CN108549297A - A kind of server test equipment - Google Patents
A kind of server test equipment Download PDFInfo
- Publication number
- CN108549297A CN108549297A CN201810537080.2A CN201810537080A CN108549297A CN 108549297 A CN108549297 A CN 108549297A CN 201810537080 A CN201810537080 A CN 201810537080A CN 108549297 A CN108549297 A CN 108549297A
- Authority
- CN
- China
- Prior art keywords
- module
- server
- voltage
- test
- main control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0423—Input/output
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24036—Test signal generated by microprocessor, for all I-O tests
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The embodiment of the invention discloses a kind of server test equipments, including:AC input module, main control module and the AC output modules being sequentially connected electrically, the AC output modules are connect with power supply, and the AC output modules are connect with server feeder ear;The main control module is also connected with voltage detection module, temperature detecting module and shaking detection module, the voltage detection module Connection Service device each point DC voltage signal;The temperature detecting module is set to server temperature test point;The shake module is set to server shaking detection point.The embodiment of the present invention can synchronize record to the equipment performance of server in test process, provide the efficiency of server test.
Description
Technical field
The present invention relates to server technical field of measurement and test, more particularly to a kind of server test equipment.
Background technology
Either in a network or in enterprises, server is borne by the key that data are calculated, store and issued
Task will endanger the data safety of user, cause serious economic loss, therefore, server once server breaks down
Software and hardware must all have high reliability, and this requires servers in development phase, need to be directed to different operating environment, difference
System configuration is largely tested, with according to test result analysis server state, optimization design improves stability.
Server research and development test phase includes mainly pressure test and restarts test, and current server pressure test is adopted more
It is carried out with softwares such as linpack, will voluntarily start to test after carrying out parameter setting, and record the dependency number in test process
According to;Restart test and mostly use fatigue machine progress, is powered on to power-off come the related of test server to server by continual
Performance.
However, in the prior art, when pressure test and testing fatigue (restarting test), cannot be to the equipment performance of server
The record that (voltage, temperature and shake) information synchronizes, needs staff to be measured respectively by other equipment again, shadow
Server testing efficiency is rung.
Invention content
A kind of server test equipment is provided in the embodiment of the present invention, to solve server testing efficiency in the prior art
Low problem.
In order to solve the above-mentioned technical problem, the embodiment of the invention discloses following technical solutions:
The present invention provides a kind of server test equipments, including:The AC input module that is sequentially connected electrically, main control module with
And AC output modules, the AC output modules are connect with power supply, the AC output modules are connect with server feeder ear;The master
Control module is also connected with voltage detection module, temperature detecting module and shaking detection module, the voltage detection module Connection Service
Device each point DC voltage signal;The temperature detecting module is set to server temperature test point;The shake module is set to clothes
Business device shaking detection point.
Preferably, the main control module includes that signal gathering unit, data processing unit, output control unit, data are deposited
Take unit and data communication units, wherein the signal gathering unit is separately connected the voltage detection module, temperature detection mould
Block, shaking detection module and data processing unit;The data processing unit, output control unit and data storage cell
It is sequentially connected electrically;The data communication units are separately connected data processing unit and server.
Preferably, the data access unit includes E2PROM chips and SD card slot.
Preferably, the voltage detection module includes multi-channel DC voltage monitoring line, DC voltage monitoring described in every road
The voltage sample of circuit ranging from 0-12V.
Preferably, the voltage detection module includes that partial pressure circuit and voltage improve circuit.
Preferably, the temperature detecting module includes multiple temperature sensors, for the multiple test point temperature of server
Synchronous acquisition.
Preferably, the shaking detection module includes multiple jitter sensors, for the multiple test point shake letters of server
The synchronous acquisition of breath.
Preferably, the equipment further includes LCD display module, and the LCD display module is connect with the main control module.
Preferably, the equipment further includes GPRS SMS modules, and the GPRS SMS modules are connect with the main control module.
Preferably, the equipment further includes expansion connection module, and the expansion connection module is connect with the main control module.
By above technical scheme as it can be seen that AC input module, main control module and AC in the present invention by being sequentially connected electrically
Output module, introduces main control unit in the current supply circuit of server testing fatigue, then by voltage detection unit, temperature detection list
Member and shaking detection unit are connect with main control unit, can be with the voltage feelings of detection service device when carrying out testing fatigue
Condition, and can realize that pressure test is the detection to server temperature and shake in the case where being changed without equipment, it can be right
The equipment performance of server synchronizes record in test process, provides the efficiency of server test.
Description of the drawings
It is illustrated more clearly that the embodiment of the present invention or technical solution in the prior art, it below will be to embodiment or existing
Attached drawing is briefly described needed in technology description, it should be apparent that, for those of ordinary skills,
Without creative efforts, other drawings may also be obtained based on these drawings.
Fig. 1 is a kind of structural schematic diagram of server test equipment provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of another server test equipment provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of another server test equipment provided in an embodiment of the present invention.
Specific implementation mode
In order to make those skilled in the art more fully understand the technical solution in the present invention, below in conjunction with of the invention real
The attached drawing in example is applied, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described implementation
Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
The every other embodiment that technical staff is obtained without making creative work, should all belong to protection of the present invention
Range.
It is a kind of structural schematic diagram of server test equipment provided in an embodiment of the present invention referring to Fig. 1, as shown in Figure 1,
Server test equipment provided in an embodiment of the present invention, including:AC input module, main control module, AC output modules, voltage detecting
Module, temperature detecting module and shaking detection module.
AC input module, main control module and AC output modules are sequentially connected electrically, and the AC output modules are connect with power supply,
The AC output modules are connect with server feeder ear;The main control module is also connected with voltage detection module, temperature detecting module
With shaking detection module, the voltage detection module Connection Service device each point DC voltage signal;The temperature detecting module setting
In server temperature test point;The shake module is set to server shaking detection point.
AC input unit is dual-port 220V AC voltage input interface in parallel, and inside is connected respectively to AC-DC voltages and turns
Circuit and AC output modules are changed, wherein AC-DC voltage conversion circuits convert 220V AC voltage to 12V DC voltage, are passing through
DC-DC decompression transformations are crossed, for powering for test equipment inside chip.
AC output modules are independently eight port 220V AC voltage output interfaces, including relay circuit, contactor circuit,
For controlling 220V AC alternating voltages, AC power is provided for tested server.
Voltage detection module is that independent four port DC voltage monitors circuit, including partial pressure circuit, voltage conditioning circuit etc.,
Sampled voltage range 0-12V, for monitoring server builtin voltage so that test equipment judges whether server powers on success.
Temperature detecting module is that independent eight port temperatures monitor circuit, including temperature sampling circuit and conditioning circuit, is used for
Real-time monitoring server internal point temperature conditions, the temperature detecting module includes multiple temperature sensors, more for server
The synchronous acquisition of a test point temperature.
Shaking detection module be 6 axle accelerations detect circuit, it can be achieved that server is vertical, horizontal direction displacement, shake etc.
Signal monitoring, for the abnormal jitter conditions in real-time monitoring server test process, the shaking detection module includes multiple
Jitter sensor is used for the synchronous acquisition of the multiple test point wobble informations of server.
Referring to Fig. 2, for the structural schematic diagram of another server test equipment provided in an embodiment of the present invention;Such as Fig. 2 institutes
Show, the main control module includes signal gathering unit, data processing unit, output control unit, data access unit and data
Communication unit.
Main control unit is using ARM chips STM32F103RBT6 as core, for realizing the intelligent control code of test equipment,
Including signal gathering unit, data processing unit, output control unit, data access unit and data communication units, wherein institute
It states signal gathering unit and is separately connected the voltage detection module, temperature detecting module, shaking detection module and data processing
Unit;The data processing unit, output control unit and data storage cell are sequentially connected electrically;The data communication units
It is separately connected data processing unit and server.
Signal gathering unit obtains voltage detection module, the testing number of temperature detecting module and shaking detection module respectively
According to, and send it to data processing unit and handled, to treated, data export output control unit according to corresponding
It is required that being sent to different receiving unit or equipment, wherein the detection data preserved is needed to be sent to data access unit progress
It preserves.
The data access unit includes E2PROM chips and SD card slot.
Data access unit includes for standard SD card slot and E2PROM chips, SD card slot can patch random capacity SD storages
Card carries out data analysis for research and development, tester and asks for storage server test process detail parameters, Serial Port Information etc.
Topic positioning;E2PROM storage units are for storing test equipment configuration parameter.
Data communication units are RS232 interface circuit unit, can be used for connecting tested server, obtain server string in real time
Message breath is stored in SD card, is analyzed for research and development, tester.
It is the structural schematic diagram of another server test equipment provided in an embodiment of the present invention, such as Fig. 3 institutes referring to Fig. 3
Show, server test equipment provided in an embodiment of the present invention, further includes LCD display module, GPRS SMS modules and expansion interface
Module.
The LCD display module is connect with the main control module, and LCD display module is touching liquid-crystal display screen, for surveying
Try the parameter setting of equipment, the test mode real-time display lamp function of tested server.
The equipment further includes GPRS SMS modules, and the GPRS SMS modules are connect with the main control module, including
SIM900A GPRS circuits and SIM card interface circuit etc. can be used for grafting SIM card, be configured to fixation by LCD display module
Time interval or it is fixed power on-power off number and send test short message to tester, so as to tester understand in time test into
Exhibition.
The equipment further includes expansion connection module, and the expansion connection module is connect with the main control module, for that can match
Interface module is set, input port is both can be configured to, for connecting tested server CPLD or BMC I/O ports, is used for self-defined work(
It can configuration;Output port is can be configured as, for connecting external acousto-optical alarm, when test equipment detects overcurrent, overvoltage, super
Temperature etc. carries out sound-light alarm when urgent abnormal.
It is tired in server by the AC input module, main control module and the AC output modules that are sequentially connected electrically in the present invention
Main control unit is introduced in the current supply circuit of labor test, then by voltage detection unit, temperature detecting unit and shaking detection unit
It is connect with main control unit, can be with the voltage condition of detection service device when carrying out testing fatigue, and can be set being changed without
Realize that pressure test is the detection to server temperature and shake, can set server in test process in the case of standby
Standby performance synchronizes record, provides the efficiency of server test.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair
It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest range caused.
Claims (10)
1. a kind of server test equipment, which is characterized in that including:The AC input module that is sequentially connected electrically, main control module and
AC output modules, the AC output modules are connect with power supply, and the AC output modules are connect with server feeder ear;The master control
Module is also connected with voltage detection module, temperature detecting module and shaking detection module, the voltage detection module Connection Service device
Each point DC voltage signal;The temperature detecting module is set to server temperature test point;The shake module is set to service
Device shaking detection point.
2. server test equipment according to claim 1, which is characterized in that the main control module includes signal acquisition list
Member, data processing unit, output control unit, data access unit and data communication units, wherein the signal gathering unit
It is separately connected the voltage detection module, temperature detecting module, shaking detection module and data processing unit;At the data
Reason unit, output control unit and data storage cell are sequentially connected electrically;The data communication units are separately connected at data
Manage unit and server.
3. server test equipment according to claim 2, which is characterized in that the data access unit includes E2PROM
Chip and SD card slot.
4. server test equipment according to claim 1, which is characterized in that the voltage detection module includes that multichannel is straight
Voltage monitoring line is flowed, often the voltage sample ranging from 0-12V of DC voltage monitoring circuit described in road.
5. server test equipment according to claim 4, which is characterized in that the voltage detection module includes partial pressure line
Road and voltage improve circuit.
6. server test equipment according to claim 1, which is characterized in that the temperature detecting module includes multiple temperature
Sensor is spent, the synchronous acquisition of the multiple test point temperature of server is used for.
7. server test equipment according to claim 1, which is characterized in that the shaking detection module includes multiple trembles
Dynamic sensor, is used for the synchronous acquisition of the multiple test point wobble informations of server.
8. according to any server test equipments of claim 1-7, which is characterized in that the equipment further includes LCD aobvious
Show that module, the LCD display module are connect with the main control module.
9. according to any server test equipments of claim 1-7, which is characterized in that the equipment further includes GPRS short
Believe that module, the GPRS SMS modules are connect with the main control module.
10. according to any server test equipments of claim 1-7, which is characterized in that the equipment further includes extension
Interface module, the expansion connection module are connect with the main control module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810537080.2A CN108549297A (en) | 2018-05-30 | 2018-05-30 | A kind of server test equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810537080.2A CN108549297A (en) | 2018-05-30 | 2018-05-30 | A kind of server test equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108549297A true CN108549297A (en) | 2018-09-18 |
Family
ID=63511300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810537080.2A Pending CN108549297A (en) | 2018-05-30 | 2018-05-30 | A kind of server test equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108549297A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111722142A (en) * | 2020-05-24 | 2020-09-29 | 苏州浪潮智能科技有限公司 | Server power signal transmission quality detection device and method |
CN113394013A (en) * | 2021-05-18 | 2021-09-14 | 周龙珍 | Intelligent voltage transformer |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102224491A (en) * | 2008-09-22 | 2011-10-19 | Mts系统公司 | Testing machine with workflow based test procedure |
CN102411526A (en) * | 2011-12-31 | 2012-04-11 | 曙光信息产业股份有限公司 | Test method of mainboard of blade server |
CN104038604A (en) * | 2014-02-12 | 2014-09-10 | 宁波高新区捷远科技有限公司 | Portable intelligent mobile terminal mainboard performance parameter acquisition device |
CN105043699A (en) * | 2015-06-29 | 2015-11-11 | 浪潮电子信息产业股份有限公司 | Vibration and impact test method of server chassis internal and external parameters and vibration and impact test device of server chassis internal and external parameters |
CN107797005A (en) * | 2017-09-28 | 2018-03-13 | 郑州云海信息技术有限公司 | A kind of intelligent fatigue tester suitable for more PSU servers |
-
2018
- 2018-05-30 CN CN201810537080.2A patent/CN108549297A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102224491A (en) * | 2008-09-22 | 2011-10-19 | Mts系统公司 | Testing machine with workflow based test procedure |
CN102411526A (en) * | 2011-12-31 | 2012-04-11 | 曙光信息产业股份有限公司 | Test method of mainboard of blade server |
CN104038604A (en) * | 2014-02-12 | 2014-09-10 | 宁波高新区捷远科技有限公司 | Portable intelligent mobile terminal mainboard performance parameter acquisition device |
CN105043699A (en) * | 2015-06-29 | 2015-11-11 | 浪潮电子信息产业股份有限公司 | Vibration and impact test method of server chassis internal and external parameters and vibration and impact test device of server chassis internal and external parameters |
CN107797005A (en) * | 2017-09-28 | 2018-03-13 | 郑州云海信息技术有限公司 | A kind of intelligent fatigue tester suitable for more PSU servers |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111722142A (en) * | 2020-05-24 | 2020-09-29 | 苏州浪潮智能科技有限公司 | Server power signal transmission quality detection device and method |
CN111722142B (en) * | 2020-05-24 | 2022-05-10 | 苏州浪潮智能科技有限公司 | Server power signal transmission quality detection device and method |
CN113394013A (en) * | 2021-05-18 | 2021-09-14 | 周龙珍 | Intelligent voltage transformer |
CN113394013B (en) * | 2021-05-18 | 2022-06-07 | 南京博纳威电子科技有限公司 | Intelligent voltage transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107797005A (en) | A kind of intelligent fatigue tester suitable for more PSU servers | |
CN106952464A (en) | Intelligent data acqusition system and acquisition method | |
US10725519B1 (en) | Power control based on power controller configuration records | |
CN106407059A (en) | Server node testing system and method | |
CN105527878B (en) | A kind of collecting method, device and data acquire debugging system | |
CN108549297A (en) | A kind of server test equipment | |
CN104820156B (en) | A kind of Beam Detector and method | |
CN110174564A (en) | The filed detection system and its detection method of equipment for monitoring power quality access main website | |
CN106772206A (en) | Portable carrier module detector | |
CN104898070A (en) | Power supply test method and device | |
CN107229499B (en) | Master station simulation system and detection method for detecting fault terminal of power acquisition system | |
CN110418403B (en) | 35kV transformer substation data recording system and method based on wireless network | |
CN205826772U (en) | Non-intruding Fault Identification device | |
CN208539657U (en) | Become distribution intelligence control system | |
CN111324073A (en) | Machine tool detection and analysis method and analysis platform thereof | |
CN109144828A (en) | A kind of server monitoring device and monitoring method | |
CN110310502A (en) | A kind of fault self-checking system of electronic bus stop board | |
CN109686070A (en) | The automatic adjustment method of the terminal of power information acquisition system and its medium and equipment | |
CN105116359A (en) | Detecting device and detecting system for power utilization information collection terminal | |
CN211698656U (en) | Safe operation and maintenance module and intelligent compact shelf applying same | |
CN106100131B (en) | A kind of implementation method of secondary device status monitoring function | |
CN205038330U (en) | Power consumption information acquisition terminal Test device and system | |
Zezhong et al. | Remote monitoring system of lead-acid battery group based on GPRS | |
CN208999571U (en) | A kind of communication system based on GEM-90F magnetometer | |
CN107643494A (en) | A kind of memory supply network is for electric battery check device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180918 |