CN108288861A - The method of wind farm group wind storage system addressing constant volume combined optimization - Google Patents

The method of wind farm group wind storage system addressing constant volume combined optimization Download PDF

Info

Publication number
CN108288861A
CN108288861A CN201810101323.8A CN201810101323A CN108288861A CN 108288861 A CN108288861 A CN 108288861A CN 201810101323 A CN201810101323 A CN 201810101323A CN 108288861 A CN108288861 A CN 108288861A
Authority
CN
China
Prior art keywords
wind
power
energy
storage system
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810101323.8A
Other languages
Chinese (zh)
Other versions
CN108288861B (en
Inventor
江岳文
温步瀛
林建新
王燕彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201810101323.8A priority Critical patent/CN108288861B/en
Publication of CN108288861A publication Critical patent/CN108288861A/en
Application granted granted Critical
Publication of CN108288861B publication Critical patent/CN108288861B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of methods of wind farm group wind storage system addressing constant volume combined optimization.This method considers the setting of Central Substations position, optimizes wind farm group Central Substations high and low pressure side transmission line capability and energy-storage system power configuration;Windage loss mistake is abandoned caused by considering grid power transmission income, Central Substations high and low pressure side power transmission engineering construction cost, energy storage power configuration cost and possible obstruction, structure can reflect that wind stores up the maximized Optimized model of association system social benefit, obtain Central Substations position, high and low pressure side transmission line capability and energy storage power configuration.Being implemented with for this method sends power transmission engineering outside conducive to wind farm group of making rational planning for, and makes full use of wind-resources, improves the social benefit of wind-powered electricity generation planning engineering.

Description

The method of wind farm group wind storage system addressing constant volume combined optimization
Technical field
The present invention relates to Electric Power Network Planning field, more particularly to a kind of wind farm group wind storage system addressing constant volume combined optimization Method.
Background technology
China's wind resource far from load center, wind farm group many places in power grid end, wind-powered electricity generation can not on-site elimination, need Mating long-distance transmission line is built, load center is delivered the power to.Wind power output power fluctuates big and energy density It is low, it is sent out to optimize wind-powered electricity generation, rationally utilizes power transmission engineering, reduce line loss, each output of wind electric field first converges to Central Substations, It is boosted and is sent out by Central Substations.The position of Central Substations directly affects each wind power plant and sends out line length to Central Substations And Central Substations are to system access point wind farm group overhead power transmission line length, and then influence wind storage joint delivery system Social benefit.In addition, in order to cope with the fluctuation of wind-powered electricity generation, wind is abandoned in reduction, and steady wind power output configures storage at Central Substations Energy facility, energy-storage system can be when load can not dissolve extra wind-powered electricity generation, and the electricity that script should be abandoned to wind stores, For load boom period when wind power output deficiency, energy-storage system discharges the electricity of storage.
In existing research or the position of fixed center substation, economically build wind storage combine send outside it is excellent Change model or consider influence of the position of Central Substations to optimization high and low pressure side transmission line of electricity capacity, does not consider that energy storage is held The influence of joint delivery system economy is stored up wind in amount configuration.For deficiency existing for the studies above, the present invention is to center power transformation Station location, wind farm group Central Substations high and low pressure side transmission line capability and energy-storage system power configuration carry out combined optimization, take into account While Central Substations position influences wind storage association system social benefit, it is also considered that wind is stored up in energy-storage system configuration to be joined Close the influence for sending project benefit outside.
Invention content
The purpose of the present invention is to provide a kind of method of wind farm group wind storage system addressing constant volume combined optimization, this method The addressing of combined optimization wind farm group wind storage association system Central Substations position, wind farm group Central Substations high and low pressure side are defeated Capacitance and energy-storage system power configuration save the investment of wind farm group power transmission engineering, increase social benefit, efficiently use wind money Source.
To achieve the above object, the technical scheme is that:A kind of wind farm group wind storage system addressing constant volume joint is excellent The method of change, includes the following steps:
Step S1:Obtain each output of wind electric field time series of wind farm group;
Step S2:Consider grid power transmission income, high and low pressure side power transmission engineering construction cost, energy storage power configuration cost And wind farm group caused by possible obstruction abandons windage loss mistake, structure can reflect that the center of wind storage association system social benefit becomes Power station positions, transmission line capability and energy storage power configuration combined optimization model, and object function is that wind stores up association system social benefit It maximizes;It is stated with mathematical function as follows:
Wherein, f indicates that wind farm group sends the annual social benefit of power transmission engineering outside;R(Pline,Ce) indicate that power transmission engineering is every The transmission of electricity income in year;Cline(Pline) indicate power transmission engineering construction cost;L(PL1,PL2,…,PLn,Pline) indicate annual and abandon Windage loss loses;CESS(Ce) indicate energy-storage system deployment cost;PL1Indicate that wind power plant 1 arrives the transmission line of electricity capacity of Central Substations;PL2 Indicate that wind power plant 2 arrives the transmission line of electricity capacity of Central Substations;PLnThe power transmission line appearances of a street of the expression wind power plant n to Central Substations Amount;PlineTransmission line of electricity capacity of the expression wind farm group Central Substations high-pressure side to electric system access point;CeIndicate energy storage most Big charge-discharge electric power;
Step S3:It solves wind storage association system and sends Optimized model outside, obtain position, the wind power plant to center of Central Substations The optimal outlets capacity of substation, the optimal transmission line capability of Central Substations to electric system, energy storage power optimized allocation plan.
In an embodiment of the present invention, in the step S2, grid power transmission income is to store up association system according to wind to send every year The electricity gone out is calculated, and is stated with mathematical function as follows:
R(Pline,Ce)=Kr(Gwind+Gfound)
Wherein, KrIndicate the charge of transmission of electricity enterprise conveying unit wind-powered electricity generation electricity;GwindExpression is not counted and energy-storage system transmission of electricity work The wind-power electricity generation electricity that journey is sent out every year;GfoundIndicate the electricity for making power transmission engineering increase submitting every year due to configuration energy-storage system Amount;
GwindAnd Gfound, stated with mathematical function as follows:
Wherein, tlineIndicate that wind farm group output power is higher than the continuous output time for sending transmission-line capacity outside;T indicates wind Electric field group total continuous output time;teWhen being higher than the continuous output of the sum of outlets capacity and energy storage power for wind farm group output Between;P (t) is that wind power plant i sends power outside in t moment.
In an embodiment of the present invention, in the step S2, high and low pressure side power transmission engineering construction cost and energy storage power are matched Be set to is calculated using the years value method such as expense, wherein high and low pressure side power transmission engineering construction cost is stated with mathematical function It is as follows:
Wherein, Kc1Indicate low-pressure side unit capacity, the power transmission engineering cost of unit length;KchIndicate that high-pressure side unit is held Amount, the power transmission engineering cost of unit length;PLiTransmission line of electricity capacity of the expression wind power plant i to Central Substations;LiIndicate wind-powered electricity generation Transmission line lengths of the field i to Central Substations;N indicates there be n wind power plant in wind farm group;L indicates that wind farm group center becomes Power station is to system access point transmission line length;TsIndicate Transmission Investment static return period;R indicates discount rate;
Energy-storage system deployment cost is stated as follows with mathematical function:
Wherein, C1Indicate energy-storage system power price;CeIndicate the power of energy-storage system configuration;TcIndicate week in energy storage service life Phase.
In an embodiment of the present invention, in the step S2, it is every according to wind storage association system that wind farm group, which abandons windage loss mistake, The wind-powered electricity generation amount of abandoning in year is calculated, and is stated with mathematical function as follows:
Wherein, KlTo abandon the unit price of windage loss mistake, calculated by wind-powered electricity generation power generation unit price;GlostiFor wind power plant i to Central Substations Transmission line of electricity capacity limit and caused by abandon wind-powered electricity generation amount year, GlostaIndicate Central Substations high-pressure side to electric system access point Transmission line of electricity capacity limit caused by abandon windage loss mistake;
GlostiAnd Glost, stated with mathematical function as follows:
Wherein, tLiIt contributes for wind power plant i and is higher than transmission line of electricity capacity PLiThe continuous output time;Pi(t) it is that wind power plant i exists T moment sends wind power output outside.
In an embodiment of the present invention, in the step S2, the constraints that object function includes has:Each wind power plant is sent outside Capacity of trunk constraint, the constraint of energy-storage system charge-discharge electric power, energy-storage system state-of-charge are sent in capacity of trunk constraint, wind farm group outside Constraints of Equilibrium, energy storage system capacity constraint and the constraint of energy-storage system energy balance;Wherein,
(a) wind power plant sends capacity of trunk constraint outside, wind farm group sends capacity of trunk constraint outside, such as with mathematical function statement Under:
0≤P(t)≤Pline
0≤Pi(t)≤PLi
(b) energy-storage system charge-discharge electric power constrains, and is stated with mathematical function as follows:
|Pe(t)|≤Ce
(c) energy-storage system state-of-charge Constraints of Equilibrium is stated as follows with mathematical function:
SOC (t)=SOC (t-1)+Pe(t)
Wherein, state-of-charge of SOC (t) the expression energy-storage systems in t moment;
(d) energy storage system capacity constrains, and is stated with mathematical function as follows:
SOC (t) < SOCmax
Wherein, SOCmaxIndicate the maximum state-of-charge that energy-storage system allows;
(e) energy-storage system energy balance constrains, and is stated with mathematical function as follows:
Compared to the prior art, the invention has the advantages that:The method of the present invention consider grid power transmission income, Windage loss is abandoned caused by Central Substations high and low pressure side power transmission engineering construction cost, energy storage power configuration cost and possible obstruction It loses, structure can reflect that wind stores up the maximized Optimized model of association system social benefit, obtain Central Substations position, high-low pressure Side transmission line capability and energy storage power configuration;Being implemented with for this method sends power transmission engineering outside conducive to wind farm group of making rational planning for, fully Using wind-resources, the social benefit of wind-powered electricity generation planning engineering is improved.
Description of the drawings
Fig. 1 is wind power plant cluster access system schematic diagram;After each output of wind electric field converges to Central Substations, become by center Power station boosting is sent out, and the position of Central Substations is sent outside each wind power plant is influenced to the distance and Central Substations of Central Substations Transmission distance, i.e. L1, L2, L3And L, optimized variable are transmission line capability P of each wind power plant to Central SubstationsL1、PL2、PL3, center Substation sends transmission line capability P outsideline, energy-storage system power configuration CeAnd the position (x, y) of Central Substations.
Fig. 2 is that any two points distance calculates schematic diagram on the earth.
Fig. 3 is each output of wind electric field time series of wind farm group.
Specific implementation mode
Technical scheme of the present invention is specifically described in 1-3 below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of method of wind farm group wind storage system addressing constant volume combined optimization of the present invention, including it is as follows Step:
Step S1:Obtain each output of wind electric field time series of wind farm group;
Step S2:Consider grid power transmission income, high and low pressure side power transmission engineering construction cost, energy storage power configuration cost And wind farm group caused by possible obstruction abandons windage loss mistake, structure can reflect that the center of wind storage association system social benefit becomes Power station positions, transmission line capability and energy storage power configuration combined optimization model, and object function is that wind stores up association system social benefit It maximizes;It is stated with mathematical function as follows:
Wherein, f indicates that wind farm group sends the annual social benefit of power transmission engineering outside;R(Pline,Ce) indicate that power transmission engineering is every The transmission of electricity income in year;Cline(Pline) indicate power transmission engineering construction cost;L(PL1,PL2,…,PLn,Pline) indicate annual and abandon Windage loss loses;CESS(Ce) indicate energy-storage system deployment cost;PL1Indicate that wind power plant 1 arrives the transmission line of electricity capacity of Central Substations;PL2 Indicate that wind power plant 2 arrives the transmission line of electricity capacity of Central Substations;PLnThe power transmission line appearances of a street of the expression wind power plant n to Central Substations Amount;PlineTransmission line of electricity capacity of the expression wind farm group Central Substations high-pressure side to electric system access point;CeIndicate energy storage most Big charge-discharge electric power;
Step S3:It solves wind storage association system and sends Optimized model outside, obtain position, the wind power plant to center of Central Substations The optimal outlets capacity of substation, the optimal transmission line capability of Central Substations to electric system, energy storage power optimized allocation plan.
Further, the step S2 specifically includes following steps:
Step S21:The electricity that association system is sent out every year, which is stored up, according to wind calculates annual transmission of electricity income.Use mathematical table It states as follows:
R(Pline,Ce)=Kr(Gwind+Gfound)
Wherein, KrIndicate the charge of transmission of electricity enterprise conveying unit wind-powered electricity generation electricity;GwindExpression is not counted and energy-storage system transmission of electricity work The wind-power electricity generation electricity that journey is sent out every year;GfoundIndicate the electricity for making power transmission engineering increase submitting every year due to configuration energy-storage system Amount.
GwindAnd Gfound, stated with mathematical function as follows:
Wherein, tlineIndicate that wind farm group output power is higher than the continuous output time for sending transmission-line capacity outside;T indicates wind Electric field group total continuous output time;teWhen being higher than the continuous output of the sum of outlets capacity and energy storage power for wind farm group output Between;P (t) is that wind power plant i sends power outside in t moment.
Step S22:Power transmission engineering construction cost is calculated according to method is worth the years such as expense, is stated with mathematical function as follows:
Wherein, Kc1Indicate low-pressure side unit capacity, the power transmission engineering cost of unit length, member/(kWh);KchIndicate high Press side unit capacity, the power transmission engineering cost of unit length, member/(kWh);PLiIndicate wind power plant i to the defeated of Central Substations Electric line capacity;LiTransmission line lengths of the expression wind power plant i to Central Substations;N indicates there be n wind-powered electricity generation in wind farm group ;L indicates wind farm group Central Substations to system access point transmission line length;TsIndicate Transmission Investment static state recycling week Phase;R indicates discount rate.
Step S23:The annual wind-powered electricity generation amount calculating of abandoning of association system, which is stored up, according to wind abandons windage loss mistake.Such as with mathematical function statement Under:
Wherein, KlTo abandon the unit price (being calculated by wind-powered electricity generation power generation unit price) of windage loss mistake;GlostiFor wind power plant i to Central Substations Transmission line of electricity capacity limit and caused by abandon wind-powered electricity generation amount year, GlostaIndicate Central Substations high-pressure side to electric system access point Transmission line of electricity capacity limit caused by abandon windage loss mistake.
GlostiAnd Glost, stated with mathematical function as follows:
Wherein, tLiIt contributes for wind power plant i and is higher than outlets capacity PLiThe continuous output time;Pi(t) be wind power plant i in t That carves sends wind power output outside.
Step S24:Energy-storage system deployment cost is calculated according to method is worth the years such as expense, is stated with mathematical function as follows:
Wherein, C1Indicate energy-storage system power price;CeIndicate the power of energy-storage system configuration;TcIndicate week in energy storage service life Phase.
Further, the constraints that the step S2 includes has:Each wind power plant sends capacity of trunk constraint, wind farm group outside Send capacity of trunk constraint, the constraint of energy-storage system charge-discharge electric power, energy-storage system state-of-charge Constraints of Equilibrium, energy storage system capacity outside Constraint and the constraint of energy-storage system energy balance;
(a) capacity of trunk constrains.It is stated with mathematical function as follows:
0≤P(t)≤Pline
0≤Pi(t)≤PLi
(b) no more than the constraint of specified charge-discharge electric power in energy-storage system operational process.It is stated with mathematical function as follows:
|Pe(t)|≤Ce
(c) energy-storage system state-of-charge Constraints of Equilibrium.It is stated with mathematical function as follows:
SOC (t)=SOC (t-1)+Pe(t)
Wherein, state-of-charge of SOC (t) the expression energy-storage systems in t moment.
(d) energy storage system capacity constrains.It is stated with mathematical function as follows:
SOC (t) < SOCmax
Wherein, SOCmaxIndicate the maximum state-of-charge that energy-storage system allows.
(e) it is that energy-storage system is enable to recycle, meets the conservation of energy, i.e. energy storage in for 24 hours in a charging-discharging cycle System capacity Constraints of Equilibrium.It is stated with mathematical function as follows:
It is specific embodiments of the present invention below.
A kind of method of wind farm group wind storage system addressing constant volume combined optimization is present embodiments provided, is specifically included following Step:
Step S1:Obtain each output of wind electric field time series of wind farm group and relevant parameter;Each wind power plant of wind farm group goes out Power time series is as shown in figure 3, design parameter is as follows:Wind farm group total installation of generating capacity is 891MW;Kr=0.06 yuan/(kW h);Kch=10000 yuan/(MWkm);Kcl=4850 yuan/(MWkm);Kl=0.6 yuan/(kWh);R=0.06;Ts=20 Year;Energy-storage system power price C1=360 yuan/kW;Energy storage life cycle Tc=10 years;The longitude coordinate x of wind power plant 11= 119.374673°E;The latitude coordinate y of wind power plant 11=25.266761 ° of N this letters are north latitude;The longitude coordinate of wind power plant 2 x2=119.3008 ° of E;The latitude coordinate y of wind power plant 22=25.19453 ° of N;The longitude coordinate x of wind power plant 33= 119.176627°E;The latitude coordinate y of wind power plant 33=25.275585 ° of N;The longitude coordinate x of grid entry point=118.682514 ° E;The latitude coordinate y of grid entry point=25.367226 ° of N.
Fig. 2 is that any two points distance calculates schematic diagram on the earth, and wherein R is the radius of the earth, on the earth any two points away from It is as follows from calculation formula:
By Δ OCD, obtain:
In conclusion:
Step S2:Establish the maximized Central Substations position addressing of wind storage association system social benefit, transmission line capability and Energy storage power configuration combined optimization model.
Step S3:Utilize the position addressing of PSO Algorithm wind farm group wind storage association system Central Substations, transmission of electricity Capacity and energy storage power configuration.It is calculated by taking each output of wind electric field curve of wind farm group as an example, a wind power is taken per 10min Value, 1 outlets capacity P of optimization wind power plantL1=227MW, 2 outlets capacity P of wind power plantL2=230MW, 3 outlets capacity P of wind power plantL3 =263MW, wind farm group outlets capacity Pline=473MW, energy storage configure power Ce=237MW, Central Substations latitude and longitude coordinates (119.1810 ° of E, 25.1838 ° of N), L1=22.5km, L2=13.7km, L3=4.4km, L=57.5km, comprehensive income f= 2.10 hundred million yuan, be maximum value.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.

Claims (5)

1. a kind of method of wind farm group wind storage system addressing constant volume combined optimization, which is characterized in that include the following steps:
Step S1:Obtain each output of wind electric field time series of wind farm group;
Step S2:Consider grid power transmission income, high and low pressure side power transmission engineering construction cost, energy storage power configuration cost and Wind farm group caused by possible obstruction abandons windage loss mistake, and structure can reflect the Central Substations of wind storage association system social benefit Positioning, transmission line capability and energy storage power configuration combined optimization model, object function are that wind stores up association system social benefit maximum Change;It is stated with mathematical function as follows:
Wherein, f indicates that wind farm group sends the annual social benefit of power transmission engineering outside;R(Pline,Ce) indicate that power transmission engineering is annual Transmission of electricity income;Cline(Pline) indicate power transmission engineering construction cost;L(PL1,PL2,…,PLn,Pline) indicate annual and abandon windage loss It loses;CESS(Ce) indicate energy-storage system deployment cost;PL1Indicate that wind power plant 1 arrives the transmission line of electricity capacity of Central Substations;PL2It indicates Wind power plant 2 arrives the transmission line of electricity capacity of Central Substations;PLnTransmission line of electricity capacity of the expression wind power plant n to Central Substations; PlineTransmission line of electricity capacity of the expression wind farm group Central Substations high-pressure side to electric system access point;CeIndicate that energy storage is maximum Charge-discharge electric power;
Step S3:It solves wind storage association system and sends Optimized model outside, obtain position, the wind power plant to center power transformation of Central Substations Optimal transmission line capability, the energy storage power optimized allocation plan of the optimal outlets capacity, Central Substations to electric system stood.
2. the method for wind farm group wind storage system addressing constant volume combined optimization according to claim 1, which is characterized in that institute It states in step S2, grid power transmission income is to store up the electricity that association system is sent out every year according to wind to be calculated, and uses mathematical table It states as follows:
R(Pline,Ce)=Kr(Gwind+Gfound)
Wherein, KrIndicate the charge of transmission of electricity enterprise conveying unit wind-powered electricity generation electricity;GwindExpression is not counted and energy-storage system power transmission engineering is every The wind-power electricity generation electricity that year is sent out;GfoundIndicate the electricity for making power transmission engineering increase submitting every year due to configuration energy-storage system;
GwindAnd Gfound, stated with mathematical function as follows:
Wherein, tlineIndicate that wind farm group output power is higher than the continuous output time for sending transmission-line capacity outside;T indicates wind power plant Group's total continuous output time;teIt contributes higher than the continuous output time of the sum of outlets capacity and energy storage power for wind farm group;P (t) it is that wind power plant i sends power outside in t moment.
3. the method for wind farm group wind storage system addressing constant volume combined optimization according to claim 2, which is characterized in that institute It states in step S2, high and low pressure side power transmission engineering construction cost and energy storage power configuration cost are calculated using the years value method such as expense Go out, wherein high and low pressure side power transmission engineering construction cost is stated as follows with mathematical function:
Wherein, Kc1Indicate low-pressure side unit capacity, the power transmission engineering cost of unit length;KchIndicate high-pressure side unit capacity, list The power transmission engineering cost of bit length;PLiTransmission line of electricity capacity of the expression wind power plant i to Central Substations;LiIndicate that wind power plant i is arrived The transmission line length of Central Substations;N indicates there be n wind power plant in wind farm group;L indicates that wind farm group Central Substations arrive System access point transmission line length;TsIndicate Transmission Investment static return period;R indicates discount rate;
Energy-storage system deployment cost is stated as follows with mathematical function:
Wherein, C1Indicate energy-storage system power price;CeIndicate the power of energy-storage system configuration;TcIndicate energy storage life cycle.
4. the method for wind farm group wind storage system addressing constant volume combined optimization according to claim 3, which is characterized in that institute It states in step S2, it is to store up the annual wind-powered electricity generation amount of abandoning of association system according to wind to be calculated that wind farm group, which is abandoned windage loss and lost, with mathematics letter Number is expressed as follows:
Wherein, KlTo abandon the unit price of windage loss mistake, calculated by wind-powered electricity generation power generation unit price;GlostiFor wind power plant i to the defeated of Central Substations Electric line capacity limit and caused by abandon wind-powered electricity generation amount year, GlostaIndicate Central Substations high-pressure side to the defeated of electric system access point Windage loss mistake is abandoned caused by electric line capacity limit;
GlostiAnd Glost, stated with mathematical function as follows:
Wherein, tLiIt contributes for wind power plant i and is higher than transmission line of electricity capacity PLiThe continuous output time;Pi(t) be wind power plant i in t That carves sends wind power output outside.
5. the method for wind farm group wind storage system addressing constant volume combined optimization according to claim 4, which is characterized in that institute It states in step S2, the constraints that object function includes has:Each wind power plant sends capacity of trunk constraint outside, wind farm group sends circuit outside Capacity-constrained, the constraint of energy-storage system charge-discharge electric power, the constraint of energy-storage system state-of-charge Constraints of Equilibrium, energy storage system capacity and storage It can system capacity Constraints of Equilibrium;Wherein,
(a) wind power plant sends capacity of trunk constraint outside, wind farm group sends capacity of trunk constraint outside, is stated with mathematical function as follows:
0≤P(t)≤Pline
0≤Pi(t)≤PLi
(b) energy-storage system charge-discharge electric power constrains, and is stated with mathematical function as follows:
|Pe(t)|≤Ce
(c) energy-storage system state-of-charge Constraints of Equilibrium is stated as follows with mathematical function:
SOC (t)=SOC (t-1)+Pe(t)
Wherein, state-of-charge of SOC (t) the expression energy-storage systems in t moment;
(d) energy storage system capacity constrains, and is stated with mathematical function as follows:
SOC (t) < SOCmax
Wherein, SOCmaxIndicate the maximum state-of-charge that energy-storage system allows;
(e) energy-storage system energy balance constrains, and is stated with mathematical function as follows:
CN201810101323.8A 2018-02-01 2018-02-01 Site selection and volume fixing combined optimization method for wind power plant group wind storage system Expired - Fee Related CN108288861B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810101323.8A CN108288861B (en) 2018-02-01 2018-02-01 Site selection and volume fixing combined optimization method for wind power plant group wind storage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810101323.8A CN108288861B (en) 2018-02-01 2018-02-01 Site selection and volume fixing combined optimization method for wind power plant group wind storage system

Publications (2)

Publication Number Publication Date
CN108288861A true CN108288861A (en) 2018-07-17
CN108288861B CN108288861B (en) 2021-04-27

Family

ID=62836322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810101323.8A Expired - Fee Related CN108288861B (en) 2018-02-01 2018-02-01 Site selection and volume fixing combined optimization method for wind power plant group wind storage system

Country Status (1)

Country Link
CN (1) CN108288861B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109245179A (en) * 2018-11-10 2019-01-18 东北电力大学 A kind of wind-powered electricity generation-photo-thermal based on timesharing energy complement, which is combined, sends capacity optimization method outside
CN109256816A (en) * 2018-09-11 2019-01-22 河海大学 A kind of power transmission network short-term blockage management method of transmission & distribution collaboration
CN109274121A (en) * 2018-11-15 2019-01-25 山东中车风电有限公司 A kind of wind power plant Optimization about control parameter method and system
CN109449967A (en) * 2018-09-20 2019-03-08 国网福建省电力有限公司 Wind power plant group delivery site selection and volume fixing combined optimization method considering load randomness
CN109830990A (en) * 2019-01-08 2019-05-31 南京工程学院 A kind of energy storage Optimal Configuration Method based on Congestion access containing scene
CN110071505A (en) * 2019-06-04 2019-07-30 清华大学 The power transmission network enlarging of the access containing large-scale wind power configures joint planing method with energy storage
CN110135662A (en) * 2019-06-06 2019-08-16 杭州电子科技大学 A kind of energy storage addressing constant volume Multipurpose Optimal Method for considering to reduce peak-valley difference
CN114050591A (en) * 2021-11-09 2022-02-15 福州大学 Method for optimizing voltage of offshore wind power plant booster station to realize loss reduction of power transmission project
CN116384049A (en) * 2023-02-07 2023-07-04 国网甘肃省电力公司经济技术研究院 Wind-solar power generation centralized outgoing channel capacity opportunity constraint optimization method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710703A (en) * 2009-11-20 2010-05-19 东北电力大学 Static optimization method of power gathering and output electric capacity of wind power station group
CN104283226A (en) * 2014-10-13 2015-01-14 东北电力大学 Photovoltaic power station group output power transmission capacity static optimization method based on stored energy
CN104751236A (en) * 2014-12-29 2015-07-01 国家电网公司 Transmission capacity and wind and fire bundling transmission optimization method of extra-high voltage channel
US20170117711A1 (en) * 2015-10-23 2017-04-27 Fujitsu Limited Operating a solar power generating system
CN106786686A (en) * 2017-01-22 2017-05-31 东北电力大学 The wind storage system coordination control strategy that many wind power plants abandon wind is cut down using energy storage straight outside

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710703A (en) * 2009-11-20 2010-05-19 东北电力大学 Static optimization method of power gathering and output electric capacity of wind power station group
CN104283226A (en) * 2014-10-13 2015-01-14 东北电力大学 Photovoltaic power station group output power transmission capacity static optimization method based on stored energy
CN104751236A (en) * 2014-12-29 2015-07-01 国家电网公司 Transmission capacity and wind and fire bundling transmission optimization method of extra-high voltage channel
US20170117711A1 (en) * 2015-10-23 2017-04-27 Fujitsu Limited Operating a solar power generating system
CN106786686A (en) * 2017-01-22 2017-05-31 东北电力大学 The wind storage system coordination control strategy that many wind power plants abandon wind is cut down using energy storage straight outside

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
BUYING WEN等: "Wind-storage combined system optimization model considering correlation of wind speed", 《IEEE》 *
杨玉龙等: "基于储能系统提高风电外送能力的经济性研究", 《储能科学与技术》 *
穆永铮等: "汇集站和集群中心站分级协调的风场群接入系统优化规划", 《中国电机工程学报》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109256816A (en) * 2018-09-11 2019-01-22 河海大学 A kind of power transmission network short-term blockage management method of transmission & distribution collaboration
CN109256816B (en) * 2018-09-11 2021-09-07 河海大学 Transmission network short-term blocking management method with transmission and distribution coordination
CN109449967A (en) * 2018-09-20 2019-03-08 国网福建省电力有限公司 Wind power plant group delivery site selection and volume fixing combined optimization method considering load randomness
CN109449967B (en) * 2018-09-20 2022-05-13 国网福建省电力有限公司 Wind power plant group delivery site selection and volume fixing combined optimization method considering load randomness
CN109245179A (en) * 2018-11-10 2019-01-18 东北电力大学 A kind of wind-powered electricity generation-photo-thermal based on timesharing energy complement, which is combined, sends capacity optimization method outside
CN109245179B (en) * 2018-11-10 2021-12-21 东北电力大学 Wind power-photo-thermal combined delivery capacity optimization method based on time-sharing energy complementation
CN109274121B (en) * 2018-11-15 2021-03-23 山东中车风电有限公司 Wind power plant control parameter optimization method and system
CN109274121A (en) * 2018-11-15 2019-01-25 山东中车风电有限公司 A kind of wind power plant Optimization about control parameter method and system
CN109830990A (en) * 2019-01-08 2019-05-31 南京工程学院 A kind of energy storage Optimal Configuration Method based on Congestion access containing scene
CN109830990B (en) * 2019-01-08 2022-09-20 南京工程学院 Energy storage optimization configuration method based on wind and light access contained in output resistor plug
CN110071505B (en) * 2019-06-04 2020-09-11 清华大学 Power transmission network extension and energy storage configuration combined planning method with large-scale wind power access
CN110071505A (en) * 2019-06-04 2019-07-30 清华大学 The power transmission network enlarging of the access containing large-scale wind power configures joint planing method with energy storage
CN110135662B (en) * 2019-06-06 2021-04-20 杭州电子科技大学 Energy storage site selection constant volume multi-objective optimization method considering reduction of peak-valley difference
CN110135662A (en) * 2019-06-06 2019-08-16 杭州电子科技大学 A kind of energy storage addressing constant volume Multipurpose Optimal Method for considering to reduce peak-valley difference
CN114050591A (en) * 2021-11-09 2022-02-15 福州大学 Method for optimizing voltage of offshore wind power plant booster station to realize loss reduction of power transmission project
CN114050591B (en) * 2021-11-09 2024-01-30 福州大学 Method for reducing loss of power transmission engineering by optimizing voltage of offshore wind farm booster station
CN116384049A (en) * 2023-02-07 2023-07-04 国网甘肃省电力公司经济技术研究院 Wind-solar power generation centralized outgoing channel capacity opportunity constraint optimization method
CN116384049B (en) * 2023-02-07 2023-09-19 国网甘肃省电力公司经济技术研究院 Wind-solar power generation centralized outgoing channel capacity opportunity constraint optimization method

Also Published As

Publication number Publication date
CN108288861B (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN108288861A (en) The method of wind farm group wind storage system addressing constant volume combined optimization
CN102751728B (en) Energy management method for isolated network running mode in micro network based on load interruption model
CN103248064B (en) A kind of compound energy charging energy-storing system and method thereof
CN108446796A (en) Consider net-source-lotus coordinated planning method of electric automobile load demand response
CN106655207A (en) Power distribution network reactive power optimization system and method based on multi-data analysis
CN107069814B (en) The Fuzzy Chance Constrained Programming method and system that distribution distributed generation resource capacity is layouted
CN109948849B (en) Power distribution network frame planning method considering energy storage access
CN108110795A (en) Wind farm group sends transmission line capability and energy storage configuration combined optimization method outside
CN102664423A (en) Wind power station energy storage capacity control method based on particle swarm optimization
CN107947192A (en) A kind of optimal reactive power allocation method of droop control type isolated island micro-capacitance sensor
CN108599206A (en) The power distribution network hybrid energy-storing configuration method under power scenario is not known at high proportion
CN111049171B (en) Active power distribution network energy storage configuration method
CN108206547A (en) The method of wind hydrogen coupled electricity-generation system each unit capacity optimization
CN104538988B (en) Voltage stability regulating system for distributed power connection and control method thereof
CN107769235A (en) A kind of microgrid energy management method based on hybrid energy-storing and electric automobile
CN104810861A (en) Optimal locating and constant volume method for distributed power supply in low-voltage distribution network
CN109492824A (en) Consideration source-net-lotus multi-party interests distributing wind storage system optimization method
Gundogdu et al. Battery SOC management strategy for enhanced frequency response and day-ahead energy scheduling of BESS for energy arbitrage
CN106505608A (en) Meter and the distributed power source calculation of penetration level method of capacity of short circuit constraint
CN110021940A (en) A kind of capacitor placement optimization method based on improvement particle swarm algorithm
CN107732937B (en) Peak clipping and valley filling method for grid-connected micro-grid containing wind-light-storage-electric automobile
Ma et al. Optimal configuration of 5G base station energy storage considering sleep mechanism
CN104868468A (en) UPFC optimization configuration method based on life cycle cost
CN105071397A (en) Coordinated reactive voltage control method of different reactive compensation devices of wind power delivery
CN105262143A (en) Photovoltaic source network control method based on optimal regional economy and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210427

Termination date: 20220201

CF01 Termination of patent right due to non-payment of annual fee