CN107295679A - The dispatching method and device of resource - Google Patents

The dispatching method and device of resource Download PDF

Info

Publication number
CN107295679A
CN107295679A CN201610203782.8A CN201610203782A CN107295679A CN 107295679 A CN107295679 A CN 107295679A CN 201610203782 A CN201610203782 A CN 201610203782A CN 107295679 A CN107295679 A CN 107295679A
Authority
CN
China
Prior art keywords
business
base station
control signaling
subframe
delay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610203782.8A
Other languages
Chinese (zh)
Inventor
黄双红
卢有雄
杨瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201610203782.8A priority Critical patent/CN107295679A/en
Priority to PCT/CN2017/078621 priority patent/WO2017167204A1/en
Publication of CN107295679A publication Critical patent/CN107295679A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/56Allocation or scheduling criteria for wireless resources based on priority criteria
    • H04W72/566Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient
    • H04W72/569Allocation or scheduling criteria for wireless resources based on priority criteria of the information or information source or recipient of the traffic information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a kind of dispatching method of resource and device, wherein, this method includes:Base station UE is dispatched according to the characteristic information of the UE business of reported by user equipment UE;Base station is sent control signaling according to scheduling result and/or delay parameter, and scheduling result is carried in the control signaling.By the present invention, solve the interval between the packet that V2X communicates in correlation technique and there is skew, there is also the effect for the reliability for the problem of change, having reached raising V2X communications for the data package size of different types of service.

Description

The dispatching method and device of resource
Technical field
The present invention relates to the communications field, in particular to the dispatching method and device of a kind of resource.
Background technology
Car networking refers to the communication protocol and Data Exchange Standard according to agreement, in car-X (X:Car, road, pedestrian and mutually Networking etc.) between, communicate wirelessly the big grid exchanged with information.It can obtain vehicle by car networking communication Driving safety is obtained, traffic efficiency is improved and is facilitated or entertainment information.Classify from the object of radio communication, Che Lian Network Communication includes three kinds of different types:Communicate (Vehicle to Vehicle, referred to as V2V), car between vehicle and vehicle Communicate (Vehicle to Infrastructure, abbreviation V2I), and communicated between vehicle and pedestrian between roadside equipment (Vehicle to Pedestrian, referred to as V2P), is referred to as V2X communications.
3GPP (3rd Generation Partnership Project) tissue based on LTE (Long Term Evolution, Referred to as Long Term Evolution) V2X Communication Studies in, the V2X communication means of the Uu links based on cellular communication is V2X One of mode of standard implementation, abbreviation Uu-based V2X communications.Fig. 1 is Uu-based V2X communications in correlation technique Configuration diagram, as shown in figure 1, user equipment (User Equipment, referred to as UE) include vehicle-mounted user (Vehicle UE, abbreviation V UE) and pedestrian user (Pedestrian UE, abbreviation P UE).Transmitting terminal UE (such as UE1) leads to Cross cellular uplink (UL) and transmit data to base station eNB, base station is again by cellular downlink (DL) by number According to being broadcast to receiving terminal UE (such as UE2).
For Uu-based V2X communications, semi-persistent scheduling (Semi-Persistent Scheduling, abbreviation SPS) is Realize after a kind of scheduling resources transmitted methods of UL, scheduling first resource, UE can be periodically repeated using tune The resource of degree.
The business of V2X communications includes periodic traffic and bursts of traffic, because the high-speed motion of vehicle causes communication scenes Change is frequent, and the speed of vehicle, the change in direction also cause periodic traffic data to be not to be produced completely by the cycle, number There is certain skew according to the interval between bag, while the data package size of different types of service also changes than larger.
But the size of the VoIP business data packets of existing LTE SPS transmission supports is relatively fixed, between packet Time interval also meets certain regularity, it is impossible to adapt to skew and the data package size of the packet interval of V2X communications Change.For the above mentioned problem in correlation technique, not yet there is effective solution at present.
The content of the invention
The invention provides a kind of dispatching method of resource and device, at least to solve the number that V2X communicates in correlation technique There is skew according to the interval between bag, there is also the problem of change for the data package size of different types of service.
According to an aspect of the invention, there is provided a kind of dispatching method of resource, including:Base station is according to user equipment The characteristic information for the UE business that UE is reported dispatches the UE;Sent out according to scheduling result and/or delay parameter base station Control signaling is sent, wherein, carry scheduling result in the control signaling.
Further, the UE bags are dispatched in base station according to the characteristic information of the UE business of reported by user equipment UE Include:The base station determines the resource of the semi-static transmission of the UE according to the content of the characteristic information;Or, the base station The resource of the semi-static transmission of the UE is determined according to the corresponding priority of the characteristic information, wherein, the characteristic information Corresponding priority is obtained according to the mapping relations with the content of the characteristic information;Wherein, the content of the characteristic information Including at least one of:The type of service of the UE business, cycle corresponding with the UE business and the UE The corresponding delay requirement information of business;The cycle corresponding with the UE business, including business datum generation cycle And/or business datum sends the cycle.
Further, the base station according to scheduling result and/or delay parameter send control signaling including:The base station base Send the control signaling in delay parameter T2, wherein, the value of the T2 for the base station send the control signaling with Time delay between second timing reference, second timing reference includes receiving the tune that the UE is sent with the base station The degree request SR and/or reporting cached state BSR corresponding timing of subframe;Or, the base station sends the control letter Delay parameter T3 is included in order, wherein, the value of the T3 indicates that the scheduling UE sends the subframe of business and the 3rd and determined When refer between time delay, the subframe that the 3rd timing reference includes with the base station sends the control signaling is corresponding The corresponding timing of subframe where timing and/or the UE receive the control signaling;Or, the base station is joined based on time delay Number T4 subtracts N and sends the control signaling, wherein, the value of the T4 for dispatch the UE send the subframe of business with Time delay between second timing reference, second timing reference includes receiving the tune that the UE is sent with the base station The degree request SR and/or reporting cached state BSR corresponding timing of subframe, wherein N is positive integer;Or, the base Stand to subtract M1 and T6 based on delay parameter T5 and subtract M2 and send the control signaling, wherein, dispatch the UE and send industry Time delay between the subframe of business and the second timing reference is more than or equal to delay parameter T5 value, and less than or equal to time delay Parameter T6 value, second timing reference include with the base station receive dispatch request SR that the UE sends and / or reporting cached state BSR the corresponding timing of subframe, wherein, M1 and M2 are positive integer.
Further, the UE business includes control information and/or data.
Further, the unit of described delay parameter T2, T3, T4, T5 and T6 value is number of sub-frames or millisecond; Described delay parameter T2, T3, T4, T5 and T6 value are predefined value, and/or by the base station from selection set Selection determination, wherein, the criterion of selection is:The characteristic information of the UE business is different, and time delay described in corresponding selection is joined Number T2, T3, T4, T5 and T6 value are also different;Or, select described delay parameter T2, T3, T4, T5 and T6 Value be fixed value;Wherein, the content of the characteristic information includes at least one of:The service class of the UE business Type, cycle corresponding with the UE business, delay requirement information corresponding with the business of the UE;It is described with it is described UE business corresponding cycle, including business datum generation cycle and/or business datum send the cycle.
According to another aspect of the present invention there is provided a kind of dispatching method of resource, including:User equipment (UE) is to base Station reports the characteristic information of the UE business;The UE receives the control letter for the carrying scheduling result that the base station is sent Order;The UE determines the resource of transmission business according to the control signaling and/or the scheduling result.
Further, the content of the characteristic information includes at least one of:The type of service of the UE business, with The UE business corresponding cycle, delay requirement information corresponding with the business of the UE;Wherein, it is described with it is described UE business corresponding cycle, including business datum generation cycle and/or business datum send the cycle.
Further, reporting the characteristic information of the UE business includes at least one of:The UE is adjusted by sending Degree request SR reports the characteristic information of the UE business;The UE is reported by sending reporting cached state BSR The characteristic information of the UE business.
Further, the control signaling for the carrying scheduling result that the UE receptions base station is sent includes:The UE After dispatch request SR and/or reporting cached state BSR is sent, delay time delay T2 receives the control signaling;Or, The UE is after dispatch request SR and/or reporting cached state BSR is sent, and delay time delay T4 subtracts N and receives described Control signaling;Or,
The UE is subtracting M1 more than or equal to time delay T5, and subtracts less than or equal to time delay T6 in M2 time range The control signaling is received, wherein, N, M1 and M2 are positive integer.
Further, the UE determines that the resource of transmission business includes according to the control signaling and/or the scheduling result: The UE is received after the control signaling, and delay time delay T1 sends the business of the UE, or, the UE is connecing Receive after the control signaling according to fixed sequential relationship, the corresponding hair of subframe where the control signaling is received Subframe is sent to send the business of the UE;Or, the UE sends the business of the UE, bag according to the scheduling result The business that the time delay T3 included according to scheduling result sends the UE is included, is postponed after the control signaling is received Time delay T3 sends the business of the UE.
Further, the UE business includes control information and/or data.
Further, the unit of described delay parameter T1, T2, T3, T4, T5 and T6 value is number of sub-frames or milli Second;Described delay parameter T1, T2, T3, T4, T5 and T6 value are predefined value, and/or are matched somebody with somebody according to the base station Put determination.
According to a further aspect of the invention there is provided a kind of dispatching device of resource, applied to base station side, including:Adjust Module is spent, the characteristic information for the UE business according to reported by user equipment UE dispatches the UE;First sends Module, for being sent control signaling according to scheduling result and/or delay parameter, wherein, carry and adjust in the control signaling Spend result.
According to a further aspect of the invention there is provided a kind of dispatching device of resource, applied to user equipment (UE) side, Including:Reporting module, the characteristic information of the UE business is reported to base station;Receiving module, for receiving the base station The control signaling of the carrying scheduling result of transmission;Second sending module, for according to the control signaling and/or the tune Degree result determines the resource of transmission business.
By the present invention, UE is dispatched according to the characteristic information of the UE business of reported by user equipment UE using base station, and then Base station sends control signaling according to scheduling result and/or delay parameter, so as to solve the number that V2X communicates in correlation technique There is skew according to the interval between bag, the data package size of different type of service has reached and carried there is also the problem of change The effect of the reliability of high V2X communications.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, the present invention Schematic description and description be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the configuration diagram of Uu-based V2X communications in correlation technique;
