CN107194546A - A kind of import resources product riskses appraisal procedure - Google Patents

A kind of import resources product riskses appraisal procedure Download PDF

Info

Publication number
CN107194546A
CN107194546A CN201710304826.0A CN201710304826A CN107194546A CN 107194546 A CN107194546 A CN 107194546A CN 201710304826 A CN201710304826 A CN 201710304826A CN 107194546 A CN107194546 A CN 107194546A
Authority
CN
China
Prior art keywords
risk
risks
value
link
assumptions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710304826.0A
Other languages
Chinese (zh)
Inventor
吕新明
田延河
迪里拜尔·沙比尔
朱建峰
潘存燕
王东
李小波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710304826.0A priority Critical patent/CN107194546A/en
Publication of CN107194546A publication Critical patent/CN107194546A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Primary Health Care (AREA)
  • Animal Husbandry (AREA)
  • General Health & Medical Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Agronomy & Crop Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of import resources product riskses appraisal procedure.Its step of is:(1) risk management object is determined, risks and assumptions that may be present are found for mineral products, risk assessment is carried out by the way of mathematical modeling, the risk size of different mineral products is determined:Relevant information is inputted for different risk points, automatically there is quantized value corresponding, pass through the calculating of controllability and the order of severity, obtain the risk score value H of each factor, pass through the weighted of each factor, value-at-risk is finally given, and for different value-at-risks correspondence risk size, the risk management to commodity is realized according to risk size.The present invention can effectively assess determination mineral products risk, and realize the risk management to commodity according to risk size, practical reliable, it is easy to promote the use of.

Description

A kind of import resources product riskses appraisal procedure
Technical field
The present invention relates to a kind of import resources product riskses appraisal procedure.
Background technology
Mineral products refer to mineral resources after exploitation or selecting and purchasing, depart from the product of nature occurrence status, and China imports and exports Mineral products species is various, up to as many as hundreds of, can be divided into mineral metal products by property and purposes, nonmetallic minerals, flammable organic Mineral products, the class of groundwater resources mineral products four.Mineral products are derived from underground mineral resources, there is a variety of use value:Can as the raw material of industry, Smelting processing is into various products;Can there is provided power as energy source raw material;Building can be directly used in as natural building material;One A little precious metals and jewel can be processed into senior ornaments etc..Different from other products, mineral products belong to primary product, its raw material Mineral resources from underground, according to the different types of mineral products of import because the place of production, control of deleterious element object it is different plus Different mineral products will be carried out risk assessment respectively by the not equal link of the enterprise that work is used, and not occurred yet on the market at present Effective mineral products risk assessment, based on this, designs a kind of import resources product riskses appraisal procedure particularly necessary.
The content of the invention
In view of the shortcomings of the prior art, the present invention seeks to be to provide a kind of import resources product riskses assessment side Method, can effectively assess determination import resources product riskses, and realize the risk management to commodity according to risk size, practical reliable, It is easy to spread to use.
To achieve these goals, the present invention is to realize by the following technical solutions:A kind of import resources product riskses Appraisal procedure, its step is:(1) risk management object is determined:According to the different types of mineral products of import, because the place of production, harmful The not equal link of enterprise that control of element object is different, processing is used, risks and assumptions that may be present are found for mineral products.
(2) risk assessment is carried out by the way of mathematical modeling, the risk size of different mineral products is determined:For different wind Danger point input relevant information, has quantized value corresponding, by the calculating of controllability (P) and the order of severity (D), obtains each automatically The risk score value H of the factor, by the weighted of each factor, finally gives value-at-risk, and for different value-at-risks correspondence Risk size.
(3) risk management to commodity is realized according to risk size:The pipe under different risks is stored in software database Reason pattern, management mode is corresponded to for different risks automatically.
Preferably, described step (1) is importing and exporting each issuable risk of link according to mineral products, it is determined that Place of production link, commodity link, enterprise's link these three links find out 12 risks and assumptions, the wherein risks and assumptions of place of production link Have:Commodity place of production information, supplier information, preshipment inspection, manner of packing, the risks and assumptions of commodity link have:Radioactivity member Plain, harmful poisonous element, quarantine material, commercial quality, deficient weight, the risks and assumptions of enterprise's link have:Environmental protection equipment and Measure, waste processing and utilization equipment, business's information of receiving.
Preferably, step (2) the risk score value H is the step of determination:According in exle forms to it is each because Son gives a numerical value respectively according to controllability (P) and the order of severity (D), first step risk score H=P × D, obtain it is each because The risk score value of son;Risks and assumptions give 1-3 point according to the order of severity from small to large, it is controllable in controllability give 1 point, can not Control gives 2 points, and risk size is divided into high, medium and low according to risk score value.
Preferably, the weight W values of each factor can determine score value by two ways in the step (2):One is to adopt During used in risk analysis, the score value of each risks and assumptions is directly given by expert group;Two be to use application level in mathematical modeling Analytic approach (AHP methods) determines reciprocal influence, determines the weight coefficient of each project of rule layer.
Preferably, the final determination of step (2) the risk value is the value-at-risk H and its weight by each factor The product of coefficient, obtains the value-at-risk Wi values of each factor, finally all Wi is added the final risk value for obtaining the commodity.
Preferably, the determination of step (2) Degree of Risk:5 grades, respectively risk are determined to merchandise risk size It is minimum, small, in, it is big, maximum, obtain finally showing on software result be in 5 grades which rank of.
Beneficial effects of the present invention:Determination mineral products risk can be effectively assessed, different mineral products are carried out with risk respectively and is commented Estimate, and the risk management to commodity is realized according to risk size.
Brief description of the drawings
Describe the present invention in detail with reference to the accompanying drawings and detailed description;
Fig. 1 is the structured flowchart of risks and assumptions of the present invention.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, is expanded on further the present invention.
Reference picture 1, present embodiment uses following technical scheme:A kind of import resources product riskses appraisal procedure, its Step is:(1) risk management object is determined:According to the different types of mineral products of import, because the place of production, control of deleterious element object The not equal link of enterprise that different, processing is used, risks and assumptions that may be present are found for mineral products, to different mineral products point Risk assessment is not carried out.
(2) risk assessment is carried out by the way of mathematical modeling:In software interface correlation is inputted for different risk points Information, has quantized value corresponding automatically, and by the calculating of controllability (P) and the order of severity (D), the risk for obtaining each factor is commented Score value H, by the weighted of each factor, finally gives value-at-risk, and for different value-at-risks correspondence risk size.
(3) risk management to commodity is realized according to risk size:The pipe under different risks is stored in software database Reason pattern, management mode is corresponded to for different risks automatically, also can assign a code to management mode.
Specifically, the manufacturing process of present embodiment is as follows:
(1) risks and assumptions that may be present are found for import mineral products:It may be produced in each link of import and export according to mineral products Raw risk, it is determined that at source link, commodity link, enterprise's link these three links find out risks and assumptions respectively, passes through demonstration It is determined that finding out the reasonability of risks and assumptions, 12 risks and assumptions in 3 links are finally determined.
The risks and assumptions of wherein place of production link have:Commodity place of production information, supplier information, preshipment inspection, manner of packing; The risks and assumptions of commodity link have:Radioactive element, harmful poisonous element, quarantine material, commercial quality, deficient weight;Enterprise The risks and assumptions of industry link have:Environmental protection equipment and measure, waste processing and utilization equipment, business's information of receiving.
(2) risk score value H determination:In application software, according in exle forms to each factor according to controllability (P) and the order of severity (D) gives a numerical value respectively, first step risk score H=P × D obtains the risk score of each factor Value;Risks and assumptions give 1-3 point according to the order of severity from small to large, controllable in controllability to give 1 point, uncontrollable give 2 points, wind Dangerous size is divided into high, medium and low according to risk score value.
(3) each link and risks and assumptions weight (or given score value) W values are determined:Score value can be determined by two ways: One when being utilized in risk analysis, and the score value of each risks and assumptions is directly given by expert group;Two be to use in mathematical modeling to answer Reciprocal influence is determined with analytic hierarchy process (AHP) (AHP methods), the weight coefficient of each project of rule layer is determined.
(4) the final value-at-risk of this commodity is determined:By the value-at-risk H and the product of its weight coefficient of each factor, obtain To the value-at-risk Wi values of each factor, finally all Wi are added the final risk value for obtaining the commodity.
(5) determination of merchandise risk size:Determine 5 grades to merchandise risk size, respectively least risk, it is small, in, it is big, Maximum, obtain finally showing on software result be in 5 grades which rank of.
(6) risk management to commodity is realized according to risk size:Different pipes are formulated according to risk size by manager Reason pattern, the database for having increase or modification management mode in software, in actual applications, is obtained finally by above-mentioned calculating Risk size, can correspond to automatically in management mode.
Present embodiment can be accurate, objective, determines the risk size of different mineral products, effectively assesses and determines mineral products Different mineral products are carried out risk assessment, and realize the risk management to commodity, reliability according to risk size by risk respectively Height, applicability is wide.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (6)

1. a kind of import resources product riskses appraisal procedure, it is characterised in that its step is:(1) risk management object is determined:According to The different types of mineral products of import, because the not equal link of enterprise that the place of production, control of deleterious element object are different, processing is used, Risks and assumptions that may be present are found for mineral products;
(2) risk assessment is carried out by the way of mathematical modeling, the risk size of different mineral products is determined:For different risk points Relevant information is inputted, has quantized value corresponding automatically, by the calculating of controllability (P) and the order of severity (D), obtains each factor Risk score value H, by the weighted of each factor, finally give value-at-risk, and for different value-at-risks correspondence risk Size;
(3) risk management to commodity is realized according to risk size:The management mould under different risks is stored in software database Formula, management mode is corresponded to for different risks automatically.
2. a kind of import resources product riskses appraisal procedure according to claim 1, it is characterised in that described step (1) Importing and exporting each issuable risk of link according to mineral products, it is determined that at source link, commodity link, enterprise's link this three Individual link finds out 12 risks and assumptions, and the risks and assumptions of wherein place of production link have:Commodity place of production information, supplier information, dress Inspection, manner of packing before fortune, the risks and assumptions of commodity link have:Radioactive element, harmful poisonous element, quarantine material, business Quality, deficient weight, the risks and assumptions of enterprise's link have:Environmental protection equipment and measure, waste processing and utilization equipment, the business that receives letter Breath.
3. a kind of import resources product riskses appraisal procedure according to claim 1, it is characterised in that in the step (2) The step of risk score value H is determined be:According in exle forms to each factor according to controllability (P) and the order of severity (D) point A numerical value is not given, and first step risk score H=P × D obtains the risk score value of each factor;Risks and assumptions are according to tight Weight degree gives 1-3 point from small to large, in controllability it is controllable give 1 point, it is uncontrollable give 2 points, risk size is commented according to risk Score value is divided into high, medium and low.
4. a kind of import resources product riskses appraisal procedure according to claim 1, it is characterised in that in the step (2) The weight W values of each factor can determine score value by two ways:One when being utilized in risk analysis, is directly given by expert group The score value of each risks and assumptions;Two be to use application level analytic approach (AHP methods) in mathematical modeling to determine reciprocal influence, it is determined that The weight coefficient of each project of rule layer.
5. a kind of import resources product riskses appraisal procedure according to claim 1, it is characterised in that in the step (2) The final determination of value-at-risk is the value-at-risk H by each factor and its weight coefficient product, obtains the risk of each factor Value Wi values, are finally added all Wi the final risk value for obtaining the commodity.
6. a kind of import resources product riskses appraisal procedure according to claim 1, it is characterised in that in the step (2) The determination of risk size:Determine 5 grades to merchandise risk size, respectively least risk, it is small, in, it is big, maximum, on software To final display result be in 5 grades which rank of.
CN201710304826.0A 2017-05-03 2017-05-03 A kind of import resources product riskses appraisal procedure Pending CN107194546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710304826.0A CN107194546A (en) 2017-05-03 2017-05-03 A kind of import resources product riskses appraisal procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710304826.0A CN107194546A (en) 2017-05-03 2017-05-03 A kind of import resources product riskses appraisal procedure

Publications (1)

Publication Number Publication Date
CN107194546A true CN107194546A (en) 2017-09-22

Family

ID=59873525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710304826.0A Pending CN107194546A (en) 2017-05-03 2017-05-03 A kind of import resources product riskses appraisal procedure

Country Status (1)

Country Link
CN (1) CN107194546A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090833A (en) * 2019-11-21 2020-05-01 深圳微众信用科技股份有限公司 Data processing method, system and related equipment
CN112116255A (en) * 2020-09-22 2020-12-22 北京科技大学 Cross-border renewable resource quality safety early warning method and system
CN113435195A (en) * 2021-07-01 2021-09-24 贵州电网有限责任公司 Defect intelligent diagnosis model construction method based on main transformer load characteristics

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111090833A (en) * 2019-11-21 2020-05-01 深圳微众信用科技股份有限公司 Data processing method, system and related equipment
CN112116255A (en) * 2020-09-22 2020-12-22 北京科技大学 Cross-border renewable resource quality safety early warning method and system
CN113435195A (en) * 2021-07-01 2021-09-24 贵州电网有限责任公司 Defect intelligent diagnosis model construction method based on main transformer load characteristics
CN113435195B (en) * 2021-07-01 2023-10-03 贵州电网有限责任公司 Defect intelligent diagnosis model construction method based on main transformer load characteristics

Similar Documents

Publication Publication Date Title
Cao Sustainability and life assessment of high strength natural fibre composites in construction
CN107194546A (en) A kind of import resources product riskses appraisal procedure
Khaba et al. Lean awareness and potential for lean implementation in the Indian coal mining industry: An empirical study
Sahu et al. Appraisal of CNC machine tool by integrated MULTI-MOORA-IVGN circumferences: An empirical study
Amrina et al. Interpretive structural model of key performance indicators for sustainable maintenance evaluatian in rubber industry
CN112783100A (en) Memory, chemical enterprise safety production risk early warning method, equipment and device
Jalhar et al. Differential evolution for sustainable supplier selection in pulp and paper industry: a DEA based approach
CN115578043B (en) Logistics big data real-time monitoring and analysis processing system based on artificial intelligence
Hennyeyova et al. Analysis of the exploitation of information and communication technologies in the agri-food sector companies.
CN103886473A (en) Method and system for determining network transaction article suppliers
Ishak et al. Cleaner production implementation in an E-Waste recovery plant by using the Value Stream Mapping
Almashaqbeh et al. Developing a FMEA methodology to assess non-technical risks in power plants
Chinda et al. Dynamic model for construction and demolition waste recycling in Bangkok, Thailand.
Lufika et al. Supply chain risk mapping at abc cement plant in aceh, indonesia
Shi et al. Research on electricity consumption forecast based on mutual information and random forests algorithm
Jestratijevic et al. Policies versus Practices: Transparency of supply chain disclosures among luxury and mass market fashion brands
Maojun et al. The research on the relationship between industrial development and environmental pollutant emission
Trtílek et al. Measuring the performance of construction contracts with regard to the environment
CN104484768A (en) Transverse comparison post-evaluation method for oil and gas pipeline engineering project
Vaisi et al. Productivity Improvement in the Pride's Spare Parts Manufacturing using Computer Simulation and Data Envelopment Analysis
Liu et al. Study on schedule risk assessment of power transmission and transformation project based on improved risk chain
Khalil et al. A Systemic Risk Management Model to Manage the Equipment Maintenance System in Oil and Gas Companies
Didenko et al. Analysis of the development in the Russian Arctic zone
Mićunović et al. Analysis of Product’s Design Health Impact Using Daly Method
Hua et al. Research on the Mechanism of Safety Risk Influencing Factors in the Construction of Prefabricated Building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication