CN108228997A - A kind of construction management plateform system - Google Patents
A kind of construction management plateform system Download PDFInfo
- Publication number
- CN108228997A CN108228997A CN201711461442.6A CN201711461442A CN108228997A CN 108228997 A CN108228997 A CN 108228997A CN 201711461442 A CN201711461442 A CN 201711461442A CN 108228997 A CN108228997 A CN 108228997A
- Authority
- CN
- China
- Prior art keywords
- construction
- module
- data
- bim
- construction management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
- G06F21/34—User authentication involving the use of external additional devices, e.g. dongles or smart cards
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/70—Protecting specific internal or peripheral components, in which the protection of a component leads to protection of the entire computer
- G06F21/82—Protecting input, output or interconnection devices
- G06F21/83—Protecting input, output or interconnection devices input devices, e.g. keyboards, mice or controllers thereof
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/20—Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
Abstract
The invention discloses a kind of construction management plateform systems, including this body of construction management platform, soldering has design input module on circuit board in construction management platform the machine body, business exports service module and bottom module composition, design input module exports service module with business by bottom module and connect, design input module is made of designer and budgeter, meter business output service module is designed by BIM, inventory file, component designs, task scheduling, BIM exports data-interface and BIMD management compositions, the output terminal of BIM export data-interfaces connects with the input terminal of BIM export data-interfaces, bottom module is made of RevitAPI131 and component technology.This construction management plateform system, meet the BIM5D construction management softwares of domestic standard, this software uses advanced d engine, the Informatization Development requirement of unit in charge of construction can be met, it is intended that user avoids risk in the construction process, project cost is reduced, project quality is improved, improves the core competitiveness of enterprise.
Description
Technical field
The present invention relates to a kind of systems of construction management, more particularly to a kind of to be made using BIM5D construction management softwares
System software.
Background technology
In terms of BIM application software.There are many BIM softwares at present, in the market, but are mostly used for design and bidding rank
Section, the application software of construction stage are relatively deficient.Most of BIM softwares with meet individual event application based on, the high BIM of integration should
Less with system, the integrated application with project management system is even more scarcity.In addition, existing market competition and skill between software business man
Art barrier so that data integration and data difficult interface between software constrain the application and development of BIM.
In terms of BIM data standards.With the popularization and application of BIM technology, the phenomenon that data silo and difficult data exchange, is general
Store-through exists.Application and popularization of the IFC data standards in China as international standard is undesirable, and foreign standard is ground in China
Study carefully also weaker, with reference to China's architectural engineering, actually the work expanded to standard more lacks.In actual application
In, not only need the technical standard as IFC, it is also necessary to finer professional domain application standard.
In terms of BIM application models.On the one hand, the special application of BIM is more, integrates application less, and integrated, the association of BIM
Assimilation application, the application particularly combined with project management system are less;On the other hand, a perfect information model can connect
The data, process and resource of construction project life cycle different phase are connect, providing one for construction project participation each side integrates
Management with cooperate environment, but at present due to each side that takes part in building for respective interests the considerations of, be reluctant provide BIM models, no
It is willing to collaboration, is reluctant accurate and transparent, has virtually manufactured obstacle for the deep application and popularization of BIM.
In terms of the BIM talents.BIM practitioner should not only grasp BIM tool and theory, it is necessary to have corresponding engineering
Profession or practical background, not only one two BIM softwares of to master, it is often more important that the actual demand that can combine enterprise is worked out
BIM application plannings and scheme, but this compound BIM talents are quite deficient in construction enterprises of China.
Invention content
It solves the problems, such as this existing, the purpose of the present invention is to provide a kind of construction management plateform system, exists for user
It avoids risk in work progress, reduces project cost, improve project quality, improve the core competitiveness of enterprise, to solve the above-mentioned back of the body
The problem of being proposed in scape technology.
To achieve the above object, the present invention provides following technical solution:A kind of construction management plateform system is managed including construction
This body of platform, soldering has design input module, business output service module on circuit board in construction management platform the machine body
It is formed with bottom module, the design input module exports service module with business by bottom module and connect, design input mould
Block is made of designer and budgeter, business output service module designed by BIM, the design of inventory file, component, task scheduling,
BIM exports data-interface and BIMD management compositions, the input terminal phase of the output terminal and BIMD management compositions of BIM export data-interfaces
It connects, bottom module is made of RevitAPI and component technology.
Preferably, data preparation module and function module are provided in BIMD management, the output terminal of data preparation module with
The input terminal of function module connects, and data preparation module is imported by data, inventory is associated with, 3-D view and progress control form,
Function module is made of construction simulation, construction guarantor amount, report management, three-dimensional visualization and model integrated information.
Preferably, the data importing in data preparation module is connect with database, is set as distributed data according to demand
Library or centralized data base.
Preferably, the front of this body of construction management platform is equipped with control device, internal circuit board and the cabinet side of cabinet
The interface of face installation is electrically connected;The control device includes touch display screen and IC card reader, touch display screen and IC Card Readers
Device is embedded in side by side on construction management platform this body.
Preferably, interface docking third party's BIM soft projects file interface, cost checklist systems interface and financial system connect
Mouthful.
Preferably, IC card reader connects with the IC card that user holds, and IC card user obtains purview certification and user role is awarded
Power.
Another technical problem to be solved by the present invention is that provide a kind of construction management plateform system, which is characterized in that including
Following steps:
S1:After business output service module receives task delegation, entrusted information transfers to designer and budgeter, designer
Enter acquirement permission using the IC card in hand with budgeter to be operated in the software of touch display screen;
S2:Connect with BIM export data-interfaces, designer is according to requiring to be reported after being designed, then by number
BIM5D management is input to according to from BIM export data-interfaces;
S3:The data poured into are prepared by BIM5D management, progress are managed, in the progress using function module
Three-dimensional visualization, construction simulation and construction report amount convert data to simulation entity and are presented on software;
S4:The simulation entity that budgeter is presented according to data carries out estimating cost, and cost then is made report and is converged
Report;
S5:Report is checked, after there is no problem, carries out the archive of data;
Preferably, it is to realize calculating cost, further carry using model interaction inventory for budgeter in S4
High accuracy is high.
Compared with prior art, the beneficial effects of the invention are as follows:This construction management plateform system, meets domestic standard
BIM5D construction management softwares, this software use advanced d engine, can meet the Informatization Development requirement of unit in charge of construction, purport
It is avoiding risk in the construction process for user, is reducing project cost, improving project quality, improve the core competitiveness of enterprise.
Description of the drawings
Fig. 1 is the global design Organization Chart of the present invention;
Fig. 2 is the functions of modules figure of the present invention;
Fig. 3 is the overall structure figure of the present invention.
In figure:1 construction management platform this body, 11 design input modules, 111 designers, 112 budgeters, 12 business are defeated
Go out service module, 121BIM designs, the design of 122 inventory files, 123 components, 124 task schedulings, 125BIM export data-interface,
126BIM5D management, the importing of 13 bottom modules, 131RevitAPI, 132 component technologies, 2 data preparation modules, 21 data, 22 are clearly
Single association, 23 3-D views, 24 progress controls, 3 function modules, 31 construction simulations, 32 construction guarantor amounts, 33 report management, 34 3
Tie up visualization, 35 model integrated information, 4 control devices, 41 touch display screens, 42IC card reader, 5 interfaces.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
Embodiment one:
Please refer to Fig.1-3, a kind of construction management plateform system, including construction management platform this body 1, construction management platform
The front of this body 1 is equipped with control device 4, and the interface 5 that the internal circuit board of cabinet 1 is installed with 1 side of cabinet is electrically connected;Control
Device 4 processed includes touch display screen 41 and IC card reader 42, and touch display screen 41 and IC card reader 42 are embedded in construction pipe side by side
On platform this body 1, interface 5 docks third party's BIM soft projects file interface, cost checklist systems interface and financial system
Interface, main BIM modeling softwares include the Revit three-dimensionals of AUTODESK companies and build BIM soft projects file interface at present
Mould software, the Microstation under Bentley house flags etc., for the project file of different modeling softwares, correspondence is different
Interface is directed to the inventory file of the different-format of different platform for reading with display model file, cost checklist systems interface,
Need to make different interfaces to read the cost inventory file of multiple format, financial system interface BIM5D completes inventory and closes
After connection is associated with task, various report files can be generated, are settled accounts for working out, Finance Department handles solid according to clearing achievement
Determine assets and turn money work, IC card reader 42 connects with the IC card that user holds, and IC card user obtains purview certification and user role
It authorizing, system can be set to be authenticated using account number+pin mode, can also be set and is authenticated using softdog mode,
Only it could enter system after certification success, user can also be placed in institutional framework so that user right is by it in public affairs
The position of department is configured.In different project management flows, user right carries out different set according to its role or position
It puts, causes destruction or the loss of module data so as to avoid operating personnel's maloperation or malicious operation, construction management platform sheet
Soldering is made of design input module 11, business output service module 12 and bottom module 13 on 1 interior circuit board of body, and design is defeated
Enter module 11 to connect with business output service module 12 by bottom module 13, design input module 11 is by designer 111 and in advance
Calculation person 112 forms, and business exports service module 12 by BIM designs 121, inventory file 122, component design 123, task scheduling
124th, BIM exports 126 composition of data-interface 125 and BIM5D management, and the output terminal of BIM export data-interfaces 125 is managed with BIM5D
The input terminal of reason 126 connects, and bottom module 13 is made of RevitAPI131 and component technology 132, is set in BIM5D management 126
There are data preparation module 2 and function module 3, the output terminal of data preparation module 2 connects with the input terminal of function module 3, data
Data in preparation module 2 import 21 and are connect with database, are set as distributed data base or centralized data base according to demand,
Majority processing is completed on the spot;The computer of various regions is associated by data communication network, overcomes the weakness of central database:It reduces
Data transmission cost;The reliability of system is improved, local system breaks down, and other parts can also continue to work;It is each
The position of database is transparent, and the expanding data preparation module 2 of system is facilitated to import 21, inventory association 22, three-dimensional by data
View 23 and progress control 24 form, and function module 3 is by construction simulation 31, construction guarantor amount 32, report management 33, three-dimensional visualization
34 and model integrated information 35 form.
A kind of construction management plateform system, includes the following steps:
The first step:After business output service module receives task delegation, entrusted information transfers to designer and budgeter, if
Meter teacher and budgeter enter acquirement permission using the IC card in hand and are operated in the software of touch display screen;
Second step:Connect with BIM export data-interfaces, designer is according to requiring to be reported after being designed, then
Data are input to BIM5D management from BIM export data-interfaces;
Third walks:The data poured into are prepared by BIM5D management, and progress is managed, and are utilizing function module
Three-dimensional visualization, construction simulation and construction report amount are carried out, simulation entity is converted data to and is presented on software;
4th step:The simulation entity that budgeter is presented according to data carries out estimating cost, and budgeter is clear using model interaction
It is singly to realize calculating cost, further improves accuracy height, cost is then made into report and is reported;
5th step:Report is checked, after there is no problem, carries out the archive of data.
Embodiment two:
- 3 are please referred to Fig.1, a kind of construction management plateform system, advanced style of writing part is imported as all software systems,
User needs to integrate various data informations, for getting through whole flow process link, file is led after a new item engineering mesh is created
It is lead-in item is specified in the new projects of BIM5D management platforms model to enter, inventory, task dispatching file, is the various of later stage
Expanded function realization is prepared.
The association of model inventory is to realize calculating cost by model interaction inventory.Work is calculated using BIM models
Journey amount accuracy is high, is associated with that be used for after inventory calculating if cost can time that substantially reduced cost calculates.Model inventory is associated with
Be by the model of importing and corresponding inventory coding be associated, by model can with the quantities of computation model, and model and
Bill of quantities association can be realized as cross rate.And the cost in the corresponding work progress of price, it is most crucial in work progress
One of two problems.If it cannot reflect cost strictly according to the facts, then the value of entire project under construction will have a greatly reduced quality.
