Method for managing resource, device, storage medium and computer equipment Download PDF

Info

Publication number
CN107451858A
CN107451858A CN201710607999.XA CN201710607999A CN107451858A CN 107451858 A CN107451858 A CN 107451858A CN 201710607999 A CN201710607999 A CN 201710607999A CN 107451858 A CN107451858 A CN 107451858A
Authority
CN
China
Prior art keywords
resource
purchase
acquisition
preset duration
volume residual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710607999.XA
Other languages
Chinese (zh)
Inventor
孙晖
王福财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710607999.XA priority Critical patent/CN107451858A/en
Publication of CN107451858A publication Critical patent/CN107451858A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0207Discounts or incentives, e.g. coupons or rebates

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Finance (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment provides a kind of method for managing resource, device, storage medium and computer equipment.The method for managing resource includes:Resource acquisition in response to reception is asked, and sends the resource granting message for including resource data;Every the first preset duration, the volume residual of resource in resource database is obtained, and resource purchase operation is performed according to the volume residual of the resource.Using the technical scheme of the embodiment of the present invention, resource can pre-purchase again in time in the case where surplus resources are less, avoid influenceing the progress of resource provision;Furthermore, it is possible to avoid the wasting of resources caused by buying excess resource.

Description

Method for managing resource, device, storage medium and computer equipment
Technical field
The present invention relates to field of computer technology, more particularly to a kind of method for managing resource, device, storage medium and calculating Machine equipment.
Background technology
Resource (such as lottery ticket, good fortune bag, gold coin etc.) provision is operator's popularization and application (App) common method, For user using when behavior reaches preparatory condition caused by application, the resource of Pre purchase is issued to user by application server, is carried High user using experience, and then realize application.But in current resource allocation method activity, it will usually occur pre- The resource quantity of purchase is inadequate, the problem of causing resource provision can not meet user's request, is unable to reach that effectively promote should Effect;Or there is the problem of resource quantity of Pre purchase excessively causes the wasting of resources.
The content of the invention
Embodiments of the invention provide a kind of resource management scheme.
First aspect according to embodiments of the present invention, there is provided a kind of method for managing resource, including:In response to the money of reception Source obtains request, sends the resource granting message for including resource data;Every the first preset duration, obtain and provided in resource database The volume residual in source, and resource purchase operation is performed according to the volume residual of the resource.
Alternatively, it is described that resource purchase operation is performed according to the volume residual of the resource, including:If the resource Volume residual is less than preset value, then performs resource purchase operation.
Alternatively, the resource purchase operation includes:Buy the resource of predetermined number;And/or according to various types of resource Quantity between preset ratio buy various types of resource.
Alternatively, the resource acquisition in response to reception is asked, and sends the resource granting message for including resource data, bag Include:In the second preset duration, the resource acquisition in response to reception is asked, and sends the resource granting message for including resource data, Wherein, second preset duration is more than first preset duration.
Second aspect according to embodiments of the present invention, a kind of resource management apparatus is also provided, including:Module is provided, is used for Resource acquisition in response to reception is asked, and sends the resource granting message for including resource data;Module is bought, for every first Preset duration, the volume residual of resource in resource database is obtained, and resource purchase is performed according to the volume residual of the resource Buy operation.
Alternatively, if the volume residual that the purchase module is used for the resource is less than preset value, resource purchase is performed Buy operation.
Alternatively, the resource purchase operation includes:Buy the resource of predetermined number;And/or according to various types of resource Quantity between preset ratio buy various types of resource.
Alternatively, the granting module is used in the second preset duration, and the resource acquisition in response to reception is asked, and is sent Resource including resource data provides message, wherein, second preset duration is more than first preset duration.
The third aspect according to embodiments of the present invention, a kind of computer-readable recording medium is also provided, be stored thereon with meter Calculation machine programmed instruction, wherein, described program instructs the step of any one of foregoing method for managing resource is realized when being executed by processor.
Fourth aspect according to embodiments of the present invention, a kind of computer equipment is also provided, including:Processor, memory, lead to Cell part and communication bus, the processor, the memory and the communication device are completed mutual by the communication bus Between communication;The memory is used to deposit an at least executable instruction, before the executable instruction makes the computing device State and operated corresponding to any one method for managing resource.
The resource management scheme of the embodiment of the present invention, by during resource provision is carried out, obtaining number of resources According to the volume residual for the resource being pre-purchase in storehouse, so that determine to perform resource purchase operation according to the remaining data of resource, Resource can pre-purchase again in time in the case where surplus resources are less, avoid influenceing the progress of resource provision; Furthermore, it is possible to avoid the wasting of resources caused by buying excess resource.
Brief description of the drawings
Fig. 1 is a kind of step flow chart of according to embodiments of the present invention one method for managing resource;
Fig. 2 is a kind of step flow chart of according to embodiments of the present invention two method for managing resource;
Fig. 3 is a kind of structured flowchart of according to embodiments of the present invention three resource management apparatus;
Fig. 4 is a kind of structured flowchart of according to embodiments of the present invention four computer equipment.
Embodiment
(identical label represents identical element in some accompanying drawings) and embodiment below in conjunction with the accompanying drawings, implement to the present invention The embodiment of example is described in further detail.Following examples are used to illustrate the present invention, but are not limited to the present invention Scope.
Any method for managing resource that embodiments of the invention provide, can be in resource provision, for for example The resources such as lottery ticket, good fortune bag, gold coin are managed, and ensure the lasting progress of resource provision, and avoid causing the wasting of resources.With Under do not repeating.
Embodiment one
Fig. 1 shows a kind of step flow chart of according to embodiments of the present invention one method for managing resource, and this method is held Row main body can be the Resource Server or service system for arbitrarily having corresponding data processing function, and the present embodiment is taken with resource Illustrated exemplified by business device.
Reference picture 1, the method for managing resource of the present embodiment comprise the following steps:
Step S102:Resource acquisition in response to reception is asked, and sends the resource granting message for including resource data.
Wherein, resource acquisition asks to be used to obtain resource data (for example, when resource is lottery ticket, resource data can wrap Include lottery ticket species, lottery ticket issue and lottery number), it can be sent by application server.Here, application server can be and this The executive agent (such as above-mentioned Resource Server) of embodiment has the third-party application server of cooperative relationship.The application server Resource provision is carried out, when default trigger condition reaches, data for obtaining resource are sent to Resource Server Resource acquisition is asked, to obtain resource data as the resource release information sent to user.Wherein, prefabricated trigger condition can Think that the user of application server monitoring uses the concrete behavior data of its application, such as usage time, operation content.
Resource Server asks to perform resource granting behaviour after resource acquisition request is received in response to resource acquisition Make, sending includes providing message to the resource of resource data.For example, the entrained resource to be obtained is asked according to resource acquisition Information, in the resource pre-purchaseing stored from resource database, the resource data of corresponding informance is obtained, and send that include should The resource of resource data provides message.
Step S104:Every the volume residual of resource in the first preset duration, acquisition resource database, and according to described The volume residual of resource performs resource purchase operation.
In the present embodiment, during Resource Server performs resource transmission operation, obtain in resource database in advance The volume residual of the resource of purchase.Wherein, the volume residual of resource is operated transmitted quantity by total quantity and resource granting Difference.
It may determine that whether remaining resource is sufficient according to the volume residual of resource, and then determine the need for advance again Resource is bought, continues resource provision to avoid influenceing application server.If remaining resource is sufficient, can not hold The purchase operation of row resource, causes to waste to avoid buying excessive resource;If remaining resource is inadequate, resource purchase is performed Operation, to ensure being smoothed out for resource provision.
Method for managing resource according to embodiments of the present invention, by during resource provision is carried out, obtaining money The volume residual for the resource being pre-purchase in source database, so as to determine to perform resource purchase behaviour according to the remaining data of resource Make, resource can pre-purchase again in time in the case where surplus resources are less, avoid influenceing entering for resource provision OK;Furthermore, it is possible to avoid the wasting of resources caused by buying excess resource.
Embodiment two
Fig. 2 shows a kind of step flow chart of according to embodiments of the present invention two method for managing resource.This method is visual For a kind of optional embodiment of the method for managing resource of above-described embodiment one.
Reference picture 2, the method for managing resource of the present embodiment comprise the following steps:
Step S202:In the second preset duration, the resource acquisition in response to reception is asked, and transmission includes resource data Resource provides message.
In the present embodiment, resource provision is carried out within the period of restriction, that is, being carried out in the second preset duration Resource provision.
So that online game is applied as an example, application server previously according in online game set resource provision, with During behavioral data (such as user clicks on action interactions item or user's online hours and reaches setting duration) during family, triggering application clothes Business device sends resource acquisition request to Resource Server.Resource Server is asked in response to resource acquisition, and sending is included from resource The resource that the data for the resource pre-purchaseing are obtained in database provides message.For example, if resource is lottery ticket, the number of resources of transmission According to the information that can be an at least lottery ticket.
Step S204:Every the volume residual of resource in the first preset duration, acquisition resource database.
Wherein, the first preset duration is less than the second preset duration, also, the second preset duration is more than the first preset duration Multiple can be more than preset multiple, that is, the second preset duration is much larger than the first preset duration.For example, the second preset duration is 1 My god, the first preset duration can be 1 minute.
In a kind of optional embodiment, in the second preset duration, Resource Server continuously carries out above-mentioned steps S202 During, at interval of the first preset duration, detect in first resource database, obtain the volume residual of resource.Specifically, may be used With the quantity of the resource included by detecting resource database, to obtain the volume residual of resource;Can also be by resource data The difference of quantity of the quantity for the resource being pre-purchase in storehouse with having provided resource, it is defined as the volume residual of resource.In reality In, after this step is performed, step S204 is continuously carried out, until reaching the second preset duration.
Step S206:Judge whether the volume residual of resource is less than preset value.
If volume residual is more than or equal to preset value, it can determine that remaining resource supports resource provision enough Lasting progress, now, perform return to step S204, then the preset duration of minor tick first after, obtain resource database in Volume residual, and judge whether volume residual is less than preset value.
If volume residual is less than preset value, remaining inadequate resource can be determined to support holding for resource provision It is continuous to carry out, now, step S208 is performed, perform resource purchase operation, to avoid influenceing the lasting progress of resource provision.
Step S208:Perform resource purchase operation.
Alternatively, resource purchase operation includes buying the resource of predetermined number, and/or, according to the number of various types of resource Preset ratio between amount buys various types of resource, that is, according to the default ratio of quantity for various types of resource, it is determined that The quantity of various types of resource is bought, and is bought.If that is, the species of resource altogether include it is a variety of, can only lead to The total quantity that predetermined number limits purchase resource is crossed, the quantity of the resource of wherein each species is not limited;Can also be to purchase Buy total quantity not limit, only limit the quantitative proportion of the various types of resource of purchase;Or using both modes, limiting Order while buy total amount, also limit the purchase ratio of wherein various types of resource.
Still optionally further, predetermined number can also be the difference of setting numerical value and the volume residual of resource in resource database Value, that is, after purchase resource every time, the total number resource amount in resource database is setting numerical value.
The above-mentioned method for managing resource for the present embodiment, in actual applications, can when carrying out resource provision every time To be pre-configured with above-mentioned each parameter in Resource Server by staff, including it is the first preset duration, the second preset duration, default The parameters such as quantity, preset ratio.Then, Resource Server can with the volume residual of resource in automatic detection resource database, with And the automatic resource that performs buys operation, ensures the lasting progress of resource provision.
Method for managing resource according to embodiments of the present invention, by during resource provision is carried out, obtaining money The volume residual for the resource being pre-purchase in source database, so as to determine to perform resource purchase behaviour according to the remaining data of resource Make, resource can pre-purchase again in time in the case where surplus resources are less, avoid influenceing entering for resource provision OK;Furthermore, it is possible to avoid the wasting of resources caused by buying excess resource.
Embodiment three
Fig. 3 shows a kind of structured flowchart of according to embodiments of the present invention three resource management apparatus.
Reference picture 3, the resource management apparatus of the present embodiment include providing module 302 and quantity acquisition module 304.Wherein, Provide module 302 to be used to ask in response to the resource acquisition of reception, send the resource granting message for including resource data;Buy mould Block 304 is used for the volume residual that resource in resource database is obtained every the first preset duration, and according to the surplus of the resource Remainder amount performs resource purchase operation.
Alternatively, if the volume residual that purchase module 304 is used for the resource is less than preset value, resource purchase is performed Operation.
Alternatively, the resource purchase operation includes:Buy the resource of predetermined number;And/or according to various types of resource Quantity between preset ratio buy various types of resource.
Alternatively, provide module 302 to be used in the second preset duration, the resource acquisition in response to reception is asked, and sends bag The resource for including resource data provides message, wherein, second preset duration is more than first preset duration.
The resource management apparatus of the present embodiment can be used for the method for managing resource for realizing previous embodiment one or embodiment two, And the beneficial effect with embodiment of the method, do not repeating herein.
Example IV
The embodiment of the present invention four provides a kind of computer equipment, for example, can be mobile terminal, personal computer (PC), Tablet personal computer, server etc..Below with reference to Fig. 4, it illustrates suitable for for realizing the terminal device of the embodiment of the present invention or clothes The structural representation of the electronic equipment 400 of business device:As shown in figure 4, electronic equipment 400 includes one or more processors, communication Element etc., one or more of processors are for example:One or more CPU (CPU) 401, and/or one or more Individual image processor (GPU) 413 etc., processor can according to the executable instruction being stored in read-only storage (ROM) 402 or Person performs various appropriate actions from the executable instruction that storage part 408 is loaded into random access storage device (RAM) 403 And processing.Communication device includes communication component 412 and/or communication interface 409.Wherein, communication component 412 may include but be not limited to Network interface card, the network interface card may include but be not limited to IB (Infiniband) network interface card, and communication interface 409 includes such as LAN card, modulatedemodulate The communication interface of the NIC of device etc. is adjusted, communication interface 409 performs communication process via the network of such as internet.
