CN107728210B - Multiple instruments acquire the determination method and apparatus that road is lacked in data - Google Patents

Multiple instruments acquire the determination method and apparatus that road is lacked in data Download PDF

Info

Publication number
CN107728210B
CN107728210B CN201711025179.6A CN201711025179A CN107728210B CN 107728210 B CN107728210 B CN 107728210B CN 201711025179 A CN201711025179 A CN 201711025179A CN 107728210 B CN107728210 B CN 107728210B
Authority
CN
China
Prior art keywords
data
big gun
shot
road
collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711025179.6A
Other languages
Chinese (zh)
Other versions
CN107728210A (en
Inventor
聂明涛
张慕刚
汪长辉
丁冠东
黄卫宁
蒋连斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN201711025179.6A priority Critical patent/CN107728210B/en
Publication of CN107728210A publication Critical patent/CN107728210A/en
Application granted granted Critical
Publication of CN107728210B publication Critical patent/CN107728210B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/28Processing seismic data, e.g. for interpretation or for event detection
    • G01V1/30Analysis
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V2210/00Details of seismic processing or analysis
    • G01V2210/60Analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The application embodiment provides the determination method and apparatus that road is lacked in a kind of multiple instruments acquisition data, wherein, this method comprises: obtaining common detector gather data, the single-shot data, SPS file of target area, wherein, common detector gather data are obtained by first kind instrument, and single-shot data are obtained by Second Type instrument;According to SPS file, splices common detector gather data, single-shot data, obtain first bombard collection;The wire size and point number of the geophone station of seismic channel are concentrated according to the first bombard, determine missing road.Since the program is by first splicing different type instrument data collected using SPS file, complete first bombard collection is obtained.The wire size of the geophone station of seismic channel and point number is concentrated to search out the missing road in data further according to the first bombard, so that the technical issues of lacking road in a variety of instrument acquisition data can not accurately and rapidly be determined by solving present in existing method.

Description

Multiple instruments acquire the determination method and apparatus that road is lacked in data
Technical field
This application involves technical field of geophysical exploration, in particular to road is lacked really in a kind of multiple instruments acquisition data Determine method and apparatus.
Background technique
During geophysical exploration, it is often necessary to acquire corresponding number in the target area using seismic prospecting instrument According to correlation analysis and research can be carried out so as to subsequent.It was instrument (the i.e. ground of single type by single type mostly in the past Seismic exploration instrument) acquisition target area in data.For example, separately through the single-shot number in wireline tool acquisition target area According to.But with seismic prospecting to the raising of instrument tape track Capability Requirement and the exploration in complicated earth surface region to seismic prospecting The raising of instrument requirements, it is sometimes desirable to while joint number is carried out in the target area using two or more different types of instruments According to acquisition.
Since different type instrument acquisition data mode is different, the data collected are not also identical.For example, wireline tool It is usually the single-shot data put a big gun and acquire a big gun.And node instrument is usually then to acquire geophone station point in real time within a period Common detector gather data at position.Therefore, it generally comprises in the data finally collected and is adopted there are two types of different types of Collect data, the total quality of detection data is relative complex.It is lacked currently, only being acquired in data for single type instrument The detection method of (airway) does not carry out the specific method of quality monitoring specifically for above-mentioned multiple instruments acquisition data, is unable to satisfy Currently need the construction requirement of multiple instruments Collect jointly data.That is, existing method when it is implemented, often exist can not it is accurate, Quickly determine the technical issues of lacking road in a variety of instrument acquisition data.
In view of the above-mentioned problems, currently no effective solution has been proposed.
Summary of the invention
The application embodiment provides the determination method and apparatus that road is lacked in a kind of multiple instruments acquisition data, to solve The technical issues of lacking road in a variety of instrument acquisition data can not be accurately and rapidly determined present in existing method, reaching can With efficiently, accurately determine to lack in different data, with to a variety of instruments acquisition data carry out effective Quality Control technology imitate Fruit.
The application embodiment provides the determination method that road is lacked in a kind of multiple instruments acquisition data, comprising:
Obtain common detector gather data, the single-shot data, SPS file of target area, wherein the common detector gather Data are obtained by first kind instrument, and the single-shot data are obtained by Second Type instrument;
According to the SPS file, the common detector gather data and the single-shot data are spliced, obtain first Big gun collection;
The wire size and point number of the geophone station of seismic channel are concentrated according to the first bombard, determine missing road.
In one embodiment, the first kind instrument includes node instrument, and the Second Type instrument includes Line instrument;
Correspondingly,
The common detector gather data are obtained by first kind instrument, comprising: the common detector gather data are logical The node instrument is crossed to obtain;
The single-shot data are obtained by Second Type instrument, comprising: the single-shot data are obtained by the wireline tool ?.
In one embodiment, described according to the SPS file, to the common detector gather data and the single-shot Data are spliced, and first bombard collection is obtained, comprising:
According to the SPS file, shot point range is determined;
Default shot point range is chosen from the shot point range, and according to the default shot point range, establishes shot point index Table;
According to the shot point concordance list, the common detector gather data and the single-shot data are spliced, to build Found the first bombard collection.
In one embodiment, according to the shot point concordance list, to the common detector gather data and the single-shot Data are spliced, to establish the first bombard collection, comprising:
According to the shot point concordance list, to the data in the data and the single-shot data in the common detector gather into Row corresponds to;
According to corresponding as a result, being spelled to the data in the data and the single-shot data in the common detector gather It connects, obtains first bombard collection.
In one embodiment, the wire size and point number that the geophone station of seismic channel is concentrated according to the first bombard, determine and lack It is lost on the way, comprising:
According to the wire size and point number of the geophone station of the seismic channel of first bombard concentration, the earthquake of arrangement first bombard concentration Road obtains the second big gun collection;
It rejects second big gun and concentrates duplicate seismic channel, the second big gun collection that obtains that treated;
The trace header and Taoist monastic name of resetting is described treated the second big gun collection, obtain third big gun collection;
According to the third big gun collection, the missing road is determined.
In one embodiment, it rejects second big gun and concentrates duplicate seismic channel, comprising:
Whether determine that second big gun concentrates the true value of adjacent shot point and identical two seismic channels of pile No. is respectively zero;
The true value that a seismic channel in adjacent shot point and identical two seismic channels of pile No. is concentrated in second big gun is zero In the case where, retain the seismic channel that true value is not zero in described two seismic channels;
The true value difference of two seismic channels in adjacent shot point and identical two seismic channels of pile No. is concentrated in second big gun In the case where being zero, retain any one seismic channel in described two seismic channels;
The true value of two seismic channels in adjacent shot point and identical two seismic channels of pile No. is concentrated not in second big gun In the case where being zero, retain described two seismic channels.
In one embodiment, according to the third big gun collection, the missing road is determined, comprising: by the third big gun collection The seismic channel that middle true value is 0 is determined as the missing road.
In one embodiment, according to the third big gun collection, after determining the missing road, the method also includes:
The road number that the third big gun concentrates continuous missing road is counted, and/or, the third big gun concentrates missing road and earthquake The road number ratio in road;
According to the road number in the missing road, and/or, the road number ratio in the missing road and seismic channel determines the third Whether big gun collection meets construction requirement.
In one embodiment, after determining whether the third big gun collection meets construction requirement, the method also includes:
In the case where the third big gun collection meets the construction requirement, target area is generated according to the third big gun collection Seismic profile;
In the case where the third big gun collection is unsatisfactory for the construction requirement, common detector gather data, list are reacquired Big gun data, SPS file.
Embodiment further provides the determining devices that road is lacked in a kind of multiple instruments acquisition data by the application, comprising:
Module is obtained, for obtaining the common detector gather data, single-shot data, SPS file of target area, wherein institute It states common detector gather data to obtain by first kind instrument, the single-shot data are obtained by Second Type instrument;
Splicing module, for being carried out to the common detector gather data and the single-shot data according to the SPS file Splicing, obtains first bombard collection;
Determining module, the wire size and point number of the geophone station for concentrating seismic channel according to the first bombard determine missing road.
In one embodiment, the splicing module includes:
First determination unit, for determining shot point range according to the SPS file;
Unit is established, for choosing default shot point range from the shot point range, and according to the default shot point range, Establish shot point concordance list;
Concatenation unit is used for according to the shot point concordance list, to the common detector gather data and the single-shot data Spliced, to establish the first bombard collection.
In one embodiment, the determining module includes:
Arrangement units, the wire size and point number of the geophone station of the seismic channel for being concentrated according to the first bombard, arrangement first The seismic channel that big gun is concentrated, obtains the second big gun collection;
Culling unit concentrates duplicate seismic channel for rejecting second big gun, the second big gun collection that obtains that treated;
Reset cell obtains third big gun collection for resetting the trace header and Taoist monastic name of treated the second big gun collection;
Second determination unit, for determining the missing road according to the third big gun collection.
In the application embodiment, it is contemplated that the specific feature of the acquired data of different type instrument, by first with SPS file first splices different type instrument data collected, obtains complete first bombard collection;Further according to first bombard collection The wire size and point number of the geophone station of middle seismic channel search out the missing road in data, to solve nothing present in existing method Method accurately and rapidly determines the technical issues of lacking road in a variety of instrument acquisition data, and having reached efficiently, accurately to determine It is lacked in different data out, a variety of instruments acquisition data are carried out with the technical effect of effective Quality Control.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The some embodiments recorded in application, for those of ordinary skill in the art, in the premise of not making the creative labor property Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the processing stream that the determination method in road is lacked in the multiple instruments acquisition data provided according to the application embodiment Cheng Tu;
Fig. 2 is the composition knot that the determining device in road is lacked in the multiple instruments acquisition data provided according to the application embodiment Composition;
Fig. 3 is to provide in multiple instruments acquisition data to lack road really using the application embodiment in a Sample Scenario Determine the schematic diagram of the node of method and apparatus acquisition and the data of wireline tool acquisition;
Fig. 4 is to provide in multiple instruments acquisition data to lack road really using the application embodiment in a Sample Scenario Determine the schematic diagram of the node instrument common detector gather data collected of method and apparatus acquisition;
Fig. 5 is to provide in multiple instruments acquisition data to lack road really using the application embodiment in a Sample Scenario Determine the schematic diagram of the wireline tool single-shot data collected of method and apparatus acquisition;
Fig. 6 is to provide in multiple instruments acquisition data to lack road really using the application embodiment in a Sample Scenario Determine the schematic diagram of the node instrument single-shot data collected of method and apparatus acquisition;
Fig. 7 is to provide in multiple instruments acquisition data to lack road really using the application embodiment in a Sample Scenario Determine the schematic diagram by the spliced first bombard collection of two kinds of data of method and apparatus acquisition.
Specific embodiment
In order to make those skilled in the art better understand the technical solutions in the application, below in conjunction with the application reality The attached drawing in example is applied, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described implementation Example is merely a part but not all of the embodiments of the present application.Based on the embodiment in the application, this field is common The application protection all should belong in technical staff's every other embodiment obtained without making creative work Range.
In view of the prior art often only carries out the determination in missing road for the single data of single type instrument acquisition, Without being unable to satisfy current construction requirement, leading to that there are nothings for the determination method for lacking road in multiple instruments acquisition data Method accurately and rapidly determines the technical issues of lacking road in a variety of instrument acquisition data.For the root for generating above-mentioned technical problem This reason, the application consider the specific feature of the acquired data of different type instrument, first with SPS file by different type instrument Device data collected are first spliced, and complete first bombard collection is obtained;The geophone station of seismic channel is concentrated further according to the first bombard Wire size and point number search out the missing road in data entirety, can not be accurately and rapidly present in existing method to solve Determine the technical issues of lacking road in a variety of instrument acquisition data, having reached efficiently, accurately to determine in different data Road is lacked, a variety of instruments acquisition data are carried out with the technical effect of effective Quality Control.
Based on above-mentioned thinking thinking, the application embodiment provides the determination that road is lacked in a kind of multiple instruments acquisition data Method.Specifically can refering to fig. 1 shown according to the application embodiment provide multiple instruments acquisition data in missing road really Determine the process flow diagram of method.The determination method in road is lacked in the multiple instruments acquisition data that the application embodiment provides, specifically It may comprise steps of.
S11: the common detector gather data, single-shot data, SPS file of target area are obtained, wherein the common receiver Trace gather data are obtained by first kind instrument, and the single-shot data are obtained by Second Type instrument.
In the present embodiment, above-mentioned SPS file specifically can be obtain target area common detector gather data, The data file to characterize big gun inspection relationship obtained during single-shot data.Wherein, the SPS file specifically can wrap It includes: shot-file, detection dot file, relational file.Specifically, above-mentioned shot-file (SPS.s) can specifically include shot point The information such as x, y, z coordinate, pile No., uphole time and static correction value.Above-mentioned detection dot file (SPS.r) can specifically include detection The information such as x, y, z coordinate, pile No., the static correction value put.Above-mentioned relation file (SPS.x) can specifically include each earthquake record Document number and corresponding shot point pile No., cautious relationship etc., i.e. observation system information.According to the shot point in above-mentioned SPS file, inspection The relationship of wave point and the two can determine specific physical location and big gun inspection relationship.
In one embodiment, above-mentioned first kind instrument and Second Type instrument specifically can be different types ofly Seismic exploration instrument.Specifically, above-mentioned first kind instrument specifically can be node instrument, above-mentioned Second Type instrument specifically can be with It is wireline tool.Correspondingly, when it is implemented, can be by first kind instrument, that is, the node instrument that is laid in target area Device acquires the common detector gather data for obtaining target area in real time.It can often be put by Second Type instrument, i.e. wireline tool One big gun acquires the single-shot data of a big gun.Specifically, can need as the case may be with construction, emit more big guns to acquire multiple groups list Big gun data.
In the present embodiment, above-mentioned node instrument specifically can be GSR memory-type node instrument, above-mentioned wireline tool tool Body can be 408ULS cable instrument.Certainly it should be noted that above-mentioned cited GSR memory-type node instrument, 408ULS Cable instrument is intended merely to that the application embodiment is better described, when it is implemented, can also as the case may be and construction Need to use the instrument of other concrete models as the node instrument or wireline tool.
In the present embodiment, it is also necessary to which supplement can also acquire the list based on node instrument by node instrument Big gun data, wherein the single-shot data of the node instrument are different from the single-shot data obtained above by wireline tool.Therefore, Two can also be considered as by the above-mentioned single-shot data based on node instrument, by the single-shot data that wireline tool obtains when specific implementation The different types of data of kind acquire the determination method progress that road is lacked in data according to the multiple instruments that the application embodiment provides Corresponding processing.
In the present embodiment, it should be noted that above-mentioned first kind instrument and above-mentioned Second Type instrument are difference The seismic prospecting instrument of type, but be not limited to: first kind instrument is node instrument, and Second Type instrument is wireline tool.Tool When body is implemented, needed as the case may be with construction, above-mentioned first kind instrument and Second Type instrument can also be except node Other kinds of seismic prospecting instrument other than instrument, wireline tool.Correspondingly, passing through first kind instrument and Second Type instrument Acquired data are also not necessarily limited to common detector gather data and single-shot data, when it is implemented, can be according to used instrument The data of device type acquisition corresponding types.In this regard, the application is not construed as limiting.
S12: according to the SPS file, the common detector gather data and the single-shot data is spliced, are obtained First bombard collection;.
In the present embodiment, both different categorical datas of common detector gather data, single-shot data are being obtained Afterwards, target area can specifically be analyzed, studied for the ease of subsequent, need to carry out two distinct types of data It arranges, splicing, obtains comparatively unified first bombard collection.
In one embodiment, in order to obtain above-mentioned more unified first bombard collection, when it is implemented, can be by It is executed according to following steps:
S12-1: according to the SPS file, shot point range is determined.
It in the present embodiment, when it is implemented, can be according to shot-file, the detection dot file, relationship in SPS file File determines the specific shot point range of mutual corresponding data in different types of data.In the present embodiment, specifically may be used To determine the shot point range of data corresponding with common detector gather data in single-shot data.For example, above-mentioned common receiver road Collecting data includes 1000 track datas, and above-mentioned single-shot data include 10000 track datas, can be according to the information data in SPS file 1000 data corresponding with common detector gather data are determined from 10000 single-shot data.Wherein, identified 10000 single-shot data and 1000 common detector gather data shot point range having the same.
S12-2: choosing default shot point range from the shot point range, and according to the default shot point range, establishes big gun Point concordance list.
In the present embodiment, above-mentioned default shot point range specifically can be it is a kind of it is to be analyzed, to be studied specify it is multiple The shot point range of shot point, when it is implemented, can specifically be determined according to construction task.For example, when it is implemented, can root According to specific construction task, 2000 specified shot point ranges are chosen from all 10000 shot point ranges as above-mentioned default Shot point range.
In the present embodiment, above-mentioned shot point concordance list specifically can be the concordance list established according to shot point range is preset. Wherein, above-mentioned shot point concordance list specifically can wrap the relevant information containing each specified shot point in default shot point range.For example, each The pile No. of a specified shot point, reception point range of each specified shot point etc..
S12-3: according to the shot point concordance list, the common detector gather data and the single-shot data are spelled It connects, to establish the first bombard collection.
In one embodiment, in order to preferably to the common detector gather data and the single-shot data into Row splicing, obtains more unified first bombard collection, when it is implemented, can execute according to the following steps: according to the shot point rope Draw table, the data in the data and the single-shot data in the common detector gather are corresponded to;According to corresponding as a result, right The data in data and the single-shot data in the common detector gather are spliced, and first bombard collection is obtained.Specifically, example Such as, the pile No. of data in common detector gather, the data in single-shot data can be determined respectively according to the shot point concordance list Pile No.;And then it can be according to the pile No. of the data in the pile No. of data in common detector gather, single-shot data to the detection altogether The data in data and the single-shot data in point trace gather are corresponded to, can with the pile No. of data in common detector gather, The pile No. of data in single-shot data is foundation, to the data in the data and the single-shot data in the common detector gather It is ranked up, arranges, to complete the splicing to the data in the data and the single-shot data in the common detector gather, obtain To above-mentioned first bombard collection.
S13: concentrating the wire size and point number of the geophone station of seismic channel according to the first bombard, determines missing road.
In one embodiment, the missing road in the data in order to accurately determine out multiple instruments Collect jointly, It can be handled according to the following contents when specific implementation.
S13-1: according to the wire size and point number of the geophone station of the seismic channel of first bombard concentration, the arrangement first bombard is concentrated Seismic channel obtains the second big gun collection;
S13-2: rejecting second big gun and concentrate duplicate seismic channel, the second big gun collection that obtains that treated;
S13-3: the trace header and Taoist monastic name of resetting is described treated the second big gun collection obtain third big gun collection;
S13-4: according to the third big gun collection, the missing road is determined.
In one embodiment, in order to improve the accuracy of data, when it is implemented, above-mentioned rejecting the second big gun collection In duplicate seismic channel, may include the following contents:
S1: determine that second big gun concentrates whether the true value of adjacent shot point and identical two seismic channels of pile No. is respectively Zero;
S2: the true value for concentrating a seismic channel in adjacent shot point and identical two seismic channels of pile No. in second big gun is In the case where zero, retain the seismic channel that true value is not zero in described two seismic channels;
S3: the true value point of two seismic channels in adjacent shot point and identical two seismic channels of pile No. is concentrated in second big gun In the case where being not zero, retain any one seismic channel in described two seismic channels;
S4: concentrate the true value of two seismic channels in adjacent shot point and identical two seismic channels of pile No. equal in second big gun In the case where being not zero, retain described two seismic channels.
In the present embodiment, it should be noted that the true value of above-mentioned seismic channel specifically can be discrete in seismic channel The sample value of sampling point.
In the present embodiment, it is also necessary to which explanation, for the same pile No., there may be two or more different Seismic channel.In the present embodiment, it is only carried out specifically in case where same pile No. is there are two different seismic channels It is bright, but the determination method that road is lacked in multiple instruments provided by the present application acquisition data is not limited to same pile No. and only includes two earthquakes The case where road.For example, same pile No. can may also have X-direction, Y direction, Z-direction, pressure in the case where water inspection 4 different seismic channels of direction of vibration.It include and the seismic channel that true value is not zero more than two for the same pile No., Embodiment can be equally applicable in.
In one embodiment, above-mentioned according to the third big gun collection, determine the missing road, when specific implementation can wrap Include: it is that 0 seismic channel is determined as the missing road that the third big gun, which is concentrated true value,.In this way, the second big gun can be rejected effectively Duplicate seismic channel is concentrated, relatively accurate second shot gather data is obtained, so as to subsequent processing.
In the embodiment of the present application, compared to the prior art, it is contemplated that the specific spy of the acquired data of different type instrument Point obtains complete first bombard collection by first splicing different type instrument data collected first with SPS file; The wire size of the geophone station of seismic channel and point number is concentrated to search out the missing road in data further according to the first bombard, to solve existing The technical issues of lacking road in a variety of instruments acquisition data can not be accurately and rapidly determined present in method, having reached can be with Efficiently, it accurately determines to lack in different data, to carry out a variety of instruments acquisition data the technical effect of effective Quality Control.
In one embodiment, the first kind instrument can specifically include node instrument, the Second Type instrument Implement body may include wireline tool;Correspondingly, the common detector gather data are obtained by first kind instrument, specifically may be used To include: that the common detector gather data pass through node instrument acquisition;The single-shot data pass through Second Type instrument It obtains, can specifically include: the single-shot data are obtained by the wireline tool.Certainly it should be noted that it is above-mentioned listed First kind instrument, the Second Type instrument of act are intended merely to be better described the application embodiment, and when specific implementation can also To need with construction as the case may be, select to use other suitable different types of seismic prospecting instruments as above-mentioned first Type instrument, Second Type instrument.In this regard, the application is not construed as limiting.
In one embodiment, according to the third big gun collection, after determining the missing road, in order to multiple instruments The quality condition of the data of Collect jointly is specifically evaluated, to determine whether the data using the acquisition of above-mentioned multiple instruments It is specifically constructed, the method can also include the following contents when being embodied:
S1: counting the road number that the third big gun concentrates continuous missing road, and/or, the third big gun concentrate missing road with The road number ratio of seismic channel;
S2: according to the road number in the missing road, and/or, the road number ratio in the missing road and seismic channel determines described the Whether three big gun collection meet construction requirement.
In one embodiment, when it is implemented, the road number in the continuous missing road that third big gun can be concentrated, and/ Or, third big gun concentrates the road number ratio of missing road and seismic channel as evaluation parameter, to evaluate the quality feelings of acquired data Condition.Specifically, the road number in the continuous missing road that third big gun can be concentrated is made comparisons with first threshold, concentrated in third big gun In the case that the road number in continuous missing road is more than or equal to first threshold, determines that third big gun collection is unsatisfactory for construction requirement, that is, think The quality of data of multiple instruments acquisition is poor;The case where road number in the continuous missing road that third big gun is concentrated is less than first threshold Under, it determines that third big gun collection meets construction requirement, that is, thinks that the quality of data of multiple instruments acquisition is qualified.It is of course also possible to by third Big gun concentrates missing road to make comparisons with the road number ratio of seismic channel with second threshold, concentrates the road in missing road and seismic channel in third big gun It in the case that number ratio is more than or equal to second threshold, determines that third big gun collection is unsatisfactory for construction requirement, that is, thinks multiple instruments acquisition The quality of data is poor;In the case where third big gun concentrates the road number ratio of missing road and seismic channel to be less than second threshold, the is determined Three big gun collection meet construction requirement, that is, think that the quality of data of multiple instruments acquisition is qualified.Wherein, above-mentioned first threshold, second threshold It can specifically be determined according to Specific construction situation.Usual first threshold can be taken as 5.When it is implemented, if third big gun is concentrated Out when 5 or 5 or more continuous missing roads, it can determine that the data of multiple instruments acquisition are unsatisfactory for construction requirement.
In the present embodiment, when it is implemented, the road number for lacking road can also be counted according to passing through, and/or, institute The road number ratio in missing road and seismic channel is stated, missing road statistical form is generated, and then can use missing road statistical form and adopted really Whether the data of collection meet construction requirement.
In one embodiment, after determining whether the third big gun collection meets construction requirement, according to identified tool Body situation, the method can also include the following contents when being embodied:
S1: in the case where the third big gun collection meets the construction requirement, target area is generated according to the third big gun collection The seismic profile in domain;
S2: in the case where the third big gun collection is unsatisfactory for the construction requirement, reacquisition common detector gather data, Single-shot data, SPS file.
In the present embodiment, when it is implemented, in the case where third big gun collection meets construction requirement, it is believed that more instrument The quality of the data (i.e. third big gun collection) of device acquisition meets specific construction requirement, can use third big gun collection collected and carries out Subsequent specific analysis, research.For example, generating the seismic profile of target area using third big gun collection, third big gun also can use Collection carries out other earthquake analysis researchs.In this regard, the application is not construed as limiting.
In the present embodiment, when it is implemented, in the case where third big gun collection is unsatisfactory for construction requirement, it is believed that more The quality of the data of instrument acquisition does not meet specific construction requirement, i.e., cannot be carried out using third big gun collection collected subsequent Specific analysis, research.Therefore, it is necessary to reacquire common detector gather data, single-shot data, SPS file, and by above-mentioned The determination method that road is lacked in multiple instruments acquisition data redefines the quality of data of acquisition, until determination resurveys to obtain After data meet construction requirement, it just can use corresponding third big gun collection and carry out subsequent specific construction.
It can be seen from the above description that lacking road in the multiple instruments acquisition data that the application embodiment provides Determine method, it is contemplated that the specific feature of the acquired data of different type instrument, by first with SPS file by different type instrument Device data collected are first spliced, and complete first bombard collection is obtained;The geophone station of seismic channel is concentrated further according to the first bombard Wire size and point number search out the missing road in data, so that solving can not accurately and rapidly determine present in existing method The technical issues of lacking road in a variety of instrument acquisition data, having reached can efficiently, accurately determine to lack in different data Road, a variety of instruments acquisition data are carried out with the technical effect of effective Quality Control;Further through according to SPS file, shot point index is established Different types of data are spliced to obtain more complete first bombard collection using shot point concordance list, so as to subsequent missing by table The determination in road;Also by rejecting duplicate seismic channel, the quality of acquired data is further improved.
Based on the same inventive concept, it is additionally provided in embodiment of the present invention in a kind of multiple instruments acquisition data and lacks road Determining device, as described in following embodiment.It is lacked in principle and multiple instruments the acquisition data solved the problems, such as due to device Determination method it is similar, therefore multiple instruments acquisition data in lack road determining device implementation may refer to multiple instruments acquisition number According to the implementation of the determination method in middle missing road, overlaps will not be repeated.It is used below, term " unit " or " module " The combination of the software and/or hardware of predetermined function may be implemented.Although device described in following embodiment is preferably with software It realizes, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.Referring to Fig. 2, being this Shen Please embodiment multiple instruments acquisition data in lack road determining device a kind of composite structural diagram, the apparatus may include: Module 21, splicing module 22, determining module 23 are obtained, the structure is specifically described below.
Module 21 is obtained, specifically can be used for obtaining common detector gather data, single-shot data, the SPS text of target area Part, wherein the common detector gather data are obtained by first kind instrument, and the single-shot data pass through Second Type instrument It obtains;
Splicing module 22 specifically can be used for according to the SPS file, to the common detector gather data and the list Big gun data are spliced, and first bombard collection is obtained;
Determining module 23 specifically can be used for concentrating the wire size and point number of the geophone station of seismic channel according to the first bombard, Determine missing road.
In one embodiment, in order to according to the SPS file, to common detector gather data and described Single-shot data are spliced, and first bombard collection is obtained;, the splicing module 22 can specifically include following structural unit:
First determination unit specifically can be used for determining shot point range according to the SPS file;
Unit is established, specifically can be used for choosing default shot point range from the shot point range, and according to described default Shot point range establishes shot point concordance list;
Concatenation unit, specifically can be used for according to the shot point concordance list, to common detector gather data and described Single-shot data are spliced, to establish the first bombard collection.
In one embodiment, in order to according to the wire size and point of the geophone station of first bombard concentration seismic channel Number, determine missing road, the determining module 23 can specifically include following structural unit:
Arrangement units, the wire size and point number of the geophone station for the seismic channel that specifically can be used for being concentrated according to the first bombard, The seismic channel that the first bombard is concentrated is arranged, the second big gun collection is obtained;
Culling unit specifically can be used for rejecting second big gun and concentrate duplicate seismic channel, obtain that treated second Big gun collection;
Reset cell specifically can be used for resetting the trace header and Taoist monastic name of treated the second big gun collection, obtain third big gun Collection;
Second determination unit specifically can be used for determining the missing road according to the third big gun collection.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
It should be noted that system, device, module or unit that above embodiment illustrates, it specifically can be by computer Chip or entity are realized, or are realized by the product with certain function.For convenience of description, in the present specification, it retouches It is divided into various units when stating apparatus above with function to describe respectively.It certainly, when implementing the application can be the function of each unit It realizes in the same or multiple software and or hardware.
In addition, in the present specification, such as adjective as first and second can be only used for an element or move Make to distinguish with another element or movement, without requiring or implying any actual this relationship or sequence.Permit in environment Perhaps in the case where, it should not be interpreted as limited to one in only element, component or step referring to element or component or step (s) It is a, and can be the one or more etc. in element, component or step.
It can be seen from the above description that lacking road in the multiple instruments acquisition data that the application embodiment provides Determining device, it is contemplated that the specific feature of the acquired data of different type instrument, it will be different using SPS file by splicing module Type instrument data collected are first spliced, and complete first bombard collection is obtained;Again by determining module according to first bombard collection The wire size and point number of the geophone station of middle seismic channel search out the missing road in data, to solve nothing present in existing method Method accurately and rapidly determines the technical issues of lacking road in a variety of instrument acquisition data, and having reached efficiently, accurately to determine It is lacked in different data out, a variety of instruments acquisition data are carried out with the technical effect of effective Quality Control;Further through splicing module With specific reference to SPS file, shot point concordance list is established, is spliced to obtain more by different types of data using shot point concordance list Complete first bombard collection, so as to the determination in subsequent missing road;Also by rejecting duplicate seismic channel, further improves and acquired The quality of data.
In a specific implementation Sample Scenario, the determining dress that road is lacked in multiple instruments acquisition data is provided using the application It sets and is determined in certain target area by the missing road in the data of node instrument and wireline tool Collect jointly.It is specific real The process of applying is referred to the following contents execution.
In the present embodiment, certain above-mentioned target area specifically can be the intermediate zone in certain complicated city.Wherein, due to ground Table is related to the problems such as complicated earth surfaces unwrapping wire such as city is difficult, land to use GSR memory-type node (i.e. a kind of node instrument), transition Band and use 408ULS cable (i.e. a kind of wireline tool) waterborne.
In the present embodiment, when it is implemented, according to construction requirement, which designs 700,000 big guns altogether, In 470,000 big guns reception arrangement simultaneously use GSR and 408ULS, i.e., in the regular data Quality Control of project day, have 470,000 big guns need use The invention researches and develops device and carries out data splicing Quality Control work (acquiring data using multiple instruments).
Wherein, the instrument data recycling collected of specific GSR memory-type node is by will set during normally falling to arrange It is standby to retract campsite obtain after the volume of data such as data downloading, synthesis, sorting are handled data and (be equivalent to a kind of total Geophone station trace gather data).408ULS cable data collected return the received earthquake letter of per pass particular by cable in real time Number, for example, completing data back in the several seconds, and form corresponding shot gather data and be stored in instrument after a certain shot point completes excitation Data (being equivalent to single-shot data) in host external world NAS disk or IBM3592 tape.When it is implemented, can also be according to tool Body situation and construction needs regular (such as one day or half a day) take back campsite by movable storage device and transfer to in-situ processing, with Just subsequent data Quality Control is carried out.
In the present embodiment, practical because of coastline reason because GSR and the boundary 408ULS are land and water handover The boundary is very irregular in work area, so the wired big gun collection of the GSR big gun collection and 408ULS that obtain divides boundary also very irregularly. Specifically, the data cases acquired by multiple instruments can apply the application real refering to shown in Fig. 3 in a Sample Scenario The mode of applying provides the number that determination the method and apparatus node obtained and wireline tool acquisition in road are lacked in multiple instruments acquisition data According to schematic diagram.
In the present embodiment, common detector gather (i.e. common detector gather data) can be exported by data sorting, It can specifically be lacked refering to shown in Fig. 4 provided in multiple instruments acquisition data in a Sample Scenario using the application embodiment The schematic diagram for the node instrument common detector gather data collected that lost on the way determination method and apparatus obtain;It can also export Big gun collection (i.e. single-shot data) can specifically provide in a Sample Scenario using the application embodiment refering to shown in fig. 5 Multiple instruments acquire the schematic diagram that the wireline tool single-shot data collected of determination method and apparatus acquisition in road are lacked in data. In the present embodiment, consider output common detector gather will not lag field data recycling, and it is lower to hardware requirement, operation is fast Degree is faster.
In the present embodiment, input data can be common detector gather data shown in Fig. 4 and Fig. 5 when specific implementation Shown 408ULS shot gather data and the corresponding SPS file of data, in addition to input data load, it is also necessary to which merging data is set The parameters such as start file number, output big gun line concentration point number range, outgoing route.Certainly, you need to add is that can be acquired by GSR Geophone station trace gather data can also acquire the single-shot data based on node instrument.It specifically can be refering to shown in fig. 6 a field The section for lacking the determination method and apparatus in road in multiple instruments acquisition data and obtaining is provided in scape example using the application embodiment The schematic diagram of point instrument single-shot data collected.According to data (the i.e. default shot point model of the different type instrument of input acquisition Enclose), shot point concordance list is established according to output parameter, successively out of node and wireline tool acquisition data with retrieving corresponding geophone station Road is shaken, new big gun collection (i.e. first bombard collection) is formed.The shot gather data newly formed is carried out according to geophone station wire size+point number rule Data rearrangement (obtains the second big gun collection).To arbitrary neighborhood geophone station pile No. in new big gun collection (wire size+point number+index, it is intended that in order to The case where excluding in wired shot gather data containing double inspection) identical twice carry out true value comparison, retain the seismic channel of true value non-zero, when It is any to retain together when twice are zero road, and the seismic channel is marked;The new of Repeating earthquakes road is rejected to completion again Big gun collection resets trace header channel number;And the zero road quantity being marked in the step above process and corresponding geophone station pile No. are counted, with Tabular form exports the ratio that every big gun loses seismic channel geophone station pile No. and the shared total road number of design.It can be given birth to according to statistical result At shot point missing (missing road) statistical form.It can specifically implement in a Sample Scenario using the application refering to shown in Fig. 7 Mode provide lack that the determination method and apparatus in road obtain in multiple instruments acquisition data by two kinds of spliced first bombards of data The schematic diagram of collection.And then can be according to Fig.7, the case where, determines whether the quality of data collected meets construction requirement, with Quickly and effectively Quality Control is carried out to data collected.
By above-mentioned Sample Scenario, demonstrates in the multiple instruments acquisition data of the application embodiment offer and lack road really Determine device, it is contemplated that the specific feature of the acquired data of different type instrument, by first with SPS file by different type instrument Data collected are first spliced, and complete first bombard collection is obtained;The line of the geophone station of seismic channel is concentrated further according to the first bombard Number and point number search out the missing road in data, solve really can not accurately and rapidly be determined present in existing method it is more The technical issues of lacking road in kind instrument acquisition data, having reached can efficiently, accurately determine to lack in different data, A variety of instruments acquisition data are carried out with the technical effect of effective Quality Control
Although mentioning different specific embodiments in teachings herein, the application is not limited to be capable Situation described in industry standard or embodiment etc., certain professional standards or the implementation described using customized mode or embodiment On the basis of embodiment modified slightly also may be implemented above-described embodiment it is identical, it is equivalent or it is close or deformation after it is anticipated that Implementation result.Using the embodiment of these modifications or deformed data acquisition, processing, output, judgment mode etc., still may be used To belong within the scope of the optional embodiment of the application.
Although this application provides the method operating procedure as described in embodiment or flow chart, based on conventional or noninvasive The means for the property made may include more or less operating procedure.The step of enumerating in embodiment sequence is only numerous steps One of execution sequence mode, does not represent and unique executes sequence.It, can when device or client production in practice executes To execute or parallel execute (such as at parallel processor or multithreading according to embodiment or method shown in the drawings sequence The environment of reason, even distributed data processing environment).The terms "include", "comprise" or its any other variant are intended to contain Lid non-exclusive inclusion, so that process, method, product or equipment including a series of elements are not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, product or equipment Intrinsic element.In the absence of more restrictions, be not precluded include the process, method of the element, product or There is also other identical or equivalent elements in person's equipment.
Device that above-described embodiment illustrates or module etc. can specifically realize by computer chip or entity, or by having There is the product of certain function to realize.For convenience of description, it is divided into various modules when description apparatus above with function to retouch respectively It states.Certainly, the function of each module can be realized in the same or multiple software and or hardware when implementing the application, The module for realizing same function can be realized by the combination of multiple submodule etc..Installation practice described above is only Schematically, for example, the division of the module, only a kind of logical function partition, can there is other draw in actual implementation The mode of dividing, such as multiple module or components can be combined or can be integrated into another system, or some features can be ignored, Or it does not execute.
It is also known in the art that other than realizing controller in a manner of pure computer readable program code, it is complete Entirely can by by method and step carry out programming in logic come so that controller with logic gate, switch, specific integrated circuit, programmable Logic controller realizes identical function with the form for being embedded in microcontroller etc..Therefore this controller is considered one kind Hardware component, and the structure that the device for realizing various functions that its inside includes can also be considered as in hardware component.Or Person even, can will be considered as realizing the device of various functions either the software module of implementation method can be hardware again Structure in component.
The application can describe in the general context of computer-executable instructions executed by a computer, such as program Module.Generally, program module includes routines performing specific tasks or implementing specific abstract data types, programs, objects, group Part, data structure, class etc..The application can also be practiced in a distributed computing environment, in these distributed computing environments, By executing task by the connected remote processing devices of communication network.In a distributed computing environment, program module can To be located in the local and remote computer storage media including storage equipment.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can It realizes by means of software and necessary general hardware platform.Based on this understanding, the technical solution essence of the application On in other words the part that contributes to existing technology can be embodied in the form of software products, the computer software product It can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer equipment (can be personal computer, mobile terminal, server or the network equipment etc.) executes each embodiment of the application or implementation Method described in certain parts of example.
Each embodiment in this specification is described in a progressive manner, the same or similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.The application can be used for crowd In mostly general or special purpose computing system environments or configuration.Such as: personal computer, server computer, handheld device or Portable device, laptop device, multicomputer system, microprocessor-based system, set top box, programmable electronics set Standby, network PC, minicomputer, mainframe computer, distributed computing environment including any of the above system or equipment etc..
Although depicting the application by embodiment, it will be appreciated by the skilled addressee that the application there are many deformation and Variation is without departing from spirit herein, it is desirable to which appended embodiment includes these deformations and changes without departing from the application.

Claims (10)

1. lacking the determination method in road in a kind of multiple instruments acquisition data characterized by comprising
Obtain common detector gather data, the single-shot data, SPS file of target area, wherein the common detector gather data It is obtained by first kind instrument, the single-shot data are obtained by Second Type instrument;
According to the SPS file, the common detector gather data and the single-shot data are spliced, the first bombard is obtained Collection;
The wire size and point number of the geophone station of seismic channel are concentrated according to the first bombard, determine missing road;
Wherein, the wire size and point number that the geophone station of seismic channel is concentrated according to the first bombard determine missing road, comprising:
According to the wire size and point number of the geophone station of the seismic channel of first bombard concentration, the seismic channel that the arrangement first bombard is concentrated is obtained To the second big gun collection;
It rejects second big gun and concentrates duplicate seismic channel, the second big gun collection that obtains that treated;
The trace header and Taoist monastic name of resetting is described treated the second big gun collection, obtain third big gun collection;
According to the third big gun collection, the missing road is determined.
2. the method according to claim 1, wherein the first kind instrument includes node instrument, described Two type instruments include wireline tool;
Correspondingly,
The common detector gather data are obtained by first kind instrument, comprising: the common detector gather data pass through institute State the acquisition of node instrument;
The single-shot data are obtained by Second Type instrument, comprising: the single-shot data are obtained by the wireline tool.
3. the method according to claim 1, wherein described according to the SPS file, to the common receiver road Collection data and the single-shot data are spliced, and first bombard collection is obtained, comprising:
According to the SPS file, shot point range is determined;
Default shot point range is chosen from the shot point range, and according to the default shot point range, establishes shot point concordance list;
According to the shot point concordance list, the common detector gather data and the single-shot data are spliced, to establish State first bombard collection.
4. according to the method described in claim 3, it is characterized in that, according to the shot point concordance list, to the common receiver road Collection data and the single-shot data are spliced, to establish the first bombard collection, comprising:
According to the shot point concordance list, the data in the data and the single-shot data in the common detector gather are carried out pair It answers;
According to correspondence as a result, splicing to the data in the data and the single-shot data in the common detector gather, obtain To first bombard collection.
5. the method according to claim 1, wherein rejecting second big gun concentrates duplicate seismic channel, comprising:
Determine that second big gun concentrates whether the true value of adjacent shot point and identical two seismic channels of pile No. is respectively zero;
The feelings that the true value of a seismic channel in adjacent shot point and identical two seismic channels of pile No. is zero are concentrated in second big gun Under condition, retain the seismic channel that true value is not zero in described two seismic channels;
The true value that two seismic channels in adjacent shot point and identical two seismic channels of pile No. are concentrated in second big gun is respectively zero In the case where, retain any one seismic channel in described two seismic channels;
The true value of two seismic channels in adjacent shot point and identical two seismic channels of pile No. is concentrated to be not zero in second big gun In the case where, retain described two seismic channels.
6. being wrapped the method according to claim 1, wherein determining the missing road according to the third big gun collection Include: it is that 0 seismic channel is determined as the missing road that the third big gun, which is concentrated true value,.
7. the method according to claim 1, wherein according to the third big gun collection, after determining the missing road, The method also includes:
The road number that the third big gun concentrates continuous missing road is counted, and/or, the third big gun concentrates missing road and seismic channel Road number ratio;
According to the road number in the missing road, and/or, the road number ratio in the missing road and seismic channel determines the third big gun collection Whether construction requirement is met.
8. the method according to the description of claim 7 is characterized in that determining whether the third big gun collection meets construction requirement Afterwards, the method also includes:
In the case where the third big gun collection meets the construction requirement, the earthquake of target area is generated according to the third big gun collection Section;
In the case where the third big gun collection is unsatisfactory for the construction requirement, common detector gather data, single-shot number are reacquired According to, SPS file.
9. lacking the determining device in road in a kind of multiple instruments acquisition data characterized by comprising
Module is obtained, for obtaining the common detector gather data, single-shot data, SPS file of target area, wherein described total Geophone station trace gather data are obtained by first kind instrument, and the single-shot data are obtained by Second Type instrument;
Splicing module, for being spelled to the common detector gather data and the single-shot data according to the SPS file It connects, obtains first bombard collection;
Determining module, the wire size and point number of the geophone station for concentrating seismic channel according to the first bombard determine missing road;
Wherein, the determining module includes:
Arrangement units, the wire size and point number of the geophone station of the seismic channel for being concentrated according to the first bombard arrange first bombard collection In seismic channel, obtain the second big gun collection;
Culling unit concentrates duplicate seismic channel for rejecting second big gun, the second big gun collection that obtains that treated;
Reset cell obtains third big gun collection for resetting the trace header and Taoist monastic name of treated the second big gun collection;
Second determination unit, for determining the missing road according to the third big gun collection.
10. device according to claim 9, which is characterized in that the splicing module includes:
First determination unit, for determining shot point range according to the SPS file;
Unit is established, for choosing default shot point range from the shot point range, and according to the default shot point range, is established Shot point concordance list;
Concatenation unit, for being carried out to the common detector gather data and the single-shot data according to the shot point concordance list Splicing, to establish the first bombard collection.
CN201711025179.6A 2017-10-27 2017-10-27 Multiple instruments acquire the determination method and apparatus that road is lacked in data Active CN107728210B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711025179.6A CN107728210B (en) 2017-10-27 2017-10-27 Multiple instruments acquire the determination method and apparatus that road is lacked in data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711025179.6A CN107728210B (en) 2017-10-27 2017-10-27 Multiple instruments acquire the determination method and apparatus that road is lacked in data

Publications (2)

Publication Number Publication Date
CN107728210A CN107728210A (en) 2018-02-23
CN107728210B true CN107728210B (en) 2019-07-09

Family

ID=61202749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711025179.6A Active CN107728210B (en) 2017-10-27 2017-10-27 Multiple instruments acquire the determination method and apparatus that road is lacked in data

Country Status (1)

Country Link
CN (1) CN107728210B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108508477B (en) * 2018-05-28 2020-06-09 中国石油天然气集团有限公司 Seismic data acquisition system and method
CN109143338A (en) * 2018-08-13 2019-01-04 中国石油天然气集团有限公司 A kind of method and device that seismic data merges
CN111352152B (en) * 2018-12-21 2022-11-04 中国石油天然气集团有限公司 Rapid quality control method and device for seismic data observation system
CN112051608B (en) * 2019-06-05 2023-01-03 中国石油化工股份有限公司 Multi-path micro-seismic data real-time combination method and storage medium
CN112630828B (en) * 2020-12-15 2023-12-05 四川吉赛特科技有限公司 Single shot quality monitoring method for wireless node instrument seismic data acquisition system
CN114706120B (en) * 2022-04-15 2023-03-31 电子科技大学 Method for reducing high-efficiency acquisition vibroseis shot-filling rate

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009038769A1 (en) * 2007-09-21 2009-03-26 Geospace Technologies, Lp Low- power satellite-timed seismic data acquisition system
CN105549074B (en) * 2016-01-11 2018-10-26 吉林大学 Mix telseis exploitation method

Also Published As

Publication number Publication date
CN107728210A (en) 2018-02-23

Similar Documents

Publication Publication Date Title
CN107728210B (en) Multiple instruments acquire the determination method and apparatus that road is lacked in data
CN107664778B (en) The determination method and apparatus of earthquake data quality
CN108181648B (en) The quality control method and device of continuous record aliased seismic acquisition data
CN109975273A (en) A kind of petrographic classification method based on laser induced breakdown spectroscopy
CN104199103B (en) Static correction method and static correction device for converted wave
CN109115987A (en) A kind of evaluation method and device of the fluid factor based on petrophysical model
Trani et al. DeepQuake—An application of CNN for seismo-acoustic event classification in The Netherlands
CN108107471B (en) The acquisition methods and device of a kind of point of orientation first arrival data volume
CN105954797A (en) Fracture identification method and fracture identification device of seismic data
CN104932017A (en) Anomalous amplitude suppression method and apparatus
Álvares et al. Exploring gravitational-wave detection and parameter inference using deep learning methods
CN105005075B (en) Multi-wave matching method based on seismic frequency information
Zheng et al. SC-PSNET: A deep neural network for automatic P-and S-phase detection and arrival-time picker using 1C recordings
CN107229075B (en) The determination method and apparatus of Depth Domain seismic wavelet
CN105700016A (en) Organic bank reservoir earthquake prediction method
CN105445793B (en) A kind of method and device for determining bad track data
CN107065007B (en) A kind of seismic data amplitude method of adjustment and device
CN110308483A (en) Reflection coefficient acquiring method and device based on multitask Bayes's compressed sensing
CN107991716B (en) The deposition phasor of thin layer and the determination method and apparatus for depositing body thickness
CN106842316B (en) Crack determines method and apparatus
CN106199705A (en) The detection method of seismic acquisition data
CN105204067B (en) Seismic horizon method for tracing and device
Rodgers et al. Peakmatch: a Java program for multiplet analysis of large seismic datasets
CN106094020A (en) A kind of seismic inversion method and device
CN107688197B (en) Thin bed prediction method and apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant