CN107727137A CN201610672173.7A CN201610672173A CN107727137A CN 107727137 A CN107727137 A CN 107727137A CN 201610672173 A CN201610672173 A CN 201610672173A CN 107727137 A CN107727137 A CN 107727137A
Authority
CN
China
Prior art keywords
processor
sensor
mine fan
monitoring system
wireless carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610672173.7A
Other languages
Chinese (zh)
Inventor
甘景秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hengsheng Jiahe Technology Co Ltd
Original Assignee
Tianjin Hengsheng Jiahe Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hengsheng Jiahe Technology Co Ltd filed Critical Tianjin Hengsheng Jiahe Technology Co Ltd
Priority to CN201610672173.7A priority Critical patent/CN107727137A/en
Publication of CN107727137A publication Critical patent/CN107727137A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link

Abstract

This explanation discloses a kind of mine fan on-line monitoring system, including processor, sensor, display and wireless carrier repeater, sensor is provided with multiple, it is connected respectively with mine fan, multiple sensors are connected through power line with processor, display is connected with processor, display everywhere sensor transmissions to processor signal;Each sensor connects a wireless carrier repeater, and wireless carrier repeater is connected with receiving module wireless data, and receiving module is connected with processor.This explanation sets sensor on mine fan, through power line or/and is wirelessly transmitted to processor, is easy to monitor its running situation, using double-communication mode, it is ensured that monitoring is reliable.

Description

A kind of mine fan on-line monitoring system
Technical field
This explanation is related to technical field, especially a kind of mine fan on-line monitoring system.
Background technology
With the continuous improvement that country is required safety in production, colliery, metal and non-metal mine, national defense transportation tunnel leads to The safe for operation of wind system is increasingly valued by people, if making ventilation blower be protected in the state of working environment is complicated and changeable Normal operation is demonstrate,proved, meets security needs, voltage, electric current, wind speed, blast, temperature, the gas for grasping blower fan anywhere or anytime are dense The service data such as stability of degree, body, it is a significant task of fan monitoring work.
Existing ventilation blower monitoring system is more traditional, manually carries out watching record, it is not only cumbersome but also can not accomplish in real time Monitoring, operating failure can not be understood in time by easily causing, and produce accident potential;Although also have using intelligence instrument reading Monitoring mode, but be to be not provided with link of alarming the defects of this monitoring mode maximum, artificial timing can only be leaned on to read ventilation blower The temperature value of bearing shell, this monitoring system poor real, it is impossible to judge the running status of ventilation blower immediately.Another system be with PLC controllers for core component switch board as data acquisition link, communicated by Ethernet and host computer, it is upper Machine realizes the real-time displays of ventilation blower running state parameters using common industrial computer, and each parameter is set suitable threshold value with Exceptional value sound and light of alarm is realized, but whole system volume is larger, installation is complicated, and also the stability of a system receives greatly Influence, largely reduce monitoring reliability.Both systems can not all improve the security of ventilation blower monitoring well.
Description
This explanation in view of the shortcomings of the prior art, proposes a kind of mine fan on-line monitoring system, and clever structure is easy to use Safety.
In order to realize described above purpose, this explanation provides following technical scheme:A kind of mine fan on-line monitoring system System, including processor, sensor, display and wireless carrier repeater, sensor are provided with multiple, connect respectively with mine fan Connect, multiple sensors are connected through power line with processor, and display is connected with processor, and sensor transmissions are extremely handled everywhere for display The signal of device;Each sensor connects a wireless carrier repeater, and wireless carrier repeater connects with receiving module wireless data Connect, receiving module is connected with processor.
Preferably, in addition to alarm, the alarm are connected with processor.
Preferably, control module is provided with power line, for regulating and controlling the operating of mine fan.
Compared with prior art, this explanation has advantages below:Sensor is set on mine fan, through power line Or/and processor is wirelessly transmitted to, it is easy to monitor its running situation, using double-communication mode, it is ensured that monitoring is reliable.
Brief description of the drawings
Fig. 1 is a kind of structural representation of mine fan on-line monitoring system of this explanation.
Embodiment
This explanation is described in detail below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, should not There is any restriction effect to the protection domain of this explanation.
As shown in figure 1, a kind of mine fan on-line monitoring system, including processor 1, sensor 2, display 5, reception Module 7 and wireless carrier repeater 3, sensor 2 be provided with it is multiple, be connected respectively with mine fan, multiple sensors 2 are through electric power Line 4 is connected with processor 1, and display 5 is connected with processor 1, and sensor 2 is transmitted to the signal of processor 1 everywhere for display;Each Sensor 2 connects a wireless carrier repeater 3, and wireless carrier repeater 3 is connected with the wireless data of receiving module 7, receives mould Block 7 is connected with processor 1.
By multiple sensors 2 and multiple wireless carrier repeaters 3, using dual communication mode, by the electricity of mine fan The service datas such as pressure, electric current, wind speed, blast, temperature, gas concentration, the stability of body, transmit to processor 1;It is easy to show Device 5 carries out real time inspection.
The system is provided with the alarm 6 being connected with processor 1, and situations such as monitoring omission, detection data exception is reported Alert prompting.
Control module 8 is provided with power line 4, mine fan is regulated and controled according to the service data for monitoring ventilation blower Operating.
Described above is only the preferred embodiment of this explanation, it is noted that for the ordinary skill people of the art For member, on the premise of this principle of specification is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of this explanation.

Claims (3)

  1. A kind of 1. mine fan on-line monitoring system, it is characterised in that:Including processor, sensor, display, receiving module With wireless carrier repeater, sensor be provided with it is multiple, be connected respectively with mine fan, multiple sensors through power line with handle Device connects, and display is connected with processor, shows that sensor transmissions are to the signal of processor everywhere;Each sensor connects one Wireless carrier repeater, wireless carrier repeater are connected with receiving module wireless data, and receiving module is connected with processor.
  2. A kind of 2. mine fan on-line monitoring system as claimed in claim 1, it is characterised in that:Also include alarm, the report Alert device is connected with processor.
  3. A kind of 3. mine fan on-line monitoring system as claimed in claim 1, it is characterised in that:Control is provided with power line Module, for regulating and controlling the operating of mine fan.
CN201610672173.7A 2016-08-13 2016-08-13 A kind of mine fan on-line monitoring system Pending CN107727137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610672173.7A CN107727137A (en) 2016-08-13 2016-08-13 A kind of mine fan on-line monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610672173.7A CN107727137A (en) 2016-08-13 2016-08-13 A kind of mine fan on-line monitoring system

Publications (1)

Publication Number Publication Date
CN107727137A true CN107727137A (en) 2018-02-23

Family

ID=61201106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610672173.7A Pending CN107727137A (en) 2016-08-13 2016-08-13 A kind of mine fan on-line monitoring system

Country Status (1)

Country Link
CN (1) CN107727137A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6839753B2 (en) * 2001-02-23 2005-01-04 Cardiopulmonary Corporation Network monitoring systems for medical devices
CN2874655Y (en) * 2006-01-25 2007-02-28 郑文宸 Composite data collector based on radio and power carrier communication
CN102527170A (en) * 2012-01-11 2012-07-04 苏州市职业大学 Fan filter unit (FFU) group control system based on wireless and electric wire carrier communication technology
CN103321933A (en) * 2013-05-22 2013-09-25 北京工业大学 Fan state online monitoring system and method based on advanced reduced instruction-set computer machine (ARM) and ZigBee
CN204331387U (en) * 2015-01-15 2015-05-13 李小宁 A kind of computer equipment with radio communication and measuring ability
CN204755365U (en) * 2015-06-10 2015-11-11 华北科技学院 Mining axial -flow blower bearing temperature -detecting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6839753B2 (en) * 2001-02-23 2005-01-04 Cardiopulmonary Corporation Network monitoring systems for medical devices
CN2874655Y (en) * 2006-01-25 2007-02-28 郑文宸 Composite data collector based on radio and power carrier communication
CN102527170A (en) * 2012-01-11 2012-07-04 苏州市职业大学 Fan filter unit (FFU) group control system based on wireless and electric wire carrier communication technology
CN103321933A (en) * 2013-05-22 2013-09-25 北京工业大学 Fan state online monitoring system and method based on advanced reduced instruction-set computer machine (ARM) and ZigBee
CN204331387U (en) * 2015-01-15 2015-05-13 李小宁 A kind of computer equipment with radio communication and measuring ability
CN204755365U (en) * 2015-06-10 2015-11-11 华北科技学院 Mining axial -flow blower bearing temperature -detecting device

Similar Documents

Publication Publication Date Title
AU2024202546A1 (en) Gas Monitor, System and Method
CN103246256A (en) Field production safety monitoring system for building construction and application method thereof
CN107091115A (en) A kind of safety of coal mines detecting system
CN203232543U (en) A production safety monitoring system at a construction site
CN203352702U (en) A mining monitoring illumination system
CN204754991U (en) Novel colliery is gas density monitoring alarm in pit device
CN203022821U (en) Coal mine safety monitoring system substation
CN203934724U (en) A kind of novel multisensor helmet
CN104393665A (en) Double-power type automatic change-over switch device
CN204650277U (en) On-the-spot mobile robot environmental information being carried out to mobile monitoring of harmful influence leakage accident
CN105094097A (en) Factory hazard source real-time monitoring control system and control method based on Internet of things
CN203781253U (en) Long-distance belt conveyor provided with intelligent monitoring system
CN113888833A (en) Remote early warning detection device for limited space operation
CN205297649U (en) Colliery is stranded personnel positioning system in pit based on wiFi
CN107727137A (en) A kind of mine fan on-line monitoring system
CN203647938U (en) Fire hydrant monitoring system
CN207670365U (en) A kind of vehicle window forcible entry control system
CN203369436U (en) Gas monitoring and alarming safety helmet
CN205102933U (en) A temperature -detecting device for detecting inside temperature of rack
CN212027881U (en) Tunnel gas grading control system
CN104952203A (en) Machine room safety monitoring system
CN205578034U (en) Mine personnel location system
CN203626890U (en) Gas monitor system for gas tunnel prevention and control
CN207847697U (en) A kind of coal mine communication system
CN207541745U (en) New-energy automobile fire alarm system and new-energy automobile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180223