CN107185198B - A kind of preparation process of badminton head - Google Patents

A kind of preparation process of badminton head Download PDF

Info

Publication number
CN107185198B
CN107185198B CN201710396620.5A CN201710396620A CN107185198B CN 107185198 B CN107185198 B CN 107185198B CN 201710396620 A CN201710396620 A CN 201710396620A CN 107185198 B CN107185198 B CN 107185198B
Authority
CN
China
Prior art keywords
bulb
mold
temperature
bulb mold
badminton head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710396620.5A
Other languages
Chinese (zh)
Other versions
CN107185198A (en
Inventor
陈道根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui bright noodle Co.,Ltd.
Original Assignee
Jurong Chenyang Sports Goods Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jurong Chenyang Sports Goods Co filed Critical Jurong Chenyang Sports Goods Co
Priority to CN201710396620.5A priority Critical patent/CN107185198B/en
Publication of CN107185198A publication Critical patent/CN107185198A/en
Application granted granted Critical
Publication of CN107185198B publication Critical patent/CN107185198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B67/00Sporting games or accessories therefor, not provided for in groups A63B1/00 - A63B65/00
    • A63B67/18Badminton or similar games with feathered missiles
    • A63B67/183Feathered missiles
    • A63B67/187Shuttlecocks
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B45/00Apparatus or methods for manufacturing balls
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2102/00Application of clubs, bats, rackets or the like to the sporting activity ; particular sports involving the use of balls and clubs, bats, rackets, or the like
    • A63B2102/04Badminton
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2209/00Characteristics of used materials

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The invention belongs to shuttlecock production fields, it is related to a kind of preparation process of badminton head, it is foamed and is prepared in bulb mold using polyurethane, polyurethane is when foaming prepares bulb in bulb mold, bulb mold has different temperature at different height, it is minimum in the bottom temp for being used to form bulb cambered surface, it is being used to form bulb end region temperature highest;And the maximum temperature of bulb mold and the temperature difference of minimum temperature are 15-50 DEG C.It is able to achieve one-pass molding and prepares badminton head, and guarantees that badminton head quality is distributed on demand, and the stability of badminton head quality is effectively ensured.

Description

A kind of preparation process of badminton head
Technical field
The invention belongs to shuttlecock production fields, are related to a kind of preparation process of badminton head.
Background technique
Badminton project is a sports very popular in world wide, either carries out well-regulated plumage Ball top match or be used as general body-building, will ground on the scene ceaselessly carry out that step is mobile, jumps, turns, waving It claps, reasonably ball is on the field rallied with various batsmanships and footwork, to increase upper limb, lower limb and waist flesh The strength of meat accelerates person taking exercise's systemic blood circulation, enhances the function of cardiovascular system and respiratory system, loosens shoulder, It is good to neck.Badminton is also a kind of mode of decompression, can be relaxed, and adjust mentality.
In the use process of shuttlecock, the skyborne movement needs of shuttlecock are quite high, and require shuttlecock that can generate Biggish power reaches the distance of a Dingyuan.Due to these requirements, so just needing to carry out the weight distribution of badminton head Certain adjustment.Bulb is usually used rigid plastics, foamed plastics or cork and is prepared in the prior art, and such as China is special A kind of shuttlecock head core for badminton disclosed in sharp CN2438478, the bulb head core are made of two parts, and head is by vegetable cork structure At, main part is by foamed plastic PU plate or has one layer of foamed plastic PU plate and one layer of cork to constitute, the head of bulb head core and It is connected between main body using binder.
And " a kind of shuttlecock fetcher " disclosed in Chinese patent CN203379565U, it includes that band soft magnetism is compound The shuttlecock of material and racket composition with soft magnetic composite material piece, in the sphere of the shuttlecock of soft magnetic composite material The heart is semicircle cork sphere, and outer layer wraps tightly magnetic rubber piece, and outermost layer bonds one layer of netted fiber cloth, and band soft magnetism is compound The racket of material, the two sides at the top of racket respectively bond one piece of magnetic rubber piece.
But above two mode all cannot be guaranteed that the badminton head Mass Distribution produced every time is stablized, and can not be effectively ensured The stability of bulb quality.
Summary of the invention
The present invention provides a kind of preparation process of badminton head, is able to achieve one-pass molding and prepares badminton head, and Guarantee that badminton head quality is distributed on demand, the stability of badminton head quality is effectively ensured.
To realize the above-mentioned technical purpose, it is a kind of preparation work of badminton head that the present invention, which takes specific technical solution, Skill is foamed in bulb mold using polyurethane and is prepared, and polyurethane is when foaming prepares bulb in bulb mold, bulb mould Tool has different temperature at different height, minimum in the bottom temp for being used to form bulb cambered surface, is being used to form bulb End region temperature highest;And the maximum temperature of bulb mold and the temperature difference of minimum temperature are 15-50 DEG C.
As the improved technical solution of the present invention, bulb mold energy uniformly transfer heat.
As the improved technical solution of the present invention, specifically comprise the following steps:
Step 1: condensing water conduit is laid in the periphery along bulb mold in a spiral manner, and guarantee every circle condensing water conduit Spacing be 2-5mm, meanwhile, condensing water conduit is able to achieve condensed water and is used to form bulb curved end to forming ball from bulb mold The flowing of cephalic par direction;
Step 2: being used to form bulb end installation adding thermal resistance in bulb mold;
Step 3 powers on adding thermal resistance, realizes and heats to bulb mold, reaches 90-150 in bulb mold temperature DEG C when, condensed water is passed through into condensing water conduit;
Step 4: control bulb mold is 50-70 DEG C in the temperature of bulb curved end, bulb mold is forming bulb cambered surface The temperature at end is 90-150 DEG C, and polyurethane is injected into bulb mold, keeps 1-5h to get the bulb of foaming is arrived.
As the improved technical solution of the present invention, bulb protective case is disposed into bulb mold before injecting polyurethane.
As the improved technical solution of the present invention, bulb mold is prepared using 3D laser printing technology, specifically will Material with different thermal conduction rates successively prints from bottom to top, so that the bulb mold heat transfer from bottom to top of preparation Rate gradually rises.
Beneficial effect
Preparation process of the invention has different temperature using bulb mold at different height, can guarantee the ball of preparation Head has maximal density at cambered surface, has minimum density in bulb end, the Mass Distribution of bulb is effectively ensured, improves bulb Quality;
Using polyurethane foam, and the polyurethane to foam has different densities in different location, so that bulb is with good Good elasticity.
Specific embodiment
To keep purpose and the technical solution of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention to this hair Bright technical solution is clearly and completely described.
Obviously, described embodiment is a part of the embodiments of the present invention, instead of all the embodiments.Based on being retouched The embodiment of the present invention stated, those of ordinary skill in the art are obtained every other under the premise of being not necessarily to creative work Embodiment shall fall within the protection scope of the present invention.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technology art Language and scientific term) there is meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Should also Understand, those terms such as defined in the general dictionary, which should be understood that, to be had and the meaning in the context of the prior art The consistent meaning of justice, and unless defined as here, it will not be explained in an idealized or overly formal meaning.
A kind of preparation process of badminton head is foamed in bulb mold using polyurethane and is prepared, main to utilize To the demand of temperature when polyurethane foam, specifically in different temperatures, the size of the bubble of polyurethane foam is different, though This right principle is well known, but it is combined as a whole with badminton head without technical staff in the prior art, to solve Badminton head is during the preparation process to the Spreading requirements of quality and aeroelastic requirements.
Particularly: when foaming prepares bulb in bulb mold, bulb mold has not polyurethane at different height Same temperature, it is minimum in the bottom temp for being used to form bulb cambered surface, it is being used to form bulb end region temperature highest, and bulb Mold has bottom to gradually rise to end region temperature;And the maximum temperature of bulb mold and the temperature difference of minimum temperature are 15-50 ℃;
Effect is: principal security bulb does not generate bubble at cambered surface or generates the bubble of smaller size, and in ball Cephalic par can generate the stomata of larger size, realize control bulb Mass Distribution by control bubble size.
Specifically comprise the following steps:
Step 1: condensing water conduit (the one side wall of pipeline is laid in the periphery along bulb mold in a manner of spiral (wound form) For the outer surface of bulb mold);
During not winding and guarantee that the spacing of every circle condensing water conduit is 2-5mm,
Meanwhile condensing water conduit is able to achieve condensed water and is used to form bulb curved end to forming bulb end from bulb mold Direction flowing, the condensate temperature for being primarily due to the condensing water conduit just flowed into is minimum, is countercurrently the bottom that can guarantee bulb mold Portion's temperature is minimum;
Step 2: being used to form bulb end installation adding thermal resistance in bulb mold;
Step 3 powers on adding thermal resistance, realizes and heats to bulb mold, reaches 90-150 in bulb mold temperature DEG C when, condensed water is passed through into condensing water conduit;
Step 4: control bulb mold is 50-70 DEG C in the temperature of bulb curved end, bulb mold is forming bulb end Temperature is 90-150 DEG C, and polyurethane is injected into bulb mold, keeps 1-5h to get the bulb of foaming is arrived.
In order to facilitate processing, bulb mold energy uniformly transfer heat used in the present embodiment.In bulb mold energy uniformly transfer heat When, the spacing of every circle condensing water conduit is 2-3mm;It is 50 DEG C in the temperature of bulb curved end when injecting polyurethane, bulb mould Having in the temperature for forming bulb end is 90-120 DEG C.
Another technical solution is that bulb mold is prepared using 3D laser printing technology, will specifically have difference The material of thermal conduction rate successively prints from bottom to top, so that thermal conduction rate is gradually from bottom to top for the bulb mold of preparation It increases.If pure iron material can be used in the top layer of bulb mold, and it is (existing using pure iron and vanadium dioxide in the bottom of bulb mold In technology report vanadium dioxide heating conduction it is very poor) mixture.In bulb mold energy uniformly transfer heat, every circle condensing water conduit Spacing be 2-5mm;It is 50-70 DEG C in the temperature of bulb curved end, bulb mold is forming bulb end when injecting polyurethane Temperature be 90-120 DEG C of
Taking-up can be facilitated in order to facilitate bulb, and be not adhere in bulb mold, to bulb mold before injecting polyurethane Middle placement bulb protective case.
The above is only embodiments of the present invention, and the description thereof is more specific and detailed, and but it cannot be understood as right The limitation of the invention patent range.It should be pointed out that for those of ordinary skill in the art, not departing from the present invention Under the premise of design, various modifications and improvements can be made, these are all belonged to the scope of protection of the present invention.

Claims (5)

1. a kind of preparation process of badminton head is foamed in bulb mold using polyurethane and is prepared, which is characterized in that For polyurethane when foaming prepares bulb in bulb mold, bulb mold has different temperature at different height, is being used for shape Bottom temp at bulb cambered surface is minimum, is being used to form bulb end region temperature highest;And the maximum temperature of bulb mold with The temperature difference of minimum temperature is 15-50 DEG C.
2. a kind of preparation process of badminton head according to claim 1, bulb mold energy uniformly transfer heat.
3. a kind of preparation process of badminton head according to claim 1 or 2, specifically comprises the following steps:
Step 1: condensing water conduit is laid in the periphery along bulb mold in a spiral manner, and guarantee between every circle condensing water conduit Away from for 2-5mm, meanwhile, condensing water conduit is able to achieve condensed water and is used to form bulb curved end to forming bulb end from bulb mold The flowing of portion direction;
Step 2: being used to form bulb end installation adding thermal resistance in bulb mold;
Step 3 powers on adding thermal resistance, realizes and heats to bulb mold, reaches 90-150 DEG C in bulb mold temperature When, condensed water is passed through into condensing water conduit;
Step 4: control bulb mold is 50-70 DEG C in the temperature of bulb curved end, bulb mold is in the temperature for forming bulb end It is 90-150 DEG C, polyurethane is injected into bulb mold, keeps 1-5h to get the bulb of foaming is arrived.
4. a kind of preparation process of badminton head according to claim 3, which is characterized in that before injecting polyurethane to Bulb protective case is disposed in bulb mold.
5. a kind of preparation process of badminton head according to claim 1, which is characterized in that bulb mold is swashed using 3D Light printing technique is prepared, and specifically successively prints the material with different thermal conduction rates from bottom to top, so that Thermal conduction rate gradually rises the bulb mold of preparation from bottom to top.
CN201710396620.5A 2017-05-31 2017-05-31 A kind of preparation process of badminton head Active CN107185198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710396620.5A CN107185198B (en) 2017-05-31 2017-05-31 A kind of preparation process of badminton head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710396620.5A CN107185198B (en) 2017-05-31 2017-05-31 A kind of preparation process of badminton head

Publications (2)

Publication Number Publication Date
CN107185198A CN107185198A (en) 2017-09-22
CN107185198B true CN107185198B (en) 2019-06-21

Family

ID=59876721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710396620.5A Active CN107185198B (en) 2017-05-31 2017-05-31 A kind of preparation process of badminton head

Country Status (1)

Country Link
CN (1) CN107185198B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108211292A (en) * 2018-01-31 2018-06-29 海宁市博展经编有限公司 A kind of manufacture craft of badminton head

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0384713A2 (en) * 1989-02-22 1990-08-29 Acushnet Company Polyurethane golf ball cover
US5181717A (en) * 1989-03-03 1993-01-26 Adidas Sarragan France Inflated sports ball
CN2438478Y (en) * 2000-08-22 2001-07-11 上海裕安软木厂 Shuttlecock head core for badminton
CN1843530A (en) * 2006-04-30 2006-10-11 汪永国 Solid spring ball and process for making same

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4563116B2 (en) * 2004-09-03 2010-10-13 Sriスポーツ株式会社 Golf ball manufacturing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0384713A2 (en) * 1989-02-22 1990-08-29 Acushnet Company Polyurethane golf ball cover
US5181717A (en) * 1989-03-03 1993-01-26 Adidas Sarragan France Inflated sports ball
CN2438478Y (en) * 2000-08-22 2001-07-11 上海裕安软木厂 Shuttlecock head core for badminton
CN1843530A (en) * 2006-04-30 2006-10-11 汪永国 Solid spring ball and process for making same

Also Published As

Publication number Publication date
CN107185198A (en) 2017-09-22

Similar Documents

Publication Publication Date Title
CN107185198B (en) A kind of preparation process of badminton head
CN103706089A (en) Badminton racket and manufacturing method thereof
CN105694364A (en) Handle high-energy rubber and preparation method and application thereof
CN103990260B (en) Nonirrigated farmland hockey lever and preparation method thereof
CN104645567B (en) The preparation method of battledore frame
CN206745816U (en) A kind of high trampoline of stability
CN204775923U (en) Life jacket
CN111467732B (en) Hula hoop with auxiliary massage and blood circulation promoting functions
CN101112650A (en) Taiji exercising ball and method of manufacturing the same
JP2022115834A (en) Molds and methods for producing parts by molding, parts thereof, and shoes with such parts
CN213609810U (en) Reinforced hollow rotary dart
CN206730381U (en) A kind of anti-swimming preheating device that knots of safety
KR200453743Y1 (en) Racket head cover
CN201919776U (en) Baseball cap
CN206823037U (en) A kind of Novel dumbbell
CN206391485U (en) A kind of racket handle
CN204233707U (en) A kind of soft javelin
CN207462606U (en) A kind of preheating apparatus of feather process equipment
CN213100740U (en) Outdoor ball equipment
CN207928666U (en) A kind of step-movement training device of football training
CN205549604U (en) Giant waves stage property
CN207055783U (en) A kind of safe trampoline
CN209965362U (en) Light high-elasticity jumping shoes
CN209933985U (en) Novel fitness ball
CN211215330U (en) Golf exercising rod

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201203

Address after: 234000 building, Xiaodu Town, Suzhou City, Anhui Province

Patentee after: Anhui bright noodle Co.,Ltd.

Address before: 212431, Jiangsu Province, Zhenjiang City, Jurong province Guo Town Village No. 6

Patentee before: JURONG CHENYANG PHYSICAL CULTURE ARTICLE Co.,Ltd.