CN107270497A - Central Air Conditioner Used in Buildings control system - Google Patents

Central Air Conditioner Used in Buildings control system Download PDF

Info

Publication number
CN107270497A
CN107270497A CN201710655172.6A CN201710655172A CN107270497A CN 107270497 A CN107270497 A CN 107270497A CN 201710655172 A CN201710655172 A CN 201710655172A CN 107270497 A CN107270497 A CN 107270497A
Authority
CN
China
Prior art keywords
central air
machine
conditioning
air conditioner
signal acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710655172.6A
Other languages
Chinese (zh)
Inventor
冉琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tairan Information Technology Project Co Ltd
Original Assignee
Anhui Tairan Information Technology Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tairan Information Technology Project Co Ltd filed Critical Anhui Tairan Information Technology Project Co Ltd
Priority to CN201710655172.6A priority Critical patent/CN107270497A/en
Publication of CN107270497A publication Critical patent/CN107270497A/en
Pending legal-status Critical Current

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a kind of Central Air Conditioner Used in Buildings control system, including central air conditioner external machine, machine in central air-conditioning, monitor terminal, microprocessor, signal acquisition terminal, the monitor terminal is electrically connected with central air conditioner external machine by wire respectively, machine and signal acquisition terminal in central air-conditioning, the input of the microprocessor is electrically connected at the output end of signal acquisition terminal by wire, the control output end of the microprocessor is electrically connected at the automatically controlled end of machine in central air-conditioning, humiture information and personal information that the signal acquisition terminal is used in pickup area.The present invention can monitor the working condition of machine in each central air conditioner external machine and central air-conditioning in real time by computer as monitor terminal, and logging is stored by preservation by server, be conducive to supervising machine in each central air conditioner external machine or central air-conditioning, can inside building nobody when in time close Current central air-conditioning internal machine, be conducive to energy-saving and emission-reduction.

Description

Central Air Conditioner Used in Buildings control system
Technical field
The invention belongs to air-conditioner control system technical field, and in particular to a kind of Central Air Conditioner Used in Buildings control system.
Background technology
Central air conditioner system has main frame and end system.Medium used in burden Indoor Thermal humidity load can be divided into full air system System, all water system, air-water system, refrigerant system.It can be divided into centralization and half by the intensity of airhandling equipment to collect Chinese style.It can be divided into closed, single flow, hybrid (primary retirn air secondary return air) by the source of processed air.Main composition Equipment has air-conditioner host (Cooling and Heat Source), unitary air handling unit (wind cabinet), fan coil etc..In the buildings such as building Portion, central air-conditioning directly control the air quality in building, for the ease of unified management, generally in the buildings such as building Central air-conditioning is installed.Because existing central air-conditioning is directly uniformly controlled each floor each central air-conditioning by central controller The working condition of interior machine, cause when in building nobody when, the air-conditioning internal machine at this is also at working condition, undoubtedly adds center The load of outdoor machine of air-conditioner, is unfavorable for energy-saving and emission-reduction.
The content of the invention
It is an object of the invention to provide a kind of Central Air Conditioner Used in Buildings control system, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the present invention provides following technical scheme:A kind of Central Air Conditioner Used in Buildings control system, including in Machine, monitor terminal, microprocessor, signal acquisition terminal in centre outdoor machine of air-conditioner, central air-conditioning, wherein:
The monitor terminal, it is electrically connected with central air conditioner external machine by wire respectively, machine and signal in central air-conditioning Acquisition terminal, for controlling the switch of machine in central air conditioner external machine and central air-conditioning, and receives the data letter of signal acquisition terminal The setup parameter ceased with machine in central air-conditioning is contrasted;
The central air conditioner external machine, it constitutes central air conditioner system with machine at least one central air-conditioning, to central air-conditioning Transporting cold wind in installation region where interior machine;
The microprocessor, the inside of machine in central air-conditioning, the input of the microprocessor passes through wire electricity Property is connected to the output end of signal acquisition terminal, and the control output end of the microprocessor is electrically connected at machine in central air-conditioning Automatically controlled end;
The signal acquisition terminal, the humiture information for gathering in corresponding central air-conditioning in machine region And personal information.
It is preferred that, the monitor terminal is using computer as platform, in addition to server, and the server and computer are electrical Memory module and enquiry module are provided with connection, the server, the memory module is used for stored record central air conditioner external machine With the working condition of machine in central air-conditioning, enquiry module called data simultaneously checks going through for machine in central air conditioner external machine and central air-conditioning History duty parameter.
It is preferred that, machine is electrically connected with automatic failure detection circuit in the central air conditioner external machine and each central air-conditioning, and Testing result Real-time Feedback is stored into monitor terminal.
It is preferred that, the signal acquisition terminal includes Temperature Humidity Sensor, infrared sensor of the human body and high speed ball sensor.
The technique effect and advantage of the present invention:
1st, machine in each central air conditioner external machine and central air-conditioning can be monitored in real time by being used as monitor terminal by computer Working condition, and by server by logging store preserve, be conducive to each central air conditioner external machine or central air-conditioning Interior machine is supervised, and the working condition of air-conditioning system is grasped in real time.
2nd, by signal acquisition terminal, detection signal can be transferred in microprocessor when someone passes through and be handled Judge, and control in central air-conditioning machine to be freezed or humidified the operation such as dehumidifying, when in building nobody when, can close in time ought Machine in preceding central air-conditioning, is conducive to energy-saving and emission-reduction.
Brief description of the drawings
Fig. 1 is the structural representation of Central Air Conditioner Used in Buildings control system of the present invention;
Fig. 2 is the signal acquisition terminal schematic diagram of Central Air Conditioner Used in Buildings control system of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in Figure 1-2, a kind of Central Air Conditioner Used in Buildings control system, including machine, prison in central air conditioner external machine, central air-conditioning Control terminal, microprocessor, signal acquisition terminal,
Monitor terminal is using computer as platform, in addition to server, and the server is electrically connected with computer, the clothes It is engaged in being provided with memory module and enquiry module in device, the memory module is used in stored record central air conditioner external machine and central air-conditioning The working condition of machine, enquiry module called data and the history duty parameter for checking machine in central air conditioner external machine and central air-conditioning, Computer is electrically connected with central air conditioner external machine by wire respectively, machine and signal acquisition terminal in central air-conditioning, each center Machine is electrically connected with automatic failure detection circuit in outdoor machine of air-conditioner and each central air-conditioning, and testing result Real-time Feedback is extremely monitored Stored in terminal, the use of machine in central air conditioner external machine all in whole building and central air-conditioning can be monitored by computer State, realization is precisely controlled to machine in each central air conditioner external machine or central air-conditioning, improves the control of central air conditioner system Efficiency, computer is received after the data message of signal acquisition terminal, and this data and the setup parameter of machine in the central air-conditioning are entered Row contrast, if humiture is more than setting value, controls machine increase in central air-conditioning to go out cold and to empty in building by computer Gas carries out dehumidification operation, if humiture is less than setting value, controls machine in central air-conditioning to stop Song Lengbingdui buildings by computer Air carries out wet operations in the world, it is ensured that the humiture in building is in preset level;
Central air conditioner external machine, it constitutes central air conditioner system, the machine into central air-conditioning with machine at least one central air-conditioning Machine has been at least connected with an air outlet in transporting cold wind in the installation region at place, central air-conditioning, and center is controlled by computer The Air Blast fan of air-conditioning internal machine, cold air is sent into inside building;
Microprocessor, the inside of machine in central air-conditioning, the input of the microprocessor is electrically connected by wire The output end of signal acquisition terminal is connected to, is passed through when the infrared sensor of the human body in signal acquisition terminal detects someone in the region Out-of-date, infrared sensor of the human body transmits signals to microprocessor, after microprocessor processes judge, starts high speed ball sensor pair The region is monitored, while monitoring video recording is transferred into monitor terminal memory storage, while the control output end electricity of microprocessor Property is connected to the automatically controlled end of machine in central air-conditioning, opens machine in the central air-conditioning;
Signal acquisition terminal, including Temperature Humidity Sensor, infrared sensor of the human body, be respectively used to collection it is corresponding in The humiture information and personal information in air-conditioning internal machine region are entreated, this can be passed through in someone by high speed ball sensor The region is monitored during region.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic, Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the present invention's Within protection domain.

Claims (4)

1. a kind of Central Air Conditioner Used in Buildings control system, including machine, monitor terminal, microprocessor in central air conditioner external machine, central air-conditioning Device, signal acquisition terminal, it is characterised in that:
The monitor terminal, it is electrically connected with central air conditioner external machine by wire respectively, machine and signal acquisition in central air-conditioning Terminal, for controlling the switch of machine in central air conditioner external machine and central air-conditioning, and receive the data message of signal acquisition terminal with The setup parameter of machine is contrasted in central air-conditioning;
The central air conditioner external machine, it constitutes central air conditioner system with machine at least one central air-conditioning, in central air-conditioning machine to Transporting cold wind in the installation region at place;
The microprocessor, the inside of machine in central air-conditioning, the input of the microprocessor is electrically connected by wire It is connected to the output end of signal acquisition terminal, the control output end of the microprocessor is electrically connected at the automatically controlled of machine in central air-conditioning End;
The signal acquisition terminal, humiture information for gathering in corresponding central air-conditioning in machine region and Personal information.
2. a kind of Central Air Conditioner Used in Buildings control system according to claim 1, it is characterised in that:The monitor terminal is in terms of Calculation machine is platform, in addition to server, the server is electrically connected with computer, in the server provided with memory module and Enquiry module, the memory module is used for the working condition of machine in stored record central air conditioner external machine and central air-conditioning, inquires about mould Block is used for called data and checks the history duty parameter of machine in central air conditioner external machine and central air-conditioning.
3. a kind of Central Air Conditioner Used in Buildings control system according to claim 1, it is characterised in that:The central air conditioner external machine Automatic failure detection circuit is electrically connected with machine in each central air-conditioning, and testing result Real-time Feedback is deposited into monitor terminal Storage.
4. a kind of Central Air Conditioner Used in Buildings control system according to claim 1, it is characterised in that:The signal acquisition terminal Including Temperature Humidity Sensor, infrared sensor of the human body and high speed ball sensor.
CN201710655172.6A 2017-08-03 2017-08-03 Central Air Conditioner Used in Buildings control system Pending CN107270497A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710655172.6A CN107270497A (en) 2017-08-03 2017-08-03 Central Air Conditioner Used in Buildings control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710655172.6A CN107270497A (en) 2017-08-03 2017-08-03 Central Air Conditioner Used in Buildings control system

Publications (1)

Publication Number Publication Date
CN107270497A true CN107270497A (en) 2017-10-20

Family

ID=60075405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710655172.6A Pending CN107270497A (en) 2017-08-03 2017-08-03 Central Air Conditioner Used in Buildings control system

Country Status (1)

Country Link
CN (1) CN107270497A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111836018A (en) * 2020-07-16 2020-10-27 上海锋思城界建筑设计研究院有限公司 Building equipment monitoring and management system and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100280667A1 (en) * 2008-07-14 2010-11-04 John Douglas Steinberg System and method for using a networked electronic device as an occupancy sensor for an energy management system
CN102748835A (en) * 2012-07-21 2012-10-24 中山大洋电机股份有限公司 System for controlling split units of household central air conditioner
US8955761B2 (en) * 2008-03-19 2015-02-17 Rockwell Automation Technologies, Inc. Retrofitting a constant volume air handling unit with a variable frequency drive
CN104976741A (en) * 2015-07-23 2015-10-14 魏强 Central air conditioner control method
CN104990209A (en) * 2015-06-16 2015-10-21 广东美的暖通设备有限公司 Central air conditioner, failure query method of central air conditioner, and wire controller of central air conditioner
CN105020861A (en) * 2015-08-14 2015-11-04 四川长虹电器股份有限公司 Management method for operational data of central air-conditioner
CN105042780A (en) * 2015-07-23 2015-11-11 魏强 Central-air-conditioner control system
CN204987362U (en) * 2015-07-23 2016-01-20 魏强 Central air -conditioning control system
CN105526669A (en) * 2014-09-29 2016-04-27 中山大洋电机股份有限公司 State parameter display method of integrated controller of central air conditioning system and circuit structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8955761B2 (en) * 2008-03-19 2015-02-17 Rockwell Automation Technologies, Inc. Retrofitting a constant volume air handling unit with a variable frequency drive
US20100280667A1 (en) * 2008-07-14 2010-11-04 John Douglas Steinberg System and method for using a networked electronic device as an occupancy sensor for an energy management system
CN102748835A (en) * 2012-07-21 2012-10-24 中山大洋电机股份有限公司 System for controlling split units of household central air conditioner
CN105526669A (en) * 2014-09-29 2016-04-27 中山大洋电机股份有限公司 State parameter display method of integrated controller of central air conditioning system and circuit structure
CN104990209A (en) * 2015-06-16 2015-10-21 广东美的暖通设备有限公司 Central air conditioner, failure query method of central air conditioner, and wire controller of central air conditioner
CN104976741A (en) * 2015-07-23 2015-10-14 魏强 Central air conditioner control method
CN105042780A (en) * 2015-07-23 2015-11-11 魏强 Central-air-conditioner control system
CN204987362U (en) * 2015-07-23 2016-01-20 魏强 Central air -conditioning control system
CN105020861A (en) * 2015-08-14 2015-11-04 四川长虹电器股份有限公司 Management method for operational data of central air-conditioner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111836018A (en) * 2020-07-16 2020-10-27 上海锋思城界建筑设计研究院有限公司 Building equipment monitoring and management system and method
CN111836018B (en) * 2020-07-16 2021-12-21 上海锋思城界建筑设计研究院有限公司 Building equipment monitoring and management system and method

Similar Documents

Publication Publication Date Title
CN108386972B (en) Energy-saving control system and method for air conditioner of machine room
CN103383130B (en) A kind of intelligent fresh air air-conditioning coordinated signals management method
CN210772639U (en) Energy-saving centralized control management system for communication machine room
CN106052033A (en) Air conditioner control system and multi-level intelligent temperature control scheduling method of data center
CN107726573A (en) A kind of central air conditioning system
CN103644627A (en) Water-cooling machine room dew point self-optimizing control device and method
CN106885350A (en) A kind of air conditioner energy conservation control system
CN106288236A (en) Air-conditioner compress control method and air-conditioner
CN105159367A (en) System and method for adjusting environmental temperature and humidity of plate cartridge
CN105020850B (en) A kind of central air-conditioning wind cabinet intelligent drive device based on embedded technology
CN106091277A (en) A kind of monitoring air-conditioner controlled based on intelligent power saving
CN205747349U (en) A kind of air-conditioning monitoring and controlling system
CN107449101A (en) Temperature control method and device, controller, electronic equipment and humidity control system
CN105157187B (en) A kind of base station thermal source intelligent management energy conserving system
CN107270497A (en) Central Air Conditioner Used in Buildings control system
CN104949257A (en) Air-conditioner control system
CN206061396U (en) A kind of flow-optimized system of rack intelligent gas and the data center based on the system
CN102878649A (en) Intelligent ventilated energy-saving system for base station
CN109831889A (en) The progress control method and device of a kind of cabinet, cabinet
CN205566857U (en) Integration shielding cabinet
CN104949259B (en) Air-conditioner control system
CN208269356U (en) Circulation device for air and the blower air circulatory system for the station with blower
CN204216676U (en) Based on transformer station's temperature and humidity intelligent supervisory control system of EnOcean technology
CN208296146U (en) A kind of environmental dehumidification energy conserving system
JPH10300166A (en) Operating performance evaluation system of air conditioning heat source equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171020

RJ01 Rejection of invention patent application after publication