CN108847868A - AFH update method and device - Google Patents

AFH update method and device Download PDF

Info

Publication number
CN108847868A
CN108847868A CN201710307711.7A CN201710307711A CN108847868A CN 108847868 A CN108847868 A CN 108847868A CN 201710307711 A CN201710307711 A CN 201710307711A CN 108847868 A CN108847868 A CN 108847868A
Authority
CN
China
Prior art keywords
afh
equipment
time
receiving performance
renewable time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710307711.7A
Other languages
Chinese (zh)
Other versions
CN108847868B (en
Inventor
张�杰
俞忠兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spreadtrum Communications Shanghai Co Ltd
Original Assignee
Spreadtrum Communications Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Spreadtrum Communications Shanghai Co Ltd filed Critical Spreadtrum Communications Shanghai Co Ltd
Priority to CN201710307711.7A priority Critical patent/CN108847868B/en
Publication of CN108847868A publication Critical patent/CN108847868A/en
Application granted granted Critical
Publication of CN108847868B publication Critical patent/CN108847868B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/69Spread spectrum techniques
    • H04B1/713Spread spectrum techniques using frequency hopping
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/69Spread spectrum techniques
    • H04B1/692Hybrid techniques using combinations of two or more spread spectrum techniques
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/69Spread spectrum techniques
    • H04B1/713Spread spectrum techniques using frequency hopping
    • H04B1/7136Arrangements for generation of hop frequencies, e.g. using a bank of frequency sources, using continuous tuning or using a transform
    • H04B2001/71362Arrangements for generation of hop frequencies, e.g. using a bank of frequency sources, using continuous tuning or using a transform using a bank of frequency sources

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of AFH update method and device, the described method comprises the following steps:Determine the current transmitting-receiving performance quality of link, the link is main equipment and from the link between equipment;Practical renewable time is determined according to the current transmitting-receiving performance quality;AFH request at least once is sent from equipment to described, the AFH request includes the practical renewable time, so that described update AFH information in the practical renewable time from equipment;The AFH information is updated in the practical renewable time;Wherein, the current transmitting-receiving performance quality is poorer, and the practical renewable time is longer apart from the interval at the AFH sending moment for the first time requested.The present invention program can make have more chances to receive AFH request from equipment, to be changed to be effectively reduced caused by using different AFH frequency point groups because of master and slave equipment using AFH frequency point group identical with main equipment and received and dispatched failure rate on time.

Description

AFH update method and device
Technical field
The present invention relates to fields of communication technology, more particularly, to a kind of AFH update method and device.
Background technique
Bluetooth (Blue tooth, BT) work is in industry, science, Medical Band (Industrial Scientific Medical band, ISM band), ISM band is an open frequency range, is the frequency range that does not need authorization and can use. And WLAN (WIFI) some working frequency points are located in above-mentioned frequency range, so for BT, in this frequency range There may be very strong interference signal.When environment is more complicated, interference than it is more serious when, BT will be greatly affected, meeting The problems such as song Caton, bluetooth conversation noise, is listened in appearance, so BT can spread (Adaptive using adaptive frequency hopping Frequency-Hopping, AFH) functional assessment channel quality, with the frequency point to avoid interference.
In existing AFH technology, main equipment (Master) sends AFH request at least once to from equipment (Slave) (LMP_set_AFH), so that master and slave equipment is in renewable time, the AFH frequency point group before use is changed to request using AFH In AFH frequency point group (AFH_channel_map), and only carry out frequency hopping on the frequency point in AFH frequency point group.Wherein, described AFH request includes renewable time and AFH information, and the AFH information may include the AFH frequency point group by can be used frequency point to form.
But it since the time span of renewable time only has corresponding relationship with the number from equipment, is got over from the number of equipment More, renewable time is longer apart from the interval at the AFH sending moment for the first time requested, and when receiving and dispatching performance and poor environment, has There may be AFH request is not received from equipment, transmitting-receiving is caused to fail, disconnecting link when serious.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of AFH update method and device, it can make have more multimachine from equipment AFH request can be received, to be changed to be effectively reduced using AFH frequency point group identical with main equipment because of master and slave equipment on time Using receiving and dispatching failure rate caused by different AFH frequency point groups.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of AFH update method, include the following steps:It determines The current transmitting-receiving performance quality of link, the link are main equipments and from the link between equipment;According to the current transmitting-receiving It can the determining practical renewable time of quality;AFH request at least once is sent from equipment to described, the AFH request includes the reality Border renewable time, so that described update AFH information in the practical renewable time from equipment;The practical renewable time more The new AFH information;Wherein, the current transmitting-receiving performance quality is poorer, what the practical renewable time was requested apart from the AFH It is longer that the interval at moment is issued for the first time.
Optionally, the current transmitting-receiving performance quality of the determining link includes:Service request is sent from equipment to described, and And receive the confirmation from equipment for the service request and reply, determine the service request transmission times and it is described really Recognize the number of reply;The quotient of transmission times based on the confirmation number replied described in preset duration and the service request, Determine the current transmitting-receiving performance quality;Wherein, the quotient is smaller, and the current transmitting-receiving performance quality is poorer.
Optionally, the service request includes following one or more:Audio data request, communicating data request, connection State confirmation request and AFH request.
Optionally, determine that practical renewable time includes according to the current transmitting-receiving performance quality:Based on the current transmitting-receiving Performance quality determines and extends duration, and the current transmitting-receiving performance quality is poorer, and the extension duration is longer;In original update It engraves and increases the extension duration, with the determination practical renewable time;Wherein, the original renewable time is apart from the AFH The interval for issuing the moment for the first time of request is determined according to described from the number of equipment.
Optionally, the number from equipment is bigger, the sending for the first time that the original renewable time is requested apart from the AFH The interval at moment is longer.
Optionally, the AFH update method further includes:After updating the AFH information, determine in default detection duration The reduction amount of the current transmitting-receiving performance quality;It is more by the AFH Information recovering if the reduction amount exceeds preset difference value AFH information before new.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of AFH updating device, including:Quality determination module, It is adapted to determine that the current transmitting-receiving performance quality of link, the link is main equipment and from the link between equipment;When practical update Determining module is carved, is suitable for determining practical renewable time according to the current transmitting-receiving performance quality;AFH request sending module, is suitable for Send AFH at least once to described from equipment and request, AFH request includes the practical renewable time so that it is described from Equipment updates AFH information in the practical renewable time;Update module is suitable for updating the AFH in the practical renewable time Information;Wherein, the current transmitting-receiving performance quality is poorer, the sending for the first time that the practical renewable time is requested apart from the AFH The interval at moment is longer.
Optionally, the quality determination module includes:Number determines submodule, suitable for asking to described from equipment transmission business Ask, and receive the confirmation from equipment for the service request and reply, determine the transmission times of the service request with The number that the confirmation is replied;Quality determines submodule, suitable for the number and described replied based on confirmation described in preset duration The quotient of the transmission times of service request determines the current transmitting-receiving performance quality;Wherein, the quotient is smaller, described current It is poorer to receive and dispatch performance quality.
Optionally, the service request includes following one or more:Audio data request, communicating data request, connection State confirmation request and AFH request.
Optionally, the practical renewable time determining module includes:Extend duration and determine submodule, suitable for being worked as based on described Preceding transmitting-receiving performance quality determines and extends duration, and the current transmitting-receiving performance quality is poorer, and the extension duration is longer;Reality is more The new moment determines submodule, suitable for increasing the extension duration on original renewable time, with the determination practical renewable time; Wherein, the original renewable time is apart from the interval for issuing the moment for the first time that the AFH is requested according to the number from equipment It determines.
Optionally, the number from equipment is bigger, the sending for the first time that the original renewable time is requested apart from the AFH The interval at moment is longer.
Optionally, the AFH updating device further includes:Reduction amount determining module, be suitable for update the AFH information it Afterwards, the reduction amount of the current transmitting-receiving performance quality in default detection duration is determined;Recovery module is suitable for when the reduction amount is super It is the AFH information before updating by the AFH Information recovering out when preset difference value.
Compared with prior art, the technical solution of the embodiment of the present invention has the advantages that:
In embodiments of the present invention, determine the current transmitting-receiving performance quality of link, the link be main equipment with from equipment Between link;Practical renewable time is determined according to the current transmitting-receiving performance quality;It is sent at least once to described from equipment AFH request, AFH request include the practical renewable time so that it is described from equipment the practical renewable time more New AFH information;The AFH information is updated in the practical renewable time;Wherein, the current transmitting-receiving performance quality is poorer, institute It is longer apart from the interval at the AFH sending moment for the first time requested to state practical renewable time.Using the above scheme, based on link Current transmitting-receiving performance quality determines practical renewable time, and updates AFH information in the practical renewable time, due to currently receiving Volatility quality is poorer, and the practical renewable time is longer apart from the interval at the AFH sending moment for the first time requested, and prolongs Long renewable time, which helps to increase main equipment, retransmits the number of AFH request, so that it is described to make to have from equipment more chances to receive AFH request helps to be changed on time to be effectively reduced using AFH frequency point group identical with main equipment because master and slave equipment is not using Failure rate is received and dispatched caused by same AFH frequency point group.
Further, after updating the AFH information, the current transmitting-receiving performance quality in default detection duration is determined Reduction amount;It is the AFH information before updating by the AFH Information recovering if the reduction amount exceeds preset difference value.Using this Whether the scheme of inventive embodiments judges the AFH frequency point group of master and slave equipment by the current transmitting-receiving performance quality of lasting detection It updates simultaneously, if currently the decline of transmitting-receiving performance quality is more, it is believed that since the AFH frequency point group at both ends is inconsistent, at this time The AFH information that the AFH Information recovering is before updating is helped avoid because master and slave equipment is using different AFH frequency point groups And cause transmitting-receiving performance severe, it improves from the received success rate of equipment.
Detailed description of the invention
Fig. 1 is a kind of flow chart of AFH update method in the embodiment of the present invention;
Fig. 2 is a kind of flow chart of specific implementation of step S11 in Fig. 1;
Fig. 3 is a kind of flow chart of specific implementation of step S12 in Fig. 1;
Fig. 4 is a kind of schematic diagram of a scenario of determining practical renewable time in the embodiment of the present invention;
Fig. 5 is the partial process view of another kind AFH update method in the embodiment of the present invention;
Fig. 6 is a kind of structural schematic diagram of AFH updating device in the embodiment of the present invention;
Fig. 7 is a kind of structural schematic diagram of specific implementation of quality determination module 61 in Fig. 6;
Fig. 8 is a kind of structural schematic diagram of specific implementation of practical renewable time determining module 62 in Fig. 6.
Specific embodiment
In existing AFH technology, (LMP_set_AFH) is requested to AFH at least once is sent from equipment, so that master and slave Equipment is changed to from the AFH frequency point group before use using the AFH frequency point group (AFH_ in AFH request in renewable time Channel_map), and only frequency hopping is carried out on the frequency point in AFH frequency point group.But due to the time span of renewable time Only there is corresponding relationship with the number from equipment, receiving and dispatching performance and when poor environment, it is possible to exist and not receive AFH from equipment and ask The case where asking causes transmitting-receiving to fail, disconnecting link when serious.
The present inventor has found after study, since the time span of renewable time only has with the number from equipment pair It should be related to, parameter setting is excessively single, does not consider the current transmitting-receiving performance quality factor of link, causes in transmitting-receiving performance and environment When poor, it is possible to because current transmitting-receiving performance quality is poor, fail the AFH request for receiving main equipment sending from equipment, also It can not be changed to using AFH frequency point group identical with main equipment, and then cause because master and slave equipment is using different AFH frequencies in time It puts group and receives and dispatches and fail.
In embodiments of the present invention, determine the current transmitting-receiving performance quality of link, the link be main equipment with from equipment Between link;Practical renewable time is determined according to the current transmitting-receiving performance quality;It is sent at least once to described from equipment AFH request, AFH request include the practical renewable time so that it is described from equipment the practical renewable time more New AFH information;The AFH information is updated in the practical renewable time;Wherein, the current transmitting-receiving performance quality is poorer, institute It is longer apart from the interval at the AFH sending moment for the first time requested to state practical renewable time.Using the above scheme, based on link Current transmitting-receiving performance quality determines practical renewable time, and updates AFH information in the practical renewable time, due to currently receiving Volatility quality is poorer, and the practical renewable time is longer apart from the interval at the AFH sending moment for the first time requested, and prolongs Long renewable time, which helps to increase main equipment, retransmits the number of AFH request, so that it is described to make to have from equipment more chances to receive AFH request helps to be changed on time to be effectively reduced using AFH frequency point group identical with main equipment because master and slave equipment is not using Failure rate is received and dispatched caused by same AFH frequency point group.
It is understandable to enable above-mentioned purpose of the invention, feature and beneficial effect to become apparent, with reference to the accompanying drawing to this The specific embodiment of invention is described in detail.
Referring to Fig.1, Fig. 1 is a kind of flow chart of AFH update method in the embodiment of the present invention.The AFH update method can To include step S11 to step S14:
Step S11:Determine the current transmitting-receiving performance quality of link, the link is main equipment and from the chain between equipment Road;
Step S12:Practical renewable time is determined according to the current transmitting-receiving performance quality;
Step S13:AFH request at least once is sent from equipment to described, when the AFH request includes that the reality updates It carves, so that described update AFH information in the practical renewable time from equipment;
Step S14:The AFH information is updated in the practical renewable time.
In the specific implementation of step S11, for a main equipment and from the link (link) between equipment, it can pass through It determines the current transmitting-receiving performance quality of the link, reflects main equipment and from the transmitting-receiving performance between equipment.
Specifically, it is determined that a kind of specific implementation of the current transmitting-receiving performance quality of link be referred to Fig. 2 shows process Figure.
As shown in Fig. 2, the current transmitting-receiving performance quality for determining link may include step S21 and step S22, below to each A step is described in detail.
Step S21:Service request is sent from equipment to described, and is directed to the service request from equipment described in reception Confirmation is replied, and determines the number that the transmission times of the service request and the confirmation are replied.
In specific implementation, main equipment sends service request to from equipment, is being properly received the service request from equipment After can to main equipment send confirmation reply (ACK) with feedback reception situation.During this period, if main equipment in preset duration not The ACK issued from equipment can be received, it is likely that retransmit to the service request.
Specifically, the service request includes following one or more:Audio data request, communicating data request, connection State confirmation request and AFH request.
Wherein, audio data request is for sending packets of audio data to from equipment, so that meeting user passes through bluetooth equipment It listens to music, the demand of playback.
Communicating data request is set so as to meet user by bluetooth for transmitting communicating data packet between master and slave equipment The standby demand conversed.
Confirming electrical connection status request is for confirming the connection status between master and slave equipment, such as when receiving from equipment really When to recognize reply be ACK=1, indicate between master and slave equipment as connection status;It replys when receiving from the confirmation of equipment as ACK=0 When, it indicates between master and slave equipment as not-connected status.
Further, it is determined that the number that the transmission times of the service request and the confirmation are replied, determines the business When the transmission times of request, need to include the data packet retransmitted with mistake.
Step S22:The quotient of transmission times based on the confirmation number replied described in preset duration and the service request Value, determines the current transmitting-receiving performance quality.
Specifically, the current transmitting-receiving performance quality can be calculated via following formula:
Tx_quality=Tx_success ÷ Tx_total_num;
Wherein, Tx_quality indicates the current transmitting-receiving performance quality;
Tx_success indicates the number that the confirmation is replied;
Tx_total_num indicates the transmission times of the service request.
Further, the quotient is smaller, indicates to receive in the case where main equipment issues identical data packet from equipment Confirm that the quantity replied is fewer, the current transmitting-receiving performance quality is poorer;Conversely, the quotient is bigger, current transmitting-receiving property is indicated Energy quality is better.It as a unrestricted example, can be set to as Tx_quality≤50%, indicate current transmitting-receiving Performance quality is poor;As Tx_quality >=80%, indicate that current transmitting-receiving performance quality is good.
It should be pointed out that current transmitting-receiving performance quality can also be fed back with other parameters, such as asked based on the business The difference for the number that the transmission times and the confirmation asked are replied, determines the current transmitting-receiving performance quality, and the difference is bigger, Indicate that current transmitting-receiving performance quality is poorer;Conversely, the difference is smaller, indicate that current transmitting-receiving performance quality is better.In the present invention In embodiment, for determine link current transmitting-receiving performance quality concrete mode with no restriction.
It is possible to further it is regular or it is irregular current transmitting-receiving performance quality is determined, such as every default Duration recalculates once, to ensure to grasp current transmitting-receiving performance quality in real time.As a unrestricted example, Ke Yishe It sets every 2s and determines primary current transmitting-receiving performance quality.
With continued reference to Fig. 1, in the specific implementation of step S12, can be determined according to the current transmitting-receiving performance quality real Border renewable time, the current transmitting-receiving performance quality is poorer, the sending for the first time that the practical renewable time is requested apart from the AFH The interval at moment is longer, conversely, currently transmitting-receiving performance quality is better, the head that the practical renewable time is requested apart from the AFH The secondary interval for issuing the moment is shorter.
Specifically, Fig. 3, which is shown, determines that one kind of practical renewable time is specific according to the current transmitting-receiving performance quality The flow chart of realization may include step S31 to step S32:
Step S31:It based on the current transmitting-receiving performance quality, determines and extends duration, the current transmitting-receiving performance quality is got over Difference, the extension duration are longer;
Step S32:Increase the extension duration, on original renewable time with the determination practical renewable time.
In the specific implementation of step S31, current performance quality of receiving and dispatching is poorer, true based on the current transmitting-receiving performance quality Fixed extension duration is longer;Conversely, currently transmitting-receiving performance quality is better, the extension determined based on the current transmitting-receiving performance quality Duration is shorter.
In the specific implementation of step S32, increase the extension duration on original renewable time, so that obtained reality Renewable time receives the influence of current transmitting-receiving performance quality, and current performance quality of receiving and dispatching is poorer, described in practical renewable time distance The interval at the sending moment for the first time of AFH request is longer.
Wherein, original renewable time can be by determining that the method for renewable time (AFH_instant) obtains in existing AFH technology , the interval for issuing the moment for the first time apart from AFH request is determined according to described from the number of equipment.
Further, the number from equipment is bigger, the hair for the first time that the original renewable time is requested apart from the AFH The interval at moment is longer out;Conversely, the number from equipment is smaller, the original renewable time is requested for the first time apart from the AFH The interval for issuing the moment is shorter.
A kind of schematic diagram of a scenario of determining practical renewable time in the embodiment of the present invention is shown referring to Fig. 4, Fig. 4.Tool Body, main equipment 41 sends AFH request 43 to from equipment 42, and is retransmitted, and returns until receiving from the confirmation of equipment 42 Multiple 44.
In AFH request 43, including practical renewable time 46, the practical renewable time 46 are in original update It carves to increase on 45 and extends duration 47, to make there are more chances to receive the AFH request from equipment.
With continued reference to Fig. 3, in the specific implementation of step S32, it should be pointed out that the extension duration is unsuitable too long, Otherwise the transmitting-receiving efficiency of the link will be reduced;When the current transmitting-receiving performance quality is poor, the extension duration should not mistake It is short, it otherwise cannot effectively increase from equipment and receive the chance that AFH is requested.As a unrestricted example, it can be set and prolong The value of long duration is less than original renewable time and issues the interval at moment for the first time apart from what the AFH was requested, and is greater than zero.
It will be appreciated by those skilled in the art that the step of determining practical renewable time can be by fixed original update When engrave increase variation extension duration realize, can also by directly determine variation practical renewable time realize, in this hair In bright embodiment, for practical renewable time specific method of determination with no restriction.
With continued reference to Fig. 1, in the specific implementation of step S13, AFH request at least once, institute are sent from equipment to described Stating AFH request includes the practical renewable time, so that described update AFH information in the practical renewable time from equipment.
Specifically, the protocol Data Unit (Protocol Data Unit, PDU) of AFH request in the prior art is interior Appearance generally includes renewable time (AFH_instant) and AFH information, wherein at the time of the renewable time is a future, It can be indicated with Bluetooth Clock Value, such as in an existing PDU example, the renewable time is 2 to 5.Wherein, described 2 Position in PDU namely PDU are referred to as a packet (packet) to 5, and the content of the 2nd byte to the 5th byte is more New moment, specially following clock (clock) value.And in embodiments of the present invention, it is replaced using practical renewable time The renewable time.
Further, the AFH information may include AFH frequency point group (AFH_channel_map), AFH mode (AFH_ ) and other information known to a person skilled in the art mode.
Wherein, AFH frequency point group is made of multiple available frequency points, so that master and slave equipment is only on the frequency point in AFH frequency point group Frequency hopping is carried out, such as in an existing PDU example, the AFH frequency point group is frequency point 7 to frequency point 16.
AFH mode may include enabling (enable) mode or not enabling (disable) mode, adopt for indicating whether With AFH technology, such as in an existing PDU example, the AFH mode is 6.Wherein, described 6 the position in PDU is referred to It sets namely PDU is as a packet, the content of the 6th byte is the mode of AFH, and specially 0 or 1,0 does not make for indicating Energy (AFH_disabled), 1 for indicating enabled (AFH_enabled).
In the specific implementation of step S14, main equipment updates the AFH information in the practical renewable time, while from Equipment updates the AFH information based on the AFH request received, the practical renewable time.
In embodiments of the present invention, the current transmitting-receiving performance quality based on link determines practical renewable time, and described Practical renewable time updates AFH information, and poorer due to currently receiving and dispatching performance quality, the practical renewable time is apart from the AFH Request for the first time issue the moment interval it is longer, and extend renewable time facilitate increase main equipment retransmit AFH request time Number helps to be changed on time using identical with main equipment to make have more chances to receive the AFH request from equipment AFH frequency point group is effectively reduced caused by using different AFH frequency point groups because of master and slave equipment and receives and dispatches failure rate.
Further, referring to Fig. 5, Fig. 5 is the partial process view of another kind AFH update method in the embodiment of the present invention.Institute Stating another AFH update method may include step S51 to step S52:
Step S51:After updating the AFH information, the current transmitting-receiving performance quality in default detection duration is determined Reduction amount;
Step S52:It is the AFH letter before updating by the AFH Information recovering if the reduction amount exceeds preset difference value Breath.
In the specific implementation of step S51, after master and slave equipment updates the AFH information, it will use updated Frequency point group in AFH information carries out frequency hopping, if being properly received AFH request from equipment due to failing, and still uses originally AFH frequency point group will lead to master and slave equipment using different AFH frequency point groups, then currently transmitting-receiving performance quality reduces.It therefore, can be with This parameter of reduction amount using current transmitting-receiving performance quality reflects whether master and slave equipment uses identical AFH frequency point group.
Specifically, according to preceding description, the number and the business that can be replied based on confirmation described in preset duration are asked The quotient for the transmission times asked determines the current transmitting-receiving performance quality.
Further, after updating AFH information, persistently detect whether the quotient reduces, and using default detection duration The reduction amount of the interior quotient indicates the decline situation of current transmitting-receiving performance quality.
In the specific implementation of step S52, if the reduction amount exceeds preset difference value, it may be considered that master and slave equipment Using different AFH frequency point groups, transmitting-receiving performance is caused sharply to decline, can be the AFH before updating by the AFH Information recovering Information, so that main equipment cooperates from equipment.
As a unrestricted example, a length of 2s when the default detection can be set, the preset difference value is set It is 40%.
Using the scheme of the embodiment of the present invention, the AFH of master and slave equipment is judged by the current transmitting-receiving performance quality of lasting detection Whether information has updated simultaneously, if currently the decline of transmitting-receiving performance quality is more, it is believed that due to the AFH frequency point group at both ends It is inconsistent, at this time by the AFH information that the AFH Information recovering is before updating, help avoid because master and slave equipment is using different AFH frequency point group to lead to receive and dispatch performance severe, improve from the received success rate of equipment.
Referring to Fig. 6, Fig. 6 is a kind of structural schematic diagram of AFH updating device in the embodiment of the present invention.The AFH more new clothes It sets and may include:Quality determination module 61, practical renewable time determining module 62, AFH request sending module 63, update module 64, reduction amount determining module 65 and recovery module 66.
Wherein, the quality determination module 61 is adapted to determine that the current transmitting-receiving performance quality of link, the link are that master sets It is standby with from the link between equipment;
The practical renewable time determining module 62, when being suitable for determining practical update according to the current transmitting-receiving performance quality It carves;
The AFH request sending module 63 is suitable for sending AFH request at least once, the AFH request from equipment to described Including the practical renewable time, so that described update AFH information in the practical renewable time from equipment;Wherein, described Current transmitting-receiving performance quality is poorer, and the practical renewable time is longer apart from the interval at the AFH sending moment for the first time requested.
The update module 64 is suitable for updating the AFH information in the practical renewable time;
The reduction amount determining module 65 is suitable for after updating the AFH information, determines described in default detection duration The reduction amount of current transmitting-receiving performance quality;
The recovery module 66 is suitable for when the reduction amount exceeds preset difference value, is to update by the AFH Information recovering AFH information before.
Further, Fig. 7 is a kind of structural schematic diagram of specific implementation of quality determination module 61 in Fig. 6.The quality Determining module 61 may include:Number determines that submodule 611 and quality determine submodule 612.
Wherein, the number determines submodule 611, is suitable for sending service request from equipment to described, and described in reception Confirmation from equipment for the service request is replied, and determines time that the transmission times of the service request and the confirmation are replied Number;
Further, the service request includes following one or more:Audio data request, connects communicating data request Connect state confirmation request and AFH request.
The quality determines submodule 612, the number suitable for being replied based on confirmation described in preset duration and the business The quotient of the transmission times of request determines the current transmitting-receiving performance quality;Wherein, the quotient is smaller, the current transmitting-receiving Performance quality is poorer.
Further, Fig. 8 is a kind of structural schematic diagram of specific implementation of practical renewable time determining module 62 in Fig. 6. The practical renewable time determining module 62 may include extending duration to determine that submodule 621 and practical renewable time determine son Module 622.
Wherein, the extension duration determines submodule 621, is suitable for being based on the current transmitting-receiving performance quality, determines and extend Duration, the current transmitting-receiving performance quality is poorer, and the extension duration is longer;
The practical renewable time determines submodule 622, suitable for increasing the extension duration on original renewable time, with Determine the practical renewable time;Wherein, the original renewable time is apart from the interval for issuing the moment for the first time that the AFH is requested It is determined according to described from the number of equipment.
Further, the number from equipment is bigger, the hair for the first time that the original renewable time is requested apart from the AFH The interval at moment is longer out.
More detailed contents about the AFH updating device please refer to updating above and shown in Fig. 1 to Fig. 5 about AFH The associated description of method, details are not described herein again.
Those of ordinary skill in the art will appreciate that all or part of the steps in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can store in computer readable storage medium, storage Medium may include:ROM, RAM, disk or CD etc..
Although present disclosure is as above, present invention is not limited to this.Anyone skilled in the art are not departing from this It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute Subject to the range of restriction.

Claims (12)

1. a kind of AFH update method, which is characterized in that include the following steps:
Determine the current transmitting-receiving performance quality of link, the link is main equipment and from the link between equipment;
Practical renewable time is determined according to the current transmitting-receiving performance quality;
AFH request at least once is sent from equipment to described, the AFH request includes the practical renewable time, so that institute It states and updates AFH information from equipment in the practical renewable time;
The AFH information is updated in the practical renewable time;
Wherein, the current transmitting-receiving performance quality is poorer, when the sending for the first time that the practical renewable time is requested apart from the AFH The interval at quarter is longer.
2. AFH update method according to claim 1, which is characterized in that the current transmitting-receiving performance matter of the determining link Amount includes:
Service request is sent from equipment to described, and receives the confirmation from equipment for the service request and replys, really The number that the transmission times of the fixed service request and the confirmation are replied;
Based on the quotient of the transmission times for confirming the number and the service request replied described in preset duration, work as described in determination Preceding transmitting-receiving performance quality;
Wherein, the quotient is smaller, and the current transmitting-receiving performance quality is poorer.
3. AFH update method according to claim 2, which is characterized in that the service request includes with the next item down or more ?:Audio data request, communicating data request, confirming electrical connection status request and AFH request.
4. AFH update method according to claim 1, which is characterized in that determined according to the current transmitting-receiving performance quality Practical renewable time includes:
It based on the current transmitting-receiving performance quality, determines and extends duration, the current transmitting-receiving performance quality is poorer, when the extension It is longer;
Increase the extension duration, on original renewable time with the determination practical renewable time;
Wherein, the interval basis for issuing the moment for the first time that the original renewable time is requested apart from the AFH is described from equipment Number determines.
5. AFH update method according to claim 4, which is characterized in that the number from equipment is bigger, described original Renewable time is longer apart from the interval at the AFH sending moment for the first time requested.
6. AFH update method according to claim 1, which is characterized in that further include:
After updating the AFH information, the reduction amount of the current transmitting-receiving performance quality in default detection duration is determined;
It is the AFH information before updating by the AFH Information recovering if the reduction amount exceeds preset difference value.
7. a kind of AFH updating device, which is characterized in that including:
Quality determination module, is adapted to determine that the current transmitting-receiving performance quality of link, and the link is main equipment and between equipment Link;
Practical renewable time determining module is suitable for determining practical renewable time according to the current transmitting-receiving performance quality;
AFH request sending module is suitable for sending AFH request at least once from equipment to described, and the AFH request includes the reality Border renewable time, so that described update AFH information in the practical renewable time from equipment;
Update module is suitable for updating the AFH information in the practical renewable time;
Wherein, the current transmitting-receiving performance quality is poorer, when the sending for the first time that the practical renewable time is requested apart from the AFH The interval at quarter is longer.
8. AFH updating device according to claim 7, which is characterized in that the quality determination module includes:
Number determines submodule, is suitable for sending service request from equipment to described, and be directed to the industry from equipment described in reception The confirmation of business request is replied, and determines the number that the transmission times of the service request and the confirmation are replied;
Quality determines submodule, suitable for the transmission time based on the confirmation number replied described in preset duration and the service request Several quotients determines the current transmitting-receiving performance quality;
Wherein, the quotient is smaller, and the current transmitting-receiving performance quality is poorer.
9. AFH updating device according to claim 8, which is characterized in that the service request includes with the next item down or more ?:Audio data request, communicating data request, confirming electrical connection status request and AFH request.
10. AFH updating device according to claim 7, which is characterized in that the practical renewable time determining module packet It includes:
Extend duration and determine submodule, is suitable for being based on the current transmitting-receiving performance quality, determines and extend duration, the current transmitting-receiving Performance quality is poorer, and the extension duration is longer;
Practical renewable time determines submodule, suitable for increasing the extension duration on original renewable time, with the determination reality Border renewable time;
Wherein, the interval basis for issuing the moment for the first time that the original renewable time is requested apart from the AFH is described from equipment Number determines.
11. AFH updating device according to claim 10, which is characterized in that the number from equipment is bigger, the original Beginning renewable time is longer apart from the interval at the AFH sending moment for the first time requested.
12. AFH updating device according to claim 7, which is characterized in that further include:
Reduction amount determining module is suitable for after updating the AFH information, determines the current transmitting-receiving in default detection duration The reduction amount of energy quality;
Recovery module is suitable for when the reduction amount exceeds preset difference value, is the AFH before updating by the AFH Information recovering Information.
CN201710307711.7A 2017-05-04 2017-05-04 AFH update method and device Active CN108847868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710307711.7A CN108847868B (en) 2017-05-04 2017-05-04 AFH update method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710307711.7A CN108847868B (en) 2017-05-04 2017-05-04 AFH update method and device

Publications (2)

Publication Number Publication Date
CN108847868A true CN108847868A (en) 2018-11-20
CN108847868B CN108847868B (en) 2019-11-05

Family

ID=64211721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710307711.7A Active CN108847868B (en) 2017-05-04 2017-05-04 AFH update method and device

Country Status (1)

Country Link
CN (1) CN108847868B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070206660A1 (en) * 2006-03-06 2007-09-06 Texas Instruments Incorporated Radio frequency collision avoidance mechanism in wireless networks using frequency synchronization
CN101361279A (en) * 2006-01-17 2009-02-04 诺基亚公司 Method for avoiding interference from a cellular transmitter to the 2.4/5ghz ism band
CN103517296A (en) * 2012-06-20 2014-01-15 京信通信技术(广州)有限公司 Frequency point switching detection method, frequency point switching detection equipment and frequency point switching detection system
CN104703233A (en) * 2013-12-06 2015-06-10 苹果公司 Peer-to-peer communications on restricted channels

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101361279A (en) * 2006-01-17 2009-02-04 诺基亚公司 Method for avoiding interference from a cellular transmitter to the 2.4/5ghz ism band
US20070206660A1 (en) * 2006-03-06 2007-09-06 Texas Instruments Incorporated Radio frequency collision avoidance mechanism in wireless networks using frequency synchronization
CN103517296A (en) * 2012-06-20 2014-01-15 京信通信技术(广州)有限公司 Frequency point switching detection method, frequency point switching detection equipment and frequency point switching detection system
CN104703233A (en) * 2013-12-06 2015-06-10 苹果公司 Peer-to-peer communications on restricted channels

Also Published As

Publication number Publication date
CN108847868B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN108337074B (en) The bluetooth headset wireless communications method of high reliability
US20050058107A1 (en) Method and system for repeat request in hybrid ultra wideband-bluetooth radio
CN111435844B (en) Method, device, equipment and system for correcting audio data in dual-wireless Bluetooth communication
JP2002271235A (en) Organized adaptive frequency hopping
CN107113122A (en) HARQ feedback method, apparatus and system
CN109803321A (en) Resource selection method and terminal under a kind of multi-service
CN107079331A (en) For the method and apparatus for the business for controlling electronic installation in a wireless communication system
WO2010151425A1 (en) Interference reduction with coexisting wireless systems
CN108616818A (en) A kind of data repeating method, Bluetooth slave devices and wireless communication system
CN107155204B (en) Bluetooth and Wifi switching method and system
CN108616819A (en) A kind of data repeating method, bluetooth master and wireless communication system
CN106488384A (en) A kind of method and device sending packet
CN105191459A (en) Device and method for data transmission in direct communication
CN107819833A (en) A kind of method and device for accessing live even wheat
CN109922540A (en) Wireless transmitting-receiving equipments group communication method, equipment group, system and storage medium
CN104065452A (en) Wireless communication method, related equipment and system
KR20190103179A (en) Method for transmitting RLC layer status report control PDUs and related devices
CN107733583A (en) Method, base station and the user equipment of the communication mode of hybrid automatic repeat-request are set
CN108847868B (en) AFH update method and device
CN109428684B (en) Data transmission method, RLC entity and PDCP entity
CN109687944A (en) Packet data convergence protocol data transmission method and device
CN109618406B (en) Wireless connection method, equipment group, system
CN104641586A (en) Method for automatic retransmission, user equipment, and base station
CN104270821B (en) A kind of anti-interference frequency spectrum access method based on user fairness
CN102932392A (en) UDP (User Datagram Protocol) downloading method of multi-terminal system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant