CN107587842A - A kind of efficiently power cable device - Google Patents

A kind of efficiently power cable device Download PDF

Info

Publication number
CN107587842A
CN107587842A CN201710841232.3A CN201710841232A CN107587842A CN 107587842 A CN107587842 A CN 107587842A CN 201710841232 A CN201710841232 A CN 201710841232A CN 107587842 A CN107587842 A CN 107587842A
Authority
CN
China
Prior art keywords
chamber
elongation
tip
access opening
intracavitary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710841232.3A
Other languages
Chinese (zh)
Inventor
陈志桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710841232.3A priority Critical patent/CN107587842A/en
Publication of CN107587842A publication Critical patent/CN107587842A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of efficiently power cable device, including pedestal and the construction portion being fixedly mounted in pedestal, the conversion chamber that left and right elongation is set is provided with construction portion, lead to the jacket casing for providing that elongation is set up and down in section on the left of conversion chamber, extension is probeed into the inner roof wall of conversion chamber left side section at the top of jacket casing and convolution is connected, jacket casing bottom extended section probes into the inner bottom wall of conversion chamber left side section and convolution is connected, convert and be fixedly installed the first transmission wheel on the jacket casing outer surface of intracavitary, jacket casing inside spin line is connected with screw rod, it is provided with construction portion on the right side of conversion chamber below extension and mixes chamber, convert and be provided with the swing arm that elongation is set up and down on the right side of chamber in extension, elongation tip is connected with driver at the top of swing arm;The present invention is simple in construction, easy to operate, improves operating efficiency, reduces worker's amount of labour, time saving and energy saving.

Description

A kind of efficiently power cable device
Technical field
The present invention relates to power cable field, is specifically a kind of efficiently power cable device.
Background technology
Needed before power cable laying to needing to set up the wall of cable, ground to carry out jewel hole, so as to convenient installation iron Frame, jewel hole machine is held by worker in order to which the later stage sets up, under existing technical conditions and carries out jewel hole, is wasted time and energy, efficiency Lowly, and after the completion of jewel hole need, to being rinsed inside the hole that is drilled, the powder ash in hole to be gone out in favor of later stage post Installation, the powder ash and aqueous mixtures gone out are needed with scoop shovel totally, and process is cumbersome, cumbersome.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of efficiently power cable device, and it can solve the problem that above-mentioned existing In the art the problem of.
The present invention is achieved through the following technical solutions:A kind of efficiently power cable device of the present invention, including Pedestal and the construction portion being fixedly mounted in the pedestal, the conversion chamber that left and right elongation is set, institute are provided with the construction portion State and lead to the jacket casing for providing that elongation is set up and down on the left of conversion chamber in section, it is left to probe into the conversion chamber for extension at the top of the jacket casing In the inner roof wall of side section and convolution is connected, and the jacket casing bottom extended section is probeed on the left of the conversion chamber in the inner bottom wall of section And convolution is connected, the first transmission wheel is fixedly installed on the jacket casing outer surface of the conversion intracavitary, in the jacket casing Spiral lamination is connected with screw rod, is provided with the construction portion converted on the right side of chamber below extension and mixes chamber, described Convert and be provided with the swing arm that elongation is set up and down on the right side of chamber in extension, elongation tip coordinates with driver at the top of the swing arm connects Connect, the driver outer surface is arranged on the right side of the conversion chamber in the inner roof wall of section and is fixedly connected, and the swing arm bottom is stretched Long section is logical to pass through the construction portion mixed between chamber and the conversion chamber and convolution mating connection, the swing arm bottom extended Tip mixes intracavitary described in probeing into, and is fixedly installed on the swing arm outer surface for mixing intracavitary and mixes leaf, the conversion The second transmission wheel is fixedly installed on the swing arm outer surface of intracavitary, the second transmission wheel coordinates with the described first transmission wheel Zone of transformation is connected with, the tube channel that elongation is set up and down, the tube channel are provided with the construction portion converted on the right side of chamber Bottom extended tip mixes chamber right hand top intercommunication setting with described, and tip intercommunication is extended at the top of the tube channel and is provided with cone chamber, It is described cone chamber be arranged in construction portion top surface, in the construction portion below the jacket casing in provided with to the screw rod The jewel hole constructing device of mating connection, pedestal bottom surrounding are provided with four pulleys, on each pulley outer ring surface Wearing layer is provided with, storing unit is internally provided with the left of the pedestal.
Preferably technical scheme, the jewel hole constructing device, which includes being arranged on below the jacket casing and led to, passes through described apply The access opening of Ministry of worker bottom surface and it is logical pass through the access opening and both sides elongation to the left and right is set first slides chamber, described first slides chamber Right side extension is set positioned at the lower position for mixing chamber and intercommunication, and the first cunning intracavitary neat fit has left and right to extend The slide plate of upper setting, the slide plate left side extend the first cunning intracavitary that tip is probeed on the left of the access opening and smoothly matched somebody with somebody Close, the first cunning intracavitary and the neat fit that elongation tip is probeed on the right side of the access opening on the right side of the slide plate, described first Be provided with the spring part being connected with the slide plate left end face in sliding chamber inner left wall, be provided with the left of the slide plate in section with it is described The tank that access opening intercommunication is provided with, slide plate right side section is interior to be provided with storage tank, and described first slides the access opening on the upside of chamber The second of elongation setting downwards is provided with inner left wall and slides chamber, described second slides chamber bottom extended tip slides under chamber with described second Described the first of side slides top of chamber intercommunication and set, and neat fit has jewel hole bar, jewel hole bar top tip in the access opening Setting is fixedly connected with screw rod bottom tip, the jewel hole bar bottom stage is logical to pass through the tank and mating connection, described Jewel hole bar bottom tip is probeed into the described first access opening slided below chamber, solid in the tank on the left of the jewel hole bar Surely oblique cunning portion is provided with, the second cunning intracavitary neat fit has what is be fixedly connected with the top of outer wall on the left of the jewel hole bar to push away Block.
Preferably technical scheme, the access opening and the first cunning intracavitary mixed between bottom of chamber portion tip Intercommunication is provided with lower row's tank between inwall on the right side of the access opening on the downside of bottom wall and the first cunning chamber.
Preferably technical scheme, the storing unit include the internal storage chamber set and setting on the left of the pedestal Storing compartment in the storage chamber, the storing compartment bottom are provided with pulley, the storing compartment by the pulley with it is described Storage chamber neat fit connects.
The beneficial effects of the invention are as follows:
1. being connected by swing arm top elongation tip with driver, driver outer surface is arranged on the interior of conversion chamber right side section In roof and it is fixedly connected, swing arm bottom extended section is logical to pass through construction portion and the convolution mating connection mixed between chamber and conversion chamber, Swing arm bottom extended tip, which probes into, mixes intracavitary, mixes to be fixedly installed on the swing arm outer surface of intracavitary and mixes leaf, converts intracavitary Swing arm outer surface on fixed setting second transmission wheel, second transmission wheel with first transmission take turns mating connection zone of transformation, convert chamber The tube channel that elongation is set up and down is set in the construction portion on right side, tube channel bottom extended tip is set with mixing chamber right hand top intercommunication Put, tip intercommunication is extended at the top of tube channel and sets cone chamber, cone chamber is arranged in construction portion top surface, and use is set in the construction portion below jacket casing With the jewel hole constructing device being connected with screw rod, work and jewel hole bar oscilaltion are mixed so as to realize to automatically control Work is driven, reduces worker's amount of labour, it is time saving and energy saving, improve operating efficiency.
Passed through 2. including being arranged on below jacket casing by jewel hole constructing device and leading to the access opening for passing through construction portion bottom surface and lead to Access opening and to the left and right both sides elongation set first slide chamber, first cunning chamber on the right side of extension be located at mix chamber lower position and Intercommunication is set, the slide plate set in first cunning intracavitary neat fit or so elongation, and elongation tip probes into an access opening left side on the left of slide plate The first of side slides intracavitary and neat fit, and the first cunning intracavitary that tip is probeed on the right side of access opening is extended on the right side of slide plate and is smoothly matched somebody with somebody Close, the spring part being connected with slide plate left end face is set in the first cunning chamber inner left wall, is set in the section of slide plate left side mutual with access opening Lead to the tank set, storage tank is set in the section of slide plate right side, realized while automatically controlling jewel hole bar lifting jewel hole so as to realize automatic Control construction, improves operating efficiency.
3. the present invention is simple in construction, easy to operate, realization realizes automatic control while automatically controlling jewel hole bar lifting jewel hole System construction, improves operating efficiency, meanwhile, worker's amount of labour is reduced, it is time saving and energy saving, improve operating efficiency.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 is overall structure diagram inside a kind of efficiently power cable device of the present invention;
Fig. 2 be inclined-plane on the pushing block of the present invention with oblique cunning portion to inclined-plane top pressure when structural representation;
Fig. 3 is the storage tank of the present invention and the structural representation at the top of lower row's tank during intercommunication;
Fig. 4 mixes intracavitary portion structure top view for the present invention's.
Embodiment
As Figure 1-Figure 4, a kind of efficiently power cable device of the invention, including pedestal 5 and be fixedly mounted on Construction portion 6 in the pedestal 5, the interior conversion chamber 64 for being provided with left and right elongation and setting in the construction portion 6 are described to convert the left side of chamber 64 Lead to the jacket casing 641 for providing that elongation is set up and down in section, the top extension of jacket casing 641 probes into the conversion left side section of chamber 64 Inner roof wall in and convolution be connected, the bottom extended section of jacket casing 641 probe into it is described conversion the left side section of chamber 64 inner bottom wall Interior and convolution is connected, and the first transmission wheel 642 is fixedly installed on the outer surface of the jacket casing 641 in the conversion chamber 64, The inside spin line of jacket casing 641 is connected with screw rod 611, the construction portion converted below the right side extension of chamber 64 It is provided with 6 and mixes chamber 65, the swing arm 643 that elongation is set up and down, the swing arm 643 is provided with the conversion right side extension of chamber 64 Top elongation tip is connected with driver 644, and the outer surface of driver 644 is arranged on the conversion right side section of chamber 64 In inner roof wall and it is fixedly connected, the bottom extended section of swing arm 643 is logical to pass through described mix between chamber 65 and the conversion chamber 64 The construction portion 6 and convolution is connected, the bottom extended tip of swing arm 643 probe into it is described mix in chamber 65, it is described to mix It is fixedly installed on the outer surface of the swing arm 643 in chamber 65 and mixes leaf 651, outside the swing arm 643 in the conversion chamber 64 The second transmission wheel 645 is fixedly installed on surface, the second transmission wheel 645 is connected with the described first transmission wheel 642 Zone of transformation 646, the construction portion 6 on the right side of conversion chamber 64 is interior to be provided with the tube channel 66 that elongation is set up and down, the passage The bottom extended tip of pipe 66 mixes the right hand top intercommunication of chamber 65 setting with described, and the top of the tube channel 66 elongation tip intercommunication is set There is cone chamber 67, the cone chamber 67 is arranged in the top surface of construction portion 6, is provided with the construction portion 6 of the lower section of jacket casing 641 To the jewel hole constructing device being connected with the screw rod 611, the bottom surrounding of pedestal 5 is provided with four pulleys 51, Wearing layer 510 is provided with each outer ring surface of pulley 51, the left side of pedestal 5 is internally provided with storing unit.
Valuably, the jewel hole constructing device includes being arranged on the lower section of jacket casing 641 and leading to passing through the bottom surface of construction portion 6 Access opening 61 and it is logical pass through the access opening 61 and both sides elongation to the left and right is set first slides chamber 62, described first slides chamber 62 Right side extension is set positioned at the lower position for mixing chamber 65 and intercommunication, and neat fit has left and right in the first cunning chamber 62 The slide plate 620 set in elongation, the left side of the slide plate 620 elongation tip probe into described the first of the left side of access opening 61 and slide chamber In 62 and neat fit, the right side of the slide plate 620 elongation tip probe into described the first of the right side of access opening 61 and slided in chamber 62 And neat fit, described first slides the spring part for being provided with the inner left wall of chamber 62 and being connected with the left end face of slide plate 620 621, the left side section of slide plate 620 is interior to be provided with the tank 6202 being provided with the intercommunication of access opening 61, the right side section of slide plate 620 Interior to be provided with storage tank 6201, described first slides what is set in the inner left wall of the access opening 61 of the upside of chamber 62 provided with elongation downwards Second slides chamber 63, and described second slides the bottom extended tip of chamber 63 slides the top of chamber 62 with described the first of the lower section of the described second cunning chamber 63 Intercommunication is set, and neat fit has jewel hole bar 610, the top tip of jewel hole bar 610 and the screw rod in the access opening 61 611 bottom tips are fixedly connected with setting, and the bottom stage of jewel hole bar 610 is logical to pass through the tank 6202 and be connected, the brill The bottom tip of eyebar 610 is probeed into the described first access opening 61 for sliding the lower section of chamber 62, described on the left of the jewel hole bar 610 Oblique cunning portion 6203 is fixedly installed in tank 6202, there is and the left side of jewel hole bar 610 neat fit in the second cunning chamber 63 The pushing block 630 being fixedly connected at the top of outer wall, so as to realize that automatically controlling jewel hole bar 610 lifts jewel hole, improves operating efficiency.
Valuably, the access opening 61 and it is described mix between the bottom tip of chamber 65 described first slide the inner bottom wall of chamber 62 with Intercommunication is provided with lower row's tank 68 between the right side inwall of the access opening 61 of the downside of first cunning chamber 62, so as to realize automatic confession Water, improve the operating efficiency of construction.
Wherein, the storing unit includes the internal storage chamber 501 set in the left side of pedestal 5 and is arranged on the storage Storing compartment 502 in chamber 501, the bottom of storing compartment 502 are provided with pulley 503, and the storing compartment 502 passes through the pulley 503 are connected with the neat fit of storage chamber 501.
During original state, when jewel hole bar 610 is located at the top position in access opening 61, now, the bottom of jewel hole bar 610 end The tip is located at lower row's tank 68 with the access opening 61 above the connection of access opening 61, making the bottom tip maximum journey of jewel hole bar 610 Position of the degree away from lower row's tank 68 and the connection of access opening 61, meanwhile, drive pushing block 630 to slide into the by jewel hole bar 610 Two slide chambers 63 in top position, now, make pushing block 630 at utmost away from first slide chamber 62, meanwhile, slide plate 620 by The pressure on top surface of spring part 621, the right side tip of slide plate 620 is slided the right side inwall of chamber 62 with first and offset, now, make the right side section of slide plate 620 Interior storage tank 6201 is located at the position directly below for mixing the bottom end of chamber 65 and intercommunication is set, meanwhile, make in the right side section of slide plate 620 Storage tank 6201 at utmost away from the lower side of row's tank 68, now, make the oblique cunning portion 6203 in tank 6202 and jewel hole bar 610 left outer surface top pressures are slidably matched, meanwhile, make the right side inwall of tank 6202 at utmost outer away from the right side of jewel hole bar 610 Surface.
When needing construction, water is poured into cone chamber 67 first, now, water is slipped into tube channel 66 through boring chamber 67, then Slip into and mixed in chamber 65 through tube channel 66, now, drive swing arm 643 to circle round by driver 644, and then driven by swing arm 643 Second transmission, which takes turns 645 and mixes leaf 651, circles round, and by mixing leaf 651, persistently convolution realizes that mixing the water in chamber 65 uniformly mixes Work, meanwhile, the water for making to mix in chamber 65 is slides quickly into storage tank 6201, now, the zone of transformation on 645 is taken turns by the second transmission 646 drive the convolution of the first transmission wheel 642, and then take turns 642 drive jacket casings 641 by the first transmission and circle round, meanwhile, by the band of jacket casing 641 Dynamic screw rod 611 and the slide downward of jewel hole bar 610 of the bottom of screw rod 611, now, by jewel hole bar 610 drive pushing block 630 by Gradually slide the bottom direction of chamber 63 along second to slide, until jewel hole bar 610 as shown in Figure 3 drives inclined-plane and oblique cunning portion on pushing block 630 Inclined-plane on 6203 is offseted, and now, the bottom tip of jewel hole bar 610 is stretched out outside the bottom surface of construction portion 6, meanwhile, make the right side of jewel hole bar 610 Outer surface and lower row's tank 68 of the right side inwall of access opening 61 compress neat fit, then proceed to control and drive spiral shell by jacket casing 641 Swing arm 611 and the slide downward of jewel hole bar 610 of the bottom of screw rod 611, now, are driven oblique on pushing block 630 by jewel hole bar 610 Face is slidably matched with the inclined-plane top pressure in oblique cunning portion 6203, meanwhile, make oblique cunning portion 6203 drive slide plate 620 to overcome spring part 621 The left direction that pressure on top surface is gradually slided to first in chamber 62 slides, until pushing block 630 as shown in Figure 4 is slid completely into tank 6202 When, now, make oblique cunning portion 6203 drive slide plate 620 at utmost to overcome the pressure on top surface of spring part 621 to slide into the first cunning chamber 62 Left-most position, meanwhile, the right side inwall of tank 6202 is slidably matched with the right side outer surface top pressure of jewel hole bar 610, meanwhile, make The bottom end of jewel hole bar 610, which is at utmost stretched out outside the bottom surface of construction portion 6 and probeed into, completes drilling in ground, now, make slide plate The position directly above that storage tank 6201 in 620 is slid into lower row's tank 68, make the water in storage tank 6201 slide completely into In lower row's tank 68, then swing arm 643 is driven reversely to circle round by driver 644, meanwhile, by the second transmission on swing arm 643 Wheel 645 drives the first reversely convolution of transmission wheel 642 by zone of transformation 646, and then takes turns 642 by the first transmission and drive jacket casing 641 anti- To convolution, until driving screw rod 611 and the jewel hole bar 610 of the bottom of screw rod 611 to be moved to initial position by jacket casing 641 When, now, in ground of the water after access opening 61 slides jewel hole in lower row's tank 68, so as to be automatically performed construction.
The beneficial effects of the invention are as follows:
1. being connected by swing arm top elongation tip with driver, driver outer surface is arranged on the interior of conversion chamber right side section In roof and it is fixedly connected, swing arm bottom extended section is logical to pass through construction portion and the convolution mating connection mixed between chamber and conversion chamber, Swing arm bottom extended tip, which probes into, mixes intracavitary, mixes to be fixedly installed on the swing arm outer surface of intracavitary and mixes leaf, converts intracavitary Swing arm outer surface on fixed setting second transmission wheel, second transmission wheel with first transmission take turns mating connection zone of transformation, convert chamber The tube channel that elongation is set up and down is set in the construction portion on right side, tube channel bottom extended tip is set with mixing chamber right hand top intercommunication Put, tip intercommunication is extended at the top of tube channel and sets cone chamber, cone chamber is arranged in construction portion top surface, and use is set in the construction portion below jacket casing With the jewel hole constructing device being connected with screw rod, work and jewel hole bar oscilaltion are mixed so as to realize to automatically control Work is driven, reduces worker's amount of labour, it is time saving and energy saving, improve operating efficiency.
Passed through 2. including being arranged on below jacket casing by jewel hole constructing device and leading to the access opening for passing through construction portion bottom surface and lead to Access opening and to the left and right both sides elongation set first slide chamber, first cunning chamber on the right side of extension be located at mix chamber lower position and Intercommunication is set, the slide plate set in first cunning intracavitary neat fit or so elongation, and elongation tip probes into an access opening left side on the left of slide plate The first of side slides intracavitary and neat fit, and the first cunning intracavitary that tip is probeed on the right side of access opening is extended on the right side of slide plate and is smoothly matched somebody with somebody Close, the spring part being connected with slide plate left end face is set in the first cunning chamber inner left wall, is set in the section of slide plate left side mutual with access opening Lead to the tank set, storage tank is set in the section of slide plate right side, realized while automatically controlling jewel hole bar lifting jewel hole so as to realize automatic Control construction, improves operating efficiency.
3. the present invention is simple in construction, easy to operate, realization realizes automatic control while automatically controlling jewel hole bar lifting jewel hole System construction, improves operating efficiency, meanwhile, worker's amount of labour is reduced, it is time saving and energy saving, improve operating efficiency.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of efficiently power cable device, including pedestal and the construction portion that is fixedly mounted in pedestal, it is characterised in that: The conversion chamber that left and right elongation is set is provided with construction portion, converts the jacket casing for leading on the left of chamber in section and providing elongation setting up and down, cylinder Set top extension probes into the inner roof wall of conversion chamber left side section and convolution is connected, and jacket casing bottom extended section probes into conversion chamber In the inner bottom wall of left side section and convolution is connected, and converts and the first transmission wheel, cylinder are fixedly installed on the jacket casing outer surface of intracavitary Set inside spin line is connected with screw rod, converts to be provided with the construction portion on the right side of chamber below extension and mixes chamber, conversion chamber is right The swing arm that elongation is set up and down is provided with the extension of side, elongation tip is connected with driver at the top of swing arm, driver appearance Face is arranged on the right side of conversion chamber in the inner roof wall of section and is fixedly connected, and logical pass through of swing arm bottom extended section is mixed between chamber and conversion chamber Construction portion and convolution be connected, swing arm bottom extended tip, which probes into, mixes intracavitary, mixes on the swing arm outer surface of intracavitary solid Surely it is provided with and mixes leaf, convert and the second transmission wheel is fixedly installed on the swing arm outer surface of intracavitary, the second transmission wheel passes with first Defeated wheel is connected with zone of transformation, converts and the tube channel that elongation is set up and down, passage bottom of the tube are provided with the construction portion on the right side of chamber Elongation tip is with mixing chamber right hand top intercommunication setting, and the elongation tip intercommunication of tube channel top, which is provided with, bores chamber, and cone chamber, which is arranged on, to be applied The jewel hole constructing device to be connected with screw rod, pedestal bottom are provided with Ministry of worker's top surface, in the construction portion below jacket casing Surrounding is provided with four pulleys, and wearing layer is provided with each pulley outer ring surface, storing unit is internally provided with the left of pedestal.
A kind of 2. efficiently power cable device according to claim 1, it is characterised in that:The jewel hole constructing device bag Include to be arranged on below the jacket casing and lead to the access opening for passing through construction portion bottom surface and lead to and pass through the access opening and to the left and right two The first of side elongation setting slides chamber, and the first cunning chamber right side extension mixes the lower position of chamber described in and intercommunication is set Put, the first cunning intracavitary neat fit has left and right to extend the slide plate set, and the slide plate left side elongation tip probes into described Described first on the left of access opening slides intracavitary and neat fit, and elongation tip is probeed on the right side of the access opening on the right side of the slide plate Described first slides intracavitary and neat fit, is provided with the first cunning chamber inner left wall and the slide plate left end face is connected Spring part, be provided with the tank being provided with the access opening intercommunication on the left of the slide plate in section, be provided with and deposit in section on the right side of the slide plate Put groove, described first, which slides be provided with that elongation downwards is set in the access opening inner left wall on the upside of chamber second, slides chamber, and described the Two, which slide the first cunning top of chamber intercommunication that chamber bottom extended tip is slided with described second below chamber, is set, and is put down in the access opening Sliding fit has jewel hole bar, and jewel hole bar top tip is fixedly connected with setting, the jewel hole bar with screw rod bottom tip Bottom stage is logical to pass through the tank and mating connection, the passage that the jewel hole bar bottom tip is probeed into below the first cunning chamber In hole, oblique cunning portion is fixedly installed in the tank on the left of the jewel hole bar, the second cunning intracavitary neat fit has and institute State the pushing block being fixedly connected on the left of jewel hole bar at the top of outer wall.
A kind of 3. efficiently power cable device according to claim 1, it is characterised in that:The access opening stirs with described Described first between mixed bottom of chamber portion tip slide intracavitary bottom wall with described first slide on the right side of the access opening on the downside of chamber inwall it Between intercommunication be provided with lower row's tank.
A kind of 4. efficiently power cable device according to claim 1, it is characterised in that:The storing unit includes institute The internal storage chamber set and the storing compartment being arranged in the storage chamber on the left of pedestal are stated, the storing compartment bottom is provided with cunning Wheel, the storing compartment are connected by the pulley with the storage chamber neat fit.
CN201710841232.3A 2017-09-18 2017-09-18 A kind of efficiently power cable device Withdrawn CN107587842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710841232.3A CN107587842A (en) 2017-09-18 2017-09-18 A kind of efficiently power cable device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710841232.3A CN107587842A (en) 2017-09-18 2017-09-18 A kind of efficiently power cable device

Publications (1)

Publication Number Publication Date
CN107587842A true CN107587842A (en) 2018-01-16

Family

ID=61048460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710841232.3A Withdrawn CN107587842A (en) 2017-09-18 2017-09-18 A kind of efficiently power cable device

Country Status (1)

Country Link
CN (1) CN107587842A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202280A (en) * 1995-11-13 1998-12-16 西门子公司 Method of introducing optical cable into solid bed
DE102005029595A1 (en) * 2005-06-23 2006-12-28 Nordmeyer Gmbh & Co. Kg Well drilling device, has deflection roller with sensor arranged to sense constantly or periodically whether roller is loaded by cable winch or chain, and emitting optical and/or acoustic signal to environment
CN204429278U (en) * 2015-01-17 2015-07-01 曲靖麒麟福牌印刷有限公司 A kind of novel glue-making tank-reactor device
CN204511287U (en) * 2015-03-26 2015-07-29 郑州巨业液压机械有限公司 A kind of drilling rod bidirectional hydraulic driving arrangement
CN106029988A (en) * 2014-01-31 2016-10-12 勒罗伊·G·哈根布赫 Cutter assembly with freewheeling cutting elements
CN106382094A (en) * 2016-11-30 2017-02-08 防城港市宝兴工艺品有限公司 Soil drilling device for mounting string bamboo fence
CN205950945U (en) * 2016-06-30 2017-02-15 重庆市潼南区太氏家具厂 Furniture plank puncher of abrasionproof
CN106437498A (en) * 2016-09-23 2017-02-22 青岛智享专利技术开发有限公司 Automatic opening device for pavement of underground power cable
CN106677539A (en) * 2017-03-10 2017-05-17 厦门市新岚五金工具有限公司 Integrated slurry pouring machine

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202280A (en) * 1995-11-13 1998-12-16 西门子公司 Method of introducing optical cable into solid bed
DE102005029595A1 (en) * 2005-06-23 2006-12-28 Nordmeyer Gmbh & Co. Kg Well drilling device, has deflection roller with sensor arranged to sense constantly or periodically whether roller is loaded by cable winch or chain, and emitting optical and/or acoustic signal to environment
CN106029988A (en) * 2014-01-31 2016-10-12 勒罗伊·G·哈根布赫 Cutter assembly with freewheeling cutting elements
CN204429278U (en) * 2015-01-17 2015-07-01 曲靖麒麟福牌印刷有限公司 A kind of novel glue-making tank-reactor device
CN204511287U (en) * 2015-03-26 2015-07-29 郑州巨业液压机械有限公司 A kind of drilling rod bidirectional hydraulic driving arrangement
CN205950945U (en) * 2016-06-30 2017-02-15 重庆市潼南区太氏家具厂 Furniture plank puncher of abrasionproof
CN106437498A (en) * 2016-09-23 2017-02-22 青岛智享专利技术开发有限公司 Automatic opening device for pavement of underground power cable
CN106382094A (en) * 2016-11-30 2017-02-08 防城港市宝兴工艺品有限公司 Soil drilling device for mounting string bamboo fence
CN106677539A (en) * 2017-03-10 2017-05-17 厦门市新岚五金工具有限公司 Integrated slurry pouring machine

Similar Documents

Publication Publication Date Title
CN106738340B (en) A kind of construction material blending device
CN106964270A (en) A kind of application device
CN107020038A (en) A kind of decorative paint device
CN106677539A (en) Integrated slurry pouring machine
CN107803528A (en) A kind of new letter box arrangement
CN107838477A (en) A kind of aluminum alloy materials installation drilling equipment for building
CN107199359A (en) A kind of aluminum alloy materials drilling equipment for building
CN107587842A (en) A kind of efficiently power cable device
CN107269223A (en) A kind of power cable equipment
CN107546654A (en) A kind of power cable device
CN108222850A (en) A kind of modified electric power cable unit
CN107313718A (en) A kind of power cable device
CN107439117A (en) A kind of quantitative fertilization device of solid-state fertilizer
CN209444331U (en) Self-action hydraulic mining drilling tool
CN107364012A (en) A kind of labor-saving bridging apparatus
CN108544499A (en) A kind of service robot device
CN205532269U (en) Just, anti - multi -functional rig that circulates
CN108481551A (en) A kind of cement mortar agitating device
CN107100231A (en) A kind of water conservancy equipment
CN107262778A (en) A kind of novel power cable equipment
CN107491147B (en) A kind of big data server apparatus
CN107740562A (en) A kind of sturdy device of the brick bat of construction and decoration
CN107377467A (en) A kind of power cable equipment
CN208880931U (en) Construction site easy cleaning cement mixer
CN209656329U (en) A kind of hydrographic water resource engineering bed mud in river sampler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180116

WW01 Invention patent application withdrawn after publication