CN107226221B - The space of different sizes towing sail for space junk removal manufactures mechanism - Google Patents

The space of different sizes towing sail for space junk removal manufactures mechanism Download PDF

Info

Publication number
CN107226221B
CN107226221B CN201710438977.5A CN201710438977A CN107226221B CN 107226221 B CN107226221 B CN 107226221B CN 201710438977 A CN201710438977 A CN 201710438977A CN 107226221 B CN107226221 B CN 107226221B
Authority
CN
China
Prior art keywords
sail
towing
space
towing sail
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710438977.5A
Other languages
Chinese (zh)
Other versions
CN107226221A (en
Inventor
洛佩兹圣格雷戈里奥米格尔
艾哈迈德鲁海默德
谢侃
王宁飞
张景瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Publication of CN107226221A publication Critical patent/CN107226221A/en
Application granted granted Critical
Publication of CN107226221B publication Critical patent/CN107226221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G4/00Tools specially adapted for use in space

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Road Paving Machines (AREA)

Abstract

Space of the present invention for the different sizes towing sail of space junk removal manufactures mechanism, belongs to the towing sail space manufacturing technology field of space junk removal.Including space subsystem and capture target debris and the method two parts for discharging towing sail;Space subsystem includes mechanical container and and assistant subsystem and material container;Mechanical container is empty again comprising towing sail maker;Assistant subsystem and material container are for operating subsystem needed for mechanical mechanism and for material needed for manufacturing towing sail;Mechanical container includes two L shape support constructions, two cylindrical bars, two extruders, two compactors, two conveying arms and towing sail;Assistant subsystem and material container include the laminating roll for manufacturing different resistance sail sizes, further include other subsystems and unit needed for operating the mechanism, such as power unit and thermal control sub-system.Mentioned mechanism permission automatically manufactures several towing sails in space and can change as needed.

Description

The space of different sizes towing sail for space junk removal manufactures mechanism
Technical field
The present invention relates to the spaces of the different sizes removed for space junk towing sail to manufacture mechanism, belongs to space manufacture The towing orbit space manufacturing technology field of field and space junk removal.
Background technique
All spacecrafts for being sent to space all have it is limited the service life is actively used, after it enlivens the service life, space flight Device and satellite become useless and accumulate in space, increase the amount of fragment.Unless they are removed or burn in an atmosphere, Otherwise spacecraft and satellite are kept on its track, and with the increase of number of tiles, the collision between them is possibly realized Cause to generate more fragments, and this phenomenon will also become increasingly prevalent.
Currently, there is several methods that the spacecraft derailing that life cycle can be made to terminate.The methodical purpose of institute is by near-earth Point height is reduced to that air force is sufficiently large to reenter track to it, and the air force for being applied to spacecraft or satellite at this time adds Heat and pressure will be sufficiently large, and spacecraft or satellite will be destroyed largely in an atmosphere.
Existing main derailing strategy includes using small rocket motor, and electronic tether or aerodynamic drag enhancing come Pressure enters back into, then destroys target debris.
Small rocket engine can be used for pushing satellite to the earth at a particular angle and speed, to reenter When ensure to destroy.Rocket engine can be used for reducing the speed of satellite, it is caused to fall and burn in an atmosphere.Rocket engine Have benefited from using the missilery for having reached business level.The major advantage of rocket is to shoot to tear open to control by accurate angle Unload process.However, rocketry is very expensive, very heavy, technical complexity, such as rocket fuel is before the use It need to be up to 10 years under pressure.
Electronic tether is extended a distance between derailing spacecraft and the end mass of deployment, it is possible to public up to number In, conductive strips below.Therefore tether technology is related to that the conductor wire from satellite is disposed and drawn by earth magnetic field.Tether and Interaction between earth magnetic field generates propulsive force for raising and reducing satellite altitude track.In general, the portion of tether system It will mostly in a dormant state during affixing one's name to the unit movable service life of the host spacecraft attached by it.When needing to derail, system By deployment end quality to start derailment course.Electronic tether has potentiality, but in deployment and during derailment course itself Need the active control of height.
Pneumatic towing enhancing is related with air drag increase.Air drag or towing with atmosphere height increase, atmosphere by Gradual change is thin and reduces.This strategy of freeing is only limitted to low orbit satellite (LEO).Satellite in this region undergoes fairly limited gas Dynamic resistance, and since air drag reduction causes satellite velocities also very small.The system that air force towing can be enhanced increases Add air drag will enable satellite velocities reduced within the desired time.
In resistance enhancing system, towing sail is paid special attention to.Up to the present, the concept proposed includes by navigating Its device is transported close to target debris position, and then compact towing sail is connected to target debris, finally expands to its final surface. It is assumed that towing sail must be loaded into spacecraft in compact mode, and even if the packaging efficiency of towing sail is high, portable device Quantity be also limited.
In view of future has a large amount of clasts to be removed, the mechanism that can manufacture resistance sail in space will be advantageous, Various sizes of resistance sail mechanism can be especially manufactured, various sizes of derailing clast is allowed.In addition, will retain in space And it can use raw material and necessary component to be refilled in space to manufacture the mechanism of resistance sail and will be advantageous.
In short, space manufacturing technology experienced fast development in the past few years.A large amount of new concepts and idea are suggested, These concepts and idea essentially relate to the mechanism that a kind of structure and the necessary material of loading are established in space.These mechanisms are carried on Beam is squeezed out on different directions, is combined together generation network by distinct methods again thereafter, and the space of network passes through Different method panels or laminate covering.
Up to the present, the development of large scale structure, such as 8 solar panel of solar energy are concentrated on to the research of in-orbit space manufacture The manufacture of array.Although manufacturing machine fixture has good prospect in big structure space, focus on to manufacture in space And multiple smaller structures are discharged, such as resistance sail mechanism, it also will be meaningful.
Summary of the invention
Present invention aim to address the in-orbit manufacturing issues that towing sail space junk removes, and propose for space junk The space of the different sizes towing sail of removal manufactures mechanism.
Firstly, the present invention proposes space subsystem, including mechanism container and and assistant subsystem and material container;Its In, mechanism container includes the mechanism of the different sizes towing sail of in-orbit manufacture removal clast, abbreviation mechanism;Assistant subsystem and original Material container includes the subsystem for operating mechanism and manufacture towing sail material requested;
Wherein, mechanism container can also have mechanism container cover and mechanism container cover rail;
Mechanism container is by two L shape support constructions, two cylindrical bars, two extruders, two compactors, two conveyings Arm and towing sail composition;Pulling sail includes attachment device;Two L shape support constructions it is at regular intervals and with the towing that will manufacture The side of sail is overlapped;The horizontal component of two L shape support constructions extends to the towing sail side length that is equal to and will manufacture;Two Cylindrical bar is for storing towing sail frame transverse beam;Each cylindrical bar is attached respectively to one in L shape support construction simultaneously It moves with it;The vertical component of two extruder insertion L shape support constructions;The pipe being discharged by assistant subsystem and material container Road provides feeding mechanism;Its function is the longitudinal beam for squeezing out towing sail frame;Two compactors are attached to the water of L shape support construction Flat part, they extend to the side length for being equal to the towing sail that will be manufactured together with the horizontal component of L support construction;Pressure Real device function is the element of connection towing element;Two conveying arms always remain at the center of two support constructions, and function is The transverse beam group being stored in cylindrical bar is carried to different location by pulling each stage of sail manufacturing process.Track peace Mounted in the surface of assistant subsystem and material container;Its function is guidance conveying arm;
Assistant subsystem and material container include for manufacturing the laminating roll of different towing sail sizes, mechanism selection manufacture often Lamination spool and the feeding mechanism for extruder needed for a towing sail;The assistant subsystem and material container further include being used for Power unit needed for operating mechanism and thermal control sub-system;
Secondly, present invention discloses towing sail mechanisms, i.e., have different sizes for broken by what mechanism manufactured in space The towing sail of piece removal;Each towing sail is made of a square frame and a flexible laminated sheet, and square frame is by one group Two extendible transverse beams and two extruding longitudinal beam compositions;Transverse beam is wired to attachment device;The mechanism Transverse beam group is inserted into cylindrical bar in a manner of being compacted, and will then be expanded into necessary length;Attachment device includes capture The capture net of target debris is connected to transverse beam by four extendible lines;
Finally, capturing target debris and discharging the process of towing sail, i.e., it is broken the capture net in attachment device to be opened capture Piece, then the door of mechanism container is opened and discharges the towing sail of manufacture, the specific steps are as follows:
Step 1: manufacture towing sail frame;
Step 1, specifically:
Step 1.1 will be in the multiple groups transverse beam insertion cylindrical bar equal with being intended to manufacture towing sail quantity;
Feeding mechanism needed for step 1.2 will be used to squeeze out the extruder of longitudinal beam and the necessary laminating roll for being used to manufacture sail It is loaded in assistant subsystem and material container;
In space, spacecraft tracks the first fragment target, the separation of L shape support construction, L shape support construction water to step 1.3 Flat part extends;
Wherein, the distance between L shape support construction is identical with L shape support construction horizontal component length, and with will manufacture Towing sail square frame side it is corresponding;
For step 1.4 when L shape support construction horizontal component has been extended to desired size, conveying arm catches first group of cross Xiang Liang and it is directed at the end of beam with extruder;Then extruder squeezes out two longitudinal beams;
One in step 1.5 conveying arm is taken to a transverse beam end of longitudinal beam, and another remain close to it is crowded The nozzle of machine out;
So far, step 1.5 is arrived by step 1.1, completes the production of towing sail frame;
Step 2: laminate is unfolded under the longitudinal beam of extrusion to form towing surface in laminating roll;Later, left compactor It closes and passes through heat and pressure and left longitudinal beam and laminate are bonded together;Since compactor also squeezes the angle of square frame Portion, left end and the longitudinal beam of transverse beam group are combined together;
Step 3: laminating roll continues that laminated material is unfolded, until completing the production of towing sail;
Step 3, specifically:
For step 3.1 since laminate cannot advance, it initially forms curve;
For step 3.2 when the expectation unfolded surface of laminate, right compactor closure connects right longitudinal beam and laminate;
Due to the pressure and heat in square frame corner, right end and the transverse beam of longitudinal beam group be combined together step 3.3;
So far, step 3.3 is arrived by step 3.1, completes towing sail production;
Step 4: the net pop-up when reaching target clast, in attachment device;After mechanism container is captured, mechanism container Lid is opened and pulls sail and is released;
Step 5: space subsystem starts to manufacture next towing when spacecraft starts to track next target debris Sail;
So far, from step 1 to step 5, the space system of the different sizes towing sail for space junk removal is completed Make mechanism.
Beneficial effect
The space of different sizes towing sail for space junk removal manufactures mechanism, manufactures mechanism phase with other spaces Than having the following beneficial effects:
1. the mentioned mechanism permission of the present invention automatically manufactures various sizes of multiple towing sails in space;
2. the mentioned mechanism of invention increases the flexibility of task, because the manufacturing sequence of towing sail is not predefined, and And it can change as needed;
3. the towing sail that the mentioned mechanism of the present invention manufactures discharges in such a way that its is final, do not need to extend;
4. the spacecraft for carrying mechanism of the present invention can reload the necessary original for manufacturing more resistance sails Material and element.
Detailed description of the invention
Attached drawing indicates that mechanism of the present invention manufactures the process of four towing sails;
Fig. 1 shows the space subsystem appearance of the towing sail production comprising mechanism and material;
Fig. 2 shows the space subsystem appearance without mechanism container cover, disclose for manufacturing different sizes in space The appearance for pulling sail mechanism, removes clast with compacting mode;
Fig. 3 shows the appearance in one group of extensible transverse beam compacting mode;
Fig. 4 is shown for manufacturing various sizes of towing sail mechanism in space, for removing clast with its expansion fashion;
Fig. 5 is shown in the case where not having assistant subsystem and material container for manufacturing different sizes in space Towing sail mechanism, for its expansion fashion remove clast;
The step 1 that Fig. 6 shows towing sail manufacturing process is rapid;
Fig. 7 shows the second step of towing sail manufacturing process;
Fig. 8 shows the third step of towing sail manufacturing process;
The step 4 that Fig. 9 shows towing sail manufacturing process is rapid;
The step 5 that Figure 10 shows towing sail manufacturing process is rapid;
The step 6 that Figure 11 shows towing sail manufacturing process is rapid;
The step 7 that Figure 12 shows towing sail manufacturing process is rapid;
The step 8 that Figure 13 shows towing sail manufacturing process is rapid;
Figure 14 shows manufacture in space and is brought to for the installation of clast removal different sizes towings sail mechanism close to target The subsystem of crumb position;
Figure 15 shows mechanism of the installation for manufacturing different size clast removal towing sails in space and captures target debris Mechanism subsystem;
Figure 16 shows mechanism container cover gab;
Figure 17 shows the towing sail of release;
Wherein, Fig. 1 to 5 indicates the mechanism part and material requested for manufacturing towing the relied on space subsystem of sail;
Fig. 6 to Figure 13 indicates the manufacturing process of a towing sail;
Figure 14 to 17 indicates the process for the towing sail that release has manufactured;
In above-mentioned figure, active procedure relevant portion is colored as grey in each step of manufacturing process;
It illustrates
In Fig. 1: 1- mechanism container, 2- assistant subsystem and material container, 3- mechanism container cover and 4- mechanism container cover rail;
Show that the mechanism for space manufacture for the different sizes towing sail of clast removal is put in Fig. 2 in perimeter A Big view;
In Fig. 2: left cylindrical bar 5.1 and right cylindrical bar 5.2 are respectively used to storage towing sail transverse beam group;The left L of 6.1- Shape support construction, the right L shape support construction of 6.2-, the left extruder of 7.1-, the right extruder of 7.2-, the left compactor of 8.1-, 8.2 right compactings Device, 9- conveying arm, 10- conveying arm guide rail;
In Fig. 3: transverse beam before 11.1-, transverse beam after 11.2-, preceding transverse beam is connected to attachment device by 12.1,12.2- Extensible line, 12.3,12.4- are connected to rear transverse beam on the extensible line of attachment device;13- attachment device;
In Fig. 4: the left L shape support construction of 16.1- is displaced to its final position for being used to pull sail manufacture, the right L shape branch of 16.2- Support structure is displaced to its final position for being used to pull sail manufacture, and 15.1,15.2,15.3,15.4 respectively correspond four groups of transverse beams Extend, the compactor extended on the left of 17.1-, the compactor extended on the right side of 17.2-;
In Fig. 5: the feeding mechanism of 18.1,18.2- extruders, 19- active laminate roll axis;
In Fig. 6: the conveying arm that 20- extends grabs first group of transverse beam;
In Fig. 7: the conveying arm that 21- is shunk, the transverse beam group that 22- is aligned with the nozzle of extruder, 23- is from its home position The attachment device of displacement, 24.1,24.2,24.3,24.4- be respectively the extending line extended;
In Fig. 8: the left longitudinal beam of 25.1-, the right longitudinal beam of 25.2-;
In Fig. 9: 26- conveying arm is displaced to its final position, and 27- transverse beam is displaced to its final position, 28- attachment device It is displaced to the stretching, extension line that its final position 29.1,29.2,29.3,29.4- extends to its maximum length;
In Figure 10: 30- initially pulls surface;
In Figure 11: 31- closes left compactor;
In Figure 12: 32- finally pulls surface and is formed as curve;
In Figure 13: 33- is close to right compactor;
In Figure 14: 34- target debris;
In Figure 15: 35- captures net;
In Figure 16: 36- opening mechanism container cover;
In Figure 17: 37- finally pulls areal stretch.
Specific embodiment
It will be more fully described and be removed not based on disclosed for space junk in conjunction with each attached drawing now The process of four towing sails is manufactured with the space manufacture mechanism of size towing sail.
It can be changed using the towing sail dimension that mechanism of the present invention manufactures, i.e., mechanism of the present invention allows to manufacture not With the towing sail of quantity.The positive side (left side) of X-axis shown in the left and right corresponding diagram mentioned in a particular embodiment and negative Side (right side).
Embodiment
Fig. 1 to 5 indicates the building block and material requested for manufacturing towing sail mechanism.Fig. 1 is shown comprising for sky Between manufacture for clast removal different sizes towing sail mechanism space subsystem appearance, include: mechanism container 1, auxiliary Subsystem and material container 2, mechanism container cover 3, mechanism container cover track and 4. mechanism container covers.Wherein, 4. mechanism container It covers and is remained turned-off during pulling sail manufacturing process, and it is opened to discharge towing sail, 3. mechanism container cover tracks, which are used as, to be dragged Drag the guiding piece of the attachment device of sail.
Fig. 2 shows the appearances of the subsystem without mechanism container cover.Fig. 2 is disclosed for manufacturing different sizes in space Towing sail mechanism appearance, for removing fragment in a manner of being compacted.Perimeter A, which is shown, manufactures various sizes of use for space In the enlarged view of the towing sail mechanism of clast removal, with part: for storing the transverse beam group 5.1 and 5.2 of towing sail Transverse bar, L shape support construction 6.1 and 6.2, extruder 7.1 and 7.2, compactor 8.1 and 8.2, conveying arm 9 and conveying arm rail Road 10.When bloated organizational structure and staff, L shape support construction 6.1 and 6.2 points open the distance for being equal to the towing sail side to be manufactured, the support of L shape Structure 6.1 is moved to the left, and right L shape support construction 6.1 moves right.
In Fig. 2, L shape support construction vertical component effect is integrated to for storing the transverse bar of transverse beam group 5.1 and 5.2 of towing sail The rear portion divided, and when bloated organizational structure and staff, therewith indexing is mobile.Extruder 7.1 and 7.2 is inserted into L shape support construction vertical component effect The front divided, and when bloated organizational structure and staff, indexing is mobile together with which;Feeding mechanism for extruder is by assistant subsystem It is provided with the pipeline of material container output.Conveying arm guide rail 10 is mounted in assistant subsystem and material container surface;It is always It is maintained at the centre of two L shape support constructions.
Fig. 3 shows the compacting mode appearance of one group of extensible transverse beam 11.1 and 11.2, passes through four extensible lines 12.1,12.2,12.3 the shrink form with 12.4 is connected to attachment device 13.Attachment device 13 includes capture net for capturing mesh Mark fragment.It is the mechanism enlarged view that space manufacture clast removes different size towing sails shown in perimeter B, wherein four groups Transverse beam insertion transverse bar is used to store the transverse beam group of towing sail.Attachment device is encapsulated between mechanism container cover track.
Attached drawing shows the process that four towing sails are manufactured based on the mentioned mechanism of the present invention;However, mechanism of the invention Size is modified to allow the greater amount of towing sail of manufacture.It can be on earth with the process of transverse beam group loading mechanism Or it is carried out on space station.
Fig. 4 is shown for manufacturing various sizes of towing sail mechanism in space and removing clast with its expansion fashion.L shape Support construction 16.1 and 16.2 is displaced to the two sides of transmitted conveying orbit arm.The distance between two L shape support constructions etc. In the towing sail side length that will be manufactured.Cylindrical bar storage towing sail transverse beam, and extruder and L shape support construction one Play displacement.Transverse beam group 15.1,15.2,15.3 and 15.4 extends as L shape support construction separates;So far, four transverse beams Group has the side length for being equal to the towing sail that will be manufactured.
Compactor 17.1 and 17.2 extends to together with the horizontal component of two L shape support constructions to be dragged equal to what will be manufactured Drag sail side length.Given towing sail, mechanism of the space manufacture for the different sizes towing sail of clast removal need to have just Square frame, distance and compactor length are identical between two L shape support constructions.Once the first towing sail has manufactured And release, then the side that mechanism will make its size adapt to the second towing sail.
Fig. 5 is shown for manufacturing various sizes of towing sail mechanism in space, for not having assistant subsystem at it Clast is removed with its expansion fashion in the case where material container;In assistant subsystem and material container disclosed in this Fig. 5 Unique composition be the feeding mechanism 18.1 and 18.2 of extruder and the towing sail for needing to manufacture laminating roll 19, be referred to as Laminating roll;Assistant subsystem and material container include the side that length is equal to the resistance side that will be manufactured in task laminating roll and For laminate roll sub-system needed for activating each towing sail of manufacture.For example, if the mechanism described in attached drawing is intended to manufacture Two towing sails having a size of A (surface unit), a towing sail having a size of B (ground unit) and (ground is single having a size of C Position) a towing sail, then assistant subsystem and material container will comprising three lamination spools and a laminate roll sub-system, When needing to manufacture each towing sail, need to activate each lamination spool and laminate roll sub-system.
The manufacturing process of towing sail is made of eight steps.Fig. 6 to Figure 13 indicates the manufacturing process of a towing sail.At this In a little figures, the relevant portion of manufacture towing sail involved in each step of manufacturing process is colored as grey.
Step 1 is rapid as shown in fig. 6, conveying arm extends and catches first group of transverse beam 20;
Second step is as shown in fig. 7, conveying arm shrinks 21 so that this group of transverse beam is aligned with the nozzle 22 of extruder.Connection Device is shifted along mechanism container cover rail 23 from its home position, this group of transverse beam is connected to attachment device and extends 24.
Third step is as shown in figure 8, extruder squeezes out longitudinal beam 24.2 and 25.2;They are squeezed by the hole at transverse beam both ends Out.
Step 4 is rapid as shown in figure 9, conveying arm 26 is moved along conveying orbit arm, and preceding transverse beam is moved to its most final position Set 27.Meanwhile attachment device reaches its final position 28 when it is pulled by extending line, wherein 29.1,29.2,29.3 Hes 29.4 be the stretching, extension line for extending to its maximum length.
So far, the longitudinal beam of extruding and transverse beam form square structure, that is, complete the manufacture of towing sail frame.
Step 5 is suddenly as shown in Figure 10, and laminating roll is spread across between the horizontal component and right longitudinal beam of left L shape support construction Space, until it reaches the horizontal component and left longitudinal beam of left L shape support construction, as a result, initially pulling surface 30.
Step 6 is suddenly as shown in figure 11, and left compactor closes 31.Compactor is in two transverse beams, left longitudinal beam and towing table The left end at face edge applies pressure and heat.The movement has a dual effect: lateral beam end is engaged and is inserted into left longitudinal beam by it In, left longitudinal beam is connected with towing sail surface.
Step 7 is suddenly as shown in figure 12, and laminating roll continues to be unfolded.As in step 6, left compactor closes and by left longitudinal beam It is joined to the edge on towing surface, laminate surface can not be advanced further.Extra laminate forms surface Curve 12.The purpose of the movement is to increase the surface of towing sail, once towing sail is released, towing sail will generate towing.Expansion The quantity of additional surface depend on the towing sail number that is manufacturing.If it is determined that using the towing sail with flat towing surface Target debris is removed, then will omit this step 7.
Step 8 is suddenly as shown in figure 13, and right side compactor closes 33.Compactor is longitudinal on the right end of two transverse beams, right side Apply pressure and heat on the region of non-resistant surface below beam and right side longitudinal beam.The movement has a dual effect: it will be horizontal It is connected to right longitudinal beam to the right end of beam, and right longitudinal beam is connected to towing surface.In addition, the compactor includes razor, when When engaging process is completed, razor cutting laminate simultaneously separates on the towing surface for pulling sail with laminating roll;So far, it completes and drags Drag the manufacture of sail.
The process of release towing sail after the fabrication is shown in Figure 14 to 17.
Figure 14 illustrates tandem operating side and flies the mechanism for carrying manufacture clast in space and removing different sizes towing sails Ship takes the closer position of distance objective fragment to;When the operation that crosses is completed, attachment device and the target debris 34 for pulling sail are right It is quasi-.At this point, debris catching net is projected from the attachment device of towing sail 35, target debris is captured, as shown in figure 15.Then, mechanism Container cover 36 is opened, so that the towing sail of manufacture leaves container, as shown in figure 16.After towing sail is released, towing surface is stretched Particle in exhibition capture atmosphere, as shown in figure 17.
When the first sail is released, the mechanism for manufacturing various sizes of clast removal towing sail for space starts under manufacture One towing sail.
The above is several exemplary embodiments of the invention, and the present invention should not be limited to the embodiment and attached drawing Disclosure of that.It is all not depart from the lower equivalent or modification completed of spirit disclosed in this invention, both fall within protection of the present invention Range.

Claims (6)

1. the space manufacturing method of the different sizes towing sail for space junk removal, the space subsystem of support includes mechanism Container and assistant subsystem and material container, wherein mechanism container includes the different sizes towing of in-orbit manufacture removal clast The mechanism of sail, abbreviation mechanism;Assistant subsystem and material container include for operating mechanism and manufacture towing sail material requested Subsystem;It is characterized by: mechanism container has mechanism container cover and mechanism container cover rail;Mechanism container is supported by two L shapes Structure, two cylindrical bars, two extruders, two compactors, two conveying arms and towing sail composition;Pulling sail includes connection Device;Two L shape support constructions are at regular intervals and are overlapped with the side for the towing sail that will be manufactured;Two L shape support constructions Horizontal component extend to and be equal to the towing sail side length that will manufacture;Two cylindrical bars are horizontal for storing towing sail frame Xiang Liang;Be attached respectively in L shape support construction one of each cylindrical bar simultaneously moves with it;Two extruders are inserted into L shape branch The vertical component of support structure;Feeding mechanism is provided by the pipeline that assistant subsystem and material container are discharged;Its function is to squeeze out Pull the longitudinal beam of sail frame;Two compactors are attached to the horizontal component of L shape support construction, they and L support construction Horizontal component extends to the side length for being equal to the towing sail that will be manufactured together;Compactor function is the member of connection towing element Element;Two conveying arms always remain at the center of two support constructions, and function is the transverse beam that will be stored in cylindrical bar Group is carried to different location by pulling each stage of sail manufacturing process;Track installation is in assistant subsystem and material container Surface;Its function is guidance conveying arm.
2. the space manufacturing method of the different sizes towing sail according to claim 1 for space junk removal, special Sign is: assistant subsystem and material container include every for manufacturing the laminating rolls of different towing sail sizes, mechanism selection manufacture Lamination spool and the feeding mechanism for extruder needed for a towing sail;The assistant subsystem and material container further include being used for Power unit needed for operating mechanism and thermal control sub-system.
3. the space manufacturing method of the different sizes towing sail according to claim 1 for space junk removal, special Sign is: towing sail mechanism, i.e., is used for the towing sail that fragment removes with different sizes by what mechanism manufactured in space;Each Towing sail is made of a square frame and a flexible laminated sheet, square frame by one group of two extendible transverse beam and Two extruding longitudinal beam compositions;Transverse beam is wired to attachment device;The transverse beam group of the mechanism is inserted in a manner of being compacted Enter in cylindrical bar, and will then be expanded into necessary length;Attachment device includes the capture net of capture target debris, is passed through Four extendible lines are connected to transverse beam.
4. the space manufacturing method of the different sizes towing sail according to claim 1 for space junk removal, special Sign is: the capture net in attachment device is opened capture fragment, then by capture target debris and the process for discharging towing sail The door of mechanism container is opened and discharges the towing sail of manufacture, the specific steps are as follows:
Step 1: manufacture towing sail frame;
Step 2: laminate is unfolded under the longitudinal beam of extrusion to form towing surface in laminating roll;Later, left compactor is closed And left longitudinal beam and laminate are bonded together by heat and pressure;It is horizontal since compactor also squeezes the corner of square frame It is combined together to the left end of beam group with longitudinal beam;
Step 3: laminating roll continues that laminated material is unfolded, until completing the production of towing sail;
Step 4: the net pop-up when reaching target clast, in attachment device;After mechanism container is captured, mechanism container cover is beaten It opens and pulls sail and be released;
Step 5: space subsystem starts to manufacture next towing sail when spacecraft starts to track next target debris;
So far, from step 1 to step 5, the space manufacturer of the different sizes towing sail for space junk removal is completed Method.
5. the space manufacturing method of the different sizes towing sail according to claim 4 for space junk removal, special Sign is: step 1, specifically:
Step 1.1 will be in the multiple groups transverse beam insertion cylindrical bar equal with being intended to manufacture towing sail quantity;
Feeding mechanism needed for step 1.2 will be used to squeeze out the extruder of longitudinal beam and the necessary laminating roll for being used to manufacture sail load In assistant subsystem and material container;
In space, spacecraft tracks the first fragment target, the separation of L shape support construction, L shape support construction horizontal part to step 1.3 Divide and extends;
Wherein, the distance between L shape support construction is identical with L shape support construction horizontal component length, and drags with what will be manufactured The side for draging sail square frame is corresponding;
For step 1.4 when L shape support construction horizontal component has been extended to desired size, conveying arm catches first group of transverse beam And it is directed at the end of beam with extruder;Then extruder squeezes out two longitudinal beams;
One in step 1.5 conveying arm is taken to a transverse beam end of longitudinal beam, and another remains close to extruder Nozzle;
So far, step 1.5 is arrived by step 1.1, completes the production of towing sail frame.
6. the space manufacturing method of the different sizes towing sail according to claim 4 for space junk removal, special Sign is: step 3, specifically:
For step 3.1 since laminate cannot advance, it initially forms curve;
For step 3.2 when the expectation unfolded surface of laminate, right compactor closure connects right longitudinal beam and laminate;
Due to the pressure and heat in square frame corner, right end and the transverse beam of longitudinal beam group be combined together step 3.3;
So far, step 3.3 is arrived by step 3.1, completes the production of towing sail.
CN201710438977.5A 2016-11-16 2017-06-12 The space of different sizes towing sail for space junk removal manufactures mechanism Active CN107226221B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611018438 2016-11-16
CN2016110184388 2016-11-16

Publications (2)

Publication Number Publication Date
CN107226221A CN107226221A (en) 2017-10-03
CN107226221B true CN107226221B (en) 2019-11-05

Family

ID=59935456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710438977.5A Active CN107226221B (en) 2016-11-16 2017-06-12 The space of different sizes towing sail for space junk removal manufactures mechanism

Country Status (1)

Country Link
CN (1) CN107226221B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07209322A (en) * 1994-01-25 1995-08-11 Mitsubishi Heavy Ind Ltd Micro vibration/acceleration detection sensor
CN102490912A (en) * 2011-11-08 2012-06-13 西安交通大学 Space debris prevention structure of spacecraft
CN102756811A (en) * 2012-07-02 2012-10-31 北京航空航天大学 Rope net unfolding device based on thin-wall type stretching arm
CN103587728A (en) * 2013-10-23 2014-02-19 北京空间飞行器总体设计部 Rope net type space debris capturing and cleaning system
CN103662104A (en) * 2013-11-29 2014-03-26 北京空间机电研究所 Non-pyrotechnic unlocking and releasing mechanism
CN105416613A (en) * 2015-11-23 2016-03-23 哈尔滨工业大学 Repeatable and flexible capture structure based on dielectric elastomer and shape memory polymer and method for capturing space debris

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6910308B2 (en) * 2003-02-04 2005-06-28 Ilc Dover Lp Inflatable rigidizable boom

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07209322A (en) * 1994-01-25 1995-08-11 Mitsubishi Heavy Ind Ltd Micro vibration/acceleration detection sensor
CN102490912A (en) * 2011-11-08 2012-06-13 西安交通大学 Space debris prevention structure of spacecraft
CN102756811A (en) * 2012-07-02 2012-10-31 北京航空航天大学 Rope net unfolding device based on thin-wall type stretching arm
CN103587728A (en) * 2013-10-23 2014-02-19 北京空间飞行器总体设计部 Rope net type space debris capturing and cleaning system
CN103662104A (en) * 2013-11-29 2014-03-26 北京空间机电研究所 Non-pyrotechnic unlocking and releasing mechanism
CN105416613A (en) * 2015-11-23 2016-03-23 哈尔滨工业大学 Repeatable and flexible capture structure based on dielectric elastomer and shape memory polymer and method for capturing space debris

Also Published As

Publication number Publication date
CN107226221A (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN104890900B (en) Method and apparatus for one group of panel to be unfolded
US20090072092A1 (en) Bimodal kite system
US8905357B1 (en) Thin membrane structure
CN106114919B (en) A kind of space junk rope system pulls racemization and method for cleaning
EP2773556B1 (en) High altitude aircraft, aircraft unit and method for operating an aircraft unit
Jenniskens et al. SHEPHERD: a concept for gentle asteroid retrieval with a gas-filled enclosure
CN107150818B (en) It is a kind of that towing sail is removed based on the space junk of flexible technology and oriented film panel
US20120286100A1 (en) Device for Trapping Space Debris
CN107264846A (en) Graphene film parcel space junk cleaning plant and method based on Lorentz force
US20130306267A1 (en) Advanced protective system against dangerous caused moving water masses
CN103590188B (en) A kind of netting of catching for space and storage method for packing thereof
CN108177801B (en) Space debris cleaning device and method based on solar sail
CN106184830A (en) The automatic apparatus for removing of space junk and removing method thereof
CN107226221B (en) The space of different sizes towing sail for space junk removal manufactures mechanism
CN106428653B (en) A kind of space junk certain tracks remove device and its application method
CN107933966B (en) A kind of the electric power rope system's Orbital Transfer and system of lift rail double mode
CN207292479U (en) A kind of cube satellite braking sail leaves the right or normal track device
CN102358438A (en) Increased resistance type device applicable to low-orbit post-task spacecraft deorbit
CN110510150A (en) A kind of spider web capturing structure and its method for catching based on intelligent composite
CN106288980A (en) A kind of three grades of vehicles and usings method thereof of based on RBCC power
CN103863580B (en) A kind of method for folding being suitable to piecemeal quadrate support rod-type solar sail sail face
CN107472527A (en) A kind of flapping wing that folding and unfolding is driven using marmem
CN110143299A (en) A kind of composite machine arm-Sheng Xi mechanism for space junk capture
JP6793724B2 (en) Deployment of solar arrays
JP6448293B2 (en) Structural member deployment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant