CN108241906A - A kind of assembled architecture digitlization construction method based on cloud platform - Google Patents

A kind of assembled architecture digitlization construction method based on cloud platform Download PDF

Info

Publication number
CN108241906A
CN108241906A CN201810025706.1A CN201810025706A CN108241906A CN 108241906 A CN108241906 A CN 108241906A CN 201810025706 A CN201810025706 A CN 201810025706A CN 108241906 A CN108241906 A CN 108241906A
Authority
CN
China
Prior art keywords
construction
digitlization
assembled
cloud platform
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810025706.1A
Other languages
Chinese (zh)
Inventor
周东明
王成龙
景园
赵典刚
张彦欢
刘贝
高溪溪
陆子雨
倪晓飞
王维轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201810025706.1A priority Critical patent/CN108241906A/en
Publication of CN108241906A publication Critical patent/CN108241906A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Architecture (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to urban construction to analyze prediction construction field, and in particular to a kind of assembled architecture digitlization construction method based on cloud platform.Assembled architecture is combined with cloud platform and digitlization construction, by building the model library in cloud platform and carrying out rapid modeling according to assembled architecture prefabrication demand, based on building the huge efficiently shared information resources of cloud, the digitlization construction technology of assembled architecture is finally improved in guidance, development;Construction experience, buildings model, assembly technology of each newly-built assembled architecture etc. can be entered into again in building cloud large database concept simultaneously, abundant this platform of building cloud, building cloud platform so more preferably can more efficiently instruct digitlization to construct, the development of digitlization construction can enrich building cloud platform in turn again, form benign cycle.

Description

A kind of assembled architecture digitlization construction method based on cloud platform
Technical field
The present invention relates to urban construction to analyze prediction construction field, and in particular to a kind of assembled architecture based on cloud platform Digitize construction method.
Background technology
The object for building cloud big data meaning is city, so referred to as CIM, here it is wish all data being all placed on Entire city is become a multi-C stereo, visual visible model by lane database, so as to allow entire city transparence.CIM is not Only the multi-party of existing building information is summarized, original two dimensional surface drawing is upgraded to the visual architecture information mould of multidimensional Type, it also summarizes the data such as the stream of people for depending on building, wagon flow, logistics;And merge above and below ground building information Big data platform.CIM can realize visualized management and the architectural engineering of the interior of building stream of people, logistics, wagon flow and information flow From the operation management after the deduction and delivery approved and initiate a project, design and constructed up to the buildings Life cycle such as dismounting are complete The big data acquisition of process excavates and manages use.
The concept of digitlization construction is exactly with computer, positions, automatically controls and visualization technology is by engineering construction Whole process is digitized, is information-based, is intelligent, visualization, so as to reach the target of Modern Construction construction.Digitlization is applied The realization key of work is to manage, and " digitlization construction management " is exactly by construction management digitized process, it includes engineering management Digitlization, networking, intelligence and the visualization of overall process and whole construction informations.The essence of " digitlization construction management " is exactly On the basis of digitlization is constructed, solve the problems, such as engineering construction with digitlization means globality and maximally utilise information Resource.Digitlization construction management is based on informatization and network, integrates information and data bank system with the concept in space, is One kind emphasizes knowledge sharing and newer mechanism and process, focuses on firsthand information by arranging, counting with becoming letter after analysis Breath, and information can then be converted into useful knowledge by fully using and sharing.
The advantage of assembled architecture is fairly obvious;First, it is energy saving, relative to its exterior wall internal insulation of traditional architecture object All it is that performance is more preferable with exterior insulation;Second, environmentally friendly, the few noise simultaneously of the live rubbish of factory's batch production is few;Third, it saves Template makes scene without template in factory;Fourth, short time limit, slab column all in plant produced, save assembling reinforcement, build by laying bricks or stones, The programs such as plastering.Assembled architecture is developed towards the lower and lower direction of the higher and higher cost of efficiency, thus assembled Building is also a kind of trend.At present, connectivity problem of the assembled architecture carried out energetically of country because of bean column node, construction skill The reasons such as art is not perfect are difficult to promote, and will digitize construction and the combination of building cloud and are able in assembled architecture using can be with Accelerate the development of assembled architecture, solve the problems, such as that presently, there are allow assembled architecture to be promoted.
Invention content
The technical problem to be solved is that connectivity problem of the assembled architecture because of bean column node, construction technologies for patent of the present invention The reasons such as not perfect are difficult to promote, and will digitize and construct and build the combination of cloud and application is able in assembled architecture and can add The development of fast assembled architecture, solves the problems, such as that presently, there are allow assembled architecture to be promoted.
To solve the above problems, assembled architecture is combined by the present invention with cloud platform and digitlization construction, pass through building Model library in cloud platform simultaneously carries out rapid modeling according to assembled architecture prefabrication demand, can be very fine in modeling process Ground examines construction drawing, it can be found that various problems present in construction drawing, are made a joint checkup by drawing in modeling process Problem is fed back into designer, designer modifies to construction drawing perfect, is then changed further according to perfect construction drawing Buildings model;It so can be to avoid problems various caused by construction drawing mistake, to build the huge efficiently shared information of cloud Based on resource, the digitlization construction technology of assembled architecture is finally improved in guidance, development;While each newly-built assembled architecture Construction experience, buildings model, assembly technology etc. can be entered into again in building cloud large database concept, abundant this platform of building cloud, Building cloud platform so more preferably can more efficiently instruct digitlization to construct, and digitizing the development of construction can enrich in turn again Cloud platform is built, forms benign cycle.
In order to achieve the above objectives, the present invention provides a kind of assembled architecture digitlization construction method based on cloud platform, first First, rapid modeling is carried out according to the model library built in cloud platform and according to assembled architecture prefabrication demand;It calls successively Assembled digitlization construction management relevant information in cloud is built, and combines this item purpose feature and formulates assembled digitlization construction pipe Reason plan;Assembled digitlization construction plan in cloud platform is called, and combines this project characteristic and formulates assembled digitlization construction Plan;Assembled digitlization arrangement and method for construction and the technique in cloud platform are called, corresponding assembled is formulated with reference to this project characteristic Digitize arrangement and method for construction and technique;The problem of being encountered in assembled digitlization construction in cloud platform is called, with reference to this project characteristic The problem of to being likely to occur, formulates precautionary measures;With reference to above-mentioned governing plan, construction plan, arrangement and method for construction technique and precautionary measures Construction simulation is carried out, appeal plan and solution process are improved and perfect according to the problem of discovery in construction simulation;Treat mould After plan construction is errorless, the construction drawing and model of each component are exported according to fabricated construction technique using cloud platform, simulation is applied The component construction drawing and model of work issue precasting yard, and factory produces component according to construction drawing and model, and utilizes planar bar code technology Component is numbered;Then unit in charge of construction carries out assembled digitlization construction management according to the governing plan of simulation, according to mould The construction plan and arrangement and method for construction technique of plan carry out assembled digitlization construction;Component is determined by the Quick Response Code of identification means The position of placement, then setting-out is carried out by setting-out robot, it is ensured that component placement location is accurate;All construction tasks to be done Afterwards, unit in charge of construction summarizes whole assembleds digitlization construction information of this engineering practice of construction.
Further optimization, in modeling process, the problem of finding construction drawing, is simultaneously summarized, passes through drawing Problem is fed back to designer by joint examination, designer is modified construction drawing problem, construction drawing is then improved, further according to perfect Model library of the construction drawing afterwards in building cloud carries out modeling modification, so recycles, until building up this item purpose building mould Type.So very subtly construction drawing can be examined, avoid the various problems caused by construction drawing mistake.
Further optimization, the model library in this item purpose buildings model typing building cloud platform after building up.Simultaneously The model library of abundant building cloud, convenient for using in the future.
Further optimization, by this project assembled digitlization construction management plan of formulation, this project assembled number Change the problem of corresponding assembled digitlization arrangement and method for construction of construction plan, this project and technique and this project are to being likely to occur to formulate Precautionary measures typing building cloud platform, enrich cloud platform.
Further optimization, whole assembleds digitlization construction information of this engineering practice of construction after summarizing are entered into In cloud platform, constantly update and abundant cloud platform, the two realize cycle waxing development pattern.
The beneficial effects of the present invention are:(1) building the combination of cloud and assembled digitlization construction can realize that efficiency is got over Come higher;(2) with the development of science and technology the cost of the combination cycle development of building cloud and digitlization construction also naturally can be increasingly It is low;(3) a kind of new model built cloud and be combined and recycle waxing development with assembled digitlization construction is given.
Description of the drawings
Fig. 1 is the flow diagram of the present invention.
Specific embodiment
Purpose, technical scheme and advantage to make the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiments obtained without creative efforts shall fall within the protection scope of the present invention.
Embodiment 1:
As shown in Figure 1, enterprise by build the model library in cloud platform and according to assembled architecture prefabrication demand into Row rapid modeling, a big purposes of modeling process exactly can very subtly examine construction drawing, in modeling process It can be found that various problems present in construction drawing, are made a joint checkup by drawing problem feeding back to designer, designer couple Construction drawing is modified perfect, then changes buildings model further according to perfect construction drawing;It so can be to avoid because of construction drawing mistake Various problems caused by accidentally.
After buildings model is built up, enterprise needs to formulate corresponding governing plan, construction plan, and selects rational construction Scheme and construction technology.At this point, enterprise can call assembled digitlization construction management relevant information in building cloud, and combine this The characteristics of project, formulates assembled digitlization construction management plan, and this item purpose assembled then is digitized construction management plan Cloud platform is built in typing, enriches cloud platform;Assembled digitlization construction construction plan in cloud platform is called, and combines this project system Fixed practicable assembled digitlization construction plan, it is entered into cloud platform again;Call the assembled number in cloud platform Word arrangement and method for construction and technique formulate corresponding assembled digitlization arrangement and method for construction and technique, typing cloud with reference to this project characteristic Platform;The problem of encountering in assembled digitlization construction is called in cloud platform, the problem of with reference to this project characteristic to being likely to occur Prevented in advance, typing cloud platform.It is carried out with reference to appeal governing plan, construction plan, arrangement and method for construction technique and precautionary measures Construction simulation is improved appeal plan and solution process and perfect according to the problem of discovery in construction simulation.
After construction simulation is errorless, using cloud platform according to fabricated construction technique go out each component CAD construction drawings and The component construction drawing and model of construction simulation are issued precasting yard by model, and factory produces component, and profit according to construction drawing and model Component is numbered with planar bar code technology;Then unit in charge of construction carries out assembled digitlization construction according to the governing plan of simulation Management carries out assembled digitlization construction according to the construction plan of simulation and arrangement and method for construction technique;Pass through the two dimension of identification means Code come determine component place position, then pass through setting-out robot carry out setting-out, it is ensured that component placement location is accurate.Institute to be done After having construction task, unit in charge of construction summarizes whole assembleds digitlization construction information of this engineering practice of construction, then It is entered into cloud platform, constantly updates and abundant cloud platform, the two realize cycle waxing development pattern.
Building cloud is a vast platform, its developing direction is the entire city of typing information as much as possible, is formed huge Big database;So saying that building cloud can be combined with the anything in this city from this angle, above-mentioned follow is realized Ring development model;Various abundant information are easily made peace in cloud large database concept is built simultaneously, in this way to help achieve wound New development provides endlessly internal motivation to the development in entire city.

Claims (5)

1. a kind of assembled architecture digitlization construction method based on cloud platform, it is characterised in that:First, according to building cloud platform In model library and according to assembled architecture prefabrication demand carry out rapid modeling;Assembled number in building cloud is called successively Change construction management relevant information, and combine this item purpose feature and formulate assembled digitlization construction management plan;Call cloud platform Middle assembled digitizes construction plan, and combines this project characteristic and formulate assembled digitlization construction plan;It calls in cloud platform Assembled digitlization arrangement and method for construction and technique, formulate corresponding assembled digitlization arrangement and method for construction and work with reference to this project characteristic Skill;The problem of being encountered in assembled digitlization construction in cloud platform is called, with reference to this project characteristic to being likely to occur the problem of system Determine precautionary measures;Construction simulation is carried out with reference to above-mentioned governing plan, construction plan, arrangement and method for construction technique and precautionary measures, according to Appeal plan and solution process are improved the problem of discovery in construction simulation and perfect;After construction simulation is errorless, utilize Cloud platform exports the construction drawing and model of each component according to fabricated construction technique, by the component construction drawing and mould of construction simulation Type issues precasting yard, and factory produces component according to construction drawing and model, and component is numbered using planar bar code technology;Then Unit in charge of construction carries out assembled digitlization construction management according to the governing plan of simulation, according to the construction plan and construction party of simulation Case technique carries out assembled digitlization construction;The position of component placement is determined by the Quick Response Code of identification means, then by putting Sample robot carries out setting-out, it is ensured that component placement location is accurate;After all construction tasks to be done, unit in charge of construction is real by this engineering Whole assembleds digitlization construction information of border construction is summarized.
2. a kind of assembled architecture digitlization construction method based on cloud platform as described in claim 1, it is characterised in that: In modeling process, find construction drawing the problem of and summarized, by drawing joint examination by problem feed back to designer, Designer is modified construction drawing problem, then improves construction drawing, further according to the construction drawing after improving according to building cloud In model library carry out modeling modification, so recycle, until build up this item purpose buildings model.
3. a kind of assembled architecture digitlization construction method based on cloud platform as described in claim 1, it is characterised in that:It will The model library in this item purpose buildings model typing building cloud platform after building up.
4. a kind of assembled architecture digitlization construction method based on cloud platform as described in claim 1, it is characterised in that:It will This project assembled digitlization construction management plan of formulation, this project assembled digitlization construction plan, this project are corresponding The precautionary measures typing building cloud that the problem of assembled digitlization arrangement and method for construction and technique and this project are to being likely to occur is formulated is put down Platform.
5. a kind of assembled architecture digitlization construction method based on cloud platform as described in claim 1, it is characterised in that:It will Whole assembleds digitlization construction information of this engineering practice of construction after summarizing is entered into cloud platform.
CN201810025706.1A 2018-01-11 2018-01-11 A kind of assembled architecture digitlization construction method based on cloud platform Pending CN108241906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810025706.1A CN108241906A (en) 2018-01-11 2018-01-11 A kind of assembled architecture digitlization construction method based on cloud platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810025706.1A CN108241906A (en) 2018-01-11 2018-01-11 A kind of assembled architecture digitlization construction method based on cloud platform

Publications (1)

Publication Number Publication Date
CN108241906A true CN108241906A (en) 2018-07-03

Family

ID=62699485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810025706.1A Pending CN108241906A (en) 2018-01-11 2018-01-11 A kind of assembled architecture digitlization construction method based on cloud platform

Country Status (1)

Country Link
CN (1) CN108241906A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472074A (en) * 2018-10-30 2019-03-15 刘燕 A kind of Design of digital and virtual construction method of implementable positive construction project
CN109655021A (en) * 2019-01-31 2019-04-19 中铁四局集团第二工程有限公司 A kind of curve PC track girder construction survey method
CN109760059A (en) * 2019-02-28 2019-05-17 华中科技大学 Mechanical arm fittage planing method and building assembly method based on BIM
CN111160777A (en) * 2019-12-30 2020-05-15 河南城建学院 Real estate assembly type supply chain management system
CN111539053A (en) * 2020-04-03 2020-08-14 辽宁新欣建筑科技有限公司 BIM software-based material identification generation system and use method thereof
CN112343352A (en) * 2019-08-06 2021-02-09 湖北大成空间科技股份有限公司 Intelligent control system and control method for combined wall construction
CN114036622A (en) * 2021-11-23 2022-02-11 中建八局第二建设有限公司 BIM-based fabricated concrete building design and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170098015A1 (en) * 2009-12-18 2017-04-06 Patco, Llc Integrated construction portal
CN106779620A (en) * 2016-12-30 2017-05-31 广州市凯思软件工程有限公司 Digitized Design Platform building method based on IPD systems
CN107506907A (en) * 2017-08-02 2017-12-22 中国十七冶集团有限公司 Application of the mobile terminal based on BIM cloud platforms in construction quality inspection
CN107542161A (en) * 2017-08-23 2018-01-05 中建八局第建设有限公司 BIDA engineering of integrating technical systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170098015A1 (en) * 2009-12-18 2017-04-06 Patco, Llc Integrated construction portal
CN106779620A (en) * 2016-12-30 2017-05-31 广州市凯思软件工程有限公司 Digitized Design Platform building method based on IPD systems
CN107506907A (en) * 2017-08-02 2017-12-22 中国十七冶集团有限公司 Application of the mobile terminal based on BIM cloud platforms in construction quality inspection
CN107542161A (en) * 2017-08-23 2018-01-05 中建八局第建设有限公司 BIDA engineering of integrating technical systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙园园: "建筑工业化背景下BIM技术计划体系研究", 《中国优秀硕士论文全文数据库 经济与管理科学辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472074A (en) * 2018-10-30 2019-03-15 刘燕 A kind of Design of digital and virtual construction method of implementable positive construction project
CN109472074B (en) * 2018-10-30 2020-01-17 刘燕 Digital design and virtual construction method capable of implementing forward construction engineering
CN109655021A (en) * 2019-01-31 2019-04-19 中铁四局集团第二工程有限公司 A kind of curve PC track girder construction survey method
CN109760059A (en) * 2019-02-28 2019-05-17 华中科技大学 Mechanical arm fittage planing method and building assembly method based on BIM
CN109760059B (en) * 2019-02-28 2020-12-08 华中科技大学 Mechanical arm assembly task planning method based on BIM and building assembly method
CN112343352A (en) * 2019-08-06 2021-02-09 湖北大成空间科技股份有限公司 Intelligent control system and control method for combined wall construction
CN111160777A (en) * 2019-12-30 2020-05-15 河南城建学院 Real estate assembly type supply chain management system
CN111539053A (en) * 2020-04-03 2020-08-14 辽宁新欣建筑科技有限公司 BIM software-based material identification generation system and use method thereof
CN114036622A (en) * 2021-11-23 2022-02-11 中建八局第二建设有限公司 BIM-based fabricated concrete building design and construction method

Similar Documents

Publication Publication Date Title
CN108241906A (en) A kind of assembled architecture digitlization construction method based on cloud platform
US20220309202A1 (en) Artificial intelligence-based urban design multi-plan generation method for regulatory plot
CN110929328A (en) Concrete assembly type building construction method based on BIM
CN107423518B (en) Comprehensive pipe gallery full-line BIM collaborative design method combining Civil3D and Revit
CN111395520B (en) Prefabricated column and superposed beam deep design method based on CAD and WebGl fabricated structures
CN109509132A (en) A kind of city integrated infrastructure method based on BIM+GIS
CN101924647A (en) Local area topology rebuilding method for updating navigation road network increment
CN115330253A (en) BIM-based industrial base construction comprehensive management system and method
CN113032872A (en) BIM technology-based integrated resource management and control method for assembly type building progress plan
CN110909409A (en) BIM-based assembly type construction steel bar data generation method, device, equipment and medium
Lien et al. BIM-based steel reinforcing bar detail construction design and picking optimization
Ren et al. Research on cutting stock optimization of rebar engineering based on building information modeling and an improved particle swarm optimization algorithm
Liu et al. Research on building data acquisition methods in smart city
Zhao et al. Toward automatic calculation of construction quantity based on building information modeling
CN116070311A (en) BIM forward design method for long and large bridge
Chao et al. Research on construction quality control of prefabricated concrete bridge based on BIM technology
CN108197798A (en) A kind of assembled architecture project construction component management system
CN114547761A (en) High-precision model-based prefabricated part steel bar optimization method and system
Zhao Automatic Detection Algorithm and Simulation of Building Engineering Structural Components Based on BIM
CN108197799A (en) A kind of assembled project mobile terminal management control system
Laccone et al. Static-And Fabrication-Aware Segmented Concrete Shells Made of Post-tensioned Precast Flat Tiles
Lixiao et al. Research and development of prefabricated detailed design software based on intelligent construction
Huang et al. Intelligent Application of “Internet+” BIM Technology in Prefabricated Building Construction
Qin BIM combined intelligent computer system in precast concrete structure design with data mining integration
Ma et al. Deciphering the Key Characteristics of On-Site Industrialized Construction: Inspiration from China

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination