CN107775946A - A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique - Google Patents
A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique Download PDFInfo
- Publication number
- CN107775946A CN107775946A CN201610786564.1A CN201610786564A CN107775946A CN 107775946 A CN107775946 A CN 107775946A CN 201610786564 A CN201610786564 A CN 201610786564A CN 107775946 A CN107775946 A CN 107775946A
- Authority
- CN
- China
- Prior art keywords
- blowing
- online
- automatic
- feedback
- product
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C49/00—Blow-moulding, i.e. blowing a preform or parison to a desired shape within a mould; Apparatus therefor
- B29C49/42—Component parts, details or accessories; Auxiliary operations
- B29C49/78—Measuring, controlling or regulating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C49/00—Blow-moulding, i.e. blowing a preform or parison to a desired shape within a mould; Apparatus therefor
- B29C49/02—Combined blow-moulding and manufacture of the preform or the parison
- B29C49/04—Extrusion blow-moulding
Abstract
The invention belongs to be blow molded production field, more particularly to a kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique, it is followed successively by:3D bottle-type or the input of 3D drawing scannings;Select appropriate flow rubber head and determine gummosis curve;Automatic batch mixing, online aberration inspection feedback and adjust automatically color masterbatch ratio;Electromagnetic induction heating, flexible neck is carried out to extrusion type embryo and is adjusted to axial wall thickness, monitor-type germ wall is thick and feedback makes product Thickness Distribution evenly;Blow-molded process, online outward appearance and kerf quality inspection feedback;Overlap is automatically removed, online bottleneck and body dimensional measurement, online leak test, online labeling, Online Video, finally enters the packing of automatic stacking packing machine.Beneficial effects of the present invention:Operation is based on lasting, automatic process adjustments, without any manual intervention, hollow container raw material is distributed exactly, online product measurement feedback and adjust automatically technique are monitored in real time, product is in dynamic and do not adjust state intermittently, constantly tend to master sample, hollow container quality is improved, reduces or prevents the generation of waste product, thoroughly change the passive situation of the accomplished fact detected afterwards, on-line checking, closed loop feedback, the very first time adjusts, and really realizes and lifts prediction, process control, the perfect condition of high quality output.
Description
Technical field
The invention belongs to be blow molded production field, more particularly to a kind of human-computer interaction intelligent closed-loop control is automatically blow molded production
Line and technique.
Background technology
Extrusion-blown modling is mainly used in the parison processing not supported, and production efficiency is high, and equipment cost is low, mould and machinery
Range of choice is wide, and shortcoming is that percent defective is higher, the recovery of waste material, is limited using difference, the thickness control of product, the dispersiveness of raw material
System, the quality controls of hollow container, frequently sampling and laboratory test are generally relied on, is adjusted manually further according to test result,
Not only time-consuming for this process, greatly reduces production line efficiency, and hollow container can not be completely secured and all meet rule
Case marker is accurate.
The quality control of hollow container is not increasingly strict in the industry, and blow molding process also becomes more crucial therewith.In hollow appearance
In device production, product distribution is bad or unstable establish a capital may influence processing quality, even results in whole production line shut-down.
The content of the invention
For the above mentioned problem to be solved, the present invention provides the intelligent control method of blowing production.
Technical scheme:A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique, it is special
Sign is to comprise the following steps:
Step 1:3D bottle-type or 3D drawing scannings are inputted using 3D scanners, collection technology parameter;
Step 2:According to collection technology parameter, automatically select appropriate flow rubber head and determine gummosis curve;
Step 3:Automatic batch mixing is according to gummosis head and gummosis curve, online aberration inspection feedback and adjust automatically color masterbatch ratio
Example;
Step 4:Heated using electromagnetic induction heating device, and blowout type embryo flexible neck is adjusted to axial wall thickness
Whole, real-time monitor-type germ wall is thick and feeds back, and automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
Step 5:Blow-molded process is entered according to predetermined process parameter, adjust automatically blowing pressure, tolerance, controls mould
Temperature, open mold speed and cycle, online outward appearance and kerf quality inspection feedback, to carrying out size, wall thickness etc. to blow moulding equipment
Automatic correction, final production goes out qualified product, the closed-loop automatic control of realization;
Step 6:It is blow molded to enter in semi-finished product and removes rim charge structure, automatically remove overlap, it is anti-monitors deflashing effect in real time
Present step 5 process adjustment adjust automatically blow molding process parameter, blowing and folding mold technique;
Step 7:The online bottleneck of blowing semi-finished product and the body dimensional measurement gone after flash trimming, the adjust automatically of feedback step five
Blow molding process parameter;
Step 8:Online leak test, automatic detection reject leakage bottle and feedback and charging, batch mixing, the online inspection alarm of filtering;
Step 9:The surface labelled using flame pretreatment device to plastic hollow vessel carries out flame pretreatment, can
The firmness of label is improved, is not easy bulge or disengaging;
Step 10:Online labeling, is labelled using dual-purpose labelling machine, and different can produce needs, Online Video inspection
Label is to mistake, position, aberration problem;
Step 11:Plastic hollow vessel is leaked hunting using secondary leak-checking apparatus, plastics when preventing flame pretreatment
There is side leakage in hollow container, improves plastic hollow vessel quality;
Step 12:Detect qualified product and carry out stacking packaging into pile packing machine, into automatic stacking packing machine
Packing, adjust automatically transports, speed of packing;
Step 13:Perfect predictive maintenance demand.By the human-computer interaction interface (HMI) of bottle blowing machine, can check with figure
The process data for each bottle blowing process that mode records.So, operator's can fully understands the general status of processing performance,
Machine can also remind operator to pay attention to potential inconsistence problems, it is indicated that the product of which process exceeds acceptable tolerance model
Enclose, operator can easily identify the abnormal process of operation, formulate necessary maintenance plan, farthest reduce to production
Influence;Totally reduce maintenance workload and required manually operated, significantly save labour and control cost.
The step 4 is specific as follows:Heated using electromagnetic induction heating device, set blow molding process parameter, pass through
Above-mentioned parameter is adjusted to set pre- blowing reference curve, feedback control extrusion melt amount, melt is entered machine by predetermined flow rate
Head, when storing amount reaches predetermined value, machine head port mould is opened, and type embryo flexible neck is adjusted to axial wall thickness, real-time monitor-type
Germ wall is thick and feeds back, and automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
The step 5 comprises the following steps:
Step A:Pre- blowing aeration phase, the blowing curve in each blowing station of auto-real-time monitoring, if blow molding process
Parameter curve deviates reference curve, then correction can be performed automatically, when making the pre- blowing of each actual blow mold stage in all blowing station
Between start blowing and duration and blowing pressure, it is completely the same with setting value, ensure that the accurate with one of material distribution
Cause property;
Step B:Stage pressure period, mould carry out matched moulds according to the speed of setting, require stable movement, left and right during matched moulds
Balance, blown after matched moulds, parison is close to mould inner wall in the presence of gas pressure, is opened after keeping pressure cooling and shaping
Mould, each blow molded product is persistently adjusted, it is ensured that each blow molded product meets standard.
Maintenance alarm when the mould clip that the step 6 also includes removal rim charge structure breaks down.
Present invention has the advantages that:Operation is based on continuing, automatic process adjustments, without any manual intervention, exactly
Container stock in distribution, monitors online wall thickness measuring feedback in real time and automatic adjustment germ wall is thick, makes product Thickness Distribution more equal
It is even, solve the problems, such as that wall thickness differs, improve hollow container quality, solve that percent defective is higher, the recovery of waste material, utilize difference, system
The problems such as thickness control of product, the dispersiveness of raw material are restricted, energy consumption is big, speed-raising is difficult, can effectively ensure that production quality, produce
Technique, Optimal Production is obtained, be easy to implement, saved material, reduce cost, shorten molding cycle, improve production efficiency, improved
Automaticity.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of oily automatic feeding system of the present utility model.
Fig. 3 is oily blow moulding machine of the present utility model and the structural representation of secondary cooling mechanism.
Fig. 4 is the structural representation of compression cold air feed mechanism of the present utility model.
In accompanying drawing, 1. automatic feeding systems, 2. blow moulding machines, 3. secondary cooling mechanisms, 4. remove rim charge mechanism, 5. online surveys
Leakage machine, 6. online labelling machines, 7. pile packing machines, 8. conveying mechanisms, 9. flame pretreatment devices, 10. 2 leak-checking apparatus,
11. feeding system, 12. batch mixers, 13. total holding vessels, 14. points of storage tanks, 15. magnetic valves, 16. level sensors, 17. automatic controls
Display board processed, 18. extruders, 19. accumulators, 20. heads, 21. equipment for cooling die, 22. air intake lever structures, 23. cooling ducks
Mouth, 24. compression cold air feed mechanisms, 25. air blowers, 26. air intake fan housings, 27. air cooling heat exchangers, 28. air-out fan housings, 29 remove
The wet magnetic valves of device .30. first, 31. first gas flowmeters, 32. dry-air blast devices, 33. dedusters, 34. threaded connection sections.
Embodiment
The embodiment of the present invention is explained below in conjunction with the accompanying drawings.
In accompanying drawing, 1. automatic feeding systems, 2. blow moulding machines, 3. secondary cooling mechanisms, 4. remove rim charge mechanism, 5. online surveys
Leakage machine, 6. online labelling machines, 7. pile packing machines, 8. conveying mechanisms, 9. flame pretreatment devices, 10. 2 leak-checking apparatus,
11. feeding system, 12. batch mixers, 13. total holding vessels, 14. points of storage tanks, 15. magnetic valves, 16. level sensors, 17. automatic controls
Display board processed, 18. extruders, 19. accumulators, 20. heads, 21. equipment for cooling die, 22. air intake lever structures, 23. cooling ducks
Mouth, 24. compression cold air feed mechanisms, 25. air blowers, 26. air intake fan housings, 27. air cooling heat exchangers, 28. air-out fan housings, 29 remove
The wet magnetic valves of device .30. first, 31. first gas flowmeters, 32. dry-air blast devices, 33. dedusters, 34. threaded connection sections.
The present invention relates to a kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique, step 1:Using
3D scanners input to 3D bottle-type or 3D drawing scannings, collection technology parameter;
Step 2:According to collection technology parameter, automatically select appropriate flow rubber head and determine gummosis curve;
Step 3:Automatic batch mixing is according to gummosis head and gummosis curve, online aberration inspection feedback and adjust automatically color masterbatch ratio
Example;
Step 4:Heated using electromagnetic induction heating device, and blowout type embryo flexible neck is adjusted to axial wall thickness
Whole, real-time monitor-type germ wall is thick and feeds back, and automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
The step 4 is specific as follows:Heated using electromagnetic induction heating device, set blow molding process parameter, pass through
Above-mentioned parameter is adjusted to set pre- blowing reference curve, feedback control extrusion melt amount, melt is entered machine by predetermined flow rate
Head, when storing amount reaches predetermined value, machine head port mould is opened, and type embryo flexible neck is adjusted to axial wall thickness, real-time monitor-type
Germ wall is thick and feeds back, and automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
Step 5:Blow-molded process is entered according to predetermined process parameter, adjust automatically blowing pressure, tolerance, controls mould
Temperature, open mold speed and cycle, online outward appearance and kerf quality inspection feedback, to carrying out size, wall thickness etc. to blow moulding equipment
Automatic correction, final production goes out qualified product, the closed-loop automatic control of realization;
The step 5 comprises the following steps:
Step A:Pre- blowing aeration phase, the blowing curve in each blowing station of auto-real-time monitoring, if blow molding process
Parameter curve deviates reference curve, then correction can be performed automatically, when making the pre- blowing of each actual blow mold stage in all blowing station
Between start blowing and duration and blowing pressure, it is completely the same with setting value, ensure that the accurate with one of material distribution
Cause property;
Step B:Stage pressure period, mould carry out matched moulds according to the speed of setting, require stable movement, left and right during matched moulds
Balance, blown after matched moulds, parison is close to mould inner wall in the presence of gas pressure, is opened after keeping pressure cooling and shaping
Mould, each blow molded product is persistently adjusted, it is ensured that each blow molded product meets standard.
Maintenance alarm when the mould clip that the step 6 also includes removal rim charge structure breaks down.
Step 6:It is blow molded to enter in semi-finished product and removes rim charge structure, automatically remove overlap, it is anti-monitors deflashing effect in real time
Present step 5 process adjustment adjust automatically blow molding process parameter, blowing and folding mold technique;
Step 7:The online bottleneck of blowing semi-finished product and the body dimensional measurement gone after flash trimming, the adjust automatically of feedback step five
Blow molding process parameter;
Step 8:Online leak test, automatic detection reject leakage bottle and feedback and charging, batch mixing, the online inspection alarm of filtering;
Step 9:The surface labelled using flame pretreatment device to plastic hollow vessel carries out flame pretreatment, can
The firmness of label is improved, is not easy bulge or disengaging;
Step 10:Online labeling, is labelled using dual-purpose labelling machine, and different can produce needs, Online Video inspection
Label is to mistake, position, aberration problem;
Step 11:Plastic hollow vessel is leaked hunting using secondary leak-checking apparatus, plastics when preventing flame pretreatment
There is side leakage in hollow container, improves plastic hollow vessel quality;
Step 12:Detect qualified product and carry out stacking packaging into pile packing machine, into automatic stacking packing machine
Packing, adjust automatically transports, speed of packing;
Step 13:Perfect predictive maintenance demand.By the human-computer interaction interface (HMI) of bottle blowing machine, can check with figure
The process data for each bottle blowing process that mode records.So, operator's can fully understands the general status of processing performance.
In addition, machine can also remind operator to pay attention to potential inconsistence problems, it is indicated that the product of which process exceeds acceptable appearance
Poor scope.Thus, operator can easily identify the abnormal process of operation, formulate necessary maintenance plan, farthest drop
The low influence to production.In general, reduce maintenance workload and required manually operated, significantly save labour and control
Cost.
Above method is based on being blow molded full-automatic production line, and being blow molded full-automatic production line includes automatic feeding system, blows
Molding machine, secondary cooling mechanism, remove rim charge mechanism, conveying mechanism, online air leak tester, online labelling machine, pile packing machine, PLC
Controller and drive device, it is characterised in that automatic feeding system, blow moulding machine, secondary cooling mechanism, removal rim charge mechanism, conveying
Mechanism is sequentially connected, and sets gradually online air leak tester, online labelling machine along conveying mechanism, conveying mechanism output end sets pile bag
Mounting mechanism, sets flame pretreatment device between online air leak tester and online labelling machine, automatic feeding system, blow moulding machine, secondary
Cooling body, remove rim charge mechanism, conveying mechanism, online air leak tester, online labelling machine, pile packing machine and PLC
Being connected with drive device, be adapted to different production requirements, middle production equipment substantially reduces equipment cost, and with high response
Property, the advantage such as energy-conserving and environment-protective, solve the problems such as blow moulding machine energy consumption is big, speed-raising is difficult, can effectively ensure that production quality, produce work
Skill, Optimal Production is obtained, be easy to implement, saved material, reduce cost, shorten molding cycle, improve machine efficiency, improved certainly
Dynamicization degree.
Automatic feeding system include feeding system, batch mixer, total holding vessel, divide storage tank, magnetic valve, level sensor, from
Dynamic control display board and industrial computer, the outlet of feeding system are connected with batch mixer, and batch mixer is connected with total holding vessel, divides storage tank
To be multiple, multiple points of storage tanks are connected by suction tube with total holding vessel, divide storage tank to be connected with blow moulding machine, total holding vessel with multiple points
Level sensor is respectively provided with storage tank, divides and magnetic valve is set on the suction tube of tank ends, multiple level sensors are controlled with PLC
Device processed connects with display board is automatically controlled, and feeding system, batch mixer, total holding vessel, divides storage tank to be connected with vacuum system, point storage
Tank sets dispensing adding mouth,:PLC is with being arranged on total holding vessel and the magnetic valve divided on holding vessel, level sensor, root
According to dividing scarce material signal sequence feed on holding vessel, situation auto-sequencing need to be expected, central centralized Control is realized, is inputted by inspection defeated
Go out a little, rapid failure judgement source, automatically control display board and caution device, warning in time is damaged to reduce breaking down
Lose;
Blow moulding machine includes extruder, accumulator, head, equipment for cooling die and air intake lever structure, extruder, accumulator,
Head is sequentially connected, and equipment for cooling die is arranged on below head, and air intake lever structure setting is below equipment for cooling die, mould
Cooling device includes split mold mechanism, cooling structure, and cooling structure is arranged in split mold mechanism, and cooling structure is snakelike
Cooling coil, split mold mechanism are connected with transport structure, and shaping speed is fast, Stability Analysis of Structures, reduce shaping time;
Secondary cooling mechanism includes cooling duckbilled and compression cold air feed mechanism, compression cold air feed mechanism and cooling
Duckbilled is connected and provides cooling air, and cooling duckbilled includes nozzle and threaded connection section, and multiple column type injection gas are set on nozzle
Hole;Compressing cold air feed mechanism includes air blower, air intake fan housing, air cooling heat exchanger, air-out fan housing, dehumidifier, the first electromagnetism
Valve, first gas flowmeter and dry-air blast device, air intake fan housing and air-out fan housing are respectively fixedly disposed at air cooling heat exchanger both sides, enter
Wind fan housing is connected by pipeline with air blower, and air-out fan housing is connected by pipeline with dehumidifier, and dehumidifier passes through pipeline and cooling
Duckbilled connects, and the air inlet of air blower is provided with deduster, and dry-air blast device is provided with heat exchange pipeline, heat exchange pipeline and air-cooled heat exchange
Device is connected, and cooling duckbilled is fixed with manipulator, is cooled down and is set the first magnetic valve and first on the air supply duct of duckbilled and dehumidifier
Gas flowmeter, using multiple sizing, after one-step building, product is projecting is placed on structure for conveying, is set above product bottom
Special duckbill structure, duckbill structure connect with compression cold air, reach and accelerate part cooling purpose, in the same of hollow container conveying
Shi Jinhang is cooled down, and effectively improves production efficiency, shortens time production cycle, reduces production cost;
Removing rim charge mechanism includes installation base plate and bale splitter structure, and bale splitter structure is arranged on installation base plate, bale splitter structure
Including frame, rubber knife, rubber knife frame, auxiliary stand, bearing assembly, reinforcement fixed mount, cylinder, transmission component, its feature exists
In being provided with guided way on the left and right sides opposing end surface of frame, auxiliary stand and rubber knife frame or so end set guide sleeve frame
Be slidably connected by the guided way and guide sleeve that are mutually matched with auxiliary stand and rubber knife frame, cylinder by piston rod with cutting
Glue knife rest upper end connects, and rubber knife includes upper rubber knife and lower rubber knife, and upper rubber knife is arranged on rubber knife frame lower end, incision glue
Knife sets the upper of frame, and upper rubber knife and lower rubber knife are oppositely arranged, and frame upper end is symmetrical arranged two fixed mounts, auxiliary stand
On be symmetrical arranged two bearing assemblies, transmission component is two groups and is symmetrical arranged that one end and the fixed mount of transmission component are fixed, biography
The other end of dynamic component is connected with rubber knife frame, and transmission component is connected with bearing assembly, strengthens fixed mount and two bearing assemblies
Top connection, ensure to remove rim charge quick, while make the position of bearing assembly, rubber knife and rubber knife frame in cutting process
Keep relative stability, rocked so as to avoid or reduce rubber knife and rubber knife frame caused by the factors such as mechanical oscillation, extension is cut
The service life of glue knife;
Conveying mechanism includes transfer gantry and conveyer belt, and transfer gantry is set on the table, and conveyer belt, which is arranged on, send branch
On frame, conveying mechanism is provided with the moveable manipulator of sliding equipment, plastic hollow vessel is kept stable in conveyer belt,
Ensure stabilization during hollow container labeling simultaneously;
Online air leak tester is provided with leaky bucket testing apparatus, and leaky bucket testing apparatus reject substandard product, ensures product product
Matter
Online labelling machine use dual-purpose labelling machine structure, can PLC control under in two kinds of thermal transfer and adhesive sticker
Changed between operator scheme, adapt to different production requirements.
Secondary leak-checking apparatus is set online, secondary leak-checking apparatus is to plastic hollow vessel between labelling machine and pile packing machine
Leaked hunting, prevent that side leakage occurs in plastic hollow vessel during flame pretreatment.
Air intake fan housing, air-out fan housing bottom and dehumidifier are respectively arranged with discharge outlet;Discharge outlet connects with circulating water chennel, closes
Reason utilizes resource, reduces production cost, and the heat exchange pipeline being connected with air cooling heat exchanger sets second solenoid valve and second gas stream
Gauge, effectively control and monitoring,
Dry-air blast device is cooling-water machine, and snakelike cooling coil pipe sets inner fin along inside pipe wall, and inner fin is 2, inner fin
To there is protrusion screw thread cable architecture, 2 inner fins are symmetrical arranged along inwall and intersected, and improve heat exchanger effectiveness.
An example of the present invention is described in detail above, but content is only presently preferred embodiments of the present invention, no
The practical range for limiting the present invention can be considered as.Any changes and modifications in accordance with the scope of the present application,
Should still it belong within the patent covering scope of the present invention.
Claims (4)
1. a kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique, it is characterised in that comprise the following steps:
Step 1:3D bottle-type or 3D drawing scannings are inputted using 3D scanners, collection technology parameter;
Step 2:According to collection technology parameter, automatically select appropriate flow rubber head and determine gummosis curve;
Step 3:Automatic batch mixing is according to gummosis head and gummosis curve, online aberration inspection feedback and adjust automatically color masterbatch ratio;
Step 4:Heated using electromagnetic induction heating device, and blowout type embryo flexible neck is adjusted to axial wall thickness, it is real
When monitor-type germ wall it is thick and feed back, automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
Step 5:Blow-molded process is entered according to predetermined process parameter, adjust automatically blowing pressure, tolerance, control mold temperature,
Open mold speed and cycle, online outward appearance and kerf quality inspection feedback, to carrying out the automatic of size, wall thickness etc. to blow moulding equipment
Correction, final production go out qualified product, the closed-loop automatic control of realization;
Step 6:It is blow molded to enter in semi-finished product and removes rim charge structure, automatically remove overlap, monitors deflashing staining effect step in real time
Rapid five processes adjustment adjust automatically blow molding process parameter, blowing and folding mold technique;
Step 7:The online bottleneck of blowing semi-finished product and the body dimensional measurement gone after flash trimming, the blowing of the adjust automatically of feedback step five
Technological parameter;
Step 8:Online leak test, automatic detection reject leakage bottle and feedback and charging, batch mixing, the online inspection alarm of filtering;
Step 9:The surface labelled using flame pretreatment device to plastic hollow vessel carries out flame pretreatment, it is possible to increase
The firmness of label, it is not easy bulge or disengaging;
Step 10:Online labeling, is labelled using dual-purpose labelling machine, and different can produce needs, Online Video inspection tag
To mistake, position, aberration problem;
Step 11:Plastic hollow vessel is leaked hunting using secondary leak-checking apparatus, plastic hollow when preventing flame pretreatment
There is side leakage in container, improves plastic hollow vessel quality;
Step 12:Detect qualified product and carry out stacking packaging into pile packing machine, packed into automatic stacking packing machine,
Adjust automatically transports, speed of packing;
Step 13:Perfect predictive maintenance demand, by the human-computer interaction interface (HMI) of bottle blowing machine, it can check to graphically
The process data of each bottle blowing process of record.So, operator's can fully understands the general status of processing performance, machine
Also operator can be reminded to pay attention to potential inconsistence problems, it is indicated that the product of which process exceeds acceptable range of tolerable variance, behaviour
Work person can easily identify the abnormal process of operation, formulate necessary maintenance plan, farthest reduce the influence to production;
Totally reduce maintenance workload and required manually operated, significantly save labour and control cost.
2. a kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line according to claim 1 and technique, its feature exist
It is specific as follows in the step 4:Heated using electromagnetic induction heating device, blow molding process parameter is set, by adjustment
Parameter is stated to set pre- blowing reference curve, feedback control extrusion melt amount, melt is entered head by predetermined flow rate, works as storage
When doses reaches predetermined value, machine head port mould is opened, and type embryo flexible neck is adjusted to axial wall thickness, and real-time monitor-type germ wall thickness is simultaneously
Feedback, automatic adjustment germ wall is thick, makes product Thickness Distribution evenly;
3. the intelligent control method of blowing production according to claim 1, it is characterised in that the step 5 comprises the following steps:
Step A:Pre- blowing aeration phase, the blowing curve in each blowing station of auto-real-time monitoring, if blow molding process parameter
Curve deviates reference curve, then can perform correction automatically, make the pre- blowing time of each actual blow mold stage in all blowing station i.e.
Start blowing and duration and blowing pressure, it is completely the same with setting value, it ensure that the accurate and uniformity of material distribution;
Step B:Pressure period, mould carry out matched moulds according to the speed of setting, and stable movement is required during matched moulds, left-right balance, is closed
Blown after mould, parison is close to mould inner wall in the presence of gas pressure, is molded after keeping pressure cooling and shaping, to each
Blow molded product is persistently adjusted, it is ensured that each blow molded product meets standard.
4. a kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line according to claim 1 and technique, its feature exist
The maintenance alarm when mould clip that the step 6 also includes removal rim charge structure breaks down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610786564.1A CN107775946A (en) | 2016-08-31 | 2016-08-31 | A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610786564.1A CN107775946A (en) | 2016-08-31 | 2016-08-31 | A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107775946A true CN107775946A (en) | 2018-03-09 |
Family
ID=61451477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610786564.1A Pending CN107775946A (en) | 2016-08-31 | 2016-08-31 | A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107775946A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108528812A (en) * | 2018-03-30 | 2018-09-14 | 薛寓怀 | A kind of intelligence integral type packaging system and its working method |
CN108773046A (en) * | 2018-06-07 | 2018-11-09 | 岱纳包装(天津)有限公司 | The online labeling production line of adhesive label |
CN109049642A (en) * | 2018-10-11 | 2018-12-21 | 张家港市联鑫塑料机械有限公司 | Note blows blow moulding machine and leaks hunting Jian Ti mechanism |
CN111251579A (en) * | 2020-03-02 | 2020-06-09 | 杭州普信塑料包装有限公司 | Rear end processing device for hollow blow molding machine |
CN111559065A (en) * | 2020-05-14 | 2020-08-21 | 李宁军 | Blow molding label machine |
CN111745937A (en) * | 2019-03-29 | 2020-10-09 | 住友重机械工业株式会社 | Blown film forming device |
CN112140609A (en) * | 2020-07-14 | 2020-12-29 | 宁波卫生职业技术学院 | Production method of antibacterial plastic |
CN112180855A (en) * | 2020-09-15 | 2021-01-05 | 岱纳包装(天津)有限公司 | Plant equipment operation management system |
CN112297394A (en) * | 2019-07-26 | 2021-02-02 | 克朗斯股份公司 | System and method for manufacturing containers |
CN112454870A (en) * | 2020-10-15 | 2021-03-09 | 广东乐善智能装备股份有限公司 | Intelligent bottle blowing machine |
CN112744538A (en) * | 2020-11-16 | 2021-05-04 | 泰州市华仕达机械制造有限公司 | Blow molding time regulation and control system and method based on conveying speed |
CN112743804A (en) * | 2020-12-18 | 2021-05-04 | 童少兵 | Plastic product production blow molding auxiliary equipment with gas pressure control function |
CN112757612A (en) * | 2021-01-15 | 2021-05-07 | 董辉 | Colorful coloring injection molding bottle blowing process based on visual transmission |
CN113021076A (en) * | 2021-04-09 | 2021-06-25 | 杭州秋瑞自动化科技有限公司 | Automatic adaptive control method for machining |
CN115284580A (en) * | 2022-10-08 | 2022-11-04 | 张家港市联鑫塑料机械有限公司 | Injection blow molding intelligent manufacturing system based on remote monitoring |
CN116175939A (en) * | 2023-04-25 | 2023-05-30 | 张家港市纽迈机械有限公司 | Bottle blowing machine control system and bottle blowing machine control method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1178499A (en) * | 1995-03-13 | 1998-04-08 | S·T·索菲亚焦技术有限公司 | Method and apparatus for producting blow-molded body having multiple dimensions |
CN1188824A (en) * | 1996-10-08 | 1998-07-29 | 伊利诺斯工具制造公司 | Meltblowing method and apparatus |
CN101249721A (en) * | 2008-03-13 | 2008-08-27 | 华南理工大学 | Extrusion blow moulding wall-thickness on-line control system based on image recognition technology and method thereof |
CN101466526A (en) * | 2006-06-07 | 2009-06-24 | 普瑞斯克技术公司 | A method and system for laser-based, wavelength specific infrared irradiation treatment |
CN201525122U (en) * | 2009-06-10 | 2010-07-14 | 张家港市同创机械有限公司 | Three-dimensional hollow blow molding machine |
CN102189674A (en) * | 2010-03-19 | 2011-09-21 | 郭锡南 | Three-dimensional blow molding equipment generation method |
CN103978708A (en) * | 2014-05-16 | 2014-08-13 | 潘玉军 | Automatic production line of plastic hollow container |
-
2016
- 2016-08-31 CN CN201610786564.1A patent/CN107775946A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1178499A (en) * | 1995-03-13 | 1998-04-08 | S·T·索菲亚焦技术有限公司 | Method and apparatus for producting blow-molded body having multiple dimensions |
CN1188824A (en) * | 1996-10-08 | 1998-07-29 | 伊利诺斯工具制造公司 | Meltblowing method and apparatus |
CN101466526A (en) * | 2006-06-07 | 2009-06-24 | 普瑞斯克技术公司 | A method and system for laser-based, wavelength specific infrared irradiation treatment |
CN101249721A (en) * | 2008-03-13 | 2008-08-27 | 华南理工大学 | Extrusion blow moulding wall-thickness on-line control system based on image recognition technology and method thereof |
CN201525122U (en) * | 2009-06-10 | 2010-07-14 | 张家港市同创机械有限公司 | Three-dimensional hollow blow molding machine |
CN102189674A (en) * | 2010-03-19 | 2011-09-21 | 郭锡南 | Three-dimensional blow molding equipment generation method |
CN103978708A (en) * | 2014-05-16 | 2014-08-13 | 潘玉军 | Automatic production line of plastic hollow container |
Non-Patent Citations (2)
Title |
---|
杨鸣波等: "《塑料成型工艺学》", 30 June 2014, 中国轻工业出版社 * |
黄汉雄: "《塑料吹塑技术》", 31 January 1999, 化学工业出版社 * |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108528812B (en) * | 2018-03-30 | 2020-04-14 | 薛寓怀 | Intelligent integrated packaging system and working method thereof |
CN108528812A (en) * | 2018-03-30 | 2018-09-14 | 薛寓怀 | A kind of intelligence integral type packaging system and its working method |
CN108773046A (en) * | 2018-06-07 | 2018-11-09 | 岱纳包装(天津)有限公司 | The online labeling production line of adhesive label |
CN109049642A (en) * | 2018-10-11 | 2018-12-21 | 张家港市联鑫塑料机械有限公司 | Note blows blow moulding machine and leaks hunting Jian Ti mechanism |
CN111745937A (en) * | 2019-03-29 | 2020-10-09 | 住友重机械工业株式会社 | Blown film forming device |
CN111745937B (en) * | 2019-03-29 | 2022-07-15 | 住友重机械工业株式会社 | Film blowing forming device |
CN112297394B (en) * | 2019-07-26 | 2022-10-04 | 克朗斯股份公司 | System and method for manufacturing containers |
CN112297394A (en) * | 2019-07-26 | 2021-02-02 | 克朗斯股份公司 | System and method for manufacturing containers |
CN111251579B (en) * | 2020-03-02 | 2022-03-18 | 杭州普信塑料包装有限公司 | Rear end processing device for hollow blow molding machine |
CN111251579A (en) * | 2020-03-02 | 2020-06-09 | 杭州普信塑料包装有限公司 | Rear end processing device for hollow blow molding machine |
CN111559065A (en) * | 2020-05-14 | 2020-08-21 | 李宁军 | Blow molding label machine |
CN112140609A (en) * | 2020-07-14 | 2020-12-29 | 宁波卫生职业技术学院 | Production method of antibacterial plastic |
CN112180855B (en) * | 2020-09-15 | 2022-09-09 | 岱纳包装(天津)有限公司 | Plant equipment operation management system |
CN112180855A (en) * | 2020-09-15 | 2021-01-05 | 岱纳包装(天津)有限公司 | Plant equipment operation management system |
CN112454870A (en) * | 2020-10-15 | 2021-03-09 | 广东乐善智能装备股份有限公司 | Intelligent bottle blowing machine |
CN112744538B (en) * | 2020-11-16 | 2021-09-21 | 浙江嘉宬科技股份有限公司 | Blow molding time regulation and control system and method based on conveying speed |
CN112744538A (en) * | 2020-11-16 | 2021-05-04 | 泰州市华仕达机械制造有限公司 | Blow molding time regulation and control system and method based on conveying speed |
CN112743804A (en) * | 2020-12-18 | 2021-05-04 | 童少兵 | Plastic product production blow molding auxiliary equipment with gas pressure control function |
CN112757612A (en) * | 2021-01-15 | 2021-05-07 | 董辉 | Colorful coloring injection molding bottle blowing process based on visual transmission |
CN113021076A (en) * | 2021-04-09 | 2021-06-25 | 杭州秋瑞自动化科技有限公司 | Automatic adaptive control method for machining |
CN115284580A (en) * | 2022-10-08 | 2022-11-04 | 张家港市联鑫塑料机械有限公司 | Injection blow molding intelligent manufacturing system based on remote monitoring |
CN115284580B (en) * | 2022-10-08 | 2022-12-27 | 张家港市联鑫塑料机械有限公司 | Injection blow molding intelligent manufacturing system based on remote monitoring |
CN116175939A (en) * | 2023-04-25 | 2023-05-30 | 张家港市纽迈机械有限公司 | Bottle blowing machine control system and bottle blowing machine control method |
CN116175939B (en) * | 2023-04-25 | 2023-08-11 | 张家港市纽迈机械有限公司 | Bottle blowing machine control system and bottle blowing machine control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107775946A (en) | A kind of human-computer interaction intelligent closed-loop control full-automatic blowing coating line and technique | |
CN106346753B (en) | It is blow molded full-automatic production line | |
CN104968568B (en) | For producing the method and apparatus with filling container | |
CN100478654C (en) | Method for controlling a container blow molding machine to correct anomalies in material distribution | |
US10773438B2 (en) | Molding system | |
CN114179320A (en) | Automatic adjusting method for technological parameters of injection molding machine in combination with visual detection | |
US9778031B2 (en) | Method for thermally monitoring process for forming plastic blow-molded containers | |
US20120226376A1 (en) | Method and device for blow molding containers | |
CN103079796B (en) | Utilize and carry out feeding back the method being manufactured container by crude green body according to detected pressures minimum of a value | |
CN101138885B (en) | Extrusion-blow molding product wall thickness intelligentized control system and control method thereof | |
JP2020533196A (en) | Methods and equipment for manufacturing containers from thermoplastic materials | |
CN107775865A (en) | A kind of production equipment and its production technology being automatically molded | |
CN102320115A (en) | Online quality detecting method and device for micro-foamed injection molded product | |
CN206589243U (en) | A kind of production equipment being automatically molded | |
CN206264330U (en) | The full-automatic production line of blowing | |
CN109878045A (en) | Intelligence adjusts the control device that mold cavity pressure is constant and is precisely controlled | |
CN107775942A (en) | A kind of method of extrusion glue embryo adjust automatically and control extrusion-blown modling based on 3D scannings | |
CN106313464A (en) | Intelligent temperature control device for injection molding machine | |
CN208600687U (en) | One kind being used for the thermostatically controlled machine side cooling stations of hot forming tool cooling water | |
CN207736666U (en) | A kind of cavity injection mold possessing efficient runner | |
CN202412645U (en) | Variable mould temperature control system | |
CN117836128A (en) | System comprising a facility with a heating system and a device or component, and method for determining the energy consumption of a system | |
CN105619745A (en) | Preparation method of FFS (Form-Fill-Seal) three-layer co-extrusion heavy packaging film | |
CN201179724Y (en) | Intelligentized control system for wall thickness of extrusion-blow molding product | |
CN106079385A (en) | A kind of bottle blowing machine bottleneck processing temperature controls device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180309 |
|
RJ01 | Rejection of invention patent application after publication |