CN107546736A - A kind of virtual regulating units dispatching method based on automatic demand response - Google Patents

A kind of virtual regulating units dispatching method based on automatic demand response Download PDF

Info

Publication number
CN107546736A
CN107546736A CN201610487750.5A CN201610487750A CN107546736A CN 107546736 A CN107546736 A CN 107546736A CN 201610487750 A CN201610487750 A CN 201610487750A CN 107546736 A CN107546736 A CN 107546736A
Authority
CN
China
Prior art keywords
user
capacity
power
power network
demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610487750.5A
Other languages
Chinese (zh)
Inventor
张剑
李洪宾
袁新润
徐彤
田娜
曹筱欧
刘建宇
秦丽洁
李禹瞳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610487750.5A priority Critical patent/CN107546736A/en
Publication of CN107546736A publication Critical patent/CN107546736A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of virtual regulating units dispatching method based on automatic demand response, using the fast tunable section load of user side as a kind of virtual quick regulating units, participate in the interactive operation of power network, capacity can be responded including user's automatic data collection, uploaded in real time to power network by the two-way interaction information model between power network and user and feed back participation state, power network carries out capacity fitting and issues the steps such as execution.Pass through quick, the effective regulation and control to user side deferrable load, a kind of virtual peak regulation standby resources are provided to power network, when generated output is difficult to meet power network quickly increased workload demand, load quick regulation electricity consumption in dispatcher-controlled territory, reduce load, equivalent to a kind of virtual spinning reserve unit, to alleviate power network supply and demand anxiety.

Description

A kind of virtual regulating units dispatching method based on automatic demand response
Technical field
The present invention relates to dispatching of power netwoks field, especially a kind of virtual regulating units based on automatic demand response Dispatching method.
Background technology
By years development, China's dispatching of power netwoks has achieved tremendous development, establishes highly reliable with one Basic platform and " monitoring in real time and early warning, management and running, operation plan, Security Checking " four major class applications The dispatch automated system of composition, realize reliable scheduling and management to power network, strong guarantee power network fortune Capable security and economy.Because power supply with demand must keep balancing in good time, therefore must in system Certain spare capacity must be left, avoids causing surely when generating set forced outage, negative rules fluctuation Qualitative destruction, the configuration of spinning reserve are the major issues for needing to consider in a dispatching of power netwoks operation.
The problem of configuration of spinning reserve is substantially system operation reliability and economy integrated decision-making, works as system When possessing higher spinning reserve capacity, reliability is higher, but economy is poor;The on the contrary then reliability of system Difference and good economy performance.At present, dispatching of power netwoks is conceived to safety and reliability premise more, according to《Power system skill Art directive/guide》Regulation, to ensure the demand of spare capacity and acquisition, its stand by margin is generally the one of load Certainty ratio, such as 10%-20% or equal to system maximum single-machine capacity, reliability basic guarantee, economy deficiency.
Dsm provides the different another thinking of more traditional dispatching of power netwoks " generating follows load ", The burdened resource of user side is transferred, actively adjusts power network peak-valley difference.The Central Committee of the Communist Party of China in 2015, State Council's hair Cloth《Some opinions on further in-depth power system reform》(No. 9 texts), it is indicated that " further lifting with Equilibrium of supply and demand safeguard level based on dsm.Relevant government department will according to the marketization direction, from Demand-side and the aspect of supply side two are started with, and do quantity of electricity whole machine balancing well.The safety for improving supply of electric power can By level." but up to the present, due to the huge uncertainty of load responding, there is no method by the active of load, Quick regulation lifting, with level, is carried out orderly to the standby level of dispatching of power netwoks real time rotation to load The fast dispatch method of combination.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of virtual regulating units tune based on automatic demand response Degree method, it can reduce network load management workload, improve power supply reliability and flexibility, have very Big economic results in society.
In order to solve the above-mentioned technical problem, a kind of virtual regulating units based on automatic demand response of the invention Dispatching method comprises the following steps:
1) role and the function structure of participant are determined;
Participant includes Load Regulation main website, user mutual terminal, user's energy at power network demand response center Management system and adjustable electrical equipment, wherein Load Regulation main website mainly complete demand response target capacity It is determined that, the participation opinion for responding capacity and feedback that gathers and collect institute accessing user, fitting user's distribution Response capacity simultaneously issues;User mutual terminal mainly realizes Load Regulation main website and user side energy management system Information exchange medium, user can be responded into capacity and report main website, the regulating command of main website is received and feed back ginseng With state;User side energy management system specifically collects adjustable electrical equipment, gathers its real time execution power, Calculating can respond capacity, and the regulation target issued according to user mutual terminal, and control device performs demand and rung Should;
2) the two-way interaction information model at power network demand response center and user mutual terminal room is established;
1. user is to power network upload information:
A1 user's real time execution power message:User's mark, real-time active power, reactive power power,
A2 user can respond capacity message:User's mark, maximum can respond capacity, most I response capacity,
A3 user participates in demand response confirmation message:Whether user identifies, participates in, responds time started, sound End time, power adjustment value are answered,
2. power network is to photos and sending messages under user:
B1 demand responses quick regulation instructs:User's mark, response time started, response end time, work( Rate regulated value,
The transmission of information above can use the communication protocol that public or mutual concession confirms;
3) user mutual terminal can gather the responding ability of adjustable electrical equipment in real time, and pass through step 2) In information model to power network demand response center upload can respond capacity data;
4) power network demand response center is used according to target capacity using the sort method based on user feedback Family combination arranges;
1. determining network load regulation target, determined according to the actual conditions of the power network equilibrium of supply and demand, can be electricity Appropriate reduction, the operation of fluctuation regenerative resource of power the load breach, system peak load that supply falls short of demand Demand;
2. collection user can respond capacity, each by the real-time Communication for Power with user's energy management system, collection What user assessed responds capacity;
3. user selects and capacity arrangement is to adjust target and user according to network load to respond capacity, it is determined that The user of participation and its response time and capacity, the method for use are mainly based upon the FIFO of user feedback Ranking method;
4. according to user feedback time order and function, queue is put into;
5. gradually extracting the user in queue, capacity can be responded in real time by gathering it, be fitted;
6. after response capacity reaches target capacity, stop, that is, complete the fitting of user;Such as whole users Off-capacity is responded, then is fed back to Generation Side scheduling, starting-generating scheduling flow;
5) power network demand response center issues demand response instruction;
Sent out according to the fitting result of step 4) to the user mutual terminal for participating in user at power network demand response center Regulating command is sent, instruction message receives user feedback message and carried out really according to the information model in step 2) Recognize;
6) user mutual terminal is decomposed according to capacity is issued, and control adjustable apparatus performs;
User mutual terminal is after the response time starts, to user's energy management system or adjustable electrical equipment Control command is issued, to control adjustable electrical equipment to complete power adjusting target.
The beneficial effects of the invention are as follows:The virtual regulating units dispatching method of the present invention, can support demand to ring The execution answered:By the two-way communication of power network demand response center and user's energy efficiency management system, to power network area Deferrable load in domain is grasped comprehensively, effectively transfers the deferrable load resource of whole society's power consumer, real Existing harmonious electricity consumption, reduces and the large scale of user is rationed the power supply, and improves power supply quality, is improving user's satisfaction Degree, reduction network load management workload, raising power supply reliability and flexibility etc. have great potential, With very big economic results in society, for a user, realized by user's energy efficiency management system and equipment is transported The real-time collection of row situation, flexible configuration management is carried out to deferrable load and automatic/hand state of a control is cut Change, there is flexible response input to be born with exiting ability, the reliable section that the present invention is grasped in power network compass of competency Lotus capacity, improve the degree of accuracy of Load Regulation;Simultaneously provide user become more meticulous excavate electricity consumption means, fill Divide the basis using user's energy efficiency management system, to coordinate grid company to complete spatial load forecasting very well, to ensure The harmonious power supply of power network.
Embodiment
The present invention is further detailed explanation below:
The invention discloses a kind of virtual regulating units dispatching method based on automatic demand response, in this method At demand response center, from power network level, fitting is ranked up to the user's combination and capacity for participating in scheduling; User side, fitting is combined to the electrical equipment and power for participating in regulation;Demand response center also can be to tool The equipment for having larger regulating power is directly fitted, wherein, virtual regulating units refer to the adjustable of scheduling Load, unit fitting refer to the load selection participated in and capacity.At power network demand response center, virtual peak regulation Unit fitting refers to the user for participating in response or equipment combination and pondage, and fitting content includes:User marks Know, respond time started, Load Regulation capacity, response end time;In user side, virtual regulating units Fitting refers to the user for participating in response, according to schedule, determines electrical equipment combination and capacity, in fitting Appearance includes:Device name, control time started, pondage, control end time;Propose use simultaneously The illumination of family side, motor, air conditioner load can respond the computational methods of capacity;Its pondage can be positive regulator, It can also be negative regulator, i.e., increase the load of designated capabilities at the appointed time or reduce the load of designated capabilities; User is supported to feed back the implementing result of fitting.This method can successively be run.
A kind of virtual regulating units dispatching method based on automatic demand response of the present invention comprises the following steps:
1) role and the function structure of participant are determined;
Participant includes Load Regulation main website, user mutual terminal, user's energy at power network demand response center Management system and adjustable electrical equipment, wherein Load Regulation main website mainly complete demand response target capacity It is determined that, the participation opinion for responding capacity and feedback that gathers and collect institute accessing user, fitting user's distribution Response capacity simultaneously issues;User mutual terminal mainly realizes Load Regulation main website and user side energy management system Information exchange medium, user can be responded into capacity and report main website, the regulating command of main website is received and feed back ginseng With state;User side energy management system specifically collects adjustable electrical equipment, gathers its real time execution power, Calculating can respond capacity, and the regulation target issued according to user mutual terminal, and control device performs demand and rung Should;
2) the two-way interaction information model at power network demand response center and user mutual terminal room is established;
1. user is to power network upload information:
A1 user's real time execution power message:User's mark, real-time active power, reactive power power,
A2 user can respond capacity message:User's mark, maximum can respond capacity, most I response capacity,
A3 user participates in demand response confirmation message:Whether user identifies, participates in, responds time started, sound End time, power adjustment value are answered,
2. power network is to photos and sending messages under user:
B1 demand responses quick regulation instructs:User's mark, response time started, response end time, work( Rate regulated value,
The transmission of information above can use the communication protocol that public or mutual concession confirms;
3) user mutual terminal can gather the responding ability of adjustable electrical equipment in real time, and pass through step 2) In information model to power network demand response center upload can respond capacity data;
Common fast tunable nodal pattern load (adjustable electrical equipment) mainly includes illumination (tunable optical/close Light fixture), variable frequency adjustment motor, central air-conditioning, user's energy storage device etc., each type load responds capacity (Pr) Computational methods are as follows:
1. illuminate Pr=Pi-Pn*Wi
Pi:The realtime power of adjustable light fixture or lighting loop (lighting loop is more feasible at this stage);
Pn:Equipment rated power
Si:The solar radiation factor, i.e., the illumination minimum brightness limit value in the case of various typical sunshines, is specifically pushed away Recommend value:0 is can be taken as in the case of the good sunshine of fine day;Cloudy day on daytime can be taken as 0.5;Sunrise is to 8 a.m. Preceding or at 16 points in afternoon to post sunset, can be taken as 0.8;It can be taken as 1 at night;User can also build according to itself Daylighting or optical sensor situation are configured;
It is specific when calculating, optical sensor can be gathered by gathering the realtime power Pi of light fixture or lighting loop Or system clock, with reference to the rated power and the solar radiation factor of configuration, calculate in real time credible, controllable Illumination can respond capacity;To the less demanding occasion of illumination, when light fixture can be closed, how controlled, Pr=Pi;
2. variable frequency adjustment motor
Pr=Pi-Pn*Ni
Nmin<Ni<Nmax
Pi:The actual power of motor operation;
Ni:Rotating speed factor of influence, the motor operation performance number under different rotating speeds is determined, can configure rotating speed-power Table or rotating speed power curve are to calculate.
The minimum and maximum rotational speed limit that Nmin and Nmax refers to motor operation (has with regulation performance, efficiency level Close);
3. central air-conditioning
Central air conditioner system is complicated, and it is relevant with the Comprehensive Control of each relevant device to respond capacity, needs basis can The motor conditions of control are arranged, it is considered herein that by adjustable electrical equipment carry out packet control (P1, P2...Pn represents every group and responds capacity)
Pr=Pi-C (n, m)
C (n, m) represents to close the power accumulated value of m group air-conditioning packet equipments;
The variable capacity of interruptible load is the real time execution power of interruptible load, if user's is adjustable negative Lotus is arranged to non-automatic controllable state, then corresponding variable capacity is zero;
User's energy management system after the response capacity data collection computing of adjustable load, passes through step by more than Rapid information model 2) is to sending on demand response center;
4) power network demand response center is used according to target capacity using the sort method based on user feedback Family combination arranges;
1. determining network load regulation target, determined according to the actual conditions of the power network equilibrium of supply and demand, can be electricity Appropriate reduction, the operation of fluctuation regenerative resource of power the load breach, system peak load that supply falls short of demand Demand;
2. collection user can respond capacity, each by the real-time Communication for Power with user's energy management system, collection What user assessed responds capacity;
3. user selects and capacity arrangement is to adjust target and user according to network load to respond capacity, it is determined that The user of participation and its response time and capacity, the method for use are mainly based upon the FIFO of user feedback Ranking method;
4. according to user feedback time order and function, queue is put into;
5. gradually extracting the user in queue, capacity can be responded in real time by gathering it, be fitted;
6. after response capacity reaches target capacity, stop, that is, complete the fitting of user;Such as whole users Off-capacity is responded, then is fed back to Generation Side scheduling, starting-generating scheduling flow;
5) power network demand response center issues demand response instruction;
Sent out according to the fitting result of step 4) to the user mutual terminal for participating in user at power network demand response center Regulating command is sent, instruction message receives user feedback message and carried out really according to the information model in step 2) Recognize;
6) user mutual terminal is decomposed according to capacity is issued, and control adjustable apparatus performs;
User mutual terminal is after the response time starts, to user's energy management system or adjustable electrical equipment Control command is issued, to control adjustable electrical equipment to complete power adjusting target.
In summary, present disclosure is not limited in the above embodiments, those skilled in the art Other embodiments can be proposed within the technological guidance's thought of the present invention, but these embodiments are included in Within the scope of the present invention.

Claims (1)

  1. A kind of 1. virtual regulating units dispatching method based on automatic demand response, it is characterised in that including with Lower step:
    1) role and the function structure of participant are determined;
    Participant includes Load Regulation main website, user mutual terminal, user's energy at power network demand response center Management system and adjustable electrical equipment, wherein Load Regulation main website mainly complete demand response target capacity It is determined that, the participation opinion for responding capacity and feedback that gathers and collect institute accessing user, fitting user's distribution Response capacity simultaneously issues;User mutual terminal mainly realizes Load Regulation main website and user side energy management system Information exchange medium, user can be responded into capacity and report main website, the regulating command of main website is received and feed back ginseng With state;User side energy management system specifically collects adjustable electrical equipment, gathers its real time execution power, Calculating can respond capacity, and the regulation target issued according to user mutual terminal, and control device performs demand and rung Should;
    2) the two-way interaction information model at power network demand response center and user mutual terminal room is established;
    1. user is to power network upload information:
    A1 user's real time execution power message:User's mark, real-time active power, reactive power power,
    A2 user can respond capacity message:User's mark, maximum can respond capacity, most I response capacity,
    A3 user participates in demand response confirmation message:Whether user identifies, participates in, responds time started, sound End time, power adjustment value are answered,
    2. power network is to photos and sending messages under user:
    B1 demand responses quick regulation instructs:User's mark, response time started, response end time, work( Rate regulated value,
    The transmission of information above can use the communication protocol that public or mutual concession confirms;
    3) user mutual terminal can gather the responding ability of adjustable electrical equipment in real time, and pass through step 2) In information model to power network demand response center upload can respond capacity data;
    4) power network demand response center is used according to target capacity using the sort method based on user feedback Family combination arranges;
    1. determining network load regulation target, determined according to the actual conditions of the power network equilibrium of supply and demand, can be electricity Appropriate reduction, the operation of fluctuation regenerative resource of power the load breach, system peak load that supply falls short of demand Demand;
    2. collection user can respond capacity, each by the real-time Communication for Power with user's energy management system, collection What user assessed responds capacity;
    3. user selects and capacity arrangement is to adjust target and user according to network load to respond capacity, it is determined that The user of participation and its response time and capacity, the method for use are mainly based upon the FIFO of user feedback Ranking method;
    4. according to user feedback time order and function, queue is put into;
    5. gradually extracting the user in queue, capacity can be responded in real time by gathering it, be fitted;
    6. after response capacity reaches target capacity, stop, that is, complete the fitting of user;Such as whole users Off-capacity is responded, then is fed back to Generation Side scheduling, starting-generating scheduling flow;
    5) power network demand response center issues demand response instruction;
    Sent out according to the fitting result of step 4) to the user mutual terminal for participating in user at power network demand response center Regulating command is sent, instruction message receives user feedback message and carried out really according to the information model in step 2) Recognize;
    6) user mutual terminal is decomposed according to capacity is issued, and control adjustable apparatus performs;
    User mutual terminal is after the response time starts, to user's energy management system or adjustable electrical equipment Control command is issued, to control adjustable electrical equipment to complete power adjusting target.
CN201610487750.5A 2016-06-26 2016-06-26 A kind of virtual regulating units dispatching method based on automatic demand response Pending CN107546736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610487750.5A CN107546736A (en) 2016-06-26 2016-06-26 A kind of virtual regulating units dispatching method based on automatic demand response

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610487750.5A CN107546736A (en) 2016-06-26 2016-06-26 A kind of virtual regulating units dispatching method based on automatic demand response

Publications (1)

Publication Number Publication Date
CN107546736A true CN107546736A (en) 2018-01-05

Family

ID=60961924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610487750.5A Pending CN107546736A (en) 2016-06-26 2016-06-26 A kind of virtual regulating units dispatching method based on automatic demand response

Country Status (1)

Country Link
CN (1) CN107546736A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108510158A (en) * 2018-03-07 2018-09-07 南方电网科学研究院有限责任公司 A kind of interregional formulating method and device sent by electricity plan
CN112529372A (en) * 2020-11-26 2021-03-19 国电南瑞科技股份有限公司 Accurate load regulation and control method considering user satisfaction
CN112819275A (en) * 2020-12-31 2021-05-18 上海玫克生储能科技有限公司 Intelligent device and method for regulating power peak valley by user participating in power distribution network
CN113437764A (en) * 2021-05-21 2021-09-24 国网辽宁省电力有限公司鞍山供电公司 Source-load interaction peak regulation strategy based on active control of fused magnesium
CN113487151A (en) * 2021-06-23 2021-10-08 广东润建电力科技有限公司 Intelligent power utilization and demand side response method, system and device based on 5G message
CN113612220A (en) * 2021-06-23 2021-11-05 国网浙江省电力有限公司嘉兴供电公司 Power carrier technology-based household appliance power utilization optimization control method
CN116388205A (en) * 2023-06-06 2023-07-04 中国电力科学研究院有限公司 Load equipment power regulation and control method and device suitable for intelligent energy unit
CN116544935A (en) * 2023-07-06 2023-08-04 中国电力科学研究院有限公司 Optimization control method and device for motor loads participating in demand response
CN117273557A (en) * 2023-11-20 2023-12-22 杭州轻舟科技有限公司 User virtual power plant operation method based on light-EMS, electronic equipment and medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105470971A (en) * 2016-01-12 2016-04-06 中国电力科学研究院 Flexible adaptive power load control system and control method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105470971A (en) * 2016-01-12 2016-04-06 中国电力科学研究院 Flexible adaptive power load control system and control method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108510158A (en) * 2018-03-07 2018-09-07 南方电网科学研究院有限责任公司 A kind of interregional formulating method and device sent by electricity plan
CN108510158B (en) * 2018-03-07 2020-12-18 南方电网科学研究院有限责任公司 Method and device for making inter-area power transmission and reception plan
CN112529372A (en) * 2020-11-26 2021-03-19 国电南瑞科技股份有限公司 Accurate load regulation and control method considering user satisfaction
CN112529372B (en) * 2020-11-26 2022-09-16 国电南瑞科技股份有限公司 Accurate load regulation and control method considering user satisfaction
CN112819275A (en) * 2020-12-31 2021-05-18 上海玫克生储能科技有限公司 Intelligent device and method for regulating power peak valley by user participating in power distribution network
CN113437764A (en) * 2021-05-21 2021-09-24 国网辽宁省电力有限公司鞍山供电公司 Source-load interaction peak regulation strategy based on active control of fused magnesium
CN113612220A (en) * 2021-06-23 2021-11-05 国网浙江省电力有限公司嘉兴供电公司 Power carrier technology-based household appliance power utilization optimization control method
CN113487151A (en) * 2021-06-23 2021-10-08 广东润建电力科技有限公司 Intelligent power utilization and demand side response method, system and device based on 5G message
CN116388205A (en) * 2023-06-06 2023-07-04 中国电力科学研究院有限公司 Load equipment power regulation and control method and device suitable for intelligent energy unit
CN116388205B (en) * 2023-06-06 2023-08-11 中国电力科学研究院有限公司 Load equipment power regulation and control method and device suitable for intelligent energy unit
CN116544935A (en) * 2023-07-06 2023-08-04 中国电力科学研究院有限公司 Optimization control method and device for motor loads participating in demand response
CN116544935B (en) * 2023-07-06 2023-12-19 中国电力科学研究院有限公司 Optimization control method and device for motor loads participating in demand response
CN117273557A (en) * 2023-11-20 2023-12-22 杭州轻舟科技有限公司 User virtual power plant operation method based on light-EMS, electronic equipment and medium
CN117273557B (en) * 2023-11-20 2024-04-19 杭州轻舟科技有限公司 User virtual power plant operation method based on light-EMS, electronic equipment and medium

Similar Documents

Publication Publication Date Title
CN107546736A (en) A kind of virtual regulating units dispatching method based on automatic demand response
CN107528385B (en) A kind of source net lotus control method for coordinating and system based on new energy consumption
CN102427244B (en) Large-scale photovoltaic wind power information accessing system
CN105006846B (en) A kind of wind energy turbine set station level active power optimization method
CN103050989B (en) A kind of cluster wind power plant active power intelligent control system and method
CN109103893A (en) A kind of cluster temperature control load participates in the auxiliary frequency modulation method of power grid AGC
CN202696272U (en) Wind power farm operation concentrated monitoring system
CN105978043B (en) Photovoltaic plant multi-inverter active power controller method
CA2814864A1 (en) Method and system facilitating control strategy for power electronics interface of distributed generation resources
CN104037805B (en) A kind of photovoltaic plant taking into account power system security constraints can power generation margin distribution method
CN105226726B (en) A kind of photovoltaic plant centralized monitoring system
CN104810851B (en) Load regulation speed dynamic regulating method and device under AGC mode of thermal power generating unit
CN105244912B (en) Active power distribution network isolated island restores electricity and black-start method
CN103545849A (en) Framework with wind electricity participating in system frequency modulation control
CN102244677A (en) Green energy Cloud computing method and system
CN112838603B (en) Wind-solar energy storage and pumping multi-source energy AGC coordinated complementary control method and device
CN104037817A (en) Method for controlling automatic starting and automatic stopping of wind turbine generators by using wind power plant with minimum hourage deviation
CN105978031B (en) The method and system of active and idle coordinated control are carried out to photovoltaic apparatus
CN106712087A (en) Micro-energy grid switching mode
CN113949075A (en) New energy network source coordinated frequency modulation and inertia support online monitoring and analysis system and method
CN105048498B (en) For how wind farm grid-connected dispatching patcher
CN103138293A (en) Optimal distribution method and system for heat-engine plant plant-level loads
CN106340893A (en) Distributed photovoltaic power generation power control method based on virtual power plant
CN110676887A (en) Two-stage dispatching wind-fire coordination control method for sharing delivery section by regions
CN103532172B (en) Multistage reserve coordination method based on set dynamic classification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180105