CN108717627A - A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism - Google Patents
A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism Download PDFInfo
- Publication number
- CN108717627A CN108717627A CN201810889240.XA CN201810889240A CN108717627A CN 108717627 A CN108717627 A CN 108717627A CN 201810889240 A CN201810889240 A CN 201810889240A CN 108717627 A CN108717627 A CN 108717627A
- Authority
- CN
- China
- Prior art keywords
- unit
- job information
- department
- subsystem
- important decision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 210000000056 organ Anatomy 0.000 title claims abstract description 9
- 230000000737 periodic effect Effects 0.000 claims abstract description 17
- 238000007689 inspection Methods 0.000 claims description 12
- 230000000694 effects Effects 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 3
- 238000012790 confirmation Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to the informatization platforms that a kind of Party and government organs' very important decision disposes implementing mechanism, including star to mark unit, finish unit, periodic feedback unit in limited time, remind prewarning unit, supervising and press unit, whole trace unit, check and check unit, performance appraisal unit, open notification unit.It applies to governability system, system solves the problems, such as the existing propulsion of job information carried out by very important decision deployment through the invention, constantly promotes practicable scientific, standardization, fining, standardization to determining every major tasks information such as item from center to provinces and cities' leaders instruction written instructions, very important decision deployment, meeting.Ensure carrying out for the job informations such as very important decision deployment.
Description
Technical field
The present invention relates to informatization platforms, and in particular to a kind of letter of Party and government organs' very important decision deployment implementing mechanism
Breathization platform.
Background technology
With the informationization of government department's information management, the propulsion of hardware and software platform, government department manages the information platform of system
It need to be more and more perfect.The propulsion for the job information that very important decision deployment is carried out is to realize to promote state treatment system and improvement
The important management guarantee of ability modernization strategy.
Invention content
It is an object of the present invention to provide the informatization platform that a kind of Party and government organs' very important decision disposes implementing mechanism, fortune
For governability system, system solves pushing away for the existing job information carried out by very important decision deployment through the invention
Into problem, constantly promoted to determining the items such as item from center to provinces and cities' leaders instruction written instructions, very important decision deployment, meeting
The practicable scientific, standardization of major tasks information, fining, standardization.Ensure the work letter such as very important decision deployment
Breath is carried out.
In order to achieve the goal above, the technical solution adopted by the present invention is:A kind of deployment of Party and government organs' very important decision is implemented
The informatization platform of implementing mechanism, including star mark unit, in limited time finish unit, periodic feedback unit, remind prewarning unit,
It supervises and presses unit, whole trace unit, checks review unit, performance appraisal unit, open notification unit;
The star marks unit, is classified to the subsystem of various regions, each department by the job information of management system;
Described finishes unit in limited time, to there is the job information for clearly completing time limit requirement, is transferred in management system each
Ground, each department subsystem the job information that is undertaken is reminded by time limit requirement;
The periodic feedback unit, to without the job information for clearly completing time limit requirement, being transferred in management system each
Ground, each department subsystem to the job information periodic feedback undertaken to management system display station;
The prompting prewarning unit and star mark unit connects, are closed on or periodic feedback in the job information completion time limit
It being reminded when node closes on, when to reaching scheduled critical value, carrying out early warning, and unit is marked by star and is classified again,
Upgrading undertaking unit be apprised of the various regions of object, each department subsystem grade;
Unit is pressed in described supervising, and supervise pressing to the various regions of undertaking unit, the subsystem of each department, by holding
Do the various regions of unit, the subsystem of each department gives information and feed back to management system display station to supervising to press;
The whole trace unit is pressed unit and is connect with supervising, and the whole trace unit includes to job information
Pretreatment the first control memory module, to the second of job information mission dispatching the control memory module, held to job information
It does the third control memory module signed for, the 4th control memory module for handling feedback to job information, job information reminded
5th control memory module of early warning, the 6th control storage that unit work in every information progress total factor record is pressed to supervising
Module;
The inspection review unit is connect with whole trace unit, and the inspection is checked unit and confirmed in job information
Afterwards, inspection review is carried out, shows work effect;
The performance appraisal unit, by managing the predefined scoring procedures of system, the frequency handled to job information
It is bound with actual effect;
The described open notification unit connection management system display station, to the inspection of job information check result into
The open display of row.
Further, the periodic feedback unit is additional periodically anti-to there is the job information for clearly completing time limit requirement
Feedback requires to remind.
The technical effects of the invention are that:It applies to governability system, and system solves existing pass through through the invention
The propulsion problem for the job information that very important decision deployment is carried out constantly is promoted to from center to provinces and cities' leaders instruction batch
Show, very important decision deployment, meeting determine the practicable scientific, standardization, fining, mark of every major tasks information such as item
Standardization is horizontal.Ensure carrying out for the job informations such as very important decision deployment.
Specific implementation mode
A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism, including star mark unit, limit
When finish unit, periodic feedback unit, remind prewarning unit, supervise press unit, whole trace unit, check review unit,
Performance appraisal unit, open notification unit;
The star marks unit, is classified to the subsystem of various regions, each department by the job information of management system;
Described finishes unit in limited time, to there is the job information for clearly completing time limit requirement, is transferred in management system each
Ground, each department subsystem the job information that is undertaken is reminded by time limit requirement;
The periodic feedback unit, to without the job information for clearly completing time limit requirement, being transferred in management system each
Ground, each department subsystem to the job information periodic feedback undertaken to management system display station;
The prompting prewarning unit and star mark unit connects, are closed on or periodic feedback in the job information completion time limit
It being reminded when node closes on, when to reaching scheduled critical value, carrying out early warning, and unit is marked by star and is classified again,
Upgrading undertaking unit be apprised of the various regions of object, each department subsystem grade;
Unit is pressed in described supervising, and supervise pressing to the various regions of undertaking unit, the subsystem of each department, by holding
Do the various regions of unit, the subsystem of each department gives information and feed back to management system display station to supervising to press;
The whole trace unit is pressed unit and is connect with supervising, and the whole trace unit includes to job information
Pretreatment the first control memory module, to the second of job information mission dispatching the control memory module, held to job information
It does the third control memory module signed for, the 4th control memory module for handling feedback to job information, job information reminded
5th control memory module of early warning, the 6th control storage that unit work in every information progress total factor record is pressed to supervising
Module;
The inspection review unit is connect with whole trace unit, and the inspection is checked unit and confirmed in job information
Afterwards, inspection review is carried out, shows work effect;
The performance appraisal unit, by managing the predefined scoring procedures of system, the frequency handled to job information
It is bound with actual effect;
The described open notification unit connection management system display station, to the inspection of job information check result into
The open display of row.
Further, the periodic feedback unit is additional periodically anti-to there is the job information for clearly completing time limit requirement
Feedback requires to remind.
It is constantly promoted by above-mentioned specific implementation mode to from center to provinces and cities' leaders instruction written instructions, very important decision portion
Administration, momentous conference determine the practicable scientific, standardization, fining, standardization of every major tasks information such as item.
State treatment system and Governance Ability modernization strategy is promoted to provide important management guarantee to realize.
Above-described specific implementation mode has carried out further the purpose of the present invention, technical solution and advantageous effect
It is described in detail, it should be understood that the foregoing is merely the specific implementation mode of the present invention, is not intended to limit the present invention
Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (2)
1. a kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism, which is characterized in that including star mark
Note unit finishes unit, periodic feedback unit, reminds prewarning unit, supervising and press unit, whole trace unit, check in limited time
Check unit, performance appraisal unit, open notification unit;
The star marks unit, is classified to the subsystem of various regions, each department by the job information of management system;
It is described to finish unit in limited time, the job information that the time limit requires clearly is completed to having, is transferred to various regions in management system, each
The subsystem of department is reminded the job information undertaken by time limit requirement;
The periodic feedback unit, to without the job information that the time limit requires clearly is completed, being transferred to various regions in management system, each
The subsystem of department is to the job information periodic feedback undertaken to management system display station;
The prompting prewarning unit and star mark unit connects, are closed on or periodic feedback node in the job information completion time limit
It is reminded when closing on, when to reaching scheduled critical value, carrying out early warning, and unit is marked by star and is classified again, upgrading
Undertaking unit be apprised of the various regions of object, each department subsystem grade;
Unit is pressed in described supervising, and supervise pressing to the various regions of undertaking unit, the subsystem of each department, single by undertaking
The various regions of position, the subsystem of each department give information and feed back to management system display station to supervising to press;
The whole trace unit is pressed unit and is connect with supervising, and the whole trace unit includes to the pre- of job information
First control memory module of disposition controls memory module to the second of job information mission dispatching, undertakes and sign to job information
The third control memory module of receipts, reminds early warning at the 4th control memory module that feedback is handled to job information to job information
The 5th control memory module, to supervise press unit work in every information carry out total factor record the 6th control storage mould
Block;
The inspection review unit is connect with whole trace unit, and the inspection checks unit after job information confirmation,
Inspection review is carried out, shows work effect;
The performance appraisal unit, by managing the predefined scoring procedures of system, the frequency handled to job information and reality
Effect is bound;
The open notification unit connection management system display station carries out the inspection review result of job information public
Open display.
2. a kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism according to claim 1,
It is characterized in that, the periodic feedback unit is to having the job information for clearly completing time limit requirement, additional periodic feedback to require to carry
It wakes up.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810889240.XA CN108717627A (en) | 2018-08-07 | 2018-08-07 | A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810889240.XA CN108717627A (en) | 2018-08-07 | 2018-08-07 | A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108717627A true CN108717627A (en) | 2018-10-30 |
Family
ID=63913815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810889240.XA Pending CN108717627A (en) | 2018-08-07 | 2018-08-07 | A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108717627A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115310869A (en) * | 2022-09-29 | 2022-11-08 | 安徽商信政通信息技术股份有限公司 | Combined supervision method, system, equipment and storage medium for supervision items |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101079761A (en) * | 2006-05-26 | 2007-11-28 | 天津市人民政府行政审批管理办公室 | Method for one-stop administration and efficiency supervision of information network system |
WO2010139167A1 (en) * | 2009-06-05 | 2010-12-09 | 深圳市脑库计算机系统有限公司 | Expert support application system platform for government affair and business affair decision-making and its construction method |
CN102521686A (en) * | 2011-11-30 | 2012-06-27 | 陕西东显永益机电技术有限公司 | Examining and approving management system for administrative information |
CN102663582A (en) * | 2011-07-21 | 2012-09-12 | 上海互联网软件有限公司 | Electronic government document handling system |
CN106875155A (en) * | 2017-02-09 | 2017-06-20 | 江西师范大学 | A kind of chain of command |
CN107909282A (en) * | 2017-11-24 | 2018-04-13 | 广州明动软件股份有限公司 | A kind of e _-Government Service efficiency evaluation system and method |
CN108022034A (en) * | 2016-11-04 | 2018-05-11 | 浙江奇道网络科技有限公司 | A kind of comprehensive executive decision is supported and administrative behavior management information platform |
-
2018
- 2018-08-07 CN CN201810889240.XA patent/CN108717627A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101079761A (en) * | 2006-05-26 | 2007-11-28 | 天津市人民政府行政审批管理办公室 | Method for one-stop administration and efficiency supervision of information network system |
WO2010139167A1 (en) * | 2009-06-05 | 2010-12-09 | 深圳市脑库计算机系统有限公司 | Expert support application system platform for government affair and business affair decision-making and its construction method |
CN102663582A (en) * | 2011-07-21 | 2012-09-12 | 上海互联网软件有限公司 | Electronic government document handling system |
CN102521686A (en) * | 2011-11-30 | 2012-06-27 | 陕西东显永益机电技术有限公司 | Examining and approving management system for administrative information |
CN108022034A (en) * | 2016-11-04 | 2018-05-11 | 浙江奇道网络科技有限公司 | A kind of comprehensive executive decision is supported and administrative behavior management information platform |
CN106875155A (en) * | 2017-02-09 | 2017-06-20 | 江西师范大学 | A kind of chain of command |
CN107909282A (en) * | 2017-11-24 | 2018-04-13 | 广州明动软件股份有限公司 | A kind of e _-Government Service efficiency evaluation system and method |
Non-Patent Citations (1)
Title |
---|
曲志华: "威海市政协提案网络化管理系统的研究与实现", 《中国优秀博硕士学位论文全文数据库(硕士) 信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115310869A (en) * | 2022-09-29 | 2022-11-08 | 安徽商信政通信息技术股份有限公司 | Combined supervision method, system, equipment and storage medium for supervision items |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Arango et al. | Berth allocation planning in Seville inland port by simulation and optimisation | |
KR20170080395A (en) | System and method for providing integratively unloading plan using cloud service | |
Conca et al. | Automation in freight port call process: real time data sharing to improve the stowage planning | |
CN108717627A (en) | A kind of informatization platform of Party and government organs' very important decision deployment implementing mechanism | |
Bhardwaj et al. | Technology introduction on ships: The tension between safety and economic rationality | |
Minh et al. | Optimal design of container terminal gate layout | |
Duggan et al. | Venture maintainability: a path to project success Why are some projects less successful than others and what can we do to improve? | |
Löfgren et al. | In and out of amber: The New Zealand government major projects performance reporting | |
Zeng et al. | Evolutionary game analysis and countermeasure study of construction enterprises safety supervision in China | |
Dua et al. | Identification of factors affecting quality of multimodal transportation for containerised export in Indian scenario | |
Poopetch et al. | Greening Ports: Bangkok Port’s Experience and Achievements | |
Love et al. | IPD: facilitating innovation diffusion | |
Ben-Yosef et al. | Impact: An R&D organization that doesn’t move the needle is stuck in first gear | |
Phillips | Henry Wilson and the role of civil-military cooperation during the planning of British mobilisation for war, 1910-1914 | |
Seah et al. | A Whole of Government Approach for Maritime Logistics Hub Development: Case of Singapore | |
Milondzo et al. | Exploring the consequences of inadequate inventory management accountability within Eskom, Limpopo | |
Dahri et al. | THE ROLE OF THE PORT BUSINESS ENTITY (BUP) PT. PELINDO III IN THE CONTEXT OF REALIZING GREEN & SMART PORT OPERATIONS AT TERMINAL TELUK LAMONG SURABAYA | |
Fecarotta | Myboeingfleet and agile software development | |
Heneman et al. | Using work valuation to identify and protect the talent pool | |
Abubakar | Improving Competence of NNRA Supervisors: a Regulator's perspective | |
Cruz | Do not leave your brand to chance: Plan your crisis communications now | |
McGrath et al. | Project Failure: A Catalyst for Success. | |
Karanikas | How much is your system capable of avoiding safety risk events? The SAREAC indicator | |
Κιαμίλης | The role of information and communication technologies in customs procedures (e-Customs) and their contribution to the development of ports | |
Vellenga et al. | Technology Transfer in Transportation: Problems and Research Questions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181030 |