CN107506294A - Visualize automated testing method, device, storage medium and computer equipment - Google Patents
Visualize automated testing method, device, storage medium and computer equipment Download PDFInfo
- Publication number
- CN107506294A CN107506294A CN201710539297.2A CN201710539297A CN107506294A CN 107506294 A CN107506294 A CN 107506294A CN 201710539297 A CN201710539297 A CN 201710539297A CN 107506294 A CN107506294 A CN 107506294A
- Authority
- CN
- China
- Prior art keywords
- test
- node
- case
- visual page
- triggering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
- G06F11/3688—Test management for test execution, e.g. scheduling of test suites
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Stored Programmes (AREA)
Abstract
The present invention relates to one kind visualization automated testing method, device, storage medium and computer equipment, including:Test node is created by visual page automation corresponding to master station;Test plan is obtained by visual page corresponding to master console, the test plan includes test case scope, test triggering information and corresponding test node;The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching so that test assignment corresponding to test node test case execution according to corresponding to the test case scope.The present invention realizes that clustering manages each test node, and automatic distributing test case by visualization technique, improves the operating efficiency of automatic test.
Description
Technical field
The present invention relates to software testing technology field, more particularly to one kind visualization automated testing method, device, deposits
Storage media and computer equipment.
Background technology
Generally, devise test case and by evaluation after, by tester according to the rule described in test case
Journey performs test step by step, obtains the comparison of actual result and expected result.In the process, in order to save manpower, the time or
Hardware resource, testing efficiency is improved, just introduce the concept of automatic test.Automatic test is the test taking human as driving
Behavior is converted into a kind of process of machine execution.
Traditional automatic test is typically all to perform test assignment by individual node, causes the efficiency of automatic test
It is low, it is necessary to take a substantial amount of time.
The content of the invention
Based on this, it is necessary in view of the above-mentioned problems, providing a kind of visualization automated testing method, device, storage medium
And computer equipment, to improve the operating efficiency of automatic test.
One kind visualization automated testing method, described method include:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, the test plan includes test case model
Enclose, test triggering information and corresponding test node;
The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching
So that test assignment corresponding to test node test case execution according to corresponding to the test case scope.
In one embodiment, it is described to pass through the step of visual page automation creates test node corresponding to master station
Including:
Virtual machine node is downloaded by visual page corresponding to master station;
The virtual machine node is cloned, generates multiple test nodes.
In one embodiment, methods described also includes:
Sub-control platform by corresponding visual page obtain test plan, the test plan include test case scope,
Test triggering information, the sub-control platform are deployed on corresponding test node;
Sub-control platform triggers the execution of information triggering test assignment according to the test, and it is corresponding to obtain the test case scope
Test case with cause the test node perform corresponding to test assignment.
In one embodiment, methods described also includes:
Receive the test result of test node and the test result is shown in visualization corresponding to the master console
The page;
Analyzing and positioning is carried out to the test result and obtains project leak, and submits the project leak;
The test result is collected into generation test report automatically;
The test report is sent to management terminal by mail.
One kind visualization automatic test device, described device include:
Test node creation module, for creating test node by visual page automation corresponding to master station;
Master station test plan acquisition module, for obtaining test plan by visual page corresponding to master console,
The test plan includes test case scope, test triggering information and corresponding test node;
Test case sending module, for triggering the execution of information triggering test assignment according to the test, test is used
Example is sent to the test node of matching so that test node test case according to corresponding to the test case scope performs
Corresponding test assignment.
In one embodiment, the test node creation module includes:
Virtual machine download module, for downloading virtual machine node by visual page corresponding to master station;
Virtual machine cloning module, for the virtual machine node to be cloned, generate multiple test nodes.
In one embodiment, described device also includes:
Sub-control platform test plan acquisition module, for obtaining test plan, institute by visual page corresponding to sub-control platform
Stating test plan includes test case scope, test triggering information, and the sub-control platform is deployed on test node;
Test assignment execution module, for triggering the execution of information triggering test assignment according to the test, described in acquisition
Test case corresponding to test case scope with cause the test node perform corresponding to test assignment.
In one embodiment, described device also includes:
Test result display module, for receiving the test result of test node and being shown in the test result described
Visual page corresponding to master console;
Analyzing and positioning module, project leak is obtained for carrying out analyzing and positioning to the test result, and submit the item
Mesh leak;
Test result summarizing module, for the test result to be collected into generation test report automatically;
Test report sending module, for the test report to be sent to management terminal by mail.
A kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the program is by processor
Following steps are realized during execution:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, the test plan includes test case model
Enclose, test triggering information and corresponding test node;
The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching
So that test assignment corresponding to test node test case execution according to corresponding to the test case scope.
In one embodiment, the step of automation creates test node includes:
Virtual machine node is downloaded by visual page corresponding to master station;
The virtual machine node is cloned, generates multiple test nodes.
In one embodiment, following steps are realized when the program is executed by processor:
Sub-control platform by corresponding visual page obtain test plan, the test plan include test case scope,
Test triggering information, the sub-control platform are deployed on test node;
Sub-control platform triggers the execution of information triggering test assignment according to the test, and it is corresponding to obtain the test case scope
Test case with cause the test node perform corresponding to test assignment.
In one embodiment, following steps are realized when the program is executed by processor:
Receive the test result of test node and the test result is shown in visualization corresponding to the master console
The page;
Analyzing and positioning is carried out to the test result and obtains project leak, and submits the project leak;
The test result is collected into generation test report automatically;
The test report is sent to management terminal by mail.
A kind of computer equipment, the computer equipment include memory, processor and are stored on the memory simultaneously
The computer program that can be run on the processor, it is characterised in that real during computer program described in the computing device
Existing following steps:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, the test plan includes test case model
Enclose, test triggering information and corresponding test node;
The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching
So that test assignment corresponding to test node test case execution according to corresponding to the test case scope.
In one embodiment, the step of automation creates test node includes:
Virtual machine node is downloaded by visual page corresponding to master station;
The virtual machine node is cloned, generates multiple test nodes.
In one embodiment, following steps are realized during computer program described in the computing device:
Sub-control platform by corresponding visual page obtain test plan, the test plan include test case scope,
Test triggering information, the sub-control platform are deployed on test node;
The execution of information triggering test assignment is triggered according to the test, obtains and is tested corresponding to the test case scope
Use-case with cause the test node perform corresponding to test assignment.
In one embodiment, following steps are realized during computer program described in the computing device:
Receive the test result of test node and the test result is shown in visualization corresponding to the master console
The page;
Analyzing and positioning is carried out to the test result and obtains project leak, and submits the project leak;
The test result is collected into generation test report automatically;
The test report is sent to management terminal by mail.
Above-mentioned visualization automated testing method, device, readable storage medium storing program for executing and computer equipment, it is automatic on master station
Change and create test node, test plan is obtained by visual page corresponding to master console, the test plan includes test
Use-case scope, test triggering information and corresponding test node, the execution of information triggering test assignment is triggered according to the test,
Test case is sent to the test node of matching so that the test node is tested according to corresponding to the test case scope
Test assignment corresponding to use-case execution.Test assignment is performed jointly by multiple test nodes in the present invention, and passes through master console
Each test node is visualized, clustering management, and automatic distributing test case, the work for improving automatic test are imitated
Rate.
Brief description of the drawings
Fig. 1 is the applied environment figure that automated testing method is visualized in one embodiment;
Fig. 2 is that automated testing method flow chart is visualized in one embodiment;
Fig. 3 is by the step of visual page automation creates test node corresponding to master station in one embodiment
Flow chart;
Fig. 4 is that automated testing method flow chart is visualized in another embodiment;
Fig. 5 is that automated testing method flow chart is visualized in another embodiment;
Fig. 6 is that automatic test device structured flowchart is visualized in one embodiment;
Fig. 7 is test node creation module structured flowchart in one embodiment;
Fig. 8 is that automatic test device structured flowchart is visualized in one embodiment;
Fig. 9 is that automatic test device structured flowchart is visualized in one embodiment.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention
Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
Fig. 1 is one kind visualization automated testing method applied environment figure in one embodiment.As shown in figure 1, the application
Environment includes master station 100 and multiple test nodes 101, and master station 100 and test node 101 can pass through network connection.Master control
Platform 100 carries out centralized management to test node 101, and test plan is uniformly generated by its corresponding visual page, and under
Test case is sent out to test node 101.
In one embodiment, as shown in Figure 2, there is provided one kind visualization automated testing method, this method is applied to upper
The master station 100 stated, methods described includes:
Step S110, test node is created by visual page automation corresponding to master station.
Specifically, the step of automation establishment test node is completed on master station, is needed before automation creates node
First to log in master station.
In the present embodiment, master station logs in accordance with the following steps:
1) java running environment is configured.Download and JDK (Java Development Kit) is installed, then set JDK's
Environmental variance, verifies whether JDK environmental variance sets success, if success, java running environment configuration successfuls.
2) Tomcat servers are disposed.Download Tomcat and to local hard drive and Tomcat environmental variance is set, verify
Whether the configuration of Tomcat environmental variances succeeds.
3) the War bags of Web projects are disposed to Tomcat servers.
4) start Tomcat servers, input web network address in a browser and enter login page.
After login, you can various visualized operations are carried out in web site, and are provided according to specific project demands and hardware
Source creates one or more test nodes.
Step S120, test plan is obtained by visual page corresponding to master console, test plan includes test and used
Example scope, test triggering information and corresponding test node.
Specifically, test start before, corresponding to master station visual page formulate test plan, specify test object,
Test purpose, the contents of a project of test, the method for test, the schedule requirement of test, it is ensured that test required manpower, hardware, number
According to etc. resource be ready for fully, and nominative testing use-case scope, test triggering information and corresponding test node, wherein test is touched
The time that photos and sending messages can be the objective condition of test triggering or the triggering of setting is tested.After making test plan,
Person of being handed down to case designing.
Further, case designing person analyzes testing requirement, designing to cover according to test plan and statement of requirements book
The test case of all demand points, special test case document is formed, and the use-case for being able to carry out automatic test is collected
Into automatic test cases.
Further, automatic test personnel can set about building test environment while case designing works and carried out.Cause
Need to record page control for the script edit of automatic test, add object.Test environment is built, including system under test (SUT)
Deployment, the test calling of hardware, the mounting box of testing tool are set, the arrangement of network environment etc..
Step S130, according to the execution of test triggering information triggering test assignment, test case is sent to the survey of matching
Node is tried so that test assignment corresponding to test node test case execution according to corresponding to test case scope.
Specifically, when condition of test triggering information setting or time etc. reaching triggering requirement, master station is from test number
According to test case is obtained in storehouse, test case corresponding to the test case scope specified in test plan is sent to test section
Point, test node start to perform test assignment after receiving test case.
The distribution of test case can be on the premise of test data does not conflict mutually random distribution or according to
Certain rule mean allocation, can also be distributed according to path, and same type of test case is distributed into same section
Point.
In one embodiment, as shown in figure 3, automation includes the step of creating test node:
Step S111, virtual machine node is downloaded by visual page corresponding to master station.
Step S112, the virtual machine node is cloned, generate multiple test nodes.
Specifically, master station downloads virtual machine node as male parent, the male parent is cloned, to dispose multiple virtual machines
Node.Connection clone (linked clone) is cloned in the present embodiment, and the virtual machine after clone is shared using male parent
Disk file, so save space, and identical male parent software merit rating environment can be used, save create virtual machine when
Between, improve operating efficiency.
In one embodiment, automation creates node and can also realized by following steps:Master station passes through corresponding
Visual page is authorized to the server in server cluster, and the configuration file of master station is shared to the service of mandate
Device.
In one embodiment, as shown in figure 4, the above method also includes:
Step S140, sub-control platform obtain test plan by corresponding visual page, and the test plan includes test
Use-case scope, test triggering information, the sub-control platform are deployed on test node.
Specifically, test start before, corresponding to sub-control platform visual page formulate test plan, specify test object,
Test purpose, the contents of a project of test, the method for test, the schedule requirement of test, it is ensured that test required manpower, hardware, number
According to etc. resource be ready for fully, and nominative testing use-case scope, test triggering information and corresponding test node, wherein test is touched
The time that photos and sending messages can be the objective condition of test triggering or the triggering of setting is tested.After making test plan,
Person of being handed down to case designing.
Further, case designing person analyzes testing requirement, designing to cover according to test plan and statement of requirements book
The test case of all demand points, special test case document is formed, and the use-case for being able to carry out automatic test is collected
Into automatic test cases.
Further, automatic test personnel can set about building test environment while case designing works and carried out.Cause
Need to record page control for the script edit of automatic test, add object.Test environment is built, including system under test (SUT)
Deployment, the test calling of hardware, the mounting box of testing tool are set, the arrangement of network environment etc..
Step S150, sub-control platform obtain test case scope pair according to the execution of test triggering information triggering test assignment
The test case answered with cause the test node perform corresponding to test assignment.
Specifically, when condition of test triggering information setting or time etc. reaching triggering requirement, sub-control platform is from test number
According to test case corresponding to test case scope is obtained in storehouse, test node corresponding to sub-control platform starts to perform test assignment.
In one embodiment, as shown in figure 5, the above method also includes:
Step S160, receive the test result of test node and be shown in test result can corresponding to the master console
Depending on changing the page.
Specifically, after the completion of each test node test, test result is sent to master station, and it is corresponding to be shown in master station
Visual page on.
Step S170, analyzing and positioning is carried out to the test result and obtains project leak, and submit project leak (BUG).
Specifically, automatic test personnel can carried out corresponding to master station on visual page to automatic test result
Analysis, after the operation failure of automatic test case, test node will report a BUG automatically, and automatic test personnel can be with
Test result is analyzed in visual page corresponding to master station, confirms these BUG reported automatically, if is real
System defect, if system defect just submits developer to repair, if not system defect, just check automatic test pin
Sheet or test environment.
Further, the BUG of test record recorded in bug management tool, so that periodically tracking is handled.Exploit person
, it is necessary to perform regression test to this problem after member repairs, repeat once relatively thin corresponding to the problem, perform by then closing
Close, otherwise continue to change.
Step S180, test result is collected to generation test report automatically.
Specifically, master station collects each test result for performing node, and these test results are collected to generation test automatically
Report.
Step S190, test report is sent to management terminal by mail.
Specifically, master station sends test report to management terminal, and developer or tester can be in management eventually
End is checked.
In one embodiment, as shown in fig. 6, also providing a kind of visualization automatic test device, the device includes:
Test node creation module 210, for creating test node by visual page automation corresponding to master station;
Master station test plan acquisition module 220, for obtaining tester by visual page corresponding to master console
Draw, the test plan includes test case scope, test triggering information and corresponding test node;
Test case sending module 230, for triggering the execution of information triggering test assignment according to the test, it will test
Use-case is sent to the test node of matching so that test node test case according to corresponding to the test case scope is held
Test assignment corresponding to row.
In one embodiment, as shown in fig. 7, test node creation module includes:
Virtual machine download module 211, for downloading virtual machine node by visual page corresponding to master station;
Virtual machine cloning module 212, for the virtual machine node to be cloned, generate multiple test nodes.
In one embodiment, as shown in figure 8, said apparatus also includes:
Sub-control platform test plan acquisition module 240, for obtaining test plan by visual page corresponding to sub-control platform,
The test plan includes test case scope, test triggering information, and the sub-control platform is deployed on test node;
Test assignment execution module 250, for triggering the execution of information triggering test assignment according to the test, obtain institute
Test case corresponding to test case scope is stated to cause test assignment corresponding to the test node execution.
In one embodiment, as shown in figure 9, said apparatus also includes:
Test result display module 260, for receiving the test result of test node and being shown in the test result
Visual page corresponding to the master console.
Analyzing and positioning module 270, BUG is obtained for carrying out analyzing and positioning to the test result, and submit the BUG.
Test result summarizing module 280, for the test result to be collected into generation test report automatically.
Test report sending module 290, for the test report to be sent to management terminal by mail.
In one embodiment, a kind of computer-readable recording medium is also provided, is stored thereon with computer program, the journey
Following steps are realized when sequence is executed by processor:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, test plan includes test case scope, surveyed
Examination triggering information and corresponding test node;
The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching
So that test assignment corresponding to test node test case execution according to corresponding to test case scope.
In one embodiment, automation creates the step of test node, including:By visualizing page corresponding to master station
Download virtual machine node in face;Virtual machine node is cloned, generates multiple test nodes.
In one embodiment, following steps are also realized when the program is executed by processor:Sub-control platform by it is corresponding can
Test plan is obtained depending on changing the page, test plan includes test case scope, test triggering information, and the sub-control platform is deployed in survey
Try on node;Sub-control platform is obtained and tested corresponding to test case scope according to the execution of test triggering information triggering test assignment
Use-case with cause the test node perform corresponding to test assignment.
