CN108199957A - A kind of test system, method and device for router test - Google Patents
A kind of test system, method and device for router test Download PDFInfo
- Publication number
- CN108199957A CN108199957A CN201711327180.4A CN201711327180A CN108199957A CN 108199957 A CN108199957 A CN 108199957A CN 201711327180 A CN201711327180 A CN 201711327180A CN 108199957 A CN108199957 A CN 108199957A
- Authority
- CN
- China
- Prior art keywords
- test
- router
- server
- temperature control
- control experiment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/38—Flow based routing
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0823—Errors, e.g. transmission errors
- H04L43/0829—Packet loss
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0876—Network utilisation, e.g. volume of load or congestion level
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0876—Network utilisation, e.g. volume of load or congestion level
- H04L43/0888—Throughput
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The applicable field of communication technology of the present invention, provides a kind of test system, method and device for router test, which includes:Temperature control experiment case, for simulating the test environment with different temperatures and/or humidity;Test router in temperature control experiment case;Power supply is connected with the test router in temperature control experiment case, for powering to test router;Flow generator for sending ethernet data stream to test router, makes test router operate at full capacity;The test server being connect with temperature control experiment case, test router, power supply and flow generator;And the test terminal being connect with test router and test server, for carrying out operation exchange between test server, so as to reduce the configuration requirement of test environment, the full-automatic test of router is realized, improves the testing efficiency of test system.
Description
Technical field
The invention belongs to field of communication technology more particularly to a kind of test system, method and dresses for router test
It puts.
Background technology
With the rapid development of information industry, computer networking technology is used widely, and computer network has become existing
For a part essential in Working Life.Core equipment of the router as computer network, correspondingly exists on network
It is widely applied.High-end router becomes telecom carrier-class device important on public network by enterprise-level equipment.With internet
The indexs such as gradually universal and its importance in life the increase of network, performance, function, safety, the reliability of router
Become more and more important.So there are its importance and necessity to the test of router.At present, it is mostly to adopt to the test of router
The method manually tested, but manual testing there are high labor cost, testing efficiency is low, test result is inaccurate the problem of.
Invention content
The purpose of the present invention is to provide a kind of test system, method and device for router test, for routeing
The reliability of radio transmission performance is carried out when device is in operation at full load state in different voltages, different temperatures and/or humidity
Test, it is intended to solve that due to the prior art a kind of test method of effective router test can not be provided, lead to testing efficiency
Lowly, the problem of test result is inaccurate.
On the one hand, the present invention provides it is a kind of for router test test system, the system comprises:
Temperature control experiment case, for simulating the test environment with different temperatures and/or humidity;
Test router in the temperature control experiment case;
Power supply is connected with the test router in the temperature control experiment case, for being supplied to the test router
Electricity;
Flow generator for sending ethernet data stream to the test router, makes the test router completely negative
Lotus works;
The test being connect with the temperature control experiment case, the test router, the power supply and the flow generator
Server;And
The test terminal being connect with the test router and the test server, for the testing service
Operation exchange is carried out between device.
On the other hand, the present invention provides a kind of test method for above-mentioned test system, the method includes following
Step:
When receiving router test request, the test server according to receive temperature and/or humidity value, confession
Piezoelectric voltage is configured the test environment that router is tested described in the temperature control experiment case;
Detect whether preset length of testing speech reaches, when the length of testing speech does not reach, the test server according to
Pre-set flow rate test data control test router hair of the flow generator into the temperature control experiment case
Send test data bag;
The test terminal receives the test data bag of the test router forwarding by the test router,
The test data bag received is analyzed, obtain corresponding flow rate test result and is sent to the testing service
Device;
The test server is according to the flow rate test data and the flow rate test as a result, obtaining the tested routing
Handling capacity and packet loss of the device under the test environment simultaneously export.
On the other hand, the present invention provides a kind of test device for above-mentioned test system, described device includes:
Test environment setting unit, for when receiving router test request, the test server to be according to reception
Test environment progress of the temperature and/or humidity value, supply voltage arrived to router tested described in the temperature control experiment case
Setting;
Data packet transmitting element, for detecting whether preset length of testing speech reaches, when the length of testing speech does not reach,
The test server controls the flow generator into the temperature control experiment case according to pre-set flow rate test data
The test router send test data bag;
Data analysis unit receives the test router by the test router for the test terminal and forwards
The test data bag, the test data bag received is analyzed, it is concurrent to obtain corresponding flow rate test result
Give the test server;And
Test result output unit, for the test server according to the flow rate test data and the flow rate test
As a result, it obtains handling capacity and packet loss of the test router under the test environment and exports.
The present invention provides a kind of test systems for router test, which includes temperature control experiment case, for mould
Draw up has the test environment of different temperatures and/or humidity;Test router in temperature control experiment case;Power supply, with temperature control reality
Test router in tryoff is connected, for powering to test router;Flow generator, for being sent to test router
Ethernet data stream makes test router operate at full capacity;Occur with temperature control experiment case, test router, power supply and flow
The test server of device connection;And the test terminal being connect with test router and test server, for test
Operation exchange is carried out between server, so as to reduce the configuration requirement of test environment, the full-automatic of router is realized and surveys
Examination improves the testing efficiency of test system.
Description of the drawings
Fig. 1 is the structure diagram of the test system for router test that the embodiment of the present invention one provides;
Fig. 2 is the realization flow chart of the test method of router test system provided by Embodiment 2 of the present invention;And
Fig. 3 is the structure diagram of the test device of router test system that the embodiment of the present invention three provides.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
The specific implementation of the present invention is described in detail below in conjunction with specific embodiment:
Embodiment one:
Fig. 1 shows the structure of the test system for router test that the embodiment of the present invention one provides, for the ease of
Illustrate, illustrate only and the relevant part of the embodiment of the present invention.
An embodiment of the present invention provides a kind of test system for router test, which includes temperature control experiment case
11st, test router 12, power supply 13, flow generator 14, test server 15 and test terminal 16, wherein:
For temperature control experiment case 11 for simulating the test environment with different temperatures and/or humidity, temperature control experiment case 11 can be with
- 50 °~150 ° of test temperature of simulation, therefore it can be provided low temperature (such as -10 °), high temperature (such as 55 °), high/low temperature recycle
Test environment, temperature control experiment case 11 can also simulate different humidity, such as the humidity between 10%~90%RH.Test router
12 are located in temperature control experiment case 11, so as to test the different test environments that test router 12 is simulated in temperature control experiment case 11
In, can work normally under full load condition.Power supply 13 is connected with the test router 12 in temperature control experiment case 11, is used for
It powers to test router 12.Flow generator 14 is used to send ethernet data stream to test router 12, makes tested routing
Device 12 is operated at full capacity.Test server 15 and temperature control experiment case 11, test router 12, power supply 13 and flow generator 14
Connection, with according to pre-set test condition, the temperature of automatic adjustment temperature control experiment case 11 and/or the confession of humidity and power supply
Piezoelectric voltage, control flow generator 14 is to 12 transmitted traffic test data of test router, to test the nothing of test router 12
Line transmission performance.Test terminal 16 connect with test router 12 and test server 15, for test server 15
Between carry out operation exchange.
Preferably, which further includes electronic load 17, the electronic load 17 and test router 12 and test
The USB interface connection of server 15, the USB interface of test router 12 to be controlled to export electricity under the control of test server 15
Stream it is constant so that USB interface is operated at full capacity, so as to test test router 12 when its USB interface is operated at full capacity
Radio transmission performance.
Preferably, power supply 13 is Programmable AC Power Source, and test server 15 can be compiled according to the control of preset test parameter
Journey AC power exports variable voltage and frequency, and test router 12 is made to operate at full capacity just under specified voltage and frequency
Often, in order to being tested by radio transmission performance of the router 12 under different voltages and frequency.
Preferably, test terminal 16 and 12 wireless connection of test router, for the wireless of test test router 12
Output performance.
The present invention provides a kind of test system for router test, which includes temperature control experiment case, tested road
By device, power supply, flow generator, test server and test terminal.The system has built a kind of test for test router
System, the real simulation working environment of test router are the complete of router while test system configurations requirement is reduced
Automatic test provides the foundation, and improves the testing efficiency of test system.
Embodiment two:
The realization flow of the test method of system is tested Fig. 2 shows router provided by Embodiment 2 of the present invention, in order to
Convenient for explanation, illustrate only with the relevant part of the embodiment of the present invention, details are as follows:
In step s 201, when receiving router test request, test server according to the temperature received and/or
Humidity value, supply voltage are configured the test environment that router is tested in temperature control experiment case.
Router test system of the embodiment of the present invention suitable for embodiment one, with to being route in router test system
Device is tested.Temperature control experiment case can simulate the test environment with different temperatures and/or humidity, specifically, test environment
Working environment for low-temperature working environment, high-temperature work environment, high/low temperature cycle operation environment or high temperature and humidity.It is being route
It before device test, needs to be pre-configured with test parameter in test server, such as length of testing speech, the temperature and/or humidity of test
And voltage etc..As illustratively, if for example, the test temperature being configured in current length of testing speech is -10 ° of low temperature, humidity is
10%RH, voltage 100V, then test server according to these test parameter informations received in temperature control experiment case be tested
The test environment of examination router is configured.
In step S202, detect whether preset length of testing speech reaches, when length does not reach when tested, test server
According to pre-set flow rate test data, test router of the control flow generator into temperature control experiment case sends test number
According to packet.
In embodiments of the present invention, need test router wireless at different temperature and/or humidity and voltage
Therefore transmission performance, first detects whether the length of testing speech under set temperature and/or humidity and voltage reaches, for example, test
Shi Changwei 24 hours, when length does not reach when tested, test server controls flow according to pre-set flow rate test data
Test router of the generator into temperature control experiment case sends test data bag.
Preferably, when length reaches when tested, test server is to the temperature and/or humidity and power supply of temperature control experiment case
Supply voltage be adjusted, test router is made to enter next setting or test temperature and/or humidity and voltage environment, with
The continuance test being wirelessly transferred at different temperature and/or humidity and voltage.As illustratively, such as preset survey
A length of 24 hours during examination, when tested during long arrival, then test environment is adjusted, into next test period.For example, current survey
Try the period in test environment for -10 ° of temperature, humidity 10%RH, voltage 100V, next test period be 55 ° of temperature, humidity
30%RH, voltage 220V so carry out continuance test to test router, it is achieved thereby that it is unattended, improve test
Automatization level.
In step S203, test terminal receives the test data bag of test router forwarding by test router, right
The test data bag received is analyzed, and is obtained corresponding flow rate test result and is sent to test server.
In embodiments of the present invention, it tests between terminal and test router and passes through for wireless connection, test server
The control terminal of IxChariot sends pre-set test data bag, such as 100 data packets, test to the test terminal of distal end
After terminal has received test data bag, corresponding flow rate test result is sent to test server, test result includes transmission
Bandwidth, number, the transmission time etc. that receive data packet.
In step S204, test server is according to flow rate test data and flow rate test as a result, obtaining test router
Handling capacity under the test environment and packet loss simultaneously export.
In embodiments of the present invention, test server is according to every test data, such as flow rate test data, test terminal
The data on flows packet that receives, transmission bandwidth, transmission duration etc. calculate test router handling capacity under the test environment and packet loss
The radio transmission parameters such as rate.Further, test server can automatically generate test report and the output of test router.
Preferably, the load current of test server control electronic load, the USB interface of test router to be kept to export
Electric current it is constant, so as to which the USB interface for making test router is operated at full capacity, connect so as to test test router 12 in its USB
Radio transmission performance when mouth is operated at full capacity improves the accuracy of test result.
In embodiments of the present invention, when receiving router test request, test server is according to the temperature received
And/or humidity value, supply voltage are configured the test environment that router is tested in temperature control experiment case, detect preset survey
Whether examination duration reaches, and when length does not reach when tested, test server is according to pre-set flow rate test data, control stream
It measures test router of the generator into temperature control experiment case and sends test data bag, test terminal receives quilt by test router
The test data bag of router forwarding is surveyed, the test data bag received is analyzed, obtains corresponding flow rate test result
And test server is sent to, test server exists according to flow rate test data and flow rate test as a result, obtaining test router
Handling capacity and packet loss under test environment simultaneously export, and realize the automatic test of router, improve the survey of test system
Try efficiency.
Embodiment three:
Fig. 3 shows the structure of the test device of router test system that the embodiment of the present invention three provides, test dress
The router test system suitable for embodiment one is put, for convenience of description, is illustrated only relevant with the embodiment of the present invention
Part, including:
Test environment setting unit 31, for when receiving router test request, test server is according to receiving
Temperature and/or humidity value, supply voltage in temperature control experiment case be tested router test environment be configured;
Data packet transmitting element 32 for detecting whether preset length of testing speech reaches, when length does not reach when tested, is surveyed
Server is tried according to pre-set flow rate test data, test router hair of the control flow generator into temperature control experiment case
Send test data bag;
Data analysis unit 33 receives the test data of test router forwarding for testing terminal by test router
Packet, analyzes the test data bag received, obtains corresponding flow rate test result and be sent to test server;And
Test result output unit 34, for test server according to flow rate test data and flow rate test as a result, obtaining
Test router handling capacity under the test environment and packet loss simultaneously export.
In embodiments of the present invention, each unit of test device can be realized by corresponding hardware or software unit, each unit
Soft and hardware unit can be independent, a soft and hardware unit can also be integrated into, herein not limiting the present invention.Each list
The specific embodiment of member can refer to the description of embodiment two, and details are not described herein.
Claims (10)
1. a kind of test system for router test, which is characterized in that the system comprises:
Temperature control experiment case, for simulating the test environment with different temperatures and/or humidity;
Test router in the temperature control experiment case;
Power supply is connected with the test router in the temperature control experiment case, for powering to the test router;
Flow generator for sending ethernet data stream to the test router, makes test router work at full capacity
Make;
The testing service being connect with the temperature control experiment case, the test router, the power supply and the flow generator
Device;And
The test terminal being connect with the test router and the test server, for the test server it
Between carry out operation exchange.
2. test system as described in claim 1, which is characterized in that the test system further includes:
Electronic load is connected with the test router in the temperature control experiment case, for keeping the test router
USB interface output current it is constant.
3. test system as described in claim 1, which is characterized in that the test terminal wirelessly connects with the test router
It connects.
4. test system as described in claim 1, which is characterized in that the power supply is Programmable AC Power Source, for exporting
Variable voltage and frequency make the test router be operated in the voltage specified and frequency.
5. a kind of test method based on any test systems of claim 1-4, which is characterized in that the method includes with
Lower step:
When receiving router test request, the test server is electric according to the temperature and/or humidity value, power supply received
It presses and the test environment that router is tested described in the temperature control experiment case is configured;
Detect whether preset length of testing speech reaches, when the length of testing speech does not reach, the test server is according in advance
The flow rate test data of setting control the test router of the flow generator into the temperature control experiment case to send and survey
Try data packet;
The test terminal receives the test data bag of the test router forwarding by the test router, to institute
It states the test data bag received to be analyzed, obtain corresponding flow rate test result and is sent to the test server;
The test server exists according to the flow rate test data and the flow rate test as a result, obtaining the test router
Handling capacity and packet loss under the test environment simultaneously export.
6. test method as claimed in claim 5, which is characterized in that the method further includes:
The test server controls the load current of the electronic load, so that the USB interface of the test router is completely negative
Lotus works.
7. test method as claimed in claim 5, which is characterized in that the method further includes:
When the length of testing speech reaches, the test server is to the temperature and/or humidity of the temperature control experiment case and institute
The supply voltage for stating power supply is adjusted, so that the test router is held at different temperature and/or humidity and voltage
Continuous test.
8. a kind of test device based on any test systems of claim 1-4, which is characterized in that described device includes:
Test environment setting unit, for when receiving router test request, the test server is according to receiving
Temperature and/or humidity value, supply voltage are configured the test environment that router is tested described in the temperature control experiment case;
Data packet transmitting element, it is described when the length of testing speech does not reach for detecting whether preset length of testing speech reaches
Test server controls institute of the flow generator into the temperature control experiment case according to pre-set flow rate test data
It states test router and sends test data bag;
Data analysis unit receives the institute of the test router forwarding for the test terminal by the test router
Test data bag is stated, the test data bag received is analyzed, obtain corresponding flow rate test result and is sent to
The test server;And
Test result output unit, for the test server according to the flow rate test data and the flow rate test knot
Fruit obtains handling capacity and packet loss of the test router under the test environment and exports.
9. test device as claimed in claim 8, which is characterized in that described device further includes:
Load current control unit controls the load current of the electronic load for the test server, so that the quilt
The USB interface for surveying router is operated at full capacity.
10. test device as claimed in claim 8, which is characterized in that described device further includes:
Test environment adjustment unit, for when the length of testing speech reaches, the test server to be to the temperature control experiment case
Temperature and/or the supply voltage of humidity and the power supply be adjusted so that the test router is in different temperature
And/or continuance test under humidity and voltage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711327180.4A CN108199957A (en) | 2017-12-13 | 2017-12-13 | A kind of test system, method and device for router test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711327180.4A CN108199957A (en) | 2017-12-13 | 2017-12-13 | A kind of test system, method and device for router test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108199957A true CN108199957A (en) | 2018-06-22 |
Family
ID=62573944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711327180.4A Pending CN108199957A (en) | 2017-12-13 | 2017-12-13 | A kind of test system, method and device for router test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108199957A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108900376A (en) * | 2018-06-27 | 2018-11-27 | 四川斐讯信息技术有限公司 | A kind of router method for testing reliability and device |
CN110191017A (en) * | 2019-05-28 | 2019-08-30 | 上海连尚网络科技有限公司 | It is a kind of for monitoring the monitoring system and method for routing device exception |
CN115242673A (en) * | 2022-07-21 | 2022-10-25 | 深圳市凯利华电子有限公司 | Detection apparatus for detect router network stability |
CN115396351A (en) * | 2022-08-25 | 2022-11-25 | 广东省高峰科技有限公司 | Automatic router test method, device, equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102006616A (en) * | 2010-11-09 | 2011-04-06 | 中兴通讯股份有限公司 | Test system and test method |
CN103441899A (en) * | 2013-08-27 | 2013-12-11 | 上海斐讯数据通信技术有限公司 | Performance testing method and system of wireless router |
CN105407017A (en) * | 2015-12-04 | 2016-03-16 | 上海斐讯数据通信技术有限公司 | Router test system and method |
CN106452975A (en) * | 2016-11-18 | 2017-02-22 | 上海斐讯数据通信技术有限公司 | Method and system for testing router |
US9714978B2 (en) * | 2012-04-12 | 2017-07-25 | Larry Ross | At-speed integrated circuit testing using through silicon in-circuit logic analysis |
-
2017
- 2017-12-13 CN CN201711327180.4A patent/CN108199957A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102006616A (en) * | 2010-11-09 | 2011-04-06 | 中兴通讯股份有限公司 | Test system and test method |
US9714978B2 (en) * | 2012-04-12 | 2017-07-25 | Larry Ross | At-speed integrated circuit testing using through silicon in-circuit logic analysis |
CN103441899A (en) * | 2013-08-27 | 2013-12-11 | 上海斐讯数据通信技术有限公司 | Performance testing method and system of wireless router |
CN105407017A (en) * | 2015-12-04 | 2016-03-16 | 上海斐讯数据通信技术有限公司 | Router test system and method |
CN106452975A (en) * | 2016-11-18 | 2017-02-22 | 上海斐讯数据通信技术有限公司 | Method and system for testing router |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108900376A (en) * | 2018-06-27 | 2018-11-27 | 四川斐讯信息技术有限公司 | A kind of router method for testing reliability and device |
CN110191017A (en) * | 2019-05-28 | 2019-08-30 | 上海连尚网络科技有限公司 | It is a kind of for monitoring the monitoring system and method for routing device exception |
CN115242673A (en) * | 2022-07-21 | 2022-10-25 | 深圳市凯利华电子有限公司 | Detection apparatus for detect router network stability |
CN115396351A (en) * | 2022-08-25 | 2022-11-25 | 广东省高峰科技有限公司 | Automatic router test method, device, equipment and storage medium |
CN115396351B (en) * | 2022-08-25 | 2024-04-30 | 广东省高峰科技有限公司 | Automatic router testing method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108199957A (en) | A kind of test system, method and device for router test | |
CN110492906B (en) | Method for rapidly and automatically detecting performance of HPLC carrier module | |
CN108141385B (en) | Cloud-based system and method for managing test configuration of cable test equipment | |
CN101124775B (en) | Dual-mode detection of powered device in power over Ethernet system | |
AU2016334120C1 (en) | Cloud based system and method for managing messages regarding cable test device operation | |
CN106789401A (en) | The performance test methods and system of a kind of double-frequency wireless router | |
CN211293214U (en) | Automatic test system for whole train cable of motor train unit | |
US9841737B2 (en) | Automatic test system and method | |
CN108111596B (en) | Method for debugging power acquisition terminal based on remote login | |
CN104796298A (en) | SDN (Software Defined Network) network fault analyzing method and device | |
CN105611019B (en) | Mobile terminal power consumption test method and mobile terminal power consumption test system | |
CN106093797B (en) | Battery temperature field simulation device and system and verification method for battery thermal management | |
CN107526000A (en) | Non- register one's residence does not power off the adjustable injecting scheme of wrong wiring of electric energy meter detection | |
CN110543164A (en) | test system and method of automatic driving controller and upper computer | |
JP2023100695A (en) | Induction powered electricity current monitoring | |
TW200412069A (en) | Apparatus and method for a network testing system | |
CN104660662A (en) | Advanced meter reading infrastructure field surveying system | |
CN106875646B (en) | Data acquisition method and device | |
CN104037946B (en) | Machine room power control method, device and system | |
CN104793083B (en) | A kind of communication unit interchangeability test system and its exchange method | |
CN111277303A (en) | Production testing method and system based on universal asynchronous receiving and transmitting transmitter to Bluetooth | |
CN107682227B (en) | Ammeter detection configuration method | |
CN105306311A (en) | Electric energy data acquisition local communication reliability test system and method | |
CN206698441U (en) | A kind of wisdom guide system based on MEC | |
CN204559600U (en) | A kind of rail vehicle communication network consistency test device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180622 |