CN107330664A - A kind of intelligence based on Internet of Things builds management system - Google Patents

A kind of intelligence based on Internet of Things builds management system Download PDF

Info

Publication number
CN107330664A
CN107330664A CN201710332048.6A CN201710332048A CN107330664A CN 107330664 A CN107330664 A CN 107330664A CN 201710332048 A CN201710332048 A CN 201710332048A CN 107330664 A CN107330664 A CN 107330664A
Authority
CN
China
Prior art keywords
data
platform
personnel
rfid
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710332048.6A
Other languages
Chinese (zh)
Inventor
李永青
王庆山
周伦淡
马景祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Point Trading Information Technology Co Ltd
Original Assignee
Shanghai Point Trading Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Point Trading Information Technology Co Ltd filed Critical Shanghai Point Trading Information Technology Co Ltd
Publication of CN107330664A publication Critical patent/CN107330664A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0029Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement being specially adapted for wireless interrogation of grouped or bundled articles tagged with wireless record carriers

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention relates to the intelligent management system of building course, a kind of especially intelligence based on Internet of Things of the building trade in building course builds management system, pass through the personal information and component therein in intelligent information collecting platform collection site construction area, material, the detection data and monitoring data of safety and environment, handled through Intelligent Information Processing platform, user is responded by different management platforms to ask, and show corresponding data in different management platforms respectively, so that the information at project under construction scene and processing work become simple, comprehensively, accurate and science intelligence.

Description

A kind of intelligence based on Internet of Things builds management system
Technical field
It is based on the present invention relates to the one kind of the intelligent management system of building course, especially building trade in building course The intelligence of Internet of Things builds management system.
Background technology
In recent years, China's economy enters the transitional period, but due to urbanization, railway, orbit construction, urban construction level still Social development needs can not be met, the data display announced according to State Statistics Bureau, building trade is still protected for 2011 to 2015 Average annual 9.19% rapid growth is held, and in a foreseeable future, still has the ability to keep continual and steady development.
However, the development of industry, which does not have, brings management development.Job site is big and numerous and disorderly:Subpackage unit is random, Work post is more, while the scope of operation constructed is more, and the activity duration is indefinite.The means of information are based on artificially collecting, only There are only a few data to be collected by Information Technology Methods.A variety of unfavorable factors determine that relevant unit is in construction project pipe above Still can only be based on extensive style management in reason.
There is problems with project entity's aspect, the information of project management:1st, the depth of information, field management The daily management mission of personnel is heavy, administrative staff's quantity is few, quality of science not enough determines the of low quality of information, main The property seen is strong and depth is inadequate;2nd, the range of information, construction site condition is complicated, and the scope of operation is more, progress, quality, secure side The information in face can not be accomplished exhaustive;3rd, the ageing of information is collected, to be returned report after information is artificially collected and integrates Judgement processing has often had already passed by optimal processing time;4th, the exchange cost of information is high, between each subpackage unit, work post Exchange it is not smooth;5, the means of information fall behind, for example, the applicable high-tech staff attendance system in some importance project scene System has IC-card work attendance and bio-identification work attendance respectively, efficient low, the recognition time length of this two major classes work attendance means, identification mistake The high defect of rate, can only often adhere to using seldom a period of time.Above-mentioned variety of problems causes the rearmounted of project management means, The manager at scene is more to carry out decision commanding by experience, it is impossible to accomplish fine, timely and accurately science.Manage resource Waste, cost increases, effect is had a greatly reduced quality.
Construction unit aspect, it is main to the management of project entity collected layer by layer with traditional artificial report and data based on. Company can not obtain the live progress of project, quality, the real-time accurate picture of safety in time, to the management basic flow of project entity In form.
Supervisor's aspect, the management of Projects during Construction Stage, the at present main double control inspection using keypoint part.Means Based on tour and other station.Because construction site condition is complicated, construction speed is often changed, even emphasis construction stage, management Personnel also tend to accomplish in time, comprehensively to follow up.Moreover, being limited by the energy and quality of supervisor, supervisor Level to quality control differs, and the effect of management is also uneven.
In construction unit's aspect, reality, because of the live information obtained between administrative department of construction unit of project construction not Symmetrically, construction unit is to critical process of the construction unit in construction, supervision and check of key position and not in place;To management list Quality control situation, daily management activity and the other station situation of supervisor of position also are difficult to accomplish supervision and check.
Government regulation aspect, supervision and management of the safety supervision department of government to the quality, safety and environment of job site is led at present Will be based on to spot-check, patrol and handle afterwards;To the recurrent dispute between workers & employer in project scene, because the management of job site is mixed Disorderly complicated, effective work attendance system can not be set up at all, be more to try to plaster over the differences at the expense of principle, based on stability maintenance when ruling.
The content of the invention
In order to solve variety of problems present in above-mentioned building course, the invention provides a kind of intelligence based on Internet of Things Management system can be built.
Present invention employs following technical scheme:
A kind of intelligence based on Internet of Things builds management system, including intelligent information collecting platform, Intelligent Information Processing are put down Platform and management application platform,
Intelligent information collecting platform, for the personal information in collection site construction area, and in site operation region Component, material, safety and environment detected and monitored;
Intelligent Information Processing platform, the data message gathered for processing information acquisition module, corresponding arrange forms personnel Data, component data, monitoring data, security monitoring data and environment measuring data, and each data are uploaded to system data deposited Bank;
Application platform is managed, for generating different management platforms according to the data message of Intelligent Information Processing platform, is passed through User's request is responded, corresponding data is shown in different management platforms respectively.
Further, described intelligent information collecting platform includes station acquisition module, on-site supervision module and environment prison Survey module,
Described station acquisition module, including the RFID read-write base station that is arranged in site operation region and with RFID electricity The component of subtab and personnel, station acquisition module is by RFID read-write identification of base stations RFID come real-time collection site The three-dimensional coordinate information of personnel and component in construction area;
On-site supervision module, including site operation infrared induction equipment within and outside the region and picture pick-up device are laid in, it is described On-site supervision module monitors by infrared induction equipment and picture pick-up device to material, template system, scaffold system and danger Region is monitored in real time,
Environment monitoring module, is believed by environmental sensor, dust sensor, sensor noise real-time collecting site environment Breath.
Further, described intelligent information collecting platform also includes room entry/exit management module,
Described room entry/exit management module includes being arranged on picture pick-up device at gateway, the first RFID read-write base station and second RFID read-write base station, the monitor area of described picture pick-up device covers the identification region A and second of the first RFID read-write base station The identification region B of RFID read-write base station, identification region A are overlapping with identification region B holding parts,
Described picture pick-up device calculates the component of porch and the turnover quantity of personnel and records turnover time, first RFID read-write base station and the second RFID read-write base station are according to the order for reading RFID in site operation region, to judge Component and the turnover process of personnel, and the component of mandate and the turnover number of personnel are calculated, described picture pick-up device is calculated Turnover number subtracts the component and the turnover number of personnel for the mandate that the first RFID read-write base station and the second RFID read-write base station are calculated, and comes Obtain the number of components and personnel amount in current unauthorized entrance site operation region.
Further, obliquity sensor, displacement transducer and should are provided with described scaffold system and template system Power monitors sensor, to collect the bracing displacement data and pressure change data of scaffold and template.
Further, at least one RFID that described station acquisition module also includes being arranged in site operation region is read Base station is write, described RFID is corresponded with each component, personnel respectively, and air pressure is integrated with RFID Sensor, gyroscope, gravity sensor and magnetometer, described RFID read-write base station is according to each in site operation region RFID carries out location Calculation to the distance of RFID read-write base station, obtains component and the three-dimensional coordinate information of personnel.
Further, described RFID is taken by personnel using bracelet or pin ring or safety cap as RFID carriers Band, described bracelet or the non-real time physiological data of pin ring collector.
Further, described RFID is arranged in component before component enters scene.
Further, described Intelligent Information Processing platform includes home server and Cloud Server, and intelligent information is collected The discrepancy information of collection, three-dimensional coordinate information, monitor video, security information, environmental information are uploaded to this by platform by network Ground server, described home server to data be uploaded to the system data thesaurus of Cloud Server after sifting sort In.
Further, the data message collating sort that described Intelligent Information Processing platform gathers information acquisition module, Formed respectively:Time data, personnel's real time position data, personnel's historical position data, component turnover field data, component install number According to, live unauthorized entrance data, on-site supervision video data, danger zone real-time monitoring data, scaffold system supervise in real time Control data, template system real-time monitoring data, material monitoring data, job site periphery monitoring data, environment measuring data.
Further, described management platform includes video monitoring platform, personal management platform, Schedule monitoring platform, peace Full monitor supervision platform, environmental monitoring platform,
Described video monitoring platform is watched scene by on-site supervision video data and regarded in real time with history from different perspectives The video monitoring of frequency;
Described personal management platform:
According to real time position data and time data, the focus in the real time personnel geographical position in displaying scene construction area Scheme, and teams and groups, work post, position and the number of personnel are obtained in hotspot graph, and
According to real time position data, time data and historical position data, personnel's is real-time in displaying scene construction area Track simultaneously reduces historical movement track;And
According to live unauthorized entrance data, component turnover field data, time data, staff attendance situation is shown, to existing Unauthorized personnel in the construction area of field is defined management, and carries out warehousing management to component;
Described Schedule monitoring platform judges project progress feelings by personnel's real time position data and component installation data Condition;
Described security monitor platform passes through danger zone real-time monitoring data, material monitoring data, job site periphery Monitoring data, is monitored, and pass through danger in real time to the danger zone in site operation region, material and job site periphery Region scaffold system real-time monitoring data, template system real-time monitoring data, monitor weight scaffold and template incessantly Change in displacement and stress variation, early warning is sent reaching the stress fatigue limit or being displaced to up to before critical point;
Described environmental monitoring platform is showed by the construction of environment measuring data monitoring job site dust, noise, temperature Field environmental aspect.
The present invention is allowed to compared with prior art, have the following advantages that and actively imitate due to using above technical scheme Really:
1. changing the construction projects information management mode that tradition falls behind, intelligent information collecting platform is utilized Field data is collected and is real-time transmitted to Intelligent Information Processing platform, intelligent information by the technologies such as RFID, sensor, video monitoring Processing platform carries out classification processing to the data message of collection, and is stored, so that the information at project under construction scene Become simple, comprehensive, accurate and science intelligence with processing work;
2. having built different management platforms, the real-time monitoring of all standing of different angles in site operation region is realized And supervision, allow the mobile office of job site to be possibly realized, and each interests relevant unit can provide shifting for service item simultaneously Dynamic management application platform;
3. establish timely and effectively information feedback system and early warning system, solve that feedback of the information is accurate not in time, pipe Difficulty is big for reason, production efficiency is low, professional's technical deficiency, safety management is not enough, attendance management is performed practically no function etc. building The problem of building site is frequently present of;
4. being additionally arranged room entry/exit management module, pass through picture pick-up device, the first RFID read-write base station and the second RFID read-write base station Statistics calculating is carried out to wherein carrying the component of RFID, personnel, so as to the unauthorized people in site operation region The live unauthorized component of member and personnel are managed.
Brief description of the drawings
The intelligence that Fig. 1 is the present invention builds management system organisational chart.
Fig. 2 is that the intelligence of the present invention builds the topological structure schematic diagram of information platform in management system.
Fig. 3 is that the intelligence of the present invention builds the schematic diagram of room entry/exit management module in management system.
Embodiment
Technical scheme proposed by the present invention is further described below in conjunction with the drawings and specific embodiments.According to following Illustrate and claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing is using very simplified shape Formula and use non-accurately ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
Intelligent management system of the invention based on technology of Internet of things, passes through RFID, sensor and network shooting Field data is collected and is real-time transmitted to Intelligent Information Processing platform by the electronic equipments such as machine, changes the backward building of tradition and applies Work project information collect processing mode, by project under construction scene information and backstage processing work become it is simple, comprehensive, Accurate and science is intelligent, has agreed with the developing direction of building trade, be assembled architecture development and BIM technology in construction The application at scene provides the digital interface of information age.The present invention is specifically described below in conjunction with accompanying drawing.
The system includes intelligent information collecting platform, Intelligent Information Processing platform and management application platform, as shown in figure 1, Intelligent information collecting platform, is mainly used for the personal information in collection site construction area, and in site operation region Component, material, safety and environment are detected and monitored;Intelligent Information Processing platform, for the collection of processing information acquisition module Data message, corresponding arrange form demographic data, component data, monitoring data, security monitoring data and environment measuring data, And each data are uploaded to system data thesaurus;Application management platform, for being believed according to the data of Intelligent Information Processing platform The different management platforms of breath generation, are asked by responding user, show corresponding data in different management platforms respectively.
Intelligent information collecting platform obtains scene using station acquisition module, on-site supervision module and environment monitoring module Personnel, material, component, safety and environmental information, mainly above-mentioned are set by RFID tag, sensor, web camera and transmitting The various equipment compositions such as the base station of standby gathered data, referring to Fig. 2.
Station acquisition module, including the RFID read-write base station that is arranged in site operation region and with RFID Component and personnel, wherein, component is that the various foundation constructions such as building (room) face, wall, beam, plate, pillar in architectural process will Element, personnel then include workmen, administrative staff and supervisor etc..Station acquisition module passes through RFID read-write identification of base stations Personnel and the three-dimensional coordinate information of component that RFID is come in real-time collection site construction area.Specifically, be At least provided with a RFID read-write base station in site operation region, it is generally preferable to for the RFID read-write base of three or more than three Stand to increase positioning precision, RFID is corresponded with each component, personnel respectively, the circuit board of RFID On be integrated with baroceptor, gyroscope, gravity sensor and magnetometer, baroceptor is aided in by obtaining elevation information System improves personnel positioning precision;Gyroscope, gravity sensor and magnetometer are then used for accessory system and improve personnel positioning precision. Thus, RFID read-write base station is entered according to each RFID in site operation region to the distance of RFID read-write base station Row location Calculation, so as to obtain component and the three-dimensional coordinate information of personnel.
RFID is carried by personnel using bracelet or pin ring or safety cap as RFID carriers, personnel's real name identity letter Breath need to be by identification apparatus typing intelligence system, each personnel need correspondence unique in intelligence system before engineering starts RFID coding, bracelet numbering or pin ring numbering and safety cap numbering, be integrated with a variety of physiology on bracelet or pin ring Inductor, to the non-real time physiological data of collector, understands the health of personnel.In view of the situation of job site, on The carrier for stating the RFID of staff's carrying is preferably corresponding safety cap.For component, RFID exists Component is arranged in component before entering scene, is generally that RFID chip directly is implanted into component inside by the way of.In addition, also RFID electronics marks can be set on the various construction equipments in turnover site operation region, detecting instrument equipment, vehicles passing in and out Label, and by corresponding informance typing intelligence system, further to expand the range of management of building management system, formed more fully Data monitoring.
In view of part construction site condition it is arduouser or reply temporary interruption situation, RFID read-write base station can be set It is equipped with solar energy electroplax and electric energy storage device.
On-site supervision module, including site operation infrared induction equipment within and outside the region and picture pick-up device are laid in, scene Monitoring module monitoring is entered by infrared induction equipment and picture pick-up device to material, template system, scaffold system and danger zone Row monitoring in real time.The real-time monitoring of material is the laying infrared inductor and high definition network in place and material stockyard surrounding Head, is collected into the monitoring safeguard information at scene;Template system and scaffold body are set on scaffold system and template system There are obliquity sensor, displacement transducer and stress monitoring sensor, to collect the bracing displacement data and pressure of scaffold and template Power delta data;Danger zone is then to judge whether that someone leans on by being provided separately within the RFID reading base stations of danger zone Closely, voice warning module and also can be set to reach the purpose of early warning.
Environment monitoring module is then believed by environmental sensor, dust sensor, sensor noise real-time collecting site environment Breath, understands site environment data.
In addition, intelligent information collecting platform also includes room entry/exit management module, whether authorized person passes in and out place to intelligent decision, The authorized workmen of Intelligent Recognition passes in and out the personnel amount and relevant information in place, Intelligent Recognition component enter place when Between, its schematic diagram can be found in Fig. 3,
Picture pick-up device, the first RFID read-write base station and the 2nd RFID that room entry/exit management module includes being arranged at gateway are read Write the first RFID read-write base station in base station, figure and represent that the second RFID read-write base station is represented with RFID base stations B, is taken the photograph with RFID base stations A The identification region A of the first RFID read-write base station and the identification region of the second RFID read-write base station need to be covered as the monitor area of equipment B, identification region A are overlapping with identification region B holding parts,
Picture pick-up device calculates the component of porch and the turnover quantity of personnel and records the turnover time, the first RFID read-write Base station and the second RFID read-write base station are according to the order for reading RFID in site operation region, to judge component and people The turnover process of member, and the component of mandate and the turnover number of personnel are calculated, the turnover number that described picture pick-up device is calculated is subtracted The component and the turnover number of personnel of the mandate of the first RFID read-write base station and the calculating of the second RFID read-write base station are removed, it is current to obtain The number of components and personnel amount in unauthorized entrance site operation region.
When specifically used, by high definition monitoring camera alignment just to front door, the first RFID read-write base station and the 2nd RFID Read/write base station then be arranged in parallel along the direction of discrepancy, and the first RFID read-write base station and the second RFID read-write base station is kept One segment distance, it is poor that two RFID read-write base stations reading RFID has certain time;High definition monitoring camera is counted Entrance number of people entering, due to having the record of related intelligent video passenger number statistical system in the prior art, therefore passes through video The calculation of statistical number of person will not be described here;Recycle the first RFID read-write base station and the orientation of the second RFID read-write base station two The order that RFID is read in RFID read-write base station enters or gone out judging authorized person, and counts mandate work The number of people entering of personnel, correspondingly, need to also increase in system database or delete corresponding personal information.Camera is recognized and is The turnover total number of persons completely counted subtracts the first RFID read-write base station, the orientation RFID read-write base station institute of the second RFID read-write base station two The number of people entering of the mandate staff of statistics, you can the number of current unauthorized entrance job site is obtained, by number record In database, also warning can be sent to live security in time by managing application platform, equally, rely solely on the first RFID readings Base station and the first RFID read-write base station are write, the situation of marching into the arena of component can also be counted.
Intelligent Information Processing platform includes home server and Cloud Server, the real time information that RFID is collected into It is pooled to behind distribution RFID read-write base station at the scene, with sensor host machine, environment detector, video monitoring, safety monitoring It is collected into discrepancy information, three-dimensional coordinate information, monitor video, security information, environmental information and local service is uploaded to by network Device by network insertion home server, internetwork connection mode is preferably wireless network, and home server is sieved to data The preparatory processing processing such as choosing classification, then be uploaded in the system data thesaurus of Cloud Server.If constructed in Cloud Server with The big data processing for possessing data screening, classification, storage, retrieval and query function based on dry Database Systems is flat Platform.
The data message collating sort that Intelligent Information Processing platform gathers information acquisition module, is formed respectively:Time number According to, personnel's real time position data, personnel's historical position data, component turnover field data, component installation data, scene it is unauthorized enter Enter data, on-site supervision video data, danger zone real-time monitoring data, scaffold system real-time monitoring data, template system Real-time monitoring data, material monitoring data, job site periphery monitoring data, environment measuring data.
Management platform in the present invention includes video monitoring platform, personal management platform, Schedule monitoring platform, security monitoring Platform, environmental monitoring platform, the different application of each management platform correspondence can also correspond to construction unit, unit in charge of construction, supervisor With government regulation unit, have access to and check on demand so as to constituent parts.
Video monitoring platform watches regarding for live real-time and history video from different perspectives by on-site supervision video data Frequency is monitored;
Personal management platform:
According to real time position data and time data, the focus in the real time personnel geographical position in displaying scene construction area Scheme, and teams and groups, work post, position and the number of personnel are obtained in hotspot graph, and
According to real time position data, time data and historical position data, personnel's is real-time in displaying scene construction area Track simultaneously reduces historical movement track;And
According to live unauthorized entrance data, component turnover field data, time data, staff attendance situation is shown, to existing Unauthorized personnel in the construction area of field is defined management, and carries out warehousing management to component;
Schedule monitoring platform judges project progress situation by personnel's real time position data and component installation data;
Security monitor platform passes through danger zone real-time monitoring data, material monitoring data, job site periphery monitoring number According to being monitored in real time to the danger zone in site operation region, material and job site periphery, and pass through danger zone pin Hand cradle system real-time monitoring data, template system real-time monitoring data, the displacement that weight scaffold and template are monitored incessantly become Change and stress variation, early warning is sent reaching the stress fatigue limit or being displaced to up to before critical point;
Environmental monitoring platform by environment measuring data monitoring job site dust, noise, temperature job site environment Situation.
In addition, above-mentioned management application platform can realize application with hardware platform or software platform, hardware realizes platform bag The multimedia terminal that PC ends, mobile phone terminal, tablet personal computer end and scene are put is included, it is soft that software realizes that platform includes the specialized management of PC ends Part, webpage, APP and wechat.
Before system operation, following preparation need to be carried out:
First, according to site operation organization scheme and total figure, scheme Design is carried out;According to construction feature, point Into different phase, by RFID read-write base station and various sensors enter field time and coordinate position specific aim arrangement carry out it is basic Cable sets up work, by the station acquisition module being made up of infrared induction equipment and web camera, scene before engineering starts Monitoring module and environment monitoring module, the basic RFID read-write base station of access management module and working site, web camera Arrangement is completed.Finally, the real name identity information of site operation personnel, administrative staff and supervisor are passed through into card reader of ID card Log in system database, and the unique RFID numbering of correspondence, healthy bracelet (pin ring) numbering in database With safety cap numbering;RFID chip is implanted into component inside before component enters scene, and logged in system database.
Intelligent Information Processing platform after the data collected by intelligent information collecting platform are got, in home server and Correspondence application demand is respectively processed in Cloud Server, and time data, the personnel for sorting out live all staff on board are real-time Position data, personnel's historical position information, component turnover field data, component installation data, scene work monitor video data, Live unauthorized personnel illegally illegally supervises in real time into data, limitation working region unauthorized personnel into information, danger zone Control data, scaffold system real-time monitoring data, template system real-time monitoring data, placing of material place safety monitoring data, Job site periphery security protection system data, job site environmental monitoring data.
The data crossed as described above by Intelligent Information Processing platform processes can respectively should by different combinations To different applications.
Live all staff on board's turnover time data can sort out the work attendance note of site operation personnel, administrative staff Record;
The real-time position information mating component mount message of field personnel, work post, reality that can be by staff When position and component final position under construction judge the progress situation of engineering;
The historical position information of all staff on board, can restore the historical track of staff, be entangled there is labour and capital When confused, coordinate the video monitoring information of relevant position, the Main Basiss mediated an issue can be used as;
Component march into the arena information historical data mating component install historical information be optimize field warehouse management it is important Foundation;
The work monitor video real-time pictures information at scene is then produced on-site, the important tool of safety management, custodian Member, supervisor, safety supervision administrative staff reach monitoring life in real time by switching heterogeneous networks video camera in management application platform Produce the purpose at scene;
It is existing to construction by 24 hours that live unauthorized personnel illegally enters information combination job site periphery security protection system The continual intelligent monitoring in field, is the Main Means of live Migrant women management and security system;
The unauthorized entrance data in scene can also enter administrative staff to the working region of high-risk work post and limit management;Danger zone is real When monitoring information workman Yi Fasheng is fallen hole hole, can not temporarily set railing face border area domain, it is high-order chemicals, quick-fried Storage region of fried thing etc. realizes Real-time Monitor Management;And the real-time monitoring data of scaffold system and template system, energy The change in displacement and stress variation of monitoring important node position, the stress fatigue limit or position are reached in support system incessantly Move on to and send early warning in time up to before critical point.The application of several information can greatly be likely to reduced several frequently seen on building site above , the industrial accident that harm is maximum occurs.
Material stockyard safety monitoring data be ensure the job site production order and strengthen live security management it is important according to According to.
Job site environmental monitoring data provides the environmental datas such as the real-time air in job site and noise.
By above-mentioned Intelligent Information Processing Platform Screening and processing after data result can in the form of form picture and text basis Presented using the unit of object and the different of responsibility in management application platform after various combination on individual character interface.Management application The hardware of platform realize platform include and be not limited to PC ends, mobile phone terminal, tablet personal computer end and the multimedia terminal put of scene, it is soft Part realizes that platform includes and is not limited to include PC ends specialized management software, webpage, APP and wechat.Can also be by strongly professional Individual character interface and various hardware realize platform and various software realizes the combination of platform, allow the pipes of not different responsibilities of commensurate Reason personnel, administrative department regulatory requirement can be accomplished in same management platform.
Specifically, above-mentioned management application platform has following exhibition method:The group company of construction unit bears The essential information that the management platform of duty people shows be responsible for project is collected and is responsible for the keynote message of specialty, and can inquire about responsible The concrete condition of project;The management platform of the project manager of construction unit shows that this project includes scene and regarded in real time Frequently, progress control, quality management, the essential information of safety management and supervisor that he is managed, the custodian of unit in charge of construction Member job information, according to respective duty and authority not with he can with can obtain deeper into check authority, warning prompt and processing Authority;Likewise, the company director of supervision companies can be obtained in management platform company responsible project management management Essential information and keynote message, and the project manager of supervision companies can obtain the real-time progress msg of this project, and by entering Spend the arrangement of the change adjustment management in time of information;Unit in charge of construction builds the emphasis of management system as the intelligence of the present invention And difficult point, can obtain project more comprehensively with specific data feedback.The parent company administrative staff of unit in charge of construction can pass through management Application platform obtain each project live real-time video information, personal management information, material management information, progress control information, Quality management information and safety management information, and obtain the first-hand data of live emergency situations.Existed according to the progress of project Reasonable distribution resource between each project;The project manager of unit in charge of construction then can obtain this project by managing application platform Real-time video information, personal management information, material management information, progress control information, quality management information and safety management Information, and according to specialty and responsibility distribution live targetedly keynote message prompting and corresponding processing authority;Government's safety supervision Department can then obtain environmental information, safety management information and the quality management letter of each project by this management application platform Breath, and carried out according to these data management and to be used as what is followed up afterwards under the information leave-on after processing in advance, in thing Foundation.Likewise, when there is dispute between workers & employer, what departments of government can also from platform acquisition staff attendance record and daily Movement track is recorded, and transfers the history video data of respective regions according to track record come auxiliary judgment processing.
Those skilled in the art should be understood that the present invention can be implemented without departing from this with many other concrete forms The spirit or scope of invention, disclosed above is only the preferred embodiment of the present invention.Preferred embodiment does not have detailed descriptionthe and owned Details, it is only described embodiment that the invention is not limited yet.Obviously, according to the content of this specification, it can make a lot Modifications and variations.This specification is chosen and specifically describes these embodiments, be in order to preferably explain the present invention principle and Practical application, so that one of ordinary skill in the art can utilize the present invention well.The present invention is only by claims and its entirely The limitation of portion's scope and equivalent, those skilled in the art can be defined such as appended claims the present invention spirit and Within the scope of make and changing and modifications.

Claims (10)

1. a kind of intelligence based on Internet of Things builds management system, it is characterised in that including intelligent information collecting platform, intelligence letter Processing platform and management application platform are ceased,
Intelligent information collecting platform, for the personal information in collection site construction area, and to the structure in site operation region Part, material, safety and environment are detected and monitored;
Intelligent Information Processing platform, the data message gathered for processing information acquisition module, it is corresponding arrange formed demographic data, Component data, monitoring data, security monitoring data and environment measuring data, and each data are uploaded to system data thesaurus;
Application platform is managed, for generating different management platforms according to the data message of Intelligent Information Processing platform, passes through response User asks, and shows corresponding data in different management platforms respectively.
2. a kind of intelligence based on Internet of Things according to claim 1 builds management system, it is characterised in that described intelligence Can information platform include station acquisition module, on-site supervision module and environment monitoring module, described station acquisition module, Including being arranged on the RFID read-write base station in site operation region and the component with RFID and personnel, station acquisition Module is by RFID read-write identification of base stations RFID come the personnel and the three of component in real-time collection site construction area Dimension coordinate information;
On-site supervision module, including site operation infrared induction equipment within and outside the region and picture pick-up device are laid in, described shows Field monitoring module monitoring is by infrared induction equipment and picture pick-up device to material, template system, scaffold system and danger zone Monitored in real time,
Environment monitoring module, passes through environmental sensor, dust sensor, sensor noise real-time collecting site environment information.
3. a kind of intelligence based on Internet of Things according to claim 1 or 2 builds management system, it is characterised in that described Intelligent information collecting platform also include room entry/exit management module,
Described room entry/exit management module includes being arranged on picture pick-up device, the first RFID read-write base station and the 2nd RFID at gateway Read/write base station, the monitor area of described picture pick-up device covers identification region A and the 2nd the RFID reading of the first RFID read-write base station The identification region B of base station is write, identification region A is overlapping with identification region B holding parts,
Described picture pick-up device calculates the component of porch and the turnover quantity of personnel and records the turnover time, and the first RFID is read Base station and the second RFID read-write base station are write according to the order for reading RFID in site operation region, come judge component and The turnover process of personnel, and calculate the component of mandate and the turnover number of personnel, the turnover number that described picture pick-up device is calculated The component and the turnover number of personnel for the mandate that the first RFID read-write base station and the second RFID read-write base station are calculated are subtracted, is worked as to obtain The number of components and personnel amount in preceding unauthorized entrance site operation region.
4. a kind of intelligence based on Internet of Things according to claim 2 builds management system, it is characterised in that described pin Obliquity sensor, displacement transducer and stress monitoring sensor are provided with hand cradle system and template system, to collect scaffold With the bracing displacement data and pressure change data of template.
5. a kind of intelligence based on Internet of Things according to claim 3 builds management system, it is characterised in that described position Put at least one RFID read-write base station that acquisition module also includes being arranged in site operation region, described RFID Corresponded respectively with each component, personnel, baroceptor, gyroscope, gravity sensor are integrated with RFID And magnetometer, described RFID read-write base station is according to each RFID in site operation region to RFID read-write base station Distance carry out location Calculation, obtain component and the three-dimensional coordinate information of personnel.
6. a kind of intelligence based on Internet of Things according to claim 5 builds management system, it is characterised in that described RFID is carried by personnel using bracelet or pin ring or safety cap as RFID carriers, described bracelet or pin ring collection people The non-real time physiological data of member.
7. a kind of intelligence based on Internet of Things according to claim 5 builds management system, it is characterised in that described RFID is arranged in component before component enters scene.
8. a kind of intelligence based on Internet of Things according to claim 1 builds management system, it is characterised in that described intelligence Can the information processing platform include home server and Cloud Server, intelligent information collecting platform is by discrepancy information, the three-dimensional of collection Coordinate information, monitor video, security information, environmental information are uploaded to home server, described home server by network It is uploaded to after carrying out sifting sort to data in the system data thesaurus of Cloud Server.
9. a kind of intelligence based on Internet of Things according to claim 1 builds management system, it is characterised in that described intelligence The data message collating sort that the energy information processing platform gathers information acquisition module, is formed respectively:Time data, personnel are real-time Position data, personnel's historical position data, component turnover field data, component installation data, live unauthorized entrance data, scene Monitor video data, danger zone real-time monitoring data, scaffold system real-time monitoring data, template system monitor number in real time According to, material monitoring data, job site periphery monitoring data, environment measuring data.
10. a kind of intelligence based on Internet of Things according to claim 1 builds management system, it is characterised in that described Management platform includes video monitoring platform, personal management platform, Schedule monitoring platform, security monitor platform, environmental monitoring platform,
Described video monitoring platform watches live real-time and history video from different perspectives by on-site supervision video data Video monitoring;
Described personal management platform:
According to real time position data and time data, the hotspot graph in the real time personnel geographical position in displaying scene construction area, And teams and groups, work post, position and the number of personnel are obtained in hotspot graph, and
According to real time position data, time data and historical position data, the real-time track of personnel in displaying scene construction area And reduce historical movement track;And
According to live unauthorized entrance data, component turnover field data, time data, staff attendance situation is shown, scene is applied Unauthorized personnel in the domain of work area is defined management, and carries out warehousing management to component;
Described Schedule monitoring platform judges project progress situation by personnel's real time position data and component installation data;
Described security monitor platform passes through danger zone real-time monitoring data, material monitoring data, job site periphery monitoring Data, are monitored, and pass through danger zone in real time to the danger zone in site operation region, material and job site periphery Scaffold system real-time monitoring data, template system real-time monitoring data,
The change in displacement and stress variation of weight scaffold and template are monitored incessantly, reach the stress fatigue limit or displacement Early warning is sent before reaching critical point;
Described environmental monitoring platform by environment measuring data monitoring job site dust, noise, temperature job site ring Border situation.
CN201710332048.6A 2016-05-12 2017-05-11 A kind of intelligence based on Internet of Things builds management system Pending CN107330664A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610313778 2016-05-12
CN2016103137787 2016-05-12

Publications (1)

Publication Number Publication Date
CN107330664A true CN107330664A (en) 2017-11-07

Family

ID=60193443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710332048.6A Pending CN107330664A (en) 2016-05-12 2017-05-11 A kind of intelligence based on Internet of Things builds management system

Country Status (1)

Country Link
CN (1) CN107330664A (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107845236A (en) * 2017-12-05 2018-03-27 中铁局集团天津建设工程有限公司 Based on the construction operation security protection early warning system positioned in real time and its method for early warning
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108320449A (en) * 2017-12-25 2018-07-24 上海建工五建集团有限公司 Construction site personal safety detection method and system
CN108824817A (en) * 2018-06-15 2018-11-16 宁波大学 Based on can the component of real-time perception and the assembled architecture automatic assembly method of BIM
CN108871460A (en) * 2018-08-24 2018-11-23 绿山高科建设科技有限公司 It is a kind of that monitoring system is built based on the wisdom of BIM and technology of Internet of things
CN109214040A (en) * 2018-07-17 2019-01-15 广州圣安环保科技有限公司 A kind of fabricated construction real-time monitoring system and method based on BIM
CN109461290A (en) * 2018-11-13 2019-03-12 机械工业第六设计研究院有限公司 A kind of monitoring management system and equipment of civil construction
CN109472375A (en) * 2018-11-06 2019-03-15 武汉瑞莱保能源技术有限公司 A kind of scaffold management method and device
CN109729490A (en) * 2018-11-12 2019-05-07 浙江众合科技股份有限公司 Full-automatic driving rolling stock section personnel safety guard's system
CN109739185A (en) * 2018-11-16 2019-05-10 成都生活家网络科技有限公司 Long-distance intelligent house ornamentation field management system
CN110197444A (en) * 2019-06-12 2019-09-03 李贵平 It is a kind of integrate resource consolidation, on line bid, construction management finished system
CN110210830A (en) * 2019-05-31 2019-09-06 深圳中物智建科技有限公司 A kind of construction site management system and method
CN110244679A (en) * 2019-07-29 2019-09-17 南京合智信息技术有限公司 A kind of wisdom building site management system and its application method based on SAAS platform
CN110570340A (en) * 2019-09-04 2019-12-13 河北斯博思创新科技有限公司 rural toilet transformation management system
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN110969418A (en) * 2019-11-29 2020-04-07 伍知行 Project management system and management method
CN111062650A (en) * 2020-01-19 2020-04-24 国网河南省电力公司信息通信公司 Big data-based power grid safety management information system
CN111080945A (en) * 2019-12-05 2020-04-28 北京无线电计量测试研究所 Gas operation field dynamic sensing system
CN111401773A (en) * 2020-03-26 2020-07-10 上海蓝彬新材料科技有限公司 Engineering construction monitoring system based on big data
CN111598375A (en) * 2019-11-28 2020-08-28 利尔达科技集团股份有限公司 Equipment management platform for early warning terminal system
CN111614755A (en) * 2020-05-20 2020-09-01 梅州市悦思智能科技有限公司 Environment intelligent management system based on Internet of things
CN111898866A (en) * 2020-07-03 2020-11-06 浙江华卫智能科技有限公司 Wisdom building site management platform
CN112034742A (en) * 2019-06-04 2020-12-04 中国石油天然气股份有限公司 Construction site management system
CN112270482A (en) * 2020-11-02 2021-01-26 上海建工一建集团有限公司 Vertical transportation management method for super high-rise building
CN112783131A (en) * 2021-01-08 2021-05-11 上海景事科技有限公司 Wisdom building site thing networking systems based on big data
CN112989099A (en) * 2021-05-14 2021-06-18 赣通通信股份有限公司 Intelligent construction management system and method based on image communication
CN113034311A (en) * 2021-03-07 2021-06-25 赵子佩 Building construction supervision system and method based on BIM
CN113177771A (en) * 2021-04-22 2021-07-27 深圳市威斯登信息科技有限公司 Construction site supervision platform based on 5G network and implementation method thereof
CN113627874A (en) * 2021-07-29 2021-11-09 福州交通信息投资运营有限公司 Engineering construction comprehensive management method and terminal
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN114095633A (en) * 2021-11-09 2022-02-25 中建一局集团第五建筑有限公司 Intelligent construction technology application system
CN114353858A (en) * 2021-07-26 2022-04-15 安徽云路交通信息技术有限公司 On-spot monitored control system based on safety control
CN116402407A (en) * 2023-06-05 2023-07-07 山东四维卓识信息技术有限公司 Construction detection data management system and method based on Internet of things
CN112270482B (en) * 2020-11-02 2024-05-10 上海建工一建集团有限公司 Vertical transportation management method for super high-rise building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201583827U (en) * 2010-01-18 2010-09-15 江苏先行工业设备安装有限公司 Building construction field safety monitoring system
CN103174325A (en) * 2013-03-28 2013-06-26 浙江优创信息技术有限公司 Novel construction fencing device
CN103390255A (en) * 2013-07-30 2013-11-13 上海城建市政工程(集团)有限公司 Construction site digital management system and application method thereof
CN103544562A (en) * 2013-10-12 2014-01-29 佛山市中韬信息科技有限公司 Intelligent confidential article identification management system on basis of internet of things
CN105338112A (en) * 2015-11-25 2016-02-17 广州广隧机电设备有限公司 Internet of Things-based shield tunnel construction refine digit management platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201583827U (en) * 2010-01-18 2010-09-15 江苏先行工业设备安装有限公司 Building construction field safety monitoring system
CN103174325A (en) * 2013-03-28 2013-06-26 浙江优创信息技术有限公司 Novel construction fencing device
CN103390255A (en) * 2013-07-30 2013-11-13 上海城建市政工程(集团)有限公司 Construction site digital management system and application method thereof
CN103544562A (en) * 2013-10-12 2014-01-29 佛山市中韬信息科技有限公司 Intelligent confidential article identification management system on basis of internet of things
CN105338112A (en) * 2015-11-25 2016-02-17 广州广隧机电设备有限公司 Internet of Things-based shield tunnel construction refine digit management platform

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107845236A (en) * 2017-12-05 2018-03-27 中铁局集团天津建设工程有限公司 Based on the construction operation security protection early warning system positioned in real time and its method for early warning
CN108320449A (en) * 2017-12-25 2018-07-24 上海建工五建集团有限公司 Construction site personal safety detection method and system
CN108053150A (en) * 2018-01-09 2018-05-18 中建七局安装工程有限公司 A kind of site operation personnel's intelligent management based on BIM
CN108824817B (en) * 2018-06-15 2021-05-04 宁波大学 Assembly type building automatic assembly method based on real-time perception component and BIM
CN108824817A (en) * 2018-06-15 2018-11-16 宁波大学 Based on can the component of real-time perception and the assembled architecture automatic assembly method of BIM
CN109214040A (en) * 2018-07-17 2019-01-15 广州圣安环保科技有限公司 A kind of fabricated construction real-time monitoring system and method based on BIM
CN109214040B (en) * 2018-07-17 2023-07-11 广东强雄建设集团有限公司 BIM-based real-time monitoring system and method for assembly construction
CN108871460A (en) * 2018-08-24 2018-11-23 绿山高科建设科技有限公司 It is a kind of that monitoring system is built based on the wisdom of BIM and technology of Internet of things
CN109472375A (en) * 2018-11-06 2019-03-15 武汉瑞莱保能源技术有限公司 A kind of scaffold management method and device
CN109729490A (en) * 2018-11-12 2019-05-07 浙江众合科技股份有限公司 Full-automatic driving rolling stock section personnel safety guard's system
CN109461290A (en) * 2018-11-13 2019-03-12 机械工业第六设计研究院有限公司 A kind of monitoring management system and equipment of civil construction
CN109739185A (en) * 2018-11-16 2019-05-10 成都生活家网络科技有限公司 Long-distance intelligent house ornamentation field management system
CN110210830A (en) * 2019-05-31 2019-09-06 深圳中物智建科技有限公司 A kind of construction site management system and method
CN112034742A (en) * 2019-06-04 2020-12-04 中国石油天然气股份有限公司 Construction site management system
CN110197444A (en) * 2019-06-12 2019-09-03 李贵平 It is a kind of integrate resource consolidation, on line bid, construction management finished system
CN110244679B (en) * 2019-07-29 2023-07-04 南京合智信息技术有限公司 Intelligent building site management system based on SAAS platform and application method thereof
CN110244679A (en) * 2019-07-29 2019-09-17 南京合智信息技术有限公司 A kind of wisdom building site management system and its application method based on SAAS platform
CN110570340A (en) * 2019-09-04 2019-12-13 河北斯博思创新科技有限公司 rural toilet transformation management system
CN110910063A (en) * 2019-11-18 2020-03-24 何小钟 Method for collecting material information in road construction process
CN111598375A (en) * 2019-11-28 2020-08-28 利尔达科技集团股份有限公司 Equipment management platform for early warning terminal system
CN110969418A (en) * 2019-11-29 2020-04-07 伍知行 Project management system and management method
CN111080945A (en) * 2019-12-05 2020-04-28 北京无线电计量测试研究所 Gas operation field dynamic sensing system
CN111062650A (en) * 2020-01-19 2020-04-24 国网河南省电力公司信息通信公司 Big data-based power grid safety management information system
CN111401773A (en) * 2020-03-26 2020-07-10 上海蓝彬新材料科技有限公司 Engineering construction monitoring system based on big data
CN111614755A (en) * 2020-05-20 2020-09-01 梅州市悦思智能科技有限公司 Environment intelligent management system based on Internet of things
CN111898866A (en) * 2020-07-03 2020-11-06 浙江华卫智能科技有限公司 Wisdom building site management platform
CN112270482B (en) * 2020-11-02 2024-05-10 上海建工一建集团有限公司 Vertical transportation management method for super high-rise building
CN112270482A (en) * 2020-11-02 2021-01-26 上海建工一建集团有限公司 Vertical transportation management method for super high-rise building
CN112783131A (en) * 2021-01-08 2021-05-11 上海景事科技有限公司 Wisdom building site thing networking systems based on big data
CN113034311A (en) * 2021-03-07 2021-06-25 赵子佩 Building construction supervision system and method based on BIM
CN113177771A (en) * 2021-04-22 2021-07-27 深圳市威斯登信息科技有限公司 Construction site supervision platform based on 5G network and implementation method thereof
CN112989099A (en) * 2021-05-14 2021-06-18 赣通通信股份有限公司 Intelligent construction management system and method based on image communication
CN114353858A (en) * 2021-07-26 2022-04-15 安徽云路交通信息技术有限公司 On-spot monitored control system based on safety control
CN113627874A (en) * 2021-07-29 2021-11-09 福州交通信息投资运营有限公司 Engineering construction comprehensive management method and terminal
CN114095633A (en) * 2021-11-09 2022-02-25 中建一局集团第五建筑有限公司 Intelligent construction technology application system
CN114023048A (en) * 2021-11-27 2022-02-08 安徽博达项目管理咨询有限公司 Engineering supervision system based on artificial intelligence data processing and visual analysis
CN116402407A (en) * 2023-06-05 2023-07-07 山东四维卓识信息技术有限公司 Construction detection data management system and method based on Internet of things
CN116402407B (en) * 2023-06-05 2023-09-08 山东四维卓识信息技术有限公司 Construction detection data management system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN107330664A (en) A kind of intelligence based on Internet of Things builds management system
CN108520342B (en) BIM-based Internet of things platform management method and system
CN111126838B (en) Intelligent engineering management system
CN112785798B (en) Behavior analysis method for constructors of power substation engineering construction project
CN201917921U (en) Face monitoring and recognizing system for large assembly places
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN109886196A (en) Personnel track traceability system and method based on BIM plus GIS video monitoring
US20210349476A1 (en) Method and apparatus for controlling cruise of unmanned air vehicle based on prefabricated construction platform
CN108304983A (en) Management platform is repaiied in a kind of oil and gas pipeline inspection acquired based on unmanned plane and network communication technology data
CN211509189U (en) Electric power operation field supervision equipment and system
CN111260506A (en) Information management system for Internet of things of construction engineering
CN108710827A (en) A kind of micro- police service inspection in community and information automatic analysis system and method
CN109829693A (en) One kind being used for Construction Schedule management system and management method
CN112286994A (en) Glass curtain wall integrated management platform
CN115278542A (en) Ultra-wideband technology-based construction site personnel positioning management system and method
CN114399265A (en) Electric power engineering construction project overall process management and control system
CN204515433U (en) The healthy and safe data Real-Time Monitoring of occupational illness and information management system
CN110503327A (en) A kind of visualization construction total safe management system based on BIM
CN115330129A (en) Enterprise safety risk early warning analysis method and system
CN115640925A (en) Wisdom building site management system
CN107885831A (en) A kind of collection and analysis method and system of field data
CN114723388A (en) Intelligent building site comprehensive safe operation informatization monitoring system
CN110830558A (en) Mobile inspection system for power monitoring equipment
CN114329106A (en) Big data analysis system and method for community

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171107

RJ01 Rejection of invention patent application after publication