In one embodiment, following steps are also realized when the program is executed by processor:Receive the test of test node
As a result and by test result it is shown in visual page corresponding to master console;Analyzing and positioning is carried out to test result and obtains project
Leak, and submit project leak;Test result is collected to generation test report automatically;Test report is sent to pipe by mail
Manage terminal.
In one embodiment, a kind of computer equipment is also provided, the computer equipment includes memory, processor and deposits
Storage realizes following step on a memory and the computer program that can run on a processor, during the computing device computer program
Suddenly:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, test plan includes test case scope, surveyed
Examination triggering information and corresponding test node;
The execution of information triggering test assignment is triggered according to the test, test case is sent to the test node of matching
So that test assignment corresponding to test node test case execution according to corresponding to test case scope.
In one embodiment, automation creates the step of test node, including:By visualizing page corresponding to master station
Download virtual machine node in face;Virtual machine node is cloned, generates multiple test nodes.
In one embodiment, following steps are also realized during the computing device computer program:Sub-control platform passes through correspondingly
Visual page obtain test plan, test plan includes test case scope, test triggering information, sub-control platform deployment
On test node;Sub-control platform is obtained corresponding to test case scope according to the execution of test triggering information triggering test assignment
Test case with cause the test node perform corresponding to test assignment.
In one embodiment, following steps are also realized during the computing device computer program:Receive test node
Test result is simultaneously shown in visual page corresponding to master console by test result;Analyzing and positioning is carried out to test result to obtain
Project leak, and submit project leak;Test result is collected to generation test report automatically;Test report is sent by mail
To management terminal.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. one kind visualization automated testing method, described method include:
Test node is created by visual page automation corresponding to master station;
Test plan is obtained by visual page corresponding to master console, the test plan includes test case scope, surveyed
Examination triggering information and corresponding test node;
According to it is described test trigger information triggering test assignment execution, test case is sent to the test node of matching so that
Test assignment corresponding to test node test case execution according to corresponding to the test case scope.
2. according to the method for claim 1, it is characterised in that described to be automated by visual page corresponding to master station
The step of creating test node includes:
Virtual machine node is downloaded by visual page corresponding to master station;
The virtual machine node is cloned, generates multiple test nodes.
3. according to the method for claim 1, it is characterised in that methods described also includes:
Sub-control platform obtains test plan by corresponding visual page, and the test plan includes test case scope, test
Information is triggered, the sub-control platform is deployed on corresponding test node;
Sub-control platform triggers the execution of information triggering test assignment according to the test, obtains and is surveyed corresponding to the test case scope
Example is tried out to cause test assignment corresponding to the test node execution.
4. according to the method for claim 1, it is characterised in that methods described also includes:
Receive the test result of test node and the test result is shown in visual page corresponding to the master console;
Analyzing and positioning is carried out to the test result and obtains project leak, and submits the project leak;
The test result is collected into generation test report automatically;
The test report is sent to management terminal by mail.
5. one kind visualization automatic test device, it is characterised in that described device includes:
Test node creation module, for creating test node by visual page automation corresponding to master station;
Master station test plan acquisition module, it is described for obtaining test plan by visual page corresponding to master console
Test plan includes test case scope, test triggering information and corresponding test node;
Test case sending module, for triggering the execution of information triggering test assignment according to the test, test case is sent out
The test node of matching is delivered to so that test node test case according to corresponding to the test case scope performs correspondence
Test assignment.
6. device according to claim 5, it is characterised in that the test node creation module includes:
Virtual machine download module, for downloading virtual machine node by visual page corresponding to master station;
Virtual machine cloning module, for the virtual machine node to be cloned, generate multiple test nodes.
7. device according to claim 5, it is characterised in that described device also includes:
Sub-control platform test plan acquisition module, for obtaining test plan, the survey by visual page corresponding to sub-control platform
Examination plan includes test case scope, test triggering information, and the sub-control platform is deployed on corresponding test node;
Test assignment execution module, for triggering the execution of information triggering test assignment according to the test, obtain the test
Test case corresponding to use-case scope with cause the test node perform corresponding to test assignment.
8. device according to claim 5, it is characterised in that described device also includes:
Test result display module, for receiving the test result of test node and the test result being shown in into the master control
Visual page corresponding to platform processed;
Analyzing and positioning module, project leak is obtained for carrying out analyzing and positioning to the test result, and submit the project to leak
Hole;
Test result summarizing module, for the test result to be collected into generation test report automatically;
Test report sending module, for the test report to be sent to management terminal by mail.
9. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the program is held by processor
The visualization automated testing method as any one of Claims 1-4 is realized during row.
10. a kind of computer equipment, the computer equipment includes memory, processor and is stored on the memory and can
The computer program run on the processor, it is characterised in that realized described in the computing device during computer program
Visualization automated testing method as any one of Claims 1-4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710539297.2A CN107506294A (en) | 2017-07-04 | 2017-07-04 | Visualize automated testing method, device, storage medium and computer equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710539297.2A CN107506294A (en) | 2017-07-04 | 2017-07-04 | Visualize automated testing method, device, storage medium and computer equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107506294A true CN107506294A (en) | 2017-12-22 |
Family
ID=60679471
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710539297.2A Pending CN107506294A (en) | 2017-07-04 | 2017-07-04 | Visualize automated testing method, device, storage medium and computer equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107506294A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108388514A (en) * | 2018-02-24 | 2018-08-10 | 平安科技(深圳)有限公司 | Automatic interface testing method, device, equipment and computer readable storage medium |
CN109947641A (en) * | 2019-02-20 | 2019-06-28 | 北京百佑科技有限公司 | Automated testing method and device |
CN112015654A (en) * | 2020-08-31 | 2020-12-01 | 京东数字科技控股股份有限公司 | Method and apparatus for testing |
CN112378420A (en) * | 2020-10-30 | 2021-02-19 | 北斗星通智联科技有限责任公司 | Signal simulation method and system for automobile navigation test and electronic equipment |
CN112699040A (en) * | 2020-12-30 | 2021-04-23 | 深圳前海微众银行股份有限公司 | Pressure testing method, device, equipment and computer readable storage medium |
CN113742001A (en) * | 2021-09-02 | 2021-12-03 | 刘忠琪 | Tomcat cluster visual unified management system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103678093A (en) * | 2012-08-30 | 2014-03-26 | 腾讯科技(深圳)有限公司 | Automatic testing framework and testing method |
US20140149494A1 (en) * | 2012-11-29 | 2014-05-29 | International Business Machines Corporation | Management infrastructure analysis for cloud migration |
US20140282421A1 (en) * | 2013-03-15 | 2014-09-18 | Microsoft Corporation | Distributed software validation |
CN104572473A (en) * | 2015-01-29 | 2015-04-29 | 无锡江南计算技术研究所 | Compatibility testing method of Web applications supporting multi-type and multi-version browsers |
US9032373B1 (en) * | 2013-12-23 | 2015-05-12 | International Business Machines Corporation | End to end testing automation and parallel test execution |
CN105446878A (en) * | 2015-11-09 | 2016-03-30 | 上海爱数信息技术股份有限公司 | Continuous program automated testing method |
CN105487977A (en) * | 2015-11-30 | 2016-04-13 | 北京锐安科技有限公司 | Agility-oriented automatic test management system and method |
CN106326115A (en) * | 2016-08-17 | 2017-01-11 | 北京奇虎科技有限公司 | Method, device and system for testing application programming interfaces (APIs) |
CN106484623A (en) * | 2016-10-21 | 2017-03-08 | 郑州云海信息技术有限公司 | A kind of method of software test, apparatus and system |
CN106648797A (en) * | 2016-12-30 | 2017-05-10 | 郑州云海信息技术有限公司 | Method and system for installing test software, test server and shared server |
-
2017
- 2017-07-04 CN CN201710539297.2A patent/CN107506294A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103678093A (en) * | 2012-08-30 | 2014-03-26 | 腾讯科技(深圳)有限公司 | Automatic testing framework and testing method |
US20140149494A1 (en) * | 2012-11-29 | 2014-05-29 | International Business Machines Corporation | Management infrastructure analysis for cloud migration |
US20140282421A1 (en) * | 2013-03-15 | 2014-09-18 | Microsoft Corporation | Distributed software validation |
US9032373B1 (en) * | 2013-12-23 | 2015-05-12 | International Business Machines Corporation | End to end testing automation and parallel test execution |
CN104572473A (en) * | 2015-01-29 | 2015-04-29 | 无锡江南计算技术研究所 | Compatibility testing method of Web applications supporting multi-type and multi-version browsers |
CN105446878A (en) * | 2015-11-09 | 2016-03-30 | 上海爱数信息技术股份有限公司 | Continuous program automated testing method |
CN105487977A (en) * | 2015-11-30 | 2016-04-13 | 北京锐安科技有限公司 | Agility-oriented automatic test management system and method |
CN106326115A (en) * | 2016-08-17 | 2017-01-11 | 北京奇虎科技有限公司 | Method, device and system for testing application programming interfaces (APIs) |
CN106484623A (en) * | 2016-10-21 | 2017-03-08 | 郑州云海信息技术有限公司 | A kind of method of software test, apparatus and system |
CN106648797A (en) * | 2016-12-30 | 2017-05-10 | 郑州云海信息技术有限公司 | Method and system for installing test software, test server and shared server |
Non-Patent Citations (3)
Title |
---|
TOSHIHIKO KOJU等: ""Regression test selection based on intermediate code for virtual machines"", 《 INTERNATIONAL CONFERENCE ON SOFTWARE MAINTENANCE, 2003. ICSM 2003. PROCEEDINGS.》 * |
唐晓韬: ""基于虚拟化的自动化测试框架"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
项阳阳: ""面向实时数据库的自动化测试系统的设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108388514A (en) * | 2018-02-24 | 2018-08-10 | 平安科技(深圳)有限公司 | Automatic interface testing method, device, equipment and computer readable storage medium |
CN108388514B (en) * | 2018-02-24 | 2021-02-23 | 平安科技(深圳)有限公司 | Interface automation test method, device, equipment and computer readable storage medium |
CN109947641A (en) * | 2019-02-20 | 2019-06-28 | 北京百佑科技有限公司 | Automated testing method and device |
CN109947641B (en) * | 2019-02-20 | 2022-07-19 | 北京百佑科技有限公司 | Automatic testing method and device |
CN112015654A (en) * | 2020-08-31 | 2020-12-01 | 京东数字科技控股股份有限公司 | Method and apparatus for testing |
CN112378420A (en) * | 2020-10-30 | 2021-02-19 | 北斗星通智联科技有限责任公司 | Signal simulation method and system for automobile navigation test and electronic equipment |
CN112699040A (en) * | 2020-12-30 | 2021-04-23 | 深圳前海微众银行股份有限公司 | Pressure testing method, device, equipment and computer readable storage medium |
CN112699040B (en) * | 2020-12-30 | 2024-02-23 | 深圳前海微众银行股份有限公司 | Pressure testing method, device, equipment and computer readable storage medium |
CN113742001A (en) * | 2021-09-02 | 2021-12-03 | 刘忠琪 | Tomcat cluster visual unified management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107506294A (en) | Visualize automated testing method, device, storage medium and computer equipment | |
US7895565B1 (en) | Integrated system and method for validating the functionality and performance of software applications | |
CN105302716B (en) | Test method, device under the development mode of interflow | |
US10127143B2 (en) | Generating an evolving set of test cases | |
US8381184B2 (en) | Dynamic test coverage | |
Chauhan et al. | Latest research and development on software testing techniques and tools | |
CN107608874A (en) | Method of testing and device | |
Neto et al. | A regression testing approach for software product lines architectures | |
US7328134B1 (en) | Enterprise integration test tool | |
CN108536593A (en) | CS Framework Softwares automated testing method based on UI and system | |
CN108182058A (en) | A kind of software development methodology and cloud development platform based on cloud platform | |
CN107992424A (en) | Automatic test analysis method, application server and computer-readable recording medium | |
Grbac et al. | A quantitative analysis of the unit verification perspective on fault distributions in complex software systems: an operational replication | |
CN108595323A (en) | A kind of system detection method and relevant apparatus | |
CN109947642A (en) | Automated hierarchical test method based on case classification, apparatus and system | |
CN112612702B (en) | Automatic testing method and device based on web | |
CN110941830B (en) | Vulnerability data processing method and device | |
Ibrahim et al. | Finite State Machine-Model Based Testing on Website Application | |
KR20180035515A (en) | Method for verifying a performance of clients and servers for smart ternimal | |
Pathania et al. | Role of test case prioritization based on regression testing using clustering | |
CN111966665A (en) | Data migration test method and device | |
CN109669868A (en) | The method and system of software test | |
Deuter et al. | Measuring the software size of sliced V-model projects | |
Damm | Evaluating and Improving Test Efficiency | |
Bahill et al. | The requirements discovery process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20211126 |