Fig. 2 is the schematic diagram of Radio Resource frame structure in correlation technique;
Fig. 3 is the schematic diagram of Radio Resource structure in correlation technique;
Fig. 4 is the flow chart one of the dispatching method of resource according to embodiments of the present invention;
Fig. 5 is the flowchart 2 of the dispatching method of resource according to embodiments of the present invention;
Fig. 6 is the structured flowchart one of the dispatching device of resource according to embodiments of the present invention;
Fig. 7 is the structured flowchart two of the dispatching device of resource according to embodiments of the present invention;
Fig. 8 is according to the schematic diagram dispatched in alternative embodiment two of the present invention based on time delay T1;
Fig. 9 is according to the schematic diagram dispatched in alternative embodiment two of the present invention based on time delay T2;
Figure 10 is according to the schematic diagram dispatched in alternative embodiment two of the present invention based on time delay T4.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that in the feelings not conflicted Under condition, the feature in embodiment and embodiment in the application can be mutually combined.
Technical scheme is applied to cellular radio Communication system or network.Common cellular radio Communication system can be with Based on CDMA (Code Division Multiplexing Access, referred to as CDMA) technology, frequency division multiple access (Frequency Division Multiplexing Access, referred to as FDMA) technology, OFDM (Orthogonal-FDMA, referred to as OFDMA) technology, single-carrier frequency division multiple access (Single Carrier-FDMA, Referred to as SC-FDMA) technology, etc..For example, 3GPP (3rd Generation Partnership Project), long-term Evolution (Long Term Evolution, referred to as LTE)/senior long term evolution (LTE-Advanced, referred to as LTE-A) Cellular communication system downlink (or for forward link) is based on OFDMA technologies, up-link (or be reverse Link) it is based on SC-FDMA multiple access technologies.
In OFDMA/SC-FDMA systems, when the Radio Resource (Radio Resource) for communication is-frequency two The form of dimension.For example, for LTE/LTE-A systems, the communication resource of uplink and downlink link is in time orientation On be all with radio frames (radio frame) be unit divide, each radio frames (radio frame) length be 10ms, Comprising the subframe (sub-frame) that 10 length are 1ms, each subframe includes two time slots (slot) that length is 0.5ms, Fig. 2 is the schematic diagram of Radio Resource frame structure in correlation technique, as shown in Figure 2.And according to cyclic prefix (Cyclic Prefix, CP configuration) is different, and each time slot can include 6 or 7 OFDM or SC-FDM symbols.
Fig. 3 is the schematic diagram of Radio Resource structure in correlation technique, as shown in figure 3, in frequency direction, resource is with sub- load Ripple (subcarrier) be unit divide, specifically in the communications, frequency domain resource distribution least unit be (Resource Block, Referred to as RB resource blocks), a Physical Resource Block (Physical RB, referred to as PRB) for correspondence physical resource.One Individual PRB includes 12 subcarriers (sub-carrier) in frequency domain, corresponding to a time slot (slot) of time domain.Each The resource of one subcarrier of correspondence is referred to as resource unit (Resource Element, abbreviation on OFDM/SC-FDM symbols For RE).
It should be noted that term " first ", " second " in description and claims of this specification and above-mentioned accompanying drawing Etc. being for distinguishing similar object, without for describing specific order or precedence.
A kind of dispatching method of resource is provided in the present embodiment, and Fig. 4 is the scheduling of resource according to embodiments of the present invention The flow chart one of method, as shown in figure 4, the flow comprises the following steps:
Step S402:Base station UE is dispatched according to the characteristic information of the UE business of reported by user equipment UE;
Step S404:Base station sends control signaling according to scheduling result and/or delay parameter, wherein, taken in control signaling Band scheduling result;
By the above-mentioned steps S402 in the present embodiment to step S404, using base station according to reported by user equipment UE The characteristic information of UE business dispatches UE, and then base station sends control signaling according to scheduling result and/or delay parameter, from And there is skew in the interval solved between the packet that V2X in correlation technique communicates, the data of different type of service Bag size has reached the effect for the reliability for improving V2X communications there is also the problem of change.
In the optional embodiment of the present embodiment, for the base station that is related in the present embodiment step S402 according to user The characteristic information for the UE business that equipment UE is reported dispatches UE mode, can realize in the following way:
Mode one:Base station determines the resource of the semi-static transmission of UE according to the content of characteristic information;
Mode two:Base station determines the resource of the semi-static transmission of UE according to the corresponding priority of characteristic information, wherein, feature The corresponding priority of information is obtained according to the mapping relations of the content with characteristic information;
Wherein, the content of characteristic information includes at least one of:It is the type of service of UE business, corresponding with UE business Cycle, delay requirement information corresponding with UE business;And be somebody's turn to do the cycle corresponding with UE business, including business Data generation period and/or business datum send the cycle.
In another optional embodiment of the present embodiment, the base station being related in the present embodiment step S404 is according to tune Degree result and/or the mode that sends control signaling of delay parameter, can include in the optional embodiment of the present embodiment with Under it is several:
Mode one:Base station is sent control signaling based on delay parameter T2, wherein, T2 value sends control signaling for base station With the time delay between the second timing reference, the second timing reference includes receiving the dispatch request of UE transmissions with base station (Scheduling Request, abbreviation SR) and/or reporting cached state (Buffer Status Report, abbreviation BSR) The corresponding timing of subframe;
Mode two:Base station includes delay parameter T3 in sending control signaling, wherein, T3 value indicates that scheduling UE is sent Time delay between the subframe of business and the 3rd timing reference, the 3rd timing reference includes the subframe sent control signaling with base station The corresponding timing of subframe where corresponding timing and/or UE receive control signaling;
Mode three:Base station subtracts N based on delay parameter T4 and sends UE business, wherein, T4 value sends for scheduling UE The subframe of business and the second timing reference mode one:Between time delay, the second timing reference include receive UE with base station The corresponding timing of dispatch request SR and/or reporting cached state BSR subframe of transmission, wherein, N is positive integer;
Mode four:Base station subtracts M1 and delay parameter T6 based on delay parameter T5 and subtracts M2 transmission UE business, wherein, Dispatch UE and send value of the time delay between the subframe and the second timing reference of business more than or equal to delay parameter T5, and Less than or equal to delay parameter T6 value, the second timing reference includes the dispatch request SR that UE transmissions are received with base station And/or the reporting cached state BSR corresponding timing of subframe, wherein, M1 and M2 are positive integer.
It should be noted that the UE business being related in the present embodiment includes control information and/or data.In addition, above-mentioned The unit of the value of delay parameter T2, T3, T4, T5 and T6 in mode is number of sub-frames or millisecond;And the time delay Parameter T2, T3, T4, T5 and T6 value are predefined value, and/or select determination from selection set by base station, its In, the criterion of selection is:The characteristic information of UE business is different, corresponding selection delay parameter T2, T3, T4, T5 and T6 value is also different;Or, selection delay parameter T2, T3, T4, T5 and T6 value are fixed value;Wherein, it is described The content of characteristic information includes at least one of:It is the type of service of the UE business, corresponding with the UE business Cycle, delay requirement information corresponding with the business of the UE;The cycle corresponding with the UE business, including Business datum generates the cycle and/or business datum sends the cycle.
Above-described embodiment is the description carried out from base station side, will be described below from user equipment side;
Fig. 5 is the flowchart 2 of the dispatching method of resource according to embodiments of the present invention, as shown in figure 5, the step of this method Suddenly include:
Step S502:User equipment (UE) reports the characteristic information of UE business to base station;
Step S504:UE receives the control signaling for the carrying scheduling result that base station is sent;
Step S506:UE determines the resource of transmission business according to control signaling and/or scheduling result.
For the content for the characteristic information being related in above-mentioned steps, at least one of can be included in the present embodiment: The type of service of UE business, cycle corresponding with UE business, delay requirement information corresponding with UE business;Wherein, Cycle corresponding with UE business, including business datum generation cycle and/or business datum send the cycle.
In addition, the characteristic information for reporting UE business being related in the present embodiment includes at least one of:UE passes through Send the characteristic information that dispatch request SR reports UE business;UE reports UE by sending reporting cached state BSR The characteristic information of business.
For what is be related in the present embodiment step S504, UE receives the control signaling for the carrying scheduling result that base station is sent Mode, following several ways can be included in the present embodiment:
Mode one:UE is after dispatch request SR and/or reporting cached state BSR is sent, and delay time delay T2 is received Control signaling;
Mode two:UE is after dispatch request SR and/or reporting cached state BSR is sent, and delay time delay T4 subtracts N Receive control signaling;
Mode three:UE is subtracting M1 more than or equal to time delay T5, and is less than or equal to the time model that time delay T6 subtracts M2 Interior reception control signaling is enclosed, wherein, N, M1 and M2 are positive integer.
The UE being related in the present embodiment step S506 determines transmission business according to control signaling and/or scheduling result The mode of resource, can include following several ways in the present embodiment:
Mode one:UE is received after control signaling, and delay delay parameter T1 sends UE business;
Mode two:UE receive control signaling after according to fixed sequential relationship, where control signaling is received Subframe is corresponding to send the business that subframe sends UE;
Mode three:UE sends UE business, including the delay parameter T3 included according to scheduling result according to scheduling result UE business is sent, postpones the business that time delay T3 sends UE after control signaling is received.
It should be noted that the UE business being related in the present embodiment includes control information and/or data.In addition, this reality The unit for applying the value of time delay T1, T2, T3, T4, T5 and T6 in example is number of sub-frames or millisecond;Time delay T1, T2, T3, T4, T5 and T6 value are predefined value, and/or configure determination according to base station.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-described embodiment Method the mode of required general hardware platform can be added to realize by software, naturally it is also possible to by hardware, but a lot In the case of the former be more preferably embodiment.Understood based on such, technical scheme is substantially in other words to existing The part for having technology to contribute can be embodied in the form of software product, and the computer software product is stored in one In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions are make it that a station terminal equipment (can To be mobile phone, computer, server, or network equipment etc.) perform method described in each embodiment of the invention.
A kind of dispatching device of resource is additionally provided in the present embodiment, and the device is used to realize above-described embodiment and preferred real Mode is applied, repeating no more for explanation had been carried out.As used below, term " module " can realize predetermined work( The combination of the software and/or hardware of energy.Although the device described by following examples is preferably realized with software, Hardware, or the realization of the combination of software and hardware is also that may and be contemplated.
Fig. 6 is the structured flowchart one of the dispatching device of resource according to embodiments of the present invention, and the device is applied to base station side, As shown in fig. 6, the device includes:Scheduler module 62, the feature for the UE business according to reported by user equipment UE Message scheduling UE;First sending module 64, is of coupled connections with scheduler module 62, for according to scheduling result and/or time delay Parameter sends control signaling, wherein, carry scheduling result in the control signaling.
Fig. 7 is the structured flowchart two of the dispatching device of resource according to embodiments of the present invention, and the device is applied to user equipment UE sides, as shown in fig. 7, the device includes:Reporting module 72, the characteristic information of UE business is reported to base station;Connect Module 74 is received, is of coupled connections with reporting module 72, the control signaling of the carrying scheduling result for receiving base station transmission; Second sending module 76, is of coupled connections with receiving module 74, for determining to send according to control signaling and/or scheduling result The resource of business.
It should be noted that above-mentioned modules can be by software or hardware to realize, for the latter, Ke Yitong Cross in the following manner realization, but not limited to this:Above-mentioned module is respectively positioned in same processor;Or, above-mentioned module distinguishes position In multiple processors.
The present invention is illustrated with reference to the alternative embodiment of the present invention;
Embodiment one
This alternative embodiment provides a kind of Semi-static scheduling method, and this method reports characteristic information including UE, reports bag Include and reported and/or reported by high-level signaling by physical layer signaling, the characteristic information of UE business includes but is not limited to UE Type of service, and/or data cycle, and/or delay requirement information.
For example, characteristic information is reported by reporting cached state BSR, it is to distinguish UE different service types, such as all Phase property business and event triggering property business;And/or distinguish the corresponding different cycles of UE business, such as the cycle is 100ms It is 500ms with the cycle;And/or the corresponding different delay demand of UE business is distinguished, for example, delay requirement is 100ms It is 20ms with delay requirement.
In addition, a kind of Semi-static scheduling method is additionally provided, including the characteristic information reported according to UE is dispatched, base station can With directly according to UE characteristic information, for example, the information such as UE type of service and/or data cycle and/or delay requirement, UE is scheduled.Such as, dispatched according to type of service, to event triggering property business priority scheduling, and when dispatching Prolong control within the specific limits, such as 10ms;Or, according to the data periodic scheduling of business, for different cycles Business can control different scheduling delays, such as, and the cycle is 100ms business datum, and scheduling delay control is 20ms, Cycle is 500ms business datum, and scheduling delay control is 40ms;Or, to the data of identical services different cycles The different scheduling delay of control, the different delay parameter of correspondence.
Or, there are the mapping relations determined, scheduling identification between the characteristic information content and scheduling identification of UE business The priority including but not limited to dispatched.Such as, according to service quality (the Quality of Service, abbreviation of UE business QoS class letter (QoS Class Identifier, abbreviation QCI)) determines the priority and the tune to UE of UE business Degree.
Embodiment two
This alternative embodiment provides a kind of Semi-static scheduling method, including base station sends the control signaling for indicating scheduling result, And/or distribution UE sends the resource of business.
In this alternative embodiment, it can use based on time delay T1 scheduling, the scheduling includes:Business is sent in scheduling UE Subframe and the subframe that sends control signaling of base station between time delay be T1, Fig. 8 is according to alternative embodiment two of the present invention In the schematic diagram dispatched based on time delay T1, as shown in figure 8, for example, taking T1 for 8 sub- frame lengths, then base station is issued After PDCCH 8 subframes of subframe delay, corresponding subframe is to be scheduled to the subframe that UE sends V2X, and UE is opened The transmission first of beginning SPS transmission.Also, before SPS scheduling is re-started, according to the selection pair of SPS transmission cycles The subframe answered sends V2X message.Such as, it is assumed that the SPS transmission cycles of V2X business configurations are 100ms, and base station exists Radio frames #1 subframe 5 issues PDCCH, then UE transmits V2X message first in radio frames #2 subframe 3, Next V2X message is sent in radio frames #102 subframe 3.
Or, based on time delay T2 scheduling, including:The scheduling to UE is completed within time delay T2, UE is being received Time delay between the dispatch request SR and/or reporting cached state BSR of transmission subframe and the subframe for sending PDCCH is T2, Fig. 9 be according in alternative embodiment two of the present invention based on time delay T2 dispatch schematic diagram, as shown in figure 9, for example, It is 10 sub- frame lengths to take T2, then base station completes to dispatch UE SPS after the SR of UE transmissions is received, And postponing the subframe corresponding to 10 subframes, PDCCH is sent, is that UE indicates scheduling result.UE is being received After PDCCH, 4 subframes of delay start the transmission first of SPS transmission.Also, dispatch it re-starting SPS Before, select corresponding subframe to send V2X message according to SPS transmission cycles.
Or, based on time delay T3 scheduling, including:T3 is that UE sends the subframe of business and receives control signaling place In the time delay of subframe, the control information carried included in control signaling.
For example, a kind of DCI format, includes the instruction for the time delay T3 that V2X message is sent to UE.Such as, T3 takes 13 subframe lengths, then UE receive PDCCH, solve after DCI, obtain T3 value, and existed according to T3 value Postpone to start the transmission first that SPS is transmitted after 10 subframes.PDCCH such as is received in radio frames #N subframe 4, Then UE starts to send V2X message in radio frames #N+1 subframe 7.Also, before SPS scheduling is re-started, Corresponding subframe is selected to send V2X message according to SPS transmission cycles.
Or, based on time delay T4 scheduling, including:Receiving the dispatch request SR and/or buffer status of UE transmissions The time delay for reporting BSR subframe and scheduling UE to send between the subframe of business is T4, and Figure 10 is optional according to the present invention The schematic diagram dispatched in embodiment two based on time delay T4, as shown in Figure 10, it is assumed that T4 is 20ms, then base station connects After the SR for receiving UE transmissions, UE is dispatched to the corresponding subframes of delay 20ms and sends V2X message, and is being prolonged The corresponding subframes of 16ms send PDCCH late.Such as, base station receives UE transmissions in radio frames #N subframe 3 SR, scheduling UE proceed by SPS transmission V2X message in radio frames #N+2 subframe 3, and in radio frames #N+1 Subframe 9 send PDCCH.
Or, based on time delay range [T5, T6] scheduling, including:Receiving the dispatch request SR of UE transmissions and/or delaying Deposit state reporting BSR subframe and UE send business subframe between time delay be more than or equal to time delay T5, be less than or Equal to time delay T6.Wherein, content is indicated for different SR, T5 is different with T6 value.
Illustrate, it is assumed that T5 is 10ms, and T6 is 20ms, if base station receives what UE1 and UE2 was sent UE1, can be dispatched to the corresponding subframes of delay 15ms and send V2X message by SR, and corresponding in delay 11ms Subframe sends PDCCH 1;UE2 is dispatched to the corresponding subframes of delay 20ms and sends V2X message, and in delay The corresponding subframes of 16ms send PDCCH 2.Such as, base station receives UE1 and UE2 in radio frames #N subframe 3 The SR of transmission, scheduling UE1 proceed by SPS transmission V2X message in radio frames #N+1 subframe 8, and wireless Frame #N+1 subframe 4 sends PDCCH 1;Scheduling UE2 proceeds by SPS transmission in radio frames #N+2 subframe 3 V2X message, and send PDCCH 2 in radio frames #N+1 subframe 9.
Delay parameter T1~T6 of foregoing description unit is number of sub-frames or millisecond (ms), delay parameter T1~T6 Value can be predefined value, and/or by the base station from selection set in select determine, wherein, the criterion of selection is: The characteristic information of the UE business is different, and the value of delay parameter is also different described in corresponding selection;Or, select the time delay The value of parameter is fixed value.Wherein, the characteristic information of UE business include but is not limited to type of service and/or data cycle and / or delay requirement.The transmission V2X message of foregoing description includes sending SA and/or data.For TDD system, on State corresponding subframe after the delay fixed delay of description and refer to effective subframe, if the effective DL subframe of correspondence subframe is (right For sending PDCCH), or be not effective UL subframe (for UE sends V2X message), then subframe Earliest effective subframe after correspondence fixed delay.
Embodiment three
This alternative embodiment provides a kind of Semi-static scheduling method, and this method includes the method sent control signaling, control Signaling bear indicates the control information of scheduling result.
Wherein, it can be sent control signaling in this alternative embodiment based on time delay T1, including:Relative scheduling UE hairs The subframe of business is sent, time delay T1 sends control signaling in advance.
For example, it is assumed that T1 values are 12 subframe lengths, if base station scheduling UE is opened in radio frames #N subframe 7 The SPS transmission of beginning V2X message, then send PDCCH in radio frames #N-1 subframe 5.
Or, sent control signaling based on time delay T2, including:Receive UE transmission dispatch request SR and/or After reporting cached state BSR subframe, delay time delay T2 sends control signaling.
For example, it is assumed that T2 values are 16 subframe lengths, if base station receives SR in radio frames #N subframe 3, Subframe 9 after the completion of then dispatching in radio frames #N+1 issues PDCCH.
Or, sent control signaling based on time delay T3, including:T3 value is included in the control information of control signaling carrying, Indicate that scheduling UE sends the subframe of business and receives the time delay of control signaling place subframe.
Time delay T3 values are contained under this mode, in control information, the time delay that UE sends business is used to refer to.Such as, If T3 values are 12 subframe lengths, UE receives PDCCH in radio frames #N subframe 4, then UE exists The subframe 6 for postponing corresponding radio frames #N+1 after 12 subframes sends V2X message.
Or, sent control signaling based on time delay T4, including:Receive UE transmission dispatch request SR and/or After reporting cached state BSR subframe, delay time delay T4-4 sends PDCCH;Wherein T4 sends out to receive UE The dispatch request SR and/or reporting cached state BSR subframe and scheduling UE that send send the time delay between the subframe of business.
For example, T4 values are 20ms, then base station is after SR is received, in the corresponding subframe hairs of delay 16ms Send PDCCH.Such as, SR is received in radio frames #N subframe 8, then send in radio frames #N+2 subframe 4 PDCCH。
Or, sent control signaling based on time delay range [T5, T6], including:The subframe sent control signaling, it is relative with The time delay of the dispatch request SR and/or reporting cached state BSR of UE transmissions subframe is received, more than or equal to time delay T5-4, less than or equal to time delay T6-4.
Illustrate, it is assumed that T5 is 10ms, and T6 is 20ms, if base station receives what UE1 and UE2 was sent UE1, can be dispatched to the corresponding subframes of delay 15ms and send V2X message by SR, and corresponding in delay 11ms Subframe sends PDCCH 1;UE2 is dispatched to the corresponding subframes of delay 20ms and sends V2X message, and in delay The corresponding subframes of 16ms send PDCCH 2.Such as, base station receives UE1 and UE2 in radio frames #N subframe 3 The SR of transmission, scheduling UE1 proceed by SPS transmission V2X message in radio frames #N+1 subframe 8, and wireless Frame #N+1 subframe 4 sends PDCCH 1;Scheduling UE2 proceeds by SPS transmission in radio frames #N+2 subframe 3 V2X message, and send PDCCH 2 in radio frames #N+1 subframe 9.
Delay parameter T1~T6 of foregoing description unit is number of sub-frames or millisecond (ms), delay parameter T1~T6 Value can be predefined value, and/or by the base station from selection set in select determine, wherein, the criterion of selection is: The characteristic information of the UE business is different, and the value of delay parameter is also different described in corresponding selection;Or, select the time delay The value of parameter is fixed value.Wherein, the characteristic information of UE business include but is not limited to type of service and/or data cycle and / or delay requirement.The transmission V2X message of foregoing description includes sending SA and/or data.For TDD system, on State corresponding subframe after the delay fixed delay of description and refer to effective subframe, if the effective DL subframe of correspondence subframe is (right For sending PDCCH), or be not effective UL subframe (for UE sends V2X message), then subframe Earliest effective subframe after correspondence fixed delay.
Example IV
This alternative embodiment provides a kind of Semi-static scheduling method, and this method includes the side that UE receives descending control signaling Method, control signaling carrying indicates the control information of scheduling result.
Control signaling is received based on time delay T2, including:Send dispatch request SR and/or reporting cached state BSR it Afterwards, delay time delay T2 receives control signaling.
For example, it is assumed that T2 is 16ms, then UE is sent after SR, corresponding subframe is received after delay 16ms Corresponding PDCCH;Or, including receive the processing of PDCCH failures, such as it is, corresponding after delay 16ms If subframe does not receive PDCCH successes, SR is resend.
Or, receive after control signaling, solve the content of control information, obtain T3 values, it is determined that the son of the business of transmission Frame.Wherein, T3 is to indicate that scheduling UE sends the subframe of business and receives the time delay of control signaling place subframe.
Such as, it is assumed that T3 value is 8ms, then UE is solved after DCI contents, based on the subframe for receiving PDCCH, Postpone after 8ms in correspondence subframe transmission V2X message.For example, the subframe 9 in radio frames #N receives PDCCH, Then UE sends V2X message in radio frames #N+1 subframe 7.
Or, control signaling is received based on time delay T4, including:Sending dispatch request SR and/or reporting cached state After BSR, delay time delay T4-4 receives control signaling.Wherein T4 is the SR and/or BSR for receiving UE transmissions Subframe and scheduling UE send business subframe between time delay.
For example, it is assumed that T4 value is 20ms, then UE connects after SR is sent in the corresponding subframes of delay 16ms Receive corresponding PDCCH;Or, including receive the processing of PDCCH failures, such as, and the correspondence after delay 16ms If subframe do not receive PDCCH success, resend SR.
Or, control signaling is received based on time delay range [T5, T6], including:More than or equal to time delay T5-4, it is less than Or receive control signaling in the time range equal to time delay T6-4.
For example, it is assumed that T5 value is 10ms, T6 value is 20ms, then UE is after SR is sent, in delay 6ms Corresponding PDCCH is received to the corresponding subframe of scope between delay 16ms;Or, including receive PDCCH mistakes The processing lost, such as, if not receiving PDCCH successes also in the corresponding subframes of delay 16ms, resend SR。
Delay parameter T1~T6 of foregoing description unit is number of sub-frames or millisecond (ms), delay parameter T1~T6 Value can be predefined value, and/or by the base station from selection set in select determine, wherein, the criterion of selection is: The characteristic information of the UE business is different, and the value of delay parameter is also different described in corresponding selection;Or, select the time delay The value of parameter is fixed value.Wherein, the characteristic information of UE business include but is not limited to type of service and/or data cycle and / or delay requirement;The transmission V2X message of foregoing description includes sending SA and/or data.For TDD system, on State corresponding subframe after the delay fixed delay of description and refer to effective subframe, if the effective DL subframe of correspondence subframe is (right For sending PDCCH), or be not effective UL subframe (for UE sends V2X message), then subframe Earliest effective subframe after correspondence fixed delay.
Embodiment five
This alternative embodiment provides a kind of Semi-static scheduling method, and this method includes the resource that UE determines transmission business.
Wherein, business is sent based on time delay T1, including:Postpone time delay T1 after control signaling is received and send V2X Message.
For example, it is assumed that T1 value is 8ms, if UE receives PDCCH in radio frames #N subframe 4, then Postpone 8ms, V2X message is sent in radio frames #N+1 subframe 2.
Or, V2X message is sent based on fixed time sequence, including:After receiving control signaling according to it is fixed when Order relation, business is sent in the corresponding subframe that sends of the subframe where control signaling.
Such as, it is assumed that UE receives PDCCH in radio frames #N subframe 9, according to fixed sequential relationship, it is determined that The subframe for sending V2X message is radio frames #N+2 subframe 3, then UE selects the subframe 3 in radio frames #N+2 to send out Send V2X message.
Or, business is sent based on control information content, including:T3 values are obtained based on solution control information, received Business is sent after subframe delay time delay T3 where control signaling.
Delay parameter T1~T6 of foregoing description unit is number of sub-frames or millisecond (ms), delay parameter T1~T6 Value can be predefined value, and/or by the base station from selection set in select determine, wherein, the criterion of selection is: The characteristic information of the UE business is different, and the value of delay parameter is also different described in corresponding selection;Or, select the time delay The value of parameter is fixed value.Wherein, the characteristic information of UE business include but is not limited to type of service and/or data cycle and / or delay requirement.The transmission V2X message of foregoing description includes sending SA and/or data.For TDD system, on State corresponding subframe after the delay fixed delay of description and refer to effective subframe, if the effective DL subframe of correspondence subframe is (right For sending PDCCH), or be not effective UL subframe (for UE sends V2X message), then subframe Earliest effective subframe after correspondence fixed delay.
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can The program code for performing following steps to be arranged to storage to be used for:
Step S1:Base station determines the semi-static transmission of UE according to the characteristic information of the UE business of reported by user equipment UE Resource;
Step S2:Base station is scheduled according to the resource of the semi-static transmission of UE;
Step S3:Base station is sent to UE to be carried the control of scheduling result that base station is scheduled and/or delay parameter and believes Order.
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can The program code for performing following steps to be arranged to storage to be used for:
Step S1:User equipment (UE) reports the characteristic information of UE business to base station;
Step S2:UE receives the control for carrying the scheduling result that base station is scheduled according to characteristic information that base station is sent Signaling;
Step S3:What UE was distributed in base station is used to send to send business in the resource of business.
Alternatively, the specific example in the present embodiment may be referred to showing described in above-described embodiment and optional embodiment Example, the present embodiment will not be repeated here.
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general Computing device realizes that they can be concentrated on single computing device, or is distributed in multiple computing devices and is constituted Network on, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to by they Storage is performed by computing device in the storage device, and in some cases, can be to be held different from order herein They, are either fabricated to each integrated circuit modules or will be many in them by the shown or described step of row respectively Individual module or step are fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware Combined with software.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the technology of this area For personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made is any Modification, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (14)

1. a kind of dispatching method of resource, it is characterised in that including:
Base station the UE is dispatched according to the characteristic information of the UE business of reported by user equipment UE;
Base station sends control signaling according to scheduling result and/or delay parameter, wherein, carried in the control signaling Scheduling result.
2. according to the method described in claim 1, it is characterised in that base station is according to the UE of reported by user equipment UE The characteristic information of business, which dispatches the UE, to be included:
The base station determines the resource of the semi-static transmission of the UE according to the content of the characteristic information;Or,
The base station determines the resource of the semi-static transmission of the UE according to the corresponding priority of the characteristic information, its In, the corresponding priority of the characteristic information is obtained according to the mapping relations with the content of the characteristic information;
Wherein, the content of the characteristic information includes at least one of:The type of service of the UE business, with The UE business corresponding cycle, delay requirement information corresponding with the business of the UE;The described and UE Business corresponding cycle, including business datum generation cycle and/or business datum send the cycle.
3. according to the method described in claim 1, it is characterised in that the base station is according to scheduling result and/or delay parameter Send control signaling including:
The base station is based on delay parameter T2 and sends the control signaling, wherein, the value of the T2 is the base station The time delay between the control signaling and the second timing reference is sent, second timing reference includes and the base station Receive the corresponding timing of dispatch request SR and/or reporting cached state BSR subframe that the UE is sent;Or,
The base station, which is sent, includes delay parameter T3 in the control signaling, wherein, the value of the T3 indicates scheduling The UE sends the time delay between the subframe and the 3rd timing reference of business, and the 3rd timing reference includes and institute The corresponding timing of subframe and/or the UE for stating the base station transmission control signaling receive the control signaling institute In the corresponding timing of subframe;Or,
The base station subtracts N based on delay parameter T4 and sends the control signaling, wherein, the value of the T4 is scheduling The UE sends the time delay between the subframe and the second timing reference of business, and second timing reference includes and institute The subframe for stating dispatch request SR and/or reporting cached state BSR that base station receives the UE transmissions is corresponding fixed When, wherein N is positive integer;Or,
The base station subtracts M1 and T6 based on delay parameter T5 and subtracts the M2 transmissions control signaling, wherein, scheduling The time delay that the UE is sent between the subframe and the second timing reference of business is more than or equal to delay parameter T5 value, And the value less than or equal to delay parameter T6, second timing reference with the base station including receiving the UE The corresponding timing of dispatch request SR and/or reporting cached state BSR subframe of transmission, wherein, M1 and M2 For positive integer.
4. method according to claim 3, it is characterised in that the UE business includes control information and/or data.
5. method according to claim 3, it is characterised in that
The unit of described delay parameter T2, T3, T4, T5 and T6 value is number of sub-frames or millisecond;
Described delay parameter T2, T3, T4, T5 and T6 value are predefined value, and/or by the base station from choosing Select and select to determine in set, wherein, the criterion of selection is:The characteristic information of the UE business is different, correspondence choosing The value for selecting described delay parameter T2, T3, T4, T5 and T6 is also different;Or, the selection delay parameter T2, T3, T4, T5 and T6 value are fixed value;Wherein, the content of the characteristic information includes at least one of: The type of service of the UE business, the cycle corresponding with the UE business, it is corresponding with the business of the UE when Prolong demand information;The cycle corresponding with the UE business, including business datum generation cycle and/or business number According to the cycle of transmission.
6. a kind of dispatching method of resource, it is characterised in that including:
User equipment (UE) reports the characteristic information of the UE business to base station;
The UE receives the control signaling for the carrying scheduling result that the base station is sent;
The UE determines the resource of transmission business according to the control signaling and/or the scheduling result.
7. method according to claim 6, it is characterised in that the content of the characteristic information includes at least one of: The type of service of the UE business, the cycle corresponding with the UE business, it is corresponding with the business of the UE when Prolong demand information;Wherein, the cycle corresponding with the UE business, including business datum generation the cycle and/ Or business datum sends the cycle.
8. method according to claim 6, it is characterised in that report the characteristic information of the UE business including following At least one:
The UE reports the characteristic information of the UE business by sending dispatch request SR;
The UE reports the characteristic information of the UE business by sending reporting cached state BSR.
9. method according to claim 6, it is characterised in that the UE receives the carrying scheduling that the base station is sent As a result control signaling includes:
The UE is after dispatch request SR and/or reporting cached state BSR is sent, and delay time delay T2 receives institute State control signaling;Or,
The UE is after dispatch request SR and/or reporting cached state BSR is sent, and delay time delay T4 subtracts N Receive the control signaling;Or,
The UE is subtracting M1 more than or equal to time delay T5, and is less than or equal to the time range that time delay T6 subtracts M2 It is interior to receive the control signaling, wherein, N, M1 and M2 are positive integer.
10. method according to claim 9, it is characterised in that the UE is according to the control signaling and/or the tune Degree result determines that the resource of transmission business includes:
The UE is received after the control signaling, and delay time delay T1 sends the business of the UE, or,
The UE, according to fixed sequential relationship, is receiving the control letter after the control signaling is received The corresponding business for sending the subframe transmission UE of subframe where order;Or,
The UE sends the business of the UE according to the scheduling result, including according to scheduling result include when Prolong the business that T3 sends the UE, postpone time delay T3 after the control signaling is received and send the UE Business.
11. method according to claim 10, it is characterised in that the UE business includes control information and/or data.
12. the method according to claim 9 or 10, it is characterised in that the delay parameter T1, T2, T3, T4, The unit of T5 and T6 value is number of sub-frames or millisecond;Described delay parameter T1, T2, T3, T4, T5 and T6 Value be predefined value, and/or according to the base station configure determine.
13. a kind of dispatching device of resource, applied to base station side, it is characterised in that including:
Scheduler module, the characteristic information for the UE business according to reported by user equipment UE dispatches the UE;
First sending module, for being sent control signaling according to scheduling result and/or delay parameter, wherein, it is described Scheduling result is carried in control signaling.
14. a kind of dispatching device of resource, applied to user equipment (UE) side, it is characterised in that including:
Reporting module, the characteristic information of the UE business is reported to base station;
Receiving module, the control signaling for receiving the carrying scheduling result that the base station is sent;
Second sending module, the money for determining transmission business according to the control signaling and/or the scheduling result Source.
CN201610203782.8A 2016-04-01 2016-04-01 The dispatching method and device of resource Withdrawn CN107295679A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610203782.8A CN107295679A (en) 2016-04-01 2016-04-01 The dispatching method and device of resource
PCT/CN2017/078621 WO2017167204A1 (en) 2016-04-01 2017-03-29 Resource scheduling method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610203782.8A CN107295679A (en) 2016-04-01 2016-04-01 The dispatching method and device of resource

Publications (1)

Publication Number Publication Date
CN107295679A true CN107295679A (en) 2017-10-24

Family

ID=59963519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610203782.8A Withdrawn CN107295679A (en) 2016-04-01 2016-04-01 The dispatching method and device of resource

Country Status (2)

Country Link
CN (1) CN107295679A (en)
WO (1) WO2017167204A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019096276A1 (en) * 2017-11-16 2019-05-23 华为技术有限公司 Data transmission method and apparatus
WO2019095207A1 (en) * 2017-11-16 2019-05-23 Oppo广东移动通信有限公司 Time slot indication method, terminal device, network device and computer storage medium
WO2019178850A1 (en) * 2018-03-23 2019-09-26 Oppo广东移动通信有限公司 Wireless communication method, user equipment and network device
CN110381463A (en) * 2018-04-12 2019-10-25 维沃移动通信有限公司 A kind of transmission method and equipment of by-link information
WO2020051807A1 (en) * 2018-09-12 2020-03-19 Guangdong Oppo Mobile Telecommunications Corp.,Ltd. User equipment, base station, and method of vehicle-to-everything communication of same
CN110933742A (en) * 2018-09-20 2020-03-27 华为技术有限公司 Scheduling method, device and computer readable storage medium
CN110958681A (en) * 2018-09-27 2020-04-03 中兴通讯股份有限公司 Service transmission method and device
CN110996397A (en) * 2019-11-07 2020-04-10 京信通信系统(中国)有限公司 Resource scheduling method, device, base station and storage medium

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110719230B (en) * 2018-07-13 2023-06-23 中兴通讯股份有限公司 Method and device for adjusting peak staggering interval and computer readable storage medium
CN113055115B (en) * 2021-03-11 2023-01-31 宸芯科技有限公司 Timing adjustment method and device, internet of vehicles equipment and storage medium
CN117858243B (en) * 2024-03-04 2024-05-28 北京数易科技有限公司 Multi-weapon-class communication interaction method, system and medium based on Internet of things

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428874A (en) * 2012-05-14 2013-12-04 中兴通讯股份有限公司 Data scheduling method and device
CN103874218A (en) * 2012-12-12 2014-06-18 普天信息技术研究院有限公司 Resource scheduling method in semi-static transmission
CN104170303A (en) * 2014-01-29 2014-11-26 华为技术有限公司 Data transmission method, device and system
WO2015142082A1 (en) * 2014-03-19 2015-09-24 Lg Electronics Inc. Method and apparatus for configuring buffer status report for public safety transmission or vehicle-related transmission in wireless communication system
CN105101428A (en) * 2014-05-22 2015-11-25 中兴通讯股份有限公司 Scheduling method and system, terminal, sending method, base station and scheduling method for base station

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102932920B (en) * 2011-08-10 2017-05-10 中兴通讯股份有限公司 Radio resource scheduling request (SR) configuration method and device
CN105188045B (en) * 2015-09-08 2018-11-06 宇龙计算机通信科技(深圳)有限公司 D2D for vehicle communication has found method, apparatus and terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103428874A (en) * 2012-05-14 2013-12-04 中兴通讯股份有限公司 Data scheduling method and device
CN103874218A (en) * 2012-12-12 2014-06-18 普天信息技术研究院有限公司 Resource scheduling method in semi-static transmission
CN104170303A (en) * 2014-01-29 2014-11-26 华为技术有限公司 Data transmission method, device and system
WO2015142082A1 (en) * 2014-03-19 2015-09-24 Lg Electronics Inc. Method and apparatus for configuring buffer status report for public safety transmission or vehicle-related transmission in wireless communication system
CN105101428A (en) * 2014-05-22 2015-11-25 中兴通讯股份有限公司 Scheduling method and system, terminal, sending method, base station and scheduling method for base station

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2742297C1 (en) * 2017-11-16 2021-02-04 Гуандун Оппо Мобайл Телекоммьюникейшнз Корп., Лтд. Method of indicating time intervals, terminal, network device and computer data medium
WO2019095207A1 (en) * 2017-11-16 2019-05-23 Oppo广东移动通信有限公司 Time slot indication method, terminal device, network device and computer storage medium
CN109803382A (en) * 2017-11-16 2019-05-24 华为技术有限公司 The method and apparatus of data transmission
WO2019096276A1 (en) * 2017-11-16 2019-05-23 华为技术有限公司 Data transmission method and apparatus
US11877266B2 (en) 2017-11-16 2024-01-16 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Time slot indication method, terminal device, network device and computer storage medium
CN109803382B (en) * 2017-11-16 2021-11-09 华为技术有限公司 Data transmission method and device
WO2019178850A1 (en) * 2018-03-23 2019-09-26 Oppo广东移动通信有限公司 Wireless communication method, user equipment and network device
US11895642B2 (en) 2018-03-23 2024-02-06 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Wireless communication method for sidelink resource scheduling, user equipment, and network device
CN110381463A (en) * 2018-04-12 2019-10-25 维沃移动通信有限公司 A kind of transmission method and equipment of by-link information
CN110381463B (en) * 2018-04-12 2021-02-26 维沃移动通信有限公司 Method and equipment for transmitting sidelink information
WO2020051807A1 (en) * 2018-09-12 2020-03-19 Guangdong Oppo Mobile Telecommunications Corp.,Ltd. User equipment, base station, and method of vehicle-to-everything communication of same
US11937154B2 (en) 2018-09-12 2024-03-19 Guangdong Oppo Mobile Telecommunications Corp., Ltd. User-equipment, base station, and method of vehicle-to-everything communication of same
CN110933742B (en) * 2018-09-20 2021-08-13 华为技术有限公司 Scheduling method, device and computer readable storage medium
CN110933742A (en) * 2018-09-20 2020-03-27 华为技术有限公司 Scheduling method, device and computer readable storage medium
CN110958681A (en) * 2018-09-27 2020-04-03 中兴通讯股份有限公司 Service transmission method and device
CN110958681B (en) * 2018-09-27 2023-09-05 中兴通讯股份有限公司 Service transmission method and device
US11825435B2 (en) 2018-09-27 2023-11-21 Zte Corporation Service transmission method and device
CN110996397A (en) * 2019-11-07 2020-04-10 京信通信系统(中国)有限公司 Resource scheduling method, device, base station and storage medium
CN110996397B (en) * 2019-11-07 2022-11-29 京信网络系统股份有限公司 Resource scheduling method, device, base station and storage medium

Also Published As

Publication number Publication date
WO2017167204A1 (en) 2017-10-05

Similar Documents

Publication Publication Date Title
CN107295679A (en) The dispatching method and device of resource
JP6945589B2 (en) Time Division Duplex (TDD) Subframe Structure Supporting Single Interlaced Mode and Multi Interlaced Mode
EP3735074B1 (en) Method and apparatus for handling retransmission indication for configured grant in sidelink in a wireless communication system
US10833829B2 (en) Method of transmitting ACK/NACK message in wireless communication system and terminal using same method
CN102077670B (en) Base station device, user device and method for mobile communication system
CN101433123B (en) Mobile station, base station, and communication control method
CN101785218B (en) The method of distributing radio resource in a wireless communication system
CN109565853A (en) The method and device thereof of data are sent and received in a wireless communication system
CN109479314A (en) Method and apparatus for handling the conflict in next generation communication system
CN110140408A (en) The method and device thereof sent for executing secondary link in a wireless communication system
CN102131297B (en) Method and equipment for allocating uplink resource
CN109075952A (en) Medium access protocol Data Unit assembles in radio systems
CN103988455B (en) The method and apparatus for being used to send reverse control signal in GSM
CN110249676A (en) Indicate the method and its equipment of camp-on resource information
CN102573074B (en) Method, system and apparatus for semi-persistent scheduling on backhaul link, and receiving method and apparatus thereof
TW201008335A (en) Mobile station device, mobile communication system, and communication method
CN113545138A (en) Method and apparatus for allocating transmission power in wireless communication system
CN107624263A (en) The method and its equipment of the transmission result of the PUSCH based on competition are determined in wireless communication system
CN106954272A (en) A kind of resource regulating method, apparatus and system
CN101646239A (en) Semi-persistent scheduling method
CN110366835A (en) The communication technology based on auto-adaptive parameter set
CN107682891B (en) A kind of method and apparatus of determining resource occupation state
EP3834322A1 (en) Low latency harq protocol for urllc services
CN104541544A (en) Base station device, mobile station device, wireless communication method, and integrated circuit
CN101931960B (en) Method for avoid uplink transmission conflict, system and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20171024