CN107483261A - A kind of upgrade method and gateway device - Google Patents

A kind of upgrade method and gateway device Download PDF

Info

Publication number
CN107483261A
CN107483261A CN201710750931.7A CN201710750931A CN107483261A CN 107483261 A CN107483261 A CN 107483261A CN 201710750931 A CN201710750931 A CN 201710750931A CN 107483261 A CN107483261 A CN 107483261A
Authority
CN
China
Prior art keywords
upgrading
gateway device
updating operation
needed
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710750931.7A
Other languages
Chinese (zh)
Inventor
卢荣昌
王家乐
曹鹏飞
傅锋
唐锦坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Comba Telecom Technology Guangzhou Ltd
Comba Telecom Systems China Ltd
Comba Telecom Systems Guangzhou Co Ltd
Tianjin Comba Telecom Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comba Telecom Technology Guangzhou Ltd, Comba Telecom Systems China Ltd, Comba Telecom Systems Guangzhou Co Ltd, Tianjin Comba Telecom Systems Co Ltd filed Critical Comba Telecom Technology Guangzhou Ltd
Priority to CN201710750931.7A priority Critical patent/CN107483261A/en
Publication of CN107483261A publication Critical patent/CN107483261A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0813Configuration setting characterised by the conditions triggering a change of settings
    • H04L41/082Configuration setting characterised by the conditions triggering a change of settings the condition being updates or upgrades of network functionality
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/66Arrangements for connecting between networks having differing types of switching systems, e.g. gateways
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Stored Programmes (AREA)
  • Computer And Data Communications (AREA)

Abstract

The invention discloses a kind of upgrade method and gateway device, to take a large amount of human and material resources when solving upgrade gateway equipment in the prior art, and upgrades less efficient technical problem.Methods described is applied to gateway device, and methods described includes:Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate the updating operation instruction that gateway device is upgraded;Updating operation instruction is performed, to realize the upgrading of gateway device.

