CN108197910A - A kind of project for bidding project verification management system - Google Patents

A kind of project for bidding project verification management system Download PDF

Info

Publication number
CN108197910A
CN108197910A CN201810260795.8A CN201810260795A CN108197910A CN 108197910 A CN108197910 A CN 108197910A CN 201810260795 A CN201810260795 A CN 201810260795A CN 108197910 A CN108197910 A CN 108197910A
Authority
CN
China
Prior art keywords
responsible person
project
information
module
person
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810260795.8A
Other languages
Chinese (zh)
Inventor
薛提军
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan International Tendering Co Ltd
Original Assignee
Sichuan International Tendering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan International Tendering Co Ltd filed Critical Sichuan International Tendering Co Ltd
Priority to CN201810260795.8A priority Critical patent/CN108197910A/en
Publication of CN108197910A publication Critical patent/CN108197910A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project for bidding project verification management systems,It is related to Tender System field,Heavy workload is needed when solving selected project leader and chooses not fair enough and intelligentized drawback,Its key points of the technical solution are that include the project database stored to projects information,The responsible person's database stored to each responsible person's information,The analysis system that project information is transferred to be analyzed entry property,Responsible person's information in responsible person's database is transferred so that the control device for the responsible person for meeting pushing condition is matched and pushed according to collocation degree with entry property,The responsible person pushed according to control device is responsible for the processing terminal of handing-over with the audit of determining responsible person and notice and guiding exploit person and responsible person's progress item file of selection,A kind of project for bidding project verification management system of the present invention,The push that project carries out responsible person can efficiently be corresponded to,The workload more fair and just and that exploit person can be reduced of processing.

Description

A kind of project for bidding project verification management system
Technical field
The present invention relates to Tender System, more particularly to a kind of project for bidding project verification management system.
Background technology
With the continuous development of information network technique, electronic bidding is as a kind of convenient, efficient, transparent, environmentally friendly Operation mode, using advanced computer technology as support, using internet as platform, by electronic information technology and traditional bidding Pattern effectively combines, and realizes that bidding project is put on record, the call for tender is issued, bidding document is made with selling, tender documents The electronic management that overall process is purchased with biddings such as submission, experts' evaluation, generation reports on the evaluation of tenders is made, thus effectively specification Bidding is merchandised and supervision bidding and tendering process.Therefore, traditional bid form is transformed with computer information technology, carries out bid generation Internal quality control and the management of mechanism and the constantly dynamic supervision of supervision department are managed, is that further effectively specification is invited and submitted bids public affairs It opens, is fair, just and sincere order, transformation is invited and submitted bids industry development mode, and industry health, scientific development is promoted necessarily to become Gesture.
When being set up the project, Items in order exploit person is confirmed and is examined to every situation of purchaser project for bidding Core, and need to select suitable respective items purpose project leader, it is practical when operation, generally require a large amount of workload And the working experience that project development people is abundant, and for the selection of project leader, also there are the subjectivity meanings of many exploit persons Know control, processing when also many areas for improvement not fair enough and intelligent for the selection of responsible person.
Invention content
The object of the present invention is to provide a kind of project for bidding project verification management systems, can efficiently be born corresponding to project The push of people is blamed, handles workload more fair and just and that exploit person can be reduced.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of project for bidding project verification management system, includes:It is the project database that is stored to the project information of projects, right Responsible person's database that responsible person's information of projects responsible person is stored transfers project information in project database with right Analysis system that respective items purpose entry property is analyzed, transfer responsible person's information in responsible person's database with project Control device that matter is matched and pushes the responsible person for meeting pushing condition according to collocation degree is pushed according to control device Responsible person is with determining responsible person and the audit that the responsible person with guiding exploit person and selection carries out item file is notified to be responsible for handing-over Processing terminal.
Using the above scheme, pass through the project information of project database and responsible person's database to projects and each responsible person Responsible person's information stored, it is corresponding when the project of management in need to transfer the corresponding project information of the project and lead to It crosses after analysis system analyzed, the matching and push of responsible person is carried out by control device, and by processing terminal to negative Duty people is determined and exploit person is notified to be joined, and whole operation is efficient and reduces the control of the subjective consciousness of exploit person, The selection of responsible person pushed to project is more objective, and then realizes personnel's and project reasonable distribution and processing, more What is added is efficient, fair, intelligent.
Preferably, the control device includes the classification mould classified according to the shared characteristic of responsible person's information Block carries out the screening module of level-one screening and to tool according to the classification of sort module to the responsible person's information for being matched with entry property The characteristic of body responsible person carries out pushing module of the two level screening to push.
Using the above scheme, the sort module of control device, screening module and pushing module coordinate between each other, by dividing The classification of generic module can will be responsible for people and be divided on a large scale, and can be preliminary by screening module realization responsible person Selection, then further screened by pushing module, it is progressive, realized while reducing heavy workload most preferably negative Blame the quick push of people.
Preferably, responsible person's information includes responsible person's fields, responsible person's ability score information, responsible person Current working days information;And it is shared characteristic to define responsible person's fields.
Using the above scheme, positioning shared characteristic in field described in the responsible person of responsible person's information setting, facilitates sort module Division, responsible person's ability score information and the current working days information of responsible person can then be realized comprehensive to responsible person's ability and time It closes and judges, so that outstanding and suitable responsible person can be pushed when push, reduce and push unsuccessful probability.
Preferably, project characteristic is shared characteristic by the screening module with responsible person is compared matching and according to adaptation The selected sort module of degree divides corresponding responsible person, and the pushing module is current according to responsible person's ability score information and responsible person Working days information carries out Comprehensive Evaluation and is pushed out suitable responsible person;The current working days information of responsible person is defined prior to responsible person's energy Power score information, and pass through pushing module first to being screened with the working days the responsible person of project can be responsible for.
Using the above scheme, screening module according to project characteristic and responsible person, tentatively sieved altogether by individual comparison matching Choosing so that preliminary screening is convenient;The setting that the current working days information of responsible person of pushing module scores prior to responsible person's ability makes It obtains preferred having time when pushing and carries out the catcher of project so that push chance of success is big, further reduction pushes The probability of failure.
Preferably, the control device is further included carries out the autonomous Shen recommended to carry out responsible person's application for responsible person Please module, the pushing module, which includes, carries out the responsible person that independently recommends the audit unit of prequalification, to meeting qualification Responsible person pushed and the responsible person to disqualifying cancels and applies for and feed back unselected breath of winning the confidence to corresponding responsible person Push unit.
Using the above scheme, the setting of the application module of control device enables responsible person to have the power actively applied Profit, in order to improve the whole enthusiasm of responsible person, the audit unit of pushing module can carry out the responsible person of active application Audit, so that qualified responsible person can be pushed and eliminate the responsible person to disqualify, so that push is single The responsible person of member push is suitable for taking over corresponding project, evades early period, avoids occurring project because responsible person is improper and asking The risk of topic.
The responsible person's information for independently recommending and meeting prequalification is carried out preferably, the pushing module further includes Mark the indexing unit to be pushed;And the pushing module be provided with push scale base and according to push scale base by It sorts to push the responsible person for meeting pushing condition from high to low according to collocation degree.
Using the above scheme, the indexing unit of pushing module can be marked to meeting qualification from the responsible person of main application Push, so that convenient for being distinguished with the responsible person filtered out when push;And the push ratio root of pushing module setting High to low sequence is carried out according to collocation degree so that project can match most suitable responsible person and be handled as far as possible.
Preferably, the processing terminal include according to the responsible person that indexing unit marks prior to pushing module according to The responsible person of collocation degree sequence carries out choosing determining selection module, and the notice mould of exploit person is notified after responsible person's selection determines Block.
Using the above scheme, the responsible person that whole selection module marks indexing unit is handled preferentially to be screened according to collocation degree The responsible person gone out is chosen, and then can be reduced the unsuccessful probability of push while be reasonably allocated according to demand; The setting of notification module can then notify exploit person, so that subsequent transition is more smooth.
Preferably, it is described choose module include inform corresponding responsible person informing unit, for selection responsible person into The feedback unit of row feedback;When the responsible person of selection determines to handle corresponding project, the notification module carries out notifier processes; Otherwise informing unit cancels the sequence of the responsible person and is notified and waited to be feedback again according to sequence.
Using the above scheme, the informing unit of module and the setting of feedback unit are chosen so that since what system was chosen is responsible for Human feelings condition is timely informed the responsible person being selected, and feelings whether the setting of feedback unit can be to the catcher of responsible person Condition is fed back, convenient for subsequent processing.
In conclusion the invention has the advantages that:
The project information of projects and responsible person's information of each responsible person are carried out by project database and responsible person's database Storage, and the processing of analysis system, control device and processing terminal is matched with, automatically corresponding project can be pushed and closed Suitable responsible person, it is more objective, and then realize reasonable distribution and the processing of personnel and project, more efficiently, fair, intelligence Change.
Description of the drawings
Fig. 1 is the schematic block diagram of project for bidding project verification management system.
In figure:1st, analysis system;2nd, project database;3rd, responsible person's database;4th, control device;41st, sort module; 42nd, screening module;43rd, pushing module;44th, apply for module;5th, processing terminal;51st, module is chosen;511st, notification unit;512、 Feedback unit;52nd, notification module;6th, input system.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
A kind of project for bidding project verification management system, can be presented by the form of webpage disclosed in the present embodiment, can also It is presented by the form of APP or software, is presented preferably in the form of webpage in the present embodiment, which specially takes It is engaged in management when project for bidding is being set up the project and the selection of responsible person.
As shown in Figure 1, project for bidding project verification management system includes analysis system 1, control device 4, processing terminal 5, record Enter system 6, project database 2 and responsible person's database 3.
When one approves and initiate a project, analysis system 1 transfers the corresponding project information of the project and at the same time transferring project data Project information in library 2 is compared, to obtain corresponding entry property;Control device 4 then transfers responsible person's database 3 Interior responsible person's information is matched with entry property and meets the responsible person of pushing condition, adaptation according to the push of corresponding collocation degree Spend the matching degree in field corresponding to the field that can be defined as where project corresponds to and responsible person;Processing terminal 5 is filled according to control Responsible person is determined after putting the responsible person of 4 push and notifies to bear with exploit person is guided to carry out item file audit with the responsible person chosen The handing-over of duty.
According to different unique identifying informations to log in acquisition access right, access right is configurable to input system 6 Administrative staff's permission passes through typing system according to access right to the project information of various projects and responsible person's information of each responsible person System 6 is to 3 memory storage of project database 2 and responsible person's database, to realize that the storage of information data is transferred convenient for subsequent analysis. Project information can be that the characteristic information between items of different types is alternatively the unique project information of a certain project.Responsible person believes It ceases for the corresponding information of responsible person in project verification management system, and responsible person's information includes responsible person's fields, negative People's ability score information, the current working days information of responsible person etc. are blamed, and it is shared characteristic to define responsible person's fields.
Control device 4 includes the sort module 41 classified according to the shared characteristic of responsible person's information, according to classification The classification of module 41 carries out the screening module 42 of level-one screening and to being specifically responsible for the responsible person's information for being matched with entry property The characteristic of people carries out pushing module 43 of the two level screening to push.Screening module 42 by project characteristic and responsible person share characteristic into Row compares matching, and according to the high classification of the collocation degree that the corresponding selected sort module 41 of collocation degree is divided, will with preliminary A large amount of responsible person is quickly screened;Pushing module 43 is according to responsible person's ability score information and the current working days information of responsible person Comprehensive Evaluation is carried out, and suitable responsible person is pushed out according to the result of Comprehensive Evaluation, responsible person works as defined in pushing module 43 Preceding working days information prior to responsible person's ability score information, with by pushing module 43 first to project can be responsible for the working days Responsible person screened, then carry out in the responsible person with the working days selection preferentially to push, and then avoid the negative of push Duty people is because there is the appearance that situation about pushing again is needed without the working days.
Control device 4 further includes application module 44, and application module 44 is configured with application to each responsible person and goes permission so that negative Duty people can independently recommend corresponding project.Pushing module 43 includes pre- to the responsible person's progress qualification independently recommended Careful audit unit, audit unit can equally be chosen according to the collocation degree of responsible person's information and entry property, for certainly The requirement for promoting mainly collocation degree when the responsible person recommended is audited is screened automatically less than system, and is provided with minimum collocation degree Benchmark, the responsible person independently recommended that the benchmark of minimum collocation degree is reached at or above for collocation degree be judged to meeting qualification, instead To disqualify;Control device 4 has further included push unit, and qualified responsible person is pushed away by push unit It send, then carry out cancelling the processing of its application to the responsible person to disqualify, and feed back unselected breath of winning the confidence to corresponding responsible person It is informed.
Pushing module 43 has further included indexing unit, and indexing unit believes the responsible person for independently recommending and meeting prequalification Breath is marked in order to the difference between the responsible person that sorts according to collocation degree;Pushing module 43 is provided with push ratio base Standard, and pushing module 43 when push according to push scale base, to the responsible person that sorts according to collocation degree according to adaptation Degree sorts to push the responsible person for meeting pushing condition from high to low.
Processing terminal 5, which includes, chooses module 51 and notification module 52.It chooses module 51 and is provided with selection priority, and Responsible person according to indexing unit label according to the responsible person that collocation degree sorts choose prior to pushing module 43 to be determined.It is logical Know that unit 511 sends corresponding notice after the final responsible person's selection of completion determines to exploit person, to facilitate exploit person and bear Blame the docking between people.
For the responsible person for pushing and tentatively being selected, choose module 51 and be provided with the announcement that informing unit carries out selection situation Know, in order to the intercommunication of information.Feedback module is equally additionally provided with so that the responsible person being selected carries out selection feedback, works as selection Responsible person when determining to handle corresponding project, then feedback module feedback determine the signal of responsible person, it is on the contrary then be responsible person not Determining signal.When responsible person selectes and determines, notification module 52 carries out notifier processes;Conversely, informing unit exists Cancel the sequence of the responsible person, and notified and waited to be feedback again according to the clooating sequence of push after informing.
It can be by general processor, number with reference to the various illustrative logical blocks modules that embodiments disclosed herein describes Signal processor (DSP), application-specific integrated circuit (ASIC), field programmable gate array (FPGA) or other programmable logic groups Part, discrete gate or transistor logic, discrete hardware components are designed to perform any combinations of function described herein in fact It applies or performs.General processor can be microprocessor, but another selected as, the processor can be any conventional processing Device, controller, microcontroller or state machine.Processor can also be embodied as the combination of computation module, such as DSP and microprocessor Combination, the combination of multi-microprocessor, one or more microprocessors and DSP core are combined or any other this are matched It puts.
Each function module in each embodiment of the present invention can be integrated in a processing unit or each Module is individually physically present, can also two or more modules be integrated in a module.Above-mentioned integrated module both may be used It realizes, can also be realized in the form of SFU software functional unit in the form of using hardware.
If the integrated module is realized in the form of SFU software functional unit and is independent product sale or uses When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially The part to contribute in other words to the prior art or all or part of the technical solution can be in the form of software products It embodies, which is stored in a storage medium, is used including some instructions so that a computer Equipment (can be personal computer, server or the network equipment etc.) performs the complete of each embodiment the method for the present invention Portion or part steps.And aforementioned storage medium includes USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey The medium of sequence code.
Operating procedure and operating mode:
When project is set up the project, the analysis that entry property is carried out by analysis system 1 obtains, and pass through control device 4 The matching and push of responsible person is carried out, then the selected and notice of responsible person is carried out by processing terminal 5, it is negative with intelligentized completion It blames the selection of people and docks notice between exploit person.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of no creative contribution after this specification is read, but as long as at this It is all protected in the right of invention by Patent Law.

Claims (9)

  1. The management system 1. a kind of project for bidding is set up the project, it is characterized in that, include:The item stored to the project information of projects Mesh database(2), responsible person's database for being stored to responsible person's information of projects responsible person(3), transfer project data Library(2)Analysis system of the interior project information to be analyzed respective items purpose entry property(1), transfer responsible person's database (3)Interior responsible person's information with entry property to be matched and meet the responsible person of pushing condition according to collocation degree to push Control device(4), according to control device(4)The responsible person of push is with determining responsible person and notifies and guiding exploit person and selection The processing terminal joined is responsible in the audit that responsible person carries out item file(5).
  2. The management system 2. project for bidding according to claim 1 is set up the project, it is characterized in that:The control device(4)Include The sort module classified according to the shared characteristic of responsible person's information(41), according to sort module(41)Classification to being matched with Responsible person's information of entry property carries out the screening module of level-one screening(42)And two level sieve is carried out to the characteristic for being specifically responsible for people Select the pushing module to push(43).
  3. The management system 3. project for bidding according to claim 2 is set up the project, it is characterized in that:Responsible person's information includes negative Blame people's fields, responsible person's ability score information, the current working days information of responsible person;And it is shared to define responsible person's fields Characteristic.
  4. The management system 4. project for bidding according to claim 3 is set up the project, it is characterized in that:The screening module(42)By project Characteristic and responsible person, which share characteristic and be compared, to be matched and selectes sort module according to collocation degree(41)Corresponding responsible person is divided, The pushing module(43)Comprehensive Evaluation is carried out according to responsible person's ability score information and the current working days information of responsible person and is pushed Go out suitable responsible person;The current working days information of responsible person is defined prior to responsible person's ability score information, and passes through pushing module (43)First to being screened with the working days with the responsible person of project can be responsible for.
  5. 5. according to claim 2 to 4 any one of them project for bidding project verification management system, it is characterized in that:The control device (4)It further includes and carries out the autonomous application module recommended to carry out responsible person's application for responsible person(44), the pushing module (43)Include and the audit unit of prequalification is carried out to the responsible person independently recommended, qualified responsible person is pushed And the responsible person to disqualifying cancels and applies for and feed back unselected breath of winning the confidence to the push unit of corresponding responsible person.
  6. The management system 6. project for bidding according to claim 5 is set up the project, it is characterized in that:The pushing module(43)It further includes There is the indexing unit responsible person's information for independently recommending and meeting prequalification being marked to be pushed;And the push Module(43)It is provided with push scale base and is sorted from high to low according to collocation degree according to push scale base and met with pushing The responsible person of pushing condition.
  7. The management system 7. project for bidding according to claim 6 is set up the project, it is characterized in that:The processing terminal(5)Include The responsible person marked according to indexing unit is prior to pushing module(43)The responsible person to sort according to collocation degree choose and determines Selection module(51), the notification module of notice exploit person after responsible person's selection determines(52).
  8. The management system 8. project for bidding according to claim 7 is set up the project, it is characterized in that:The selection module(51)Include The informing unit of informing corresponding responsible person, the feedback unit that is fed back of responsible person for selection(512);As the responsible person of selection When determining to handle corresponding project, the notification module(52)Carry out notifier processes;Otherwise informing unit cancels the responsible person's It sorts and is notified and waited to be feedback again according to sequence.
  9. The management system 9. project for bidding according to claim 1 is set up the project, it is characterized in that:It further includes with good grounds different unique Identification information with log in obtain access right and to project information carry out upload typing input system(6).
CN201810260795.8A 2018-03-27 2018-03-27 A kind of project for bidding project verification management system Pending CN108197910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810260795.8A CN108197910A (en) 2018-03-27 2018-03-27 A kind of project for bidding project verification management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810260795.8A CN108197910A (en) 2018-03-27 2018-03-27 A kind of project for bidding project verification management system

Publications (1)

Publication Number Publication Date
CN108197910A true CN108197910A (en) 2018-06-22

Family

ID=62596258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810260795.8A Pending CN108197910A (en) 2018-03-27 2018-03-27 A kind of project for bidding project verification management system

Country Status (1)

Country Link
CN (1) CN108197910A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109871387A (en) * 2019-01-29 2019-06-11 广东华伦招标有限公司 Call for bid service data interaction method and system
CN112149954A (en) * 2020-08-18 2020-12-29 果尔佳建筑产业有限公司 Construction project personnel determination method and system, intelligent terminal and storage medium
CN112307081A (en) * 2020-10-24 2021-02-02 上海东方投资监理有限公司 Project budget cost management system, method, electronic device and readable storage medium
CN112766654A (en) * 2020-12-31 2021-05-07 大为国际工程咨询有限公司 Engineering cost data center management system
CN113111920A (en) * 2021-03-19 2021-07-13 江苏奔宇车身制造有限公司 Project data management system based on PLM and application method
CN114240338A (en) * 2021-11-30 2022-03-25 珠海大横琴科技发展有限公司 Data processing method and device
CN114925260A (en) * 2022-05-30 2022-08-19 南瑞集团有限公司 Intelligent bidding information fitting method
CN116414874A (en) * 2023-06-07 2023-07-11 益普索(中国)咨询有限公司 Bid information management system and method
CN116452158A (en) * 2023-06-19 2023-07-18 博思数采科技发展有限公司 Method, device, equipment and medium for managing index of random extraction of suppliers

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521685A (en) * 2011-11-30 2012-06-27 陕西东显永益机电技术有限公司 Electronic monitoring system
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN103577953A (en) * 2013-07-26 2014-02-12 江苏辉源供应链管理有限公司 Method for intelligently matching relationship of logistics service party and resource party
US20160140501A1 (en) * 2014-11-17 2016-05-19 Oleg Figlin Collaborative project execution in the cloud
CN107369002A (en) * 2017-07-07 2017-11-21 邓华 Engineering project information processing method and system
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN102521685A (en) * 2011-11-30 2012-06-27 陕西东显永益机电技术有限公司 Electronic monitoring system
CN103577953A (en) * 2013-07-26 2014-02-12 江苏辉源供应链管理有限公司 Method for intelligently matching relationship of logistics service party and resource party
US20160140501A1 (en) * 2014-11-17 2016-05-19 Oleg Figlin Collaborative project execution in the cloud
CN107369002A (en) * 2017-07-07 2017-11-21 邓华 Engineering project information processing method and system
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109871387A (en) * 2019-01-29 2019-06-11 广东华伦招标有限公司 Call for bid service data interaction method and system
CN112149954A (en) * 2020-08-18 2020-12-29 果尔佳建筑产业有限公司 Construction project personnel determination method and system, intelligent terminal and storage medium
CN112307081A (en) * 2020-10-24 2021-02-02 上海东方投资监理有限公司 Project budget cost management system, method, electronic device and readable storage medium
CN112766654B (en) * 2020-12-31 2023-11-24 大为国际工程咨询有限公司 Engineering cost data center management system
CN112766654A (en) * 2020-12-31 2021-05-07 大为国际工程咨询有限公司 Engineering cost data center management system
CN113111920A (en) * 2021-03-19 2021-07-13 江苏奔宇车身制造有限公司 Project data management system based on PLM and application method
CN113111920B (en) * 2021-03-19 2021-12-28 江苏奔宇车身制造有限公司 Project data management system based on PLM and application method
CN114240338A (en) * 2021-11-30 2022-03-25 珠海大横琴科技发展有限公司 Data processing method and device
CN114925260A (en) * 2022-05-30 2022-08-19 南瑞集团有限公司 Intelligent bidding information fitting method
CN116414874A (en) * 2023-06-07 2023-07-11 益普索(中国)咨询有限公司 Bid information management system and method
CN116414874B (en) * 2023-06-07 2023-10-03 益普索(中国)咨询有限公司 Bid information management system and method
CN116452158A (en) * 2023-06-19 2023-07-18 博思数采科技发展有限公司 Method, device, equipment and medium for managing index of random extraction of suppliers
CN116452158B (en) * 2023-06-19 2023-10-13 博思数采科技发展有限公司 Method, device, equipment and medium for managing index of random extraction of suppliers

Similar Documents

Publication Publication Date Title
CN108197910A (en) A kind of project for bidding project verification management system
Wang et al. Robot scheduling for mobile‐rack warehouses: Human–robot coordinated order picking systems
Pierreval et al. Using evolutionary algorithms and simulation for the optimization of manufacturing systems
Partovi et al. Classifying inventory using an artificial neural network approach
Chan et al. Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
Chan et al. Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems
WO2017045329A1 (en) Registration method and system
US20060212337A1 (en) Method and system for automatic assignment of sales opportunities to human agents
CN107918864A (en) Electronic insurance policy generation method, device, computer equipment and storage medium
Babazadeh et al. A novel meta-heuristic approach to solve fuzzy multi-objective straight and U-shaped assembly line balancing problems
CN110322093A (en) Information processing method, information display method, device and calculating equipment
CN109102345A (en) A kind of different purchase orders intersection tune pallet piling up method and system of B2B E-commerce
Vignesh Kumar et al. Tolerance allocation of complex assembly with nominal dimension selection using Artificial Bee Colony algorithm
CN111144938A (en) Sales lead rating method and system suitable for automobile industry
CN115775124A (en) Event network-based spare part inventory management method and device and electronic equipment
Kamali et al. A discrete event simulation method for performance analysis of an additive manufacturing in the dental clinic
Qi et al. An improved hierarchical genetic algorithm for collaborative optimization of manufacturing processes in metal structure manufacturing systems
Zhang et al. A double-layered optimisation approach for the integrated due date assignment and scheduling problem
CN116451936A (en) Scheduling method, system and storage medium based on genetic algorithm
CN115238194A (en) Book recommendation method, computing device and computer storage medium
Maroof et al. An integrated approach for the operational design of a cellular manufacturing system
Adeli et al. Integrated sourcing and inventory decisions considering sources’ disruptions with a hybrid simulation-MOPSO-TOPSIS approach: A Pharmaceutical case study
Azouz et al. Addressing over-correction in adaptive card-based pull control systems
Gopsill et al. Optimal configurations of Minimally Intelligent additive manufacturing machines for Makerspace production environments
Panghal et al. A study on adoption enablers of 3D printing technology for sustainable food supply chain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622

RJ01 Rejection of invention patent application after publication