CN107832901A - Method for allocating tasks, device, terminal device and storage medium - Google Patents

Method for allocating tasks, device, terminal device and storage medium Download PDF

Info

Publication number
CN107832901A
CN107832901A CN201710627510.5A CN201710627510A CN107832901A CN 107832901 A CN107832901 A CN 107832901A CN 201710627510 A CN201710627510 A CN 201710627510A CN 107832901 A CN107832901 A CN 107832901A
Authority
CN
China
Prior art keywords
task
inventory
waiting
distribution
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710627510.5A
Other languages
Chinese (zh)
Other versions
CN107832901B (en
Inventor
周鹏
杨克森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201710627510.5A priority Critical patent/CN107832901B/en
Publication of CN107832901A publication Critical patent/CN107832901A/en
Priority to PCT/CN2018/081420 priority patent/WO2019019687A1/en
Application granted granted Critical
Publication of CN107832901B publication Critical patent/CN107832901B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method for allocating tasks, device, terminal device and storage medium.The method for allocating tasks includes:The distribution instruction of acquisition task, task distribution instruction include ID;Task based access control distribution instruction, obtains waiting task inventory, and waiting task inventory includes that all waiting tasks that user corresponding to ID is handled can be distributed to;Judge whether task distribution instruction is the distribution instruction first of the same day corresponding to ID;If task distribution instruction same day distribution instruction first not corresponding to ID, first task distribution inventory is obtained from waiting task inventory, and first task distribution inventory is sent to user corresponding to ID;Wherein, first task distribution inventory includes at least one waiting task, and the quantity that first task distributes waiting task in inventory is newly-increased task amount.When the method for allocating tasks carries out task distribution, efficiency high and cost is low.

Description

Method for allocating tasks, device, terminal device and storage medium
Technical field
The present invention relates to field of information processing, more particularly to a kind of method for allocating tasks, device, terminal device and storage to be situated between Matter.
Background technology
One or more case management systems are provided with the financial institutions such as bank, security and insurance, pass through case management System is managed to the Related Cases that financial institution handles, and each case is divided into multiple pending according to its handling process Business., can be to all Claims Resolution cases in insurance institution by the Claims Resolution management system as being provided with Claims Resolution management system in insurance institution It is managed, each Claims Resolution case can be divided into multiple waiting tasks according to its handling process, wherein, waiting task includes But be not limited to Claims Resolution accept, first trial of settling a claim, Claims Resolution review and Claims Resolution compensate etc..In traditional case management system, every time to place When managing personnel assignment waiting task, it is both needed to treatment people and is manually entered task distribution instruction, it is related to be distributed to treatment people The waiting task of case, treatment people can only wait in each waiting task assigning process, can not reprocess other cases, Easily lose time, the time cost for causing task to be distributed is high.Moreover, handling peak period in case, also need to arrange special work Make personnel according to the role for the treatment of people, mechanism and ability etc. carry out waiting task distribution, cause task distribute manpower into This is higher.
The content of the invention
The embodiment of the present invention provides a kind of method for allocating tasks, device, terminal device and storage medium, to solve current case The problem of time cost that task is distributed in part management system is high.
In a first aspect, the embodiment of the present invention provides a kind of method for allocating tasks, including:
The distribution instruction of acquisition task, the task distribution instruction include ID;
Distributed and instructed based on the task, obtain waiting task inventory, the waiting task inventory includes distributing All waiting tasks handled to user corresponding to the ID;
Judge whether the task distribution instruction is the distribution instruction first of the same day corresponding to ID;
If task distribution instruction same day distribution instruction first not corresponding to ID, from the waiting task First task distribution inventory is obtained in inventory, and first task distribution inventory is sent to corresponding to the ID and used Family;
Wherein, the first task distribution inventory includes at least one waiting task, the first task distribution The quantity of waiting task described in inventory is newly-increased task amount.
Second aspect, the embodiment of the present invention provide a kind of task allocation apparatus, including:
Instruction acquisition module, for obtaining task distribution instruction, the task distribution instruction includes ID;
Task list acquisition module, instructed for being distributed based on the task, obtain waiting task inventory, it is described to treat Processing task list includes that all waiting tasks that user corresponding to the ID is handled can be distributed to;
Judge module is instructed, for judging whether the task distribution instruction is that the same day corresponding to ID, distribution referred to first Order;
First task acquisition module, refer to for being distributed first on the day of task distribution instruction is not corresponding to ID When making, first task distribution inventory is obtained from the waiting task inventory, and first task distribution inventory is sent To user corresponding to the ID, wherein, the first task distribution inventory includes at least one waiting task, institute The quantity for stating waiting task described in first task distribution inventory is newly-increased task amount.
The third aspect, the embodiment of the present invention provide a kind of terminal device, including memory, processor and are stored in described In memory and the computer program that can run on the processor, realized described in the computing device during computer program The step of method for allocating tasks.
Fourth aspect, the embodiment of the present invention provide a kind of computer-readable recording medium, the computer-readable storage medium The step of matter is stored with computer program, and the computer program realizes the method for allocating tasks when being executed by processor.
In method for allocating tasks provided in an embodiment of the present invention, device, terminal device and storage medium, appoint what is got Business distribution instruction for the distribution instruction first of the same day corresponding to ID when, can give automatically user's distribution corresponding to ID with it is new Increase the consistent waiting task of task amount quantity, without arranging special staff to carry out task distribution, be advantageous to improve and appoint Business allocative efficiency, saves labour turnover.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by institute in the description to the embodiment of the present invention The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention Example, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is a flow chart of method for allocating tasks in the embodiment of the present invention 1;
Fig. 2 is a particular flow sheet of step S20 in Fig. 1;
Fig. 3 is a particular flow sheet of step S50 in Fig. 1;
Fig. 4 is a particular flow sheet of step S52 in Fig. 3;
Fig. 5 is a particular flow sheet of step S60 in method for allocating tasks in the embodiment of the present invention 1;
Fig. 6 is a schematic diagram of task allocation apparatus in the embodiment of the present invention 2;
Fig. 7 is a schematic diagram of the terminal device provided in the embodiment of the present invention 4.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is part of the embodiment of the present invention, rather than whole embodiments.Based on this hair Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
Embodiment 1
Fig. 1 shows the flow chart of method for allocating tasks in the present embodiment.The method for allocating tasks can be applicable to bank, card In case management system in the financial institutions such as certificate, insurance, for waiting task corresponding to case to be distributed to different places Reason personnel are handled, and automaticity is high, are advantageous to raising task allocative efficiency, save the task distribution time.The present embodiment In, the case management system can be the Claims Resolution management system of insurance institution.
Any case management system includes server and the client being connected with server by network.Specifically, service Device is provided with database or server is connected with database, and database includes but is not limited to MySQL database, Oracle data The databases such as storehouse.Database, which is provided with, to be used to store the case storehouse of case information, the user library for storing user profile and use In the correlation database of storage related information.
Each case information in case storehouse includes case ID, case type, case processing time limit and case state etc. letter Breath.Wherein, case ID is the mark for unique identification case, and case ID can be number of policy such as in management system of settling a claim. Case type is the classification type classified according to industry rule to case, can such as be handled in management system of settling a claim according to case Complexity be divided into standard component and non-standard component, can also be classified according to other industry rule.Case handles the time limit It is the processing time limit of the corresponding case type determined according to business rule or financial institution's internal regulations, generally acceptance and hearing of a case day The time limit of day is completed to case processing.Because any case can be divided into multiple waiting tasks according to its handling process, can incite somebody to action The case processing time limit is further subdivided into the multiple tasks processing time limit, and each task processing time limit corresponds to waiting task.Case Part state refers to the processing state of case, including three kinds of " armed state ", " state in processing " and " completing processing state ".Its In, " armed state " refers to acceptance and hearing of a case but is not yet assigned to the state of user's processing." complete processing state " refer to via User completes the state of processing, and " completing processing state " includes " handling successfully " and " processing failure " two states." shape in processing State " refers to distribute to user's processing but user does not complete the state of processing.
Each user profile in user library includes the letter such as ID, user affiliated function, user post and user's professional level Breath.Wherein, ID is the mark for unique identification user, and the ID can refer to the identification card number of user, can also It is job number of the user in financial institution, the user in the present embodiment refers to the treatment people of case.User affiliated function refers to Multiple departments inside financial institution according to function division, such as customer service department, air control department and examining department, each user couple Answer a user affiliated function.User post refers to the post divided inside financial institution according to action, each user A corresponding user post, such as handle post and examination & verification post.User's professional level is to same user post inside financial institution User carries out the professional level of grade classification, and such as same user post can correspond to primary employee, intermediate employee and advanced employee user Professional level.
Each incidence relation in correlation database corresponds to case information and user profile, specially the task category in case information Property with user profile in user property incidence relation, by the incidence relation can to case carry out reasonable distribution.Wherein, appoint Business attribute includes the case information such as case type and case processing state, and user property includes user affiliated function, user post With the user profile such as user's professional level.The setting of incidence relation, have so that case corresponding to each task attribute can all be distributed to User's processing of respective handling authority, the processing authority are determined by user property., can be according to case such as in management system of settling a claim Content determine user affiliated function, and the higher case of difficulty is distributed into the use that user's professional level is higher in same user post Family is handled, to ensure treatment effeciency.
In the present embodiment, client can be the terminals such as PC, flat board, client can with server by WIFI, 3G, 4G and The wireless networks such as 5G or wired network communication are connected, to realize data transfer.Specifically, the user to settle a case passes through client Logged-on user interface, control instruction is inputted, control instruction is sent to server, enables the server to hold based on control instruction The corresponding operation of row.
As shown in figure 1, the method for allocating tasks that the present embodiment is provided comprises the following steps:
S10:The distribution instruction of acquisition task, task distribution instruction include ID.
Wherein, task distribution instruction is the instruction for controlling server to user's distribution waiting task.Specifically, use Family logs in case management system by client, and user need to input ID when logging in, so that in the display interface of client The waiting task that display user corresponding with ID need to be handled.User can click on accordingly in the display interface of client " task distribution " button, so that the distribution instruction of user end to server incoming task so that server obtains task distribution instruction. It is to be appreciated that task distribution instruction can be triggered automatically by the default program of user, can also be triggered manually by user.
In an embodiment, the task that client can also receive user's input completes instruction, and the task is complete Server is sent into instruction, so that server completes the distribution instruction of instruction triggers task according to received task;Wherein, appoint Instruction is completed in business includes ID and case ID.
Specifically, user can click on " appointing in the display interface of client after the processing of any waiting task is completed Business is completed " button, you can client is obtained the task of user's input and complete instruction, and task completion instruction is sent to service Device, so that server completes the modification of the instruction completion case information corresponding with case ID based on the task, such as will be " in processing State " is revised as " handling successfully " or " processing failure ".Server is completed to instruct completion corresponding with case ID in task based access control Case information modification after, can trigger automatically task distribution instruction wait to locate so that case management system distributes to user automatically Reason task, without user's separately incoming task distribution instruction, be advantageous to raising task allocative efficiency, save the task distribution time.
S20:Task based access control distribution instruction, obtains waiting task inventory, and waiting task inventory includes that use can be distributed to All waiting tasks that user corresponding to the ID of family is handled.
Wherein, waiting task refers to that case state is the waiting task of " armed state " in case storehouse.It is pending Task list refers to all set for distributing to the waiting task that user corresponding to ID is handled in case storehouse.Server The process that user's distribution waiting task is assigned the call in task based access control refers to choose in the middle part of it from waiting task inventory Waiting task is divided to distribute to the process of user.
In an embodiment, the waiting task of user's processing corresponding to ID can be distributed to by correlation database Related information determine, you can the case information of user information correlation corresponding with ID, base are found by related information Waiting task inventory is formed in all waiting tasks corresponding to the case information.As shown in Fig. 2 in step S20, based on appointing Business distribution instruction, obtains waiting task inventory and specifically comprises the following steps:
S21:ID in task based access control distribution instruction, determines user property.
Server can task based access control distribution instruction in ID inquire about its user affiliated function, user post and user's duty The user properties such as level.Specifically, query sentence of database can be performed in user library, the query sentence of database using ID as The field to be searched carries out inquiry screening, you can determines user property, its operating process is simple and convenient.
S22:According to user property, it is determined that the task category for the waiting task that user corresponding to ID is handled can be distributed to Property.
Server can be based on the user attribute inquiry related information obtained in step S21, to determine to associate with user property Task attribute, as the task attribute that can distribute to the waiting task that user corresponding to ID is handled.Specifically, Query sentence of database can be performed in correlation database, the query sentence of database is looked into by the field to be searched of user property Ask screening, you can obtain task attribute, its operating process is simple and convenient.
S23:Based on all waiting tasks of task attribute identical, obtain waiting task inventory.
Server can be inquired about based on the task attribute obtained in step S22 and obtain in case storehouse with task attribute identical All case information, selection case state is all tasks of " armed state " as from being needed from all case information Reason task, waiting task inventory is formed based on all waiting tasks.Specifically, data base querying can be performed in case storehouse Sentence, the query sentence of database carry out inquiry screening using task attribute and case state as the field to be searched, you can obtain Waiting task inventory, its operating process are simple and convenient.
S30:Judge whether task distribution instruction is the distribution instruction first of the same day corresponding to ID.
Wherein, the same day distributes first task distribution instruction that instruction refers to get on the day of server first;That is user First task distribution instruction for including ID that the distribution instruction first of the same day corresponding to ID refers to get on the day of server. Server often gets a task distribution instruction, i.e., acquisition time and the use of task distribution instruction are recorded using journal file Family ID, in order to determine whether task distribution instruction is the same day.In the present embodiment, server often gets a task distribution and referred to Order, the i.e. journal file on the inquiry same day are instructed with determining whether there is other tasks distribution corresponding to ID;If user be present Other tasks distribution instruction corresponding to ID, then assert that the same day, distribution referred to first not corresponding to ID for task distribution instruction Order;If in the absence of other tasks distribution instruction corresponding to ID, assert that task distribution instruction is worked as corresponding to ID It distributes instruction first.
S40:If task distribution instruction same day distribution instruction first corresponding to ID, from waiting task inventory The second task distribution inventory is obtained, and the second task distribution inventory is sent to user corresponding to ID;Wherein, the second task Distribution inventory includes at least one waiting task, and the quantity that the second task distributes waiting task in inventory is at least appointed to be default Business amount.
Wherein, it is minimum distributing to user corresponding to ID daily and handling pre-set to preset minimum task amount Business amount.On the day of the distribution instruction of server received task is corresponding to ID during distribution instruction first, from step S20 The waiting task consistent with presetting minimum task amount quantity is sequentially chosen in the waiting task inventory of acquisition, forms second Business distribution inventory, and the second task distribution inventory is sent to client corresponding to ID, so that user corresponding to ID Waiting task in second task distribution inventory is obtained by client and waiting task is handled.The present embodiment In, the waiting task that the second task is distributed in inventory is stored in the pending message queue of client, so as to according to first Enter to select rule to handle the waiting task in pending message queue, to cause the pending message queue of client In be cached with least one waiting task, be advantageous to save the distribution stand-by period between two neighboring waiting task.
It is to be appreciated that server distribution instruction first on the day of the task distribution instruction of acquisition is corresponding to ID When, the second task that can distribute at least one waiting task formation to user corresponding to ID automatically distributes inventory, without Arrange special staff to carry out task distribution, be advantageous to save labour turnover.Moreover, server distributes in the task of acquisition Instruct for the distribution instruction first of the same day corresponding to ID when, it is disposable to give user's distribution corresponding to ID minimum to appoint with default The consistent waiting task of business amount data, so that user corresponding to ID is when waiting task is handled, without being treated at one The distribution of another waiting task is waited after the completion of the processing of processing task, to save the distribution stand-by period of waiting task, is carried High task treatment effeciency.
In an embodiment, obtaining in time and case processing time limit for task distribution instruction can be in advance based on Case processing is completed to calculate remaining processing number of days day, further according to the remaining how much carry out priority rankings for handling number of days;It is i.e. remaining Processing number of days is fewer, and its priority is more first;Conversely, remaining processing number of days is more, its priority more after.Clear from waiting task When the second task distribution inventory is obtained in list, by first and consistent with the presetting minimum task amount quantity waiting task of priority Set as the second task distribute inventory.
S50:If task distribution instruction same day distribution instruction first not corresponding to ID, from waiting task inventory Middle acquisition first task distribution inventory, and first task distribution inventory is sent to user corresponding to ID;Wherein, it is first Business distribution inventory includes at least one waiting task, and the quantity that first task distributes waiting task in inventory is newly-increased task Amount.
Wherein, it is to be reassigned to what user corresponding to ID was handled based on the distribution instruction of this subtask to increase task amount newly Task amount.If task distribution instruction same day distribution instruction first not corresponding to ID, illustrates that server is obtaining this Before business distribution instruction, case management system distributed the second task distribution inventory to user corresponding to ID;And After obtaining task distribution instruction, case management system need to determine to be reassigned to the new of user's processing corresponding to the ID Increase task amount, to form first task distribution inventory and be sent to user corresponding to ID.In the present embodiment, by first task Waiting task in distribution inventory is stored in the tail of the queue of the pending message queue of client, waits user corresponding to ID Processing, to be cached with least one waiting task in the pending message queue of client, is advantageous to save adjacent two The distribution stand-by period between individual waiting task.
It is to be appreciated that server distribution first on the day of the task distribution instruction got is not corresponding to ID refers to When making, the waiting task consistent with increasing task amount quantity newly can be distributed to user corresponding to ID automatically, it is special without arranging The staff of door carries out task distribution, is advantageous to raising task allocative efficiency, saves labour turnover.
In an embodiment, as shown in figure 3, in step S50, first task is obtained from waiting task inventory Distribution inventory specifically comprises the following steps:
S51:Task based access control distribution instruction obtains the currently pending task amount corresponding with ID.
Wherein, currently pending task amount refers to be already allocated to user corresponding to ID but the user does not complete processing Task amount, i.e., case state is distributed in all waiting tasks of ID on the day of case management system as " shape in processing The task amount of state ".In the present embodiment, server statistics are currently assigned to case in the second task distribution inventory corresponding to ID State is currently assigned to ID pair for all task amounts of " state in processing " as currently pending task amount, or statistics Case state is made for all task amounts of " state in processing " in the second task distribution inventory and first task distribution inventory answered For currently pending task amount.
S52:The acquisitions time determination of task based access control distribution instruction is corresponding with ID to handle task amount.
Wherein, when the acquisition time of task distribution instruction is that server obtains task distribution instruction, remember in journal file The time of record.Manageable task amount on the day of task amount refers to user corresponding to ID can be handled, generally refers to task point Manageable task amount between quitting time on acquisition time to the same day with instruction.In the present embodiment, used corresponding to ID Family handle task amount can by task distribute instruction the acquisition time and the quitting time on the same day determine.
In an embodiment, as shown in figure 4, in step S52, the acquisition time of task based access control distribution instruction determines The handle task amount corresponding with ID specifically comprises the following steps:
S521:The acquisition time of task based access control distribution instruction, it is determined that the residue working time on the same day.
Wherein, the same day residue working time refers to the effective time on the day of user corresponding to ID.Specifically, when Its remaining working time can be the difference of quitting time on the same day and the acquisition time of task distribution instruction, can also come off duty on the same day The difference of time and the acquisition time of task distribution instruction deduct the difference of time of having a rest again.Work hours such as any user are 9:00-18:00, wherein, 12:00-14:00 the two hours were the time of having a rest.If the acquisition time of task distribution instruction is 11: 00, then the difference (i.e. 18-11=7 hours) of quitting time on the same day and the acquisition time of task distribution instruction deduct 2 hours again stops Cease the difference (i.e. 7-2=5 hours) of time.If the acquisition time of task distribution instruction is 16:00, then current residual working time For the difference (i.e. 18-16=2 hours) of quitting time on the same day and the acquisition time of task distribution instruction.In the present embodiment, if appointing The acquisition time of business distribution instruction after the time of having a rest, then need not deduct the time of having a rest when the remaining working time on the same day obtains; If task distributes the acquisition time of instruction before the time of having a rest, when the current residual working time need to deduct rest when obtaining Between.
S522:Task based access control distribution instruction obtains time and the acquisition time of previous task distribution instruction, it is determined that waiting to locate The unit task processing time of reason task.
Unit task processing time refers to complete the time needed for the processing procedure of a waiting task.User can wait to locate Incoming task completes instruction after the completion of reason task, and task based access control completes the distribution instruction of the task of instruction triggers one.In the present embodiment, if Not across the time of having a rest between the acquisition time for obtaining time and previous task distribution instruction of task distribution instruction, then will appoint The difference of the acquisition time of business distribution instruction and the acquisition time of previous task distribution instruction are as one waiting task of completion Time needed for processing procedure is as the unit task processing time.If acquisition time and the previous task point of task distribution instruction Across the time of having a rest between the acquisition time with instruction, then the acquisition time and previous task distribution that task is distributed to instruction instruct The acquisition time difference deduct again the time of having a rest as complete a waiting task processing procedure needed for time as should Unit task processing time.It is to be appreciated that user corresponding to ID can complete one and wait to locate within unit task processing time The processing procedure of reason task.
S523:Based on residue working time on the same day and unit task processing time, it is determined that corresponding with ID locates Manage task amount.
Effective time on the day of being user due to the residue working time on the same day, and unit task processing time is to complete Time needed for the processing procedure of one waiting task, by residue working time on the same day divided by unit task processing time, by two The quotient of person is defined as corresponding with ID handling task amount.
In step S521- steps S523, by calculating remaining working time on the same day and unit task processing time, then determine User's handles task amount, to give user's reasonable distribution task, you can avoids distributing to appointing for user corresponding to ID Business amount is overweight, cause user can not the complete corresponding waiting task of timely processing and form waiting task and overstock, so as to cause Client reduces to the service satisfaction of financial institution;Also the task amount for distributing to user can be avoided very few, cause waiting task Treatment effeciency it is relatively low.
S53:Based on currently pending task amount and task amount can be handled, it is determined that newly-increased task amount.
Due to currently pending task amount to have distributed to the task amount of user but untreated completion, and task amount can be handled Manageable task amount on the day of for user corresponding to ID, task amount and currently pending task amount can be handled by calculating Difference, to determine to be reassigned to the newly-increased task amount that user corresponding to ID is handled.
S54:The waiting task consistent with newly-increased task amount quantity is chosen from waiting task inventory, to obtain first Task distributes inventory.
Waiting task inventory refers to all pending for distributing to user corresponding to ID and handling in case storehouse The set of business;And any waiting task can determine that its residue processing according to its case processing time limit in waiting task inventory Number of days, based on remaining processing number of days number can determine that waiting task priority sequencing.In the present embodiment, from treating The set that first and consistent with the newly-increased task amount quantity waiting task of priority is chosen in task list is handled as first Task distributes inventory, and the waiting task that first task is distributed in inventory is distributed into user corresponding to ID is handled, with The waiting task for avoiding priority first exceeds the time limit to overstock, and influences service satisfaction of the client to financial institution.
In step S51- steps S54, by task distribute instruction obtain the time determine it is corresponding with ID current Waiting task amount and task amount can be handled, based on currently pending task amount and task amount can be handled determine newly-increased task amount, The set of the waiting task consistent with newly-increased task amount quantity will be chosen from waiting task inventory as first task point With inventory, and by first task distribution inventory distribute to user corresponding to ID so that user corresponding to ID based on When first task distribution inventory carries out waiting task processing, it can both ensure task treatment effeciency, waiting task can be avoided again Exceed the time limit to overstock.
In an embodiment, before step S50, i.e., it is clear that first task distribution is obtained from waiting task inventory Before list, the method for allocating tasks also includes step S60:Determine whether to continue to distribute pending to user corresponding to ID The step of business.As shown in figure 5, step S60 specifically comprises the following steps:
S61:Upper limit control instruction is obtained, upper limit control instruction includes ID and task distribution upper limit amount.
Wherein, task distribution upper limit amount is user-defined for pending of distribution on the day of controlling case management system The maximum of business.In the present embodiment, user clicks on " upper limit control " button in the display page of client, enters behind Incoming task distribution upper limit amount in the page is controlled, then clicks on " submission " button, you can upper limit control instruction is sent to server, with Server is set to obtain the upper limit control instruction.
S62:Task based access control distribution instruction, obtains the currently pending task amount corresponding with ID and has currently completed Task amount.
Wherein, currently pending task amount refers to be already allocated to user corresponding to ID but the user does not complete processing Task amount, that is, distributed to the task amount that user corresponding to ID and case state are " state in processing ".It is current complete Refer to be already allocated to user corresponding to ID into task amount and the task amount of processing is completed by the user, that is, distribute to use User corresponding to the ID of family and case state are the task amount of " completing processing state ".In the present embodiment, data are performed in database Library inquiry sentence, using ID, date as the same day, User Status is " state in processing " and " completing processing state " is as lookup Field carries out inquiry screening, you can determines currently pending task amount corresponding to ID and has currently completed task amount.
S63:Task amount has been completed with current based on currently pending task amount, has obtained current task total amount.
Wherein, current task total amount is currently pending task amount corresponding to ID and the current sum for having completed task amount Value, i.e. current task total amount distribute to the total of all waiting tasks of user corresponding to ID on the day of being case management system With.
S64:Judge whether current task total amount is less than task distribution upper limit amount.
Specifically, the size of upper limit amount is distributed by current task total amount corresponding to multilevel iudge ID and task, with Determine the need for giving the new waiting task of sub-distribution again of user corresponding to ID, to reach the purpose of reasonable distribution.
S65:If current task total amount is less than task distribution upper limit amount, execution obtains first from waiting task inventory Task distributes inventory.
Specifically, if current task total amount corresponding to ID is less than task corresponding to ID and distributes upper limit amount, say The bright quantity for being currently assigned to the waiting task that user corresponding to ID is handled is not up to user corresponding to the ID and worked as It can distribute the maximum of waiting task so that case management system can continue give user distribute waiting task, perform from The step of first task distribution inventory is obtained in waiting task inventory (performs step S50).
S66:If current task total amount stops treating to user's distribution corresponding to ID not less than task distribution upper limit amount Processing task.
Specifically, if current task total amount corresponding to ID is not less than task corresponding to ID and distributes upper limit amount, The quantity for illustrating to be currently assigned to the waiting task that user corresponding to ID is handled has reached the same day and can distribute pending The maximum of business, it is impossible to continue to distribute waiting task to user, need to stop distributing pending to user corresponding to ID Business, to avoid waiting task from overstocking, so as to reach the purpose of reasonable distribution.
In step S61- steps S66, obtain the same day by calculating and distributed to user corresponding to ID and need to be located Current task total amount corresponding to reason task, compare current task total amount and task distribution higher limit so that determine whether need to be to ID Corresponding user continues to distribute waiting task, to reach the purpose of guarantee task reasonable distribution, avoids distributing to ID pair The task amount of the waiting task for the user's processing answered is overweight, causes waiting task to overstock and influence client to financial institution Service satisfaction.
It should be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Embodiment 2
Fig. 6 shows the theory diagram with the one-to-one task allocation apparatus of method for allocating tasks in embodiment 1.Such as Fig. 6 Shown, the task allocation apparatus includes instruction acquisition module 10, task list acquisition module 20, instruction judge module 30, first Task acquisition module 50, the second task acquisition module 40 and task distribution determining module 60.Wherein, instruction acquisition module 10, appoint Inventory acquisition module 20, instruction judge module 30, first task acquisition module 50, the second task acquisition module 40 and the task of being engaged in are divided With determining module 60 realize function respectively the step S10, S20 corresponding with method for allocating tasks in embodiment 1, S30, S50, S40 and S60 is corresponded, and to avoid repeating, the present embodiment is not described in detail one by one.
Instruction acquisition module 10, for obtaining task distribution instruction, task distribution instruction includes ID.
Task list acquisition module 20, distribute and instruct for task based access control, obtain waiting task inventory, waiting task Inventory includes that all waiting tasks that user corresponding to ID is handled can be distributed to.
Judge module 30 is instructed, for judging whether task distribution instruction is that the same day corresponding to ID, distribution referred to first Order.
First task acquisition module 50, for the distribution instruction first on the day of task distribution instruction is not corresponding to ID When, first task distribution inventory is obtained from waiting task inventory, and first task distribution inventory is sent to ID pair The user answered.
Wherein, first task distribution inventory includes at least one waiting task, and first task is distributed pending in inventory The quantity of task is newly-increased task amount.
Preferably, the second task acquisition module 40, for dividing first on the day of task distribution instruction is corresponding to ID During with instruction, the second task distribution inventory is obtained from waiting task inventory, and the second task distribution inventory is sent to use User corresponding to the ID of family.
Wherein, the second task distribution inventory includes at least one waiting task, and the second task is distributed pending in inventory The quantity of task is to preset minimum task amount.
Preferably, first task acquisition module 50 includes current task amount acquiring unit 51, can handle task amount acquisition list Member 52, newly-increased task amount acquiring unit 53 and task distribution inventory acquiring unit 54.
Current task amount acquiring unit 51, corresponding with ID for task based access control distribution instruction acquisition currently waits to locate Manage task amount.
Task amount acquiring unit 52 can be handled, the acquisition time for task based access control distribution instruction determines relative with ID That answers handles task amount.
Newly-increased task amount acquiring unit 53, for based on currently pending task amount and task amount can be handled, it is determined that newly-increased Task amount;
Task distribution inventory acquiring unit 54, it is consistent with newly-increased task amount quantity for being chosen from waiting task inventory Waiting task, with obtain first task distribution inventory.
Preferably, can handle task amount acquiring unit 52 includes remaining time determining unit 521, unit interval determining unit 522 and task amount determination subelement 523.
Remaining time determination subelement 521, for the acquisition time of task based access control distribution instruction, it is determined that the same day remaining work Time.
Unit interval determination subelement 522, acquisition time and previous task distribution for task based access control distribution instruction refer to The acquisition time of order, determine the unit task processing time of waiting task.
Task amount determination subelement 523, for based on residue working time on the same day and unit task processing time, it is determined that with ID it is corresponding handle task amount.
Preferably, task allocation apparatus also includes task distribution determining module 60, is used to determine whether corresponding to ID User continue distribute waiting task.Task is distributed determining module 60 and worked as including upper limit control instruction acquiring unit 61, first Preceding task acquiring unit 62, the second current task acquiring unit 63, task judging unit 64, at first processing units 65 and second Manage unit 66.
Upper limit control instruction acquiring unit 61, for obtaining upper limit control instruction, upper limit control instruction include ID and Task distributes upper limit amount.
First current task acquiring unit 62, distribute and instruct for task based access control, obtain corresponding with ID current Waiting task amount and currently task amount is completed.
Second current task amount acquiring unit 63, for based on currently pending task amount and currently having completed task amount, Obtain current task total amount.
Task amount judging unit 64, for judging whether current task total amount is less than task distribution upper limit amount.
First processing units 65, for when current task total amount is less than task distribution upper limit amount, performing from pending It is engaged in obtaining first task distribution inventory in inventory.
Second processing unit 66, for when current task total amount is not less than task distribution upper limit amount, stopping to ID Corresponding user distributes waiting task.
Preferably, task list acquisition module 20 includes user property determining unit 21, the and of task attribute determining unit 22 Waiting task acquiring unit 23.
User property determining unit 21, for the ID in task based access control distribution instruction, determine user property.
Task attribute determining unit 22, for according to user property, being handled it is determined that user corresponding to ID can be distributed to Waiting task task attribute.
Waiting task acquiring unit 23, for based on all waiting tasks of task attribute identical, obtain and wait to locate Manage task list.
Embodiment 3
The present embodiment provides a computer-readable recording medium, and computer journey is stored with the computer-readable recording medium Sequence, the computer program realize method for allocating tasks in embodiment 1 when being executed by processor, no longer superfluous here to avoid repeating State.Or the computer program realizes the work(of each module/unit in task allocation apparatus in embodiment 2 when being executed by processor Can, to avoid repeating, repeat no more here.
Embodiment 4
Fig. 7 is the schematic diagram for the terminal device that one embodiment of the invention provides.As shown in fig. 7, the terminal of the embodiment is set Standby 70 include:Processor 71, memory 72 and it is stored in the computer journey that can be run in memory 72 and on processor 71 Sequence 73.Processor 71 realizes in above-described embodiment 1 step S10-S60 in method for allocating tasks when performing computer program 73.Or Person, processor 71 realize the function of each module/unit in above-mentioned each device embodiment, such as Fig. 6 when performing computer program 73 Shown instruction acquisition module 10, task list acquisition module 20, instruction judge module 30, first task acquisition module 50, second The function of task acquisition module 40 and task distribution determining module 60.
Exemplary, computer program 73 can be divided into one or more module/units, one or more mould Block/unit is stored in memory 72, and is performed by processor 71, to complete the present invention.One or more module/units can To be the series of computation machine programmed instruction section that can complete specific function, the instruction segment is for describing computer program 73 at end Implementation procedure in end equipment 70.For example, computer program 73 can be divided into instruction acquisition module 10 in embodiment 2, Task list acquisition module 20, instruction judge module 30, first task acquisition module 50, the second task acquisition module 40 and task Determining module 60 is distributed, each module concrete function is as follows:
Instruction acquisition module 10, for obtaining task distribution instruction, task distribution instruction includes ID.
Task list acquisition module 20, distribute and instruct for task based access control, obtain waiting task inventory, waiting task Inventory includes that all waiting tasks that user corresponding to ID is handled can be distributed to.
Judge module 30 is instructed, for judging whether task distribution instruction is that the same day corresponding to ID, distribution referred to first Order.
First task acquisition module 50, for the distribution instruction first on the day of task distribution instruction is not corresponding to ID When, first task distribution inventory is obtained from waiting task inventory, and first task distribution inventory is sent to ID pair The user answered.
Wherein, first task distribution inventory includes at least one waiting task, and first task is distributed pending in inventory The quantity of task is newly-increased task amount.
Second task acquisition module 40, for the distribution instruction first on the day of task distribution instruction is corresponding to ID When, the second task distribution inventory is obtained from waiting task inventory, and the second task distribution inventory is sent to ID pair The user answered.
Wherein, the second task distribution inventory includes at least one waiting task, and the second task is distributed pending in inventory The quantity of task is to preset minimum task amount.
Task distributes determining module 60, is used to determine whether to continue to distribute waiting task to user corresponding to ID.
Preferably, task list acquisition module 20 includes user property determining unit 21, the and of task attribute determining unit 22 Waiting task acquiring unit 23.
User property determining unit 21, for the ID in task based access control distribution instruction, determine user property.
Task attribute determining unit 22, for according to user property, being handled it is determined that user corresponding to ID can be distributed to Waiting task task attribute.
Waiting task acquiring unit 23, for based on all waiting tasks of task attribute identical, obtain and wait to locate Manage task list.
Preferably, first task acquisition module 50 includes current task amount acquiring unit 51, can handle task amount acquisition list Member 52, newly-increased task amount acquiring unit 53 and task distribution inventory acquiring unit 54.
Current task amount acquiring unit 51, corresponding with ID for task based access control distribution instruction acquisition currently waits to locate Manage task amount.
Task amount acquiring unit 52 can be handled, the acquisition time for task based access control distribution instruction determines relative with ID That answers handles task amount.
Newly-increased task amount acquiring unit 53, for based on currently pending task amount and task amount can be handled, it is determined that newly-increased Task amount;
Task distribution inventory acquiring unit 54, it is consistent with newly-increased task amount quantity for being chosen from waiting task inventory Waiting task, with obtain first task distribution inventory.
Preferably, can handle task amount acquiring unit 52 includes remaining time determining unit 521, unit interval determining unit 522 and task amount determination subelement 523.
Remaining time determination subelement 521, for the acquisition time of task based access control distribution instruction, it is determined that the same day remaining work Time.
Unit interval determination subelement 522, acquisition time and previous task distribution for task based access control distribution instruction refer to The acquisition time of order, determine the unit task processing time of waiting task.
Task amount determination subelement 523, for based on residue working time on the same day and unit task processing time, it is determined that with ID it is corresponding handle task amount.
Preferably, task allocation apparatus also includes task distribution determining module 60, is used to determine whether corresponding to ID User continue distribute waiting task.Task is distributed determining module 60 and worked as including upper limit control instruction acquiring unit 61, first Preceding task acquiring unit 62, the second current task acquiring unit 63, task judging unit 64, at first processing units 65 and second Manage unit 66.
Upper limit control instruction acquiring unit 61, for obtaining upper limit control instruction, upper limit control instruction include ID and Task distributes upper limit amount.
First current task acquiring unit 62, distribute and instruct for task based access control, obtain corresponding with ID current Waiting task amount and currently task amount is completed.
Second current task amount acquiring unit 63, for based on currently pending task amount and currently having completed task amount, Obtain current task total amount.
Task amount judging unit 64, for judging whether current task total amount is less than task distribution upper limit amount.
First processing units 65, for when current task total amount is less than task distribution upper limit amount, performing from pending It is engaged in obtaining first task distribution inventory in inventory.
Second processing unit 66, for when current task total amount is not less than task distribution upper limit amount, stopping to ID Corresponding user distributes waiting task.
Terminal device 70 can be the computing devices such as desktop PC, notebook, palm PC and cloud server end End equipment may include, but be not limited only to, processor 71, memory 72.It will be understood by those skilled in the art that Fig. 7 is only eventually The example of end equipment 70, the restriction to terminal device 70 is not formed, parts more more or less than diagram can be included, or Combine some parts, or different parts, for example, terminal device can also include input-output equipment, network access equipment, Bus etc..
Alleged processor 71 can be CPU (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), application specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other PLDs, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor Deng.
Memory 72 can be the internal storage unit of terminal device 70, such as the hard disk or internal memory of terminal device 70.Deposit Reservoir 72 can also be the plug-in type hard disk being equipped with the External memory equipment of terminal device 70, such as terminal device 70, intelligence Storage card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) Deng.Further, memory 72 can also both include the internal storage unit of terminal device 70 or including External memory equipment.Deposit Reservoir 72 is used to store computer program and other programs and data needed for terminal device.Memory 72 can be also used for temporarily When store the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work( Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that unit is individually physically present, can also two or more units it is integrated in a unit, it is above-mentioned integrated Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.In addition, each function list Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Said system The specific work process of middle unit, module, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and is not described in detail or remembers in some embodiment The part of load, it may refer to the associated description of other embodiments.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and algorithm steps, it can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, application-specific and design constraint depending on technical scheme.Professional and technical personnel Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, can be with Realize by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of division of logic function, there can be other dividing mode when actually realizing, such as Multiple units or component can combine or be desirably integrated into another system, or some features can be ignored, or not perform.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be by some interfaces, device Or INDIRECT COUPLING or the communication connection of unit, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and as independent production marketing or In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation All or part of flow in example method, by computer program the hardware of correlation can also be instructed to complete, described meter Calculation machine program can be stored in a computer-readable recording medium, and the computer program can be achieved when being executed by processor The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or some intermediate forms etc..The computer-readable medium It can include:Any entity or device, recording medium, USB flash disk, mobile hard disk, the magnetic of the computer program code can be carried Dish, CD, computer storage, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as in some jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and Telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations.Although with reference to foregoing reality Example is applied the present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme, all should Within protection scope of the present invention.

Claims (10)

  1. A kind of 1. method for allocating tasks, it is characterised in that including:
    The distribution instruction of acquisition task, the task distribution instruction include ID;
    Distributed and instructed based on the task, obtain waiting task inventory, the waiting task inventory includes that institute can be distributed to State all waiting tasks that user corresponding to ID is handled;
    Judge whether the task distribution instruction is the distribution instruction first of the same day corresponding to ID;
    If task distribution instruction same day distribution instruction first not corresponding to ID, from the waiting task inventory Middle acquisition first task distribution inventory, and first task distribution inventory is sent to user corresponding to the ID;
    Wherein, the first task distribution inventory includes at least one waiting task, and the first task distributes inventory Described in the quantity of waiting task be newly-increased task amount.
  2. 2. method for allocating tasks as claimed in claim 1, it is characterised in that it is described judge task distribution instruction whether be The distribution instruction first of the same day corresponding to ID, also includes afterwards:
    If task distribution instruction same day distribution instruction first corresponding to ID, from the waiting task inventory The second task distribution inventory is obtained, and second task distribution inventory is sent to user corresponding to the ID;
    Wherein, the second task distribution inventory includes at least one waiting task, and second task distributes institute in inventory The quantity for stating waiting task is to preset minimum task amount.
  3. 3. method for allocating tasks as claimed in claim 1, it is characterised in that described to be obtained from the waiting task inventory First task distributes inventory, including:
    Instruction, which is distributed, based on the task obtains the currently pending task amount corresponding with the ID;
    Acquisitions time determination based on task distribution instruction is corresponding with the ID to handle task amount;
    Based on the currently pending task amount and it is described handle task amount, determine the newly-increased task amount;
    The waiting task consistent with the newly-increased task amount quantity is chosen from the waiting task inventory, to obtain The first task distributes inventory.
  4. 4. method for allocating tasks as claimed in claim 3, it is characterised in that the acquisition based on task distribution instruction Time determines the handle task amount corresponding with ID, including:
    Based on the acquisition time of task distribution instruction, it is determined that the residue working time on the same day;
    Time and the acquisition time of previous task distribution instruction are obtained based on task distribution instruction, determined described pending The unit task processing time of task;
    Based on the same day residue working time and the unit task processing time, it is determined that corresponding with ID is handled Task amount.
  5. 5. method for allocating tasks as claimed in claim 1, it is characterised in that described to be obtained from the waiting task inventory First task distributes inventory, also includes before:
    Upper limit control instruction is obtained, the upper limit control instruction includes ID and task distribution upper limit amount;
    Distributed and instructed based on the task, obtained the currently pending task amount corresponding with the ID and currently completed Task amount;
    Based on the currently pending task amount and it is described it is current completed task amount, obtain current task total amount;
    Judge whether the current task total amount is less than task distribution upper limit amount;
    If the current task total amount is less than task distribution upper limit amount, execution obtains from the waiting task inventory First task distributes inventory;
    If the current task total amount stops to user corresponding to the ID point not less than task distribution upper limit amount With the waiting task.
  6. 6. method for allocating tasks as claimed in claim 1, it is characterised in that it is described based on task distribution instruction, obtain Waiting task inventory, including:
    Based on the ID in task distribution instruction, user property is determined;
    According to the user property, it is determined that appointing for the waiting task that user corresponding to the ID is handled, can be distributed to Business attribute;
    Based on all waiting tasks of task attribute identical, obtain the waiting task inventory.
  7. A kind of 7. task allocation apparatus, it is characterised in that including:
    Instruction acquisition module, for obtaining task distribution instruction, the task distribution instruction includes ID;
    Task list acquisition module, instructed for being distributed based on the task, acquisition waiting task inventory, described pending Business inventory includes that all waiting tasks that user corresponding to the ID is handled can be distributed to;
    Judge module is instructed, for judging whether the task distribution instruction is the distribution instruction first of the same day corresponding to ID;
    First task acquisition module, for the distribution instruction first on the day of task distribution instruction is not corresponding to ID When, first task distribution inventory is obtained from the waiting task inventory, and first task distribution inventory is sent to User corresponding to the ID;
    Wherein, the first task distribution inventory includes at least one waiting task, and the first task distributes inventory Described in the quantity of waiting task be newly-increased task amount.
  8. 8. task allocation apparatus as claimed in claim 7, it is characterised in that the task allocation apparatus also includes:
    Second task acquisition module, when being instructed for being distributed first on the day of task distribution instruction is corresponding to ID, The second task distribution inventory is obtained from the waiting task inventory, and second task distribution inventory is sent to described User corresponding to ID;
    Wherein, the second task distribution inventory includes at least one waiting task, and second task distributes institute in inventory The quantity for stating waiting task is to preset minimum task amount.
  9. 9. a kind of terminal device, including memory, processor and it is stored in the memory and can be on the processor The computer program of operation, it is characterised in that realize such as claim 1 to 6 described in the computing device during computer program The step of any one method for allocating tasks.
  10. 10. a kind of computer-readable recording medium, the computer-readable recording medium storage has computer program, and its feature exists In the step of realization method for allocating tasks as described in any one of claim 1 to 6 when the computer program is executed by processor Suddenly.
CN201710627510.5A 2017-07-28 2017-07-28 Task allocation method and device, terminal equipment and storage medium Active CN107832901B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710627510.5A CN107832901B (en) 2017-07-28 2017-07-28 Task allocation method and device, terminal equipment and storage medium
PCT/CN2018/081420 WO2019019687A1 (en) 2017-07-28 2018-03-30 Task allocating method and device, terminal device and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710627510.5A CN107832901B (en) 2017-07-28 2017-07-28 Task allocation method and device, terminal equipment and storage medium

Publications (2)

Publication Number Publication Date
CN107832901A true CN107832901A (en) 2018-03-23
CN107832901B CN107832901B (en) 2021-04-23

Family

ID=61643149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710627510.5A Active CN107832901B (en) 2017-07-28 2017-07-28 Task allocation method and device, terminal equipment and storage medium

Country Status (2)

Country Link
CN (1) CN107832901B (en)
WO (1) WO2019019687A1 (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876051A (en) * 2018-06-28 2018-11-23 中国建设银行股份有限公司 Personnel assignment method and device
CN108921374A (en) * 2018-05-16 2018-11-30 中国平安人寿保险股份有限公司 Declaration form distribution method, unit and computer readable storage medium
CN109255515A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 A kind of task exploitation cloud platform based on page metering and unit time distribution
WO2019019687A1 (en) * 2017-07-28 2019-01-31 平安科技(深圳)有限公司 Task allocating method and device, terminal device and storage medium
CN109840677A (en) * 2018-12-14 2019-06-04 中国平安财产保险股份有限公司 A kind of intelligence division method, apparatus, storage medium and server
CN109858724A (en) * 2018-11-08 2019-06-07 中国平安财产保险股份有限公司 Intelligent worker assigning method, apparatus and computer equipment based on data analysis
CN109902922A (en) * 2019-01-21 2019-06-18 新疆恒致达信息技术有限公司 Distribution method, device, computer equipment and the storage medium of audit task
CN109903023A (en) * 2018-11-22 2019-06-18 阿里巴巴集团控股有限公司 A kind of resource allocation methods and system
CN110135674A (en) * 2019-02-20 2019-08-16 深圳大维理文科技有限公司 Transaction management system and office management method
CN110264060A (en) * 2019-06-13 2019-09-20 广州宝荣科技应用有限公司 A kind of prescription distribution method and system for examining square state based on pharmacist
CN110334961A (en) * 2019-07-10 2019-10-15 诺亚阿客(上海)网络科技有限公司 A kind of method for allocating tasks and system
WO2019200780A1 (en) * 2018-04-18 2019-10-24 平安科技(深圳)有限公司 Task distribution method, electronic device and storage medium
CN110428124A (en) * 2019-06-10 2019-11-08 平安科技(深圳)有限公司 Method for allocating tasks, task allocation apparatus, storage medium and computer equipment
CN110991808A (en) * 2019-11-06 2020-04-10 中国建设银行股份有限公司 Task allocation method and device
CN111309482A (en) * 2020-02-20 2020-06-19 浙江亿邦通信科技有限公司 Ore machine controller task distribution system, device and storable medium thereof
CN111554367A (en) * 2020-04-26 2020-08-18 贵州精准健康数据有限公司 Data processing method and device and computer readable medium
CN112085412A (en) * 2020-09-21 2020-12-15 王渡江 Resource optimization distribution system and distribution method
CN112633855A (en) * 2020-12-31 2021-04-09 中国平安人寿保险股份有限公司 Task reminding method and computer equipment
CN113098947A (en) * 2021-03-26 2021-07-09 北京蓦然认知科技有限公司 Method and device for controlling equipment access
CN113312359A (en) * 2021-06-28 2021-08-27 北京筑云慧建软件技术有限公司 Distributed job progress calculation method and device and storage medium
CN114708970A (en) * 2022-04-11 2022-07-05 上海铂桐医疗科技有限公司 Pain comprehensive assessment data processing method and system suitable for big data
CN115953008A (en) * 2023-02-16 2023-04-11 北京易思汇商务服务有限公司 Task execution time distribution method and device, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011232788A (en) * 2010-04-23 2011-11-17 Nec Corp Workflow management system, workflow management method, and workflow management program
CN103853713A (en) * 2012-11-28 2014-06-11 成都勤智数码科技股份有限公司 Efficient storage method of mass data
CN104239148A (en) * 2013-06-06 2014-12-24 腾讯科技(深圳)有限公司 Distributed task scheduling method and device
CN105608531A (en) * 2015-12-18 2016-05-25 北京奇虎科技有限公司 Task dispatching method and device
CN105933372A (en) * 2016-01-13 2016-09-07 平安科技(深圳)有限公司 Task distribution execution method, server and terminal
CN106056296A (en) * 2016-06-06 2016-10-26 深圳市永兴元科技有限公司 Order allocation method and device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077701B (en) * 2014-06-09 2018-03-27 中国建设银行股份有限公司 Task processing method and device for electric business platform
CN104392310A (en) * 2014-11-13 2015-03-04 深圳市玖昔物联科技发展有限公司 Networked work coordinated management system
CN105160453A (en) * 2015-07-16 2015-12-16 北京中亦安图科技股份有限公司 Task allocating method, device, and system based on location service
CN105809323A (en) * 2016-02-23 2016-07-27 平安科技(深圳)有限公司 Task allocation method and system
CN107832901B (en) * 2017-07-28 2021-04-23 平安科技(深圳)有限公司 Task allocation method and device, terminal equipment and storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011232788A (en) * 2010-04-23 2011-11-17 Nec Corp Workflow management system, workflow management method, and workflow management program
CN103853713A (en) * 2012-11-28 2014-06-11 成都勤智数码科技股份有限公司 Efficient storage method of mass data
CN104239148A (en) * 2013-06-06 2014-12-24 腾讯科技(深圳)有限公司 Distributed task scheduling method and device
CN105608531A (en) * 2015-12-18 2016-05-25 北京奇虎科技有限公司 Task dispatching method and device
CN105933372A (en) * 2016-01-13 2016-09-07 平安科技(深圳)有限公司 Task distribution execution method, server and terminal
CN106056296A (en) * 2016-06-06 2016-10-26 深圳市永兴元科技有限公司 Order allocation method and device

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019019687A1 (en) * 2017-07-28 2019-01-31 平安科技(深圳)有限公司 Task allocating method and device, terminal device and storage medium
WO2019200780A1 (en) * 2018-04-18 2019-10-24 平安科技(深圳)有限公司 Task distribution method, electronic device and storage medium
CN108921374A (en) * 2018-05-16 2018-11-30 中国平安人寿保险股份有限公司 Declaration form distribution method, unit and computer readable storage medium
CN108921374B (en) * 2018-05-16 2022-07-12 中国平安人寿保险股份有限公司 Policy distribution method, device and apparatus and computer readable storage medium
CN108876051A (en) * 2018-06-28 2018-11-23 中国建设银行股份有限公司 Personnel assignment method and device
CN108876051B (en) * 2018-06-28 2021-05-11 中国建设银行股份有限公司 Personnel allocation method and device
CN109255515A (en) * 2018-07-24 2019-01-22 武汉空心科技有限公司 A kind of task exploitation cloud platform based on page metering and unit time distribution
CN109858724B (en) * 2018-11-08 2024-04-09 中国平安财产保险股份有限公司 Intelligent dispatching method and device based on data analysis and computer equipment
CN109858724A (en) * 2018-11-08 2019-06-07 中国平安财产保险股份有限公司 Intelligent worker assigning method, apparatus and computer equipment based on data analysis
CN109903023A (en) * 2018-11-22 2019-06-18 阿里巴巴集团控股有限公司 A kind of resource allocation methods and system
CN109903023B (en) * 2018-11-22 2023-07-11 创新先进技术有限公司 Resource allocation method and system
CN109840677A (en) * 2018-12-14 2019-06-04 中国平安财产保险股份有限公司 A kind of intelligence division method, apparatus, storage medium and server
CN109902922A (en) * 2019-01-21 2019-06-18 新疆恒致达信息技术有限公司 Distribution method, device, computer equipment and the storage medium of audit task
CN110135674A (en) * 2019-02-20 2019-08-16 深圳大维理文科技有限公司 Transaction management system and office management method
CN110428124A (en) * 2019-06-10 2019-11-08 平安科技(深圳)有限公司 Method for allocating tasks, task allocation apparatus, storage medium and computer equipment
CN110264060A (en) * 2019-06-13 2019-09-20 广州宝荣科技应用有限公司 A kind of prescription distribution method and system for examining square state based on pharmacist
CN110334961A (en) * 2019-07-10 2019-10-15 诺亚阿客(上海)网络科技有限公司 A kind of method for allocating tasks and system
CN110991808A (en) * 2019-11-06 2020-04-10 中国建设银行股份有限公司 Task allocation method and device
CN110991808B (en) * 2019-11-06 2022-06-28 中国建设银行股份有限公司 Task allocation method and device
CN111309482A (en) * 2020-02-20 2020-06-19 浙江亿邦通信科技有限公司 Ore machine controller task distribution system, device and storable medium thereof
CN111309482B (en) * 2020-02-20 2023-08-15 浙江亿邦通信科技有限公司 Hash algorithm-based block chain task allocation system, device and storable medium
CN111554367A (en) * 2020-04-26 2020-08-18 贵州精准健康数据有限公司 Data processing method and device and computer readable medium
CN112085412A (en) * 2020-09-21 2020-12-15 王渡江 Resource optimization distribution system and distribution method
CN112085412B (en) * 2020-09-21 2023-11-17 王渡江 Resource optimization distribution system and distribution method
CN112633855A (en) * 2020-12-31 2021-04-09 中国平安人寿保险股份有限公司 Task reminding method and computer equipment
CN113098947A (en) * 2021-03-26 2021-07-09 北京蓦然认知科技有限公司 Method and device for controlling equipment access
CN113098947B (en) * 2021-03-26 2023-12-22 本田汽车用品(广东)有限公司 Method and device for controlling equipment access
CN113312359B (en) * 2021-06-28 2023-04-07 北京筑云慧建软件技术有限公司 Distributed job progress calculation method and device and storage medium
CN113312359A (en) * 2021-06-28 2021-08-27 北京筑云慧建软件技术有限公司 Distributed job progress calculation method and device and storage medium
CN114708970A (en) * 2022-04-11 2022-07-05 上海铂桐医疗科技有限公司 Pain comprehensive assessment data processing method and system suitable for big data
CN114708970B (en) * 2022-04-11 2023-05-16 上海铂桐医疗科技有限公司 Pain comprehensive evaluation data processing method and system suitable for big data
CN115953008A (en) * 2023-02-16 2023-04-11 北京易思汇商务服务有限公司 Task execution time distribution method and device, electronic equipment and storage medium
CN115953008B (en) * 2023-02-16 2024-03-12 北京易思汇商务服务有限公司 Task execution time distribution method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN107832901B (en) 2021-04-23
WO2019019687A1 (en) 2019-01-31

Similar Documents

Publication Publication Date Title
CN107832901A (en) Method for allocating tasks, device, terminal device and storage medium
CN108551533B (en) Scheduling method of customer service agents, storage medium and server
CN107844947A (en) Method, apparatus, storage medium and the terminal of insured amount preposition verification
CN108183933A (en) Information push method, apparatus and system, electronic equipment and computer storage media
WO2019001126A1 (en) Task management method and device, computer device and storage medium
CN109523225A (en) A kind of measure of managing contract, system and terminal device
CN107784481A (en) Task timeliness method for early warning and device
CN104217304A (en) Cleaning service information management system and cleaning service information processing method
CN108256721A (en) A kind of method for scheduling task, terminal device and medium
CN107748696A (en) The method and terminal device of a kind of task scheduling
CN107315627A (en) A kind of method and apparatus of automatic configuration data warehouse parallel task queue
CN109800080A (en) A kind of method for scheduling task based on Quartz frame, system and terminal device
CN107798031A (en) Policy information querying method and device
CN107464049A (en) A kind of task distribution method, device and terminal device
CN108764633A (en) A kind of method for allocating tasks, system and terminal device
CN109658003A (en) A kind of property facility equipment management system and method
CN109214936A (en) A kind of expense collection method, system and terminal device
CN111160779A (en) Priority-based scheduling and attendance management method, system and equipment
CN111178952A (en) System, method and medium for sales lead follow-up and processing for the automotive industry
CN107832858A (en) Telemarketing method of servicing, system, terminal device and storage medium
CN104299082A (en) HR management device realized based on cloud technology
CN116313007A (en) Medical high-value consumable full life cycle management system
CN110533518A (en) A kind of method of collection case management after loan
CN115310906A (en) Method, device and equipment for establishing picking task and computer readable storage medium
CN111209281A (en) Annuity data processing method, device, medium and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant