CN107175283B - A kind of large-scale pair of fine machine linkage production line and its working method - Google Patents
A kind of large-scale pair of fine machine linkage production line and its working method Download PDFInfo
- Publication number
- CN107175283B CN107175283B CN201710475534.3A CN201710475534A CN107175283B CN 107175283 B CN107175283 B CN 107175283B CN 201710475534 A CN201710475534 A CN 201710475534A CN 107175283 B CN107175283 B CN 107175283B
- Authority
- CN
- China
- Prior art keywords
- fine
- fine machine
- machine
- processing
- machines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D28/00—Shaping by press-cutting; Perforating
- B21D28/002—Drive of the tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D28/00—Shaping by press-cutting; Perforating
- B21D28/02—Punching blanks or articles with or without obtaining scrap; Notching
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D45/00—Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
- B21D45/02—Ejecting devices
Abstract
The present invention relates to a kind of large-scale double fine machine linkage production lines and its working methods, it solves existing fine machine and is not capable of processing the defect that structure is complicated, is punched shape and the irregular product of thickness, including the other fine machine of two ad eundems, each fine machine is provided with oily control loop, electric control loop, First fine machine is as first road sequence process equipment, second fine machine is as extreme trace sequence process equipment, wherein First fine machine docks material evener by material passage, is connected between two fine machines by transition bridge material coordinate well device.Two fine machine joints complete the processing of a product, divide the procedure of processing of product to sequence, to complete to structure is complicated, the processing of punching shape and the irregular product of thickness;Since the time of first road sequence processing and the time of extreme trace sequence processing can have difference, coordinated by transition bridge material coordinate well device, so that the one action time difference of two fine machines is compensated, and then realizes that product is continuously run, product processing is not influenced.
Description
Technical field
The present invention relates to a kind of production line and working method, especially a kind of large-scale double fine machine linkage production lines and its work
Make method.
Background technique
Fine production line traditional at present is all made of single device and carries out product processing, repeats essence by the movement of lathe
Degree, cooperation precision, to guarantee the euphotic belt of product, cross section perpendicular degree, product shape precision.But it is multiple for product structure
It is miscellaneous, it is punched for shape and the irregular a part of part of thickness, because the step of its processing is more, has exceeded the pressure of fine machine
Range causes not to be capable of processing;In addition serious pressure unbalance loading is caused due to the limitation of the sequencing of technique again, to product quality,
The equipment and mold service life causes influence very serious, so being that cannot achieve this kind of productions using conventional single device processing
The producing feasibility of product.
Summary of the invention
The present invention solves existing fine machine and is not capable of processing that structure is complicated, punching shape and thickness irregular product
Defect provides a kind of large-scale double fine machine linkage production lines and its working method, using double fine machines of linkage form, divide sequence into
Row processing, to complete to structure is complicated, the processing of punching shape and the irregular product of thickness.
This invention also solves two equipment processing efficiency differences to cause product operating uncoordinated, influences lacking for product processing
It falls into, a kind of large-scale pair of fine machine linkage production line and its working method is provided, passed through between double fine machines of linkage intermediate recessed
The conveying device of portal structure transport semi-finished product, storage department is formed in the lower recess of conveying device, to coordinate product fortune
Turn, does not influence product processing.
The specific technical proposal of the invention is: a kind of large-scale double fine machine linkage production lines, including two ad eundems are other
Fine machine, each fine machine are provided with oily control loop, electric control loop, and First fine machine is set as first road sequence processing
Standby, second fine machine is as extreme trace sequence process equipment, and wherein First fine machine docks material evener by material passage,
It is connected between two fine machines by transition bridge material coordinate well device.Two fine machine joints complete adding for a product
Work divides the procedure of processing of product to sequence, to complete to structure is complicated, the processing of punching shape and the irregular product of thickness;By
The time of Yu Shoudao sequence processing and the time of extreme trace sequence processing can have difference, pass through transition bridge material coordinate well device
Coordinated, so that the one action time difference of two fine machines compensated, and then realizes that product is continuously run, is not influenced
Product processing.
