CN108492660A - Substation's peace arranges analogy method, device and system - Google Patents
Substation's peace arranges analogy method, device and system Download PDFInfo
- Publication number
- CN108492660A CN108492660A CN201810281618.8A CN201810281618A CN108492660A CN 108492660 A CN108492660 A CN 108492660A CN 201810281618 A CN201810281618 A CN 201810281618A CN 108492660 A CN108492660 A CN 108492660A
- Authority
- CN
- China
- Prior art keywords
- peace
- internal unit
- screen cabinet
- awaiting overhaul
- ticket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Abstract
The present invention provides a kind of substation peaces to arrange analogy method, device and system, is related to the technical field of intelligent substation, is suitable for the maintenance process of transformer station secondary system, and the substation includes multiple screen cabinets, including:Establish the structural model of Awaiting Overhaul screen cabinet;The structural model includes the type of multiple internal units and each internal unit, attribute in screen cabinet;The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket;Ticket is arranged according to the structural model and the secondary peace, and the peace for simulating the Awaiting Overhaul screen cabinet arranges process.The reliability that peace is arranged is improved, high pressure accident is effectively avoided.
Description
Technical field
The present invention relates to intelligent substation technical field, more particularly, to a kind of substation peace arrange analogy method, device and
System.
Background technology
The introducing of intelligent substation brings many technical breakthroughs, in intelligent substation to traditional substation's technology
Electrical secondary system by digitlization and information-based, to complete the basic functions such as information collection, measurement, control, protection and detection.So
And compared to traditional substation's technology, the electrical secondary system of intelligent substation has many controls, protection and detection etc. function simultaneously
It is not very intuitive.So the maintenance of secondary equipment of intelligent converting station is a problem.
Due to the high-voltage electricity of intelligent substation transmission so that be intended to carry out safety precautions before maintenance, i.e., peace is arranged.
For now, artificial experience and paper drawing are largely also relied on and is arranged to carry out peace.However, when artificial experience is insufficient,
Or when paper drawing error, the operator overhauled may be given to bring danger.
Invention content
In view of this, the purpose of the present invention is to provide substation's peaces to arrange analogy method, device and system, improves peace and arrange
Reliability, effectively avoid high pressure accident.
In a first aspect, an embodiment of the present invention provides a kind of substation peaces to arrange analogy method, it is suitable for substation secondary system
The maintenance process of system, the substation include multiple screen cabinets, including:Establish the structural model of Awaiting Overhaul screen cabinet;The structure mould
Type includes the type of multiple internal units and each internal unit, attribute in screen cabinet;Each inside in Awaiting Overhaul screen cabinet is obtained to set
Standby secondary peace arranges ticket;Ticket is arranged according to the structural model and the secondary peace, and the peace for simulating the Awaiting Overhaul screen cabinet arranges process.
With reference to first aspect, an embodiment of the present invention provides the first possible embodiments of first aspect, wherein
The structural model for establishing Awaiting Overhaul screen cabinet, including:By parsing SCD configuration files, Awaiting Overhaul screen cabinet is obtained
In internal unit;According to the internal unit in the Awaiting Overhaul screen cabinet, the structural model of Awaiting Overhaul screen cabinet internal unit is established.
With reference to first aspect, an embodiment of the present invention provides second of possible embodiments of first aspect, wherein
The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket, including:The Awaiting Overhaul is determined one by one
Shield the interval belonging to each internal unit in cabinet;Interval belonging to internal unit obtains in each in Awaiting Overhaul screen cabinet
The secondary peace of portion's equipment arranges ticket.
With reference to first aspect, an embodiment of the present invention provides the third possible embodiments of first aspect, wherein
Interval belonging to internal unit, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arrange ticket, including:
Judge that the interval belonging to internal unit whether there is in peace arranges ticket data library one by one;The peace arrange record in ticket data library it is internal
Facility information, the internal unit information includes interval belonging to internal unit and the corresponding secondary peace of internal unit arranges ticket;Such as
Fruit is, then the secondary peace that each internal unit in Awaiting Overhaul screen cabinet is obtained in arranging ticket data library from the peace arranges ticket.
With reference to first aspect, an embodiment of the present invention provides the 4th kind of possible embodiments of first aspect, wherein
After judging the interval belonging to internal unit with the presence or absence of the step in ticket data library is arranged in peace one by one, also wrap
It includes:If it is not, then according to safety measure semanteme, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket.