Three-dimensional visualization for building trade, the effect that is visually really used in construction industry be it is very big,
Such as the construction drawing often taken, only the information of each component draws expression on drawing using lines, but it is true
Positive structural form just needs construction industry participant to go voluntarily to imagine.For general simple thing, this imagination
Also it should be all right, but the construction style of construction industry was different in recent years, complex model is constantly being released, then this to depend people alone
Brain goes the thing of the imagination just rather somewhat unrealistic.So BIM provides visual thinking, people are allowed by previous line
The component of formula forms a kind of three-dimensional real object figure of three-dimensional and is illustrated in face of people;Construction industry also has design aspect to go out effect
The needs of figure, but this design sketch, which is subpackage, to carry out distinguishing the line type designed and produced out to the design sketch production team of profession
What information was made, not by the Automatic generation of information of component, lack the interactivity and feedback between isomorphic product
Property, however the visualizations mentioned of BIM be it is a kind of can be formed between isomorphic product interactive and feedback visual, built in BIM
In information model, since whole process is all visual, so visual result can not only be used for the displaying of design sketch
And the generation of report, it is often more important that, the communication, discussion, decision during Project design, construction, operation are all visual
It is carried out under state.By visualizing, make each project participant that can intuitively understand designing scheme and intention, greatly
Improve the managerial ability and communication efficiency of project.Further, the visualization agreement of model helps to pinpoint the problems early, excellent
Change design, avoid mistake and do over again, so as to reduce waste, reduce cost.
Construction simulation, that is, dynamic analog condition of construction, simulates and plays an important roll in BIM5D, passes through the construction of BIM5D
Simulation can simulate possible problems faced in practice of construction, and examine whether schedule needs to adjust from simulation, set
Meter stage, BIM can carry out simulated experiment to some things simulated in design, such as:Energy saving simulation is promptly dredged
Dissipate simulation, sunshine simulation, thermal energy conduction simulation etc.;4D simulations (threedimensional model plus item can be carried out in bidding and construction stage
Purpose development time), that is, according to the organization design of construction simulate practice of construction, so as to come determine rational arrangement and method for construction come
Guiding construction.(cost Control based on 3D models) is simulated in BIM5D, can be controlled with cost of implementation;Operation stage in later stage can be with
The simulation of the processing mode of daily emergency is simulated, such as geologist's escape simulation and fire fighter evacuate simulation etc..Fortune
With the construction simulation characteristic of BIM, when the rectifying plan design phase can find the construction stage in advance, problems that project faces
Situations such as or project is caused to delay the reason of of discovery, will can reduce the situation of progress backwardness, at the same can allow the construction stage with
The participant in planning and designing stage can adjust construction plan and schedule by construction simulation so that integrated engineering project
Quality, duration, cost etc. are greatly improved and improve.
Progress control can also be referred to as task management, be one of two core contents of BIM5D, be appointed by model interaction
Business, lays the groundwork for construction simulation.Scientific and effective project construction progress control is carried out using Gantt chart, each construction plan can
To be associated with the model to be constructed, according to the association of model and inventory, facilitate what is counted the quantities each planned and construct
Dynamic analog.
The finally establishment of construction report amount BIM databases, by establishing 5D linked databases, accurately can quickly calculate engineering
Amount, the precision and efficiency of lifting construction budget.Since the data granularity of BIM databases reaches component grade, branch can be quickly provided
Data information needed for each wire management of support project, effective lifting construction efficiency of management.Report amount of constructing is exactly quantities calculation
As a result, allowing to count the quantities of different construction times sections, the data such as construction speed and construction volume are conveniently checked and tracked.
In conclusion construction management plateform system proposed by the present invention, the BIM5D construction managements for meeting domestic standard are soft
Part, this software use advanced d engine, can meet the Informatization Development requirement of unit in charge of construction, it is intended to construct for user
It avoids risk in journey, reduces project cost, improve project quality, improve the core competitiveness of enterprise.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (8)
1. a kind of construction management plateform system, which is characterized in that including construction management platform this body (1), construction management platform
Soldering has design input module (11), business output service module (12) and bottom module (13) on this body (1) interior circuit board
Composition, the design input module (11) export service module (12) with business by bottom module (13) and connect, design input
Module (11) is made of designer (111) and budgeter (112), and business output service module (12) designs (121), clear by BIM
Monofile (122), component design (123), task scheduling (124), BIM export data-interfaces (125) and BIM5D management (126)
Composition, the input terminal that output terminal and the BIM5D of BIM export data-interfaces (125) manage (126) connect, bottom module (13) by
RevitAPI (131) and component technology (132) composition.
2. a kind of construction management plateform system as described in claim 1, it is characterised in that:It is provided in BIM5D management (126)
Data preparation module (2) and function module (3), the output terminal of data preparation module (2) and the input terminal phase of function module (3)
It connecing, data preparation module (2) imports (21), inventory association (22), 3-D view (23) and progress control (24) by data and forms,
Function module (3) measures (32), report management (33), three-dimensional visualization (34) and model integrated by construction simulation (31), construction guarantor
Information (35) forms.
3. a kind of construction management plateform system as claimed in claim 2, it is characterised in that:Number in data preparation module (2)
It is connect according to (21) are imported with database, is set as distributed data base or centralized data base according to demand.
4. a kind of construction management plateform system as described in claim 1, it is characterised in that:This body of construction management platform (1)
Front be equipped with control device (4), the internal circuit board of cabinet (1) and the interface (5) of cabinet (1) side installation are electrically connected;
The control device (4) includes touch display screen (41) and IC card reader (42);Touch display screen (41) and IC card reader (42)
It is embedded in side by side on construction management platform this body (1).
5. a kind of construction management plateform system as claimed in claim 4, it is characterised in that:Interface (5) docking third party BIM is soft
Part project file interface, cost checklist systems interface and financial system interface.
6. a kind of construction management plateform system as claimed in claim 4, it is characterised in that:IC card reader (42) is held with user
IC card connect, IC card user obtains purview certification and user role mandate.
7. a kind of construction management plateform system as described in claim 1, which is characterized in that include the following steps:
S1:After business output service module receives task delegation, entrusted information transfers to designer and budgeter, designer and pre-
Calculation person enters acquirement permission using the IC card in hand and is operated in the software of touch display screen;
S2:Connect with BIM export data-interfaces, designer according to requiring to be reported after being designed, then by data from
BIM export data-interfaces are input to BIM5D management;
S3:The data poured into are prepared by BIM5D management, and progress is managed, three-dimensional in the progress using function module
Visualization, construction simulation and construction report amount convert data to simulation entity and are presented on software;
S4:The simulation entity that budgeter is presented according to data carries out estimating cost, and cost then is made report and is reported;
S5:Report is checked, after there is no problem, carries out the archive of data.
8. a kind of construction management plateform system as claimed in claim 7, which is characterized in that utilize model for budgeter in S4
It is to realize calculating cost to be associated with inventory, further improves accuracy height.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711461442.6A CN108228997A (en) | 2017-12-28 | 2017-12-28 | A kind of construction management plateform system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711461442.6A CN108228997A (en) | 2017-12-28 | 2017-12-28 | A kind of construction management plateform system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108228997A true CN108228997A (en) | 2018-06-29 |
Family
ID=62646651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711461442.6A Pending CN108228997A (en) | 2017-12-28 | 2017-12-28 | A kind of construction management plateform system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108228997A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109145436A (en) * | 2018-08-17 | 2019-01-04 | 安徽新网讯科技发展有限公司 | One kind being used for industrial electrical equipment construction system |
CN111898186A (en) * | 2020-07-22 | 2020-11-06 | 四川省第十一建筑有限公司 | Application method of BIM technology in template temporary setting |
CN112231792A (en) * | 2020-09-09 | 2021-01-15 | 济南轨道交通集团有限公司 | BIM-based train-ground transmission construction monitoring system and working method thereof |
CN112668999A (en) * | 2020-12-24 | 2021-04-16 | 中国建筑第八工程局有限公司 | Construction management method for ultra-dangerous large formwork and support system |
CN112700146A (en) * | 2021-01-04 | 2021-04-23 | 中冶南方武汉建筑设计有限公司 | BIM model-based dynamic cost association method and system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106022587A (en) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | BIM project progress and cost management system based on earned value theory |
KR101704673B1 (en) * | 2015-12-10 | 2017-02-09 | 경희대학교 산학협력단 | Method for an auto-linkage between building information data based on an open BIM and structural analysis data |
-
2017
- 2017-12-28 CN CN201711461442.6A patent/CN108228997A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101704673B1 (en) * | 2015-12-10 | 2017-02-09 | 경희대학교 산학협력단 | Method for an auto-linkage between building information data based on an open BIM and structural analysis data |
CN106022587A (en) * | 2016-05-12 | 2016-10-12 | 广州络维建筑信息技术咨询有限公司 | BIM project progress and cost management system based on earned value theory |
Non-Patent Citations (1)
Title |
---|
刘赵昊旻 等: "基于BIM-5D 的施工过程管理应用研究", 《武汉大学第十一届研究生学术科技节系列活动之"第十届湖北省给水排水工程与环境工程研究生学术论坛"论文集》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109145436A (en) * | 2018-08-17 | 2019-01-04 | 安徽新网讯科技发展有限公司 | One kind being used for industrial electrical equipment construction system |
CN111898186A (en) * | 2020-07-22 | 2020-11-06 | 四川省第十一建筑有限公司 | Application method of BIM technology in template temporary setting |
CN112231792A (en) * | 2020-09-09 | 2021-01-15 | 济南轨道交通集团有限公司 | BIM-based train-ground transmission construction monitoring system and working method thereof |
CN112231792B (en) * | 2020-09-09 | 2023-07-04 | 济南轨道交通集团有限公司 | BIM-based vehicle-ground transmission construction monitoring system and working method thereof |
CN112668999A (en) * | 2020-12-24 | 2021-04-16 | 中国建筑第八工程局有限公司 | Construction management method for ultra-dangerous large formwork and support system |
CN112700146A (en) * | 2021-01-04 | 2021-04-23 | 中冶南方武汉建筑设计有限公司 | BIM model-based dynamic cost association method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108228997A (en) | A kind of construction management plateform system | |
US20230065286A1 (en) | Cloud-enabled generation of construction metrics and documentation | |
Ding et al. | Using nD technology to develop an integrated construction management system for city rail transit construction | |
CN105574652A (en) | Planning big data management and control system of smart power distribution network and method | |
CN105844380A (en) | BIM-based BIM project element management method and system | |
CN107273640A (en) | Hydraulic and Hydro-Power Engineering Schedule monitoring method based on three-dimensional digital model | |
CN107609237A (en) | The interim layout drawing in technical bid job site based on BIM quickly goes out drawing method | |
CN111125814A (en) | BIM-based project supervision and supervision method and system | |
CN107451738A (en) | A kind of construction-engineering project appraisal procedure and its assessment system | |
Ni et al. | Blockchain-based BIM digital project management mechanism research | |
CN110276555A (en) | Residential housing entity Life cycle analysis method based on internet and BIM | |
CN110990914A (en) | BIM technology-based large boiler installation method | |
CN115860499A (en) | Multi-professional work-type coordination construction management system based on BIM technology | |
CN111651818A (en) | BIM model rapid change method | |
CN113011832A (en) | Engineering cost system based on BIM | |
CN108153932A (en) | The modeling of Table top type three-dimensional Maintenance Model | |
CN110019435A (en) | Data processing method and system based on assembled architecture platform | |
CN109559070A (en) | The equipment production information management method and device of assembled architecture platform | |
CN111666619A (en) | BIM technology-based substation engineering implementation field digital management system | |
CN110941867A (en) | Construction method of standardized site layout based on BIM | |
CN106203969A (en) | A kind of prison check system of steel-making boiler tubing based on BIM | |
Xiaer et al. | Design for safety (DFS) and building information modeling (BIM): A review | |
Liu et al. | Research on application of BIM technology in construction project | |
CN106777832B (en) | A kind of digital reactor | |
Luo et al. | Research on intelligent management and control technology of power grid engineering based on BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180629 |
|
RJ01 | Rejection of invention patent application after publication |