Preferably, transition bridge coordinate well device includes the gantry with intermediate lower concave part, it is circularly set in bridge
The conveying device at frame both ends, and the feeding servo-system for controlling conveying device two fine machine working efficiencies of coordination.It is intermediate
Recessed position forms storage department, when semi-finished product pass through recessed bottom, extends the transport path of semi-finished product, extends simultaneously
Time of delivery.
Preferably, two fine machines are concordantly docked at gantry both ends respectively, feeding servo-system includes high point monitor, low
Point monitor and the control unit for controlling conveying device.
Preferably, conveying device include front driving mechanism, rear drive mechanism and be connected by circulation in front driving mechanism and after
Conveyer belt between driving mechanism, front driving mechanism are set to one end of gantry docking First fine machine, and rear drive mechanism is set
It is placed in one end that gantry docks second fine machine, front driving mechanism and rear drive mechanism are controlled by control unit.
Preferably, front driving mechanism and rear drive mechanism are mutually indepedent, front driving mechanism is controlled by control unit with the
The processing progress of one fine machine and rotate, rear drive mechanism by control unit control with the processing progress of second fine machine and
Rotation.
Preferably, further including a linkage servo central, two fine machines have independent control system, every task
Complete to have signal to feed back to linkage servo central, the work that linkage servo central receives two fine machines is completed signal and is just issued
The processing of next material starts signal, there is monitoring device in each link of production line, in monitoring device and linkage servo
The heart is connected, and any link monitoring device monitors fault message, then servo central issues the signal that production line stops, until failure
It releases.
Preferably, two fine machines are respectively connected with garbage collection area, second fine machine is also connected with finished product collecting region.
A kind of working method of large-scale double fine machine linkage production lines comprising the steps of: (1) feeding to first road sequence is processed
Equipment: after raw material are calibrated via material evener, raw material material strip is formed, First fine is sent to by material passage
Machine;
(2) first road sequence processing is carried out to raw material material strip by First fine machine;
(3) semi-finished product are delivered to second fine machine by conveying device after processing is completed and carry out the processing of extreme trace sequence, conveying
Device is coordinated route length and the conveying opportunity of conveying by feeding servo-system according to the working efficiency of two fine machines;
(4) it send after the processing of extreme trace sequence to finished product collecting region.
Preferably, work as one action time of the one action time less than second fine machine of First fine machine,
When second fine machine work, the rear drive mechanism of conveying device stops under the control of feeding servo-system, conveying device
Conveyer belt hangs down into the low dot location of transition bridge material coordinate well device, extends the time of delivery of conveying device to compensate
The one action time difference of two fine machines.
Preferably, when the one action time of second fine machine is less than the one action time of First fine machine,
The high point position in transition bridge material coordinate well device that the conveyer belt of conveying device is straight, the work of First fine machine
When, second fine machine interval waits, and compensates the one action time difference of two fine machines.
The beneficial effects of the present invention are: two fine machine joints complete the processing of a product, by the procedure of processing of product
Divide sequence, to complete to structure is complicated, the processing of punching shape and the irregular product of thickness;Due to first road sequence processing time and
The time of extreme trace sequence processing can have difference, be coordinated by transition bridge material coordinate well device, so that two
The one action time difference of fine machine is compensated, and then realizes that product is continuously run, and does not influence product processing.
Detailed description of the invention
A kind of structural schematic diagram of Fig. 1 present invention;
Fig. 2 is a kind of structural schematic diagram of transition bridge material coordinate well device of the present invention;
In figure: 1, material evener, 2, raw material material strip, 3, First fine machine, 4, semi-finished product material band, 5, second essences
Rush machine, 6, garbage collection area, 7, finished product collecting region, 8, product conveying belt, 9, oily control loop, 10, electric control loop, 11, mistake
Transfer bridge posture material coordinate well device, 12, material passage, 13, gantry, 14, high point monitor, 15, low spot monitor, 16,
Front driving mechanism, 17, rear drive mechanism, 18, conveyer belt.
Specific embodiment
Below by specific embodiment, and in conjunction with attached drawing, the invention will be further described.
Embodiment: a kind of large-scale double fine machine linkage production lines (referring to Fig. 1 Fig. 2), the fine including two 650T ranks
Machine, each fine machine are provided with oily control loop 9, electric control loop 10, and First fine machine 3 is set as first road sequence processing
Standby, second fine machine 5 is used as extreme trace sequence process equipment, and two fine owner's bodies are placed in horizontal linear, wherein First essence
It rushes machine and material evener 1 is docked by material passage 12, the transit bridge for conveying semi-finished product material band 4 is connected between two fine machines
Posture material coordinate well device 11.Two fine machines are respectively connected with garbage collection area 6, and it is defeated that second fine machine also passes through finished product
Band 8 is sent to be connected with finished product collecting region 7.
Transition bridge coordinate well device includes the gantry 13 with intermediate lower concave part, is circularly set in gantry both ends
Conveying device, and the feeding servo-system for controlling conveying device two fine machine working efficiencies of coordination.Gantry both ends are concordant
Two fine machines are docked respectively, and feeding servo-system includes high point monitor 14, low spot monitor 14 and control conveying device
Control unit.Conveying device includes front driving mechanism 16, rear drive mechanism 17 and is connected by circulation in front driving mechanism and rear driving
Conveyer belt 18 between mechanism, front driving mechanism are set to one end of gantry docking First fine machine, rear drive mechanism setting
One end of second fine machine is docked in gantry, front driving mechanism and rear drive mechanism are controlled by control unit.Front driving mechanism
Mutually indepedent with rear drive mechanism, front driving mechanism is controlled by control unit and is rotated with the processing progress of First fine machine,
Rear drive mechanism is controlled by control unit and is rotated with the processing progress of second fine machine.
A kind of working method of large-scale double fine machine linkage production lines comprising the steps of: (1) feeding to first road sequence is processed
Equipment: after raw material are calibrated via material evener, raw material material strip 2 is formed, is sent to by material passage 12 as head
The First fine machine of road sequence process equipment;
(2) first road sequence processing is carried out to raw material material strip by fine machine, is processed into semi-finished product material band 4;
(3) semi-finished product material band is delivered to second fine machine by conveying device after processing is completed and carries out the processing of extreme trace sequence,
Conveying device is coordinated route length and the conveying opportunity of conveying by feeding servo-system according to the working efficiency of two fine machines;
(4) it send after the processing of extreme trace sequence to finished product collecting region.
When one action time of the one action time of First fine machine less than second fine machine, second fine
When machine works, the rear drive mechanism of conveying device stops under the control of feeding servo-system, and the conveyer belt of conveying device is sagging,
Until the low dot location of transition bridge material coordinate well device, extend the time of delivery of conveying device to compensate two fines
The one action time difference of machine.Low spot monitor monitors conveyer belt and reaches minimum point, and rear drive mechanism is operated semi-finished product material
Band is delivered to the second fine machine, and rear drive mechanism accelerates speed and lifts conveyer belt, until high point position, the monitoring of high point monitor
High point position is reached to conveyer belt and then stops front driving mechanism and rear drive mechanism, waits the processing of next material.
It is less than the one action time of First fine machine when the one action time of second fine machine, conveying device
The high point position in transition bridge material coordinate well device that conveyer belt is straight, when First fine machine works, second
Fine machine interval waits, and compensates the one action time difference of two fine machines.First fine machine completes first road sequence processing, forerunner
Semi-finished product material band is quickly delivered to second fine machine by motivation structure and rear drive mechanism, completes extreme trace sequence by second fine machine
Processing.
The above is only presently preferred embodiments of the present invention, is not intended to limit the invention in any way, it is all according to the present invention
Technical spirit any simple modification, change and equivalent transformation to the above embodiments, still fall within the technology of the present invention side
The protection scope of case.
Claims (9)
1. a kind of large-scale double fine machine linkage production lines, it is characterised in that: including the other fine machine of two ad eundems, each essence
The machine of punching is provided with oily control loop, electric control loop, and First fine machine is made as first road sequence process equipment, second fine machine
For extreme trace sequence process equipment, wherein First fine machine docks material evener by material passage, passes through between two fine machines
The connection of transition bridge material coordinate well device;Transition bridge coordinate well device includes the bridge with intermediate lower concave part
Frame is circularly set in the conveying device at gantry both ends, and coordinates sending for two fine machine working efficiencies for controlling conveying device
Expect servo-system.