Processor can communicate to perform executable instruction with read-only storage 402 and/or random access storage device 403, It is connected by communication bus 404 with communication component 412 and is communicated through communication component 412 with other target devices, so as to completes this Operated corresponding to any one image processing method that inventive embodiments provide, for example, the resource acquisition in response to reception is asked, hair The resource including resource data is sent to provide message;Every the first preset duration, the volume residual of resource in resource database is obtained, And resource purchase operation is performed according to the volume residual of the resource.
In addition, in RAM 403, various programs and data needed for device operation can be also stored with.CPU401 or GPU413, ROM402 and RAM403 are connected with each other by communication bus 404.In the case where there is RAM403, ROM402 is can Modeling block.RAM403 stores executable instruction, or executable instruction is operationally write into ROM402, and executable instruction makes place Manage device and perform operation corresponding to above-mentioned communication means.Input/output (I/O) interface 405 is also connected to communication bus 404.Communication Component 412 can be with integrally disposed, it can also be provided that have multiple submodule (such as multiple IB network interface cards), and in communication bus chain Connect.
I/O interfaces 405 are connected to lower component:Importation 406 including keyboard, mouse etc.;Penetrated including such as negative electrode The output par, c 407 of spool (CRT), liquid crystal display (LCD) etc. and loudspeaker etc.;Storage part 408 including hard disk etc.; And the communication interface 409 of the NIC including LAN card, modem etc..Driver 410 is also according to needing to connect It is connected to I/O interfaces 405.Detachable media 411, such as disk, CD, magneto-optic disk, semiconductor memory etc., pacify as needed On driver 410, in order to which the computer program read from it is mounted into storage part 408 as needed.
Need what is illustrated, framework as shown in Figure 4 is only a kind of optional implementation, can root during concrete practice Selected, deleted, increased or replaced according to the component count amount and type being actually needed to above-mentioned Fig. 4;Set in difference in functionality part Put, can also use the implementation such as separately positioned or integrally disposed, such as GPU and CPU is separable sets or can be by GPU collection Into on CPU, communication device is separable to be set, can also be integrally disposed on CPU or GPU, etc..These interchangeable embodiment party Formula each falls within protection scope of the present invention.
Especially, according to embodiments of the present invention, it is soft to may be implemented as computer for the process above with reference to flow chart description Part program.For example, the embodiment of the present invention includes a kind of computer program product, it includes being tangibly embodied in machine readable media On computer program, computer program includes the program code for being used for the method shown in execution flow chart, and program code can wrap Corresponding perform is included to instruct corresponding to method and step provided in an embodiment of the present invention, for example, the resource acquisition in response to reception is asked, Sending includes the resource granting message of resource data;Every the remainder of resource in the first preset duration, acquisition resource database Amount, and resource purchase operation is performed according to the volume residual of the resource.In such embodiments, the computer program can To be downloaded and installed by communication device from network, and/or it is mounted from detachable media 411.In the computer program When being executed by processor, the above-mentioned function of being limited in the method for the embodiment of the present invention is performed.
It may be noted that according to the needs of implementation, all parts/step described in the embodiment of the present invention can be split as more Multi-part/step, the part operation of two or more components/steps or components/steps can be also combined into new part/step Suddenly, to realize the purpose of the embodiment of the present invention.
Above-mentioned method according to embodiments of the present invention can be realized in hardware, firmware, or be implemented as being storable in note Software or computer code in recording medium (such as CD ROM, RAM, floppy disk, hard disk or magneto-optic disk), or it is implemented through net The original storage that network is downloaded is in long-range recording medium or nonvolatile machine readable media and will be stored in local recording medium In computer code, can be stored in using all-purpose computer, application specific processor or can compile so as to method described here Such software processing in journey or the recording medium of specialized hardware (such as ASIC or FPGA).It is appreciated that computer, processing Device, microprocessor controller or programmable hardware include can storing or receive software or computer code storage assembly (for example, RAM, ROM, flash memory etc.), when the software or computer code are by computer, processor or hardware access and when performing, realize Method described here.In addition, when all-purpose computer accesses the code for realizing the processing being shown in which, the execution of code All-purpose computer is converted into the special-purpose computer for performing the processing being shown in which.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and method and step, it can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, application-specific and design constraint depending on technical scheme.Professional and technical personnel Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the embodiment of the present invention.
Embodiment of above is merely to illustrate the embodiment of the present invention, and is not the limitation to the embodiment of the present invention, relevant skill The those of ordinary skill in art field, in the case where not departing from the spirit and scope of the embodiment of the present invention, it can also make various Change and modification, therefore all equivalent technical schemes fall within the category of the embodiment of the present invention, the patent of the embodiment of the present invention Protection domain should be defined by the claims.

Claims (10)

  1. A kind of 1. method for managing resource, it is characterised in that including:
    Resource acquisition in response to reception is asked, and sends the resource granting message for including resource data;
    Every the volume residual of resource in the first preset duration, acquisition resource database, and according to the remainder of the resource Amount performs resource purchase operation.
  2. 2. according to the method for claim 1, it is characterised in that described that resource purchase is performed according to the volume residual of the resource Operation is bought, including:
    If the volume residual of the resource is less than preset value, resource purchase operation is performed.
  3. 3. according to the method for claim 1, it is characterised in that the resource purchase operation includes:
    Buy the resource of predetermined number;And/or
    Various types of resource is bought according to the preset ratio between the quantity of various types of resource.
  4. 4. according to the method in any one of claims 1 to 3, it is characterised in that the resource acquisition in response to reception Request, the resource granting message for including resource data is sent, including:
    In the second preset duration, the resource acquisition in response to reception is asked, and sends the resource granting message for including resource data, Wherein, second preset duration is more than first preset duration.
  5. A kind of 5. resource management apparatus, it is characterised in that including:
    Module is provided, for the resource acquisition request in response to reception, sends the resource granting message for including resource data;
    Module is bought, for the volume residual every resource in the first preset duration, acquisition resource database, and according to described The volume residual of resource performs resource purchase operation.
  6. 6. device according to claim 5, it is characterised in that if the purchase module is used for the remainder of the resource Amount is less than preset value, then performs resource purchase operation.
  7. 7. device according to claim 5, it is characterised in that the resource purchase operation includes:
    Buy the resource of predetermined number;And/or
    Various types of resource is bought according to the preset ratio between the quantity of various types of resource.
  8. 8. the device according to any one of claim 5 to 7, it is characterised in that the granting module is used for pre- second If in duration, the resource acquisition in response to reception is asked, and sends the resource granting message for including resource data, wherein, described the Two preset durations are more than first preset duration.
  9. 9. a kind of computer-readable recording medium, is stored thereon with computer program instructions, wherein, described program instruction is processed The step of device realizes the method for managing resource any one of Claims 1-4 when performing.
  10. 10. a kind of computer equipment, including:Processor, memory, communication device and communication bus, the processor, described deposit Reservoir and the communication device complete mutual communication by the communication bus;
    The memory is used to deposit an at least executable instruction, and the executable instruction makes the computing device such as right will Ask operation corresponding to the method for managing resource any one of 1 to 4.
CN201710607999.XA 2017-07-24 2017-07-24 Method for managing resource, device, storage medium and computer equipment Pending CN107451858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710607999.XA CN107451858A (en) 2017-07-24 2017-07-24 Method for managing resource, device, storage medium and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710607999.XA CN107451858A (en) 2017-07-24 2017-07-24 Method for managing resource, device, storage medium and computer equipment

Publications (1)

Publication Number Publication Date
CN107451858A true CN107451858A (en) 2017-12-08

Family

ID=60487218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710607999.XA Pending CN107451858A (en) 2017-07-24 2017-07-24 Method for managing resource, device, storage medium and computer equipment

Country Status (1)

Country Link
CN (1) CN107451858A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109710411A (en) * 2018-12-28 2019-05-03 深圳忆联信息系统有限公司 TLP field method for managing resource, device, computer equipment and storage medium
CN114881546A (en) * 2022-07-08 2022-08-09 天聚地合(苏州)科技股份有限公司 Method and device for determining resource consumption

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150294537A1 (en) * 2012-10-25 2015-10-15 Casicon Co., Ltd. Game management system
CN105100262A (en) * 2015-08-20 2015-11-25 孙晖 Resource distribution method, server and terminal device
CN105100162A (en) * 2014-05-19 2015-11-25 腾讯科技(深圳)有限公司 Virtual good sending method and device, receiving method and device, and system
CN106127382A (en) * 2016-06-22 2016-11-16 财付通支付科技有限公司 Method for managing resource and device
CN106776040A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of resource allocation methods and device
CN106779875A (en) * 2017-01-13 2017-05-31 腾讯科技(深圳)有限公司 A kind of method and server for configuring virtual numerical value
CN106878246A (en) * 2016-07-27 2017-06-20 阿里巴巴集团控股有限公司 A kind of method for managing resource and device
CN106961465A (en) * 2016-01-08 2017-07-18 深圳市星电商科技有限公司 A kind of resource sending method and server

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150294537A1 (en) * 2012-10-25 2015-10-15 Casicon Co., Ltd. Game management system
CN105100162A (en) * 2014-05-19 2015-11-25 腾讯科技(深圳)有限公司 Virtual good sending method and device, receiving method and device, and system
CN105100262A (en) * 2015-08-20 2015-11-25 孙晖 Resource distribution method, server and terminal device
CN106961465A (en) * 2016-01-08 2017-07-18 深圳市星电商科技有限公司 A kind of resource sending method and server
CN106127382A (en) * 2016-06-22 2016-11-16 财付通支付科技有限公司 Method for managing resource and device
CN106878246A (en) * 2016-07-27 2017-06-20 阿里巴巴集团控股有限公司 A kind of method for managing resource and device
CN106776040A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of resource allocation methods and device
CN106779875A (en) * 2017-01-13 2017-05-31 腾讯科技(深圳)有限公司 A kind of method and server for configuring virtual numerical value

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109710411A (en) * 2018-12-28 2019-05-03 深圳忆联信息系统有限公司 TLP field method for managing resource, device, computer equipment and storage medium
CN114881546A (en) * 2022-07-08 2022-08-09 天聚地合(苏州)科技股份有限公司 Method and device for determining resource consumption

Similar Documents

Publication Publication Date Title
US20220222171A1 (en) Systems including network simulation for mobile application development
CN104753911B (en) A kind of information processing method based on social application, relevant apparatus and system
CN107786601B (en) Information processing method, terminal and server
CN105727555B (en) The upgrade method and upgrade-system of user gradation in social software
WO2020054879A1 (en) Information processing device, etc. for calculating prediction data
CN107733735B (en) Script recording system and method implanted in pressure measurement device
CN114462969A (en) Project progress real-time monitoring method and device, electronic equipment and storage medium
CN112348648B (en) Resource processing method and device
CN107451858A (en) Method for managing resource, device, storage medium and computer equipment
CN102982048B (en) A kind of method and apparatus for being used to assess junk information mining rule
CN106936874A (en) Physical source distributing method, apparatus and system
CN114266604A (en) Advertisement putting effect evaluation method based on multiple dimensions and storage medium
CN105678550B (en) Data processing method and device
CN108632358A (en) Based on the WIFI token management methods shared and device
CN107886433A (en) User's fund monitoring follow-up method, apparatus, equipment and readable storage medium storing program for executing
CN109815106B (en) Interactive function testing method and device of information delivery platform
CN111435330B (en) Business processing flow simulation method, device and system
CN106559310B (en) A kind of the excitation update method and system of access of virtual interaction platform
KR20180035515A (en) Method for verifying a performance of clients and servers for smart ternimal
CN106886432A (en) A kind of variable parameter condition triggering method and system
CN110535849A (en) Account information management method and device
JP7244578B2 (en) Information processing device, information processing method and information processing program
KR20120082224A (en) Billing system based on using time for mobile application, and application for mobile device
CN109389378A (en) The electronics red packet distribution method and device of variable condition of withdrawing deposit
CN113343115B (en) User data processing method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171208