighted value; M3 is item code amount of work weighted value;And M1+M2+M3=1;The method also includes:After current project implementation, it will work as Preceding project information increases in the history item data sample;The method also includes:Reality after being implemented according to current project Border workload proofreads the workload parameter metric in the current project information.
In addition, the embodiment of the invention also provides a kind of project work amounts to obtain system, the system comprises:Split mould Block, for splitting current project according to project activity type;Project activity workload obtains module, for utilizing history The workload of all kinds of project activities in project data sample acquisition current project;Stage amount of work obtains module, for being directed to In current project each stage, the adduction of the workload of project activity included by each stage is obtained, obtains each stage amount of work;? Mesh workload reference value obtains module, for being directed to current project, obtains the adduction of each stage amount of work, obtains currentitem Mesh amount of work reference value;Project amount of work obtains module, for history similar terms amount of work, item code chief engineer Work amount and the current project amount of work reference value calculate weighted sum, obtain current project amount of work;The history phase It is the amount of work of history item similar with the current project in history item data sample like project amount of work;Institute Stating item code amount of work is the project amount of work obtained in the current project according to total code line number.
The project activity workload obtains module:Evaluation factor acquiring unit, for being directed to every intermediate item activity: In history item data sample, the workload parameter metric of such project activity and the demand of such project activity are obtained Points, obtain the historical evaluation factor of such project activity;And obtain the workload of such project activity in current project The demand of parameter metric and such project activity points, obtain the evaluation factor of such project activity;The assessment The factor is for identifying the movable synthetic operation figureofmerit of project;Project activity workload acquiring unit, for according to all kinds of history The workload of project activity, the historical evaluation factor and the evaluation factor obtain all kinds of project activities in current project Workload.
The workload parameter metric includes:The urgent angle value of demand stability value, project, technical ability value, technical difficulty value And complexity value;
It further includes evaluation factor computing unit that the project activity workload, which obtains module, for being measured using workload parameter Value and demand points calculate evaluation factor, i.e. the urgent angle value * technical ability value * technology of demand points * demand stability value * project is difficult Angle value * complexity value, obtains evaluation factor;
Wherein, the degree of the demand stability value mark deviation demand stability criterion value, more, the demand stability of deviation It is worth bigger;The urgent angle value mark of the project deviates the degree of degree of urgency standard value, deviation it is more, the urgent angle value of project is got over It is small;Technical ability value mark deviates the degree of technical ability standard value, deviation it is more, technical ability value is bigger;The technical difficulty value mark Know deviate technical difficulty standard value degree, deviation it is more, technical difficulty value is bigger;The complexity value mark deviates multiple It is miscellaneous degree standard value degree, deviation it is more, complexity value is bigger.
The project activity workload acquiring unit is specifically used for obtaining every movable work of intermediate item using following formula Amount:Every movable workload of the intermediate item=every movable work of class history item of (the evaluation factor/historical evaluation factor) * Amount;It counts the system also includes demand and obtains module, for obtaining the movable demand points of project in current project;It is described Demand points obtain module:Demand point information acquisition unit, for obtaining one or more groups of demand point informations, including most Small demand points, possible demand points and greatest requirements points;Demand points computing unit, for being calculated using following formula Demand points:Demand points=(V1* minimum essential requirement points+v2* may demand points+v3* greatest requirements points)/N;
Wherein, v1 is minimum essential requirement points weighted value, and v2 is possible demand points weighted value, and v3 counts for greatest requirements and weights Value;And v1+v2+v3=N.The system also includes history similar terms amounts of work to obtain module and item code amount of work Obtain module;The history similar terms amount of work obtains module:Similar historical project acquiring unit, for going through In history project data sample, history item similar with current project is obtained;Workload parameter metric acquiring unit, is used for Screening obtains the project of the project activity same type split with the current project in the similar history item The corresponding workload parameter metric of activity;The history similar operation amount acquiring unit of project activity, for being directed to current project In all kinds of project activities, respectively according in current project such project activity demand points and through it is described screen obtain should The movable workload parameter metric of intermediate item obtains the history similar operation amount of such project activity;;Stage history is similar Amount of work acquiring unit obtains the similar work of history of project activity included by each stage for being directed to current project each stage The adduction that work is measured obtains the similar amount of work of each stage history;History similar terms amount of work acquiring unit is worked as being directed to Preceding project obtains the adduction of the similar amount of work of each stage history, obtains current project history similar terms amount of work;
The item code amount of work obtains module:Similar historical project acquiring unit, in history item data In sample, history item similar with current project is obtained;Workload and lines of code acquiring unit, for obtaining institute respectively State the amount of work and total code line number of history item similar with current project;Unit line number workload acquiring unit, is used for Unit line number workload is obtained divided by total code line number using amount of work;Item code amount of work acquiring unit, being used for will Unit line number workload obtains item code amount of work multiplied by current project total code line number;The project amount of work obtains Modulus block is specifically used for calculating project amount of work using following formula:M1* current project amount of work reference value+M2* history Similar terms amount of work+M3* item code amount of work;
Wherein, M1 is the weighted value of current project amount of work reference value;M2 is history similar terms amount of work weighted value; M3 is item code amount of work weighted value;And M1+M2+M3=1;The system also includes new samples to increase module, is used for After current project is implemented, current project information is increased in the history item data sample;The system also includes check and correction Module measures the workload parameter in the current project information for the real work amount after being implemented according to current project Value is proofreaded.
As it can be seen that the embodiment of the present invention provides a kind of project work amount appraisal procedure and system, can by current project according to Project activity type is split, then sufficiently history item data sample is combined to calculate the movable workload of projects, accordingly can Enough calculate each stage work amount of entire project, and the amount of work of entire project.Therefore, it is seen that the embodiment of the present invention can The acquisition work of project work amount is fine to project activity rank, that is to say, that using the embodiment of the present invention in project work It can refine to each activity of project in amount assessment, then refine to each stage, then can accurately get entire The size of project work amount.
Further, specific using similar to history during project work amount obtains in the embodiment of the present invention Project amount of work, item code amount of work and current project amount of work reference value calculate weighted sum, obtain currentitem The mode of mesh amount of work, that is to say, that the case where fully taking into account various software workload assessment algorithm further increases Workload obtain precision.
Further, it is preferred that the workload parameter metric includes:The urgent angle value of demand stability value, project, Technical ability value, technical difficulty value and complexity value etc..That is, during being obtained to project work amount, the factor of consideration It is not solely restricted to the visible part in surface, but comprehensively considers the multinomial factor in project, to further increase project work The objective and accurate property that work amount obtains.
Further, in the embodiment of the present invention, additionally it is possible to realize the tuning method of project work amount assessment, it can root Workload parameter metric is corrected in real time according to the final workload of project and then corrects evaluation factor, to improve subsequent project work The accuracy that work amount obtains.
Detailed description of the invention
Fig. 1 is a kind of project work amount acquisition methods flow chart provided in an embodiment of the present invention;
Fig. 2 is that a kind of project work amount provided in an embodiment of the present invention obtains system structure diagram.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail;It should be noted that the embodiment of the present invention is by computer program to external data, that is, project In each supplemental characteristic in relation to workload carry out a series of processing, thus obtain meeting the natural law as a result, getting Project work amount, so as to software project early stage being capable of objective and accurate reasonable evaluation item related work amount.To right Software project plays substantive directive significance, improves enterprise software project management efficiency and reduces software project management cost.
Referring to Fig. 1, the embodiment of the present invention provides a kind of project work amount acquisition methods, the method includes:
S101:Current project is split according to project activity type.
Current project can be split in the embodiment of the present invention according to project activity type, then sufficiently combine history Project data sample calculates the movable workload of projects, hereby it is possible to calculate each stage work amount of entire project, and it is entire The amount of work of project.Therefore, it is seen that the acquisition work of project work amount can be fine to project activity by the embodiment of the present invention Rank, that is to say, that each activity of project can be refine in the assessment of project work amount using the embodiment of the present invention, after And it is refine to each stage, it then can accurately get the size of entire project work amount.
S102:The workload of all kinds of project activities in current project is obtained using history item data sample.
It should be noted that introducing several concepts here:
WBS job analysis:It is the grouping that guiding carries out project elements with deliverable achievement, it concludes and define project Entire every one layer of more detailed definition represented to project work of decline of working range.
