A kind of method and device for reducing Simulations of Water Waves Due To Landslides and endangering dam
Technical field
The present invention relates to a kind of method and devices for reducing Simulations of Water Waves Due To Landslides and endangering dam, belong to hydraulic and hydroelectric engineering protection knot
Structure technical field.
Background technology
Because power station is typically all to build mountain area in, a certain number of accumulation bodies are distributed with around reservoir area.In heavy rain season, portion
Divide accumulation body that may come down because of stability problem.When there is landslide, the water in storehouse can be caused to be formed and surged,
The high energy current for surging formed can cause high risks to dam.Landslide in order to prevent, currently used method master
Have following several:One kind is that unstable massif administer to stabilize it;Another kind is when building dam, increases dam
Thickness and height;Also one kind is to reduce operating water level.The method of the prior art in general all can be by a relatively large margin increase
Construction investment reduces on-road efficiency, and it is undesirable in turn result in scheme economic indicator.
The content of the invention
It is an object of the present invention to provide a kind of method and devices for reducing Simulations of Water Waves Due To Landslides and endangering dam, can effectively cut
The weak harm surged to dam formed by landslide, to ensure the operational safety of dam and power station, so as to overcome existing skill
The deficiency of art.
The technical proposal of the invention is realized in this way:
A kind of method that endanger dam of reduction Simulations of Water Waves Due To Landslides of the present invention, this method be Simulations of Water Waves Due To Landslides possibility spot 1~
The one or multi-channel barrier bubbled through the water column is set on the water surface at 2km, and weakening landslide by the barrier bubbled through the water column forms
Streaming potential of surging;The flow velocity of Simulations of Water Waves Due To Landslides and height are reduced to downstream dam can be in tolerance range, to ensure that landslide is gushed
Wave will not damage to dam.
In preceding method, the barrier bubbled through the water column hangs grid using folding rule shape, and folding rule shape hangs grid both ends and bank
Anchor upsetting connects;Folding rule shape, which hangs grid, to be made of one group of hinged folding rule unit of head and the tail;It is set between two sides at interval of certain distance
There are one buoyancy tank, buoyancy tank is connected with folding rule unit nearby;Folding rule unit close to bank is hinged with anchor upsetting on the bank.
For the device that a kind of reduction Simulations of Water Waves Due To Landslides of the present invention of the above method endangers dam, including being located at two sides
Anchor upsetting;Between the anchor upsetting of two sides grid are hanged equipped with folding rule shape;Folding rule shape hangs anchor upsetting of the grid both ends respectively with two sides and is hinged;Folding rule shape
Outstanding grid are made of the folding rule unit that one group of head and the tail is hinged or is flexible coupling;One group be equally spaced is equipped between two anchor upsettings to float
Case, each buoyancy tank are hinged with folding rule unit nearby.
In aforementioned device, the folding rule unit includes four square steel, and every square steel both ends are equipped with hinge hole, four sides
Steel both ends are mutually hinged the quadrangle component for forming retractable through axis pin;The quadrangle component of retractable is left
End is hinged through vertical single binaural connector and the folding rule unit of left neighbour, and the quadrangle member right end of retractable is through vertical ears
Connector and the folding rule unit of right neighbour are hinged.
In aforementioned device, the quadrangle member lower of the retractable through parallel binaural connector and buoyancy tank at the top of
Monaural connector is hinged.
By adopting the above-described technical solution, compared with prior art, the present invention the device of the invention works as Simulations of Water Waves Due To Landslides mistake
When coming, surge from grid body by being blended by water turbulence and realizing energy dissipating, reduced Simulations of Water Waves Due To Landslides speed and height, pass through multistage
After outstanding grid, Simulations of Water Waves Due To Landslides speed and height can be reduced to acceptable degree.So reach the Simulations of Water Waves Due To Landslides before dam
Through not damaging substantially to dam.It is not completely by water impact, even if preceding several outstanding grid meetings due to having gap among outstanding grid
It is destroyed, outstanding grid below can also play a role.In addition, Simulations of Water Waves Due To Landslides is rare events, then in time to hanging grid after occurring
It is repaired, possible Simulations of Water Waves Due To Landslides next time can be met.Compared to past Simulations of Water Waves Due To Landslides control method, smaller, effect is invested
Preferably, there can be greatly economic imitate to avoid the generation of large-scale slope treatment and increasing dam height or control operating level
Benefit.
Description of the drawings
Fig. 1 is the method schematic diagram of the present invention;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is the structure diagram of folding rule unit;
Fig. 4 is the assembling schematic diagram of folding rule unit;
Fig. 5 is the connection diagram of folding rule unit and buoyancy tank;
Fig. 6 is the structure diagram of buoyancy tank;
Fig. 7 is the connection diagram of three folding rule units;
Fig. 8 is vertical single binaural connector structure diagram;
Fig. 9 is vertical binaural connector structure diagram;
Figure 10 is parallel binaural connector structure diagram.
In figure:The upsetting of 1- anchors, 2- folding rules unit, 3- buoyancy tanks, 4- square steel, 5- hinge holes, 6- axis pins, the four of 7- retractables
Side shape component, 8- vertically single binaural connector, the vertical binaural connectors of 9-, the parallel binaural connectors of 10-, 11- monaurals connector,
12- folding rule shapes hang grid, 13- dams, 14- monaurals piece, 15- ears pieces.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, but not as to any of the present invention
Limitation.
The method that a kind of reduction Simulations of Water Waves Due To Landslides of the present invention endangers dam, as depicted in figs. 1 and 2, this method is in cunning
Slope surge may be at 1~2km of spot the water surface on the one or multi-channel barrier bubbled through the water column is set, under normal conditions may be used
3~20 barriers bubbled through the water column are set, the setting quantity of barrier also can according to actual use it needs to be determined that;By floating
Weaken the streaming potential of surging of landslide formation in the barrier of the water surface;The flow velocity and height for making Simulations of Water Waves Due To Landslides are reduced to downstream dam
It can be in tolerance range, to ensure that Simulations of Water Waves Due To Landslides will not damage to dam.The barrier bubbled through the water column uses folding rule shape
Outstanding grid, folding rule shape hangs grid both ends and the anchor upsetting on bank connects;Folding rule shape, which hangs grid, to be made of one group of hinged folding rule unit of head and the tail;
It is set between two sides at interval of certain distance there are one buoyancy tank, buoyancy tank is connected with folding rule unit nearby;Folding rule close to bank
Unit is hinged with anchor upsetting on the bank.
For a kind of device that endangers dam of reduction Simulations of Water Waves Due To Landslides of the present invention of the above method, as illustrated in fig. 1 and 2,
Anchor upsetting 1 including being located at two sides;Between the anchor upsetting 1 of two sides grid 12 are hanged equipped with folding rule shape;Folding rule shape hang 12 both ends of grid respectively with
The anchor upsetting 1 of two sides is hinged;Folding rule shape hangs grid 12 and is made of the folding rule unit 2 that one group of head and the tail is hinged or is flexible coupling;In two anchor upsettings 1
Between be equipped with one group of buoyancy tank 3 being equally spaced, each buoyancy tank 3 and folding rule unit 2 nearby are hinged.
As shown in Figure 3 and Figure 4, folding rule unit 2 includes four square steel 4, and every 4 both ends of square steel are equipped with hinge hole 5, and four
4 both ends of root square steel are mutually hinged the quadrangle component 7 for forming retractable through axis pin 6;Four sides of retractable
7 left end of shape component is hinged through vertical single binaural connector 8 and the folding rule unit 2 of left neighbour, and the quadrangle component 7 of retractable is right
Folding rule unit 2 of the end through vertical binaural connector 9 and right neighbour is hinged.
As shown in fig. 6,7 lower end of quadrangle component of retractable is through 3 top of parallel binaural connector 10 and buoyancy tank
Monaural connector 11 is hinged.
Embodiment
According to the related example data of prototype observation analysis of reservoir area Simulations of Water Waves Due To Landslides, if running into ground when Simulations of Water Waves Due To Landslides is along spreading in river channel
When shape mutation or barrier, larger weakening can be subject to.Therefore this example may be set often in Simulations of Water Waves Due To Landslides at 1~2km of spot
The folding rule shape arranged across a certain distance hangs grid, hangs grid and is made of steel, when SEA LEVEL VARIATION, folding rule shape hangs grid can be with hinge
The rotation of connector and realize flexible, middle part is connected with buoyancy tank, and buoyancy tank plays the role of support.Folding rule shape hangs grid and bank
Anchor pier connects, and anchor pier plays fixation.
When it is implemented, folding rule unit 2 can be by professional factory batch machining.It adopts at four 4 both ends of square steel in folding rule unit 2
With round end, and hinge hole 5 is bored, then four 4 both ends of square steel through axis pin 6 are respectively articulated with together, form one as shown in Figure 4
Retractable quadrangle component 7.The upper and lower ends of the quadrangle component 7 of retractable can directly be cut with scissors with axis pin 6
It connects.The left and right ends of the quadrangle component 7 of retractable respectively with vertical single binaural connector 8 and vertical binaural connector 9
It is hinged.Make 2 each folding rule unit 2 of the folding rule to link together unit that can only be freely rotated in two faces, prevent folding rule unit 2
It falls down;Then multiple folding rule units 2 are connected from beginning to end and is connected into a string of long folding rule shapes of composition one and hangs grid 12, folding rule shape hangs
12 both ends of grid and the anchor upsetting 1 positioned at two sides are hinged, form the barrier for weakening surge together.To ensure the safety of dam 13, specifically
During implementation, multiple tracks folding rule shape can be set to hang grid 12, make the flow velocity surged and height be reduced to downstream dam can in tolerance range,
To ensure that Simulations of Water Waves Due To Landslides will not damage to dam.During specific installation, it can be set between the anchor upsetting 1 of two sides between being waited outside more
Buoyancy tank 3 away from arrangement, buoyancy tank 3 are equipped with monaural connector 11, are cut with scissors with the parallel binaural connector 10 of 2 lower part of folding rule unit installation
It connects, makes folding rule unit 2 that can only prevent folding rule unit 2 from toppling over there are one free active face using parallel binaural connector 10.Pass through
Buoyancy tank 3 makes entire folding rule shape hang on grid 12 bubble through the water column always, can be with SEA LEVEL VARIATION automatic lifting.The device of the invention can be automatic
Adjust length and the form on the water surface.