CN108595079A - A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform - Google Patents
A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform Download PDFInfo
- Publication number
- CN108595079A CN108595079A CN201810366411.0A CN201810366411A CN108595079A CN 108595079 A CN108595079 A CN 108595079A CN 201810366411 A CN201810366411 A CN 201810366411A CN 108595079 A CN108595079 A CN 108595079A
- Authority
- CN
- China
- Prior art keywords
- project
- map
- transmitting
- cloud platform
- multiple terminals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0481—Interaction techniques based on graphical user interfaces [GUI] based on specific properties of the displayed interaction object or a metaphor-based environment, e.g. interaction with desktop elements like windows or icons, or assisted by a cursor's changing behaviour or appearance
- G06F3/0482—Interaction with lists of selectable items, e.g. menus
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0484—Interaction techniques based on graphical user interfaces [GUI] for the control of specific functions or operations, e.g. selecting or manipulating an object, an image or a displayed text element, setting a parameter value or selecting a range
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Geometry (AREA)
- Software Systems (AREA)
- Remote Sensing (AREA)
- Computer Graphics (AREA)
- Processing Or Creating Images (AREA)
Abstract
The present invention relates to a kind of project of transmitting and converting electricity surveying methods shared based on multiple terminals cloud platform, and in the power transmission engineering feasibility study design phase, early period, prospecting was one of important link, and achievement will directly influence the feasibility of project investment and the project implementation.Traditional prospective design early period scheme comes with some shortcomings, under the main trend of mobile Internet, some emerging map platforms are emerged in large numbers, make full use of the advantage of the maps such as satellite mapping, topographic map, contour and emerging mobile terminal device, a new method is integrated into be applied among project of transmitting and converting electricity, the working efficiency for making an on-the-spot survey addressing route selection early period can be not only improved, and the cost in prospective design stage early period can be saved, improves feasibility study result of design quality.The present invention is based on the shared project of transmitting and converting electricity surveying methods of the multiple terminals cloud platform difficult to understand for tieing up interactive map, can provide reference for various regions power grid project feasibility studies, prospecting early period and design work.
Description
Technical field
The present invention relates to surveying method technical fields, and in particular to a kind of power transmission and transformation work shared based on multiple terminals cloud platform
Journey surveying method.
Background technology
In Transmission Projects feasibility study stage, prospecting early period is a weight in Project Feasibility Research
Want link.Early period prospecting during, according to the conventional method, usually designer first on design office's computer 1:50000
Topographic map on carry out scheme primary election, determine 2 ~ 3 primary election schemes, then designer carry printing drawing to scene progress
It makes an on-the-spot survey on the spot, if reconnaissance trip finds that route scheme is all invalid, needs rerouting scheme.Due to designer
1 held:50000 revision of topographic map is slower, too big with live difference, and route scheme is unworkable and the thing readjusted is frequent
Occur.In recent years, Internet map is fast-developing, and Internet map can provide High Resolution Remote Sensing Satellites figure, is designer
Verification is carried out on the basis of conventional method using Internet map to provide convenience condition, in this case, research can be real
Existing multi-platform shared project of transmitting and converting electricity surveying method is very necessary.
Invention content
To solve the above problems, present invention offer is a kind of easy to use, it is flat based on multiple terminals cloud to reconnoitre efficient one kind
The shared project of transmitting and converting electricity surveying method of platform.
Technical scheme of the present invention:
A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform, the terminal includes computer terminal or movement
Terminal, the computer terminal or the interactive map client of mobile terminal installation dimension difficult to understand;
The application method of the computer terminal includes the following steps:(1)Computer end opens the interactive map of dimension difficult to understand, is clicked in menu bar
" Map Switch ";
(2)It is pressed from both sides in computer end collection establishment file, and classification display can be set, it grade can free classification display from 1 grade to 28;
(3)Checked in detail by satellite mapping the factor influential on route scheme such as the village, house, industrial enterprise on periphery and
It is marked on map, these factors are avoided in consideration, primarily determine two route schemes;
(4)The topography along the contour and route scheme in the region can be checked by elevation superposition and 3D patterns, it is contour
There is numerical value on line, judges the height above sea level where new route shaft tower;
(5)Then it by menu bar, clicks " user ", then click " with high in the clouds synchronization object ";Native object " is uploaded and is closed by selection
Be incorporated to high in the clouds " or " by native object upload covering high in the clouds ", if selection covering, synchronize rear high in the clouds file will and local file
Completely the same, the file at primitive nebula end will be deleted;If selection combining, after synchronizing, then high in the clouds object includes not only local text
Part also retains the existing file in primitive nebula end;
The application method of the mobile terminal includes the following steps:The interactive map login account of mobile terminal Austria dimension, it is following in the page
Menu bar point " collection ", in " collection " interface point " menu ", point " synchronization " may be selected to merge or cover in the synchronization option
Lid;Selection covering is local, and after synchronizing, mobile terminal file will be completely the same with high in the clouds file.
Further, the computer terminal includes being mounted with WinXP, Vista, Win7, Win8 or Win10 operating system
Computer terminal.
Further, the mobile terminal includes mobile phone or tablet, Android, apple, microsoft system mobile terminal prop up
It holds.
Further, it when mobile terminal design personnel reconnoitre at the scene, is positioned by mobile phone, is stepped on the spot according to quasi- routing diameter
It surveys, is taken on site using unmanned plane, designer makes an on-the-spot survey some barriers for finding that some are difficult to judge by satellite mapping on the spot
Hinder object, designer that information above is tagged on map, synchronized update to high in the clouds, computer end synchronizes update again.
Further, described some barriers for being difficult to judge include cemetery, explosives magazine or commodity trees.
Further, when designer solicits the opinion about the scheme in path to departments such as government planning, territories, pass through
Mobile phone or tablet intuitively show route scheme, or route scheme is printed;Meanwhile by soliciting meaning in planning, land departments
See, collected planning information, these information can be synchronized to cloud platform by designer by mobile phone or computer.
Further, the planning information includes planning road and airport headroom barrier limit for height figure.
Beneficial effects of the present invention:
1)By more moneys such as Google satellites combination chart, Baidu map, Microsoft's Bing maps, Opencycle hypsographic maps
Figure is integrated in 1 platform, the advantages of making full use of each map, improves early period and reconnoitres efficiency.
2)By the synchronizing function of the mobile terminals such as computer, high in the clouds, mobile phone, slitless connection is realized.
3)The mobile terminal devices such as mobile phone, tablet computer are easy to carry, easy to operate, and convenience is strong, can greatly mention
Outdoor survey efficiency.
4)Route scheme selection is more accurate.Designer found early by satellite mapping villages and small towns on transmission line of electricity path,
Railway, highway, airport, river etc.;By receiving money analysis, the feasibility of transmission line of electricity scheme can be primarily determined, in time
Prioritization scheme avoids the inspection of the scene of a crime repeatedly, can effectively reduce the number of reconnaissance trip, enormously simplifies workload, improves
Working efficiency.
5)It is accumulated by different projects, cloud database will more be enriched.With an engineering investigation route selection work
Work is carried out, and the planning road, explosives magazine, approach area grasped in money are reconnoitred and received to the scheme and scene reality of every engineering
Equal information flags are tieed up to Austria in interactive map, and cloud database information will be more and more abundant, is more conducive to other works from now on
Cheng Kaizhan greatlys improve prospecting route selection efficiency.
It can be effectively reduced labor intensity based on the project of transmitting and converting electricity surveying method that multiple terminals cloud platform is shared, improve work
Make efficiency, saves production cost, and as the constantly improve of map software and map influence the continuous renewal of data, not only
Can apply in power transmission engineering application for developing prospective design, more can in engineering construction thematic figure drafting, various special topic numbers
According to displaying provide convenient, and the application in the fields such as Electric Power Network Planning, design, construction is used widely.
Description of the drawings
Fig. 1 is tab file folder figure;
Fig. 2 is that trail file presss from both sides file map;
Fig. 3 be and high in the clouds synchronization object surface chart;
Fig. 4 mobile phone terminals and high in the clouds synchronization object figure;
Fig. 5 mobile phone terminals and high in the clouds synchronization object figure.
Specific implementation mode
As shown in Figs. 1-5, map platform brief introduction
1.1 hardware condition
Computer terminal:It is mounted with the computer of the operating systems such as WinXP, Vista, Win7, Win8 or Win10.
Mobile terminal:Mobile phone or tablet.The mobile terminal of the dominant systems such as Android, apple, Microsoft can be supported.Herein with
It is introduced for Android mobile phone.
1.2 software condition
The interactive map window client of computer installation dimension difficult to understand, the interactive map Android client of Android mobile phone installation dimension difficult to understand.
The interactive map browser of Austria's dimension(The interactive map of dimension hereinafter referred to as difficult to understand)It is that Beijing Yuan Shenghuawang softcom limiteds open
The cross-platform map browser of hair, is integrated with Google Maps, Google satellite mappings, Google topographic maps, Baidu map, search dog
The a variety of well-known maps in the ground such as map, Microsoft's Bing maps, Opengcycle hypsographic maps, user can free switchings and offline
Download these types of map.Each map has the advantages that respective respectively above, for example the satellite mapping remote sensing images of Google and Microsoft are clear,
And update is very fast, Baidu map vector graphics updating decision can see in map in highway, railway built etc..Ao Wei
Interactive map additionally provides superposition altitude data, big font pattern, white background pattern, grey bed die formula, rp mode, 3D patterns, 2D
The various modes such as pattern, can unrestricted choice as needed.
Austria ties up the interactive Map Integration whole world SRTM3, ASTER-GDEM2 altitude data, can be arbitrary with the quick search whole world
The height above sea level of position.Its elevation service can directly export the contour of 10 meters of precision on satellite mapping, straight when seeing satellite mapping
It sees and understands altitude information.In conjunction with satellite mapping and altitude data, quick 3D modeling can be carried out automatically, show the whole world glibly truly
Shape.
The interactive map of Austria's dimension can also directly read CAD design file and be translated into dimensional object difficult to understand, and design is presented in
On map;Austria's dimension browser picture and dimensional object difficult to understand can also be converted directly into CAD base maps and object vector, in order to set
Meter personnel do Fine design on CAD.
The interactive map of Austria's dimension supports that cloud platform synchronizing function, cloud platform are one of the critical functions of the interactive map of dimension difficult to understand, by
Beijing Yuan Shenghuawang softcom limiteds provide.By cloud platform, it is mobile that the ends computer PC and mobile phone, tablet computer etc. may be implemented
Data between the multi-terminal equipments such as end synchronize.The various modes such as covering and merging are provided when synchronous, support unrestricted choice, no matter
Computer end or mobile terminal, can by uploading and downloading function, realize it is synchronouss with high in the clouds, also can be as needed using merging
Function, while data file being supported to import and export, data file is supported to be suitable for a variety of of the editors such as CAD, Google earth
Data format.Various geographical planning and designing on computer can be on Fast synchronization to cell phone platform, in mobile terminal, collection in worksite arrives
Data also can realize slitless connection on Fast synchronization to computer.
2 application methods
2.1 computer end
Computer end can open the interactive map of dimension difficult to understand, click " Map Switch " in menu bar, realize the base map of map in Google's satellite
Free switching between the maps such as figure, Baidu map, Microsoft's bing maps, contour map.
It can be pressed from both sides in computer end collection establishment file, and classification display can be set, grade can be freely classified from 1 grade to 28 aobvious
Show, such as a certain file map level is set at 12 grades to 19 grades, then it can be on map when map is amplified to 12 grades to 19 grades
See the label in this document folder.
Such as certain engineering creates the route scheme of 110 KV transmission lines.The engineering is quasi- newly-built from present situation 220kV substations
1 time 110kV transmission line of electricity is precisely found by telephone counseling Party A, by satellite mapping to proposed 110kV substations, designer
The position of present situation 220kV substations and proposed 110kV substations, is marked on map.It is looked into detail by satellite mapping simultaneously
It sees the factor influential on route scheme such as the village, house, industrial enterprise on periphery and is marked on map, consider to avoid
These factors primarily determine two route schemes.
The topography along the contour and route scheme in the region can be checked by elevation superposition and 3D patterns, it is contour
There is numerical value on line, can substantially judge the height above sea level where new route shaft tower, the big position of height above sea level drop, mountain shape is precipitous,
Difficulty of construction is big, and investment is also corresponding to be increased.
Then it by menu bar, clicks " user ", then click " with high in the clouds synchronization object ", the interfaces Fig. 3 occurs, can select
" native object upload is merged into high in the clouds " or " native object is uploaded into covering high in the clouds ".If selection covering, synchronizes rear cloud
Hold file will be completely the same with local file, the file at primitive nebula end will be deleted;If selection combining, after synchronizing, then high in the clouds
Object not only also retains the existing file in primitive nebula end comprising local file.
2.2 mobile terminal
The interactive map login account of the mobile terminals such as mobile phone, tablet computer Austria dimension, then in the following menu bar point " collection " of the page,
Then in " collection " interface point " menu ", then point " synchronization " may be selected to merge or cover, such as Fig. 4 institutes in the synchronization option
Show.
Selection covering is local, and after synchronizing, mobile terminal file will be completely the same with high in the clouds file.Designer can be according to quasi-
Routing line carries out the inspection of the scene of a crime.
It since reconnaissance trip needs detailed map, needs to download map, needs consumption big if being downloaded again to scene
Data in mobile phone flow is measured, and weak if it is mobile phone signal in the wild, download Online Map is slow, therefore to improve work effect
Rate reduces the consumption of data in mobile phone flow, can download offline map in advance and be stored on mobile phone, then offline in the wild to use.It is logical
Often downloading offline map can directly download.Download body of a map or chart in Austria ties up interactive map, can download some city from
Line map can also select arbitrary polygon region to download the offline map in the region, for the needs for meeting different, can select
Different levels, level is bigger, and the map of download is also bigger, and the space occupied is also bigger.
It when designer reconnoitres at the scene, can be positioned by mobile phone, be made an on-the-spot survey on the spot according to quasi- routing diameter, nothing can also be utilized
It is man-machine to be taken on site.Designer makes an on-the-spot survey some barriers that can find that some are difficult to judge by satellite mapping on the spot, than
Such as cemetery, explosives magazine, commodity trees(Part forest measure of indemnity is higher), information above is tagged on map by designer,
Update can be synchronized again with synchronized update to high in the clouds, computer end.
When designer solicits the opinion about the scheme in path to departments such as government planning, territories, mobile phone can be passed through
Or tablet intuitively shows route scheme, can also print route scheme.Meanwhile by soliciting meaning in planning, land departments
See, some related planning informations, including planning road, airport headroom barrier limit for height figure etc., designer can be collected
These information can be synchronized to cloud platform by member by mobile phone or computer, in order to be used in sundry item from now on.
Claims (7)
1. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform, terminal includes that computer terminal or movement are whole
End, which is characterized in that the computer terminal or the interactive map client of mobile terminal installation dimension difficult to understand;
The application method of the computer terminal includes the following steps:(1)Computer end opens the interactive map of dimension difficult to understand, is clicked in menu bar
" Map Switch ";
(2)It is pressed from both sides in computer end collection establishment file, and classification display can be set, it grade can free classification display from 1 grade to 28;
(3)Checked in detail by satellite mapping the factor influential on route scheme such as the village, house, industrial enterprise on periphery and
It is marked on map, these factors are avoided in consideration, primarily determine two route schemes;
(4)The topography along the contour and route scheme in the region can be checked by elevation superposition and 3D patterns, it is contour
There is numerical value on line, judges the height above sea level where new route shaft tower;
(5)Then it by menu bar, clicks " user ", then click " with high in the clouds synchronization object ";Native object " is uploaded and is closed by selection
Be incorporated to high in the clouds " or " by native object upload covering high in the clouds ", if selection covering, synchronize rear high in the clouds file will and local file
Completely the same, the file at primitive nebula end will be deleted;If selection combining, after synchronizing, then high in the clouds object includes not only local text
Part also retains the existing file in primitive nebula end;
The application method of the mobile terminal includes the following steps:The interactive map login account of mobile terminal Austria dimension, it is following in the page
Menu bar point " collection ", in " collection " interface point " menu ", point " synchronization " may be selected to merge or cover in the synchronization option
Lid;Selection covering is local, and after synchronizing, mobile terminal file will be completely the same with high in the clouds file.
2. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 1, feature
It is, the computer terminal includes the computer terminal for being mounted with WinXP, Vista, Win7, Win8 or Win10 operating system.
3. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 1, feature
Be, the mobile terminal includes mobile phone or tablet, Android, apple, microsoft system mobile terminal support.
4. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 1, feature
It is, when mobile terminal design personnel reconnoitre at the scene, is positioned by mobile phone, is made an on-the-spot survey on the spot according to quasi- routing diameter, utilize nobody
Machine is taken on site, and designer makes an on-the-spot survey discovery and is difficult to disturbance in judgement object by satellite mapping on the spot, and designer will believe above
Breath is tagged on map, and synchronized update to high in the clouds, computer end synchronizes update again.
5. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 4, feature
It is, the barrier includes cemetery, explosives magazine or commodity trees.
6. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 1, feature
It is, it is straight by mobile phone or tablet when the departments such as designer to government planning, territory solicit the opinion about the scheme in path
Ground displaying route scheme is seen, or route scheme is printed;Meanwhile by being consulted in planning, land departments, collecting planning
These information are synchronized to cloud platform by information, designer by mobile phone or computer.
7. a kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform according to claim 6, feature
It is, the planning information includes planning road and airport headroom barrier limit for height figure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810366411.0A CN108595079A (en) | 2018-04-23 | 2018-04-23 | A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810366411.0A CN108595079A (en) | 2018-04-23 | 2018-04-23 | A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108595079A true CN108595079A (en) | 2018-09-28 |
Family
ID=63614688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810366411.0A Pending CN108595079A (en) | 2018-04-23 | 2018-04-23 | A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108595079A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110110307A (en) * | 2019-04-19 | 2019-08-09 | 国网天津市电力公司 | A kind of engineering previous information editor's shared system based on cloud |
CN110457019A (en) * | 2019-08-16 | 2019-11-15 | 国网青海省电力公司西宁供电公司 | A kind of sequencing application method of 10kV on-pole switch acceptance process |
CN110968920A (en) * | 2019-11-29 | 2020-04-07 | 江苏方天电力技术有限公司 | Method for placing chain type service entity in edge computing and edge computing equipment |
CN111831779A (en) * | 2020-07-24 | 2020-10-27 | 深圳市新旭龙通信实业有限公司 | Engineering management system platform |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110055024A1 (en) * | 2007-08-03 | 2011-03-03 | Hao Shen | Method for loading advertisement in electronic map |
CN102708518A (en) * | 2012-05-03 | 2012-10-03 | 山东电力研究院 | Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology |
CN107609242A (en) * | 2017-09-01 | 2018-01-19 | 山西大学 | It is a kind of that selection method is reconnoitred based on the highway of smart mobile phone and digital topography map |
-
2018
- 2018-04-23 CN CN201810366411.0A patent/CN108595079A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110055024A1 (en) * | 2007-08-03 | 2011-03-03 | Hao Shen | Method for loading advertisement in electronic map |
CN102708518A (en) * | 2012-05-03 | 2012-10-03 | 山东电力研究院 | Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology |
CN107609242A (en) * | 2017-09-01 | 2018-01-19 | 山西大学 | It is a kind of that selection method is reconnoitred based on the highway of smart mobile phone and digital topography map |
Non-Patent Citations (5)
Title |
---|
刘军: "基于奥维地图杆塔定位及寻路系统在输电线路工作中的应用研究", 《技术与应用》 * |
徐庆华;穆永保;杜鹏;卢思远;王少敏: "奥维互动地图在输电线路勘察设计中的应用", 《上海电气技术》 * |
未知: "基于omap奥维地图的输变电工程勘察选线方法", 《百度文库》 * |
未知: "奥维地图操作技巧初步整理(1)", 《百度文库》 * |
许邦鑫: "建立新型的电力线路勘测设计模式——综合路径优", 《工程勘察》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110110307A (en) * | 2019-04-19 | 2019-08-09 | 国网天津市电力公司 | A kind of engineering previous information editor's shared system based on cloud |
CN110457019A (en) * | 2019-08-16 | 2019-11-15 | 国网青海省电力公司西宁供电公司 | A kind of sequencing application method of 10kV on-pole switch acceptance process |
CN110457019B (en) * | 2019-08-16 | 2022-12-27 | 国网青海省电力公司西宁供电公司 | Programmed application method of 10kV pole-mounted switch acceptance process |
CN110968920A (en) * | 2019-11-29 | 2020-04-07 | 江苏方天电力技术有限公司 | Method for placing chain type service entity in edge computing and edge computing equipment |
CN110968920B (en) * | 2019-11-29 | 2022-06-14 | 江苏方天电力技术有限公司 | Method for placing chain type service entity in edge computing and edge computing equipment |
CN111831779A (en) * | 2020-07-24 | 2020-10-27 | 深圳市新旭龙通信实业有限公司 | Engineering management system platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106846478B (en) | Water and electricity hydraulic engineering geology three-dimensional outdoor scene editing, recording and map filling system | |
CN108595079A (en) | A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform | |
CN106779417A (en) | The collection of engineering investigation information digitalization, management and integrated application method | |
CN109902332A (en) | A kind of power matching network system based on Three-dimension | |
WO2011072467A1 (en) | Method and system for monitoring of wetlands resource and ecological environment | |
CN111080782A (en) | Visual system based on live-action three-dimensional geographic information system | |
CN107885096A (en) | A kind of unmanned plane inspection flight path three-dimensional artificial monitoring system | |
Li et al. | Webvrgis based city bigdata 3d visualization and analysis | |
CN108038138A (en) | A kind of method for the WGS84 coordinate systems that Google Maps is transformed into from CAD plane coordinate systems | |
Agugiaro et al. | A web-based interactive tool for multi-resolution 3D models of a Maya archaeological site | |
Bi et al. | Research on the construction of City information modelling basic platform based on multi-source data | |
Pascaul et al. | An architecture for geographic information systems on the web-WebGIS | |
Shi et al. | Application of New Surveying and Mapping Technology in the Construction of Smart City | |
Echlouchi et al. | Smart geoportal for efficient governance: a case study municipality of M’diq | |
Pan et al. | Preliminary Planning and Design of Power Transmission and Transformation Project Based on Tilt Photography GIS+ BIM Technology | |
Jianping et al. | Research on 3D GIS platform construction of expressway based on 3D data model | |
CN103164417A (en) | Geological information processing method and device | |
Ajwaliya et al. | Design and development of GIS based utility management system at DOS Housing Colony, Vikramnagar, Ahmedabad | |
Zhou et al. | Construction and application research of Three-dimensional digital power grid in Southwest China | |
Lei et al. | System Development of Making an Image Map Based on Google Earth | |
Hamza et al. | GIS Planning, Web and 3D Web GIS Applications for the Management and Analysis of MV/LV Electrical Networks in the Region of Medjez el Bab (North-West of Tunisia) | |
Schulze et al. | The WAVE and 3D: How the waters might have parted—visualizing evidence for a major volcanic eruption in the Mediterranean and its impact on exodus models | |
Zhanghuang et al. | Development and application of tour geographic information system (TGIS)—Taking Mount Longhushan World Geopark as an example | |
Minango | Geographic information system management tool for underground electrical and telecommunication networks: case of the University of Zambia. | |
Li et al. | Cultural Heritage Research Model Based on Big Data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |