CN107590541A - A kind of field treatment method of load data collection success rate low defect - Google Patents

A kind of field treatment method of load data collection success rate low defect Download PDF

Info

Publication number
CN107590541A
CN107590541A CN201710659958.5A CN201710659958A CN107590541A CN 107590541 A CN107590541 A CN 107590541A CN 201710659958 A CN201710659958 A CN 201710659958A CN 107590541 A CN107590541 A CN 107590541A
Authority
CN
China
Prior art keywords
terminal
mrow
msub
check
defect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710659958.5A
Other languages
Chinese (zh)
Other versions
CN107590541B (en
Inventor
陈清泰
麻吕斌
刘颖
殷杰
赵羚
杨光盛
刘海港
王伟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Zhejiang Huayun Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710659958.5A priority Critical patent/CN107590541B/en
Publication of CN107590541A publication Critical patent/CN107590541A/en
Application granted granted Critical
Publication of CN107590541B publication Critical patent/CN107590541B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of field treatment method of load data collection success rate low defect, is related to a kind of field treatment method, and at present, there is different and separate single one defect elimination method in the O&M troop of each districts and cities, poor consistency, is unfavorable for analyzing and processing, defect elimination efficiency is low.The present invention comprises the following steps:Exact protocol;The low defect elimination of lotus data acquisition success rate is carried out, it includes:Information is checked;Equipment items coherence check is carried out using mobile device;Judge that terminal whether there is defect using mobile device, and determine failure cause and processing method;Manual confirmation failure;Feed back phenomenon of the failure and result.The technical program is easy to use, optimization and the efficient professional defect elimination method of systematicness carry out live defect elimination work, reach raising collection O&M efficiency, live maintenance work amoun is reduced, lifting collection O&M troop is specialized, and then ensures the success rate of power information acquisition system.

Description

A kind of field treatment method of load data collection success rate low defect
Technical field
The present invention relates to a kind of field treatment method, more particularly to a kind of scene of load data collection success rate low defect Processing method.
Background technology
Current maintenance work lacks systematicness, continuation, perspective and lack specialized O&M troop, with O&M The continuous development of work, realize that systematic specialty collection O&M has been provided with condition by summary of experience, technological means.But pass through Often there is load data and gather unsuccessful situation.
Load data collection success rate is low to refer to that terminal continues more days load data collection success rates and is below setting threshold values. As a kind of common collection O&M failure, also because various faults reason causes a variety of defect elimination methods.Due to collection eventually The quantity at end is big, such as Zhejiang Province's acquisition terminal quantity is more than 3,000,000, and producer, batch, stipulations, model, accessory etc. are each There is difference, therefore the O&M troop of each districts and cities has different and separate single one defect elimination method to such failure.Poor consistency, no Beneficial to analyzing and processing, defect elimination efficiency is low.
The content of the invention
The technical problem to be solved in the present invention and the technical assignment proposed are prior art to be improved with being improved, A kind of field treatment method of load data collection success rate low defect is provided, is uniformly processed with reaching, effectively improves processing speed The purpose of degree.Therefore, the present invention takes following technical scheme.
A kind of field treatment method of load data collection success rate low defect, comprises the following steps:
1) exact protocol:Whole load datas are summarized according to historical data and gather low success rate of failure cause, determination simultaneously The low success rate of defect elimination workflow of solution lotus data acquisition and fault handling method that record selection optimizes, will be directed to processing Each result of process is stored to update historical data;Mobile device stores defect elimination workflow and fault handling method, Wherein it is directed to and checks remote signal, check local signal, check that basis is gone through respectively with the presence or absence of defect for terminal heartbeat setting, terminal History fault message and maintenance work logic custom are allocated by optimizing sequential algorithm analysis;
2) lotus data are carried out according to the low defect elimination workflow of lotus data acquisition success rate and fault handling method of determination to adopt The low defect elimination of integrated power, it includes:
201) information is checked, and checks on-site terminal information and whether work order information is consistent, including terminal wealth numbering verification, To prevent going to the wrong way interval or job site;
202) equipment items coherence check is carried out using mobile device, includes inspection remote signal, local signal, the terminal heart Jump and set, and failure cause and processing method are determined according to above-mentioned inspection;
203) judge that terminal whether there is defect using mobile device, mobile device is called the software version number for surveying terminal together, looked into See in terminal with the presence or absence of frequently alarm and log in and the set-up time of terminal, check terminal software version number, terminal whether Program upgrading is abnormal, terminal whether hydraulic performance decline, terminal defect is judged whether according to above-mentioned inspection, and determine failure cause And processing method;
204) manual confirmation failure, after all items are checked out, specific failure can not be still determined, is considered as terminal event Barrier, turn " knotty problem " or " changes terminal " processing;
205) feed back phenomenon of the failure and result, and propose next processing links, record storage processing procedure it is each Feedback result, feedback result are:Knotty problem processing, public network signal issue handling, result effect, archives corrigendum, replacing Terminal sub-process, change ammeter or terminal staging.
The technical program is according to the various collecting devices of current power information acquisition system, operation and maintenance tools, O&M environment feelings Condition, solve load data and gather low success rate of problem, with reference to the system flow of current collection O&M defect elimination process, according to various Load data gathers low success rate of failure cause, uses for reference the low failure defect elimination warp of the load data collection success rate of scene for many years Test, easy to use, optimization and the live defect elimination work of the professional defect elimination method progress of efficient systematicness, reach raising collection O&M effect Rate, live maintenance work amoun is reduced, lifting collection O&M troop is specialized, and then ensures the success of power information acquisition system Rate, and the work for supporting national grid to market is carried out.
As further improving and supplementing to above-mentioned technical proposal, present invention additionally comprises following additional technical feature.
Further, when remote signal checks, check whether the signal intensity of terminal is enough, if terminal signaling is weak or without letter Number, then change installation site, using gain antenna or turn public network signal.
Further, when local signal checks, check whether RS485 order wires are long, whether specification is reasonable, if deposit In signal interference;If local signal is abnormal, adjustment installation site, the suitable RS485 order wires of selection or installation trunking.
Further, when checking that terminal heartbeat is set, the eartbeat interval for surveying terminal is called together, judging the eartbeat interval of terminal is It is no suitable, when eartbeat interval setting is long, reset eartbeat interval.
Further, when checking terminal software version number, Zhao Ce terminal softwares version number, determine that terminal software function is It is no normal, if software version number is low, it is determined whether upgrading software.
Further, check terminal whether program upgrading it is abnormal when, by check terminal with the presence or absence of frequently alarm, letter Road switching, restarting information, program issues exception and caused when judging whether due to terminal staging, if terminal program upgrading is imperfect, Terminal software reset is carried out, while re-issues measurement point parameter.
Further, when check terminal whether hydraulic performance decline when, if the frequent leak source without reason of terminal, according to the peace of terminal ETL estimated time of loading goes to judge whether that terminal may be changed when terminals physical hydraulic performance decline because terminal aging causes.
Further, check whether remote signal, inspection local signal, inspection terminal heartbeat setting, terminal deposit in selection The optimization of sequencing is carried out by Algorithm Analysis in defect;
Calculated for history O&M information check every month remote signal, check local signal, check terminal heartbeat set, Terminal whether there is the generation historical probabilities of defect;
Determine to check remote signal by the daily O&M logic custom of history O&M information, check local signal, inspection terminal Heartbeat setting, terminal whether there is the logical order weighted factor of defect, be represented respectively with K1, K2, K3, K4;
Specific method step is as follows:
A) the probability coefficent L for checking remote signal is following equation:
L=C3L3+C6L6+C12L12+CL, (2)
Wherein, investigate and prosecute in formula (1) check remote signal, check local signal, check terminal heartbeat setting, terminal whether Existing defects are respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent institute in collection operational system The whole historical datas having;
K1 is the logical order weighted factor for checking remote signal, and K1 chooses 2;
In formula (2), LmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check the set of remote signal probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5;
B) the probability coefficent M for checking local signal is following equation:
M=C3M3+C6M6+C12M12+CM, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K2 is the logical order weighted factor for checking local signal, and K2 chooses 1;
In formula (2), MmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check the set of local signal probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5.
C) check that the probability coefficent N that terminal heartbeat is set is following equation:
N=C3N3+C6N6+C12N12+CN, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K3 is to check the logical order weighted factor that terminal heartbeat is set, and K3 chooses 0.8;
In formula (2), NmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check that terminal heartbeat sets the set of probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choosing Take 1, CChoose 1.5;
D) terminal is following equation with the presence or absence of the probability coefficent O of defect:
O=C3O3+C6O6+C12O12+CO, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K4 is the logical order weighted factor that terminal whether there is defect, and K4 chooses 1;
In formula (2), OmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history terminals whether there is the set of shortage probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choosing Take 1, CChoose 1.5;
E) L, M, N, the O drawn respectively according to above-mentioned 1,2,3,4 result, it is the first order to choose the maximum, and second is Second order, the 3rd is the 3rd order, and the 4th is the 4th order.
Further, described mobile device is provided with multiple modules, including information verification module, the use checked for information Check that module, the local signal for local signal inspection check module, for terminal in the remote signal of remote signal inspection Heartbeat sets the terminal heartbeat checked to set and checks module, the terminal defect inspection module for terminal defect inspection, for people Work confirm failure manual confirmation malfunctioning module, for handle record and feed back processing module, for guiding workflow PROCESS CONTROL MODULE, described information verification module, remote signal check that module, local signal check that module, terminal heartbeat are set Put and check that module, terminal defect inspection module, manual confirmation malfunctioning module work or select work as needed successively.
Beneficial effect:The technical program is according to the various collecting devices, operation and maintenance tools, fortune of current power information acquisition system Ambient conditions is tieed up, load data is solved and gathers low success rate of problem, with reference to the system flow of current collection O&M defect elimination process, Low success rate of failure cause is gathered according to various load datas, uses for reference the low failure of load data collection success rate of scene for many years Defect elimination experience, easy to use, optimization and the efficient professional defect elimination method of systematicness carry out live defect elimination work, reach raising collection O&M efficiency, live maintenance work amoun is reduced, lifting collection O&M troop is specialized, and then ensures power information acquisition system Success rate, and the work for supporting national grid to market is carried out.
Brief description of the drawings
Fig. 1 is flow chart of the present invention.
Embodiment
Technical scheme is described in further detail below in conjunction with Figure of description.
As shown in figure 1, the present invention comprises the following steps:
1) exact protocol:Whole load datas are summarized according to historical data and gather low success rate of failure cause, determination simultaneously The low success rate of defect elimination workflow of solution lotus data acquisition and fault handling method that record selection optimizes, will be directed to processing Each result of process is stored to update historical data;Mobile device stores defect elimination workflow and fault handling method; Wherein it is directed to and checks remote signal, check local signal, check that basis is gone through respectively with the presence or absence of defect for terminal heartbeat setting, terminal History fault message and maintenance work logic custom are allocated by optimizing sequential algorithm analysis.
2) lotus data are carried out according to the low defect elimination workflow of lotus data acquisition success rate and fault handling method of determination to adopt The low defect elimination of integrated power, it includes:
201) information is checked, and checks on-site terminal information and whether work order information is consistent, including terminal wealth numbering verification, To prevent going to the wrong way interval or job site;
202) equipment items coherence check is carried out using mobile device, includes inspection remote signal, local signal, the terminal heart Jump and set, and failure cause and processing method are determined according to above-mentioned inspection;
203) judge that terminal whether there is defect using mobile device, mobile device is called the software version number for surveying terminal together, looked into See in terminal with the presence or absence of frequently alarm and log in and the set-up time of terminal, check terminal software version number, terminal whether Program upgrading is abnormal, terminal whether hydraulic performance decline, terminal defect is judged whether according to above-mentioned inspection, and determine failure cause And processing method;
204) manual confirmation failure, after all items are checked out, specific failure can not be still determined, is considered as terminal event Barrier, turn " knotty problem " or " changes terminal " processing;
205) feed back phenomenon of the failure and result, and propose next processing links, record storage processing procedure it is each Feedback result, feedback result are:Knotty problem processing, public network signal issue handling, result effect, archives corrigendum, replacing Terminal sub-process, change ammeter or terminal staging.
The technical program is according to the various collecting devices of current power information acquisition system, operation and maintenance tools, O&M environment feelings Condition, solve load data and gather low success rate of problem, with reference to the system flow of current collection O&M defect elimination process, according to various Load data gathers low success rate of failure cause, uses for reference the low failure defect elimination warp of the load data collection success rate of scene for many years Test, easy to use, optimization and the live defect elimination work of the professional defect elimination method progress of efficient systematicness, reach raising collection O&M effect Rate, live maintenance work amoun is reduced, lifting collection O&M troop is specialized, and then ensures the success of power information acquisition system Rate, and the work for supporting national grid to market is carried out.
The defect elimination workflow of use mainly includes 7 contents, and concrete case is as shown in the table:
Check that remote signal, inspection local signal, inspection terminal heartbeat setting, terminal pass through with the presence or absence of defect in selection Algorithm Analysis carries out the optimization of sequencing.
Calculated for history O&M information check every month remote signal, check local signal, check terminal heartbeat set, Terminal whether there is the generation historical probabilities of defect;
Determine to check remote signal by the daily O&M logic custom of history O&M information, check local signal, inspection terminal Heartbeat setting, terminal whether there is the logical order weighted factor of defect, be represented respectively with K1, K2, K3, K4;
Specific method step is as follows:
A) the probability coefficent L for checking remote signal is following equation:
L=C3L3+C6L6+C12L12+CL, (2)
Wherein, investigate and prosecute in formula (1) check remote signal, check local signal, check terminal heartbeat setting, terminal whether Existing defects are respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent institute in collection operational system The whole historical datas having;
K1 is the logical order weighted factor for checking remote signal, and K1 chooses 2;
In formula (2), LmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check the set of remote signal probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5.
B) the probability coefficent M for checking local signal is following equation:
M=C3M3+C6M6+C12M12+CM, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K2 is the logical order weighted factor for checking local signal, and K2 chooses 1;
In formula (2), MmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check the set of local signal probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5.
C) check that the probability coefficent N that terminal heartbeat is set is following equation:
N=C3N3+C6N6+C12N12+CN, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K3 is to check the logical order weighted factor that terminal heartbeat is set, and K3 chooses 0.8;
In formula (2), NmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history check that terminal heartbeat sets the set of probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choosing Take 1, CChoose 1.5.
D) terminal is following equation with the presence or absence of the probability coefficent O of defect:
O=C3O3+C6O6+C12O12+CO, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K4 is the logical order weighted factor that terminal whether there is defect, and K4 chooses 1;
In formula (2), OmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented 3 months, 6 months, 12 months and be All history terminals whether there is the set of shortage probability, C in systemmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choosing Take 1, CChoose 1.5.
E) L, M, N, the O drawn respectively according to above-mentioned 1,2,3,4 result, it is the first order to choose the maximum, and second is Second order, the 3rd is the 3rd order, and the 4th is the 4th order.
When remote signal checks, check whether the signal intensity of terminal is enough, if terminal signaling is weak or no signal, more Change installation site, using gain antenna or turn public network signal.
When local signal checks, check whether RS485 order wires are long, whether specification is reasonable, if signal be present and do Disturb;If local signal is abnormal, adjustment installation site, the suitable RS485 order wires of selection or installation trunking.
When checking that terminal heartbeat is set, call the eartbeat interval for surveying terminal together, judge whether the eartbeat interval of terminal is suitable, when When eartbeat interval sets long, eartbeat interval is reseted.
Further, when checking terminal software version number, Zhao Ce terminal softwares version number, determine that terminal software function is It is no normal, if software version number is low, it is determined whether upgrading software.
Check terminal whether program upgrading it is abnormal when, by check terminal with the presence or absence of frequently alarm, channel switch, again Information is opened, program issues exception and caused when judging whether due to terminal staging, if terminal program upgrading is imperfect, it is soft to carry out terminal Part resets, while re-issues measurement point parameter.
When check terminal whether hydraulic performance decline when, if the frequent leak source without reason of terminal, goes according to the set-up time of terminal Judge whether that terminal may be changed when terminals physical hydraulic performance decline because terminal aging causes.
For the ease of execute-in-place, described mobile device is provided with multiple modules, including the information core checked for information To module, for remote signal inspection remote signal check module, for local signal inspection local signal check module, Set the terminal heartbeat checked to set for terminal heartbeat and check module, the terminal defect inspection mould for terminal defect inspection Block, the manual confirmation malfunctioning module for manual confirmation failure, for handle record and feed back processing module, for guiding work Make the PROCESS CONTROL MODULE of flow, described information verification module, remote signal check that module, local signal check module, end End heartbeat, which is set, checks that module, terminal defect inspection module, manual confirmation malfunctioning module work or select work as needed successively Make.
A kind of field treatment method of load data collection success rate low defect shown in figure 1 above is the specific of the present invention Embodiment, substantive distinguishing features of the present invention and progress are embodied, can be according to the use needs of reality, in the enlightenment of the present invention Under, carry out the equivalent modifications of shape, structure etc. to it, this programme protection domain row.

Claims (9)

1. a kind of field treatment method of load data collection success rate low defect, it is characterised in that comprise the following steps:
1) exact protocol:The low success rate of failure cause of whole load datas collections is summarized according to historical data, determined and recorded The low success rate of defect elimination workflow of solution lotus data acquisition and the fault handling method optimized is selected, processing procedure will be directed to Each result stored to update historical data;Mobile device stores defect elimination workflow and fault handling method;Wherein For checking remote signal, checking local signal, inspection terminal heartbeat setting, terminal with the presence or absence of defect respectively according to history event Barrier information and maintenance work logic custom are allocated by optimizing sequential algorithm analysis;
2) according to the low defect elimination workflow of lotus data acquisition success rate and fault handling method of determination carry out lotus data acquisition into The low defect elimination of power, it includes:
201) information is checked, and checks on-site terminal information and whether work order information is consistent, including terminal wealth numbering verification, to prevent Go to the wrong way interval or job site;
202) equipment items coherence check is carried out using mobile device, is set comprising inspection remote signal, local signal, terminal heartbeat Put, and failure cause and processing method are determined according to above-mentioned inspection;
203) judge that terminal whether there is defect using mobile device, mobile device calls the software version number for surveying terminal together, checks end With the presence or absence of frequently alarm and logged in and the set-up time of terminal in end, check terminal software version number, terminal whether program Upgrading is abnormal, terminal whether hydraulic performance decline, terminal defect is judged whether according to above-mentioned inspection, and determine failure cause and place Reason method;
204) manual confirmation failure, after all items are checked out, specific failure can not be still determined, is considered as terminal fault, turned " knotty problem " or " changes terminal " processing;
205) phenomenon of the failure and result are fed back, and proposes next processing links, each feedback of record storage processing procedure As a result, feedback result is:Knotty problem processing, public network signal issue handling, result effect, archives corrigendum, changes terminal Sub-process, change ammeter or terminal staging.
2. a kind of field treatment method of load data collection success rate low defect according to claim 1, its feature exist In:When remote signal checks, check whether the signal intensity of terminal is enough, if terminal signaling is weak or no signal, change are installed Position, using gain antenna or turn public network signal.
3. a kind of field treatment method of load data collection success rate low defect according to claim 2, its feature exist In:When local signal checks, check whether RS485 order wires are long, whether specification is reasonable, if signal interference be present;If Local signal is abnormal, then adjusts installation site, the suitable RS485 order wires of selection or install trunking additional.
4. a kind of field treatment method of load data collection success rate low defect according to claim 3, its feature exist In:When checking that terminal heartbeat is set, call the eartbeat interval for surveying terminal together, judge whether the eartbeat interval of terminal is suitable, work as heartbeat When being arranged at intervals long, eartbeat interval is reseted.
5. a kind of field treatment method of load data collection success rate low defect according to claim 4, its feature exist In:When checking terminal software version number, Zhao Ce terminal softwares version number, determine whether terminal software function is normal, if software Version number is low, it is determined whether upgrading software.
6. a kind of field treatment method of load data collection success rate low defect according to claim 5, its feature exist In:Check terminal whether program upgrading it is abnormal when, by check terminal with the presence or absence of frequently alarm, channel switch, restart letter Breath, program issues exception and caused when judging whether due to terminal staging, if terminal program upgrading is imperfect, carries out terminal software and answers Position, while re-issue measurement point parameter.
7. a kind of field treatment method of load data collection success rate low defect according to claim 6, its feature exist In:When check terminal whether hydraulic performance decline when, if the frequent leak source without reason of terminal, go the judgement to be according to the set-up time of terminal It is no to be caused due to terminal aging, change terminal when terminals physical hydraulic performance decline.
8. a kind of field treatment method of load data collection success rate low defect according to claim 7, its feature exist In:Check that remote signal, inspection local signal, inspection terminal heartbeat setting, terminal pass through algorithm with the presence or absence of defect in selection Analysis carries out the optimization of sequencing;
Calculated for history O&M information and check remote signal every month, check local signal, check terminal heartbeat setting, terminal With the presence or absence of the generation historical probabilities of defect;
Determine to check remote signal by the daily O&M logic custom of history O&M information, check local signal, inspection terminal heartbeat Setting, terminal whether there is the logical order weighted factor of defect, be represented respectively with K1, K2, K3, K4;
Specific method step is as follows:
A) the probability coefficent L for checking remote signal is following equation:
<mrow> <msub> <mi>L</mi> <mi>m</mi> </msub> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>W</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <mrow> <mo>(</mo> <msub> <mi>W</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>X</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Y</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Z</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> </mrow> </mfrac> <mo>*</mo> <mi>K</mi> <mn>1</mn> <mo>,</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
L=C3L3+C6L6+C12L12+CL, (2)
Wherein, investigated and prosecuted in formula (1) and check remote signal, check local signal, check that terminal heartbeat setting, terminal whether there is Defect is respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent all in collection operational system Whole historical datas;
K1 is the logical order weighted factor for checking remote signal, and K1 chooses 2;
In formula (2), LmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented in 3 months, 6 months, 12 months and system All history check the set of remote signal probability, CmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoosing Take 1.5;
B) the probability coefficent M for checking local signal is following equation:
<mrow> <msub> <mi>M</mi> <mi>m</mi> </msub> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>X</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <mrow> <mo>(</mo> <msub> <mi>W</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>X</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Y</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Z</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> </mrow> </mfrac> <mo>*</mo> <mi>K</mi> <mn>2</mn> <mo>,</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
M=C3M3+C6M6+C12M12+CM, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is defect Respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent whole all in collection operational system Historical data;
K2 is the logical order weighted factor for checking local signal, and K2 chooses 1;
In formula (2), MmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented in 3 months, 6 months, 12 months and system All history check the set of local signal probability, CmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoosing Take 1.5.
C) check that the probability coefficent N that terminal heartbeat is set is following equation:
<mrow> <msub> <mi>N</mi> <mi>m</mi> </msub> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>Y</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <mrow> <mo>(</mo> <msub> <mi>W</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>X</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Y</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Z</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> </mrow> </mfrac> <mo>*</mo> <mi>K</mi> <mn>3</mn> <mo>,</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
N=C3N3+C6N6+C12N12+CN, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is defect Respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent whole all in collection operational system Historical data;
K3 is to check the logical order weighted factor that terminal heartbeat is set, and K3 chooses 0.8;
In formula (2), NmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented in 3 months, 6 months, 12 months and system All history check that terminal heartbeat sets the set of probability, CmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5;
D) terminal is following equation with the presence or absence of the probability coefficent O of defect:
<mrow> <msub> <mi>O</mi> <mi>m</mi> </msub> <mo>=</mo> <mfrac> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>Z</mi> <mi>i</mi> </msub> </mrow> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <mrow> <mo>(</mo> <msub> <mi>W</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>X</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Y</mi> <mi>i</mi> </msub> <mo>+</mo> <msub> <mi>Z</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> </mrow> </mfrac> <mo>*</mo> <mi>K</mi> <mn>4</mn> <mo>,</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
O=C3O3+C6O6+C12O12+CO, (2)
Wherein, remote signal is checked in formula (1), local signal is checked, checks that terminal heartbeat setting, terminal whether there is defect Respectively with Wi、Xi、Yi、ZiThe history probability of happening of i months before being expressed as, i=∞ represent whole all in collection operational system Historical data;
K4 is the logical order weighted factor that terminal whether there is defect, and K4 chooses 1;
In formula (2), OmM=3, m=6 are chosen respectively, and m=12, m=∞ are represented in 3 months, 6 months, 12 months and system All history terminals whether there is the set of shortage probability, CmFor the new and old constant of failure, C3Choose 2, C6Choose 1.5, C12Choose 1, CChoose 1.5;
E) L, M, N, the O drawn respectively according to above-mentioned 1,2,3,4 result, it is the first order to choose the maximum, and second is second Sequentially, the 3rd is the 3rd order, and the 4th is the 4th order.
A kind of 9. in-situ processing of load data collection success rate low defect according to claim 1-8 any claims Method, it is characterised in that:Described mobile device is provided with multiple modules, including information verification module, the use checked for information Check that module, the local signal for local signal inspection check module, for terminal in the remote signal of remote signal inspection Heartbeat sets the terminal heartbeat checked to set and checks module, the terminal defect inspection module for terminal defect inspection, for people Work confirm failure manual confirmation malfunctioning module, for handle record and feed back processing module, for guiding workflow PROCESS CONTROL MODULE, described information verification module, remote signal check that module, local signal check that module, terminal heartbeat are set Put and check that module, terminal defect inspection module, manual confirmation malfunctioning module work or select work as needed successively.
CN201710659958.5A 2017-08-04 2017-08-04 On-site processing method for low success rate defect of load data acquisition Active CN107590541B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710659958.5A CN107590541B (en) 2017-08-04 2017-08-04 On-site processing method for low success rate defect of load data acquisition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710659958.5A CN107590541B (en) 2017-08-04 2017-08-04 On-site processing method for low success rate defect of load data acquisition

Publications (2)

Publication Number Publication Date
CN107590541A true CN107590541A (en) 2018-01-16
CN107590541B CN107590541B (en) 2021-09-21

Family

ID=61041985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710659958.5A Active CN107590541B (en) 2017-08-04 2017-08-04 On-site processing method for low success rate defect of load data acquisition

Country Status (1)

Country Link
CN (1) CN107590541B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109359962A (en) * 2018-09-20 2019-02-19 国网天津市电力公司电力科学研究院 A kind of remote recharge method for upgrading success rate based on acquisition failure defect elimination module
CN110346748A (en) * 2019-07-05 2019-10-18 国网福建省电力有限公司电力科学研究院 A kind of electric power metering system fault testing optimization method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN104504537A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 Transformer substation alternating current power supply monitoring system and transformer substation alternating current power supply monitoring method
CN105450292A (en) * 2014-09-24 2016-03-30 中兴通讯股份有限公司 Fault diagnosis analysis method, fault diagnosis device, fault analysis device and fault diagnosis analysis system
CN105699760A (en) * 2016-01-22 2016-06-22 国网冀北电力有限公司电力科学研究院 Electric energy metering equipment and method for analyzing operating condition of power utilization information collection equipment
CN106155035A (en) * 2015-04-02 2016-11-23 中国商用飞机有限责任公司 Method for diagnosing faults based on maintenance class data and fault diagnosis system
CN106643765A (en) * 2016-12-08 2017-05-10 国网浙江省电力公司 Method for calculating collection abnormality maintenance time

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104182840A (en) * 2014-08-26 2014-12-03 国家电网公司 Electric marketing metering mobile application system and work method thereof
CN105450292A (en) * 2014-09-24 2016-03-30 中兴通讯股份有限公司 Fault diagnosis analysis method, fault diagnosis device, fault analysis device and fault diagnosis analysis system
CN104504537A (en) * 2015-01-07 2015-04-08 山东鲁能智能技术有限公司 Transformer substation alternating current power supply monitoring system and transformer substation alternating current power supply monitoring method
CN106155035A (en) * 2015-04-02 2016-11-23 中国商用飞机有限责任公司 Method for diagnosing faults based on maintenance class data and fault diagnosis system
CN105699760A (en) * 2016-01-22 2016-06-22 国网冀北电力有限公司电力科学研究院 Electric energy metering equipment and method for analyzing operating condition of power utilization information collection equipment
CN106643765A (en) * 2016-12-08 2017-05-10 国网浙江省电力公司 Method for calculating collection abnormality maintenance time

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109359962A (en) * 2018-09-20 2019-02-19 国网天津市电力公司电力科学研究院 A kind of remote recharge method for upgrading success rate based on acquisition failure defect elimination module
CN110346748A (en) * 2019-07-05 2019-10-18 国网福建省电力有限公司电力科学研究院 A kind of electric power metering system fault testing optimization method

Also Published As

Publication number Publication date
CN107590541B (en) 2021-09-21

Similar Documents

Publication Publication Date Title
CN107450445B (en) Multi-station unified checking and accepting method for monitoring signals of electric power system
CN110674189B (en) Method for monitoring secondary state and positioning fault of intelligent substation
CN103454516A (en) Intelligent transformer substation secondary equipment health state diagnosis method
CN107451742A (en) A kind of electric energy meter continues the more days remote diagnosis processing methods without meter reading data failure
CN105425768B (en) A kind of second power equipment monitoring device and method
CN113361663B (en) Artificial intelligence-based power grid event diagnosis autonomous learning method and system
CN107590541A (en) A kind of field treatment method of load data collection success rate low defect
CN108020807B (en) On-site defect eliminating method for electric energy meter without meter reading data failure for multiple days
CN213750303U (en) Electric energy metering abnormity diagnosis system based on electricity consumption information acquisition system
CN108683522A (en) A kind of industry things-internet gateway intelligent trouble study and processing method and system
CN107655515A (en) A kind of acquisition terminal and live defect elimination method of the main website without communication failure
CN106817708A (en) One kind patrols and examines cluster construction method and device
CN103631245A (en) Power distribution terminal defect diagnostic system and method
CN111342454B (en) Method and system for analyzing big data of low voltage cause at platform area outlet
CN115293584A (en) Overhead transmission line risk prediction method, system and terminal
CN105119770A (en) Monitoring method and system for preventing generating flow of cell phone software
CN107632280B (en) On-site defect eliminating method for electric meter with no data fault under I-type concentrator
CN109934458A (en) A kind of power failure real-time analysis method based on the minimum common analytical unit that has a power failure
CN108120475A (en) The data monitoring method and device of a kind of piping lane
CN103997126A (en) Fault diagnosis grading method and system based on on-off state
CN115277473A (en) Remote operation and maintenance method and device for edge gateway, computer equipment and storage medium
CN111682440B (en) Digital substation inspection method
CN116150195A (en) System and method for online monitoring safety low-carbon electricity consumption of users in multiple types of parks
CN211127301U (en) Intelligent substation secondary equipment operation and maintenance management and control system
CN111245097A (en) Intelligent power grid management and control system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant