CN107167744A - A kind of power distribution automation device power supply (DPS) method for testing and detecting - Google Patents
A kind of power distribution automation device power supply (DPS) method for testing and detecting Download PDFInfo
- Publication number
- CN107167744A CN107167744A CN201610127563.6A CN201610127563A CN107167744A CN 107167744 A CN107167744 A CN 107167744A CN 201610127563 A CN201610127563 A CN 201610127563A CN 107167744 A CN107167744 A CN 107167744A
- Authority
- CN
- China
- Prior art keywords
- power supply
- distribution automation
- communication
- power distribution
- electronic load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 35
- 238000004891 communication Methods 0.000 claims abstract description 120
- 239000000203 mixture Substances 0.000 claims abstract description 40
- 230000007246 mechanism Effects 0.000 claims abstract description 28
- 238000009825 accumulation Methods 0.000 claims abstract description 21
- 238000002474 experimental method Methods 0.000 claims description 36
- 230000008569 process Effects 0.000 claims description 16
- 238000005259 measurement Methods 0.000 claims description 6
- 238000004146 energy storage Methods 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims description 3
- 230000008859 change Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- BYACHAOCSIPLCM-UHFFFAOYSA-N 2-[2-[bis(2-hydroxyethyl)amino]ethyl-(2-hydroxyethyl)amino]ethanol Chemical group OCCN(CCO)CCN(CCO)CCO BYACHAOCSIPLCM-UHFFFAOYSA-N 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The present invention relates to a kind of power distribution automation device power supply (DPS) method for testing and detecting, including:Step 1:Test power distribution automation coordinative composition of equipments communication module communication power supply stabilized output characteristic;Step 2:Test the instantaneous output characteristics of power distribution automation coordinative composition of equipments communication module communication power supply;Step 3:Power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply is tested with communication module communication power supply while output characteristics;Step 4:Power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply is tested with communication module communication power supply while output characteristics.The present invention is by the load of multifunctional wide range electronic and oscillograph, for the electric property and fan-out capability of power distribution automation device power supply (DPS), stable volume output, momentary output output and mixing capacity output test are carried out respectively, different capabilities, the test simultaneity of heterogeneity output capacity, instantaneity demand are met, instantaneous output time control can reach μ s ranks.
Description
Technical field
The present invention relates to a kind of field of power distribution and the detection method of measurement testing field, and in particular to a kind of power distribution automation equipment electricity
Source method for testing and detecting.
Background technology
Electrical power distribution automatization system is complicated, and power distribution automation number of devices is huge, and species is various.In order to ensure power distribution automation
Well-equipped working condition, it is ensured that power distribution automation device power supply (DPS) module high stability, high reliability operation, needs to meet:
(1) electric property:The requirement of primary and secondary equipment power supply, power distribution automation coordinative composition of equipments communication electricity are met simultaneously
The stable output capacity such as source, operating mechanism power supply and instantaneous output capacity meet the normal service requirement of equipment.
(2) uninterrupted power supply:It can still be worked long period of time after exchange disappears, should have energy-storage travelling wave tube, stored energy capacitance
And power supply output duration meets equipment operation demand.
(3) input:With wider input power scope and stronger grid adaptability, the voltage class requirement of power network is met.
(4) export:For different type and the equipment of property, the direct current for meeting and requiring can be exported according to different demands, separately
Outside, acted for transitions such as combined floodgate, separating brakes, the dynamic change of load can be born.
For the requirement of above-mentioned power distribution automation device power supply (DPS), existing power distribution automation device power supply (DPS) detection method can not be to power supply
Different capabilities, heterogeneity output carry out simultaneity, instantaneity test.
The content of the invention
To solve above-mentioned deficiency of the prior art, it is an object of the invention to provide a kind of power distribution automation device power supply (DPS) testing inspection
Method, the present invention carries out professional test to electric property, fan-out capability of power distribution automation device power supply (DPS) etc..
The purpose of the present invention is realized using following technical proposals:
The present invention provides a kind of power distribution automation device power supply (DPS) method for testing and detecting, and it is theed improvement is that, the inspection of methods described
Examining system includes oscillograph, small electronic load instrument and the big electronic load instrument connected by power line;(the load of large and small load meter
Scope is not distinctly claimed, and is also not limited to large and small concept, exactly needs two load meters, load meter possess firm power,
A variety of output regulative modes such as constant resistance, constant current, constant voltage, the adjustable range of load meter, degree of regulation, time
Control accuracy meets testing requirement);Methods described comprises the steps:
Step 1:Test power distribution automation coordinative composition of equipments communication module communication power supply stabilized output characteristic;
Step 2:Test the instantaneous output characteristics of power distribution automation coordinative composition of equipments communication module communication power supply;
Step 3:Test power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply simultaneously
Output characteristics;
Step 4:Test power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply and communication module communication power supply is same
When output characteristics.
Further, the step 1 comprises the steps:
(1) by the small electronic load instrument of power distribution automation equipment communication plant-grid connection, the operation of power distribution automation coordinative composition of equipments switch on/off electric
Mechanism accumulation power supply accesses big electronic load instrument;
(2) small electronic load instrument is set into pattern as constant power mode, sets output capacity and duration stable for communication power supply
Required value (output required value will be set in test according to country/enterprise's relevant criterion) is exported, and oscillograph is accessed into measurement electricity
Push back road;
(3) start oscillograph, experiment is carried after starting band after oscillograph work;
(4) voltage on small electronic load instrument is observed in process of the test, required value is exported not less than communication power supply;
(5) voltage on oscillograph is checked after off-test, if voltage exports required value, power distribution automation less than communication power supply
The communication power supply stabilized output characteristic experiment of coordinative composition of equipments communication module judges unqualified;
(6) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Further, the step 2 comprises the steps:
1) power distribution automation device power supply (DPS) is accessed into small electronic load instrument, the storage of power distribution automation coordinative composition of equipments switch on/off electric operating mechanism
Can the big electronic load instrument of plant-grid connection;
2) small electronic load instrument is set into pattern as constant power mode, it is that communication power supply is instantaneously defeated to set output capacity and duration
Go out required value, and oscillograph access is measured into voltage circuit;
3) start oscillograph, experiment is carried after starting band after oscillograph work;
4) voltage on oscillograph is checked after off-test, if voltage is less than communication power supply and exports required value, power distribution automation is set
The instantaneous output characteristics experiment of communication power supply of standby supporting communication module judges unqualified;
5) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Further, the step 3 comprises the steps:
<1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in accumulation power supply loop;
<2>By oscillograph two paths access heavy load measurement voltage circuit and small load measure voltage circuit;
<3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is same more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply
When output characteristics experiment all operationss needed for time value, start small electronic load instrument;
<4>Big electronic load instrument is set into pattern as constant current mode, it is that accumulation power supply exports requirement to set output capacity and duration
Value;
<5>Start oscillograph;
<6>Start big electronic load instrument band and carry experiment;
<7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage communication power supply exports required value, distribution
The instantaneous output characteristics experiment of communication power supply of the supporting communication module of automation equipment judges unqualified, and tank circuit voltage is less than energy storage
Power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply are same
When output characteristics experiment be determined as it is unqualified;
<8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Further, the step 4 comprises the steps:
1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in operation on/off switch loop;
2>By oscillograph two paths access heavy load measurement voltage circuit and small load measure voltage circuit;
3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply and communication module communication power supply
Time value needed for all operationss of output characteristics experiment simultaneously, starts small electronic load instrument;
4>Big electronic load instrument is set into pattern as constant current mode, it is that the output of on/off switch power supply will to set output capacity and duration
Evaluation;
5>Start oscillograph;
6>Start big electronic load instrument band and carry experiment;
7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage is less than communication power supply and exports required value,
The instantaneous output characteristics experiment of communication power supply of power distribution automation coordinative composition of equipments communication module judges unqualified, and on/off switch loop voltage is closed
Separating brake power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply communicates with communication module
Power supply output characteristics experiment simultaneously is determined as unqualified;
8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Compared with immediate prior art, the excellent effect that the technical scheme that the present invention is provided has is:
The invention provides a kind of power distribution automation device power supply (DPS) method for testing and detecting, it is possible to achieve the power output of a variety of definite values with
Control, parameter, definite value, logic control are flexibly set, and voltage, electric current are gathered in real time in running, with invariable power, perseverance
Voltage, constant current, a variety of output regulative modes of permanent resistance, output capacity adjustable range are wide, and testing time control accuracy is high, more
The deficiency that existing power distribution automation power detecting method is difficult to test, instantaneously export simultaneously is mended, to power distribution automation equipment
Power supply output performance carries out precise and high efficiency test, for research power distribution automation coordinative composition of equipments power supply type selecting, configuration provides powerful support.
Brief description of the drawings
Fig. 1 is the flow chart for the power distribution automation device power supply (DPS) method for testing and detecting that the present invention is provided.
Embodiment
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings.
The following description and drawings fully show specific embodiments of the present invention, to enable those skilled in the art to put into practice it
.Other embodiments can include structure, logic, electric, process and other changes.Embodiment only generation
The possible change of table.Unless explicitly requested, otherwise single component and function are optional, and the order operated can change.
The part of some embodiments and feature can be included in or replace part and the feature of other embodiments.The implementation of the present invention
The scope of scheme includes the gamut of claims, and claims all obtainable equivalents.Herein,
These embodiments of the present invention can individually or generally be represented that it is convenient that this is used for the purpose of with term " invention ", and
And if in fact disclosing the invention more than one, the scope for being not meant to automatically limit the application is any single invention or hair
Bright design.
The present invention is by the load of multifunctional wide range electronic and oscillograph, electric property for power distribution automation device power supply (DPS) and defeated
Output capacity, carries out stable volume output, momentary output output and mixing capacity output test, meets different capabilities, difference respectively
Test simultaneity, the instantaneity demand of property output capacity, instantaneous output time control can reach μ s ranks.
Concrete operation step is as follows:
Step 1:Power distribution automation coordinative composition of equipments communication module communication power supply stabilized output characteristic is tested:
(1) by the small electronic load instrument of power distribution automation equipment communication plant-grid connection, operating mechanism accumulation power supply accesses big electronic load
Instrument;
(2) small electronic load instrument is set into pattern as constant power mode, sets output capacity and duration stable for communication power supply
Required value is exported, and oscillograph access is measured into voltage circuit;
(3) start oscillograph, experiment is carried after starting band after oscillograph work;
(4) voltage in load meter is observed in process of the test, required value is exported not less than communication power supply;
(5) voltage on oscillograph is checked after off-test, if voltage exports required value less than communication power supply, this experiment is sentenced
It is fixed unqualified;
(6) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Step 2:The instantaneous output characteristics test of power distribution automation coordinative composition of equipments communication module communication power supply:
1) power distribution automation device power supply (DPS) is accessed into small electronic load instrument, operating mechanism accumulation power supply accesses big electronic load instrument;
2) small electronic load instrument is set into pattern as constant power mode, it is that communication power supply is instantaneously defeated to set output capacity and duration
Go out required value, and oscillograph access is measured into voltage circuit;
3) start oscillograph, experiment is carried after starting band after oscillograph work;
4) band, which is carried, checks voltage on oscillograph after off-test, if voltage is less than communication power supply and exports required value, distribution is automatic
The instantaneous output characteristics experiment of communication power supply for changing coordinative composition of equipments communication module judges unqualified;
5) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Step 3:Power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply is exported simultaneously with communication module communication power supply
Characteristic test:
<1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in accumulation power supply loop;
<2>Oscillograph two paths are accessed into large and small load measure voltage circuit;
<3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is same more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply
When output characteristics experiment all operationss needed for time value, start small electronic load instrument;
<4>Big electronic load instrument is set into pattern as constant current mode, it is that accumulation power supply exports requirement to set output capacity and duration
Value;
<5>Start oscillograph;
<6>Start big electronic load instrument band and carry experiment;
<7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage communication power supply exports required value, distribution
The instantaneous output characteristics experiment of communication power supply of the supporting communication module of automation equipment judges unqualified, and tank circuit voltage is less than energy storage
Power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply are same
When output characteristics experiment be determined as it is unqualified;
<8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Step 4:Power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply is simultaneously defeated with communication module communication power supply
Go out characteristic test:
1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in operation on/off switch loop;
2>Oscillograph two paths are accessed into large and small load measure voltage circuit;
3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply and communication module communication power supply
Time value needed for all operationss of output characteristics experiment simultaneously, starts small electronic load instrument;
4>Big electronic load instrument is set into pattern as constant current mode, it is that the output of on/off switch power supply will to set output capacity and duration
Evaluation;
5>Start oscillograph;
6>Start big electronic load instrument band and carry experiment;
7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage is less than communication power supply and exports required value,
The instantaneous output characteristics experiment of communication power supply of power distribution automation coordinative composition of equipments communication module judges unqualified, and on/off switch loop voltage is closed
Separating brake power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply communicates with communication module
Power supply output characteristics experiment simultaneously is determined as unqualified;
8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Above-mentioned steps 1 into step 4, communication power supply output capacity and duration requirement value according to supporting communication module type not
Different numerical value are set to together, accumulation power supply output capacity and duration requirement value, on/off switch power supply in step 3, step 4
Capacity and duration requirement value are set to different numerical value according to mating switch motor-operating mechanism type difference, and concrete numerical value is big
It is small to be required to determine according to power distribution automation equipment specification.
The present invention proposes a kind of power distribution automation device power supply (DPS) method for testing and detecting, electric property to power distribution automation device power supply (DPS),
Fan-out capability etc. carries out professional test.
The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, although with reference to above-described embodiment to the present invention
Be described in detail, those of ordinary skill in the art still can to the present invention embodiment modify or
Person's equivalent substitution, these any modifications or equivalent substitution without departing from spirit and scope of the invention are applying for this pending hair
Within bright claims.
Claims (5)
1. a kind of power distribution automation device power supply (DPS) method for testing and detecting, it is characterised in that the detecting system of methods described includes logical
Cross oscillograph, small electronic load instrument and the big electronic load instrument of power line connection;Methods described comprises the steps:
Step 1:Test power distribution automation coordinative composition of equipments communication module communication power supply stabilized output characteristic;
Step 2:Test the instantaneous output characteristics of power distribution automation coordinative composition of equipments communication module communication power supply;
Step 3:Test power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply simultaneously
Output characteristics;
Step 4:Test power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply and communication module communication power supply is same
When output characteristics.
2. power distribution automation device power supply (DPS) method for testing and detecting as claimed in claim 1, it is characterised in that the step 1 is wrapped
Include following step:
(1) by the small electronic load instrument of power distribution automation equipment communication plant-grid connection, the operation of power distribution automation coordinative composition of equipments switch on/off electric
Mechanism accumulation power supply accesses big electronic load instrument;
(2) small electronic load instrument is set into pattern as constant power mode, sets output capacity and duration stable for communication power supply
Required value is exported, and oscillograph access is measured into voltage circuit;
(3) start oscillograph, experiment is carried after starting band after oscillograph work;
(4) voltage on small electronic load instrument is observed in process of the test, required value is exported not less than communication power supply;
(5) voltage on oscillograph is checked after off-test, if voltage exports required value, power distribution automation less than communication power supply
The communication power supply stabilized output characteristic experiment of coordinative composition of equipments communication module judges unqualified;
(6) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
3. power distribution automation device power supply (DPS) method for testing and detecting as claimed in claim 1, it is characterised in that the step 2 is wrapped
Include following step:
1) power distribution automation device power supply (DPS) is accessed into small electronic load instrument, the storage of power distribution automation coordinative composition of equipments switch on/off electric operating mechanism
Can the big electronic load instrument of plant-grid connection;
2) small electronic load instrument is set into pattern as constant power mode, it is that communication power supply is instantaneously defeated to set output capacity and duration
Go out required value, and oscillograph access is measured into voltage circuit;
3) start oscillograph, experiment is carried after starting band after oscillograph work;
4) voltage on oscillograph is checked after off-test, if voltage is less than communication power supply and exports required value, power distribution automation is set
The instantaneous output characteristics experiment of communication power supply of standby supporting communication module judges unqualified;
5) in process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
4. power distribution automation device power supply (DPS) method for testing and detecting as claimed in claim 1, it is characterised in that the step 3 is wrapped
Include following step:
<1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in accumulation power supply loop;
<2>By oscillograph two paths access heavy load measurement voltage circuit and small load measure voltage circuit;
<3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is same more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply
When output characteristics experiment all operationss needed for time value, start small electronic load instrument;
<4>Big electronic load instrument is set into pattern as constant current mode, it is that accumulation power supply exports requirement to set output capacity and duration
Value;
<5>Start oscillograph;
<6>Start big electronic load instrument band and carry experiment;
<7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage communication power supply exports required value, distribution
The instantaneous output characteristics experiment of communication power supply of the supporting communication module of automation equipment judges unqualified, and tank circuit voltage is less than energy storage
Power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism accumulation power supply and communication module communication power supply are same
When output characteristics experiment be determined as it is unqualified;
<8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
5. power distribution automation device power supply (DPS) method for testing and detecting as claimed in claim 1, it is characterised in that the step 4 is wrapped
Include following step:
1>By the small electronic load instrument of power distribution automation equipment communication plant-grid connection, big electronic load instrument is accessed in operation on/off switch loop;
2>By oscillograph two paths access heavy load measurement voltage circuit and small load measure voltage circuit;
3>Small electronic load instrument is set into pattern as constant power mode, it is the stable output required value of communication power supply to set output capacity,
Output time is more than completion power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply and communication module communication power supply
Time value needed for all operationss of output characteristics experiment simultaneously, starts small electronic load instrument;
4>Big electronic load instrument is set into pattern as constant current mode, it is that the output of on/off switch power supply will to set output capacity and duration
Evaluation;
5>Start oscillograph;
6>Start big electronic load instrument band and carry experiment;
7>Band, which is carried, checks voltage on oscillograph after off-test, if communication loop voltage is less than communication power supply and exports required value,
The instantaneous output characteristics experiment of communication power supply of power distribution automation coordinative composition of equipments communication module judges unqualified, and on/off switch loop voltage is closed
Separating brake power supply exports required value, and the power distribution automation coordinative composition of equipments switch on/off electric operating mechanism on/off switch power supply communicates with communication module
Power supply output characteristics experiment simultaneously is determined as unqualified;
8>In process of the test power distribution automation device power supply (DPS) restart or interval power-off be judged to it is unqualified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127563.6A CN107167744A (en) | 2016-03-07 | 2016-03-07 | A kind of power distribution automation device power supply (DPS) method for testing and detecting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127563.6A CN107167744A (en) | 2016-03-07 | 2016-03-07 | A kind of power distribution automation device power supply (DPS) method for testing and detecting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107167744A true CN107167744A (en) | 2017-09-15 |
Family
ID=59849570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610127563.6A Pending CN107167744A (en) | 2016-03-07 | 2016-03-07 | A kind of power distribution automation device power supply (DPS) method for testing and detecting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107167744A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444593A (en) * | 2018-11-21 | 2019-03-08 | 科大智能电气技术有限公司 | A kind of automatization test system and method for distribution terminal load function |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201523262U (en) * | 2009-10-22 | 2010-07-07 | 邯郸供电公司 | Feeder terminal unit FTU control device |
CN102044911A (en) * | 2010-11-29 | 2011-05-04 | 东莞市开关厂有限公司 | FTU terminal power supply real-time monitoring device for power distribution monitoring system |
CN102230946A (en) * | 2011-04-02 | 2011-11-02 | 广东天乐通信设备有限公司 | Multifunctional intelligent electric power monitoring instrument |
CN102738903A (en) * | 2012-07-05 | 2012-10-17 | 江苏中凌高科技有限公司 | Alternating current-direct current integrated power monitoring device used for station |
CN103516448A (en) * | 2013-10-15 | 2014-01-15 | 国家电网公司 | Collection terminal communication interface load capacity test system |
CN203630318U (en) * | 2013-09-24 | 2014-06-04 | 许继集团有限公司 | Test system for power system switching power supply module |
CN203643552U (en) * | 2013-12-26 | 2014-06-11 | 广东电网公司东莞供电局 | Digital fault indicator for power distribution network |
CN203720256U (en) * | 2013-12-03 | 2014-07-16 | 国家电网公司 | Distributed load analyzer used for power distribution system unbalanced branch circuit |
CN104635171A (en) * | 2013-11-08 | 2015-05-20 | 鸿富锦精密工业(深圳)有限公司 | DC power supply testing system |
CN204462354U (en) * | 2015-03-26 | 2015-07-08 | 石家庄迪龙科技有限公司 | Full-automatic power supply comprehensive detector |
CN105137364A (en) * | 2015-07-23 | 2015-12-09 | 浪潮电子信息产业股份有限公司 | Automatic test system of switch power supply |
-
2016
- 2016-03-07 CN CN201610127563.6A patent/CN107167744A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201523262U (en) * | 2009-10-22 | 2010-07-07 | 邯郸供电公司 | Feeder terminal unit FTU control device |
CN102044911A (en) * | 2010-11-29 | 2011-05-04 | 东莞市开关厂有限公司 | FTU terminal power supply real-time monitoring device for power distribution monitoring system |
CN102230946A (en) * | 2011-04-02 | 2011-11-02 | 广东天乐通信设备有限公司 | Multifunctional intelligent electric power monitoring instrument |
CN102738903A (en) * | 2012-07-05 | 2012-10-17 | 江苏中凌高科技有限公司 | Alternating current-direct current integrated power monitoring device used for station |
CN203630318U (en) * | 2013-09-24 | 2014-06-04 | 许继集团有限公司 | Test system for power system switching power supply module |
CN103516448A (en) * | 2013-10-15 | 2014-01-15 | 国家电网公司 | Collection terminal communication interface load capacity test system |
CN104635171A (en) * | 2013-11-08 | 2015-05-20 | 鸿富锦精密工业(深圳)有限公司 | DC power supply testing system |
CN203720256U (en) * | 2013-12-03 | 2014-07-16 | 国家电网公司 | Distributed load analyzer used for power distribution system unbalanced branch circuit |
CN203643552U (en) * | 2013-12-26 | 2014-06-11 | 广东电网公司东莞供电局 | Digital fault indicator for power distribution network |
CN204462354U (en) * | 2015-03-26 | 2015-07-08 | 石家庄迪龙科技有限公司 | Full-automatic power supply comprehensive detector |
CN105137364A (en) * | 2015-07-23 | 2015-12-09 | 浪潮电子信息产业股份有限公司 | Automatic test system of switch power supply |
Non-Patent Citations (3)
Title |
---|
中国电力科学研究院有限公司: "国家电网公司2015年配电自动化终端检测大纲", 《百度数据库》 * |
施泽全 等: "《计算机组装与维护》", 31 January 2009, 北京出版社 * |
范须露: ""含多分布式电源的微电网孤岛检测技术"", 《万方学位论文数据库》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109444593A (en) * | 2018-11-21 | 2019-03-08 | 科大智能电气技术有限公司 | A kind of automatization test system and method for distribution terminal load function |
CN109444593B (en) * | 2018-11-21 | 2021-04-06 | 科大智能电气技术有限公司 | Automatic testing system and method for load-carrying performance of power distribution terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cataliotti et al. | Oil-filled MV/LV power-transformer behavior in narrow-band power-line communication systems | |
CN103576025B (en) | A kind of detection test system for energy storage power station grid connection | |
CN205103361U (en) | High voltage electric energy metering device detector of working a telephone switchboard | |
CN102253296A (en) | Method for testing comprehensive device of transformer | |
CN107064682A (en) | Assembly detection apparatus | |
CN103513223A (en) | Electric energy meter communication interface load capacity test system | |
CN104793028A (en) | Three-phase multifunctional test power supply device and test method thereof | |
CN105116278A (en) | Electric energy meter missort line tracker | |
CN204228800U (en) | A kind of multi-channel DC microampere meter | |
CN104849591A (en) | Power distribution automation integrated test detection device | |
CN206990675U (en) | A kind of data center intelligent electric meter monitoring system | |
CN107167744A (en) | A kind of power distribution automation device power supply (DPS) method for testing and detecting | |
CN102866378B (en) | Voltage or current transformer on-line test device and voltage or current transformer on-line test method | |
CN202886585U (en) | On-line test device for voltage/current transformer | |
CN204882853U (en) | Electric energy meter pressure resistance test installation | |
CN112462260A (en) | System and method for testing on-load performance of diesel generator | |
CN213633620U (en) | Loop resistance tester | |
CN213275769U (en) | Novel low-voltage loop resistance tester | |
CN204719152U (en) | A kind of power distribution automation integration test pick-up unit | |
CN203849399U (en) | Single-phase carrier wave intelligent electric energy meter mis-power failure fault analyzer | |
CN208207191U (en) | The negative control distribution transformer terminals comprehensive test device of one kind | |
CN204649824U (en) | A kind of Iddq testing table | |
CN105891732A (en) | Power conversion efficiency test device, power conversion efficiency test method and power conversion efficiency test system | |
CN204832480U (en) | A full -automatic testing arrangement of closed -loop for fault indicator | |
CN216350968U (en) | Secondary voltage drop testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170915 |