CN108090610A - Orbit construction system based on BIM technology - Google Patents

Orbit construction system based on BIM technology Download PDF

Info

Publication number
CN108090610A
CN108090610A CN201711341031.3A CN201711341031A CN108090610A CN 108090610 A CN108090610 A CN 108090610A CN 201711341031 A CN201711341031 A CN 201711341031A CN 108090610 A CN108090610 A CN 108090610A
Authority
CN
China
Prior art keywords
construction
information
bim
module
arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711341031.3A
Other languages
Chinese (zh)
Inventor
邹文莉
廖思伟
汤文杰
杨梁山
万阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan College of Architectural Technology
Original Assignee
Sichuan College of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan College of Architectural Technology filed Critical Sichuan College of Architectural Technology
Priority to CN201711341031.3A priority Critical patent/CN108090610A/en
Publication of CN108090610A publication Critical patent/CN108090610A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the orbit construction system based on BIM technology, the field data acquisition module including being used to gather parameter needed for construction modeling in real time at the construction field (site);For providing the arrangement and method for construction module of existing GIS geography information, construction equipment information, arrangement and method for construction drawing information, construction personnel's information;For contacting the data stored in the data of collection in worksite and arrangement and method for construction module and passing through the BIM O&M servers of modeling software platform progress construction model foundation built-in in server;For checking working vessels in time and correcting the project schedule plan tracking system of optimization;It is used to help the mobile terminal of staff's real-time reception track construction progress msg.Dynamic Model can be carried out to work progress by BIM technology so that management content becomes to visualize, and improves the ability that manager controls for project content and progress, so as to improve the cooperation efficiency of construction participant, accelerates construction progress.

Description

Orbit construction system based on BIM technology
Technical field
The present invention relates to orbit construction fields, are the orbit construction systems based on BIM technology specifically.
Background technology
Track transportation industry design today, the separation present situation built, runed and the information brought using conventional two-dimensional design Amount limitation and the missing of process of construction information, the operation maintenance management after being built up to rail transportation projects bring huge choose War.The application of BIM technology can efficiently solve information record, succession problem.BIM is by establishing the three of project in the design phase Buildings model is tieed up, then the relevant informations such as civil engineering, electromechanical equipment of project in typing process of construction, make one and melt design, build If, the digitlizations of Whole Life Cycle of Projects, visualization, the integral system information management platform such as operation, really realize operation dimension The informationization of shield.
The situation of the site operation of current track construction is that site operation personnel are according to arrangement and method for construction, the knot worked out in advance It closes national standard specification etc. and carries out site operation, then management carries out an acceptance inspection further according to national acceptance standard.Substantial amounts of drawing, mark The data such as standard are required for taking scene to, to consult at any time.And progress weekly is substantially estimated then according to the condition of construction at scene Go out a numerical value.Such working method, not only inefficiency, but also the accuracy for the data being collected into also urgently is discussed, work The real-time progress of journey is difficult to count, it is also difficult to the reference as managerial decision making.Along with the experienced management of modern project Personnel are rare, and how outstanding experienced administrative staff replace instructing just more such as phoenix feathers and unicorn horns with a set of software mechanism Site operation is the problem that modern project needs solve.And traditional construction data is mostly paper form, is unfavorable for straight The displaying of sight, and lack associating between data and building element, also lack the visual of the operations such as data record, editor, push Change means mode.Therefore providing a kind of orbit construction system based on BIM technology is necessary.
The content of the invention
It is an object of the invention to provide the orbit construction systems based on BIM technology, and track construction is established by BIM technology The dynamic model of process, to improve in work progress the communication and coordination ability between each stage, each specialty, so as to improve construction effect Rate.
The present invention is achieved through the following technical solutions:Orbit construction system based on BIM technology is gathered including field data Module, arrangement and method for construction module, BIM O&Ms server, project schedule plan tracking system, mobile terminal;The field data is adopted Collect module and be used for parameter needed for the modeling of acquisition construction in real time at the construction field (site), using the foundation as foundation construction dynamic model;Institute Arrangement and method for construction module is stated for providing existing GIS geography information, construction equipment information, arrangement and method for construction drawing information, constructor Member's information, using the foundation as foundation construction basic model;The BIM O&Ms server is believed in a manner of being wirelessly transferred with scene The communication of breath acquisition module is to obtain field data, and the data that it is stored with arrangement and method for construction module communication connection calling, for joining Be the data stored in the data of collection in worksite and arrangement and method for construction module and pass through in server built-in modeling software platform into Row construction model is established;The project schedule plan tracking system is connected with BIM O&M server communications, for current to be applied Work model progress is analyzed compared with default schedule, to check working vessels in time and to correct optimization;The movement The communication of terminal and BIM O&Ms server connects, and is used to help track construction of staff's real-time reception after final optimization pass Progress msg.
Its operation principle:BIM O&Ms server transfers construction data from arrangement and method for construction module, to establish work progress Basic model, established by GIS geography information, arrangement and method for construction drawing information construction track condition the basic mould of 3D visualizations Type by the Information Statistics of construction personnel's information and construction equipment information, important technical support is provided to project management, is made What each stage will do, and workload is how many, what is next, what the job order in each stage is, all becomes aobvious It and is clear to so that management content visualization.
Then, BIM O&Ms server is remotely received again from the real-time of the field data acquisition module acquisition of construction site Information, real time information and the basic mould of the 3D generated visualizations in the modeling software platform built in BIM O&M servers Type carries out association process, so as to establish dynamic work progress model, to improve manager for current project content and progress The ability of control.
And project schedule plan tracking system transfers dynamic construction process model from BIM O&M servers and responsible is worked as Preceding construction model progress is analyzed compared with default schedule, and by the situation to construction speed, the construction stage completes Time and quality condition check, the influence of the construction procedure to make mistake and burst accident to progress is analyzed, so as in time more Positive working vessels, and time optimization arrangement and method for construction ensure that engineering can be completed by matter on time.
The construction working personnel at scene then obtain construction speed information in time by mobile terminal, and receive newest work It instructs, so as to reach the construction of live different majors personnel synchronization, according to final constructability 4D models and construction speed Plan carries out construction organization and arrangement, instructs development time and the content of work in every, improves construction efficiency.
In order to preferably realize the present invention, further, the field data acquisition module is adopted including electrical equipment information Collect unit, Weather information collecting unit, geographical information collection unit, construction personnel's information acquisition unit;The electrical equipment letter Breath collecting unit, Weather information collecting unit, geographical information collection unit, construction personnel's information acquisition unit are also respectively connected with nothing Line communication module, to realize the wireless telecommunications with BIM O&M servers.
In order to preferably realize the present invention, further, the geographical information collection unit includes Road Base sedimentation detection Device, tunnel mountain body detection device, track bridge detection device;The Road Base settlement detecting device includes being distributed in track road Multiple GPS locators, multiple laser range finders and multiple monitoring cameras on line.By Road Base settlement detecting device, Tunnel mountain body detection device, track bridge detection device carry out comprehensive monitoring to the geography information situation of orbit construction, by adopting It is used as displacement measurement data collector with GPS, from the influence of meteorological condition, good economy performance, local measurement essence when measuring Degree is high, and is easily installed, and is not required to meet the condition of intervisibility between survey station, laser ranging can accurately measure track and surrounding The distance of barrier, monitoring camera can be apparent that site specific.
