- Publication number
- CN108678223A CN108678223A CN201810700222.2A CN201810700222A CN108678223A CN 108678223 A CN108678223 A CN 108678223A CN 201810700222 A CN201810700222 A CN 201810700222A CN 108678223 A CN108678223 A CN 108678223A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel pipe
- shear wall
- pipe concrete
- concrete frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 202
- 239000010959 steel Substances 0.000 title claims abstract description 202
- 239000004567 concrete Substances 0.000 title claims abstract description 141
- 150000001875 compounds Chemical class 0.000 title claims abstract description 37
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims abstract description 53
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 37
- 238000010276 construction Methods 0.000 claims abstract description 13
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 8
- 230000002787 reinforcement Effects 0.000 claims description 28
- 238000009826 distribution Methods 0.000 claims description 24
- 238000000034 method Methods 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000000839 emulsion Substances 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 4
- 238000000465 moulding Methods 0.000 claims description 4
- 210000003205 muscle Anatomy 0.000 claims description 4
- 239000002689 soil Substances 0.000 claims description 4
- 210000002435 tendon Anatomy 0.000 claims description 4
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000011065 in-situ storage Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 2
- 238000002955 isolation Methods 0.000 claims 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 abstract description 2
- 238000005266 casting Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000007596 consolidation process Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000001112 coagulating effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
A kind of recoverable steel pipe concrete frame compound shear wall and the practice belong to high-level structure applied technical field, are made of steel pipe concrete frame column, presstressed reinforcing steel and reinforced concrete shear wall.At shear wall both ends, steel pipe concrete frame column is set;Upper and lower part between two steel pipe concrete frame columns is connected with frame girder steel with lower frame girder steel respectively;Presstressed reinforcing steel is set inside steel pipe concrete frame column;Bind shear force wall reinforcing steel bar;The reinforcing bar of both sides is connected with each other with tension rib;Casting concrete;Prestressing force is applied using post stretching and constitutes a kind of recoverable steel pipe concrete frame compound shear wall.Relative shear sliding compared to common this wall of Self-resetting wall is substantially reduced, bearing capacity, ductility and energy dissipation capacity are more preferable than normal concrete shear wall, later stage anti-seismic performance is stablized relatively, and prestressing without bondn post-tensioning is easy for construction, can be used in high-rise or large complicated tier building.
Description
Technical field
The present invention is a kind of recoverable steel pipe concrete frame compound shear wall and the practice, belongs to high-level structure application skill
Art field is a kind of novel practical and can partly restore Novel steel-combined concrete shear wall and preparation method thereof of deformation.
Background technology
The generation of earthquake disaster often brings huge loss, present skyscraper to be on the increase, and ensures the reliable of building
Property just seem particularly significant, meanwhile, requirement of the national regulation to building is increasingly stringenter, can from no collapsing with strong earthquake towards big shake
Repair, it is self-healing to seek development, and the anti-seismic performance of shear wall structure is most important for securely and reliably having for skyscraper
Effect, the concrete breakage easy to crack under geological process of existing ordinary reinforced concrete shear wall, ductility is poor, antidetonation effect
Fruit is poor, this is very unfavorable to the anti-seismic performance of monolithic architecture structure.
Steel pipe concrete frame compound shear wall increases steel pipe concrete frame column in shear wall both sides, increases to mixed
The binding effect for coagulating soil, improves the anti-seismic performance of its bearing capacity and shear wall, and being effectively improved corner concrete, locally crushing is opened
The shortcomings of splitting, still, general steel pipe concrete frame compound shear wall, displacement is larger in seismic process, remaining after being damaged to become
Shape is larger to be difficult to restore.And the wall of general Self-resetting shear wall is disconnected with basis, and presstressed reinforcing steel is only added in wall by wall
Body is connect with basis, or by the way that vertical energy-consuming parts are arranged in shear wall bottom or set middle part to other companies of normally connection etc.
The mode of connecing is improved, and the self-healing of this wall is good, under low cycling loads effect, passes through the pact of presstressed reinforcing steel
Beam, wall can restore original position, but this wall connect less, lateral resisting deficiency with basis.Therefore it researches and develops a kind of
The compound shear wall of the novel high-bearing capacity with certain recoverable function is very significant.
Invention content
The present invention, which is directed to, solves the problems, such as that the anti-seismic performance of the irrecoverable and common shear wall in earthquake is insufficient.It will answer in advance
Power muscle and steel pipe concrete frame combined concrete shear wall combine, and form the Novel steel-coagulation with certain restorability energy
Local soil type's combination shearing wall is mainly used for the shear wall structure or tube structure of skyscraper or large complicated tier building.
The technical solution adopted by the present invention is as follows:
A kind of recoverable steel pipe concrete frame compound shear wall, by steel pipe concrete frame column (1), presstressed reinforcing steel
(2) it is formed with reinforced concrete shear wall, the bar-mat reinforcement that configuration is made of horizontal and genesis analysis reinforcing bar in shear wall slab,
It is socketed, is mainly characterized by with connecting lacing wire (7) between bar-mat reinforcement:The steel pipe concrete frame of the shapes such as rectangle is arranged in shear wall both ends
Column (1), wall section are I-shaped, and presstressed reinforcing steel 2 is built in the frame columns of steel pipe concrete frame compound shear wall;Both sides
The upper and lower part of steel core concrete column be fixedly connected with frame girder steel (10) with lower frame girder steel (11);The both sides of wall
It is arranged symmetrically the bar-mat reinforcement being made of horizontal distribution reinforcing bar (5) and vertical distribution bar (6), is used in combination and sockets reinforcing bar (7) by both sides
Bar-mat reinforcement socket;The upper and lower position setting top grid beam (10) of wall and following grid beam or foundation beam (11);By steel pipe
Concrete frame column (1), top grid beam (10), following grid beam or foundation beam (11) and reinforced concrete shear wall body pour and smash coagulation
Soil forming;After molding, using post stretching by tension of prestressed tendon to prestress value is designed, it is used in combination anchorage (3) fixed, that is, constitutes one
The recoverable steel pipe concrete frame compound shear wall of kind.
" the steel pipe concrete frame combined shear " refers to by steel pipe concrete frame column 1, horizontal reinforcement (5) and longitudinal direction
The steel-concrete compound shear wall of reinforcing bar (6) combination.
Further, steel pipe concrete frame column (1) section form can be rectangle and polygon etc., in thickness of wall body
The size in direction is more than thickness of wall body, and the construction measures such as steel reinforcement cage can be added inside frame columns, or increases partition board and form multi-cavity
Body steel core concrete column, the upper and lower part frame girder steel (8) and lower frame girder steel (9) of the steel core concrete column of both sides are solid
Fixed connection, upper end lower end is respectively protruding into top grid beam (10) and following grid beam or foundation beam (11).
Further, i shaped steel, H profile steel, U-steel may be used in the upper frame girder steel (8) and lower frame girder steel (9)
Deng other shaped steel or steel plate strip, width is less than the interior clear distance of both sides reinforcing bar, and has enough width between reinforcing bar, ensures
Concrete pours.
Further, the presstressed reinforcing steel (2) is un-bonded prestressed steel strand or prestressing force spiral, can directly be used
Finished product un-bonded prestressed steel strand also can completely cut off concrete and pre- in common steel strand wires or deformed bar housing bellows etc.
The method that stress rib bonds can be evenly arranged 1 or more presstressed reinforcing steels in frame columns, be used at both ends after tensioned prestressing bar
Anchorage (3) is fixed, and anchorage (3) is divided into fixing end anchorage and stretching end anchorage, is separately fixed at the two of steel pipe concrete frame column
End, is pressed on backing plate.
Further, the backing plate (4) is at steel pipe concrete frame column both ends, and pad is in anchorage in the following, its length and width dimensions is big
In the size of steel pipe, and on backing plate reserve presstressed reinforcing steel by hole.
Further, the horizontal distribution reinforcing bar (5) of the assembled wall is connect with steel pipe concrete frame column (1);Vertical point
Cloth reinforcing bar (6) upper end lower end, which is respectively protruding into top grid beam (10) and following grid beam or foundation beam (11), carries out reliably rigid connect
It connects.
Further, the steel tie (7) in the assembled wall divides by the horizontal distribution reinforcing bar (5) of wallboard both sides and vertically
The reinforced mesh drawknot of cloth reinforcing bar (6) composition gets up.
Further, the top grid beam (10) and following grid beam or foundation beam (11) are reinforced beam, or are shaped steel
Beams of concrete, rectangular cross-section, concrete cast in situs.