Description

A kind of upgrade method and gateway device
Technical field
The present invention relates to field of computer technology, more particularly to a kind of upgrade method and gateway device.
Background technology
Gateway device is also known as gateway, protocol converter, is the electronics of offer DTS between multiple networks Equipment, gateway are typically deployed at computer room, provide DTS for network system, the journeys such as firmware are preinstalled with each gateway Sequence.At present, in order to improve gateway device function, enhancing gateway device stability, repairing gateway device leak, it usually needs to net The program closed in equipment is upgraded.
In the prior art, when upgrading to gateway device, network management personnel needs to enter deployment gateway device Computer room, by for guide upgrading updating apparatus be connected to gateway device, by the way of manually operated into gateway device More new file is loaded into, updating operation is performed for gateway device.
It can be seen that in the prior art in upgrade gateway equipment, because network management personnel needs directly to operate into computer room Gateway device could upgrade, while also need to use special updating apparatus, so substantial amounts of human and material resources are often taken, Also, need to put the cumbersome flows such as examination & approval on record because network management personnel enters computer room, thus, in the prior art in upgrade gateway Time-consuming technical problem long, upgrading is less efficient during equipment also be present.
The content of the invention
The embodiment of the present invention provides a kind of upgrade method and gateway device, to solve upgrade gateway equipment in the prior art The a large amount of human and material resources of Shi Zhanyong, and upgrade less efficient technical problem.
First aspect, there is provided a kind of upgrade method, applied to gateway device, methods described includes:
Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate described The updating operation instruction that gateway device is upgraded;
The updating operation instruction is performed, to realize the upgrading of the gateway device.
It is described to perform the updating operation instruction in a kind of possible implementation, to realize the gateway device Upgrading, including:
The updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction;
It is determined that corresponding with the upgrading project upgrade executive process, and determine upgrading corresponding with the upgrading project Required file;Wherein, file needed for the upgrading is for completing the upgrading more new file needed for the upgrading project;
According to file needed for the upgrading executive process and the upgrading, the upgrading of the gateway device is realized.
In a kind of possible implementation, it is described determine it is corresponding with the upgrading project upgrade needed for file, including:
Determine the acquisition approach of file needed for the upgrading;
The file according to needed for the acquisition approach obtains the upgrading.
In a kind of possible implementation, methods described also includes:
During the gateway device is upgraded, the operation shape of the gateway device is sent to the network management device State information, the running state information are used for the Upgrade process for characterizing the gateway device.
In a kind of possible implementation, methods described also includes:
Before the gateway device is upgraded or during the gateway device is upgraded, receive the network management and set The stopping upgrade command that preparation is sent, the stopping upgrade command being used to indicate that the gateway device stops performing updating operation;
Perform the stopping upgrade command.
Second aspect, there is provided a kind of gateway device, including:
Memory, it is stored with instruction;
Processor, it is connected with the memory, for performing following steps when loading the instruction:
Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate described The updating operation instruction that gateway device is upgraded;
The updating operation instruction is performed, to realize the upgrading of the gateway device.
In a kind of possible implementation, the processor performs following steps when loading the instruction:
The updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction;
It is determined that corresponding with the upgrading project upgrade executive process, and determine upgrading corresponding with the upgrading project Required file;Wherein, file needed for the upgrading is for completing the upgrading more new file needed for the upgrading project;
According to file needed for the upgrading executive process and the upgrading, the upgrading of the gateway device is realized.
In a kind of possible implementation, the processor performs following steps when loading the instruction:
Determine the acquisition approach of file needed for the upgrading;
The file according to needed for obtaining the upgrading from the acquisition approach.
In a kind of possible implementation, the processor performs following steps when loading the instruction:
During the gateway device is upgraded, sent to the network management device for characterizing the gateway device The running state information of running status.
In a kind of possible implementation, the processor performs following steps when loading the instruction:
Before the gateway device is upgraded or during the gateway device is upgraded, receive the network management and set The stopping upgrade command that preparation is sent, the stopping upgrade command being used to indicate that the gateway device stops performing updating operation;
Perform the stopping upgrade command.
In the embodiment of the present invention, gateway device can receive network management device based on Web Service interactive modes The updating operation instruction of transmission, and then updating operation instruction is performed to realize the upgrading of gateway device.That is, network management Equipment can be by way of network remote sends updating operation instruction, and control gateway device performs updating operation, gateway device After updating operation instruction is received, upgrading is completed in the instruction that can be instructed according to updating operation.Sent and referred to by network remote Order control gateway device realizes the mode of upgrading, and network management personnel is reduced without entering computer room can upgrade gateway equipment The occupancy of human and material resources, improves the efficiency upgraded to gateway device.
Further, gateway device with network management device is interacted based on what Web Service interactive modes were carried out, institute With without by additional, special third party software or hardware, so that it may be exchanged with each other data, gateway device and network management are set Standby application system type, development language can not be limited so that the upgrade method in the embodiment of the present invention can adapt to not Same application scenarios, the compatibility of gateway device can be strengthened to a certain extent.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Inventive embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to carrying The accompanying drawing of confession obtains other accompanying drawings.
Fig. 1 is the flow chart of upgrade method in the embodiment of the present invention;
Fig. 2 is the flow chart that updating operation instruction is performed in the embodiment of the present invention;
Fig. 3 is the structured flowchart of gateway device in the embodiment of the present invention.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only It is part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, belongs to the scope of protection of the invention. In the case of not conflicting, the feature in embodiment and embodiment in the present invention can be mutually combined.Although also, flowing Logical order is shown in journey figure, but in some cases, can be with different from shown or described by order execution herein The step of.
In addition, the terms "and/or", only a kind of incidence relation for describing affiliated partner, represents there may be Three kinds of relations, for example, A and/or B, can be represented:Individualism A, while A and B be present, these three situations of individualism B.Separately Outside, character "/" herein, in the case where not illustrating, it is a kind of relation of "or" to typically represent forward-backward correlation object.
The embodiment of the present invention provides a kind of upgrade method, and this method can apply to gateway device, and the gateway device can be with It is used exclusively for realizing the gateway device of gateway function or other needs to carry out data interaction and with gateway function Electronic equipment, such as can be the electronic equipments such as blade server, PC, mobile phone, wearable electronic equipment, the present invention is real It is specially which kind of equipment does not limit for preceding gateway device to apply example.In order to be better understood from above-mentioned technical proposal, below will Above-mentioned technical proposal is described in detail with reference to Figure of description and specific embodiment.
Refer to Fig. 1, the flow of the upgrade method in the embodiment of the present invention is described as follows.
Step 101:Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used for Indicate the updating operation instruction that gateway device is upgraded.
Wherein, Web Service (web services) are a kind of technologies of SOA, are assisted by the Web of standard Discuss offer service, it is therefore an objective to which ensureing the application service of different platform can interoperate.The interaction side provided by WebService Formula, the different application that can to operate on different machines need not be by additional, special third party software or hardware, so that it may It is exchanged with each other data or integrated.
Network management device, such as can be the electronic equipments such as server, PC, mobile phone, wearable electronic equipment, The operator of network management device can call gateway device to provide by operating network management device on network management device Service to realize control gateway device, such as network management device can be not understood as to the control device of gateway device.
In the embodiment of the present invention, it can be communicated between gateway device and network management device.Specifically, in physics Aspect, can transmit data by wired or wireless physical channel between gateway device and network management device, such as can be with Data are transmitted using approach such as netting twine, optical fiber, Wi-Fi (WIreless-Fidelity, Wireless Fidelity).And in software interlayer, net Close equipment can be established by Web Service technologies one be used for upgrade upgrading platform, by the upgrading platform outwardly One upgrade interface that can be called by Web is provided, and then, network management device can use Web Service to mark Standard calls this upgrade interface, and the service provided upgrade interface is conducted interviews and managed to realize upgrade gateway equipment.
When the service that network management device is provided upgrade interface conducts interviews and managed, network management device is i.e. to net Close equipment and send the updating operation instruction upgraded for indicating gateway device, control gateway device is upgraded.It is and then logical Foregoing physical channel and Web Service interactive modes are crossed, gateway device can receives network management device transmission Updating operation instructs.
Step 102:Updating operation instruction is performed, to realize the upgrading of gateway device.
After updating operation instruction is received, the i.e. executable step 102 of gateway device, that is, the updating operation received is performed Instruction, in the case where gateway device successful execution updating operation instructs, it is possible to complete the upgrading to gateway device internal program.
In the embodiment of the present invention, gateway device can also enter before updating operation instruction is performed to network management device Row verification, to determine whether network management device has the operating right for controlling gateway device to be upgraded, for example, can verify The MAC (Media Access Control Address, physical address) of network management device, can also verify login account and Password, the finger print information collected by network management device, human face image information, etc. can also be verified, pass through this school Mechanism is tested, disabled user can be avoided to pass through network management device malice manipulation gateway device.Wherein, information required during verification It can be included in updating operation instruction or that gateway device individually receives.
In the embodiment of the present invention, gateway device can also be sent out before updating operation instruction is performed to network management device The confirmation for being confirmed whether to need upgrade gateway equipment is sent, is only fed back in network management device according to confirmation After expression needs the feedback information of upgrade gateway equipment, gateway device just may proceed to perform updating operation instruction.By true again Whether need the mode of upgrade gateway equipment, can avoid the maloperation of user to a certain extent if recognizing, improves gateway device liter The necessity and accuracy of level operation, it is ensured that the normal operation of gateway device.