In order to preferably realize the present invention, further, the tunnel mountain body detection device is mainly distributed in tunnel by multiple The displacement sensor composition on road massif surface.By being arranged on the displacement sensing on massif surface, it is capable of detecting when that tunnel is being built The situation of change of massif in the process, so as to predict in time massif collapse, dangerous occurring of caving in.
In order to preferably realize the present invention, further, the track bridge detection device includes being arranged on girder transverse direction GPS locator at the 1/4 of span, at 1/2, at 3/4 and the dipmeter being arranged on the king-tower of bridge longitudinal direction.Determined by GPS Position device and dipmeter can detect deformation and the misalignment of track bridge exactly.
In order to preferably realize the present invention, further, the wireless communication module is ZigBee module.Here use ZigBee module is because it has simple in structure, easy to use, reliable operation, low-cost spy as wireless communication module Point, in addition, each ZigBee-network node can also be believed in the range of the covering of oneself signal with multiple networks that do not undertake Cease the isolated child node wireless connection of transfer task, be applicable in very much with apart from not being far sensor with controlling the steady of exchange Determine information transmission.
In order to preferably realize the present invention, further, construction personnel's information acquisition unit includes identification electronic mark Label and RFID reader;The RFID reader is connected by ZigBee module and the communication of BIM O&Ms server.It is worn by RFID Thoroughly by force, stable work in work, characteristic low in energy consumption is capable of the distribution of effective monitoring field construction personnel.
In order to preferably realize the present invention, further, the mobile terminal is notebook, is appointed in mobile phone, tablet computer It is a kind of.Construction information is received by notebook, mobile phone, tablet computer, can not only be looked into whenever and wherever possible by display It sees, and the update of system construction progress can be participated in by the input module carried.
Compared with prior art, the present invention haing the following advantages and advantageous effect:
(1)Dynamic Model can be carried out to work progress by BIM technology so that management content becomes to visualize, and improves The ability that manager controls for project content and progress, so as to improve construction efficiency, accelerates construction progress.
(2)By arrangement and method for construction module, BIM models are established with the extensive essential information in project under construction, project is put down Face, facade, sectional view are directly generated by BIM models, ensure that the quality of construction drawing.It is built moreover, being contained in BIM models It builds, the information such as structure, electrical equipment, the Comprehensive Analysis Software of reason BIM technology carries out " Wrong, missing is touched, lacked " inspection of each specialty It looks into, substantially increases model quality, reduce mistake and practice in work progress, reduce the change number of engineering.
(3)By the real time data of field data acquisition module collection site, added on the construction basic model of script Dynamic parameter so as to establish dynamic model, can preferably hold work progress situation, with four-dimensional intuitive manner to construction weight Point, difficult point sharpen understanding, so as to Optimizing Construction Scheme.It is applied according to final constructability 4D models and construction schedule Development time and the content of work in every are instructed in work tissue and arrangement, improve construction efficiency.
Description of the drawings
Fig. 1 is the principle of the present invention block diagram;
Fig. 2 is the functional block diagram in the embodiment of the present invention 2;
Fig. 3 is the work flow diagram of the present invention;
Fig. 4 is the model optimization flow chart of the present invention.
Specific embodiment
Embodiment 1:
The orbit construction system based on BIM technology of the present embodiment, as shown in Figure 1:Including field data acquisition module, construction party Case module, BIM O&Ms server, project schedule plan tracking system, mobile terminal;
The field data acquisition module is used for parameter needed for the modeling of acquisition construction in real time at the construction field (site), to construct as foundation The foundation of dynamic model.
The arrangement and method for construction module is believed for providing existing GIS geography information, construction equipment information, arrangement and method for construction drawing Breath, construction personnel's information, using the foundation as foundation construction basic model.
The BIM O&Ms server is communicated in a manner of being wirelessly transferred with field data acquisition module, and and arrangement and method for construction Module communicates to connect, for contacting the data stored in the data of collection in worksite and arrangement and method for construction module and passing through in server The modeling software platform put carries out construction model foundation.
The project schedule plan tracking system is connected with BIM O&M server communications, for current construction model Progress is analyzed compared with default schedule, to check working vessels in time and to correct optimization.
The mobile terminal is connected with the communication of BIM O&Ms server, and it is final to be used to help staff's real-time reception Track construction progress msg after optimization.
Its operation principle:BIM O&Ms server transfers construction data from arrangement and method for construction module, to establish work progress Basic model, established by GIS geography information, arrangement and method for construction drawing information construction track condition the basic mould of 3D visualizations Type by the Information Statistics of construction personnel's information and construction equipment information, important technical support is provided to project management, is made What each stage will do, and workload is how many, what is next, what the job order in each stage is, all becomes aobvious It and is clear to so that management content visualization.
Then, BIM O&Ms server is remotely received again from the real-time of the field data acquisition module acquisition of construction site Information, real time information and the basic mould of the 3D generated visualizations in the modeling software platform built in BIM O&M servers Type carries out association process, so as to establish dynamic work progress model, to improve manager for current project content and progress The ability of control.
And project schedule plan tracking system transfers dynamic construction process model from BIM O&M servers and responsible is worked as Preceding construction model progress is analyzed compared with default schedule, and by the situation to construction speed, the construction stage completes Time and quality condition check, the influence of the construction procedure to make mistake and burst accident to progress is analyzed, so as in time more Positive working vessels, and time optimization arrangement and method for construction ensure that engineering can be completed by matter on time.
The construction working personnel at scene then obtain construction speed information in time by mobile terminal, and receive newest work It instructs, so as to reach the construction of live different majors personnel synchronization, according to final constructability 4D models and construction speed Plan carries out construction organization and arrangement, instructs development time and the content of work in every, improves construction efficiency.
Embodiment 2:
The present embodiment does further optimization on the basis of embodiment 1, as shown in Figure 2:The field data acquisition module includes Electrical equipment information acquisition unit, Weather information collecting unit, geographical information collection unit, construction personnel's information acquisition unit; The electrical equipment information acquisition unit, Weather information collecting unit, geographical information collection unit, construction personnel's information gathering list Member is also respectively connected with wireless communication module, to realize the wireless telecommunications with BIM O&M servers.
The geographical information collection unit includes Road Base settlement detecting device, tunnel mountain body detection device, track bridge Detection device;The Road Base settlement detecting device includes the multiple GPS locators, the multiple Laser Measurings that are distributed in track routes Distance meter and multiple monitoring cameras.Pass through Road Base settlement detecting device, tunnel mountain body detection device, track bridge detection dress It puts and comprehensive monitoring is carried out to the geography information situation of orbit construction, be used as displacement measurement data collector by using GPS, From the influence of meteorological condition during measurement, good economy performance, local measurement precision is high, and is easily installed, and is not required between survey station Meet the condition of intervisibility, laser ranging can accurately measure the distance of track and peripheral obstacle, and monitoring camera can understand Recognize site specific.
The tunnel mountain body detection device is mainly made of multiple displacement sensors for being distributed in tunnel mountain body surface face.Pass through Be arranged on the displacement sensing on massif surface, be capable of detecting when the situation of change of tunnel massif in process of construction, so as to and When prediction massif collapse, dangerous occurring of cave in.
The track bridge detection device is including being arranged at the 1/4 of girder horizontal span, the GPS at 1/2, at 3/4 determines Position device and the dipmeter being arranged on the king-tower of bridge longitudinal direction.It can be detected exactly by GPS locator and dipmeter derailed The deformation of road bridge and misalignment.
After above-mentioned improvement, the operation principle of the construction basic model foundation of the orbit construction system based on BIM technology For:Various types of data source informations are created first with BIM softwares, it includes electrically setting in field data acquisition module Standby information acquisition unit collecting device electric current, voltage, work state information;The humiture of Weather information collecting unit acquisition, wind The information such as speed, wind direction;Physical features where the track of geographical information collection unit acquisition, terrain information;Construction personnel's information gathering list Existing GIS geography information, construction are set in the work distribution information and arrangement and method for construction module of the different majors personnel of member acquisition Standby information, arrangement and method for construction drawing information, construction personnel's information, these numerous data some are IFC reference format information, and some is The information of non-IFC reference formats.Then, the information for the information of whole non-IFC reference formats being converted to IFC reference formats is real The unification of existing data realizes that data format converts here by BIM data structures, enables data under identical platform It is modeled and warehousing.Called information data is combined by BIM visual analyzings software platform again and generates track construction 3D engineering model information.
The other parts of the present embodiment are same as Example 1, and so it will not be repeated.
Embodiment 3:
The present embodiment does further optimization on the basis of embodiment 2, and the wireless communication module is ZigBee module.Here adopt By the use of ZigBee module as wireless communication module, be because it has simple in structure, easy to use, reliable operation, it is low-cost Feature, in addition, each ZigBee-network node also in the range of the covering of oneself signal and multiple can not undertake network The isolated child node wireless connection of information transfer task, it is not far sensor and control exchange to be applicable in very much with distance Stablize information transmission.
Construction personnel's information acquisition unit includes identification electronic label and RFID reader;The RFID reader leads to ZigBee module is crossed to connect with the communication of BIM O&Ms server.Strong, stable work in work, spy low in energy consumption are broken through by RFID Property is capable of the distribution condition of effective monitoring field construction personnel.
The mobile terminal is notebook, any in mobile phone, tablet computer.By notebook, mobile phone, tablet computer come Construction information is received, can not only be checked whenever and wherever possible by display, but also can be joined by the input module carried With the update of system construction progress.
When engineering occur in construction process and more becoming, by participating in the orbit construction system of BIM, each participation can Oneself specialty required more change content and information are enough extracted, changes the information content of respective responsibility part, and updated letter Breath will automatically to be stored in hub file, be shared and linked up for each participant, so as to ensure that the letter between project participation Breath timely and effectively transfers.Clearly judge in addition, visual Simulation can help to make construction progress process, ensure that height Effect linking and timely and effective communication and coordination between each stage, each participant of constructing.
The other parts of the present embodiment are same as Example 2, and so it will not be repeated.
Embodiment 4:
In the present embodiment, the orbit construction system based on BIM technology, as shown in Figure 3:Its project progress flow is:Civil engineering master Industry model and the model of mechanical discipline are contacted in the software platform of BIM O&M servers with reference to the comprehensive 3D information models of generation, Its model had not only included the relevant information of Civil Specialities but also had included the relevant information of mechanical discipline, and the information of different majors is passed through Whether software collision detection is by realize the optimization of different information unifications, if information unification is not over then carrying out parameter Change modification and establish correlation model from newly;If information unification success, then the 3D information models after being optimized, 3D information models exist 4D information models are generated after importing engineering establishment progress msg.It realizes and mould is carried out in project progress with reference to after civil engineering and equipment Intend.
As shown in Figure 4:4D information models are needed before work progress, with reference to actual work progress parameters and experience Simulation before being gone into operation, for example, implementing to the simulation in advance of vehicle approach course, placement position of material etc. selects optimal Scheme, reduce it is each specialty between influence each other, with this reach optimization 4D models, eventually by this model guiding construction.Pass through The data message stored in optimal 4D dummy models generation work progress in dynamic resource and BIM models, construction management person It can be seen that the construction speed situation of any time, understands the supply situations such as equipment, material, personnel in real time.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is every according to According to the present invention technical spirit above example is made any simple modification, equivalent variations, each fall within the present invention protection Within the scope of.

Claims (8)

1. the orbit construction system based on BIM technology, it is characterised in that:Including field data acquisition module, arrangement and method for construction module, BIM O&Ms server, project schedule plan tracking system, mobile terminal;
The field data acquisition module is used for parameter needed for the modeling of acquisition construction in real time at the construction field (site), to construct as foundation The foundation of dynamic model;
The arrangement and method for construction module for provide existing GIS geography information, construction equipment information, arrangement and method for construction drawing information, Construction personnel's information, using the foundation as foundation construction basic model;
The BIM O&Ms server in a manner of being wirelessly transferred with field data acquisition module communicate, and with arrangement and method for construction module Communication connection, for contacting the data stored in the data of collection in worksite and arrangement and method for construction module and passing through in server built-in Modeling software platform carries out construction model foundation;
The project schedule plan tracking system is connected with BIM O&M server communications, for current construction model progress It is analyzed compared with default schedule, to check working vessels in time and to correct optimization;
The mobile terminal is connected with the communication of BIM O&Ms server, is used to help staff's real-time reception final optimization pass Track construction progress msg afterwards.
2. the orbit construction system according to claim 1 based on BIM technology, it is characterised in that:The field data is adopted Collecting module includes electrical equipment information acquisition unit, Weather information collecting unit, geographical information collection unit, construction personnel's information Collecting unit;The electrical equipment information acquisition unit, Weather information collecting unit, geographical information collection unit, construction personnel Information acquisition unit is also respectively connected with wireless communication module, to realize the wireless telecommunications with BIM O&M servers.
3. the orbit construction system according to claim 2 based on BIM technology, it is characterised in that:The geography information is adopted Collecting unit includes Road Base settlement detecting device, tunnel mountain body detection device, track bridge detection device;The Road Base sedimentation Detection device includes the multiple GPS locators, multiple laser range finders and the multiple monitoring cameras that are distributed in track routes.
4. the orbit construction system according to claim 3 based on BIM technology, it is characterised in that:The tunnel mountain physical examination Device is surveyed mainly to be made of multiple displacement sensors for being distributed in tunnel mountain body surface face.
5. the orbit construction system according to claim 3 based on BIM technology, it is characterised in that:The track bridge inspection Survey device include be arranged at the 1/4 of girder horizontal span, the GPS locator at 1/2, at 3/4 and be arranged on bridge longitudinal direction Dipmeter on king-tower.
6. the orbit construction system according to claim 2 based on BIM technology, it is characterised in that:The wireless telecommunications mould Block is ZigBee module.
7. the orbit construction system according to claim 6 based on BIM technology, it is characterised in that:Construction personnel's letter Ceasing collecting unit includes identification electronic label and RFID reader;The RFID reader passes through ZigBee module and BIM O&Ms Server communication connection.
8. according to orbit construction system of the claim 1-7 any one of them based on BIM technology, it is characterised in that:The shifting Dynamic terminal is any in notebook, mobile phone, tablet computer.
CN201711341031.3A 2017-12-14 2017-12-14 Orbit construction system based on BIM technology Pending CN108090610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711341031.3A CN108090610A (en) 2017-12-14 2017-12-14 Orbit construction system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711341031.3A CN108090610A (en) 2017-12-14 2017-12-14 Orbit construction system based on BIM technology

Publications (1)

Publication Number Publication Date
CN108090610A true CN108090610A (en) 2018-05-29

Family

ID=62176084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711341031.3A Pending CN108090610A (en) 2017-12-14 2017-12-14 Orbit construction system based on BIM technology

Country Status (1)

Country Link
CN (1) CN108090610A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108681316A (en) * 2018-07-11 2018-10-19 宿州云宏建设安装有限公司 A kind of highway construction environmental monitoring system
CN109102208A (en) * 2018-09-04 2018-12-28 福建奇点时空数字科技有限公司 A kind of three-dimension visible sysem based on garden
CN109408979A (en) * 2018-10-31 2019-03-01 广西路桥工程集团有限公司 A kind of engineering construction internal control data management system
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
CN109544102A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of engineering ship construction management system and application method based on BIM model
CN109635058A (en) * 2018-11-20 2019-04-16 吉林省昊远农林规划设计有限公司 A kind of freeway management system and method using BIM technology and GIS technology
CN109784622A (en) * 2018-12-10 2019-05-21 国网湖北省电力有限公司 Power grid project process monitoring method and system based on geographical wiring diagram
CN109886479A (en) * 2019-02-01 2019-06-14 南通四建集团有限公司 A kind of hanging device construction time positioning and monitoring method based on Beidou GNSS and BIM
CN110502802A (en) * 2019-07-29 2019-11-26 兰州容大信息科技有限公司 Railway network building method and device based on BIM technology
CN110717000A (en) * 2019-09-23 2020-01-21 济南轨道交通集团有限公司 Rail transit engineering construction and maintenance integrated intelligent management platform and method
CN111027922A (en) * 2019-11-21 2020-04-17 国电南瑞科技股份有限公司 Tramcar project monitoring system and monitoring method
CN111489444A (en) * 2020-05-18 2020-08-04 中铁上海工程局集团有限公司 BIM-based capital construction project management method and digital delivery system
CN111597289A (en) * 2020-05-20 2020-08-28 福建省伟志地理信息科学研究院 Distributed construction point progress management system and method based on geographic information
CN112465684A (en) * 2020-11-09 2021-03-09 覃强 Full life cycle management system of track
CN112488540A (en) * 2020-12-03 2021-03-12 中国十九冶集团有限公司 BIM + GIS technology-based road pavement paving management system
CN113222564A (en) * 2021-06-09 2021-08-06 合肥优尔电子科技有限公司 Progress management system and method based on BIM system
CN113269411A (en) * 2021-05-08 2021-08-17 成都亲生命科技有限公司 Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection
CN113434946A (en) * 2021-07-05 2021-09-24 升维科技有限公司 Building model checking system and method based on BIM
CN113671548A (en) * 2021-09-08 2021-11-19 中交第四公路工程局有限公司 Integrated large-scale space structure construction guidance system and method
CN114117596A (en) * 2021-11-15 2022-03-01 国能大渡河猴子岩发电有限公司 Real-time monitoring and management method for water conservancy and hydropower engineering
WO2023010699A1 (en) * 2021-07-31 2023-02-09 南京轩世琪源软件科技有限公司 High-voltage power transmission line construction operation statistical model
CN116486314A (en) * 2023-06-26 2023-07-25 中国水利水电第七工程局有限公司 Construction tunnel passing control method, device and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130253968A1 (en) * 2012-03-26 2013-09-26 David Frederick Martinez Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN106096111A (en) * 2016-05-26 2016-11-09 陕西铁路工程职业技术学院 BIM technology application in high-speed railway CRTSIII plate-type Construction of Ballastless Track
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130253968A1 (en) * 2012-03-26 2013-09-26 David Frederick Martinez Facility control system (fcs, c1) to manage assets planning, design, construction, fabrication, operating, maintence and products
CN104680320A (en) * 2014-12-03 2015-06-03 上海同筑信息科技有限公司 BIM-based project management system and method
CN106096111A (en) * 2016-05-26 2016-11-09 陕西铁路工程职业技术学院 BIM technology application in high-speed railway CRTSIII plate-type Construction of Ballastless Track
CN106202723A (en) * 2016-07-10 2016-12-07 北京工业大学 A kind of BIM subway work method

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108681316A (en) * 2018-07-11 2018-10-19 宿州云宏建设安装有限公司 A kind of highway construction environmental monitoring system
CN109102208A (en) * 2018-09-04 2018-12-28 福建奇点时空数字科技有限公司 A kind of three-dimension visible sysem based on garden
CN109544102A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of engineering ship construction management system and application method based on BIM model
CN109408979A (en) * 2018-10-31 2019-03-01 广西路桥工程集团有限公司 A kind of engineering construction internal control data management system
CN109408979B (en) * 2018-10-31 2023-04-07 广西路桥工程集团有限公司 Engineering construction internal control data management system
CN109635058A (en) * 2018-11-20 2019-04-16 吉林省昊远农林规划设计有限公司 A kind of freeway management system and method using BIM technology and GIS technology
CN109784622B (en) * 2018-12-10 2023-08-04 国网湖北省电力有限公司 Power grid project progress monitoring method and system based on geographic wiring diagram
CN109784622A (en) * 2018-12-10 2019-05-21 国网湖北省电力有限公司 Power grid project process monitoring method and system based on geographical wiring diagram
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
CN109886479A (en) * 2019-02-01 2019-06-14 南通四建集团有限公司 A kind of hanging device construction time positioning and monitoring method based on Beidou GNSS and BIM
CN110502802A (en) * 2019-07-29 2019-11-26 兰州容大信息科技有限公司 Railway network building method and device based on BIM technology
CN110502802B (en) * 2019-07-29 2023-04-07 兰州容大信息科技有限公司 Railway network construction method and device based on BIM technology
CN110717000A (en) * 2019-09-23 2020-01-21 济南轨道交通集团有限公司 Rail transit engineering construction and maintenance integrated intelligent management platform and method
WO2021056791A1 (en) * 2019-09-23 2021-04-01 济南轨道交通集团有限公司 Smart management platform for integrated construction and maintenance of rail transport engineering, and method
US20220332356A1 (en) * 2019-09-23 2022-10-20 Jinan Rail Transit Group Co., Ltd. Platform and method for intelligent management of integration of construction and maintenance of rail transportation work
CN111027922A (en) * 2019-11-21 2020-04-17 国电南瑞科技股份有限公司 Tramcar project monitoring system and monitoring method
CN111489444A (en) * 2020-05-18 2020-08-04 中铁上海工程局集团有限公司 BIM-based capital construction project management method and digital delivery system
CN111597289B (en) * 2020-05-20 2022-06-21 福建省伟志地理信息科学研究院 Distributed construction point progress management system and method based on geographic information
CN111597289A (en) * 2020-05-20 2020-08-28 福建省伟志地理信息科学研究院 Distributed construction point progress management system and method based on geographic information
CN112465684A (en) * 2020-11-09 2021-03-09 覃强 Full life cycle management system of track
CN112488540A (en) * 2020-12-03 2021-03-12 中国十九冶集团有限公司 BIM + GIS technology-based road pavement paving management system
CN113269411A (en) * 2021-05-08 2021-08-17 成都亲生命科技有限公司 Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection
CN113222564A (en) * 2021-06-09 2021-08-06 合肥优尔电子科技有限公司 Progress management system and method based on BIM system
CN113434946A (en) * 2021-07-05 2021-09-24 升维科技有限公司 Building model checking system and method based on BIM
CN113434946B (en) * 2021-07-05 2023-09-29 深圳比目鱼平方科技有限公司 Building model checking system and method based on BIM
WO2023010699A1 (en) * 2021-07-31 2023-02-09 南京轩世琪源软件科技有限公司 High-voltage power transmission line construction operation statistical model
CN113671548A (en) * 2021-09-08 2021-11-19 中交第四公路工程局有限公司 Integrated large-scale space structure construction guidance system and method
CN114117596A (en) * 2021-11-15 2022-03-01 国能大渡河猴子岩发电有限公司 Real-time monitoring and management method for water conservancy and hydropower engineering
CN116486314A (en) * 2023-06-26 2023-07-25 中国水利水电第七工程局有限公司 Construction tunnel passing control method, device and system
CN116486314B (en) * 2023-06-26 2023-08-22 中国水利水电第七工程局有限公司 Construction tunnel passing control method, device and system

Similar Documents

Publication Publication Date Title
CN108090610A (en) Orbit construction system based on BIM technology
CN102044094B (en) Line polling management system and method
CN104244406B (en) Mine movable object locating system and method under a kind of cloud computing data
CN207424869U (en) A kind of bridge construction management system
CN106595565A (en) BIM-based intelligent monitoring system
CN103632509B (en) Based on the numeral of generalized information system, intelligent mine alarm linkage method and platform thereof
CN102831766B (en) Multi-source traffic data fusion method based on multiple sensors
CN106710001A (en) Substation inspection robot based centralized monitoring and simulation system and method thereof
CN106683372B (en) Underground pipeline sensing signal acquisition positioning device and system
CN103544556A (en) Life-cycle management system and method for tunnels
CN105425752A (en) Real-time monitoring system of pipe network and working method of same
CN107067690A (en) A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN107808498A (en) A kind of monitoring method of landslide and the monitoring system of application this method
CN106940187B (en) Navigation method and system for mine ground rapid inspection
CN103957508A (en) Accurate underground wireless positioning system and method based on combination of WiFi and gyroscope
CN203702258U (en) Data collection system for mine tunnel three-dimensional modeling
CN105828433A (en) Tunnel positioning system and method based on ZigBee
CN207301751U (en) The engineering machinery vehicle operation monitoring system of power grid wisdom building site control platform
CN103200675A (en) Wireless sensor network target locating method and locating system without need of node self-localization
CN103632198A (en) Visualized and full-life measurement asset management system based on intelligent mobile terminal
CN108182738A (en) A kind of Urban Underground pipe gallery method for inspecting based on WI-FI positioning
CN108718112A (en) A kind of grid monitoring system and method based on triones navigation system
KR20230083388A (en) Building information modeling(bim)-grid maintenance system for underground area of urban railway, and method for the same
CN106255198A (en) Gather construction alignment system and method
CN111275580A (en) Power distribution network cable positioning monitoring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529

RJ01 Rejection of invention patent application after publication