CN107767086A - New energy station output lower limit rolling amendment method based on generated power forecasting - Google Patents

New energy station output lower limit rolling amendment method based on generated power forecasting Download PDF

Info

Publication number
CN107767086A
CN107767086A CN201711189226.0A CN201711189226A CN107767086A CN 107767086 A CN107767086 A CN 107767086A CN 201711189226 A CN201711189226 A CN 201711189226A CN 107767086 A CN107767086 A CN 107767086A
Authority
CN
China
Prior art keywords
electricity
contract
mrow
new energy
energy station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711189226.0A
Other languages
Chinese (zh)
Inventor
傅铮
张柏林
侯锐杰
李全茂
伏岁林
郭文科
刘巍
王永年
祁莹
周云蔚
王彦文
陈晓嵩
段再超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Dong Run Huan Neng Science And Technology Co Ltd
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Original Assignee
Beijing Dong Run Huan Neng Science And Technology Co Ltd
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dong Run Huan Neng Science And Technology Co Ltd, State Grid Corp of China SGCC, State Grid Gansu Electric Power Co Ltd, Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical Beijing Dong Run Huan Neng Science And Technology Co Ltd
Priority to CN201711189226.0A priority Critical patent/CN107767086A/en
Publication of CN107767086A publication Critical patent/CN107767086A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of new energy station output lower limit rolling amendment method based on generated power forecasting a few days ago of the present invention, differs greatly for the new energy station year-on-year meteorological resources of history, while power network has no the part that effective mechanism distinguishes every daily generation.The present invention can provide a kind of effective mechanism for being adapted to such case, a kind of new energy station output lower limit rolling amendment method based on power prediction a few days ago.After considering that new energy station is large user's direct power supply, on the premise of electric power netting safe running, new energy station needs to ensure rational basic generated energy, to meet the electricity requirement for participating in large user's direct power supply.

Description

New energy station output lower limit rolling amendment method based on generated power forecasting
Technical field
The invention belongs to power domain, and in particular under a kind of new energy station based on generated power forecasting a few days ago is contributed Limit rolling amendment method
Background technology
Wind-power electricity generation and photovoltaic generation are as green cleaning new energy, compared with conventional thermoelectricity, have certain intermittence, Fluctuation, randomness, thus large-scale wind power or photoelectricity be incorporated into the power networks security, the stability of traditional power network are caused compared with It is big to influence.Along with the large-scale development and focus utilization of new energy, will be brought more to the safe operation of power network and management and running Carry out the problem of more.As what electricity changed gos deep into, it is more that power network has been gradually transitions safety economy environmental protection from initial safe operation The scheduling of target, increasing new energy station participate in the transaction of large user's direct power supply, how to ensure to adjust in new energy station In degree, especially ensure that electricity performs as agreed than more serious area abandoning wind, the generation schedule arrangement of generation of electricity by new energy field By as new problem.
The country is main at present to realize that new energy coordinates control using new energy priority scheduling technology, is meeting power system peace Under full stable operation constraint, according to generation of electricity by new energy prediction result, coordinate normal power supplies and generate electricity, formulate new energy station scheduling meter Draw, ensure generation of electricity by new energy priority scheduling and preferential consumption, realization does not abandon wind (light) or abandons wind (light) less.The depth changed with electricity Enter, power network has been gradually transitions the scheduling of safety economy environmental protection multiple target from initial safe operation, increasing new energy Source station participates in the transaction of large user's direct power supply, and the new energy priority scheduling technology cannot be distinguished by the part of every daily generation, Contract generation can not be effectively distinguished, base power generation, three public scheduling can not be realized.
Conventional method confirms that new energy station future generated energy is year-on-year based on new energy station history, and can not effectively distinguish Contract generation, base power generation, it can not ensure that new energy station large user's direct-furnish electricity performs as agreed.The overall think of of this method Lu Shi, in daily start, first to the new energy station for participating in large user's direct power supply, it is complete from current time to contract to calculate it Into the total electricity for needing during the date to complete, and further determine that in the basic electricity for currently in a few days needing to complete;Secondly, root According to the generating prediction curve on basic electricity and new energy the station same day, determine new energy station in the new energy field of this day whole day Active power output of standing lower limit curve.Because said process is carried out in daily start, rolling amendment is consequently belonging to.It is daily to calculate newly During the basic electricity of energy station, situation about can be performed to the day before yesterday is adjusted to follow-up electrical demand, so as to correct Due to power prediction precision the problems such as caused by control error, so as on the whole ensure participate in large user's direct power supply new energy The power generation needs of station.
The content of the invention
Because the new energy station year-on-year meteorological resources of history differ greatly, while power network has no effective mechanism and distinguishes daily hair The part of electricity.The present invention can provide a kind of effective mechanism for being adapted to such case, and one kind is based on power prediction a few days ago New energy station output lower limit rolling amendment method.After considering that new energy station is large user's direct power supply, transported in power grid security On the premise of row, new energy station needs to ensure rational basic generated energy, to meet the electricity requirement for participating in large user's direct power supply. Therefore, can be according to the situation of new energy station execution large user's direct power supply contract, under the output for determining the new energy station in real time Limit, that is, takeForWhen new energy station still has large user's direct-furnish electricity to need to fulfil,Otherwise,
Concretely comprise the following steps:
S1 gets new energy station annual contract electricity and monthly Contract generation, provisional contract electricity;
S2 the new energy station to participating in marketing, calculates it from current time to this month the end of month in daily start Period needs the monthly contract dump energy completed, and it is remaining from current time to contract execution Close Date provisional contract to calculate it Electricity, and further determine that the pre-planned electricity for needing to complete within the same day, i.e., the remaining electricity that decomposes of monthly contract closes with interim Electricity sum is decomposed with remaining;
S3, according to the generating prediction curve on the new energy station same day, calculates new energy station by device electricity algorithm The same day predicts electricity, and then to prediction electricity compared with pre-planned electricity, such as pre-planned electricity is more than prediction electricity, then in advance Plan electricity and be equal to prediction electricity, on the contrary it is constant;
S4 calculates the new energy station and worked as according to the generating prediction curve on pre-planned electricity and new energy the station same day The daily transaction schedule of day performs curve;
S5 integral and calculating actual power generation, its same day is calculated according to actual power generation according to the actual power curve of feedback Contract generation performance, as actual power generation be more than or equal to day Contract generation, illustrate that day Contract generation is fully completed;Otherwise with Actual power generation completes electricity as day contract, i.e., preferentially completes provisional contract and decompose electricity, residue completes monthly contract decomposition Electricity;
S6 completed electricity according to the same day, repeated 2 steps;Unfinished electricity is counted on into next month execution during the end of month.
Further, computational methods are:
S1 establishes the information of the direct power supply contract of its signing, including its contract label to participating in market-oriented new energy station i Order time Ti S, plan perform time Ti L, annual contract electricityMonthly Contract generationProvisional contract electricity
S2 is in daily start time, to the new energy station i being in large user's direct power supply contract execution time range, root Factually border electricity calculates the monthly Contract generation completed yesterday, the provisional contract electricity that yesterday completes;
This month completed monthly Contract generationUnfinished monthly Contract generation The annual contract electricity of completionUnfinished annual contract electricityCompleted provisional contract electricityUnfinished provisional contract electricityAs this month has terminated, unfinished monthly Contract generation is tired out It is added to time month execution;This month residue number of days is TM, provisional contract electricity is remaining to perform number of days TL
According to unfinished monthly Contract generation and this month residue number of days, the monthly contract point for needing to complete on the same day is calculated Solve electricity:Number of days is performed according to unfinished provisional contract electricity and provisional contract are remaining, is calculated in same day needs The provisional contract of completion decomposes electricity:Then the pre-planned electricity in the station is
S3 is according to 96 point generate electricity predictions of the new energy station power prediction system in the same day new energy station provided a few days ago Data, using slope interpolation method, 288 point generating prediction data of generation same day new energy station;
According to 288 point generating prediction data of same day new energy station, integral and calculating same day prediction electricity Pi PF;Such as Pi F≥ Pi PFThen Pi F=Pi PF
S4 uses QUADRATIC PROGRAMMING METHOD FOR, asks for 288 point of daily transaction schedule curves of the new energy station i in this day, target Function is below equation:
Wherein:
For the active power output lower limit for the same day N points asked for, unit megawatt;Ordinary circumstance N=288
ΔT:For according to it is active calculating device electricity time,Unit hour
Pi F:For the generated energy demand that the new energy station i same day is basic, unit megawatt hour
For harmonious index,Wherein:
The maximum generation predicted value for the t that the prediction that generated electricity a few days ago for new energy station provides;
Wp、WrFor weight coefficient, in actual applications, WpCan value 10.0, WrCan value 0.1;
The constraints must being fulfilled for is:
The minimum active power output at i.e. each moment is necessarily less than the predicted value at the moment;
At the end of the same day, according to the actual electricity of actual power integral and calculatingSuch asThen monthly contract Decompose electricityElectricity is decomposed with provisional contractComplete;Such as
Such asProvisional contract decomposes electricity and is fully completed, and monthly contract decomposition electricity is completed
S6 is such asProvisional contract decomposes electricity and completedMonthly contract decomposition electricity completes 0;
Repeat step 2, roll and decomposition execution is carried out to Contract generation.
This method receives space computing model according to new energy stations such as the wind power plant of foundation, photovoltaic plants, and system combines Standby conventional power unit generation schedule data, conventional AGC units backspin, load plan data, tie line plan and real time data are dispatched, Calculate the receiving ability of the whole network new energy.The new energy station for participating in large user's direct-furnish is directed to simultaneously, it is first in daily start First to the new energy station of participation large user's direct power supply, it is determined that in the basic electricity for currently in a few days needing to complete;Secondly, according to this Basic electricity and the generating prediction curve on the new energy station same day, determine that new energy station has in the new energy station of this day whole day Work(output lower limit curve., can be to the situation pair of the day before yesterday execution during large user's direct-furnish power consumption of daily calculating new energy station Follow-up electrical demand is adjusted, and error is controlled caused by the problems such as so as to correct the precision due to power prediction, so as to Ensure the power generation needs of participation large user's direct power supply new energy station on the whole.
Brief description of the drawings
Fig. 1 is flow chart of the present invention
Embodiment
First, algorithm steps brief introduction
The general thought of this method is:
New energy station annual contract electricity is got (to decompose annual contract volume by planning department with monthly Contract generation To the moon), provisional contract electricity;
(time point is calculated in daily start), the new energy station to participating in marketing, calculates it from current time To the monthly contract dump energy for needing to complete during this month the end of month, calculate it and face from current time to the contract execution Close Date Shi Hetong dump energies, and further determine that pre-planned electricity (the remaining decomposition electricity of monthly contract for needing to complete within the same day With the remaining decomposition electricity sum of provisional contract);
By device electricity algorithm, according to the generating prediction curve on the new energy station same day, calculate new energy station and work as Day prediction electricity, then to prediction electricity compared with pre-planned electricity, electricity is predicted if it is expected that drawing electricity and being more than, then in advance Plan electricity and be equal to prediction electricity, on the contrary it is constant.
According to the generating prediction curve on pre-planned electricity and new energy the station same day, the new energy station same day is calculated Daily transaction schedule perform curve;
According to the actual power curve of feedback, integral and calculating actual power generation, the conjunction of its same day is calculated according to actual power generation (if actual power generation is more than or equal to day Contract generation, illustrate that day Contract generation is fully completed (monthly conjunction with electricity performance Completed with provisional contract decomposition electricity with electricity is decomposed), on the contrary it is (preferential complete to complete electricity using actual power generation as day contract Electricity is decomposed into provisional contract, residue completes monthly contract decomposition electricity));
Electricity was completed according to the same day, repeats 2 steps;
Unfinished electricity need to be counted on to next month execution during the end of month.
2nd, algorithm realizes idiographic flow
New energy station i to participating in the marketization, establish the information of the direct power supply contract of its signing, including its contract signing Time (Ti S), plan perform the time (Ti L), annual contract electricityMonthly Contract generationProvisional contract electricityDeng.
In daily start time, to the new energy station i being in large user's direct power supply contract execution time range, according to Actual electricity calculates the monthly Contract generation completed yesterday, the provisional contract electricity that yesterday completes.
This month completed monthly Contract generationUnfinished monthly Contract generation The annual contract electricity of completionUnfinished annual contract electricityCompleted provisional contract electricityUnfinished provisional contract electricityIf this month has terminated, unfinished monthly Contract generation is tired out It is added to time month execution.This month residue number of days is TM, provisional contract electricity is remaining to perform number of days TL
According to unfinished monthly Contract generation and this month residue number of days, the monthly contract point for needing to complete on the same day is calculated Solve electricity:Number of days is performed according to unfinished provisional contract electricity and provisional contract are remaining, is calculated in same day needs The provisional contract of completion decomposes electricity:Then the pre-planned electricity in the station is
According to 96 point generate electricity prediction numbers of the new energy station power prediction system in the same day new energy station provided a few days ago According to using slope interpolation method, 288 point generating prediction data of generation same day new energy station.Formula:Check interpolation method formula text Shelves.
According to 288 point generating prediction data of same day new energy station, integral and calculating same day prediction electricity Pi PF.If Pi F ≥Pi PFThen Pi F=Pi PF
Using QUADRATIC PROGRAMMING METHOD FOR, 288 point of daily transaction schedule curves of the new energy station i in this day, target letter are asked for Number is below equation (3-5):
Wherein:
For the active power output lower limit for the same day N points asked for, unit megawatt.Ordinary circumstance N=288
ΔT:For according to it is active calculating device electricity time,Unit hour
Pi F:For the generated energy demand that the new energy station i same day is basic, unit megawatt hour
For harmonious index,Wherein:
The maximum generation predicted value for the t that the prediction that generated electricity a few days ago for new energy station provides.
Wp、WrFor weight coefficient, in actual applications, WpCan value 10.0, WrCan value 0.1.
The constraints that formula (3-5) must is fulfilled for is:
The minimum active power output at i.e. each moment is necessarily less than the predicted value at the moment.
It is herein in a few days rolling amendment daily transaction schedule curve (current period does not do).
At the end of the same day, according to the actual electricity of actual power integral and calculatingIfThen monthly conjunction With decomposition electricityElectricity is decomposed with provisional contractComplete.If
IfProvisional contract decomposes electricity and is fully completed, and monthly contract decomposition electricity is completed
IfProvisional contract decomposes electricity and completedMonthly contract decomposition electricity completes 0.
Repeat step 2, roll and decomposition execution is carried out to Contract generation.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (2)

  1. A kind of 1. new energy station output lower limit rolling amendment method based on generated power forecasting a few days ago, it is characterised in that step Suddenly it is:
    S1 gets new energy station annual contract electricity and monthly Contract generation, provisional contract electricity;
    S2 the new energy station to participating in marketing, calculates it from current time to during this month the end of month in daily start The monthly contract dump energy completed is needed, calculates it from the remaining electricity of current time to contract execution Close Date provisional contract Amount, and further determine that the pre-planned electricity for needing to complete within the same day, i.e., monthly contract is remaining to decompose electricity and provisional contract Residue decomposes electricity sum;
    S3, according to the generating prediction curve on the new energy station same day, calculates the new energy station same day by device electricity algorithm Electricity is predicted, then to prediction electricity compared with pre-planned electricity, such as pre-planned electricity is more than prediction electricity, then pre-planned Electricity is equal to prediction electricity, otherwise constant;
    S4 calculates the new energy station same day according to the generating prediction curve on pre-planned electricity and new energy the station same day Daily transaction schedule performs curve;
    S5 integral and calculating actual power generation, its same day contract is calculated according to actual power generation according to the actual power curve of feedback Electricity performance, as actual power generation be more than or equal to day Contract generation, illustrate that day Contract generation is fully completed;Otherwise with reality Generated energy completes electricity as day contract, i.e., preferentially completes provisional contract and decompose electricity, residue completes monthly contract decomposition electricity;
    S6 completed electricity according to the same day, repeated 2 steps;Unfinished electricity is counted on into next month execution during the end of month.
  2. A kind of 2. new energy station output lower limit rolling amendment based on generated power forecasting a few days ago according to claim 1 Method, it is characterised in that computational methods are:
    S1 establishes the information of the direct power supply contract of its signing, including during its contract signing to participating in the new energy station i of the marketization Between Ti S, plan perform time Ti L, annual contract electricityMonthly Contract generationProvisional contract electricity
    S2 is in daily start time, to the new energy station i being in large user's direct power supply contract execution time range, according to reality Border electricity calculates the monthly Contract generation completed yesterday, the provisional contract electricity that yesterday completes;
    This month completed monthly Contract generationUnfinished monthly Contract generationComplete Annual contract electricityUnfinished annual contract electricityCompleted provisional contract electricityUnfinished provisional contract electricityAs this month has terminated, unfinished monthly Contract generation is added up Performed by secondary month;This month residue number of days is TM, provisional contract electricity is remaining to perform number of days TL
    According to unfinished monthly Contract generation and this month residue number of days, the monthly contract decomposition electricity for needing to complete on the same day is calculated Amount:Number of days is performed according to unfinished provisional contract electricity and provisional contract are remaining, calculate had needed on the same day Into provisional contract decompose electricity:Then the pre-planned electricity in the station is
    S3 according to 96 point generating prediction data of the new energy station power prediction system in the same day new energy station provided a few days ago, Using slope interpolation method, 288 point generating prediction data of generation same day new energy station;
    According to 288 point generating prediction data of same day new energy station, integral and calculating same day prediction electricity Pi PF;Such as Pi F≥Pi PFThen Pi F=Pi PF
    S4 uses QUADRATIC PROGRAMMING METHOD FOR, asks for 288 point of daily transaction schedule curves of the new energy station i in this day, object function For below equation:
    <mrow> <munder> <mi>min</mi> <msubsup> <munder> <mi>p</mi> <mo>&amp;OverBar;</mo> </munder> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mrow> <mi>w</mi> <mo>,</mo> <mi>d</mi> </mrow> </msubsup> </munder> <mo>&amp;lsqb;</mo> <msup> <mi>W</mi> <mi>p</mi> </msup> <mo>*</mo> <msup> <mrow> <mo>(</mo> <msubsup> <mi>P</mi> <mi>i</mi> <mi>F</mi> </msubsup> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msubsup> <munder> <mi>p</mi> <mo>&amp;OverBar;</mo> </munder> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mrow> <mi>w</mi> <mo>,</mo> <mi>d</mi> </mrow> </msubsup> <mo>*</mo> <mi>&amp;Delta;</mi> <mi>T</mi> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>+</mo> <msup> <mi>W</mi> <mi>r</mi> </msup> <mo>*</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>N</mi> </munderover> <msup> <mrow> <mo>(</mo> <msubsup> <mi>r</mi> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mi>w</mi> </msubsup> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>&amp;rsqb;</mo> </mrow>
    Wherein:
    For the active power output lower limit for the same day N points asked for, unit megawatt;Ordinary circumstance N=288
    ΔT:For according to it is active calculating device electricity time,Unit hour
    Pi F:For the generated energy demand that the new energy station i same day is basic, unit megawatt hour
    For harmonious index,Wherein:
    The maximum generation predicted value for the t that the prediction that generated electricity a few days ago for new energy station provides;
    Wp、WrFor weight coefficient, in actual applications, WpCan value 10.0, WrCan value 0.1;
    The constraints must being fulfilled for is:
    <mrow> <mn>0</mn> <mo>&lt;</mo> <msubsup> <munder> <mi>p</mi> <mo>&amp;OverBar;</mo> </munder> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mrow> <mi>w</mi> <mo>,</mo> <mi>d</mi> </mrow> </msubsup> <mo>&lt;</mo> <msubsup> <mover> <mi>p</mi> <mo>&amp;OverBar;</mo> </mover> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mrow> <mi>w</mi> <mo>,</mo> <mi>f</mi> </mrow> </msubsup> </mrow>
    The minimum active power output at i.e. each moment is necessarily less than the predicted value at the moment;
    At the end of the same day, according to the actual electricity of actual power integral and calculatingSuch asThen monthly contract decomposition electricity AmountElectricity is decomposed with provisional contractComplete;Such as
    Such asProvisional contract decomposes electricity and is fully completed, and monthly contract decomposition electricity is completed
    S6 is such asProvisional contract decomposes electricity and completedMonthly contract decomposition electricity completes 0;
    Repeat step 2, roll and decomposition execution is carried out to Contract generation.
CN201711189226.0A 2017-11-24 2017-11-24 New energy station output lower limit rolling amendment method based on generated power forecasting Pending CN107767086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711189226.0A CN107767086A (en) 2017-11-24 2017-11-24 New energy station output lower limit rolling amendment method based on generated power forecasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711189226.0A CN107767086A (en) 2017-11-24 2017-11-24 New energy station output lower limit rolling amendment method based on generated power forecasting

Publications (1)

Publication Number Publication Date
CN107767086A true CN107767086A (en) 2018-03-06

Family

ID=61275865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711189226.0A Pending CN107767086A (en) 2017-11-24 2017-11-24 New energy station output lower limit rolling amendment method based on generated power forecasting

Country Status (1)

Country Link
CN (1) CN107767086A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596456A (en) * 2018-04-12 2018-09-28 国网天津市电力公司电力科学研究院 A kind of generation schedule preparation method of wind power plant long-term electricity transaction in participating in
CN110611308A (en) * 2019-08-30 2019-12-24 贵州电网有限责任公司 Method for correcting and determining minimum active power of new energy station participating in direct electricity purchase of large users
CN111612239A (en) * 2020-05-15 2020-09-01 云南电网有限责任公司电力科学研究院 Correction method for power generation plan of marketized power plant
CN112467801A (en) * 2020-10-21 2021-03-09 中国电力科学研究院有限公司 New energy station intra-day power generation plan optimization method and system
CN113991638A (en) * 2021-08-31 2022-01-28 华能(福建)能源开发有限公司 Prediction method for generated power of new energy station in different places
CN115764926A (en) * 2022-11-14 2023-03-07 金麒麟新能源股份有限公司 Power detection method and system for new energy station
CN116979390A (en) * 2023-07-31 2023-10-31 南京中汇电气科技有限公司 Automatic voltage reactive power control dual-regulation method for new energy station

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436607A (en) * 2011-11-10 2012-05-02 山东大学 Multi-time-scale decision method for charging power of electric automobile charging station
CN102509176A (en) * 2011-11-10 2012-06-20 山东电力集团公司德州供电公司 Decision method for rolling optimization of wind and light storage cooperative scheduling
CN103886388A (en) * 2014-03-06 2014-06-25 国家电网公司 Multi-cycle generation scheduling coordinated optimization and closed-loop control method
CN104158231A (en) * 2014-08-13 2014-11-19 国电南瑞科技股份有限公司 Unit control mode dynamic conversion method based on real-time generation scheduling
CN104181895A (en) * 2014-08-28 2014-12-03 国家电网公司 Strategy for optimizing short-term and ultra-short-term coordination rolling schedules adapting to access of new energy resources
CN104517199A (en) * 2015-01-16 2015-04-15 国家电网公司 New energy power generation online monitoring method based on real time data
CN104616069A (en) * 2015-01-13 2015-05-13 国电南瑞科技股份有限公司 Annual power generation plan rolled decomposition optimization method taking balance between plan finishing rate and load rate into consideration
CN104933516A (en) * 2015-05-27 2015-09-23 华南理工大学 Multi-time-scale power system robustness scheduling system design method
CN105932668A (en) * 2016-05-20 2016-09-07 甘肃省电力公司风电技术中心 New energy power generation right replacement assessment method used for minimizing electric quantity of abandoned wind and abandoned light

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102436607A (en) * 2011-11-10 2012-05-02 山东大学 Multi-time-scale decision method for charging power of electric automobile charging station
CN102509176A (en) * 2011-11-10 2012-06-20 山东电力集团公司德州供电公司 Decision method for rolling optimization of wind and light storage cooperative scheduling
CN103886388A (en) * 2014-03-06 2014-06-25 国家电网公司 Multi-cycle generation scheduling coordinated optimization and closed-loop control method
CN104158231A (en) * 2014-08-13 2014-11-19 国电南瑞科技股份有限公司 Unit control mode dynamic conversion method based on real-time generation scheduling
CN104181895A (en) * 2014-08-28 2014-12-03 国家电网公司 Strategy for optimizing short-term and ultra-short-term coordination rolling schedules adapting to access of new energy resources
CN104616069A (en) * 2015-01-13 2015-05-13 国电南瑞科技股份有限公司 Annual power generation plan rolled decomposition optimization method taking balance between plan finishing rate and load rate into consideration
CN104517199A (en) * 2015-01-16 2015-04-15 国家电网公司 New energy power generation online monitoring method based on real time data
CN104933516A (en) * 2015-05-27 2015-09-23 华南理工大学 Multi-time-scale power system robustness scheduling system design method
CN105932668A (en) * 2016-05-20 2016-09-07 甘肃省电力公司风电技术中心 New energy power generation right replacement assessment method used for minimizing electric quantity of abandoned wind and abandoned light

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
华夏等: "促进新能源消纳的自备电厂发电权交易模式可行性探讨", 《电力系统自动化》, pages 200 - 206 *
张鹏;黄越辉;李驰;康乐;岳刚伟;: "基于公平发电的新能源电站协调调度方法研究", 电测与仪表, no. 05 *
汪洋;苏峰;邓立;张贲;史沛然;: "考虑机组合同电量完成动态均衡的日内安全经济调度", 中国电力, no. 09 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108596456A (en) * 2018-04-12 2018-09-28 国网天津市电力公司电力科学研究院 A kind of generation schedule preparation method of wind power plant long-term electricity transaction in participating in
CN110611308A (en) * 2019-08-30 2019-12-24 贵州电网有限责任公司 Method for correcting and determining minimum active power of new energy station participating in direct electricity purchase of large users
CN110611308B (en) * 2019-08-30 2022-05-06 贵州电网有限责任公司 Method for correcting and determining minimum active power of new energy station participating in direct electricity purchase of large users
CN111612239A (en) * 2020-05-15 2020-09-01 云南电网有限责任公司电力科学研究院 Correction method for power generation plan of marketized power plant
CN111612239B (en) * 2020-05-15 2023-07-07 云南电网有限责任公司电力科学研究院 Correction method for power generation plan of marketized power plant
CN112467801A (en) * 2020-10-21 2021-03-09 中国电力科学研究院有限公司 New energy station intra-day power generation plan optimization method and system
CN112467801B (en) * 2020-10-21 2023-07-14 中国电力科学研究院有限公司 Method and system for optimizing new energy station daily power generation plan
CN113991638A (en) * 2021-08-31 2022-01-28 华能(福建)能源开发有限公司 Prediction method for generated power of new energy station in different places
CN115764926A (en) * 2022-11-14 2023-03-07 金麒麟新能源股份有限公司 Power detection method and system for new energy station
CN116979390A (en) * 2023-07-31 2023-10-31 南京中汇电气科技有限公司 Automatic voltage reactive power control dual-regulation method for new energy station
CN116979390B (en) * 2023-07-31 2024-02-13 南京中汇电气科技有限公司 Automatic voltage reactive power control dual-regulation method for new energy station

Similar Documents

Publication Publication Date Title
CN107767086A (en) New energy station output lower limit rolling amendment method based on generated power forecasting
CN104616069B (en) A kind of annual generation schedule rolls decomposition optimization
Lin et al. Deep reinforcement learning for economic dispatch of virtual power plant in internet of energy
Mah et al. Optimization of a standalone photovoltaic-based microgrid with electrical and hydrogen loads
Chen et al. Key technologies for integration of multitype renewable energy sources—Research on multi-timeframe robust scheduling/dispatch
Perez et al. Predictive power control for PV plants with energy storage
Wang et al. Multi-stage optimal energy management of multi-energy microgrid in deregulated electricity markets
Delarue et al. Enhanced priority list unit commitment method for power systems with a high share of renewables
WO2017000853A1 (en) Active power distribution network multi-time scale coordinated optimization scheduling method and storage medium
WO2022166114A1 (en) Electro-hydrogen energy system scheduling method thst considers flexible hydrogen requirements
CN109636056B (en) Multi-energy microgrid decentralized optimization scheduling method based on multi-agent technology
Wang et al. Dispatch optimization of thermal power unit flexibility transformation under the deep peak shaving demand based on invasive weed optimization
CN103683326A (en) Method for calculating optimal admitting ability for wind power multipoint access of regional power grid
Xie et al. Two-stage compensation algorithm for dynamic economic dispatching considering copula correlation of multiwind farms generation
Cheng et al. Stochastic short-term scheduling of a wind-solar-hydro complementary system considering both the day-ahead market bidding and bilateral contracts decomposition
CN104951899A (en) Multi-time-scale optimal scheduling method for power distribution company containing large-scale renewable energy sources
CN106844916A (en) A kind of generating and electricity consumption method for organizing and device based on peak regulation assisted hatching
He et al. Competitive model of pumped storage power plants participating in electricity spot Market——in case of China
Martinez et al. Stochastic programming for energy planning in microgrids with renewables
CN107404129A (en) Wind stores up hybrid power plant operation reserve and short-term plan generating optimization method
Wen et al. Stochastic optimization for security-constrained day-ahead operational planning under pv production uncertainties: Reduction analysis of operating economic costs and carbon emissions
CN105305485A (en) Large-scale intermittent energy consuming security constrained economic dispatch method
CN115114854A (en) Two-stage self-organizing optimization aggregation method and system for distributed resources of virtual power plant
Xie et al. Integration of intermittent resources with price-responsive loads
Bernal-Rubiano et al. Mathematical uncertainty cost functions for controllable photo-voltaic generators considering uniform distributions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination