CN107547256A - A kind of power telecom network Hardware In The Loop Simulation Method and system - Google Patents

A kind of power telecom network Hardware In The Loop Simulation Method and system Download PDF

Info

Publication number
CN107547256A
CN107547256A CN201710547016.8A CN201710547016A CN107547256A CN 107547256 A CN107547256 A CN 107547256A CN 201710547016 A CN201710547016 A CN 201710547016A CN 107547256 A CN107547256 A CN 107547256A
Authority
CN
China
Prior art keywords
data
node
processing unit
installing equipment
data processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710547016.8A
Other languages
Chinese (zh)
Inventor
谢迎军
汪洋
丁慧霞
王智慧
陈相舟
滕玲
纪鑫
张庚
方帅
仝杰
靳丹
李炜
王玉亭
黄辉
叶云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Information and Telecommunication Branch of State Grid Gansu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Information and Telecommunication Branch of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Information and Telecommunication Branch of State Grid Gansu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710547016.8A priority Critical patent/CN107547256A/en
Publication of CN107547256A publication Critical patent/CN107547256A/en
Pending legal-status Critical Current

Links

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a kind of power communication Hardware In The Loop Simulation Method and system, methods described to include:Installing equipment is mapped on dummy node, actual services data are sent to data processing unit by installing equipment, data processing unit is packaged and is loaded on dummy node to True Data, data are transmitted by virtual network and complete specific copying, and emulation data are extracted from dummy node and pass back to installing equipment;Described device includes map unit, acquiring unit, data processing unit, simulation unit and back propagation unit;The map unit is used to installing equipment being mapped to dummy node, the acquiring unit is used to installing equipment actual services data being sent to data processing unit, the data processing unit is used to be packaged actual services data, and it is loaded on simulation unit dummy node, the simulation unit is used to complete specific copying, and the back propagation unit is used to emulate data back to installing equipment.

Description

A kind of power telecom network Hardware In The Loop Simulation Method and system
Technical field
The present invention relates to communication network simulation field, more particularly, to a kind of power telecom network Hardware In The Loop Simulation Method And system.
Background technology
Power telecom network is the indispensable important component of modern power systems, is modern power network safe and stable operation One of three big pillars.It is collectively referred to as power system with the safety stabilization control system of power system, dispatch automated system Three big pillars of safe and stable operation.At present, it is even more power network schedule automation, the network operation marketization and management modernization Basis;Be to ensure that power grid security, stably, the important means of economical operation;It is the important infrastructure of power system.Due to electric power Communication network is to the reliability of communication, the rapidity of protection control information transmission and accuracy has and strict requirements, realizes electricity The simulated mass of power communication network is assessed, significant to improving power telecom network its construction level.
Currently, the simulated mass appraisal procedure of some power telecom networks has been proposed in academia, but in the essence of emulation In exactness and authenticity, however it remains many problems need to solve, and simulation data source is that pseudorandom produces, it is impossible to true reflection Current demand, examined from systemic angle;The module of more difficult accurate founding mathematical models in analogue system be present, it is non-linear because Element and influence of the enchancement factor to simulation result so that progress mathematical simulation is very difficult or is difficult to obtain ideal effect;Emulation System mathematic model in system can not proving correctness and result of mathematical simulation accuracy;Analogue system can not examine composition Some parts in kind of real system or the performance indications and reliability of whole system.
The content of the invention
In order to solve above mentioned problem existing for background technology, the invention provides a kind of power telecom network HWIL simulation Method and system, for power business communication network feature, corresponding installing equipment is accessed, builds semi-physical emulation platform;
A kind of method of power telecom network HWIL simulation, methods described include:
Step 1, the installing equipment in real power communication network is mapped on the dummy node in virtual network, makes actual load Equipment can be communicated with other dummy nodes in virtual network and each unit;
Step 2, installing equipment actual services data are sent to data processing unit;
Step 3, data processing unit is packaged to actual services data, and is loaded on dummy node;
Step 4, data are transmitted by virtual network, and specific copying is completed in virtual network;It is described logical Crossing the data that virtual network is transmitted includes the actual services data after encapsulation and emulation data;
Step 5, emulation data back is extracted to installing equipment from dummy node.
Further, the mapping of the installing equipment to dummy node refers to emulation server IP corresponding to installing equipment and void Intend node IP mapping, installing equipment is identified by IP address;
Further, business corresponding to the actual services data is thrown and moved back including relay protection, security and stability control, a distant place The data services such as the proprietary business of system and SCADA/EMS systems, measuring power angle system, electric energy metering system such as control;
Further, it is described that installing equipment actual services data are sent to data processing unit and carried from dummy node It is to be transmitted transmission by tunnel processing method to take emulation data to return to the method for installing equipment;The tunnel processing method refers to By establishing the data transmission tunnel of installing equipment and data processing unit, actual services data are Resealed and passed through Tunnel is sent to virtual network, or emulation data are unsealed and are back to installing equipment by tunnel;It is described to true industry The encapsulation of business data, which refers to, is modified to the purpose IP address of actual services data virtual IP address recognizable in corresponding analogue system Address, and interpolation data bag packet header, it is set to include specific routing iinformation;
Further, the virtual network is generated by simulation software, for carrying out the data transfer between dummy node;It is described Dummy node includes common simulation node and half node in kind;Common simulation node refers to the dummy node generated by simulation software, Half node in kind refers to mapping node of the installing equipment in artificial network;
Further, the artificial network includes physical layer, MAC layer, Internet and application layer, the application layer and number It is arranged side by side according to processing unit;When returning to installing equipment from dummy node extraction emulation data, the Internet of the dummy node connects After the data for receiving MAC layer, judge whether the dummy node is half node in kind, and half node in kind, then send the data in this way Data processing unit;Common simulation node in this way, then send the data to application layer;
Further, it is described to establish installing equipment and the data transmission tunnel of data processing unit refers to installing equipment to number Tunnel building request is sent according to processing unit;Whether data processing unit confirmation request data format is correct, obtains bandwidth demand And judge whether own node idling-resource meets bandwidth demand;Data processing unit bandwidth resource, and press tunnel building Tunnel path in request establishes swap table;Data processing unit is pressed to installing equipment passback tunnel building response, installing equipment Tunnel building response is reserved to respective bandwidth, and reserved completion confirmation is sent to data processing unit.
A kind of power telecom network semi-matter simulating system, the system include:
Map unit, the map unit are used to the installing equipment in real power communication network being mapped in virtual network Dummy node on;
Acquiring unit, the acquiring unit are used to installing equipment actual services data being sent to data processing unit;
Data processing unit, the data processing unit is used to be packaged actual services data, and is loaded into emulation On the dummy node of unit;
Simulation unit, the simulation unit are used to complete specific copying;
Back propagation unit, the back propagation unit are used to dummy node extracting emulation data back to installing equipment.
Further, the map unit makes to carry out between emulation server IP and dummy node IP corresponding to installing equipment Mapping, installing equipment is identified by IP address;
Further, business corresponding to the actual services data is thrown and moved back including relay protection, security and stability control, a distant place The data services such as the proprietary business of system and SCADA/EMS systems, measuring power angle system, electric energy metering system such as control;
Further, the acquiring unit and back propagation unit are transmitted transmission, the tunnel by tunnel processing method Road processing method refers to the data transmission tunnel by establishing installing equipment and data processing unit, and actual services data are carried out into weight It is new to encapsulate and sent by tunnel to virtual network, or emulation data are unsealed and installing equipment is back to by tunnel; The encapsulation to actual services data refers to that be modified to the purpose IP address of actual services data can in corresponding analogue system The virtual ip address of identification, and interpolation data bag packet header, it is set to include specific routing iinformation;
Further, the virtual network is generated by simulation software, for carrying out the data transfer between dummy node;It is described Dummy node includes common simulation node and half node in kind;Common simulation node refers to the dummy node generated by simulation software, Half node in kind refers to mapping node of the installing equipment in artificial network;
Further, the simulation unit includes physical layer, MAC layer, Internet and application layer, the application layer and number It is arranged side by side according to processing unit;When back propagation unit extracts emulation data back to installing equipment, the Internet of the dummy node connects After the data for receiving MAC layer, judge whether the dummy node is half node in kind, and half node in kind, then send the data in this way Data processing unit;Common simulation node in this way, then send the data to application layer;
Further, it is described to establish installing equipment and the data transmission tunnel of data processing unit refers to installing equipment to number Tunnel building request is sent according to processing unit;Whether data processing unit confirmation request data format is correct, obtains bandwidth demand And judge whether own node idling-resource meets bandwidth demand;Data processing unit bandwidth resource, and press tunnel building Tunnel path in request establishes swap table;Data processing unit is pressed to installing equipment passback tunnel building response, installing equipment Tunnel building response is reserved to respective bandwidth, and reserved completion confirmation is sent to data processing unit.
Beneficial effects of the present invention are:Technical scheme, give a kind of power telecom network HWIL simulation Method and system, methods described and system are directed to the feature of power business communication network, access corresponding installing equipment, and structure half is in kind Emulation platform, avoid because situations such as emulation is difficult to and reflects actual conditions and demand can not ensure the accuracy of emulation, Neng Gougeng Accurately, truly to assess, verifying powerline network running quality, reasonable simulation model, index system, network environment are built Good theory support is provided.
Brief description of the drawings
By reference to the following drawings, the illustrative embodiments of the present invention can be more fully understood by:
Fig. 1 is a kind of flow chart of power telecom network Hardware In The Loop Simulation Method of the specific embodiment of the invention;
Fig. 2 is a kind of structure chart of power telecom network semi-matter simulating system of the specific embodiment of the invention;
Fig. 3 is the connection diagram between the data processing unit and dummy node of the specific embodiment of the invention;And
Fig. 4 is that the dummy node of the specific embodiment of the invention extracts data back to the schematic flow sheet of installing equipment.
Embodiment
The illustrative embodiments of the present invention are introduced with reference now to accompanying drawing, however, the present invention can use many different shapes Formula is implemented, and is not limited to embodiment described herein, there is provided these embodiments are to disclose at large and fully The present invention, and fully pass on the scope of the present invention to person of ordinary skill in the field.Show for what is be illustrated in the accompanying drawings Term in example property embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements are attached using identical Icon is remembered.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has to person of ordinary skill in the field It is common to understand implication.Further it will be understood that the term limited with usually used dictionary, be appreciated that and its The linguistic context of association area has consistent implication, and is not construed as Utopian or overly formal meaning.
Fig. 1 is a kind of flow chart of power telecom network Hardware In The Loop Simulation Method of the specific embodiment of the invention;Such as Fig. 1 institutes Show, real equipment is mapped to dummy node first, by obtaining actual services data from installing equipment, and be loaded into void Intend on node, data are transmitted by virtual network, then extract data back from dummy node and complete emulation simultaneously to installing equipment Obtain emulating index result accordingly;
In a step 101, installing equipment is mapped to dummy node first;Described dummy node is right in simulation software The node of installing equipment is answered, described installing equipment truly sets for what actual access needed to emulate its business datum It is standby.Be mapping through " VLAN " of real equipment and virtual unit is completed;This process is by one kind by lan device The network segment one by one is logically divided into, so as to realize the Data Interchange Technology of virtual workgroup to complete;This technology by According to purposes on physical network, working group, using etc. carry out logical partitioning LAN, it is not related with the physical location of user. Equipment is identified based on IP address for this technology, and the real equipment IP of each access is recorded;This is mapped in management level Complete, each tunnel terminal is supplied to by a management channel;By the mapping, emulation server can on demand and virtually The related information of node switching;It is sent to from dummy node in emulation server to this property information cycle, keeps the true of access Device IP and the active state of virtual IP address mapping;The mapping of the installing equipment to dummy node refers to be emulated corresponding to installing equipment Server ip is mapped with dummy node IP, and installing equipment is identified by IP address;
In a step 102, installing equipment actual services data are sent to data processing unit;The actual services data are Access physical device transmits to obtain, wherein, described actual services data type includes:It is relay protection, security and stability control, remote Side, which is thrown, moves back the system equipments such as control, and the system equipment data such as SCADA/EMS systems, measuring power angle system, electrical energy metering; Data processing unit is input to by tunnel processing method after the business datum encapsulation of installing equipment transmission;
In step 103, data processing unit is packaged to actual services data, and is loaded on dummy node;Fig. 3 For data processing unit and dummy node connection diagram;In HWIL simulation, node is divided into common simulation node and half Node in kind;Common simulation node refers to the dummy node generated by simulation software;Half node in kind is that installing equipment is emulating Mapping node in network;During system modelling, half node in kind is replaced using data processing unit and the actual load network equipment Using layer model, and the interface of data processing unit and Internet, data processing unit and network installing equipment is developed, structure half Matter simulating system, the virtual network data in data and simulation software from real equipment are enable to interact;Wherein, Simulation software from installing equipment receive packet process be:Data processing unit receives the network that installing equipment is sent from tunnel Data;The network data received is packaged into the message in simulation software by data processing unit;Data processing unit will be packaged Message sending network layer;The network data received is packaged into the message needs in simulation software by described data processing unit The relevant informations such as the purpose IP address of packet are obtained by capture technique, are then obtained according to the purpose equipment of purpose IP address Its dummy node IP address information mapped, the form that this IP address information and other relevant informations can recognize that with simulation software It is encapsulated among the packet header of packet, the Internet of corresponding half node in kind is sent it to after the completion of encapsulation;
At step 104, data are transmitted by virtual network, and specific copying is completed in virtual network; The artificial network that virtual network is built for actual simulation software, using virtual network corresponding to different simulation softwares not Together;The data being transmitted by virtual network include the actual services data after encapsulation and emulation data;
In step 105, data back is extracted to installing equipment from dummy node;Fig. 4 is this step schematic diagram.Mainly set Three processes of score:After the Internet of node receives the data from MAC layer, judge whether the node is half node in kind, is Half node in kind then sends the data to data processing unit, is otherwise routed directly to application layer;Data processing unit processing receives Data, and it is packaged into the network data consistent with installing equipment form;Data are sent to reality by data processing unit by tunnel Install standby;Described decision node whether be half node in kind method for check the node whether with node in kind map, with The node of node mapping in kind is accordingly indicated that it is half node in kind to have the node accordingly indicated;Described is direct It is sent to application layer and refers to layered architecture in simulation software, existing simulation software has layered architecture mostly, if The node for receiving business datum is dummy node rather than half node in kind, then is transferred to its upper layer application, upper strata to its whether Forwarding is carried out to be judged;Data back is referred to encapsulate data into by the data processing unit to installing equipment to be set with actual load The consistent network data of standby form, the i.e. decapsulation to transmitting data in virtual network, reduce actual services data format.
Further, the installing equipment and the data transmission tunnel of data processing unit established is to pass through:
Installing equipment sends tunnel building request to data processing unit;Installing equipment is sending tunnel to data processing unit Road needs to obtain tunnel relevant information, such as the source in the tunnel, purpose, bandwidth demand, and tunnel path before establishing request Etc. information, these information are produced by control management equipment or human configuration planning, data processing unit receive from installing equipment Control message, and tunnel building request is obtained from the control message, it can also include reservation mode in tunnel building request Field, the field are used to indicate the mode taken when subsequently carrying out RSVP, are specifically as follows fixed form, or shared Mode, fixed form are the certain bandwidth of fixed occupancy, and the bandwidth uses only for current business, and sharing mode is reserved Bandwidth can be shared according to occupancy and other business.
Whether data processing unit confirmation request data format is correct, obtains bandwidth demand and judges the idle money of own node Whether source meets bandwidth demand;
Data processing unit bandwidth resource, and the tunnel path in being asked by tunnel building establishes swap table;
Data processing unit is responded to corresponding band to installing equipment passback tunnel building response, installing equipment by tunnel building Width is reserved, and reserved completion confirmation is sent to data processing unit.
Fig. 2 is a kind of structure chart of power telecom network semi-matter simulating system of the specific embodiment of the invention;Described one Kind power telecom network semi-matter simulating system includes:
Map unit 201, the map unit 201 are used to the installing equipment 200 in real power communication network being mapped to On dummy node in virtual network;
Acquiring unit 202, the acquiring unit 202 are used to the actual services data of installing equipment 200 being sent at data Manage unit 203;
Data processing unit 203, the data processing unit 203 is used to be packaged actual services data, and loads Onto the dummy node of simulation unit 204;
Simulation unit 204, the simulation unit 204 are used to complete specific copying;
Back propagation unit 205, the back propagation unit 205 are used to dummy node extracting emulation data back to installing equipment On 200.
Further, the map unit 201 make emulation server IP corresponding to installing equipment 200 and dummy node IP it Between mapped, installing equipment 200 is identified by IP address;
Further, business corresponding to the actual services data is thrown and moved back including relay protection, security and stability control, a distant place The data services such as the proprietary business of system and SCADA/EMS systems, measuring power angle system, electric energy metering system such as control;
Further, the acquiring unit 202 and back propagation unit 205 are transmitted transmission by tunnel processing method, The tunnel processing method refers to the data transmission tunnel by establishing installing equipment 200 and data processing unit 203, by true industry Business data are Resealed and sent by tunnel to virtual network, or emulation data are unsealed and returned by tunnel To installing equipment;The encapsulation to actual services data refers to is modified to corresponding imitate by the purpose IP address of actual services data The virtual ip address that can recognize that in true system, and interpolation data bag packet header, make it include specific routing iinformation;
Further, the dummy node includes common simulation node and half node in kind;Common simulation node refers to by imitating The dummy node of true Software Create, half node in kind refer to mapping node of the installing equipment in artificial network;
Further, the simulation unit includes physical layer, MAC layer, Internet and application layer, the application layer and number It is arranged side by side according to processing unit;When back propagation unit extracts emulation data back to installing equipment, the Internet of the dummy node connects After the data for receiving MAC layer, judge whether the dummy node is half node in kind, and half node in kind, then send the data in this way Data processing unit;Common simulation node in this way, then send the data to application layer;
Further, data processing unit is handled and then consigned to the virtual section in virtual network to business datum Point, dummy node transmit data service by virtual network, pass back to data processing unit by another dummy node, number It is honored as a queen according to processing unit solution and is transferred to outside installing equipment;
Further, described data processing unit obtains actual services data and needs to capture business datum, excellent Selection of land, capture packet need the data for including installing equipment and exchanging between each other;Dummy node is sent in packet Before, it is necessary to fall some special Packet Filterings according to customized rule;This capture technique includes three parts:First Individual module is a virtual device driver file;The function of described virtual device driver file was filter data These packets and are intactly transmitted to User space module by bag, should include the peculiar letter of certain operations system during this Breath.Second module provides a common interface for operating system platform;3rd module is independent of operating system, there is provided Higher technology.First, this capture technique needs to obtain the essential information of adapter, such as device name and description, is caught by this Obtain technology capture data and packet is mainly collected by bottom, when meeting certain condition, call readjustment, it is original by what is be collected into Packet consigns to dummy node.Described bottom refers to adapter;Preferably, this capture technique needs to possess filtering packet Engine, there is provided effective method goes to obtain some packets, wherein, there is module can compile boolean's filter expression of high level Being translated into one can be by the bytecode for the bottom that filter engine is explained.Preferably, this capture technique can enter to True Data bag Row analysis, on the form of a frame data, including MAC, IP head and other relevant informations.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the application can use the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the application can use the computer for wherein including computer usable program code in one or more The computer program production that usable storage medium is implemented on (including but is not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is with reference to the flow according to the method for the embodiment of the present application, equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processors of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which produces, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, so as in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
The present invention is described by reference to a small amount of embodiment.However, it is known in those skilled in the art, as What subsidiary Patent right requirement was limited, except the present invention other embodiments disclosed above equally fall the present invention's In the range of.
Normally, all terms used in the claims are all solved according to them in the usual implication of technical field Release, unless clearly being defined in addition wherein.All references " one/described/be somebody's turn to do (device, component etc.) " are all opened ground At least one example being construed in described device, component etc., unless otherwise expressly specified.Any method disclosed herein Step need not all be run with disclosed accurately order, unless explicitly stated otherwise.

Claims (14)

1. a kind of power telecom network Hardware In The Loop Simulation Method, methods described include:
Step 1, the installing equipment in real power communication network is mapped on the corresponding dummy node in virtual network, makes actual load Equipment can be communicated with other dummy nodes in virtual network and each unit;
Step 2, actual services data are sent to data processing unit by installing equipment;
Step 3, data processing unit is packaged to actual services data, and is loaded on dummy node;
Step 4, data are transmitted by virtual network, and specific copying is completed in virtual network;It is described to pass through void Intending the data that network is transmitted includes the actual services data after encapsulation and emulation data;
Step 5, emulation data back is extracted to installing equipment from dummy node.
2. according to the method for claim 1, it is characterised in that:The mapping of the installing equipment to dummy node refers to actual load and set Standby corresponding emulation server IP and dummy node IP is mapped, and installing equipment is identified by IP address.
3. according to the method for claim 1, it is characterised in that:Business corresponding to the actual services data is protected including relay Shield, security and stability control, a distant place, which are thrown, moves back the proprietary business of system and SCADA/EMS systems, measuring power angle system, the electric energy such as control The data services such as consumption metering system.
4. according to the method for claim 1, it is characterised in that:It is described that installing equipment actual services data are sent to data Processing unit and extract emulation data from dummy node to return to installing equipment be to be transmitted transmission by tunnel processing method; The tunnel processing method refers to the data transmission tunnel by establishing installing equipment and data processing unit, by actual services data Resealed and sent by tunnel to virtual network, or emulation data are unsealed and actual load is back to by tunnel Equipment;The encapsulation to actual services data refers to is modified to corresponding analogue system by the purpose IP address of actual services data In the virtual ip address that can recognize that, and interpolation data bag packet header makes it include specific routing iinformation.
5. according to the method for claim 1, it is characterised in that:The virtual network is generated by simulation software, for carrying out Data transfer between dummy node;The dummy node includes common simulation node and half node in kind;Common simulation node refers to The dummy node generated by simulation software, half node in kind refer to mapping node of the installing equipment in artificial network.
6. according to the method described in claim 4 and 5, it is characterised in that:The artificial network includes physical layer, MAC layer, net Network layers and application layer, the application layer and data processing unit are arranged side by side;Actual load is returned to when extracting emulation data from dummy node During equipment, after the Internet of the dummy node receives the data of MAC layer, judge whether the dummy node is half section in kind Point, half node in kind, then send the data to data processing unit in this way;Common simulation node in this way, then send the data to apply Layer.
7. according to the method for claim 4, it is characterised in that:The data for establishing installing equipment and data processing unit Transmission tunnel refers to that installing equipment sends tunnel building request to data processing unit;Data processing unit confirmation request data lattice Whether formula is correct, obtains bandwidth demand and judges whether own node idling-resource meets bandwidth demand;Data processing unit is pre- Bandwidth resources are stayed, and the tunnel path in being asked by tunnel building establishes swap table;Data processing unit returns to installing equipment Tunnel building is responded, and installing equipment is reserved by tunnel building response to respective bandwidth, and reserved completion confirmation is sent out Deliver to data processing unit.
8. a kind of power telecom network semi-matter simulating system, the system include:
Map unit, the map unit are used for the void being mapped to the installing equipment in real power communication network in virtual network Intend on node;
Acquiring unit, the acquiring unit are used to installing equipment actual services data being sent to data processing unit;
Data processing unit, the data processing unit is used to be packaged actual services data, and is loaded into simulation unit Dummy node on;
Simulation unit, the simulation unit are used to complete specific copying;
Back propagation unit, the back propagation unit are used to dummy node extracting emulation data back to installing equipment.
9. system according to claim 8, it is characterised in that:The map unit makes service of simulation corresponding to installing equipment Mapped between device IP and dummy node IP, installing equipment is identified by IP address.
10. system according to claim 8, it is characterised in that:Business includes relay corresponding to the actual services data Protection, security and stability control, a distant place, which are thrown, moves back the proprietary business of system and SCADA/EMS systems, measuring power angle system, the electricity such as control The data services such as energy meter system.
11. system according to claim 8, it is characterised in that:The acquiring unit and back propagation unit by tunnel at Reason method is transmitted transmission, and the tunnel processing method refers to the data transfer by establishing installing equipment and data processing unit Tunnel, actual services data are Resealed and sent by tunnel to virtual network, or emulation data are unsealed And installing equipment is back to by tunnel;The encapsulation to actual services data refers to the purpose IP address of actual services data The virtual ip address that can recognize that in corresponding analogue system, and interpolation data bag packet header are modified to, it is included specific route Information.
12. system according to claim 8, it is characterised in that:The virtual network is generated by simulation software, for carrying out Data transfer between dummy node;The dummy node includes common simulation node and half node in kind;Common simulation node refers to The dummy node generated by simulation software, half node in kind refer to mapping node of the installing equipment in artificial network.
13. according to the system described in claim 11 and 12, it is characterised in that:The simulation unit includes physical layer, MAC Layer, Internet and application layer, the application layer and data processing unit are arranged side by side;Arrived when back propagation unit extracts emulation data back During installing equipment, after the Internet of the dummy node receives the data of MAC layer, judge whether the dummy node is half in kind Node, half node in kind, then send the data to data processing unit in this way;Common simulation node in this way, then sending the data to should With layer.
14. according to the method for claim 11, it is characterised in that:The number for establishing installing equipment and data processing unit Refer to that installing equipment sends tunnel building request to data processing unit according to transmission tunnel;Data processing unit confirmation request data Whether form is correct, obtains bandwidth demand and judges whether own node idling-resource meets bandwidth demand;Data processing unit Bandwidth resource, and the tunnel path in being asked by tunnel building establishes swap table;Data processing unit returns to installing equipment Tunnel building response is passed, installing equipment is reserved by tunnel building response to respective bandwidth, and by reserved completion confirmation Send to data processing unit.
CN201710547016.8A 2017-07-06 2017-07-06 A kind of power telecom network Hardware In The Loop Simulation Method and system Pending CN107547256A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710547016.8A CN107547256A (en) 2017-07-06 2017-07-06 A kind of power telecom network Hardware In The Loop Simulation Method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710547016.8A CN107547256A (en) 2017-07-06 2017-07-06 A kind of power telecom network Hardware In The Loop Simulation Method and system

Publications (1)

Publication Number Publication Date
CN107547256A true CN107547256A (en) 2018-01-05

Family

ID=60970934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710547016.8A Pending CN107547256A (en) 2017-07-06 2017-07-06 A kind of power telecom network Hardware In The Loop Simulation Method and system

Country Status (1)

Country Link
CN (1) CN107547256A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111464367A (en) * 2020-04-21 2020-07-28 深圳信息职业技术学院 Method, device, computer equipment and storage medium for establishing virtual communication connection
CN111781890A (en) * 2020-07-14 2020-10-16 厦门海为科技有限公司 Multi-equipment engineering communication method and system in configuration engineering
CN114448538A (en) * 2020-11-03 2022-05-06 中国兵器科学研究院 Radio station series-parallel communication simulation system and simulation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807795A (en) * 2010-02-12 2010-08-18 重庆电力科学试验研究院 Method for forming electric energy metering simulation system and device thereof
CN103200190A (en) * 2013-03-26 2013-07-10 北京理工大学 Physical accessing method facing QualNet network semi-physical simulation
CN104570768A (en) * 2014-12-31 2015-04-29 浙江大学 Information physics semi-physical simulation system based on Rt-Lab and OPNET
CN105807629A (en) * 2014-12-30 2016-07-27 南车株洲电力机车研究所有限公司 Grid-connected photovoltaic power generation semi-physical simulation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807795A (en) * 2010-02-12 2010-08-18 重庆电力科学试验研究院 Method for forming electric energy metering simulation system and device thereof
CN103200190A (en) * 2013-03-26 2013-07-10 北京理工大学 Physical accessing method facing QualNet network semi-physical simulation
CN105807629A (en) * 2014-12-30 2016-07-27 南车株洲电力机车研究所有限公司 Grid-connected photovoltaic power generation semi-physical simulation system
CN104570768A (en) * 2014-12-31 2015-04-29 浙江大学 Information physics semi-physical simulation system based on Rt-Lab and OPNET

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111464367A (en) * 2020-04-21 2020-07-28 深圳信息职业技术学院 Method, device, computer equipment and storage medium for establishing virtual communication connection
CN111464367B (en) * 2020-04-21 2022-09-16 深圳信息职业技术学院 Method, device, computer equipment and storage medium for establishing virtual communication connection
CN111781890A (en) * 2020-07-14 2020-10-16 厦门海为科技有限公司 Multi-equipment engineering communication method and system in configuration engineering
CN114448538A (en) * 2020-11-03 2022-05-06 中国兵器科学研究院 Radio station series-parallel communication simulation system and simulation method thereof
CN114448538B (en) * 2020-11-03 2024-01-26 中国兵器科学研究院 Communication simulation system and simulation method for radio station series-parallel connection

Similar Documents

Publication Publication Date Title
CN109802852B (en) Method and system for constructing network simulation topology applied to network target range
EP2907059B1 (en) Computer implemented method for hybrid simulation of power distribution network and associated communication network for real time applications
CN103684893B (en) A kind of network simulation analytical equipment and method
CN104065398B (en) A kind of electric power communication network network merges method for designing and the system of test platform
CN102164058A (en) IEC61850 standard transformer substation based communication network and system test method
CN106375142A (en) Application program test method and apparatus
CN110213233B (en) Simulation method and simulation platform for defending against power grid distributed denial of service attack and establishment method thereof
CN107547256A (en) A kind of power telecom network Hardware In The Loop Simulation Method and system
CN104750911A (en) Transformer substation information protection sub-station simulation modeling method
CN106411637A (en) Internet-of-things device scenario testing method
CN108306753A (en) Simulator, test method and the system of a kind of Ith area data communication network shutdown
CN108650111A (en) Information security electric power semi-physical emulation platform building method and system
CN106452850A (en) SDN controller performance testing method and system
Tong et al. Flexible hardware‐in‐the‐loop testbed for cyber physical power system simulation
CN115576289A (en) Reconfigurable high-fidelity large-scale industrial internet simulation platform based on virtualization technology
CN109074280A (en) Network function virtualization
CN106970537A (en) Electric power and communication semi-matter simulating system and construction method based on RTDS and SDH
CN105847076B (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN110865263A (en) Intelligent substation virtual test method based on minimum test system
CN114707236A (en) Model-based virtual-real combined simulation test method
Klaer et al. Graph-based model of smart grid architectures
Soares et al. Enabling emulation and evaluation of iec 61850 networks with titan
CN107483284A (en) The method of testing and device of the network equipment
CN102075362A (en) Communication network simulation method and system
Pieper et al. Distributed co-simulation for software-in-the-loop testing of networked railway systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105