Second aspect, the embodiment of the present invention also provide a kind of substation peace and arrange simulator, are suitable for substation secondary system
The maintenance process of system, the substation include multiple screen cabinets, including:Module is established, the structure mould for establishing Awaiting Overhaul screen cabinet
Type;The structural model includes the type of multiple internal units and each internal unit, attribute in screen cabinet;Acquisition module is used for
The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket;Analog module, for according to the structural model and described
Secondary peace arranges ticket, and the peace for simulating the Awaiting Overhaul screen cabinet arranges process.
In conjunction with second aspect, an embodiment of the present invention provides the first possible embodiments of second aspect, wherein
It is described to establish module, it is specifically used for:By parsing SCD configuration files, the internal unit in Awaiting Overhaul screen cabinet is obtained;
According to the internal unit in the Awaiting Overhaul screen cabinet, the structural model of Awaiting Overhaul screen cabinet internal unit is established.
In conjunction with second aspect, an embodiment of the present invention provides second of possible embodiments of second aspect, wherein
The acquisition module, is specifically used for:Between determining one by one belonging to each internal unit in the Awaiting Overhaul screen cabinet
Every;Interval belonging to internal unit, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arrange ticket.
The third aspect, the embodiment of the present invention also provide a kind of substation peace and arrange simulation system, including:Processor, memory,
The processor is connected with the memory, and the memory is for storing program;The processor is for passing through the bus
The program being stored in the memory is called, any the method for above-described embodiment is executed.
In conjunction with the third aspect, an embodiment of the present invention provides the first possible embodiments of the third aspect, wherein
Further include:Display module, the display module are connected with the processor;The display module is described for showing
The peace of simulation Awaiting Overhaul screen cabinet in processor arranges process.
The embodiment of the present invention brings following advantageous effect:By establishing the structural model of Awaiting Overhaul screen cabinet, and obtains and wait for
The secondary peace of each internal unit arranges ticket in maintenance screen cabinet;Ticket is arranged according to structural model and secondary peace, simulation Awaiting Overhaul screen cabinet
Peace arranges process to improve the reliability that peace is arranged by carrying out simulation preview in advance, effectively avoid high pressure accident.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification
It obtains it is clear that understand through the implementation of the invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and is obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is that substation provided in an embodiment of the present invention peace arranges the flow chart of analogy method;
Fig. 2 is the hum pattern of screen cabinet model provided in an embodiment of the present invention;
Fig. 3 is provided in an embodiment of the present invention to obtain secondary peace and arrange the flow chart of ticket method;
Fig. 4 is that the peace of a set of busbar protective device of simulation provided in an embodiment of the present invention arranges the schematic diagram of process;
Fig. 5 is that substation provided in an embodiment of the present invention peace arranges the structure chart of simulator.
Icon:
500- substations peace arranges simulator;510- establishes module;520- acquisition modules;530- analog modules.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention
Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
Before describing in detail to the present invention, intelligent substation is introduced first, and intelligent substation includes primary
System and electrical secondary system, primary system refer to by the power generation such as generator, power transmission sequence, transformer, breaker, transmission of electricity, power transformation, match
The system of the equipment such as electricity composition.Primary system is the main body of power supply system, is the carrier of power load, and high voltage or high current are
The main feature of primary system.Electrical secondary system is by relay protection, safety automation control, system communication, dispatching automation, DCS
The system of the compositions such as (Distributed Control System, dcs) automatic control system.Due to secondary
System is mostly by digitlization and informationization, to complete the basic functions such as information collection, measurement, control, protection and detection.Institute
With the electrical secondary system maintenance in intelligent substation becomes the problem for introducing intelligent substation.
Presently, artificial experience and paper drawing are largely also relied on and is arranged to carry out peace.However, working as artificial experience
When deficiency or paper drawing malfunction, the operator overhauled may be given to bring danger.Based on this, the present invention is implemented
A kind of substation peace that example provides arranges analogy method, device and system, arranges simulation side to substation's peace of the present invention first below
Method describes in detail.
Embodiment one:
For ease of understanding the present embodiment, a kind of substation disclosed in first embodiment of the invention peace arranges simulation side
Method, method is suitable for the maintenance process of transformer station secondary system, first, shown in Figure 1, including:
S110:Establish the structural model of Awaiting Overhaul screen cabinet;The structural model is including multiple internal units in screen cabinet and often
The type of a internal unit, attribute.
Step S110 establishes the structural model of Awaiting Overhaul screen cabinet, including:
By parsing SCD configuration files, the internal unit in Awaiting Overhaul screen cabinet is obtained;
According to the internal unit in Awaiting Overhaul screen cabinet, the structural model of Awaiting Overhaul screen cabinet internal unit is established.
Specifically, by parsing SCD, (substation configuration description, whole station system are matched
Set file) it can determine the real equipment information of whole station, equipment link information, functional information, functional loop, physical loop, object
Manage port, empty circuit, empty port and exchanger information etc..After having parsed SCD, analytically extracts and wait in complete SCD file
Each facility information in maintenance screen cabinet, each facility information include soft pressing plate, virtual terminator etc. control loop letter inside equipment
Breath completes the structural model of Awaiting Overhaul screen cabinet according to each equipment in the Awaiting Overhaul screen cabinet extracted.
In conjunction with shown in Fig. 2, the screen cabinet model being had built up Fig. 2 shows one, wherein in structural model, including screen
Number, description, the cell name of cabinet shield multiple internal units in cabinet, the number of internal unit, the network port, wherein network-side
Mouthful information include:Port numbers, circuit number, cable number, type of plug, interface type, peer port number, opposite equip., description.
Shielding cabinet model further includes:It is spaced apart, hard pressing plate, loop terminals, wherein be spaced apart including number, description, associate device.Hard pressure
Plate includes:The type of number, type, description, associate device, hard pressing plate includes:Function pressing plate:1- overhauls pressing plate, the outlets 2- pressure
Plate.Loop terminals include:Number, type, description, associated apparatus, wherein the type of loop terminals can be:0-PT terminals;1-
CT terminals.
S120:The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket.
In conjunction with shown in Fig. 3, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket, including:
S210:The interval belonging to each internal unit in Awaiting Overhaul screen cabinet is determined one by one;
Interval belonging to internal unit, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arrange ticket.
Further, the interval belonging to internal unit obtains the secondary peace of each internal unit in Awaiting Overhaul screen cabinet
Arrange ticket, including:
S220:Judge that the interval belonging to internal unit whether there is in peace arranges ticket data library one by one;Peace arranges ticket data library
Middle record internal unit information, internal unit information include that interval belonging to internal unit and the corresponding secondary peace of internal unit are arranged
Ticket;If it is, S230 is executed, if it is not, then executing S240.
S230:The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet in ticket data library is arranged to arrange ticket from peace.
S240:According to safety measure semanteme, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket.
Specifically, when being maintenance object to shield cabinet, each equipment actually in maintenance screen cabinet, in shielding cabinet
In the maintenance process of each equipment, each equipment has the specific secondary peace of oneself to arrange ticket, so, it is set obtaining Awaiting Overhaul
Standby secondary peace arrange ticket when, the secondary peace for actually obtaining all devices in Awaiting Overhaul equipment arranges ticket.It is secondary for how to obtain
Peace arranges ticket, specifically, first, obtains the interval belonging to Awaiting Overhaul equipment, judges that its interval whether there is and arranges ticket data in peace
In library, peace arranges and records internal unit information in ticket data library here, internal unit information include interval belonging to internal unit and
The corresponding secondary peace of internal unit arranges ticket, that is to say, that judge its Awaiting Overhaul equipment whether had it is overhauling, be recorded in peace
It arranges in ticket data library, concrete mode is by arranging interval belonging to the associated internal unit of ticket with secondary peace, if peace arranges ticket
Have relevant device in database, then also just there is corresponding peace to arrange ticket, then extract corresponding peace in directly arranging ticket data library from peace
It arranges ticket to arrange ticket as the secondary peace of Awaiting Overhaul equipment, if peace arranges in ticket data library and do not have corresponding peace and arrange ticket, needs root
According to safety measure semanteme, the secondary peace for obtaining Awaiting Overhaul equipment arranges ticket.
Wherein, according to safety measure semanteme, the secondary peace for obtaining Awaiting Overhaul equipment arranges the mode of ticket, Ke Yiwei, according to language
The logical semantics of each real-time objects of justice carry out intelligent Matching with modeled substation data object.Such as:Typical case is pacified
In full measure:" [start failure protection] of [route protection] to [bus protection] " matching is " [A covers route protection] is to [A covers busbar
Protection] [1 failure GOOSE of starting switch sends soft pressing plate] ".
If according to safety measure semanteme, the secondary peace that still cannot obtain Awaiting Overhaul equipment arranges ticket, then can generate people
Work input interface, in such a way that technical staff inputs, the secondary peace for obtaining Awaiting Overhaul equipment arranges ticket.Meanwhile extraction is artificial defeated
The feature of the secondary peace mistake ticket entered, establishes new semanteme, is added in safety measure semanteme, as using next time.Here, lead to
The peace added of mode for crossing technical staff's input arranges ticket, can be a safety measure project, can also be that entire peace arranges ticket.
In addition, system integration SCD management and control functions, it is ensured that it is correct to generate secondary peace and arrange the basis of ticket, in conjunction with secondary peace
It arranges ticket create-rule to realize that the guaranteed secondary peace of correctness arranges ticket, secondary service personnel, then secondary peace is supplied to arrange and executed
After journey, using implementing result as maintenance process document, SCD systems are uploaded to, form a set of closed loop flow.
S130:Ticket is arranged according to structural model and secondary peace, and the peace of simulation Awaiting Overhaul screen cabinet arranges process.
Specifically, it is arranged according to the secondary peace of each equipment in the structural model of Awaiting Overhaul screen cabinet and Awaiting Overhaul screen cabinet
Ticket, the peace for previewing an Awaiting Overhaul screen cabinet in advance arrange process, and displaying peace arranges implementation result in advance, is conducive to secondary service work people
Member is familiar with its action by vivid dynamic demonstration simulation process, improves the reliability that peace is arranged, effectively avoids high pressure
Accident.
In some optional embodiments, by during preview, process certification can be arranged successfully peace will be simulated
For green, can will the peace of simulation failure to arrange process certification be red so that it is convenient to staff searches error items in time, correct
Peace arranges ticket, to avoid high pressure accident.
In conjunction with shown in Fig. 4, simulation 220KV first sets busbar protective device, 220KVXXX circuit first set bus protections dress
Set, the peace of 220KVXXX circuit first set intelligent terminals arranges process, can be by the way that Dynamic Display process and result be arranged automatically.Example
Such as:Preview soft pressing plate by put into become to exit, quantity of state displacement flicker, mouse automated procedure tracking etc. dynamic process.Such as
Shown in Fig. 4, it is for input state that soft pressing plate is horizontally disposed, and soft pressing plate is sideling placed as soft pressing plate from the horizontal by certain angle
Exit state.
Embodiment two:
In conjunction with shown in Fig. 5, the embodiment of the present invention also provides a kind of substation peace and arranges simulator 500, is suitable for substation
The maintenance process of electrical secondary system, substation include multiple screen cabinets, including:Establish module 510, acquisition module 520, analog module
530。
Wherein, module 510 is established, the structural model for establishing Awaiting Overhaul screen cabinet;Structural model includes multiple in screen cabinet
The type of internal unit and each internal unit, attribute.Acquisition module 520 is set for obtaining each inside in Awaiting Overhaul screen cabinet
Standby secondary peace arranges ticket.Analog module 530, for arranging ticket, the peace of simulation Awaiting Overhaul screen cabinet to arrange according to structural model and secondary peace
Process.
In some optional embodiments, module 510 is established, is specifically used for:By parsing SCD configuration files, acquisition waits for
Internal unit in maintenance screen cabinet;According to the internal unit in the Awaiting Overhaul screen cabinet, Awaiting Overhaul screen cabinet internal unit is established
Structural model.
In some optional embodiments, acquisition module 520 is specifically used for:It determines in the Awaiting Overhaul screen cabinet one by one
Interval belonging to each internal unit;Interval belonging to internal unit obtains each internal unit in Awaiting Overhaul screen cabinet
Secondary peace arranges ticket.
The technique effect and preceding method embodiment phase of the device that the embodiment of the present invention is provided, realization principle and generation
Together, to briefly describe, device embodiment part does not refer to place, can refer to corresponding contents in preceding method embodiment.
Embodiment three:
An embodiment of the present invention provides a kind of substation peaces to arrange simulation system, including:Processor, memory, the processing
Device is connected with the memory, and the memory is for storing program;The processor is used to call by the bus and store
Program in the memory executes any the method for above-described embodiment.With can be by establishing the knot of Awaiting Overhaul screen cabinet
Structure model, and the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket;Ticket is arranged according to structural model and secondary peace, mould
The peace of quasi- Awaiting Overhaul screen cabinet arranges process to improve the reliability that peace is arranged by carrying out simulation preview in advance, effectively avoid high pressure
Accident.
In some optional embodiments, further include:Display module, display module are connected with the processor;Show mould
Block is used to show that the peace of simulation Awaiting Overhaul screen cabinet in the processor to arrange process.
Further, display module includes human-computer interaction interface, includes control switch in human-computer interaction interface, control is opened
A key can be controlled by, which closing, executes method in above-mentioned processor, and the Dynamic Display simulation process in display screen.Meanwhile further including
Another control switch, control switch can peace arrange implement after the soft clamp operation that be automated go to bit check and
Peace arranges and carries out soft pressing plate state and be restored to bit check after recovery.
In addition, display module can also show the structural model for the Awaiting Overhaul screen cabinet established in the processor, exhibition is visualized
Show electrical secondary system.
Wherein, memory may include high-speed random access memory (RAM, Random Access Memory), also may be used
Can further include non-labile memory (non-volatile memory), for example, at least a magnetic disk storage.Memory is used
In storage program, the processor executes described program, the aforementioned any implementation of the embodiment of the present invention after receiving and executing instruction
The method performed by device that the stream process that example discloses defines can be applied in processor, or be realized by processor.
Processor may be a kind of IC chip, the processing capacity with signal.During realization, the above method
Each step can be completed by the instruction of the integrated logic circuit of the hardware in processor or software form.Above-mentioned processing
Device can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit
(Network Processor, abbreviation NP) etc.;It can also be digital signal processor (Digital Signal
Processing, abbreviation DSP), application-specific integrated circuit (Application Specific Integrated Circuit, referred to as
ASIC), ready-made programmable gate array (Field-Programmable Gate Array, abbreviation FPGA) or other are programmable
Logical device, discrete gate or transistor logic, discrete hardware components.It may be implemented or execute in the embodiment of the present invention
Disclosed each method, step and logic diagram.General processor can be microprocessor or the processor can also be to appoint
What conventional processor etc..The step of method in conjunction with disclosed in the embodiment of the present invention, can be embodied directly in hardware decoding processing
Device executes completion, or in decoding processor hardware and software module combination execute completion.Software module can be located at
Machine memory, flash memory, read-only memory, programmable read only memory or electrically erasable programmable memory, register etc. are originally
In the storage medium of field maturation.The storage medium is located at memory, and processor reads the information in memory, in conjunction with its hardware
The step of completing the above method.
Unless specifically stated otherwise, the opposite step of the component and step that otherwise illustrate in these embodiments, digital table
It is not limit the scope of the invention up to formula and numerical value.
In all examples being illustrated and described herein, any occurrence should be construed as merely illustrative, without
It is as limitation, therefore, other examples of exemplary embodiment can have different values.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In addition, in the description of the embodiment of the present invention unless specifically defined or limited otherwise, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to
Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" third " is used for description purposes only, and is not understood to indicate or imply relative importance.
Finally it should be noted that:Embodiment described above, only specific implementation mode of the invention, to illustrate the present invention
Technical solution, rather than its limitations, scope of protection of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those of ordinary skill in the art that:Any one skilled in the art
In the technical scope disclosed by the present invention, it can still modify to the technical solution recorded in previous embodiment or can be light
It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make
The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover the protection in the present invention
Within the scope of.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (10)
1. a kind of substation peace arranges analogy method, which is characterized in that be suitable for the maintenance process of transformer station secondary system, the change
Power station includes multiple screen cabinets, including:
Establish the structural model of Awaiting Overhaul screen cabinet;The structural model includes multiple internal units and each internal unit in screen cabinet
Type, attribute;
The secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket;
Ticket is arranged according to the structural model and the secondary peace, and the peace for simulating the Awaiting Overhaul screen cabinet arranges process.
2. according to the method described in claim 1, it is characterized in that, the structural model for establishing Awaiting Overhaul screen cabinet, including:
By parsing SCD configuration files, the internal unit in Awaiting Overhaul screen cabinet is obtained;
According to the internal unit in the Awaiting Overhaul screen cabinet, the structural model of Awaiting Overhaul screen cabinet internal unit is established.
3. according to the method described in claim 1, it is characterized in that, described obtain two of each internal unit in Awaiting Overhaul screen cabinet
Secondary peace arranges ticket, including:
The interval belonging to each internal unit in the Awaiting Overhaul screen cabinet is determined one by one;
Interval belonging to internal unit, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arrange ticket.
4. according to the method described in claim 3, it is characterized in that, interval belonging to internal unit, obtains Awaiting Overhaul screen
The secondary peace of each internal unit arranges ticket in cabinet, including:
Judge that the interval belonging to internal unit whether there is in peace arranges ticket data library one by one;The peace, which is arranged, to be recorded in ticket data library
Internal unit information, the internal unit information include that interval belonging to internal unit and the corresponding secondary peace of internal unit are arranged
Ticket;
If it is, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet in ticket data library is arranged to arrange ticket from the peace.
5. according to the method described in claim 4, it is characterized in that, judging that the interval belonging to internal unit whether there is one by one
After peace arranges the step in ticket data library, further include:
If it is not, then according to safety measure semanteme, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arranges ticket.
6. a kind of substation peace arranges simulator, which is characterized in that be suitable for the maintenance process of transformer station secondary system, the change
Power station includes multiple screen cabinets, including:
Module is established, the structural model for establishing Awaiting Overhaul screen cabinet;The structural model includes multiple internal units in screen cabinet
Type, attribute with each internal unit;
Acquisition module, the secondary peace for obtaining each internal unit in Awaiting Overhaul screen cabinet arrange ticket;
Analog module, for arranging ticket, the peace for simulating the Awaiting Overhaul screen cabinet to arrange according to the structural model and the secondary peace
Journey.
7. device according to claim 6, which is characterized in that it is described to establish module, it is specifically used for:Matched by parsing SCD
File is set, the internal unit in Awaiting Overhaul screen cabinet is obtained;According to the internal unit in the Awaiting Overhaul screen cabinet, Awaiting Overhaul screen is established
The structural model of cabinet internal unit.
8. device according to claim 6, which is characterized in that the acquisition module is specifically used for:It is waited for described in determining one by one
The interval belonging to each internal unit in maintenance screen cabinet;Interval belonging to internal unit obtains every in Awaiting Overhaul screen cabinet
The secondary peace of a internal unit arranges ticket.
9. a kind of substation peace arranges simulation system, which is characterized in that including:Processor, memory, the processor are deposited with described
Reservoir is connected,
The memory is for storing program;
The processor is used to call the program being stored in the memory by the bus, executes the claim 1-
5 any the methods.
10. system according to claim 9, which is characterized in that further include:Display module, the display module with it is described
Processor is connected;
The display module is used to show that the peace of simulation Awaiting Overhaul screen cabinet in the processor to arrange process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810281618.8A CN108492660A (en) | 2018-04-02 | 2018-04-02 | Substation's peace arranges analogy method, device and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810281618.8A CN108492660A (en) | 2018-04-02 | 2018-04-02 | Substation's peace arranges analogy method, device and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108492660A true CN108492660A (en) | 2018-09-04 |
Family
ID=63318020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810281618.8A Pending CN108492660A (en) | 2018-04-02 | 2018-04-02 | Substation's peace arranges analogy method, device and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108492660A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110866060A (en) * | 2019-11-19 | 2020-03-06 | 国网青海省电力公司检修公司 | Team management software based on SQL-Server database |
CN113435388A (en) * | 2021-07-08 | 2021-09-24 | 国网河北省电力有限公司电力科学研究院 | Automatic checking system and method for security measure tickets of transformer substation |
CN113889890B (en) * | 2021-10-13 | 2023-07-18 | 国网福建省电力有限公司检修分公司 | Method for judging overlapping safety measure of secondary screen cabinet |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105914892A (en) * | 2016-06-16 | 2016-08-31 | 国网福建省电力有限公司 | Secondary maintenance safety measure ticket system and realization method thereof |
CN106815681A (en) * | 2016-12-30 | 2017-06-09 | 国网江苏省电力公司检修分公司 | Substation secondary device closed loop management platform and its management system based on Quick Response Code |
CN107067081A (en) * | 2016-09-27 | 2017-08-18 | 国家电网公司 | Substation secondary maintenance safety measure generation method based on many object models |
CN107203648A (en) * | 2016-03-16 | 2017-09-26 | 上海毅昊信息科技股份有限公司 | One kind visualization maintenance peace arranges system and method |
CN107275963A (en) * | 2017-07-03 | 2017-10-20 | 国网天津市电力公司 | A kind of intelligent substation secondary maintenance safety measure automatic generation method |
-
2018
- 2018-04-02 CN CN201810281618.8A patent/CN108492660A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107203648A (en) * | 2016-03-16 | 2017-09-26 | 上海毅昊信息科技股份有限公司 | One kind visualization maintenance peace arranges system and method |
CN105914892A (en) * | 2016-06-16 | 2016-08-31 | 国网福建省电力有限公司 | Secondary maintenance safety measure ticket system and realization method thereof |
CN107067081A (en) * | 2016-09-27 | 2017-08-18 | 国家电网公司 | Substation secondary maintenance safety measure generation method based on many object models |
CN106815681A (en) * | 2016-12-30 | 2017-06-09 | 国网江苏省电力公司检修分公司 | Substation secondary device closed loop management platform and its management system based on Quick Response Code |
CN107275963A (en) * | 2017-07-03 | 2017-10-20 | 国网天津市电力公司 | A kind of intelligent substation secondary maintenance safety measure automatic generation method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110866060A (en) * | 2019-11-19 | 2020-03-06 | 国网青海省电力公司检修公司 | Team management software based on SQL-Server database |
CN113435388A (en) * | 2021-07-08 | 2021-09-24 | 国网河北省电力有限公司电力科学研究院 | Automatic checking system and method for security measure tickets of transformer substation |
CN113435388B (en) * | 2021-07-08 | 2022-07-19 | 国网河北省电力有限公司电力科学研究院 | Automatic check checking system and method for security measure tickets of transformer substation |
CN113889890B (en) * | 2021-10-13 | 2023-07-18 | 国网福建省电力有限公司检修分公司 | Method for judging overlapping safety measure of secondary screen cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112765258B (en) | Power distribution network graph model checking management system and method thereof | |
CN105022874B (en) | A kind of power distribution network Digital Simulation method for automatic modeling and system | |
CN105356619B (en) | A kind of Anti-maloperation for Substation method based on image recognition | |
CN104133953B (en) | Intelligent substation secondary design system | |
CN104749466B (en) | A kind of intelligent substation relay protection test system, method of testing and implementation method | |
CN108520163B (en) | Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN102591223B (en) | Intelligentized diagnostic system of substation-operation operation tickets | |
CN103761624A (en) | Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system | |
CN108345739B (en) | Method for identifying CIME and SVG model file information to realize protection fixed value on-line check function and obtain model | |
CN106296467B (en) | A method of generating operation order | |
CN108241771A (en) | Secondary device modeling method based on electromagnetic transient simulation platform | |
CN108304942A (en) | Secondary system of intelligent substation exception intelligent processing method and system | |
CN107565693B (en) | Visualization system and visualization method for optical fiber loop of intelligent substation | |
CN108492660A (en) | Substation's peace arranges analogy method, device and system | |
CN105205244B (en) | Loop Closing Operation analogue system based on electromechanics-electromagnetism hybrid simulation technology | |
CN109962443A (en) | A kind of protection maintenance peace based on SCD arranges tactful automatic creation system and method | |
CN108519929B (en) | CRC (cyclic redundancy check) method and device for bus protection configuration management and control of intelligent substation | |
CN108320104B (en) | Method for realizing protection fixed value on-line verification function obtaining model based on RelayCAC relay protection setting software | |
CN103903496A (en) | 10kV digital power distribution room simulation training system | |
CN106779508A (en) | Secondary system of intelligent substation safety measure analogue simulation and O&M control platform | |
CN102968096A (en) | Safe error proof verifying method for master station type comprehensive intelligent error proof system | |
CN109919451A (en) | Based on true power network topology analysis and security knowledge base digital electric network system and method | |
CN106600457A (en) | Transformer-substation micro-computer five-prevention main wiring diagram analysis system | |
CN104319891A (en) | Overhaul and operation maintenance device and method for intelligent substation process layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180904 |