A kind of way of recoverable steel pipe concrete frame compound shear wall, it is characterised in that:Production order is as follows:
1) steel pipe, backing plate (4), upper frame girder steel (8) and lower frame girder steel (9) are made, is reserved across pre- on backing plate (4)
Backing plate (4) is welded on the upper and lower ends of steel pipe by the circular hole of stress rib, by upper frame girder steel (8) and lower frame girder steel (9) difference
It is welded on the upper and lower part between two steel pipe columns, fixed steel frame, it is ensured that position will not occur partially when pouring;
2) presstressed reinforcing steel (2) is put on into bellows, passes through the inside of steel pipe, the hole reserved from backing plate is pierced by, and under
End is fixed with anchorage (3);
3) reinforcing bar of the following grid beam of binding concrete or foundation beam (11), and by steel frame, shearing with presstressed reinforcing steel
The vertical distribution bar of wall (6) is inserted into the steel reinforcement cage of following grid beam or foundation beam (11), pours into a mould following grid beam or foundation beam (11)
Concrete, ensure that the anchorage of presstressed reinforcing steel bottom is close to lower part backing plate when pouring, keep vertical, it is ensured that at presstressed reinforcing steel lower end
After anchoring status, concrete curing consolidation, keep following grid beam or foundation beam (11) and steel pipe concrete frame, shear wall vertical
Reliable rigid connection is realized in the bottom of distribution bar, and presstressed reinforcing steel lower part is in fixing end;
4) production technique reinforcing bar (5), and horizontal reinforcement and steel core concrete column are welded;With steel tie (7) by steel plate
The horizontal reinforcement (5) and longitudinal reinforcement (6) of both sides socket;
5) top grid beam (10) is made, it is made to be carried out with steel pipe concrete frame column (1) and the vertical distribution bar of wallboard (6)
Reliable rigid connection;
6) thickness of concrete cover, fixed steel pipe concrete frame are reserved by spacer in shear wall wallboard both sides
The position of bellows in column, and be allowed to keep vertical, bellows opening by the gap between bellows and presstressed reinforcing steel into
Row blocks, the template of the concrete of branch cast later;
7) concrete for pouring steel pipe concrete frame column (1), shear wall wallboard, top grid beam (10), poured engineering
There cannot be any concrete in the middle bellows for placing presstressed reinforcing steel, be demoulded after molding.
8) after being molded, remove the plugging material between bellows and presstressed reinforcing steel, it is ensured that the soap-free emulsion polymeization of presstressed reinforcing steel is being applied
Enough construction spaces can be provided for tensioning equipment in the reserved construction hole of stretching end, opened presstressed reinforcing steel using post stretching in work
It is pulled to design prestress value, is used in combination anchorage (3) fixed, space forms a kind of recoverable steel pipe concrete frame combined shear
Wall.
The beneficial effects of the invention are as follows:
The present invention is that presstressed reinforcing steel and steel pipe concrete frame compound shear wall are carried out advantageous combination, using by prestressing force
Muscle is arranged in the construction in the steel pipe concrete frame column of the larger lower region of shear wall stress, has not only given full play to steel pipe
The excellent anti-seismic performance of concrete frame shear wall also takes full advantage of the high-strength performance of unbonded prestressing tendon, and reaching can be extensive
Multiple effect.After adding presstressed reinforcing steel in the steel core concrete column of the novel compositions shear wall, have the function of with lower stress and
Feature:The steel core concrete column at wall both ends can effective confined concrete, improve the bearing capacity of concrete, enhance wall
Anti-seismic performance, and the ductility of steel pipe can preferably give full play to the deformability of steel, when by tension and compression load, due to pre-
Prestress steel strand or high tensile reinforcement are in soap-free emulsion polymeization state so that the steel pipe concrete frame of shear wall bottom is close under big shake
When surrender, the un-bonded prestressed steel strand or high tensile reinforcement that are arranged in steel pipe concrete frame are stretching also still in elasticity
Under load, pulling force is born by presstressed reinforcing steel first, until steel pipe zero stress state just starts steel pipe and presstressed reinforcing steel is born jointly
Pulling force, concrete filled steel tube stretcher strain reduction, steel pipe surrender delays, rod piece tensile capacity significantly improves, when tension load removes
Afterwards, stretcher strain can partly or entirely restore, and can reach reusable purpose through suitably repairing part is restored,
To make entire combined member that there is function restorability.Between steel core concrete column with frame girder steel connect, and with it is upper and lower
Frame beam consolidation, horizontal bar and steel-pipe welding, both sides bar-mat reinforcement tension rib drawknot make steel construction become one with concrete wall
A entirety effectively raises the globality of structure so that each section gives full play to respective performance, works together, and has complementary advantages.
A kind of recoverable steel pipe concrete frame compound shear wall of the present invention can with certain under geological process
It is restorative.In seismic energy input, reinforced concrete wall panel starts to play a role as one of anti-vibration defense lines, concrete filled steel tube
Frame also plays a role as another road defence line, and the deformation of wall can be constrained by applying prestressing force to presstressed reinforcing steel, and certain
The recoverable force for making wall in degree effectively reduces integrally-built displacement, improves concrete panel vertical bearing capacity and extensive
Multiple power.With the increase of input energy, for steel pipe concrete frame close to surrender, the interior soap-free emulsion polymeization being arranged of steel pipe concrete frame is pre-
Stress rib can constrain the displacement of wall still in elasticity.Relative shear compared to common this wall of Self-resetting wall is slided
Shifting is substantially reduced, and bearing capacity, ductility and energy dissipation capacity are more preferable than normal concrete shear wall, and later stage anti-seismic performance is stablized relatively,
Prestressing without bondn post-tensioning is easy for construction, can be used in high-rise or large complicated tier building.
When building meets with violent earthquake, its earthquake can be mitigated, there is part recoverable function, while also improving knot
The shock resistance and restoring force of structure entirety.
Description of the drawings
Fig. 1 is a kind of recoverable steel pipe concrete frame compound shear wall horizontal profile schematic diagram
Fig. 2 is compound shear wall wall elevational schematic view
Fig. 3 is vertical cross section schematic diagram at compound shear wall frame columns
Fig. 4 is compound shear wall wall vertical cross section schematic diagram
Attached drawing code name explanation:1- steel pipe concrete frame columns, 2- presstressed reinforcing steels, 3- anchorages, 4- backing plates, 5- horizontal distribution steel
Muscle, the vertical distribution bars of 6-, 7- steel ties, 8- upper ledge girder steels, 9- lower frame girder steels, the tops 10- grid beam, the following grid beams of 11- or
Foundation beam.
Specific implementation mode
With reference to specific embodiment, the present invention will be further described:
A kind of structural schematic diagram such as Fig. 1 of a structural unit of recoverable steel pipe concrete frame compound shear wall,
Shown in Fig. 2, Fig. 3 and Fig. 4.
A kind of recoverable steel pipe concrete frame compound shear wall, by steel pipe concrete frame column 1,2 and of presstressed reinforcing steel
Reinforced concrete shear wall forms, the bar-mat reinforcement that configuration is made of horizontal and genesis analysis reinforcing bar in shear wall slab, in reinforcing bar
It is socketed, is mainly characterized by with connecting lacing wire 7 between net:The steel pipe concrete frame column 1 of the shapes such as rectangle, wall is arranged in shear wall both ends
Body section is I-shaped, and presstressed reinforcing steel 2 is built in the frame columns of steel pipe concrete frame compound shear wall.
" the steel pipe concrete frame compound shear wall " refers to by steel pipe concrete frame column 1, horizontal reinforcement 5 and longitudinal direction
The steel-concrete compound shear wall that reinforcing bar 6 combines.
1 section form of steel pipe concrete frame column can be rectangle and polygon etc., the ruler in thickness of wall body direction
It is very little to be more than thickness of wall body, the construction measures such as steel reinforcement cage can be added inside frame columns, or increase partition board formation Multicarity steel pipe and mix
Solidifying earth pillar, the upper and lower part of the steel core concrete column of both sides are fixedly connected with frame girder steel 8 with lower frame girder steel 9, upper end
Lower end is respectively protruding into top grid beam 10 and following grid beam or foundation beam 11.
The upper frame girder steel 8 and lower frame girder steel 9 may be used other shaped steel such as i shaped steel, H profile steel, U-steel or
Steel plate strip, width are less than the interior clear distance of both sides reinforcing bar, and have enough width between reinforcing bar, ensure pouring for concrete
It builds.
The presstressed reinforcing steel 2 is un-bonded prestressed steel strand or prestressing force spiral, and directly finished product can be used without viscous
Prestress wire is tied, also can completely cut off concrete in common steel strand wires or deformed bar housing bellows etc. and presstressed reinforcing steel is viscous
The method of knot can be evenly arranged 1 or more presstressed reinforcing steels in frame columns, be consolidated with anchorage 3 at both ends after tensioned prestressing bar
Fixed, anchorage 3 divides for fixing end anchorage and stretching end anchorage, is separately fixed at the both ends of steel pipe concrete frame column, is pressed in backing plate
On.
The backing plate 4 is at steel pipe concrete frame column both ends, and pad is in anchorage in the following, its length and width dimensions is all higher than the ruler of steel pipe
It is very little, and on backing plate reserve presstressed reinforcing steel by hole.
The horizontal distribution reinforcing bar 5 of the assembled wall is connect with steel pipe concrete frame column 1;Vertical 6 upper end of distribution bar
Lower end is respectively protruding into top grid beam 10 and following grid beam or foundation beam 11 and is reliably rigidly connected.
Steel tie 7 in the assembled wall forms the horizontal distribution reinforcing bar 5 of wallboard both sides and vertical distribution bar 6
Reinforced mesh drawknot get up.
The top grid beam 10 and following grid beam or foundation beam 11 are reinforced beam, or are girder with rolled steel section en cased in concrete, are cut
Face is rectangle, concrete cast in situs.
A kind of recoverable steel pipe concrete frame compound shear wall, production order are as follows:
1) steel pipe, backing plate (4), upper frame girder steel (8) and lower frame girder steel (9) are made, is reserved across pre- on backing plate (4)
Backing plate (4) is welded on the upper and lower ends of steel pipe by the circular hole of stress rib, by upper frame girder steel (8) and lower frame girder steel (9) difference
It is welded on the upper and lower part between two steel pipe columns, fixed steel frame, it is ensured that position will not occur partially when pouring;
2) presstressed reinforcing steel (2) is put on into bellows, passes through the inside of steel pipe, the hole reserved from backing plate is pierced by, and under
End is fixed with anchorage (3);
3) reinforcing bar of the following grid beam of binding concrete or foundation beam (11), and by steel frame, shearing with presstressed reinforcing steel
The vertical distribution bar of wall (6) is inserted into the steel reinforcement cage of following grid beam or foundation beam (11), pours into a mould following grid beam or foundation beam (11)
Concrete, ensure that the anchorage of presstressed reinforcing steel bottom is close to lower part backing plate when pouring, keep vertical, it is ensured that at presstressed reinforcing steel lower end
After anchoring status, concrete curing consolidation, keep following grid beam or foundation beam (11) and steel pipe concrete frame, shear wall vertical
Reliable rigid connection is realized in the bottom of distribution bar, and presstressed reinforcing steel lower part is in fixing end;
4) production technique reinforcing bar (5), and horizontal reinforcement and steel core concrete column are welded;With steel tie (7) by steel plate
The horizontal reinforcement (5) and longitudinal reinforcement (6) of both sides socket;
5) top grid beam (10) is made, it is made to be carried out with steel pipe concrete frame column (1) and the vertical distribution bar of wallboard (6)
Reliable rigid connection;
6) thickness of concrete cover, fixed steel pipe concrete frame are reserved by spacer in shear wall wallboard both sides
The position of bellows in column, and be allowed to keep vertical, bellows opening by the gap between bellows and presstressed reinforcing steel into
Row blocks, the template of the concrete of branch cast later;
7) concrete for pouring steel pipe concrete frame column (1), shear wall wallboard, top grid beam (10), poured engineering
There cannot be any concrete in the middle bellows for placing presstressed reinforcing steel, be demoulded after molding.
8) after being molded, remove the plugging material between bellows and presstressed reinforcing steel, it is ensured that the soap-free emulsion polymeization of presstressed reinforcing steel is being applied
Enough construction spaces can be provided for tensioning equipment in the reserved construction hole of stretching end, opened presstressed reinforcing steel using post stretching in work
It is pulled to design prestress value, is used in combination anchorage (3) fixed, space forms a kind of recoverable steel pipe concrete frame combined shear
Wall.
It is the exemplary embodiments of the present invention above, implementation of the invention is without being limited thereto.
Claims (9)
1. a kind of recoverable steel pipe concrete frame compound shear wall, which is characterized in that including steel pipe concrete frame column
(1), presstressed reinforcing steel (2) and reinforced concrete shear wall, in shear wall slab configuration be made of horizontal and genesis analysis reinforcing bar
Bar-mat reinforcement is socketed between bar-mat reinforcement with connecting lacing wire (7), and steel pipe concrete frame column (1), wall section is arranged in shear wall both ends
To be I-shaped, presstressed reinforcing steel is built in the frame columns of steel pipe concrete frame compound shear wall;The steel core concrete column of both sides
Upper and lower part be fixedly connected respectively with frame girder steel (10) with lower frame girder steel (11);The both sides of wall be arranged symmetrically by
The bar-mat reinforcement drawing for socketing reinforcing bar (7) by both sides is used in combination in the bar-mat reinforcement of horizontal distribution reinforcing bar (5) and vertical distribution bar (6) composition
It picks up and;The upper and lower position setting top grid beam (10) of wall and following grid beam or foundation beam (11);By steel pipe concrete frame
Column (1), top grid beam (10), following grid beam or foundation beam (11) and the forming of reinforced concrete shear wall body disturbing concrete;At
After type, using post stretching by tension of prestressed tendon to prestress value is designed, it is used in combination anchorage (3) fixed, that is, constituting one kind can restore
Steel pipe concrete frame compound shear wall.
2. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
Steel pipe concrete frame column (1) section form be rectangle or polygon, thickness of wall body direction size be more than thickness of wall body, two
The upper and lower part of the steel core concrete column of side is fixedly connected with frame girder steel (8) with lower frame girder steel (9), upper end lower end point
Top grid beam (10) and following grid beam or foundation beam (11) are not stretched into.
3. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
Upper frame girder steel (8) and lower frame girder steel (9) use i shaped steel, H profile steel or U-steel, width to be less than both sides reinforcing bar
Interior clear distance, and have enough width between reinforcing bar, ensure pouring for concrete.
4. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
Presstressed reinforcing steel (2) is un-bonded prestressed steel strand or prestressing force spiral, directly finished product prestressing without bondn steel is used to twist
Line, or in the method for common steel strand wires or deformed bar housing bellows isolation concrete and presstressed reinforcing steel bonding, on side
It is evenly arranged 1 or more presstressed reinforcing steels in frame column, is fixed with anchorage (3) at both ends after tensioned prestressing bar, anchorage (3) is divided into
Fixing end anchorage and stretching end anchorage, are separately fixed at the both ends of steel pipe concrete frame column, are pressed on backing plate.
5. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
Backing plate (4) is padded in anchorage at steel pipe concrete frame column both ends in the following, its length and width dimensions is all higher than the size of steel pipe, and is padding
On plate reserve presstressed reinforcing steel by hole.
6. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
The horizontal distribution reinforcing bar (5) of assembled wall is connect with steel pipe concrete frame column (1);Vertical distribution bar (6) upper end lower end point
It does not stretch into top grid beam (10) and following grid beam or foundation beam (11) and is rigidly connected.
7. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
The reinforcing bar that steel tie (7) in assembled wall forms the horizontal distribution reinforcing bar (5) of wallboard both sides and vertical distribution bar (6)
Mesh sheet drawknot gets up.
8. a kind of recoverable steel pipe concrete frame compound shear wall according to claim 1, it is characterised in that:It is described
Top grid beam (10) and following grid beam or foundation beam (11) are reinforced beam, or are girder with rolled steel section en cased in concrete, rectangular cross-section,
Concrete cast in situs.
9. preparing a kind of side of recoverable steel pipe concrete frame compound shear wall described in claim 1-8 any one
Method, which is characterized in that production order is as follows:
1) steel pipe, backing plate (4), upper frame girder steel (8) and lower frame girder steel (9) are made, is reserved across prestressing force on backing plate (4)
Backing plate (4) is welded on the upper and lower ends of steel pipe by the circular hole of muscle, and upper frame girder steel (8) and lower frame girder steel (9) are respectively welded
Upper and lower part between two steel pipe columns, fixed steel frame, it is ensured that position will not occur partially when pouring;
2) presstressed reinforcing steel (2) is put on into bellows, passes through the inside of steel pipe, the hole reserved from backing plate is pierced by, and is used in lower end
Anchorage (3) fixes;
3) reinforcing bar of the following grid beam of binding concrete or foundation beam (11), and steel frame, shear wall with presstressed reinforcing steel are erected
It is inserted into distribution bar (6) in the steel reinforcement cage of following grid beam or foundation beam (11), pours into a mould the mixed of following grid beam or foundation beam (11)
Solidifying soil ensures that the anchorage of presstressed reinforcing steel bottom is close to lower part backing plate, keeps vertical, it is ensured that presstressed reinforcing steel lower end is in anchor when pouring
Solid fraction state makes following grid beam or foundation beam (11) are vertically distributed with steel pipe concrete frame, shear wall after concrete curing consolidates
Rigid connection is realized in the bottom of reinforcing bar, and presstressed reinforcing steel lower part is in fixing end;
4) production technique reinforcing bar (5), and horizontal reinforcement and steel core concrete column are welded;With steel tie (7) by steel plate both sides
Horizontal reinforcement (5) and longitudinal reinforcement (6) socket;
5) top grid beam (10) is made, it is made to carry out rigidity with steel pipe concrete frame column (1) and the vertical distribution bar of wallboard (6)
Connection;
6) thickness of concrete cover is reserved by spacer in shear wall wallboard both sides, fixed in steel pipe concrete frame column
The position of bellows, and be allowed to keep vertical, the gap between bellows and presstressed reinforcing steel is sealed in bellows opening
It is stifled, the template of the concrete of branch cast later;
7) concrete for pouring steel pipe concrete frame column (1), shear wall wallboard, top grid beam (10), poured in engineering and put
Any concrete cannot be had by setting in the bellows of presstressed reinforcing steel, be demoulded after molding;
8) after being molded, remove the plugging material between bellows and presstressed reinforcing steel, it is ensured that the soap-free emulsion polymeization of presstressed reinforcing steel, in construction
In the reserved construction hole of stretching end, enough construction spaces are provided for tensioning equipment, using post stretching by tension of prestressed tendon to setting
Prestress value is counted, is used in combination anchorage (3) fixed, space forms a kind of recoverable steel pipe concrete frame compound shear wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810700222.2A CN108678223A (en) | 2018-06-29 | 2018-06-29 | A kind of recoverable steel pipe concrete frame compound shear wall and the practice |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810700222.2A CN108678223A (en) | 2018-06-29 | 2018-06-29 | A kind of recoverable steel pipe concrete frame compound shear wall and the practice |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108678223A true CN108678223A (en) | 2018-10-19 |
Family
ID=63812627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810700222.2A Pending CN108678223A (en) | 2018-06-29 | 2018-06-29 | A kind of recoverable steel pipe concrete frame compound shear wall and the practice |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108678223A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622380A (en) * | 2020-04-27 | 2020-09-04 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN114457935A (en) * | 2022-02-23 | 2022-05-10 | 凯第建筑集团有限公司 | Flexible connection structure for steel structure high-rise building |
CN114687598A (en) * | 2022-03-19 | 2022-07-01 | 北京工业大学 | Assembled ecological inner wall and groove-shaped foundation beam self-tapping nail cluster connecting structure and method |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06248722A (en) * | 1993-02-25 | 1994-09-06 | Fujita Corp | Joining method for precast reinforcement concrete earthquake resisting wall and steel frame beam |
CN1995579A (en) * | 2006-12-29 | 2007-07-11 | 北京工业大学 | Steel pipe concrete frame-steel truss-concrete combined shear wall and its manufacture method |
CN201367654Y (en) * | 2008-12-12 | 2009-12-23 | 北京工业大学 | Combined shear wall of steel tube concrete, steel plate with holes and concrete |
CN201459954U (en) * | 2009-06-05 | 2010-05-12 | 陈云 | Thermal-insulation shear wall with double-layer steel plate |
CN102444224A (en) * | 2011-10-31 | 2012-05-09 | 华南理工大学 | Concrete composite shear wall |
CN102704598A (en) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | Composite shear wall with concrete-filled steel tube frames and double steel plates with concealed bracings and construction method thereof |
CN102704595A (en) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | Shear wall with 'profile steel column-steel beam-steel support' embedded between steel tube concrete columns and manufacturing method |
CN103469933A (en) * | 2013-09-25 | 2013-12-25 | 华北水利水电大学 | Double steel plate embedded supporting composite thermal insulation shear wall and manufacturing method thereof |
CN103711233A (en) * | 2013-12-30 | 2014-04-09 | 北京工业大学 | Reinforced concrete-filled steel tube frame steel plate composite shear wall with built-in concealed bracings and manufacturing method |
CN103726594A (en) * | 2013-12-30 | 2014-04-16 | 北京工业大学 | Built-in and multi-cavity double steel plate and concrete filled steel tubular column combined shearing wall and manufacturing method |
CN103966953A (en) * | 2013-02-06 | 2014-08-06 | 永升建设集团有限公司 | Large-span concrete beam construction method based on unbonded steel strand prestress post-tensioning |
CN104131707A (en) * | 2014-08-08 | 2014-11-05 | 青岛海川建设集团有限公司 | Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device |
CN104674941A (en) * | 2015-02-10 | 2015-06-03 | 海南大学 | Tubular structure system capable of restoring functions |
CN105908868A (en) * | 2016-06-22 | 2016-08-31 | 北京工业大学 | Light steel side frame and main rib type single-row reinforcement recycled-concrete shear wall and construction method |
CN206899476U (en) * | 2017-05-25 | 2018-01-19 | 华恒建设集团有限公司 | A kind of Post-tension Prestress Construction preserved pipeline component |
CN108005264A (en) * | 2017-12-20 | 2018-05-08 | 中冶建筑研究总院有限公司 | A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method |
CN108678227A (en) * | 2018-06-29 | 2018-10-19 | 北京工业大学 | A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar |
CN108678225A (en) * | 2018-06-29 | 2018-10-19 | 北京工业大学 | The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice |
CN209227835U (en) * | 2018-06-29 | 2019-08-09 | 北京工业大学 | A kind of recoverable steel pipe concrete frame compound shear wall |
-
2018
- 2018-06-29 CN CN201810700222.2A patent/CN108678223A/en active Pending
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06248722A (en) * | 1993-02-25 | 1994-09-06 | Fujita Corp | Joining method for precast reinforcement concrete earthquake resisting wall and steel frame beam |
CN1995579A (en) * | 2006-12-29 | 2007-07-11 | 北京工业大学 | Steel pipe concrete frame-steel truss-concrete combined shear wall and its manufacture method |
CN201367654Y (en) * | 2008-12-12 | 2009-12-23 | 北京工业大学 | Combined shear wall of steel tube concrete, steel plate with holes and concrete |
CN201459954U (en) * | 2009-06-05 | 2010-05-12 | 陈云 | Thermal-insulation shear wall with double-layer steel plate |
CN102444224A (en) * | 2011-10-31 | 2012-05-09 | 华南理工大学 | Concrete composite shear wall |
CN102704598A (en) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | Composite shear wall with concrete-filled steel tube frames and double steel plates with concealed bracings and construction method thereof |
CN102704595A (en) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | Shear wall with 'profile steel column-steel beam-steel support' embedded between steel tube concrete columns and manufacturing method |
CN103966953A (en) * | 2013-02-06 | 2014-08-06 | 永升建设集团有限公司 | Large-span concrete beam construction method based on unbonded steel strand prestress post-tensioning |
CN103469933A (en) * | 2013-09-25 | 2013-12-25 | 华北水利水电大学 | Double steel plate embedded supporting composite thermal insulation shear wall and manufacturing method thereof |
CN103711233A (en) * | 2013-12-30 | 2014-04-09 | 北京工业大学 | Reinforced concrete-filled steel tube frame steel plate composite shear wall with built-in concealed bracings and manufacturing method |
CN103726594A (en) * | 2013-12-30 | 2014-04-16 | 北京工业大学 | Built-in and multi-cavity double steel plate and concrete filled steel tubular column combined shearing wall and manufacturing method |
CN104131707A (en) * | 2014-08-08 | 2014-11-05 | 青岛海川建设集团有限公司 | Prestressed structure pore passage grouting device and construction method of prestressed structure pore passage grouting device |
CN104674941A (en) * | 2015-02-10 | 2015-06-03 | 海南大学 | Tubular structure system capable of restoring functions |
CN105908868A (en) * | 2016-06-22 | 2016-08-31 | 北京工业大学 | Light steel side frame and main rib type single-row reinforcement recycled-concrete shear wall and construction method |
CN206899476U (en) * | 2017-05-25 | 2018-01-19 | 华恒建设集团有限公司 | A kind of Post-tension Prestress Construction preserved pipeline component |
CN108005264A (en) * | 2017-12-20 | 2018-05-08 | 中冶建筑研究总院有限公司 | A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method |
CN108678227A (en) * | 2018-06-29 | 2018-10-19 | 北京工业大学 | A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar |
CN108678225A (en) * | 2018-06-29 | 2018-10-19 | 北京工业大学 | The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice |
CN209227835U (en) * | 2018-06-29 | 2019-08-09 | 北京工业大学 | A kind of recoverable steel pipe concrete frame compound shear wall |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111622380A (en) * | 2020-04-27 | 2020-09-04 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN111622380B (en) * | 2020-04-27 | 2022-05-10 | 江苏科技大学 | Combined shear wall capable of quickly recovering function after earthquake and wall body composed of combined shear wall |
CN114457935A (en) * | 2022-02-23 | 2022-05-10 | 凯第建筑集团有限公司 | Flexible connection structure for steel structure high-rise building |
CN114687598A (en) * | 2022-03-19 | 2022-07-01 | 北京工业大学 | Assembled ecological inner wall and groove-shaped foundation beam self-tapping nail cluster connecting structure and method |
CN114687598B (en) * | 2022-03-19 | 2024-04-12 | 北京工业大学 | Assembled ecological inner wall and groove-shaped foundation beam self-tapping screw block connection structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106869316B (en) | The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube | |
CN208668683U (en) | The built-in built-in steel plate combined shear wall of presstressed reinforcing steel steel pipe concrete frame | |
CN203905239U (en) | Prestress hollow slab laminated floor system | |
CN104727441B (en) | Prestress assembled concrete beam column joint structure and construction method thereof | |
WO2019149270A1 (en) | Assembled pier for mixed reinforcement of normal steel rebar and finished threaded steel bar | |
CN206090996U (en) | Connected node of whole thick precast floor plank unit of assembled and floor unit thereof | |
CN103046645B (en) | A kind of whole casting structure and construction method of Large-span Precast | |
CN108678225A (en) | The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice | |
CN106351374A (en) | Connecting node of assembled whole thick prefabricated slab unit and slab unit thereof | |
CN108487461A (en) | Precast prestressed concrete frame bean column node with additional bar and sleeve | |
CN108678223A (en) | A kind of recoverable steel pipe concrete frame compound shear wall and the practice | |
CN103967128B (en) | The coupled column assembled beam frame of built-in high-strength concrete stem stem and construction method thereof | |
CN106948481B (en) | Prefabrication and assembly construction concrete frame beam-column connection based on the high strengthening tendons in part | |
CN106988477A (en) | Assembled two dimension prestressing cored slab and preparation method thereof | |
CN108678227A (en) | A kind of the band diagonal brace steel pipe concrete frame shear wall and the practice of built-in prestressed steel bar | |
CN106958319A (en) | Precast concrete post component and connected node | |
CN106088412A (en) | L-type steel beam column | |
CN208668684U (en) | Prestressed steel pipe concrete frame double steel plate shear wall built in one kind | |
CN205531016U (en) | Precast concrete post component and connected node | |
CN208604792U (en) | A kind of prefabricated prestressing Self-resetting shear wall structure | |
CN107938884B (en) | Self-resetting frame-shear wall structure for reinforcing seismic damage frame and construction method | |
CN207079628U (en) | A kind of open pore steel plate steel reinforced concrete assembling rectangle piping lane section | |
CN209227835U (en) | A kind of recoverable steel pipe concrete frame compound shear wall | |
CN214364376U (en) | Strengthen built-up connection shear force wallboard and shear force wall | |
CN108643395A (en) | A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181019 |