2. a kind of large-scale double fine machine linkage production lines according to claim 1, it is characterised in that: gantry both ends are concordantly divided
Not Dui Jie two fine machines, feeding servo-system include high point monitor, low spot monitor and control conveying device control list
Member.
3. a kind of large-scale double fine machine linkage production lines according to claim 1 or 2, it is characterised in that: conveying device packet
Include front driving mechanism, rear drive mechanism and the conveyer belt being connected by circulation between front driving mechanism and rear drive mechanism, preceding driving
Mechanism is set to one end of gantry docking First fine machine, and rear drive mechanism is set to one that gantry docks second fine machine
End, front driving mechanism and rear drive mechanism are controlled by control unit.
4. a kind of large-scale double fine machine linkage production lines according to claim 3, it is characterised in that: front driving mechanism is with after
Driving mechanism is mutually indepedent, and front driving mechanism is controlled by control unit and rotated, rear-guard with the processing progress of First fine machine
Motivation structure is controlled by control unit and is rotated with the processing progress of second fine machine.
5. a kind of large-scale double fine machine linkage production lines according to claim 1 or 2, it is characterised in that: further include one
Link servo central, and two fine machines have independent control system, and every task is complete to have signal to feed back in linkage servo
The heart, the processing that the work completion signal that linkage servo central receives two fine machines just issues next material starts signal, raw
There is monitoring device in each link of producing line, monitoring device is connected with linkage servo central, any link monitoring device prison
Fault message is controlled, then servo central issues the signal that production line stops, until trouble shooting.
6. a kind of large-scale double fine machine linkage production lines according to claim 1 or 2, it is characterised in that: two fine machines
It is respectively connected with garbage collection area, second fine machine is also connected with finished product collecting region.
7. a kind of working method of the double fine machine linkage production lines of large size described in -6 any one according to claim 1, special
Sign is: comprise the steps of: (1) feeding to first road sequence process equipment: after raw material are calibrated via material evener, shape
At raw material material strip, the fine machine as first road sequence process equipment is sent to by material passage;
(2) first road sequence processing is carried out to raw material material strip by fine machine;
(3) semi-finished product are delivered to second fine machine by conveying device after processing is completed and carry out the processing of extreme trace sequence, conveying device
Coordinate route length and the conveying opportunity of conveying according to the working efficiency of two fine machines by feeding servo-system;
(4) it send after the processing of extreme trace sequence to finished product collecting region.
8. a kind of working method of large-scale double fine machine linkage production lines according to claim 7, it is characterised in that: when the
The one action time of one fine machine less than second fine machine the one action time, it is defeated when the work of second fine machine
The rear drive mechanism of device is sent to stop under the control of feeding servo-system, the conveyer belt of conveying device hangs down into transition bridge
The low dot location of material coordinate well device, when extending one action of the time of delivery of conveying device to compensate two fine machines
Between it is poor.
9. a kind of working method of large-scale double fine machine linkage production lines according to claim 7, it is characterised in that: when the
The one action time of two fine machines is less than the one action time of First fine machine, the conveyer belt of conveying device is straight place
In the high point position of transition bridge material coordinate well device, when First fine machine works, second fine machine interval etc.
Wait compensate the one action time difference of two fine machines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710475534.3A CN107175283B (en) | 2017-06-21 | 2017-06-21 | A kind of large-scale pair of fine machine linkage production line and its working method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710475534.3A CN107175283B (en) | 2017-06-21 | 2017-06-21 | A kind of large-scale pair of fine machine linkage production line and its working method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107175283A CN107175283A (en) | 2017-09-19 |
CN107175283B true CN107175283B (en) | 2019-03-01 |
Family
ID=59845071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710475534.3A Active CN107175283B (en) | 2017-06-21 | 2017-06-21 | A kind of large-scale pair of fine machine linkage production line and its working method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107175283B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1233543A (en) * | 1998-04-30 | 1999-11-03 | 南海市黄岐良奇钢瓶总厂 | Circular steel plate formation process used for steel cylinder envelope |
EP0808677B1 (en) * | 1996-05-21 | 2003-08-06 | Hans Oetiker AG Maschinen- und Apparatefabrik | Machine for automatically manufacturing puzzle-lock compression rings |
CN1522808A (en) * | 2003-09-09 | 2004-08-25 | 天津职业大学 | Automatic production line for punch |
CN2680370Y (en) * | 2004-02-26 | 2005-02-23 | 北新建材(集团)有限公司 | C-shape stamping production system |
CN202045293U (en) * | 2011-04-20 | 2011-11-23 | 上海汽车制动器有限公司 | Production line for blanking by automatically deflecting left and right |
CN103658287A (en) * | 2013-11-27 | 2014-03-26 | 江苏东顺新能源科技有限公司 | Punching equipment for grids of storage batteries |
CN205128711U (en) * | 2015-10-12 | 2016-04-06 | 天津市环球汽车配件有限公司 | Continuous pay -off shutting -off system of sheet metal |
CN205341559U (en) * | 2016-01-29 | 2016-06-29 | 广州番禺职业技术学院 | Full -automatic area material punching press controlling means |
-
2017
- 2017-06-21 CN CN201710475534.3A patent/CN107175283B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0808677B1 (en) * | 1996-05-21 | 2003-08-06 | Hans Oetiker AG Maschinen- und Apparatefabrik | Machine for automatically manufacturing puzzle-lock compression rings |
CN1233543A (en) * | 1998-04-30 | 1999-11-03 | 南海市黄岐良奇钢瓶总厂 | Circular steel plate formation process used for steel cylinder envelope |
CN1522808A (en) * | 2003-09-09 | 2004-08-25 | 天津职业大学 | Automatic production line for punch |
CN2680370Y (en) * | 2004-02-26 | 2005-02-23 | 北新建材(集团)有限公司 | C-shape stamping production system |
CN202045293U (en) * | 2011-04-20 | 2011-11-23 | 上海汽车制动器有限公司 | Production line for blanking by automatically deflecting left and right |
CN103658287A (en) * | 2013-11-27 | 2014-03-26 | 江苏东顺新能源科技有限公司 | Punching equipment for grids of storage batteries |
CN205128711U (en) * | 2015-10-12 | 2016-04-06 | 天津市环球汽车配件有限公司 | Continuous pay -off shutting -off system of sheet metal |
CN205341559U (en) * | 2016-01-29 | 2016-06-29 | 广州番禺职业技术学院 | Full -automatic area material punching press controlling means |
Also Published As
Publication number | Publication date |
---|---|
CN107175283A (en) | 2017-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104759894B (en) | A kind of sheet metal machining production line | |
CN106737082A (en) | Full-automatic pipe cutting production line device | |
CN204953732U (en) | Full -automatic body maker of integrated integral type | |
CN107199411A (en) | The automatic processing apparatus and its control system of a kind of door frame | |
CN108381086A (en) | A kind of automatic welding production line of flange processing | |
CN206425707U (en) | The automatic processing apparatus and its control system of a kind of door frame | |
CN105033090A (en) | Integrated type full-automatic can making machine | |
CN204748164U (en) | Automatic feed bin of front and back position | |
CN108907745A (en) | A kind of copper bus-bar process units with Combined production line | |
CN202317673U (en) | Automatic production line of container | |
CN107175283B (en) | A kind of large-scale pair of fine machine linkage production line and its working method | |
CN104097796A (en) | Automated assembly line structure of structural stamping parts | |
CN106736603A (en) | Processing door of elevator in road produces swinging cross automatically afterwards | |
CN210691815U (en) | Intelligent control application system training platform | |
CN105599947B (en) | A kind of transmission system and infusion soft bag production line based on vertical film feeding | |
CN204936866U (en) | The prewired platform of contact network cantilever | |
CN104308889A (en) | Film-laminating and splitting machine | |
CN107585226A (en) | A kind of intelligent assemble method of automobile door plate | |
CN204076370U (en) | A kind of pad pasting cutting machine | |
CN115229410A (en) | Double-deck longmen welding machine | |
CN106927236A (en) | A kind of conveying device for product shunting | |
CN102091803B (en) | Lock perforating machine | |
CN111531065B (en) | Forming machine tool suitable for processing multi-type spinning steel wire rings | |
CN206029469U (en) | Use straight line drive just to take visual identification's four -axis unit machine as main part | |
CN103569615A (en) | Conveying system of frame continuous processing production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |