CN108573061A - Status of electric power detection method, device, computer equipment and storage medium - Google Patents
Status of electric power detection method, device, computer equipment and storage medium Download PDFInfo
- Publication number
- CN108573061A CN108573061A CN201810386349.1A CN201810386349A CN108573061A CN 108573061 A CN108573061 A CN 108573061A CN 201810386349 A CN201810386349 A CN 201810386349A CN 108573061 A CN108573061 A CN 108573061A
- Authority
- CN
- China
- Prior art keywords
- equipment
- electric power
- history
- status
- power equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 54
- 238000004590 computer program Methods 0.000 claims description 26
- 238000010586 diagram Methods 0.000 claims description 12
- 230000000737 periodic effect Effects 0.000 claims description 11
- 241001269238 Data Species 0.000 claims description 10
- 230000005611 electricity Effects 0.000 claims description 10
- 238000004364 calculation method Methods 0.000 claims 1
- 238000000034 method Methods 0.000 description 10
- 230000008569 process Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
This application involves a kind of status of electric power detection method, system, computer equipment and storage mediums.Above-mentioned status of electric power detection method includes:Obtain the history data of each power equipment to be detected;The history visitation frequency of each power equipment is counted according to the history data;It is picked out in the power equipment according to the history visitation frequency and pays close attention to equipment, and pay close attention to the access time distribution of equipment within a preset period of time described in statistics, and be distributed according to the access time and determine status of electric power.Above-mentioned status of electric power detection method can targetedly determine detection object, improve detection efficiency.
Description
Technical field
This application involves POWER SYSTEM STATE detection technique fields, more particularly to a kind of POWER SYSTEM STATE detection side
Method, device, computer equipment and storage medium.
Background technology
With the development of POWER SYSTEM STATE detection technique, there is status of electric power detection technique.Power equipment shape
State detects the equipment operating data accumulated based on electric network information construction, is detected to the operating status of power equipment.Electric power
Condition Detection can be used for instructing the development that electric power overhaul works.
Traditional status of electric power detection method mainly according to the defective data generated in equipment running process and
Experimental data is detected the operating status of power equipment.However, testing number in traditional status of electric power detection mode
Big according to amount, detection object specific aim is poor, and working efficiency is low.
Invention content
Based on this, it is necessary in view of the above technical problems, provide a kind of status of electric power that can improve working efficiency
Detection method, device, computer equipment and storage medium.
A kind of status of electric power detection method, including:
Obtain the history data of each power equipment to be detected, wherein the history data is electricity to be detected
All operation datas recorded after the operation of power equipment investment;
The history visitation frequency of each power equipment is counted according to the history data;Wherein, the history
Visitation frequency is that user terminal accesses the power equipment to be detected within the unit interval after power equipment to be detected puts into operation
Number;
It is picked out in the power equipment according to the history visitation frequency and pays close attention to equipment, and count the emphasis
The access time distribution of equipment within a preset period of time is paid close attention to, and is distributed according to the access time and determines status of electric power.
In one embodiment, the status of electric power detection method counts each according to the history data
After the step of history visitation frequency of a power equipment, further include:
All acess control figures are drawn according to the history visitation frequency, power equipment is determined according to all acess control figures
State;Wherein, all access frequency statistical charts are using one week Monday to Sunday as ordinate, are up to 23 when with the 0 of one day
Abscissa draws Average visits daily variation diagram daily in one week according to access times in coordinates regional.
In one embodiment, the status of electric power detection method determines electricity according to all acess control figures
The step of power equipment state, including:
According to the periodic access feature of power equipment described in all acess control map analysis, periodically visited according to described
Ask that feature predicts status of electric power.
In one embodiment, the status of electric power detection method determines electricity according to all acess control figures
After the step of power equipment state, including:
Instruction is chosen by receive numerical point on all acess control figures, calls the corresponding each manufacturer of the numerical point
Equipment access times, according to the equipment access times of each manufacturer predict each manufacturer different time equipment state;
Electric power apparatus examination is instructed to work in the equipment state of different time according to each manufacturer.
In one embodiment, the status of electric power detection method, according to the history visitation frequency in institute
It states and picks out the step of paying close attention to equipment in power equipment, including:
The history visitation frequency is ranked up to obtain the ranking of each power equipment, according to the ranking in institute
It states to pick out in power equipment and pays close attention to equipment.
In one embodiment, the status of electric power detection method, according to the ranking in the power equipment
In pick out the step of paying close attention to equipment, including:
Descending arrangement is carried out to the history visitation frequency, picks out power equipment in the top, it will be in the top
Power equipment is set as paying close attention to equipment.
A kind of status of electric power detection device, including:
Acquisition module, the history data for obtaining each power equipment to be detected, wherein the history run number
According to all operation datas recorded after putting into operation for power equipment to be detected;
Statistical module, the history visitation frequency for counting each power equipment according to the history data;
Wherein, user terminal accesses described to be checked within the unit interval after the history visitation frequency puts into operation for power equipment to be detected
Survey the number of power equipment;
Choosing module pays close attention to equipment for being picked out in the power equipment according to the history visitation frequency,
And the access time distribution of equipment within a preset period of time is paid close attention to described in counting, and be distributed and determined according to the access time
Status of electric power.
In one embodiment, the status of electric power detection device further includes:
Graphics module, for drawing all acess control figures according to the history visitation frequency, according to all acess controls
Figure determines status of electric power;Wherein, all access frequency statistical charts were using one week Monday to Sunday as ordinate, with one day
0 when 23 be abscissa, coordinates regional according to access times draw different radii circle.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the processor realize following steps when executing the computer program:
Obtain the history data of each power equipment to be detected, wherein the history data is electricity to be detected
All operation datas recorded after the operation of power equipment investment;
The history visitation frequency of each power equipment is counted according to the history data;Wherein, the history
Visitation frequency is that user terminal accesses the power equipment to be detected within the unit interval after power equipment to be detected puts into operation
Number;
It is picked out in the power equipment according to the history visitation frequency and pays close attention to equipment, and count the emphasis
The access time distribution of equipment within a preset period of time is paid close attention to, and is distributed according to the access time and determines status of electric power.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor
Following steps are realized when row:
Obtain the history data of each power equipment to be detected, wherein the history data is electricity to be detected
All operation datas recorded after the operation of power equipment investment;
The history visitation frequency of each power equipment is counted according to the history data;Wherein, the history
Visitation frequency is that user terminal accesses the power equipment to be detected within the unit interval after power equipment to be detected puts into operation
Number;
It is picked out in the power equipment according to the history visitation frequency and pays close attention to equipment, and count the emphasis
The access time distribution of equipment within a preset period of time is paid close attention to, and is distributed according to the access time and determines status of electric power.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
Description of the drawings
Fig. 1 is the applied environment figure of status of electric power detection method in one embodiment;
Fig. 2 is the flow diagram of status of electric power detection method in one embodiment;
Fig. 3 is that power equipment access frequency counts schematic diagram in one embodiment;
Fig. 4 is that power equipment access frequency counts schematic diagram and equipment access time distribution map in one embodiment;
Fig. 5 is power equipment week access frequency statistics schematic diagram in one embodiment;
Fig. 6 be one embodiment in power equipment week access frequency count schematic diagram and vendor equipment access frequency statistics
Figure;
Fig. 7 is status of electric power evaluating apparatus structure diagram in one embodiment;
Fig. 8 is the internal structure chart of one embodiment Computer equipment.
Specific implementation mode
It is with reference to the accompanying drawings and embodiments, right in order to make the object, technical solution and advantage of the application be more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not
For limiting the application.
Status of electric power detection method provided by the present application, can be applied in application environment as shown in Figure 1.Its
In, terminal 101 is communicated with server 102 by network.Wherein, terminal 101 can be, but not limited to be various individual calculus
Machine, laptop, smart mobile phone, tablet computer and portable wearable device, server 102 can use independent server
The either server cluster of multiple servers composition is realized.
In one embodiment, it as shown in Fig. 2, providing a kind of status of electric power detection method, applies in this way
It illustrates, includes the following steps for server 102 in Fig. 1:
S201 obtains the history data of each power equipment to be detected, wherein history data is electricity to be detected
All operation datas recorded after the operation of power equipment investment;
In above-mentioned steps, power equipment can be main transformer, and abbreviation main transformer is main in a unit or substation
For total step-down transformer of power transmission and transformation and the core of substation.Transformer is electric locomotive traction power supply system
Core equipment, and ensure the key equipment of tractive power supply system safe and stable operation.
S202 counts the history visitation frequency of each power equipment according to history data;Wherein, history visitation frequency
User terminal accesses the number of power equipment to be detected within the unit interval after putting into operation for power equipment to be detected;
In this step, the unit interval can be one month, can also be one week, and history visitation frequency can be one month
The accessed number of interior power equipment to be detected can also be the number that power equipment to be detected is accessed in one week, Ke Yigen
Change the unit interval according to actual detection demand.
S203 is picked out in power equipment according to history visitation frequency and is paid close attention to equipment, and is counted to pay close attention to and be set
Standby access time distribution within a preset period of time, and be distributed according to access time and determine status of electric power.
In above-mentioned steps, the highest power equipment of history visitation frequency can be picked out, which is set as weight
Point concern equipment.The access time distribution of the power equipment within a preset period of time can be called out, targetedly to the electricity
Power equipment is detected.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
In one embodiment, the step of paying close attention to equipment is being picked out in power equipment according to history visitation frequency
Including:History visitation frequency is ranked up to obtain the ranking of each power equipment, is picked out in power equipment according to ranking
Pay close attention to equipment.
In the above-described embodiments, as shown in figure 3, equipment in the top can be shown on interface, it is believed that access
The risk highest that the forward equipment of frequency collating has.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
In one embodiment, it can be picked out by following steps and pay close attention to equipment:History visitation frequency is carried out
Descending arranges, and picks out power equipment in the top, is set as power equipment in the top to pay close attention to equipment.
In the above-described embodiments, power equipment in the top can be set as paying close attention to equipment, it can also be by connecing
Receive that equipment is corresponding cylindrical to be chosen operation and corresponding pay close attention to equipment within a preset period of time to call to paying close attention to
Access time distributed data, and drawing, as shown in figure 4, some in receiving Fig. 4 (a) is cylindrical choose operation when, Ke Yihui
It makes such as the access time distribution in Fig. 4 (b).It is delineated in Fig. 4 (b) from November 8,29 days to 2017 October in 2017
Equipment access time distribution map, the equipment access times of different time can be intuitively found out from time distribution map.Herein
Specific restriction is not done to the period of display.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
In one embodiment, after step S202, status of electric power can be determined by following steps:According to going through
History visitation frequency draws all acess control figures, and status of electric power is determined according to all acess control figures;Wherein, all access frequency systems
Figure is counted using one week Monday to Sunday as ordinate, using the 0 of one day up to 23 when as abscissa, it is secondary according to accessing in coordinates regional
Number draws Average visits daily variation diagram daily in one week.
In the above-described embodiments, as shown in figure 5, the equipment access frequency statistics on displaying Monday to Sunday, can count every
One week which day equipment is accessed most.According in one week daily 24 hours in Fig. 3, the par devices of each hour access
Number draws circle in coordinates regional, wherein each circular radius size is directly proportional to equipment access times.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
In one embodiment, the step of status of electric power being determined according to all acess control figures, including:It is accessed according to week
The periodic access feature for counting map analysis power equipment, predicts status of electric power according to periodic access feature.
In the above-described embodiments, the equipment access frequency statistical result that Monday to Sunday can be shown on interface, passes through
Observation and analysis to statistical chart can sum up the periodic regularity of equipment state, can according to the periodic regularity of equipment state
To instruct the service work of power equipment.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
In one embodiment, it after the step of determining status of electric power according to all acess control figures, can execute
Following steps:
Instruction is chosen by receive numerical point on all acess control figures, calls setting for the corresponding each manufacturer of the numerical point
Standby access times, according to the equipment access times of each manufacturer predict each manufacturer different time equipment state;According to each
A manufacturer instructs electric power apparatus examination to work in the equipment state of different time.
In the above-described embodiments, as shown in figure 5, can be called in circle in coordinates regional in receiving Fig. 6 (a)
The equipment access times of the corresponding each manufacturer of the circle can also draw out each of each manufacturer respectively as shown in Fig. 6 (b)
The access frequency of a equipment can intuitively show the operating status of different vendor's equipment.
Above-described embodiment is counted the history visitation frequency of each power equipment by history data, is visited according to history
It asks that the frequency is picked out in power equipment and pays close attention to equipment, and count when paying close attention to equipment access within a preset period of time
Between be distributed, and according to access time be distributed determine status of electric power, can targetedly determine detection object, improve detect
Efficiency.
It should be understood that although each step in the flow chart of Fig. 2 is shown successively according to the instruction of arrow, this
A little steps are not that the inevitable sequence indicated according to arrow executes successively.Unless expressly state otherwise herein, these steps
It executes there is no the limitation of stringent sequence, these steps can execute in other order.Moreover, at least part in Fig. 2
Step may include that either these sub-steps of multiple stages or stage are executed in synchronization to multiple sub-steps
It completes, but can execute at different times, the execution sequence in these sub-steps or stage is also not necessarily to be carried out successively,
But it can either the sub-step of other steps or at least part in stage execute in turn or alternately with other steps.
In one embodiment, as shown in fig. 7, providing a kind of status of electric power detection device, including:
Acquisition module 71, the history data for obtaining each power equipment to be detected, wherein history data
All operation datas recorded after putting into operation for power equipment to be detected;
Statistical module 72, the history visitation frequency for counting each power equipment according to history data;Wherein, it goes through
History visitation frequency is time that user terminal accesses power equipment to be detected within the unit interval after power equipment to be detected puts into operation
Number;
Choosing module 73 is paid close attention to equipment for being picked out in power equipment according to history visitation frequency, and is counted
The access time distribution of equipment within a preset period of time is paid close attention to, and is distributed according to access time and determines status of electric power.
In one embodiment, status of electric power detection device further includes:Graphics module, for accessing frequency according to history
The all acess control figures of secondary drafting, status of electric power is determined according to all acess control figures;Wherein, all access frequency statistical charts are with one
Monday to the Sunday in week is ordinate, using the 0 of one day up to 23 when as abscissa, drawn not according to access times in coordinates regional
With the circle of radius.
Specific restriction about status of electric power detection device may refer to detect above for status of electric power
The restriction of method, details are not described herein.Modules in above-mentioned status of electric power detection device can be fully or partially through
Software, hardware and combinations thereof are realized.Above-mentioned each module can be embedded in or in the form of hardware independently of the place in computer equipment
It manages in device, can also in a software form be stored in the memory in computer equipment, in order to which processor calls execution or more
The corresponding operation of modules.
The term " comprising " and " having " of the embodiment of the present invention and their any deformations, it is intended that cover non-exclusive
Including.Such as contain series of steps or the process, method, system, product or equipment of (module) unit are not limited to
The step of listing or unit, but further include the steps that optionally not listing or unit, or further include optionally for these
The intrinsic other steps of process, method, product or equipment or unit.
Referenced herein " embodiment " is it is meant that a particular feature, structure, or characteristic described can wrap in conjunction with the embodiments
It is contained at least one embodiment of the application.Each position in the description occur the phrase might not each mean it is identical
Embodiment, nor the independent or alternative embodiment with other embodiments mutual exclusion.Those skilled in the art explicitly and
Implicitly understand, embodiment described herein can be combined with other embodiments.
Referenced herein " multiple " refer to two or more."and/or", the association for describing affiliated partner are closed
System indicates may exist three kinds of relationships, for example, A and/or B, can indicate:Individualism A exists simultaneously A and B, individualism
These three situations of B.It is a kind of relationship of "or" that character "/", which typicallys represent forward-backward correlation object,.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction
Composition can be as shown in Figure 8.The computer equipment include the processor connected by system bus, memory, network interface and
Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment
Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data
Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating
The database of machine equipment is for storing status of electric power detection data.The network interface of the computer equipment is used for and outside
Terminal is communicated by network connection.To realize a kind of status of electric power detection side when the computer program is executed by processor
Method.
It will be understood by those skilled in the art that structure shown in Fig. 8, is only tied with the relevant part of application scheme
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
May include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory
And the computer program that can be run on a processor, processor realize following steps when executing computer program:
Obtain the history data of each power equipment to be detected, wherein history data is that electric power to be detected is set
It is standby put into operation after all operation datas for recording;
The history visitation frequency of each power equipment is counted according to history data;Wherein, history visitation frequency is to wait for
User terminal accesses the number of power equipment to be detected within the unit interval after detection power equipment puts into operation;
It is picked out in power equipment according to history visitation frequency and pays close attention to equipment, and counted and pay close attention to equipment pre-
If the access time distribution in the period, and be distributed according to access time and determine status of electric power.
In one embodiment, following steps are also realized when processor executes computer program:
All acess control figures are drawn according to history visitation frequency, status of electric power is determined according to all acess control figures;Its
In, all access frequency statistical charts using one week Monday to Sunday as ordinate, using the 0 of one day up to 23 when as abscissa, sitting
It marks region and draws Average visits daily variation diagram daily in one week according to access times.
In one embodiment, following steps are also realized when processor executes computer program:
According to the periodic access feature of all acess control map analysis power equipments, according to periodic access feature to electric power
Equipment state is predicted.
In one embodiment, following steps are also realized when processor executes computer program:
Instruction is chosen by receive numerical point on all acess control figures, calls setting for the corresponding each manufacturer of the numerical point
Standby access times, according to the equipment access times of each manufacturer predict each manufacturer different time equipment state;
Electric power apparatus examination is instructed to work in the equipment state of different time according to each manufacturer.
In one embodiment, following steps are also realized when processor executes computer program:
History visitation frequency is ranked up to obtain the ranking of each power equipment, is selected in power equipment according to ranking
Go out to pay close attention to equipment.
In one embodiment, following steps are also realized when processor executes computer program:
Descending arrangement is carried out to history visitation frequency, power equipment in the top is picked out, by electric power in the top
Equipment is set as paying close attention to equipment.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program realizes following steps when being executed by processor:
Obtain the history data of each power equipment to be detected, wherein history data is that electric power to be detected is set
It is standby put into operation after all operation datas for recording;
The history visitation frequency of each power equipment is counted according to history data;Wherein, history visitation frequency is to wait for
User terminal accesses the number of power equipment to be detected within the unit interval after detection power equipment puts into operation;
It is picked out in power equipment according to history visitation frequency and pays close attention to equipment, and counted and pay close attention to equipment pre-
If the access time distribution in the period, and be distributed according to access time and determine status of electric power.
In one embodiment, following steps are also realized when processor executes computer program:
All acess control figures are drawn according to history visitation frequency, status of electric power is determined according to all acess control figures;Its
In, all access frequency statistical charts using one week Monday to Sunday as ordinate, using the 0 of one day up to 23 when as abscissa, sitting
It marks region and draws Average visits daily variation diagram daily in one week according to access times.
In one embodiment, following steps are also realized when processor executes computer program:
According to the periodic access feature of all acess control map analysis power equipments, according to periodic access feature to electric power
Equipment state is predicted.
In one embodiment, following steps are also realized when processor executes computer program:
Instruction is chosen by receive numerical point on all acess control figures, calls setting for the corresponding each manufacturer of the numerical point
Standby access times, according to the equipment access times of each manufacturer predict each manufacturer different time equipment state;
Electric power apparatus examination is instructed to work in the equipment state of different time according to each manufacturer.
In one embodiment, following steps are also realized when processor executes computer program:
History visitation frequency is ranked up to obtain the ranking of each power equipment, is selected in power equipment according to ranking
Go out to pay close attention to equipment.
In one embodiment, following steps are also realized when processor executes computer program:
Descending arrangement is carried out to history visitation frequency, power equipment in the top is picked out, by electric power in the top
Equipment is set as paying close attention to equipment.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with
Instruct relevant hardware to complete by computer program, computer program can be stored in a non-volatile computer readable
It takes in storage medium, the computer program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, this Shen
Any reference to memory, storage, database or other media used in each embodiment please provided, may each comprise
Non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing
Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield is all considered to be the range of this specification record.
Above example only expresses the several embodiments of the application, the description thereof is more specific and detailed, but can not
Therefore it is construed as limiting the scope of the patent.It should be pointed out that for those of ordinary skill in the art,
Under the premise of not departing from the application design, various modifications and improvements can be made, these belong to the protection domain of the application.
Therefore, the protection domain of the application patent should be determined by the appended claims.
Claims (10)
1. a kind of status of electric power detection method, which is characterized in that including:
Obtain the history data of each power equipment to be detected, wherein the history data is that electric power to be detected is set
It is standby put into operation after all operation datas for recording;
The history visitation frequency of each power equipment is counted according to the history data;Wherein, the history accesses
The frequency is the number that user terminal accesses the power equipment to be detected within the unit interval after power equipment to be detected puts into operation;
It is picked out in the power equipment according to the history visitation frequency and pays close attention to equipment, and paid close attention to described in statistics
The access time distribution of equipment within a preset period of time, and be distributed according to the access time and determine status of electric power.
2. status of electric power detection method according to claim 1, which is characterized in that according to the history data
After the step of counting the history visitation frequency of each power equipment, further include:
All acess control figures are drawn according to the history visitation frequency, power equipment shape is determined according to all acess control figures
State;Wherein, all access frequency statistical charts are using one week Monday to Sunday as ordinate, up to 23 when are horizontal with the 0 of one day
Coordinate draws Average visits daily variation diagram daily in one week according to access times in coordinates regional.
3. status of electric power detection method according to claim 2, which is characterized in that according to all acess control figures
The step of determining status of electric power, including:
According to the periodic access feature of power equipment described in all acess control map analysis, according to periodic access spy
Sign predicts status of electric power.
4. status of electric power detection method according to claim 2, which is characterized in that according to all acess control figures
After the step of determining status of electric power, including:
Instruction is chosen by receive numerical point on all acess control figures, calls setting for the corresponding each manufacturer of the numerical point
Standby access times, according to the equipment access times of each manufacturer predict each manufacturer different time equipment state;
Electric power apparatus examination is instructed to work in the equipment state of different time according to each manufacturer.
5. status of electric power detection method according to claim 1, which is characterized in that accessing frequency according to the history
It is secondary to pick out the step of paying close attention to equipment in the power equipment, including:
The history visitation frequency is ranked up to obtain the ranking of each power equipment, according to the ranking in the electricity
It is picked out in power equipment and pays close attention to equipment.
6. status of electric power detection method according to claim 5, which is characterized in that according to the ranking in the electricity
The step of paying close attention to equipment is picked out in power equipment, including:
Descending arrangement is carried out to the history visitation frequency, power equipment in the top is picked out, by electric power in the top
Equipment is set as paying close attention to equipment.
7. a kind of status of electric power detection device, which is characterized in that including:
Acquisition module, the history data for obtaining each power equipment to be detected, wherein the history data is
All operation datas that power equipment to be detected records after putting into operation;
Statistical module, the history visitation frequency for counting each power equipment according to the history data;Wherein,
The history visitation frequency is that user terminal accesses the electricity to be detected within the unit interval after power equipment to be detected puts into operation
The number of power equipment;
Choosing module pays close attention to equipment for being picked out in the power equipment according to the history visitation frequency, and unites
The access time distribution of equipment within a preset period of time is paid close attention to described in meter, and is distributed according to the access time and is determined electric power
Equipment state.
8. status of electric power detection device according to claim 7, which is characterized in that further include:
Graphics module, it is true according to all acess control figures for drawing all acess control figures according to the history visitation frequency
Determine status of electric power;Wherein, all access frequency statistical charts are using one week Monday to Sunday as ordinate, with the 0 of one day
It is abscissa when 23, draws the circle of different radii according to access times in coordinates regional.
9. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, which is characterized in that the processor realizes any one of claim 1 to 6 institute when executing the computer program
The step of status of electric power detection method stated.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of status of electric power detection method according to any one of claims 1 to 6 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810386349.1A CN108573061B (en) | 2018-04-26 | 2018-04-26 | Power equipment state detection method and device, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810386349.1A CN108573061B (en) | 2018-04-26 | 2018-04-26 | Power equipment state detection method and device, computer equipment and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108573061A true CN108573061A (en) | 2018-09-25 |
CN108573061B CN108573061B (en) | 2020-05-12 |
Family
ID=63574327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810386349.1A Active CN108573061B (en) | 2018-04-26 | 2018-04-26 | Power equipment state detection method and device, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108573061B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102456417A (en) * | 2010-10-21 | 2012-05-16 | 中国广东核电集团有限公司 | Method and system for nuclear power equipment state monitoring |
CN103529777A (en) * | 2013-09-30 | 2014-01-22 | 中国南方电网有限责任公司调峰调频发电公司 | Method and system for automatically setting reliability data of power equipment |
US20140067295A1 (en) * | 2012-09-05 | 2014-03-06 | Apple Inc. | Tracking power states of a peripheral device |
CN103927585A (en) * | 2013-12-11 | 2014-07-16 | 江苏安方电力科技有限公司 | Method for protecting data analysis tool of reactive voltage control system |
CN105021917A (en) * | 2015-06-05 | 2015-11-04 | 中国电力科学研究院 | An electrical equipment state detection method based on an IPV6 mobile terminal and an RFID label |
CN105098790A (en) * | 2014-05-19 | 2015-11-25 | 国网上海市电力公司 | Regional power grid reactive voltage operation evaluation and early warning research system |
CN107798396A (en) * | 2017-10-23 | 2018-03-13 | 国家电网公司 | A kind of power equipment automation apparatus for examination and repair and method |
-
2018
- 2018-04-26 CN CN201810386349.1A patent/CN108573061B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102456417A (en) * | 2010-10-21 | 2012-05-16 | 中国广东核电集团有限公司 | Method and system for nuclear power equipment state monitoring |
US20140067295A1 (en) * | 2012-09-05 | 2014-03-06 | Apple Inc. | Tracking power states of a peripheral device |
CN103529777A (en) * | 2013-09-30 | 2014-01-22 | 中国南方电网有限责任公司调峰调频发电公司 | Method and system for automatically setting reliability data of power equipment |
CN103927585A (en) * | 2013-12-11 | 2014-07-16 | 江苏安方电力科技有限公司 | Method for protecting data analysis tool of reactive voltage control system |
CN105098790A (en) * | 2014-05-19 | 2015-11-25 | 国网上海市电力公司 | Regional power grid reactive voltage operation evaluation and early warning research system |
CN105021917A (en) * | 2015-06-05 | 2015-11-04 | 中国电力科学研究院 | An electrical equipment state detection method based on an IPV6 mobile terminal and an RFID label |
CN107798396A (en) * | 2017-10-23 | 2018-03-13 | 国家电网公司 | A kind of power equipment automation apparatus for examination and repair and method |
Also Published As
Publication number | Publication date |
---|---|
CN108573061B (en) | 2020-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113886752A (en) | Method, device, terminal and storage medium for calculating carbon emission intensity | |
Humayd et al. | Distribution system planning to accommodate distributed energy resources and PEVs | |
US20120240072A1 (en) | Intensity transform systems and methods | |
CN101470445A (en) | Remote monitoring system, terminal management server and terminal management server control program | |
CN112383107B (en) | Battery replacement station information display method and device, computer equipment and storage medium | |
CN104076897B (en) | A kind of information processing method and electronic equipment | |
CN116780536B (en) | Energy consumption prediction method and system based on machine learning | |
CN104965933A (en) | URL detecting task distributing method, distributor and URL detecting system | |
CN109918469A (en) | Gridding processing method and processing device | |
CN110210738A (en) | A kind of power supply reliability analysis method and its system | |
CN108446989A (en) | Service charge determines method and terminal device | |
CN109284857B (en) | Power distribution room planning method based on power distribution room plane arrangement and related equipment | |
CN104599195A (en) | Electric equipment information display method and system of electricity marketing system | |
CN108573061A (en) | Status of electric power detection method, device, computer equipment and storage medium | |
CN112527162A (en) | Schedule plan display method, device, equipment and medium applied to intelligent park | |
CN109614392A (en) | Interrupt historical data self-repairing method, device, electronic equipment and medium | |
CN107520252B (en) | Monitoring method and device of the electromagnetism oil feeding system to oil mass | |
CN108846583A (en) | The appraisal procedure and device of broadband network returns of investment | |
CN110166964A (en) | A kind of determination method and device of base station to be expanded | |
CN113780625B (en) | User electricity charge prediction method, system, terminal and storage medium | |
Zhang et al. | Multi-product dual sourcing problem with limited capacities | |
CN112230816B (en) | High-efficiency screenshot method and device, computer equipment and storage medium | |
CN114240416A (en) | Data processing method, data processing device, computer equipment and storage medium | |
JP2014093056A (en) | Electric power charge calculation device | |
CN112463051A (en) | Management method and data storage method of battery storage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200928 Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd. Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No. Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd. |