CN108197179A - Facility information querying method and terminal device - Google Patents

Facility information querying method and terminal device Download PDF

Info

Publication number
CN108197179A
CN108197179A CN201711407049.9A CN201711407049A CN108197179A CN 108197179 A CN108197179 A CN 108197179A CN 201711407049 A CN201711407049 A CN 201711407049A CN 108197179 A CN108197179 A CN 108197179A
Authority
CN
China
Prior art keywords
power equipment
facility information
information
mark
system diagram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711407049.9A
Other languages
Chinese (zh)
Inventor
刘建华
牛孟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Gucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Gucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd, Gucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711407049.9A priority Critical patent/CN108197179A/en
Publication of CN108197179A publication Critical patent/CN108197179A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/242Query formulation
    • G06F16/2428Query predicate definition using graphical user interfaces, including menus and forms
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/93Document management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Computational Linguistics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Human Computer Interaction (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is suitable for equipment query technical field more particularly to a kind of facility information querying method and terminal device.The method includes:The power equipment information inquiring request that user triggers on power equipment system diagram is received, power equipment information inquiring request carries power equipment mark;The query type for determining power equipment information inquiring request is identified according to power equipment;Obtain the corresponding facility information table of query type;Power equipment information corresponding with power equipment mark is inquired, and query result is back in power equipment system diagram in facility information table according to power equipment mark.After using the above scheme, the safe and stable operation of power grid ensure that, obtain the bumper harvests of Social benefit and economic benefit.

Description

Facility information querying method and terminal device
Technical field
The invention belongs to equipment query technical field more particularly to a kind of facility information querying methods and terminal device.
Background technology
Grid operating conditions change at any time, and scheduling person on duty is monitoring power grid and during equipment operation condition, need with When real time data is judged.
In query facility parameter, since device category is more, model is numerous and diverse, and traditional papery data is in inquiry and preservation side Face, the duplication of labour is more and efficiency is low, and causes paper waste, it is clear that has been not suitable with the requirement of Standardization Construction, and some Data work personnel also need to reference room to be searched when consulting, very inconvenient, waste time, reduce staff Working efficiency.
Invention content
In view of this, it is existing to solve an embodiment of the present invention provides a kind of facility information querying method and terminal device Some data works personnel also need to reference room to be searched when consulting in technology, very inconvenient, waste time, and reduce The problem of working efficiency of staff.
The first aspect of the embodiment of the present invention provides a kind of facility information querying method, following steps:
Receive the power equipment information inquiring request that user triggers on power equipment system diagram, the power equipment information Inquiry request carries power equipment mark;
The query type for determining the power equipment information inquiring request is identified according to the power equipment;
Obtain the corresponding facility information table of the query type;
Inquiry and the corresponding electricity of power equipment mark in the facility information table are identified according to the power equipment Power facility information, and query result is back in the power equipment system diagram.
It is described query result is back to the power equipment system diagram to include as further technical solution:
Obtain the facility information item number inquired in the query result;
Judge whether the facility information item number is more than the item number threshold value to prestore;
If it is determined that the facility information item number is not above the item number threshold value, then according to preset display rule adjustment institute Query result is stated, and the query result after adjusting is back in the power equipment system diagram and is shown.
As further technical solution, the method further includes:
The electricity is established in scheduling system according to the connection relation between the power equipment and the power equipment to prestore Power device systems figure;
It receives the information of the power equipment and establishes facility information table, the facility information table carries power equipment mark Know;
It is upper corresponding with the facility information table that the power equipment in the power equipment system diagram is corresponded into addition Power equipment mark.
As further technical solution, the method further includes:
The change request of power equipment information is received, the power equipment information change request, which carries, needs the electric power changed to set For content after content before mark, change and change;
The power equipment mark changed as needed, content, change need more after content and the change before the change The power equipment changed identifies corresponding power equipment information.
As further technical solution, the method further includes:
Receiving power equipment information increases request, and the power equipment information increases the electric power that request carries information to be increased Device identification, content to be increased and position to be increased;
According to the power equipment of information to be increased mark, the content to be increased and the position to be increased, change and wait to increase The power equipment of information is added to identify corresponding power equipment information.
The second aspect of the embodiment of the present invention provides a kind of facility information inquiry unit, including:
Information inquiring request receiving module, for receiving the power equipment information that user triggers on power equipment system diagram Inquiry request, the power equipment information inquiring request carry power equipment mark;
Query type determining module determines the power equipment information inquiring request for being identified according to the power equipment Query type;
Facility information table acquisition module, for obtaining the corresponding facility information table of the query type;
Query result return module, for according to the power equipment mark in the facility information table inquiry with it is described Power equipment identifies corresponding power equipment information, and query result is back in the power equipment system diagram.
As further technical solution, the query result returns to module and is additionally operable to:
Obtain the facility information item number inquired in the query result;
Judge whether the facility information item number is more than the item number threshold value to prestore;
If it is determined that the facility information item number is not above the item number threshold value, then according to preset display rule adjustment institute Query result is stated, and the query result after adjusting is back in the power equipment system diagram and is shown.
As further technical solution, described device further includes:
Power equipment system diagram establishes module, for according to the connection between the power equipment and the power equipment to prestore Relationship establishes the power equipment system diagram in scheduling system;
Facility information table establishes module, described to set for receiving the information of the power equipment and establishing facility information table Standby information table carries power equipment mark;
Power equipment identifies add module, for the power equipment in the power equipment system diagram to be corresponded to addition Upper power equipment mark corresponding with the facility information table.
The third aspect of the embodiment of the present invention provides a kind of facility information inquiry terminal device, including memory, processing Device and the computer program that can be run in the memory and on the processor is stored in, described in the processor performs The method as described in above-mentioned first aspect is realized during computer program.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage Media storage has computer program, and the side as described in above-mentioned first aspect is realized when the computer program is executed by processor Method.
Existing advantageous effect is the embodiment of the present invention compared with prior art:After using the above scheme, in query facility During parameter, corresponding equipment is directly clicked in device systems figure, you can show, substantially increase the work of staff Efficiency, the problem of also solving papery data bad preservation, particularly when handling electric network fault, be staff quick and precisely Ground judges, and provides powerful support, ensure that the safe and stable operation of power grid, obtains Social benefit and economic benefit Bumper harvests.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the step schematic diagram for the facility information querying method that the embodiment of the present invention one provides;
Fig. 2 is the structure diagram of facility information inquiry unit provided by Embodiment 2 of the present invention;
Fig. 3 is the structure diagram for the facility information inquiry unit that the embodiment of the present invention three provides;
Fig. 4 is the schematic diagram of facility information inquiry terminal device that the embodiment of the present invention four provides.
Specific embodiment
In being described below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specifically The present invention can also be realized in the other embodiments of details.In other situations, it omits to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one
As shown in Figure 1, the step schematic diagram for facility information querying method provided in an embodiment of the present invention, including:
Step S101 receives the power equipment information inquiring request that user triggers on power equipment system diagram, the electricity Power facility information inquiry request carries power equipment mark.
Specifically, when user wants to inquire power equipment information, power equipment letter is clicked on power equipment system diagram Inquiry request is ceased, after received server-side to power equipment information inquiring request, checks the carrying of power equipment information inquiring request Power equipment mark.
Step S102 identifies the query type for determining the power equipment information inquiring request according to the power equipment.
Query type is determined specifically, being identified according to power equipment, for example, power equipment mark can be Digital ID, Can also be alphabetical mark, it is preferred that 1 and 0 may be used in Digital ID, and mark 1 represents power equipment parameter, and mark 0 represents Power equipment curve when server end, which gets power equipment, is identified as 1, determines the inquiry of power equipment information inquiring request Type is power equipment parameter query.Certainly, other kinds of identification means are also within the protection domain of this programme.
Step S103 obtains the corresponding facility information table of the query type.
Specifically, after power equipment query type is determined according to power equipment mark, power equipment query type is obtained Corresponding facility information table, also comprising corresponding power equipment query type in facility information table, during inquiry, according to power equipment Query type inquires corresponding facility information table, and the facility information table inquired can have multiple or one, it is also possible to look into Ask less than situation, when inquiry not then, server end carries out secondary inquiry automatically, if secondary inquire, returns The facility information table inquired if still not inquiring, returns to inquiry and unsuccessfully prompts, system carries out secondary inquiry energy automatically The accuracy of inquiry is improved, one query is avoided and may be because that the influence of extraneous factor causes not inquire and think to inquire The situation of failure, improves accuracy and search efficiency.
Step S104, according to power equipment mark, inquiry is identified with the power equipment in the facility information table Corresponding power equipment information, and query result is back in the power equipment system diagram.
Specifically, corresponding power equipment information is inquired in the facility information table inquired according to power equipment mark, Such as the power equipment information parameter of inquiry or power equipment information parameter curve, and in return value power equipment system diagram.
After adopting the above technical scheme, in query facility parameter, corresponding equipment is directly clicked in device systems figure, The problem of can showing, substantially increase the working efficiency of staff, also solving papery data bad preservation, especially It is when handling electric network fault, is rapidly and accurately judged for staff, provide powerful support, ensure that the peace of power grid Full stable operation obtains the bumper harvests of Social benefit and economic benefit.
It is described query result is back to the power equipment system diagram to include in addition, in a specific example:
Obtain the facility information item number inquired in the query result.
Judge whether the facility information item number is more than the item number threshold value to prestore.
If it is determined that the facility information item number is not above the item number threshold value, then according to preset display rule adjustment institute Query result is stated, and the query result after adjusting is back in the power equipment system diagram and is shown.
Specifically, after the completion of inquiry, the facility information item number inquired in query result is obtained first, judges facility information Whether item number is more than the item number threshold value to prestore, it is preferred that item number threshold value can be 5, if it is determined that facility information item number is not super Item number threshold value is crossed, representing the query result got can be used directly to use, moderate range, if it is determined that facility information item number surpasses Item number threshold value has been crossed, then has represented that the query result range got is excessive, data may inquire less accurate, need again really Determine power identification to be inquired, be conducive to reduce query context, staff is helped to be quickly found out the information of needs, improve work The working efficiency of personnel.
In addition, in a specific example, the method further includes:
The electricity is established in scheduling system according to the connection relation between the power equipment and the power equipment to prestore Power device systems figure.
It receives the information of the power equipment and establishes facility information table, the facility information table carries power equipment mark Know.
It is upper corresponding with the facility information table that the power equipment in the power equipment system diagram is corresponded into addition Power equipment mark.
Specifically, being to establish power equipment system diagram first, the equipment figure on power equipment system diagram is referred to as pel, Such as:Transformer is referred to as transformer pel.Each pel can correspond to corresponding power equipment mark, be referred to as pel ID, facility information table are stored in system database, and facility information table includes transformer equipment table, switchgear table, disconnecting link and sets Standby table etc., each equipment corresponds to respective attribute information.
When double-clicking the pel on power equipment system diagram, system is identified in ID to facility information table by pel and searched for, searched Then rope carries out arranging order, in power equipment in a manner of the table woven to the record attribute information of corresponding pel It is shown on system diagram.
In addition, in a specific example, the method further includes:
The change request of power equipment information is received, the power equipment information change request, which carries, needs the electric power changed to set For content after content before mark, change and change.
The power equipment mark changed as needed, content, change need more after content and the change before the change The power equipment changed identifies corresponding power equipment information.
Specifically, power equipment information can in real time be changed according to the variation of power equipment, when power equipment changes, The change request of power equipment information is received, content is more after content and change before the power equipment mark changed as needed, change New power equipment information, ensure that the accuracy of data, prevents data update from slowly causing power equipment information and power equipment Actual conditions do not correspond to, influence the judgement of staff.
In addition, in a specific example, the method further includes:
Receiving power equipment information increases request, and the power equipment information increases the electric power that request carries information to be increased Device identification, content to be increased and position to be increased.
According to the power equipment of information to be increased mark, the content to be increased and the position to be increased, change and wait to increase The power equipment of information is added to identify corresponding power equipment information.
Specifically, other than changing power equipment information, power equipment information can also be increased, when power equipment has increase When, needing to correspond to increases power equipment information, the real-time effective of data is ensure that, while increase data conveniently, without work Personnel are manually recorded, reduce corrupt data rate.
In addition, in a specific example, also there is login authentication, staff is registered first, is registered After work(, log-on message is stored in the information processing platform, and when being worked, staff in the information processing platform log in and test Card, after being verified, could carry out subsequent operation, equally ensure the safety of platform.Different accounts is additionally provided with different power Limit, it is preferred that can be divided into administrator's identity and operator's identity, administrator's identity can allocation processing task give operator's body The account of part, operator's identity can only carry out task operating, and this mode of operation division of labor is clear and definite so that staff operates more Succinctly, understand, use and be also more convenient.
Embodiment two
As shown in Fig. 2, the structure diagram for facility information inquiry unit provided in an embodiment of the present invention, including:
Information inquiring request receiving module 201, for receiving the power equipment that user triggers on power equipment system diagram Information inquiring request, the power equipment information inquiring request carry power equipment mark.
Query type determining module 202 determines the power equipment information inquiry for being identified according to the power equipment The query type of request.
Facility information table acquisition module 203, for obtaining the corresponding facility information table of the query type.
Query result return module 204, for according to the power equipment mark in the facility information table inquiry with The power equipment identifies corresponding power equipment information, and query result is back in the power equipment system diagram.
After adopting the above technical scheme, in query facility parameter, corresponding equipment is directly clicked in device systems figure, The problem of can showing, substantially increase the working efficiency of staff, also solving papery data bad preservation, especially It is when handling electric network fault, is rapidly and accurately judged for staff, provide powerful support, ensure that the peace of power grid Full stable operation obtains the bumper harvests of Social benefit and economic benefit.
Embodiment three
As shown in figure 3, the structure diagram for facility information inquiry unit provided in an embodiment of the present invention, including:
Information inquiring request receiving module 301, for receiving the power equipment that user triggers on power equipment system diagram Information inquiring request, the power equipment information inquiring request carry power equipment mark.
Query type determining module 302 determines the power equipment information inquiry for being identified according to the power equipment The query type of request.
Facility information table acquisition module 303, for obtaining the corresponding facility information table of the query type.
Query result return module 304, for according to the power equipment mark in the facility information table inquiry with The power equipment identifies corresponding power equipment information, and query result is back in the power equipment system diagram.
In addition, in a specific example, the query result returns to module 304 and is additionally operable to:
Obtain the facility information item number inquired in the query result.
Judge whether the facility information item number is more than the item number threshold value to prestore.
If it is determined that the facility information item number is not above the item number threshold value, then according to preset display rule adjustment institute Query result is stated, and the query result after adjusting is back in the power equipment system diagram and is shown.
In addition, in a specific example, described device further includes:
Power equipment system diagram establishes module 305, for according between the power equipment and the power equipment to prestore Connection relation establishes the power equipment system diagram in scheduling system.
Facility information table establishes module 306, described for receiving the information of the power equipment and establishing facility information table Facility information table carries power equipment mark.
Power equipment identifies add module 307, for the power equipment in the power equipment system diagram to be corresponded to Power equipment mark corresponding with the facility information table in addition.
In addition, in a specific example, described device further includes:
Request receiving module 308 is changed, for receiving the change request of power equipment information, the power equipment information change Request carry need change power equipment mark, change before content and change after content.
Power equipment information changes module 309, and the power equipment for changing as needed identifies, content before the change With content after the change, change needs the power equipment changed to identify corresponding power equipment information.
In addition, in a specific example, described device further includes:
Increase request receiving module 310, increase request for receiving power equipment information, the power equipment information increases Request carries power equipment mark, content to be increased and the position to be increased of information to be increased.
Power equipment information increase module 311, for according to the power equipment of information to be increased mark, it is described it is to be increased in Hold and the position to be increased, the power equipment for changing information to be increased identify corresponding power equipment information.
After adopting the above technical scheme, in query facility parameter, corresponding equipment is directly clicked in device systems figure, The problem of can showing, substantially increase the working efficiency of staff, also solving papery data bad preservation, especially It is when handling electric network fault, is rapidly and accurately judged for staff, provide powerful support, ensure that the peace of power grid Full stable operation obtains the bumper harvests of Social benefit and economic benefit.
It should be understood that the size of the serial number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without coping with the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Example IV
As shown in figure 4, be the schematic diagram of facility information inquiry terminal device provided in an embodiment of the present invention, the embodiment Facility information inquiry terminal device 4 includes:It processor 40, memory 41 and is stored in the memory 41 and can be described The computer program 42 run on processor 40, such as facility information polling routine.The processor 40 performs the computer Realize the step in above-mentioned each facility information querying method embodiment during program 42, such as step 101 shown in FIG. 1 is to 104. Alternatively, the processor 40 realizes the work(of each module/unit in above-mentioned each device embodiment when performing the computer program 42 Can, such as the function of module 201 to 204 shown in Fig. 2.
Illustratively, the computer program 42 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 41, and are performed by the processor 40, to complete the present invention.Described one A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for It describes the computer program 42 and inquires the implementation procedure in terminal device 4 in the facility information.For example, the computer journey Sequence 42 can be divided into synchronization module, summarizing module, acquisition module, return to module (module in virtual bench), each module Concrete function is as follows:
Receive the power equipment information inquiring request that user triggers on power equipment system diagram, the power equipment information Inquiry request carries power equipment mark.
The query type for determining the power equipment information inquiring request is identified according to the power equipment.
Obtain the corresponding facility information table of the query type.
Inquiry and the corresponding electricity of power equipment mark in the facility information table are identified according to the power equipment Power facility information, and query result is back in the power equipment system diagram.
It is described query result is back to the power equipment system diagram to include:
Obtain the facility information item number inquired in the query result.
Judge whether the facility information item number is more than the item number threshold value to prestore.
If it is determined that the facility information item number is not above the item number threshold value, then according to preset display rule adjustment institute Query result is stated, and the query result after adjusting is back in the power equipment system diagram and is shown.
The electricity is established in scheduling system according to the connection relation between the power equipment and the power equipment to prestore Power device systems figure.
It receives the information of the power equipment and establishes facility information table, the facility information table carries power equipment mark Know.
It is upper corresponding with the facility information table that the power equipment in the power equipment system diagram is corresponded into addition Power equipment mark.
The change request of power equipment information is received, the power equipment information change request, which carries, needs the electric power changed to set For content after content before mark, change and change.
The power equipment mark changed as needed, content, change need more after content and the change before the change The power equipment changed identifies corresponding power equipment information.
Receiving power equipment information increases request, and the power equipment information increases the electric power that request carries information to be increased Device identification, content to be increased and position to be increased.
According to the power equipment of information to be increased mark, the content to be increased and the position to be increased, change and wait to increase The power equipment of information is added to identify corresponding power equipment information.
The facility information inquiry terminal device 4 can be desktop PC, notebook, palm PC and cloud service The computing devices such as device.The facility information, which inquires terminal device, may include, but be not limited only to, processor 40, memory 41.Ability Field technique personnel are appreciated that Fig. 4 is only the example of facility information inquiry terminal device 4, do not form and facility information is looked into The restriction of terminal device 4 is ask, components more more or fewer than diagram can be included and either combine certain components or different Component, such as facility information inquiry terminal device can also include input-output equipment, network access equipment, bus etc..
Alleged processor 40 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor Deng.
The memory 41 can be the internal storage unit of facility information inquiry terminal device 4, such as equipment letter The hard disk or memory of breath inquiry terminal device 4.The memory 41 can also be the outer of the facility information inquiry terminal device 4 The plug-in type hard disk being equipped in portion's storage device, such as facility information inquiry terminal device 4, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, The memory 41 can also both include the internal storage unit of facility information inquiry terminal device 4 or including external storage Equipment.The memory 41 be used for store the computer program and the facility information inquiry terminal device needed for other Program and data.The memory 41 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work( Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that each unit is individually physically present, can also two or more units integrate in a unit, it is above-mentioned integrated The form that hardware had both may be used in unit is realized, can also be realized in the form of SFU software functional unit.In addition, each function list Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Above system The specific work process of middle unit, module can refer to the corresponding process in preceding method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may realize that each exemplary lists described with reference to the embodiments described herein Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is performed with hardware or software mode, specific application and design constraint depending on technical solution.Professional technician Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, it can be with It realizes by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of division of logic function can have other dividing mode in actual implementation, such as Multiple units or component may be combined or can be integrated into another system or some features can be ignored or does not perform.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be by some interfaces, device Or the INDIRECT COUPLING of unit or communication connection, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also That each unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and be independent product sale or In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation All or part of flow in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium It can include:Any entity of the computer program code or device, recording medium, USB flash disk, mobile hard disk, magnetic can be carried Dish, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and Telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to aforementioned reality Example is applied the present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each Technical solution recorded in embodiment modifies or carries out equivalent replacement to which part technical characteristic;And these are changed Or replace, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution should all It is included within protection scope of the present invention.

Claims (10)

1. a kind of facility information querying method, which is characterized in that include the following steps:
Receive the power equipment information inquiring request that user triggers on power equipment system diagram, the power equipment information inquiry Request carries power equipment mark;
The query type for determining the power equipment information inquiring request is identified according to the power equipment;
Obtain the corresponding facility information table of the query type;
According to power equipment mark, inquiry is set with the corresponding electric power of power equipment mark in the facility information table Standby information, and query result is back in the power equipment system diagram.
2. facility information querying method as described in claim 1, which is characterized in that described that query result is back to the electricity Power device systems figure includes:
Obtain the facility information item number inquired in the query result;
Judge whether the facility information item number is more than the item number threshold value to prestore;
If it is determined that the facility information item number is not above the item number threshold value, then looked into according to preset display rule adjustment It askes as a result, and the query result after adjusting is back in the power equipment system diagram showing.
3. facility information querying method as described in claim 1, which is characterized in that further include:
The electric power is established in scheduling system according to the connection relation between the power equipment and the power equipment to prestore to set Standby system diagram;
It receives the information of the power equipment and establishes facility information table, the facility information table carries power equipment mark;
The power equipment in the power equipment system diagram is corresponded to and is added and corresponding electricity in the facility information table Power device identification.
4. facility information querying method as described in claim 1, which is characterized in that further include:
The change request of power equipment information is received, the power equipment information change request carries the power equipment mark for needing to change Know, change before content and change after content;
The power equipment mark changed as needed, content, change need what is changed after content and the change before the change Power equipment identifies corresponding power equipment information.
5. facility information querying method as described in claim 1, which is characterized in that further include:
Receiving power equipment information increases request, and the power equipment information increases the power equipment that request carries information to be increased Mark, content to be increased and position to be increased;
According to the power equipment of information to be increased mark, the content to be increased and the position to be increased, letter to be increased is changed The power equipment of breath identifies corresponding power equipment information.
6. a kind of facility information inquiry unit, which is characterized in that including:
Information inquiring request receiving module, for receiving the power equipment information inquiry that user triggers on power equipment system diagram Request, the power equipment information inquiring request carry power equipment mark;
Query type determining module determines looking into for the power equipment information inquiring request for being identified according to the power equipment Ask type;
Facility information table acquisition module, for obtaining the corresponding facility information table of the query type;
Query result returns to module, for being inquired and the electric power in the facility information table according to power equipment mark The corresponding power equipment information of device identification, and query result is back in the power equipment system diagram.
7. facility information inquiry unit as claimed in claim 6, which is characterized in that the query result returns to module and also uses In:
Obtain the facility information item number inquired in the query result;
Judge whether the facility information item number is more than the item number threshold value to prestore;
If it is determined that the facility information item number is not above the item number threshold value, then looked into according to preset display rule adjustment It askes as a result, and the query result after adjusting is back in the power equipment system diagram showing.
8. facility information inquiry unit as claimed in claim 6, which is characterized in that further include:
Power equipment system diagram establishes module, for according to the connection relation between the power equipment and the power equipment to prestore The power equipment system diagram is established in scheduling system;
Facility information table establishes module, for receiving the information of the power equipment and establishing facility information table, the equipment letter It ceases table and carries power equipment mark;
Power equipment identifies add module, for by the power equipment in the power equipment system diagram correspond to addition it is upper with Corresponding power equipment mark in the facility information table.
9. a kind of facility information inquires terminal device, including memory, processor and it is stored in the memory and can be The computer program run on the processor, which is characterized in that the processor is realized such as when performing the computer program The step of any one of claim 1 to 5 the method.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In when the computer program is executed by processor the step of realization such as any one of claim 1 to 5 the method.
CN201711407049.9A 2017-12-22 2017-12-22 Facility information querying method and terminal device Pending CN108197179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711407049.9A CN108197179A (en) 2017-12-22 2017-12-22 Facility information querying method and terminal device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711407049.9A CN108197179A (en) 2017-12-22 2017-12-22 Facility information querying method and terminal device

Publications (1)

Publication Number Publication Date
CN108197179A true CN108197179A (en) 2018-06-22

Family

ID=62583481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711407049.9A Pending CN108197179A (en) 2017-12-22 2017-12-22 Facility information querying method and terminal device

Country Status (1)

Country Link
CN (1) CN108197179A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109583524A (en) * 2018-10-15 2019-04-05 平安科技(深圳)有限公司 Method, electronic equipment and the computer readable storage medium of server admin
CN112150834A (en) * 2019-06-28 2020-12-29 浙江宇视科技有限公司 Information publishing method, device, equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102033953A (en) * 2010-12-25 2011-04-27 江西九江供电公司 Equipment accounting management method for electric distribution network
CN103310300A (en) * 2013-05-27 2013-09-18 河南省电力公司鹤壁供电公司 Mobile checking management method and system of power assets
CN105701271A (en) * 2015-12-29 2016-06-22 中国电力科学研究院 Creating and deleting method for device in electric power system graph/model hybrid simulation modeling
CN106339267A (en) * 2016-09-08 2017-01-18 华为技术有限公司 Object query method and server side

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102033953A (en) * 2010-12-25 2011-04-27 江西九江供电公司 Equipment accounting management method for electric distribution network
CN103310300A (en) * 2013-05-27 2013-09-18 河南省电力公司鹤壁供电公司 Mobile checking management method and system of power assets
CN105701271A (en) * 2015-12-29 2016-06-22 中国电力科学研究院 Creating and deleting method for device in electric power system graph/model hybrid simulation modeling
CN106339267A (en) * 2016-09-08 2017-01-18 华为技术有限公司 Object query method and server side

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梅小彬: ""发电设备综合管理系统的研究与开发"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109583524A (en) * 2018-10-15 2019-04-05 平安科技(深圳)有限公司 Method, electronic equipment and the computer readable storage medium of server admin
CN112150834A (en) * 2019-06-28 2020-12-29 浙江宇视科技有限公司 Information publishing method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108564181A (en) Electrical equipment fault detects and method for maintaining and terminal device
CN109815657A (en) A kind of identity identifying method and terminal device based on alliance's chain
CN108874640A (en) A kind of appraisal procedure and device of clustering performance
CN109523225A (en) A kind of measure of managing contract, system and terminal device
CN105940377A (en) Methods, systems, and computer readable media for a cloud-based virtualization orchestrator
CN109299846A (en) A kind of nuclear power plant equipment analysis method for reliability, system and terminal device
CN107273540A (en) Distributed search and index updating method, system, server and computer equipment
CN112698971A (en) Rule engine based parameter conversion method, device, equipment and medium
CN109241068A (en) The method, apparatus and terminal device that foreground and background data compares
CN109978474A (en) A kind of Work-flow control method and Work-flow control device
CN108171362A (en) Power supply facilities breakdown repair method, system and terminal device
CN105243125B (en) Operation method, device, cluster and the inquiry data method and device of PrestoDB clusters
CN103679557B (en) Power system operating mode data management system based on C/S framework and its implementation
CN107609797A (en) Electric operating checking method and terminal device
CN107133233B (en) Processing method and device for configuration data query
CN109064104A (en) Material equipment management method, system and terminal device
CN109685641A (en) A kind of information processing method and device
CN108197179A (en) Facility information querying method and terminal device
CN109039714A (en) The management method and device of resource in cloud computing system
CN106845257A (en) One kind etc. is protected analysis method and waits guarantor's analysis system
CN109871962A (en) A kind of method and terminal device of terminal price assessment
CN107818522A (en) Custom power status inquiry method and terminal device
US8832110B2 (en) Management of class of service
CN109447440A (en) A kind of environmental objective appraisal management method and apparatus, terminal device and storage medium
CN109377391A (en) A kind of tracking of information method, storage medium and server

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622