Demand point:It is just divided into the smallest additions and deletions and looks into the function point for changing grade.
Specifically, the scale of project can be estimated with demand point, demand point is to be multiplied by demand by demand number Difficulty or ease coefficient is added and obtains, if software requirement has defined, demand point, which can have in software requirements specification, to be obtained.Here, Demand difficulty or ease coefficient:Be divided into it is difficult, in, easily, and each degree has specific numberical range.
Evaluation factor:It is the index for identifying the synthetic operation amount of current project.According to scale of the project, type is cut, It can be according to certain algorithm(It is obtained according to coverage)Obtain the evaluation factor for newly estimating project work amount.
In this step, the above-mentioned workload that all kinds of project activities in current project are obtained using history item data sample Including:
For every intermediate item activity:In history item data sample, the workload parameter measurement of such project activity is obtained Value and the demand of such project activity points, obtain the historical evaluation factor of such project activity;And obtain current project In such project activity workload parameter metric and such project activity demand points, obtain such project activity The evaluation factor;The evaluation factor is for identifying the movable synthetic operation figureofmerit of project.
Work as further according to the movable workload of all kinds of history items, the historical evaluation factor and the evaluation factor, acquisition The workload of all kinds of project activities in preceding project.
It should be noted that in order to further increase the objective and accurate property of project work amount acquisition, to project work amount During acquisition, the factor of consideration is not solely restricted to the visible part in surface, but comprehensively considers multinomial in project Factor, it is preferred that the workload parameter metric includes:The urgent angle value of demand stability value, project, technical ability value, technology are difficult Angle value and complexity value etc..
Correspondingly, being using the method that workload parameter metric and demand points obtain evaluation factor:
Demand count the urgent angle value * technical ability value * technical difficulty value * complexity value of * demand stability value * project, obtain assessment because Son.
Wherein, the degree of demand stability value mark deviation demand stability criterion value, deviation it is more, demand is steady It is bigger to determine angle value;The urgent angle value mark of project deviates the degree of degree of urgency standard value, more, the project degree of urgency of deviation It is worth smaller;Technical ability value mark deviates the degree of technical ability standard value, deviation it is more, technical ability value is bigger;The technical difficulty Value mark deviate technical difficulty standard value degree, deviation it is more, technical difficulty value is bigger;The complexity value mark is inclined Degree from complexity standard value, deviation it is more, complexity value is bigger.
Preferably, in the formula calculated evaluation factor, in order not to make the urgent angle value of demand stability value, project, Some value is excessive in technical ability value, technical difficulty value and complexity value produces bigger effect calculated result, to influence final The assessment result of project work amount, it is preferable in the embodiment of the present invention, the urgent angle value of demand stability value, project, technical ability value, Technical difficulty value and complexity value should all the positive numbers that are less than or equal to of value.
For example, demand stability criterion value, the urgent standard value of project, technical ability standard value, technical difficulty standard value and multiple Miscellaneous degree standard value is 1, is guaranteed in above-mentioned calculation formula in this way, not right when a certain workload parameter metric is in standard value As a result it has an impact.
Wherein, if demand steadiness parameter X1 value is more than or equal to 1, i.e. demand steadiness parameter X1 is greater than more than 1, says Bright demand is more unstable, and corresponding workload is bigger, it is preferred that demand stability value is then specially X1-1, that is to say, that is used The practical bias for deviateing demand stability criterion value 1 of demand steadiness parameter is as demand stability value.
Similarly, if the urgent parameter X2 value of project is less than or equal to 1, that is to say, that when X2 is 1, illustrate that project reaches To the degree of urgency that should start at once, when project is less than 1, then illustrate that project is more urgent, i.e., than value 0.8 when X2 value is 0.7 Shi Gengjia is urgent, it is preferred that the urgent angle value of project is specially 1-X2.
Based on same reason, the processing of technical ability value, technical difficulty value and complexity value and the demand stability value is former Reason is consistent, and the embodiment of the present invention repeats no more this.
It should be noted that above-mentioned according to the movable workload of all kinds of history items, the historical evaluation factor and current Evaluation factor, the workload for obtaining all kinds of project activities in current project include:
Every movable workload of the intermediate item=every movable work of class history item of (the evaluation factor/historical evaluation factor) * Amount.
In the embodiment of the present invention, the acquisition methods of the movable demand points of project are in current project:
Obtain one or more groups of demand point informations, including minimum essential requirement points, possible demand points and greatest requirements points;
For every group of demand point information, calculate, demand points=(V1* minimum essential requirement points+v2* may demand points+v3* Greatest requirements points)/N;
Wherein, v1 is minimum essential requirement points weighted value, and v2 is possible demand points weighted value, and v3 counts for greatest requirements and weights Value;And v1+v2+v3=N;
It is averaging to obtained multiple groups demand points, obtains the movable demand points of project in current project.
S103:For current project each stage, the adduction of the workload of project activity included by each stage is obtained, is obtained Each stage amount of work.
S104:For current project, the adduction of each stage amount of work is obtained, obtains the reference of current project amount of work Value.
S105:History similar terms amount of work, item code amount of work and the current project amount of work are joined It examines value and calculates weighted sum, obtain current project amount of work;The history similar terms amount of work is history item data The amount of work of history item similar with the current project in sample;The item code amount of work is described current The project amount of work obtained in project according to total code line number.
In the preferred embodiment of the present invention, the acquisition methods of above-mentioned history similar terms amount of work are:
In history item data sample, history item similar with current project is obtained;
Screening obtains the project activity same type split with the current project in the similar history item The corresponding workload parameter metric of project activity;
For project activities all kinds of in current project, counts and pass through according to the demand of such project activity in current project respectively The workload parameter metric for screening such obtained project activity, obtains the history similar operation of such project activity Amount;
For current project each stage, the adduction of the history similar operation amount of project activity included by each stage is obtained, is obtained each The similar amount of work of stage history;
For current project, the adduction of the similar amount of work of each stage history is obtained, it is total to obtain current project history similar terms Workload.
In another preferred embodiment of the invention, the acquisition methods of the item code amount of work are:
In history item data sample, history item similar with current project is obtained;
The amount of work and total code line number of the history item similar with current project are obtained respectively;
Unit line number workload is obtained divided by total code line number using amount of work;
Unit line number workload is obtained into item code amount of work multiplied by current project total code line number again.
Then this step is to history similar terms amount of work, item code amount of work and the current project total working Amount reference value calculates weighted sum:
M1* current project amount of work reference value+M2* history similar terms amount of work+M3* item code amount of work;
Wherein, M1 is the weighted value of current project amount of work reference value;M2 is history similar terms amount of work weighted value; M3 is item code amount of work weighted value;And M1+M2+M3=1.
Those skilled in the art can be according to specific actual conditions sets itself weighted value, it is preferred that M1 0.8, M2 and M3 is 0.1.
As it can be seen that in the embodiment of the present invention, it is specific using total to history similar terms in project work amount acquisition process Workload, item code amount of work and current project amount of work reference value calculate weighted sum, obtain current project chief engineer The mode that work is measured, that is to say, that the case where fully taking into account various software workload assessment algorithm, the work further increased Measure the precision obtained.
Preferably, method provided in an embodiment of the present invention further includes:
After current project implementation, current project information is increased in the history item data sample.
Further, method provided in an embodiment of the present invention further includes:
Real work amount after being implemented according to current project carries out the workload parameter metric in the current project information Check and correction.
Specifically, it is a kind of implemented according to current project after real work amount to the work in the current project information The concrete methods of realizing that amount parameter metric is proofreaded may include the following steps:
A) project implementation process is segmented by software implementation, and records practical each fragmentation procedure workload.
B) the urgent angle value * technical ability value * technical difficulty value * complexity of evaluation requirement stability value * project before the project implementation Value, after the completion of the project implementation, corrects these indexs again.
C) revised index value and actual workload are added in project measurement library.
D) the workload parameter obtained according to project measurement library is compared with the project real work amount, after analysis relatively Obtained deviation amplitude.
If then analyzed deviating cause e) except deviation amplitude+- 20% or within+- 5%, analysis report is formed simultaneously Report is recorded in project measurement library.
As it can be seen that project work amount acquisition methods provided in an embodiment of the present invention, additionally it is possible to realize the assessment of project work amount Tuning method, it can workload parameter metric is corrected according to the final workload of project in real time and then corrects evaluation factor, with Just the accuracy that subsequent project workload obtains is improved.
Referring to fig. 2, the embodiment of the present invention also provides a kind of project work amount acquisition system, the system comprises:
Module 201 is split, for splitting current project according to project activity type;
Project activity workload obtains module 202, for obtaining each intermediate item in current project using history item data sample Movable workload;
Stage amount of work obtains module 203, for being directed to current project each stage, obtains project activity included by each stage Workload adduction, obtain each stage amount of work;
Project work amount reference value obtains module 204, for being directed to current project, obtains the adduction of each stage amount of work, obtains To current project amount of work reference value;
Project amount of work obtains module 205, for history similar terms amount of work, item code amount of work and institute It states current project amount of work reference value and calculates weighted sum, obtain current project amount of work;The history similar terms are total Workload is the amount of work of history item similar with the current project in history item data sample;The project generation Code amount of work is the project amount of work obtained in the current project according to total code line number.
Preferably, the project activity workload acquisition module 202 includes:
Evaluation factor acquiring unit, for being directed to every intermediate item activity:In history item data sample, the intermediate item is obtained The demand of movable workload parameter metric and such project activity points, obtain the historical evaluation of such project activity because Son;And obtain the workload parameter metric of such project activity and the demand point of such project activity in current project Number, obtains the evaluation factor of such project activity;The evaluation factor refers to for identifying the movable synthetic operation amount of project Mark.
And project activity workload acquiring unit, for according to the movable workload of all kinds of history items, described go through History evaluation factor and the evaluation factor obtain the workload of all kinds of project activities in current project.
Preferably, the workload parameter metric includes:The urgent angle value of demand stability value, project, technical ability value, skill Art difficulty value and complexity value.
Correspondingly, it further includes evaluation factor computing unit that the project activity workload, which obtains module 202, for utilizing Workload parameter metric and demand points calculate evaluation factor, i.e. the demand points urgent angle value * of * demand stability value * project Technical ability value * technical difficulty value * complexity value, obtains evaluation factor.
Wherein, the degree of demand stability value mark deviation demand stability criterion value, deviation it is more, demand is steady It is bigger to determine angle value;The urgent angle value mark of project deviates the degree of degree of urgency standard value, more, the project degree of urgency of deviation It is worth smaller;Technical ability value mark deviates the degree of technical ability standard value, deviation it is more, technical ability value is bigger;The technical difficulty Value mark deviate technical difficulty standard value degree, deviation it is more, technical difficulty value is bigger;The complexity value mark is inclined Degree from complexity standard value, deviation it is more, complexity value is bigger.
Specifically, the project activity workload acquiring unit is used to utilize the every intermediate item of following formula acquisition movable Workload:
Every movable workload of the intermediate item=every movable work of class history item of (the evaluation factor/historical evaluation factor) * Amount.
Further, it counts the system also includes demand and obtains module, it is movable for obtaining project in current project Demand points.
The demand points obtain module and include:
Demand point information acquisition unit, for obtaining one or more groups of demand point informations, including minimum essential requirement points, possibility Demand points and greatest requirements points;
Demand points computing unit, counts for calculating demand using following formula:
Demand points=(V1* minimum essential requirement points+v2* may demand points+v3* greatest requirements points)/N;
Wherein, v1 is minimum essential requirement points weighted value, and v2 is possible demand points weighted value, and v3 counts for greatest requirements and weights Value;And v1+v2+v3=N.
Further, the system also includes history similar terms amounts of work to obtain module and item code total working Amount obtains module.
Wherein, the history similar terms amount of work acquisition module includes:
Similar historical project acquiring unit, for obtaining history entries similar with current project in history item data sample Mesh;
Workload parameter metric acquiring unit obtains and the currentitem for screening in the similar history item The corresponding workload parameter metric of the project activity for the project activity same type that mesh is split;
The history similar operation amount acquiring unit of project activity is used to be directed to all kinds of project activities in current project, respectively basis The workload parameter degree of the demand points of such project activity and such project activity obtained through the screening in current project Magnitude obtains the history similar operation amount of such project activity;
The similar amount of work acquiring unit of stage history obtains project included by each stage for being directed to current project each stage The adduction of movable history similar operation amount obtains the similar amount of work of each stage history;
History similar terms amount of work acquiring unit obtains the similar amount of work of each stage history for being directed to current project Adduction, obtain current project history similar terms amount of work.
In addition, the item code amount of work acquisition module includes:
Similar historical project acquiring unit, for obtaining history entries similar with current project in history item data sample Mesh;
Workload and lines of code acquiring unit, for obtaining the chief engineer of the history item similar with current project respectively Work amount and total code line number;
Unit line number workload acquiring unit, for obtaining unit line number workload divided by total code line number using amount of work;
Item code amount of work acquiring unit, for multiplied by current project total code line number, obtaining unit line number workload Item code amount of work.
Preferably, the project amount of work obtains module and is specifically used for calculating project amount of work using following formula:
M1* current project amount of work reference value+M2* history similar terms amount of work+M3* item code amount of work.
Wherein, M1 is the weighted value of current project amount of work reference value;M2 is the weighting of history similar terms amount of work Value;M3 is item code amount of work weighted value;And M1+M2+M3=1.
Further, system provided in an embodiment of the present invention further includes that new samples increase module, in current project reality Shi Hou increases to current project information in the history item data sample.
Preferably, provided in an embodiment of the present invention the system also includes checking modules, for being implemented according to current project Real work amount afterwards proofreads the workload parameter metric in the current project information.
It should be noted that the working principle of modules or unit in present system embodiment and processed Journey may refer to the associated description in embodiment of the method shown in above-mentioned Fig. 1, and details are not described herein again.
As it can be seen that the embodiment of the present invention provides a kind of project work amount assessment system, it can be living according to project by current project Dynamic type is split, then sufficiently history item data sample is combined to calculate the movable workload of projects, hereby it is possible to calculate Each stage work amount of entire project out, and the amount of work of entire project.Therefore, it is seen that the embodiment of the present invention can be by project The acquisition work of workload is fine to project activity rank, that is to say, that is assessed using the embodiment of the present invention in project work amount In can refine to each activity of project, then refine to each stage, then can accurately get entire project work The size that work is measured.
Further, specific using similar to history during project work amount obtains in the embodiment of the present invention Project amount of work, item code amount of work and current project amount of work reference value calculate weighted sum, obtain currentitem The mode of mesh amount of work, that is to say, that the case where fully taking into account various software workload assessment algorithm further increases Workload obtain precision.
Further, it is preferred that the workload parameter metric includes:The urgent angle value of demand stability value, project, Technical ability value, technical difficulty value and complexity value etc..That is, during being obtained to project work amount, the factor of consideration It is not solely restricted to the visible part in surface, but comprehensively considers the multinomial factor in project, to further increase project work The objective and accurate property that work amount obtains.
Further, in the embodiment of the present invention, additionally it is possible to realize the tuning method of project work amount assessment, it can root Workload parameter metric is corrected in real time according to the final workload of project and then corrects evaluation factor, to improve subsequent project work The accuracy that work amount obtains.
For the ease of clearly describing the technical solution of the embodiment of the present invention, in the embodiment of invention, use " the One ", the printed words such as " second " distinguish function and the essentially identical identical entry of effect or similar item, those skilled in the art It is understood that the printed words such as " first ", " second " are not defined quantity and execution order.
It will appreciated by the skilled person that implement the method for the above embodiments be can It is completed with instructing relevant hardware by program, the program can store in a computer-readable storage medium In, which when being executed, includes the following steps:(The step of method), the storage medium, such as:ROM/RAM, magnetic disk, CD etc..
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention are all contained in protection model of the invention In enclosing.

Claims (1)

1. a kind of acquisition methods and system of project work amount, which is characterized in that the method includes:By current project according to Project activity type is split;The workload of all kinds of project activities in current project is obtained using history item data sample; For current project each stage, the adduction of the workload of project activity included by each stage is obtained, obtains each stage total working Amount;For current project, the adduction of each stage amount of work is obtained, obtains current project amount of work reference value;To history phase Weighted sum is calculated like project amount of work, item code amount of work and the current project amount of work reference value, is obtained Current project amount of work;The history similar terms amount of work be history item data sample in the current project The amount of work of similar history item;The item code amount of work is in the current project according to total code line number The project amount of work of acquisition;The work that all kinds of project activities in current project are obtained using history item data sample Amount includes:For every intermediate item activity:In history item data sample, the workload parameter degree of such project activity is obtained The demand of magnitude and such project activity points, obtain the historical evaluation factor of such project activity;And obtain currentitem The demand of the workload parameter metric of such project activity and such project activity is counted in mesh, obtains such project activity The evaluation factor;The evaluation factor is for identifying the movable synthetic operation figureofmerit of project;According to all kinds of history items Movable workload, the historical evaluation factor and the evaluation factor obtain the work of all kinds of project activities in current project Amount;The workload parameter metric includes demand stability value, the urgent angle value of project, technical ability value, technical difficulty value and complexity Angle value;It is using the method that workload parameter metric and demand points obtain evaluation factor:Demand points * demand stability The urgent angle value * technical ability value * technical difficulty value * complexity value of value * project, obtains evaluation factor;Wherein, the demand stability Value mark deviation demand stability criterion value degree, deviation it is more, demand stability value is bigger;The urgent angle value mark of project Know deviate degree of urgency standard value degree, deviation it is more, the urgent angle value of project is smaller;The technical ability value mark deviates technical ability mark Quasi- value degree, deviation it is more, technical ability value is bigger;The technical difficulty value mark deviates the degree of technical difficulty standard value, That deviates is more, and technical difficulty value is bigger;Complexity value mark deviates the degree of complexity standard value, deviation it is more, Complexity value is bigger;It is described according to the movable workload of all kinds of history items, the historical evaluation factor and evaluation because Son, the workload for obtaining all kinds of project activities in current project include:Every movable workload of intermediate item=(evaluation because Son/historical evaluation the factor) the every movable workload of class history item of *;The acquisition of the movable demand points of project in current project Method is:Obtain one or more groups of demand point informations, including minimum essential requirement points, possible demand points and greatest requirements point Number;For every group of demand point information, calculate, demand points=(The possible demand points+v3* of v1* minimum essential requirement points+v2* is most Big demand points)/N;Wherein, v1 is minimum essential requirement points weighted value, and v2 is possible demand points weighted value, and v3 is that maximum needs Seek points weighted value;And v1+v2+v3=N;It is averaging to obtained multiple groups demand points, obtains project activity in current project Demand points;In history item data sample, history item similar with current project is obtained;In the similar history Screening obtains workload corresponding with the project activity of project activity same type that the current project is split in project Parameter metric;For project activities all kinds of in current project, respectively according to the demand point of such project activity in current project The workload parameter metric of number and such project activity obtained through the screening, obtains the history phase of such project activity Like workload;For current project each stage, the adduction of the history similar operation amount of project activity included by each stage is obtained, Obtain the similar amount of work of each stage history;For current project, the adduction of the similar amount of work of each stage history is obtained, is obtained Current project history similar terms amount of work;The acquisition methods of the item code amount of work are:In history item data In sample, history item similar with current project is obtained;The total of the history item similar with current project is obtained respectively Workload and total code line number;Unit line number workload is obtained divided by total code line number using amount of work;Again by unit line number Workload obtains item code amount of work multiplied by current project total code line number;It is described to history similar terms amount of work, Item code amount of work and the current project amount of work reference value calculate weighted sum:M1* current project total working Measure reference value+M2* history similar terms amount of work+M3* item code amount of work;Wherein, M1 is current project total working Measure the weighted value of reference value;M2 is history similar terms amount of work weighted value;M3 is item code amount of work weighted value; And M1+M2+M3=1;The method also includes:After current project implementation, current project information is increased into the history entries In mesh data sample;The method also includes:Real work amount after being implemented according to current project is to the current project information In workload parameter metric proofreaded.
CN201810712639.0A 2018-06-29 2018-06-29 A kind of acquisition methods and system of project work amount Withdrawn CN108921430A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810712639.0A CN108921430A (en) 2018-06-29 2018-06-29 A kind of acquisition methods and system of project work amount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810712639.0A CN108921430A (en) 2018-06-29 2018-06-29 A kind of acquisition methods and system of project work amount

Publications (1)

Publication Number Publication Date
CN108921430A true CN108921430A (en) 2018-11-30

Family

ID=64424563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810712639.0A Withdrawn CN108921430A (en) 2018-06-29 2018-06-29 A kind of acquisition methods and system of project work amount

Country Status (1)

Country Link
CN (1) CN108921430A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110059957A (en) * 2019-04-17 2019-07-26 新地能源工程技术有限公司 Project task is unpacked method, apparatus, project management equipment and storage medium
CN111652403A (en) * 2019-12-09 2020-09-11 武汉空心科技有限公司 Feedback correction-based work platform task workload prediction method
CN111950929A (en) * 2020-08-25 2020-11-17 上海逸迅信息科技有限公司 Workload balanced distribution method and device for project type tasks
CN112163789A (en) * 2020-10-22 2021-01-01 上海易教信息科技有限公司 Teacher workload evaluation system and method for online education
CN112966971A (en) * 2021-03-30 2021-06-15 建信金融科技有限责任公司 Project workload assessment method and device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110059957A (en) * 2019-04-17 2019-07-26 新地能源工程技术有限公司 Project task is unpacked method, apparatus, project management equipment and storage medium
CN111652403A (en) * 2019-12-09 2020-09-11 武汉空心科技有限公司 Feedback correction-based work platform task workload prediction method
CN111950929A (en) * 2020-08-25 2020-11-17 上海逸迅信息科技有限公司 Workload balanced distribution method and device for project type tasks
CN112163789A (en) * 2020-10-22 2021-01-01 上海易教信息科技有限公司 Teacher workload evaluation system and method for online education
CN112966971A (en) * 2021-03-30 2021-06-15 建信金融科技有限责任公司 Project workload assessment method and device
CN112966971B (en) * 2021-03-30 2022-09-13 建信金融科技有限责任公司 Project workload assessment method and device

Similar Documents

Publication Publication Date Title
CN104732307B (en) Project work amount acquisition methods and system
CN108921430A (en) A kind of acquisition methods and system of project work amount
Yee et al. Vector generalized linear and additive extreme value models
Fenyves et al. Financial Performance Evaluation of agricultural enterprises with DEA Method
KR102097953B1 (en) Failure risk index estimation device and failure risk index estimation method
US20060142886A1 (en) Method and system of production planning
CN110222313B (en) Drought early warning method and device reflecting non-uniform drought characteristic variables
CN105930257A (en) Method and apparatus for determining target test cases
KR101793625B1 (en) Evaluation method and system of rainfall quantile considering climate change in nonstationary regional frequency analysis
CN106919373A (en) A kind of program code method for evaluating quality
Jiang et al. An investigation on the variation of software development productivity
CN110557829A (en) Positioning method and positioning device for fusing fingerprint database
White A control model of the software requirements process
CN111175608A (en) Power distribution network harmonic responsibility quantitative division method based on accelerated independent component analysis
Lokan et al. Investigating the use of chronological split for software effort estimation
CN105719181A (en) Risk level assessment method and device
JPWO2019111435A1 (en) Abnormality judgment device, abnormality judgment method, and program
CN115169089A (en) Wind power probability prediction method and device based on kernel density estimation and copula
CN111401671B (en) Derived feature calculation method and device in accurate marketing and readable storage medium
US20190205804A1 (en) Information processing device, information processing method and computer readable medium
US9785904B2 (en) Methods and systems for demonstrating and applying productivity gains
CN110569892B (en) Ubiquitous positioning signal static positioning method and system
CN110647466B (en) Program quality supervision method and device based on DevOps
US11882175B2 (en) Correlations between workload characteristics and elapsed times
CN103782197B (en) Estimation of Seismetic Magnitude equipment, Estimation of Seismetic Magnitude method and computer readable recording medium storing program for performing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181130

WW01 Invention patent application withdrawn after publication