In the embodiment of the present invention, gateway device, can also be to the number in gateway device before updating operation instruction is performed According to being backed up, to prevent upgrading exception or upgrading from unsuccessfully causing the loss of data of gateway device, in addition, Backup Data also may be used For the rollback operation of gateway device.
Fig. 2 is referred to, in a kind of possible embodiment, updating operation instruction is performed, to realize the liter of gateway device Level, can include the steps:
Step 201:Updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction.
Generally, the program in gateway device can have multiple, wherein different programs is used to realize different functions, and During upgrade gateway equipment, it can only upgrade subprogram therein, all programs that can also be in upgrade gateway equipment.Work as reality When only needing the subprogram in upgrade gateway equipment, it is possible to only the subprogram that needs upgrade is upgraded, can be added with this The speed upgraded soon, it also avoid the waste of gateway device computing resource, storage resource.
In the embodiment of the present invention, many kinds of parameters can be included in updating operation instruction, these parameters can be used for specifically How instruction gateway device is upgraded, and is upgraded for which program.
In specific implementation process, the data obtained after being instructed according to parsing updating operation can determine and updating operation Upgrading project corresponding to instruction, i.e. determine which of upgrade gateway equipment program.Wherein, updating operation instruction can include There is the item argument for characterizing upgrading project, item argument can be obtained and according to project after gateway device parsing upgrade command Parameter determines upgrading project corresponding to updating operation instruction.Specifically, item argument can be the title of upgrading project, deposit Store up address, numbering, etc..
Step 202:It is determined that corresponding with upgrading project upgrade executive process, and determine upgrading corresponding with upgrading project Required file;Wherein, file needed for upgrading is for completing the more new file of the upgrading needed for upgrading project.
In the embodiment of the present invention, while step 201 is performed or after step 201 performs completion, it may be determined that It is corresponding with upgrading project to upgrade executive process.In specific implementation procedure, it is determined that the essence of upgrading executive process can be Refer to the call address or calling interface for determining that upgrading performs.Also, it is a variety of to determine that the mode for upgrading executive process can have, below Illustrate two kinds therein:
The first, it is determined that after upgrading executive process, holds according to the upgrading project and the upgrading that are pre-set in gateway device The corresponding relation of traveling journey, it is determined that corresponding with upgrading project upgrade executive process.
Second, process parameter is also included in updating operation instruction, when gateway device parsing updating operation instructs It can obtain the process parameter, and then, gateway device can be determined according to process parameter for being upgraded to upgrading project Upgrade executive process.
In the embodiment of the present invention, upgrading executive process can be the process that is currently running in gateway device or still The process not brought into operation, when upgrade executive process be not yet bring into operation process when, can by call upgrading perform into The mode of executable file corresponding to journey starts upgrading executive process.Specifically, executable file can for example include pin Sheet, dll files, exe files, etc..
, can also be really while step 201 is performed or after step 201 performs completion in the embodiment of the present invention File needed for fixed upgrading corresponding with upgrading project.Wherein, file needed for upgrading refers to the existing text for updating upgrading project The file of part, file can refer to installation package file, patch file, etc. needed for upgrading.In specific implementation procedure, rising File parameters can also be included in level operational order, gateway device parsing updating operation can obtain this document ginseng when instructing Number, and then, gateway device can be determined according to file parameters for file needed for the upgrading that is upgraded to upgrading project.
In a kind of possible embodiment, the acquisition approach of file needed for upgrading can be first determined, further according to determining Acquisition approach obtain upgrading needed for file.
Wherein, acquisition approach can be according to be included in updating operation instruction in path parameter determine or Default default storage address in gateway device, it can also be gateway device file storage road according to needed for upgrading project with upgrading What the corresponding relation in footpath determined, etc..Specifically, acquisition approach can be that address is locally stored in gateway device, can also The address being directed to outside gateway device, such as can be network address.
If acquisition approach is the address outside gateway device, needed for gateway device from acquisition approach acquisition upgrading during file just File needed for upgrade can be first obtained from acquisition approach and storage is to being locally stored address, and then, when needing to use needed for upgrading During file, gateway device can directly from be locally stored address read upgrading needed for file.By this kind of mode, can ensure The stability of gateway device escalation process, avoid due in escalation process occur network failure can not from external storage address again and When obtain upgrading needed for file and cause upgrading interrupt or failure situation.
Step 203:According to file needed for upgrading executive process and upgrading, the upgrading of gateway device is realized.
After step 201 and step 202 determine file needed for upgrading executive process and upgrading, it is possible to step 203 is performed, Upgrade gateway equipment.
In specific implementation process, upgrading can be run by the call address or calling interface for upgrading executive process and held For traveling journey to realize upgrading, upgrading executive process operationally can obtain file needed for upgrading by acquisition approach, and use File needed for upgrading updates the existing file of upgrading project in gateway device.For upgrading executive process tool in the embodiment of the present invention How body realizes that upgrading does not limit.
In a kind of possible embodiment, during upgrade gateway equipment, gateway device can also be to network pipe Reason equipment sends the running state information for characterizing gateway device running status.
Wherein, running state information can represent the running status of gateway device, for example, pass through running state information It may indicate that gateway device currently performs the concrete condition of operation, such as the step of updating operation proceeds to, updating operation progress Percentage, the staging error prompting (parameter that reports an error as represented staging error) during updating operation, etc.;Running status Hardware information when information can also be gateway device operation, i.e., could also indicate that the hard of gateway device by running state information Part state, such as current residual memory space of the temperature of processor, memory, etc..Operation shape in the embodiment of the present invention State information can exist in a variety of forms, such as can exist with the formation of daily record.
In specific implementation process, gateway device can be during updating operation is performed, at interval of it is default when It is long just to send a running state information to network management device, such as just sent once to network management device at interval of 5 seconds Running state information;Gateway device can also just send to run to network management device when updating operation reaches default progress Status information;Gateway device can also be when updating operation makes a mistake, and running state information is sent to network management device; Gateway device can also be after the status inquiry instruction of network management device is received, and operation shape is sent to network management device State information, etc..
By sending running state information to network management device, network management device/network management device is enabled to Operator recognize the running statuses such as the upgrading progress of gateway device in time, also, when updating operation makes a mistake, network The operator of management equipment/network management device can also handle it in time according to running state information, ensure updating operation Be normally carried out.
In a kind of possible embodiment, before upgrade gateway equipment or during upgrade gateway equipment, net Network management equipment can also be sent to gateway device for indicating that gateway device stops performing the stopping upgrade command of updating operation, So gateway device is after stopping upgrade command being received, by performing the stopping upgrade command, you can stopping being carried out Updating operation, or updating operation then can be no longer carried out before also updating operation is not carried out.
In the embodiment of the present invention, gateway device can be set by Web Service interactive modes from network management The standby stopping upgrade command receiving.Wherein, it can be instruction to stop upgrade command instruction gateway device to stop performing updating operation Gateway device pause performs updating operation or instruction gateway device interrupts the updating operation being carrying out completely.When stopping When only upgrade command interrupts the updating operation being carrying out completely for instruction gateway device, gateway device can also rise according to stopping The promoted project of level instruction rollback, specifically, what gateway device can for example back up before according to execution updating operation Backup Data, complete rollback operation.
Receive stop upgrade command stop perform updating operation by way of, gateway device can before upgrading or Stop upgrading during upgrading.Such as in escalation process, the operator of network management device/network management device has found net When leak be present in file needed for closing the upgrading that equipment obtains, it is possible to sent to gateway device and stop upgrade command to indicate gateway Equipment stops updating operation, avoids causing unnecessary loss.Also, because gateway device can be held according to upgrade command is stopped Row rollback operation, it is thus possible to ensure that gateway device remains to carry out normal work by rollback operation after stopping upgrading in midway.
In embodiments of the present invention, gateway device can receive network management based on Web Service interactive modes and set The updating operation instruction that preparation is sent, and then updating operation instruction is performed to realize the upgrading of gateway device.That is, network pipe Managing equipment can be by way of network remote sends updating operation instruction, and control gateway device performs updating operation, and gateway is set For after updating operation instruction is received, upgrading is completed in the instruction that can be instructed according to updating operation.Sent by network remote Instruction control gateway device realizes the mode of upgrading, and network management personnel subtracts without entering computer room can upgrade gateway equipment Lack the occupancy of human and material resources, improve the efficiency upgraded to gateway device.
Further, gateway device with network management device is interacted based on what Web Service interactive modes were carried out, institute With without by additional, special third party software or hardware, so that it may be exchanged with each other data, gateway device and network management are set Standby application system type, development language can not be limited so that the upgrade method in the embodiment of the present invention can adapt to not Same application scenarios, the compatibility of gateway device can be strengthened to a certain extent.
Fig. 3 is referred to, based on same inventive concept, the embodiment of the present invention also provides a kind of gateway device, the gateway device Including memory 301 and processor 302, memory 301 and processor 302 can be connected by bus 300, or can also be led to Cross special connecting line to connect, in Fig. 3 exemplified by connecting by bus 300.Wherein:
Memory 301, it is stored with instruction;
Processor 302, it is connected with memory 301, for performing following steps when loading and instructing:
Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate gateway The updating operation instruction that equipment is upgraded;
Updating operation instruction is performed, to realize the upgrading of gateway device.
In a kind of possible embodiment, processor 302 performs following steps when loading and instructing:
Updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction;
It is determined that corresponding with upgrading project upgrade executive process, and determine text needed for upgrading corresponding with upgrading project Part;Wherein, file needed for upgrading is for completing the more new file of the upgrading needed for upgrading project;
According to file needed for upgrading executive process and upgrading, the upgrading of gateway device is realized.
In a kind of possible embodiment, processor 302 performs following steps when loading and instructing:
It is determined that the acquisition approach of file needed for upgrading;
The file according to needed for upgrading acquisition approach.
In a kind of possible embodiment, processor 302 performs following steps when loading and instructing:
During upgrade gateway equipment, the fortune for characterizing gateway device running status is sent to network management device Row status information.
In a kind of possible embodiment, processor 302 performs following steps when loading and instructing:
Before upgrade gateway equipment or during upgrade gateway equipment, the stopping of receiving network managing equipment transmission Upgrade command, stop upgrade command and be used to indicate that gateway device stops performing updating operation;
Perform and stop upgrade command.
Device embodiment described above is only schematical, wherein can be as the unit that separating component illustrates Or may not be physically separate, it can be as the part that unit is shown or may not be physical location, i.e., A place can be located at, or can also be distributed on multiple NEs.It can select according to the actual needs therein Some or all of module realizes the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying the labor of creativeness In the case of dynamic, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can Realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on The part that technical scheme substantially in other words contributes to prior art is stated to embody in the form of software product, should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including some fingers Make to cause a computer equipment (can be personal computer, server, or network equipment etc.) to perform each implementation Method described in some parts of example or embodiment.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. a kind of upgrade method, applied to gateway device, it is characterised in that methods described includes:
Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate the gateway The updating operation instruction that equipment is upgraded;
The updating operation instruction is performed, to realize the upgrading of the gateway device.
2. the method as described in claim 1, it is characterised in that it is described to perform the updating operation instruction, to realize the net The upgrading of equipment is closed, including:
The updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction;
It is determined that corresponding with the upgrading project upgrade executive process, and determine needed for upgrading corresponding with the upgrading project File;Wherein, file needed for the upgrading is for completing the upgrading more new file needed for the upgrading project;
According to file needed for the upgrading executive process and the upgrading, the upgrading of the gateway device is realized.
3. method as claimed in claim 2, it is characterised in that described to determine text needed for upgrading corresponding with the upgrading project Part, including:
Determine the acquisition approach of file needed for the upgrading;
The file according to needed for the acquisition approach obtains the upgrading.
4. the method as described in any claim in claim 1-3, it is characterised in that methods described also includes:
During the gateway device is upgraded, send to the network management device and run for characterizing the gateway device The running state information of state.
5. the method as described in any claim in claim 1-3, it is characterised in that methods described also includes:
Before the gateway device is upgraded or during the gateway device is upgraded, the network management device hair is received The stopping upgrade command sending, the stopping upgrade command being used to indicate that the gateway device stops performing updating operation;
Perform the stopping upgrade command.
A kind of 6. gateway device, it is characterised in that including:
Memory, it is stored with instruction;
Processor, it is connected with the memory, for performing following steps when loading the instruction:
Based on web services Web Service interactive modes, what receiving network managing equipment was sent is used to indicate the gateway The updating operation instruction that equipment is upgraded;
The updating operation instruction is performed, to realize the upgrading of the gateway device.
7. gateway device as claimed in claim 6, it is characterised in that the processor performs following when loading the instruction Step:
The updating operation instruction is parsed, to determine upgrading project corresponding with updating operation instruction;
It is determined that corresponding with the upgrading project upgrade executive process, and determine needed for upgrading corresponding with the upgrading project File;Wherein, file needed for the upgrading is for completing the upgrading more new file needed for the upgrading project;
According to file needed for the upgrading executive process and the upgrading, the upgrading of the gateway device is realized.
8. gateway device as claimed in claim 7, it is characterised in that the processor performs following when loading the instruction Step:
Determine the acquisition approach of file needed for the upgrading;
The file according to needed for the acquisition approach obtains the upgrading.
9. the gateway device as described in any claim in claim 6-8, it is characterised in that the processor is in loading institute Following steps are performed when stating instruction:
During the gateway device is upgraded, send to the network management device and run for characterizing the gateway device The running state information of state.
10. the gateway device as described in any claim in claim 6-8, it is characterised in that the processor is loading Following steps are performed during the instruction:
Before the gateway device is upgraded or during the gateway device is upgraded, the network management device hair is received The stopping upgrade command sending, the stopping upgrade command being used to indicate that the gateway device stops performing updating operation;
Perform the stopping upgrade command.
CN201710750931.7A 2017-08-28 2017-08-28 A kind of upgrade method and gateway device Pending CN107483261A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710750931.7A CN107483261A (en) 2017-08-28 2017-08-28 A kind of upgrade method and gateway device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710750931.7A CN107483261A (en) 2017-08-28 2017-08-28 A kind of upgrade method and gateway device

Publications (1)

Publication Number Publication Date
CN107483261A true CN107483261A (en) 2017-12-15

Family

ID=60603991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710750931.7A Pending CN107483261A (en) 2017-08-28 2017-08-28 A kind of upgrade method and gateway device

Country Status (1)

Country Link
CN (1) CN107483261A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109088783A (en) * 2018-11-01 2018-12-25 郑州云海信息技术有限公司 Refresh progress acquisition methods, device and equipment between whole machine cabinet server multistage
CN109218103A (en) * 2018-09-26 2019-01-15 京信通信系统(中国)有限公司 Gateway upgrade method, gateway and Network Management Equipment
CN111181793A (en) * 2019-12-31 2020-05-19 京信通信系统(中国)有限公司 Method, device, equipment and storage medium for controlling chain communication business process
CN111342999A (en) * 2020-02-07 2020-06-26 青岛海信网络科技股份有限公司 Web-page-based annunciator wireless upgrading method and device
CN111736877A (en) * 2020-03-31 2020-10-02 紫光云技术有限公司 Method for upgrading Agent of cloud database

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101383787A (en) * 2008-10-23 2009-03-11 武汉长光科技有限公司 Three in one network type household gateway based on EPON access
CN101394308A (en) * 2007-09-21 2009-03-25 霍尼韦尔国际公司 System and method for remotely administering and synchronizing a clustered group of access control panels
CN102132261A (en) * 2009-04-01 2011-07-20 日立系统解决方案有限公司 Home network system, gateway device, and firmware update method
CN102420784A (en) * 2011-10-13 2012-04-18 中国电力科学研究院 Home gateway, intelligent system and energy control method thereof
CN103051525A (en) * 2011-10-14 2013-04-17 海尔集团公司 Gateway service middleware system and method as well as device and system comprising gateway service middleware system
US8495182B1 (en) * 2008-04-02 2013-07-23 Bank Of America Corporation Scalable systems management abstraction framework
CN103281373A (en) * 2013-05-30 2013-09-04 烽火通信科技股份有限公司 Home gateway intelligent upgrading device and upgrading method
CN103581182A (en) * 2013-10-30 2014-02-12 汉柏科技有限公司 Web message releasing method and device
CN103595802A (en) * 2013-11-19 2014-02-19 烽火通信科技股份有限公司 Method for remotely and automatically updating family gateway software
CN104639376A (en) * 2015-03-05 2015-05-20 太仓市同维电子有限公司 Novel method for human-machine interaction type remote upgrading of home gateway
CN105553730A (en) * 2015-12-22 2016-05-04 新余未来宽带技术有限公司 Implementing method and implementing device for upgrade of gateway type EoC terminal firmware
CN105975308A (en) * 2016-05-04 2016-09-28 烽火通信科技股份有限公司 Remote upgrading system for low-memory overheads in home gateways and remote upgrading method
CN106375122A (en) * 2016-08-31 2017-02-01 上海澳润信息科技有限公司 Intelligent gateway strategy upgrading method based on LAMP (Linux+Apache+Mysql/MariaDB+Perl/PHP/Python)
CN106911502A (en) * 2017-02-22 2017-06-30 烽火通信科技股份有限公司 A kind of upgrade method and system of intelligent home gateway equipment

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101394308A (en) * 2007-09-21 2009-03-25 霍尼韦尔国际公司 System and method for remotely administering and synchronizing a clustered group of access control panels
US8495182B1 (en) * 2008-04-02 2013-07-23 Bank Of America Corporation Scalable systems management abstraction framework
CN101383787A (en) * 2008-10-23 2009-03-11 武汉长光科技有限公司 Three in one network type household gateway based on EPON access
CN102132261A (en) * 2009-04-01 2011-07-20 日立系统解决方案有限公司 Home network system, gateway device, and firmware update method
CN102420784A (en) * 2011-10-13 2012-04-18 中国电力科学研究院 Home gateway, intelligent system and energy control method thereof
CN103051525A (en) * 2011-10-14 2013-04-17 海尔集团公司 Gateway service middleware system and method as well as device and system comprising gateway service middleware system
CN103281373A (en) * 2013-05-30 2013-09-04 烽火通信科技股份有限公司 Home gateway intelligent upgrading device and upgrading method
CN103581182A (en) * 2013-10-30 2014-02-12 汉柏科技有限公司 Web message releasing method and device
CN103595802A (en) * 2013-11-19 2014-02-19 烽火通信科技股份有限公司 Method for remotely and automatically updating family gateway software
CN104639376A (en) * 2015-03-05 2015-05-20 太仓市同维电子有限公司 Novel method for human-machine interaction type remote upgrading of home gateway
CN105553730A (en) * 2015-12-22 2016-05-04 新余未来宽带技术有限公司 Implementing method and implementing device for upgrade of gateway type EoC terminal firmware
CN105975308A (en) * 2016-05-04 2016-09-28 烽火通信科技股份有限公司 Remote upgrading system for low-memory overheads in home gateways and remote upgrading method
CN106375122A (en) * 2016-08-31 2017-02-01 上海澳润信息科技有限公司 Intelligent gateway strategy upgrading method based on LAMP (Linux+Apache+Mysql/MariaDB+Perl/PHP/Python)
CN106911502A (en) * 2017-02-22 2017-06-30 烽火通信科技股份有限公司 A kind of upgrade method and system of intelligent home gateway equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109218103A (en) * 2018-09-26 2019-01-15 京信通信系统(中国)有限公司 Gateway upgrade method, gateway and Network Management Equipment
CN109088783A (en) * 2018-11-01 2018-12-25 郑州云海信息技术有限公司 Refresh progress acquisition methods, device and equipment between whole machine cabinet server multistage
CN111181793A (en) * 2019-12-31 2020-05-19 京信通信系统(中国)有限公司 Method, device, equipment and storage medium for controlling chain communication business process
CN111181793B (en) * 2019-12-31 2021-12-21 京信网络系统股份有限公司 Method, device, equipment and storage medium for controlling chain communication business process
CN111342999A (en) * 2020-02-07 2020-06-26 青岛海信网络科技股份有限公司 Web-page-based annunciator wireless upgrading method and device
CN111736877A (en) * 2020-03-31 2020-10-02 紫光云技术有限公司 Method for upgrading Agent of cloud database

Similar Documents

Publication Publication Date Title
CN107483261A (en) A kind of upgrade method and gateway device
EP3501141B1 (en) A network service design and deployment process for nfv systems
CN102411503B (en) A kind of method and system of the dry running performing business process model when design in environment
US10817819B2 (en) Workflow compilation
CN110096424B (en) Test processing method and device, electronic equipment and storage medium
US10656971B2 (en) Agile framework for vertical application development and delivery
CN104282093B (en) Tax-control equipment collective invoicing system and method
US11743295B2 (en) Methods and apparatus to provide resource security
CN101286212A (en) Business flow path execution method, business flow path engines and its deployment method
US20130204834A1 (en) Decision Tree Creation and Execution in an Interactive Voice Response System
US20220075609A1 (en) System and method for application release orchestration and deployment
KR20210042713A (en) Test apparatus to test interoperability of nfv system
CN109067809A (en) Authority configuring method, device, equipment and the storage medium of security component
CN105701406A (en) Method of Android platform for running traditional payment application
CN109992295A (en) A kind of method for edition management and server
CN106981146A (en) A kind of billing method based on many Golden Taxes disks
CN108053288B (en) Service arrangement issuing method and device
Makaya et al. Automated virtual network functions onboarding
Barbier et al. Software adaptation: classification and a case study with state chart xml
CN105827467B (en) A kind of registration center's upgrade method, relevant device and system
CN114827133A (en) Application software management method and device and computer
CN107577519A (en) A kind of virtual machine pressure method and device
WO2015180298A1 (en) Service authentication processing method and apparatus
CN105871678B (en) The method of terminal device in long-range management private network
JP2008134684A (en) Apparatus and program for verifying information communication device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200110

Address after: 510663 Shenzhou Road 10, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangzhou, Guangdong

Applicant after: Jingxin Communication System (China) Co., Ltd.

Address before: 510663 Luogang District Science City, Guangzhou, Shenzhou Road, No. 10, Guangdong

Applicant before: Jingxin Communication System (China) Co., Ltd.

Applicant before: Jingxin Communication System (Guangzhou) Co., Ltd.

Applicant before: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Applicant before: TIANJIN COMBA TELECOM SYSTEMS CO., LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215

RJ01 Rejection of invention patent application after publication