CN107795095A - A kind of Joining Technology of precast concrete terrace - Google Patents

A kind of Joining Technology of precast concrete terrace Download PDF

Info

Publication number
CN107795095A
CN107795095A CN201710933159.2A CN201710933159A CN107795095A CN 107795095 A CN107795095 A CN 107795095A CN 201710933159 A CN201710933159 A CN 201710933159A CN 107795095 A CN107795095 A CN 107795095A
Authority
CN
China
Prior art keywords
terrace
prefabricated
plate
precast concrete
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710933159.2A
Other languages
Chinese (zh)
Inventor
陈友
江凯
张建波
肖煌俊
蔡立彬
戴琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Kecheng Construction Engineering Co Ltd
Original Assignee
Shanghai Kecheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Kecheng Construction Engineering Co Ltd filed Critical Shanghai Kecheng Construction Engineering Co Ltd
Priority to CN201710933159.2A priority Critical patent/CN107795095A/en
Publication of CN107795095A publication Critical patent/CN107795095A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/08Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of Joining Technology of precast concrete terrace, it is related to construction engineering technical field.Its step of is:Prefabricated terrace plate is transported to scene from factory first, the installation site specified is transported to by handling appliance;Measurement absolute altitude production technique concrete stool, then rammed earth;The earthwork is smooth and roll, pour 70mm thickness C15 plain concrete pads;The prefabricated terrace plate of handling again;Assembled prefabricated terrace plate;The node band between contiguous prefabricated terrace plate is finally poured, is finally completed whole terrace.The present invention can significantly accelerate construction period, simple to operate, easy for construction, quality controllable, and it is artificial to reduce scene, effectively avoid dust, water resource waste and the noise in production process, and the feature of environmental protection is more preferable.

Description

A kind of Joining Technology of precast concrete terrace
Technical field
The present invention relates to construction engineering technical field, and in particular to a kind of Joining Technology of precast concrete terrace.
Background technology
At present, the development of China Logistics warehouse is swift and violent, and the terrace area of logistics is larger, using traditional cast in place process, not The needs of grassroot project development at this stage can be met, therefore, to avoid dust during the cast-in-place surface production of tradition, water resource The environmental issues such as waste, noise, reduce scene manually, solve the problems, such as labor service personnel's shortage, and accelerate construction period, need badly open Hair studies a kind of precast concrete terrace connected mode.
The content of the invention
In view of the shortcomings of the prior art, the present invention seeks to be to provide a kind of connection of precast concrete terrace Technique, it can significantly accelerate construction period, it is simple to operate, it is easy for construction, it is quality controllable, reduce scene manually, effectively avoid giving birth to Dust, water resource waste and noise during production, the feature of environmental protection is more preferable, use easy to spread.
To achieve these goals, the present invention is to realize by the following technical solutions:A kind of precast concrete terrace Joining Technology, its step is:(1) prefabricated terrace plate is transported to scene from factory first, transported to by handling appliance specified Installation site;
(2) measurement absolute altitude production technique concrete stool, then rammed earth;
(3) it is the earthwork is smooth and roll, pour 70mm thickness C15 plain concrete pads;
(4) the prefabricated terrace plate of handling again;
(5) assembled prefabricated terrace plate;
(6) the node band between contiguous prefabricated terrace plate is finally poured, is finally completed whole terrace.
Preferably, the prefabricated terrace plate includes component high position pre-erection and the pre-erection of component low level half, pass through Punching block assembles, then by connecting reinforcing bar colligation, and then C30 concrete is poured, completed finally by maintenance form removal whole pre- Terrace component processed.
Preferably, the described pre-erection cloth of component low level half is in component high position pre-erection surrounding 400mm, using half Method for prefabricating is secondary cast-in-place again when assembly overlaps at the scene, cast-in-place into a complete terrace.
Beneficial effects of the present invention:(1) prefabricated terrace early stage can shift to an earlier date Prefabrication in factory, significantly accelerate construction Cycle;
(2) prefabricated floor construction is convenient, simple to operate, effectively solves the problems, such as labor service personnel's shortage, and it is artificial to reduce scene;
(3) effective dust, water resource waste and noise avoided in production process, the feature of environmental protection are more preferable;
(4) processing quality is controllable, meets the needs of grassroot project development at this stage.
Brief description of the drawings
Describe the present invention in detail with reference to the accompanying drawings and detailed description;
Fig. 1 is the structural representation of the prefabricated terrace plate of the present invention;
Fig. 2 is the structural representation of step of the present invention (2);
Fig. 3 is the structural representation of step of the present invention (3);
Fig. 4 is the structural representation of step of the present invention (4);
Fig. 5 is the structural representation of step of the present invention (5);
Fig. 6 is the structural representation of step of the present invention (6);
Fig. 7 is the assembled connection figure of the prefabricated terrace plate of the present invention.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, the present invention is expanded on further.
Reference picture 1-7, present embodiment use following technical scheme:A kind of connection work of precast concrete terrace Skill, its step are:(1) prefabricated terrace plate 1 is transported to scene from factory first, the installation position specified is transported to by handling appliance Put;
(2) measurement absolute altitude production technique concrete stool 2, then rammed earth;
(3) it is the earthwork is smooth and roll, pour 70mm thickness C15 plain concretes pad 3;
(4) the prefabricated terrace plate 1 of handling again;
(5) assembled prefabricated terrace plate 1;
(6) the node band 4 between contiguous prefabricated terrace plate 1 is finally poured, is finally completed whole terrace.
It is worth noting that, the prefabricated terrace plate 1 includes half prefabricated portion of component high position pre-erection 101 and component low level Divide 102, assembled by the high-precision punching block of the standard of customization, then by connecting the colligation of reinforcing bar 5, and then pour C30 concrete 6, the whole prefabricated terrace component completed finally by maintenance form removal.The specific mounting process of prefabricated terrace plate includes following step Suddenly:1. the prefabricated terrace of every piece of handling to scene;2. assembled prefabricated terrace;3. place colligation cast-in-site stripe bar-mat reinforcement;4. use coagulation Soil pours the cast-in-site stripe one complete terrace of completion for building up prefabricated terrace.
The described pre-erection 102 of component low level half is distributed in the surrounding 400mm of component high position pre-erection 101, using half Method for prefabricating is secondary cast-in-place again when assembly overlaps at the scene, cast-in-place into a complete terrace.
Present embodiment provides a kind of connected mode of new precast concrete terrace, using split blade type nine grids Scheme is split, and using prefabrication+cast-in-place connection scheme of on-site consolidation+part, precast concrete terrace is mainly adopted by surrounding With a kind of combination overlapping mode of overlapping system+integral prefabricated, precast concrete terrace is prefabrication in advance, prefabricated terrace plate Surrounding 400mm uses half method for prefabricating secondary cast-in-place again when assembly overlaps at the scene, cast-in-place into a complete terrace.
The prefabricated system that present embodiment uses compares existing traditional technology mode, can shorten building site ground and apply The work duration, services dispatch is reduced, while avoid the rings such as dust in the cast-in-place terrace production process of tradition, water resource waste, noise Guarantor's problem, avoids the common quality defect of the cracking of the cast-in-place terrace of tradition, and Joining Technology has easy to operate simple, and connected mode It is simple and reliable, the advantages of being easy to execute-in-place, there is wide market application foreground.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (3)

1. a kind of Joining Technology of precast concrete terrace, it is characterised in that its step is:1. first by prefabricated terrace plate (1) Transported from factory to scene, the installation site specified is transported to by handling appliance;
2. measurement absolute altitude production technique concrete stool (2), then rammed earth;
3. the earthwork is smooth and roll, pour 70mm thickness C15 plain concretes pads (3);
4. the prefabricated terrace plate (1) of handling again;
5. assembled prefabricated terrace plate (1);
6. finally pouring the node band (4) between contiguous prefabricated terrace plate (1), whole terrace is finally completed.
A kind of 2. Joining Technology of precast concrete terrace according to claim 1, it is characterised in that the prefabricated terrace Plate (1) includes component high position pre-erection (101) and the pre-erection of component low level half (102), is assembled by punching block, then pass through company Reinforcing bar (5) colligation is connect, and then pours C30 concrete (6), the whole prefabricated terrace component completed finally by maintenance form removal.
3. the Joining Technology of a kind of precast concrete terrace according to claim 1, it is characterised in that described component is low Half pre-erection of position (102) is distributed in component high position pre-erection (101) surrounding 400mm, is spelled at the scene using half method for prefabricating It is secondary cast-in-place again during dress overlap joint, it is cast-in-place into a complete terrace.
CN201710933159.2A 2017-10-10 2017-10-10 A kind of Joining Technology of precast concrete terrace Pending CN107795095A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710933159.2A CN107795095A (en) 2017-10-10 2017-10-10 A kind of Joining Technology of precast concrete terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710933159.2A CN107795095A (en) 2017-10-10 2017-10-10 A kind of Joining Technology of precast concrete terrace

Publications (1)

Publication Number Publication Date
CN107795095A true CN107795095A (en) 2018-03-13

Family

ID=61534072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710933159.2A Pending CN107795095A (en) 2017-10-10 2017-10-10 A kind of Joining Technology of precast concrete terrace

Country Status (1)

Country Link
CN (1) CN107795095A (en)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756142A (en) * 2018-05-23 2018-11-06 江苏无锡二建建设集团有限公司 The construction method of large-area concrete terrace
CN109457909A (en) * 2018-11-23 2019-03-12 中国三冶集团有限公司 A kind of quick-assembling arrangement of reinforcement cast-in-place concrete floor construction device and application method
US11079725B2 (en) 2019-04-10 2021-08-03 Deere & Company Machine control using real-time model
CN113481960A (en) * 2021-07-26 2021-10-08 苏交科集团股份有限公司 High-fill site terrace settlement treatment method and treatment structure
US11178818B2 (en) 2018-10-26 2021-11-23 Deere & Company Harvesting machine control system with fill level processing based on yield data
US11234366B2 (en) 2019-04-10 2022-02-01 Deere & Company Image selection for machine control
US11240961B2 (en) 2018-10-26 2022-02-08 Deere & Company Controlling a harvesting machine based on a geo-spatial representation indicating where the harvesting machine is likely to reach capacity
US20220110251A1 (en) 2020-10-09 2022-04-14 Deere & Company Crop moisture map generation and control system
US11467605B2 (en) 2019-04-10 2022-10-11 Deere & Company Zonal machine control
US11474523B2 (en) 2020-10-09 2022-10-18 Deere & Company Machine control using a predictive speed map
US11477940B2 (en) 2020-03-26 2022-10-25 Deere & Company Mobile work machine control based on zone parameter modification
US11592822B2 (en) 2020-10-09 2023-02-28 Deere & Company Machine control using a predictive map
US11589509B2 (en) 2018-10-26 2023-02-28 Deere & Company Predictive machine characteristic map generation and control system
US11635765B2 (en) 2020-10-09 2023-04-25 Deere & Company Crop state map generation and control system
US11641800B2 (en) 2020-02-06 2023-05-09 Deere & Company Agricultural harvesting machine with pre-emergence weed detection and mitigation system
US11650587B2 (en) 2020-10-09 2023-05-16 Deere & Company Predictive power map generation and control system
US11653588B2 (en) 2018-10-26 2023-05-23 Deere & Company Yield map generation and control system
US11675354B2 (en) 2020-10-09 2023-06-13 Deere & Company Machine control using a predictive map
US11672203B2 (en) 2018-10-26 2023-06-13 Deere & Company Predictive map generation and control
US11711995B2 (en) 2020-10-09 2023-08-01 Deere & Company Machine control using a predictive map
US11727680B2 (en) 2020-10-09 2023-08-15 Deere & Company Predictive map generation based on seeding characteristics and control
US11778945B2 (en) 2019-04-10 2023-10-10 Deere & Company Machine control using real-time model
US11825768B2 (en) 2020-10-09 2023-11-28 Deere & Company Machine control using a predictive map
US11845449B2 (en) 2020-10-09 2023-12-19 Deere & Company Map generation and control system
US11844311B2 (en) 2020-10-09 2023-12-19 Deere & Company Machine control using a predictive map
US11849672B2 (en) 2020-10-09 2023-12-26 Deere & Company Machine control using a predictive map
US11849671B2 (en) 2020-10-09 2023-12-26 Deere & Company Crop state map generation and control system
US11864483B2 (en) 2020-10-09 2024-01-09 Deere & Company Predictive map generation and control system
US11874669B2 (en) 2020-10-09 2024-01-16 Deere & Company Map generation and control system
US11889788B2 (en) 2020-10-09 2024-02-06 Deere & Company Predictive biomass map generation and control
US11889787B2 (en) 2020-10-09 2024-02-06 Deere & Company Predictive speed map generation and control system
US11895948B2 (en) 2020-10-09 2024-02-13 Deere & Company Predictive map generation and control based on soil properties
US11927459B2 (en) 2020-10-09 2024-03-12 Deere & Company Machine control using a predictive map
US11946747B2 (en) 2020-10-09 2024-04-02 Deere & Company Crop constituent map generation and control system
US11957072B2 (en) 2020-02-06 2024-04-16 Deere & Company Pre-emergence weed detection and mitigation system
US11983009B2 (en) 2020-10-09 2024-05-14 Deere & Company Map generation and control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103850352A (en) * 2014-03-17 2014-06-11 初明进 Connection method of prefabricated slab
CN104594511A (en) * 2015-01-17 2015-05-06 安徽建筑大学 Laminated slab subjected to abutted seam assembling by corrugated steel plate with seam steel bars
CN105672564A (en) * 2016-03-30 2016-06-15 殷诗宝 Prefabricated slab with side connection structure and connection method thereof
CN205502378U (en) * 2016-03-30 2016-08-24 殷诗宝 Prefabricated plate with side connection structure
CN105926899A (en) * 2016-05-13 2016-09-07 陕西柴油机重工有限公司 Preparation technique for steel plate terrace of industrial workshop

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103850352A (en) * 2014-03-17 2014-06-11 初明进 Connection method of prefabricated slab
CN104594511A (en) * 2015-01-17 2015-05-06 安徽建筑大学 Laminated slab subjected to abutted seam assembling by corrugated steel plate with seam steel bars
CN105672564A (en) * 2016-03-30 2016-06-15 殷诗宝 Prefabricated slab with side connection structure and connection method thereof
CN205502378U (en) * 2016-03-30 2016-08-24 殷诗宝 Prefabricated plate with side connection structure
CN105926899A (en) * 2016-05-13 2016-09-07 陕西柴油机重工有限公司 Preparation technique for steel plate terrace of industrial workshop

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756142A (en) * 2018-05-23 2018-11-06 江苏无锡二建建设集团有限公司 The construction method of large-area concrete terrace
US11589509B2 (en) 2018-10-26 2023-02-28 Deere & Company Predictive machine characteristic map generation and control system
US11653588B2 (en) 2018-10-26 2023-05-23 Deere & Company Yield map generation and control system
US11672203B2 (en) 2018-10-26 2023-06-13 Deere & Company Predictive map generation and control
US11178818B2 (en) 2018-10-26 2021-11-23 Deere & Company Harvesting machine control system with fill level processing based on yield data
US11240961B2 (en) 2018-10-26 2022-02-08 Deere & Company Controlling a harvesting machine based on a geo-spatial representation indicating where the harvesting machine is likely to reach capacity
CN109457909B (en) * 2018-11-23 2023-10-13 中国三冶集团有限公司 Construction device for quickly spliced reinforced cast-in-place concrete terrace and use method
CN109457909A (en) * 2018-11-23 2019-03-12 中国三冶集团有限公司 A kind of quick-assembling arrangement of reinforcement cast-in-place concrete floor construction device and application method
US11829112B2 (en) 2019-04-10 2023-11-28 Deere & Company Machine control using real-time model
US11234366B2 (en) 2019-04-10 2022-02-01 Deere & Company Image selection for machine control
US11778945B2 (en) 2019-04-10 2023-10-10 Deere & Company Machine control using real-time model
US11467605B2 (en) 2019-04-10 2022-10-11 Deere & Company Zonal machine control
US11079725B2 (en) 2019-04-10 2021-08-03 Deere & Company Machine control using real-time model
US11650553B2 (en) 2019-04-10 2023-05-16 Deere & Company Machine control using real-time model
US11641800B2 (en) 2020-02-06 2023-05-09 Deere & Company Agricultural harvesting machine with pre-emergence weed detection and mitigation system
US11957072B2 (en) 2020-02-06 2024-04-16 Deere & Company Pre-emergence weed detection and mitigation system
US11477940B2 (en) 2020-03-26 2022-10-25 Deere & Company Mobile work machine control based on zone parameter modification
US11711995B2 (en) 2020-10-09 2023-08-01 Deere & Company Machine control using a predictive map
US11849672B2 (en) 2020-10-09 2023-12-26 Deere & Company Machine control using a predictive map
US11650587B2 (en) 2020-10-09 2023-05-16 Deere & Company Predictive power map generation and control system
US11635765B2 (en) 2020-10-09 2023-04-25 Deere & Company Crop state map generation and control system
US11727680B2 (en) 2020-10-09 2023-08-15 Deere & Company Predictive map generation based on seeding characteristics and control
US11592822B2 (en) 2020-10-09 2023-02-28 Deere & Company Machine control using a predictive map
US11474523B2 (en) 2020-10-09 2022-10-18 Deere & Company Machine control using a predictive speed map
US20220110251A1 (en) 2020-10-09 2022-04-14 Deere & Company Crop moisture map generation and control system
US11825768B2 (en) 2020-10-09 2023-11-28 Deere & Company Machine control using a predictive map
US11845449B2 (en) 2020-10-09 2023-12-19 Deere & Company Map generation and control system
US11844311B2 (en) 2020-10-09 2023-12-19 Deere & Company Machine control using a predictive map
US11675354B2 (en) 2020-10-09 2023-06-13 Deere & Company Machine control using a predictive map
US11849671B2 (en) 2020-10-09 2023-12-26 Deere & Company Crop state map generation and control system
US11864483B2 (en) 2020-10-09 2024-01-09 Deere & Company Predictive map generation and control system
US11871697B2 (en) 2020-10-09 2024-01-16 Deere & Company Crop moisture map generation and control system
US11874669B2 (en) 2020-10-09 2024-01-16 Deere & Company Map generation and control system
US11889788B2 (en) 2020-10-09 2024-02-06 Deere & Company Predictive biomass map generation and control
US11889787B2 (en) 2020-10-09 2024-02-06 Deere & Company Predictive speed map generation and control system
US11895948B2 (en) 2020-10-09 2024-02-13 Deere & Company Predictive map generation and control based on soil properties
US11927459B2 (en) 2020-10-09 2024-03-12 Deere & Company Machine control using a predictive map
US11946747B2 (en) 2020-10-09 2024-04-02 Deere & Company Crop constituent map generation and control system
US11983009B2 (en) 2020-10-09 2024-05-14 Deere & Company Map generation and control system
CN113481960A (en) * 2021-07-26 2021-10-08 苏交科集团股份有限公司 High-fill site terrace settlement treatment method and treatment structure

Similar Documents

Publication Publication Date Title
CN107795095A (en) A kind of Joining Technology of precast concrete terrace
CN104746639B (en) A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN105569264B (en) Two-sided composite beam and its construction method
CN106759462B (en) A kind of prefabricated piping lane and its construction method suitable for narrow construction site
CN105804410A (en) Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure
CN109537851A (en) A kind of method for prefabricating of assembled pipe well
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN110029599A (en) Prefabricated culvert steel connecting structure and construction method
CN108130837A (en) A kind of prefabricated road plate and its construction method
CN107023032A (en) A kind of cast-in-place method of pipe gallery
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN108005118A (en) Underground pipe gallery agent structure integrates construction method
CN207297034U (en) Tunnel double-lining concrete vault backfills grouting device
CN104790381B (en) Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN105065040B (en) A kind of prefabricated underground space tunneling construction method of top plate
CN110241915A (en) A kind of assembly concrete beam column L-type muscle integrated connection node and application method
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN107869101A (en) A kind of prefabricated assembled Intercepting Drain Used in Highway and its manufacture method
CN105862894B (en) A kind of installation method of catch pit anti-floating integral mold plate
CN110777854A (en) High-rise building basement roof structure, waterproof coiled material and construction method for protecting layer to survive in one step
CN105908883A (en) Construction method for preventing upward floating of composite floor system lightweight core formwork
CN110438859A (en) A kind of the precast concrete road and its construction method of draining of catchmenting
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN108612270A (en) The precast stair installation method of assembled architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180313

RJ01 Rejection of invention patent application after publication