CN107146020A - A kind of photovoltaic plant engineering project information management system - Google Patents

A kind of photovoltaic plant engineering project information management system Download PDF

Info

Publication number
CN107146020A
CN107146020A CN201710310369.6A CN201710310369A CN107146020A CN 107146020 A CN107146020 A CN 107146020A CN 201710310369 A CN201710310369 A CN 201710310369A CN 107146020 A CN107146020 A CN 107146020A
Authority
CN
China
Prior art keywords
photovoltaic module
photovoltaic
bar code
information
engineering project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710310369.6A
Other languages
Chinese (zh)
Other versions
CN107146020B (en
Inventor
牛道恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qingyun Energy Group Co.,Ltd.
Original Assignee
Beijing Qingkong Clean Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qingkong Clean Energy Technology Co Ltd filed Critical Beijing Qingkong Clean Energy Technology Co Ltd
Priority to CN201710310369.6A priority Critical patent/CN107146020B/en
Publication of CN107146020A publication Critical patent/CN107146020A/en
Application granted granted Critical
Publication of CN107146020B publication Critical patent/CN107146020B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Photovoltaic Devices (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses a kind of photovoltaic plant engineering project information management system, including multiple photovoltaic modulies, server, client, Wireless data receiving device and wireless bar code reading device.Wherein, photovoltaic module is photovoltaic power station power generation minimum unit, server end is used to carry out engineering project information management, progress chasing, quality testing and generation form, wireless bar code reading device reads the bar code of photovoltaic module, module information is passed into Wireless data receiving device, and uploaded onto the server in real time by client, the information of photovoltaic module, the correctness of bar code and uniqueness are verified by server.The wireless bar code reading device of the present invention realizes " installation site component numerals " information Rapid input of component increments formula based on fiducial.Present invention deployment is simple, implement convenient, with low cost, strong adaptability, realizes the closed loop quality control of photovoltaic module Life cycle.

Description

A kind of photovoltaic plant engineering project information management system
Technical field
The present invention relates to a kind of photovoltaic plant engineering project information management system, belong to photovoltaic plant project management techniques Field.
Background technology
The photovoltaic generating system that photovoltaic plant refers to be connected with power network and transmitted electric power to power network, category national policy is encouraged Green energy resource project.Traditional photovoltaic plant engineering construction realizes engineering matter using the mode of manual record and sampling Detection mostly The management and tracking of amount, it is less efficient and the problem of have following main:(1)The manufacture of photovoltaic module level is not implemented, dispatches from the factory, transport Defeated, installation, examination Life cycle automatic closed loop quality management;(2)Engineering construction is without for nucleus equipments such as photovoltaic modulies Effective positioning recording meanses, it is impossible to realize the installation check of photovoltaic module rank, reinspection and issue track management;(3)Photovoltaic Component mounting position information and the unrealized one-to-one corresponding of module information, its information can not be tracked again after component installation;(4)Light The sampling observation sample for lying prostrate the nucleus equipments such as component is usually the continuation subset from same batch, producing line or same installation region, is taken out Procuratorial organ's case has larger randomness, it is impossible to embody the randomness and representativeness of sample complete or collected works;(5)The acceptance of work stage needs to spend Plenty of time arranges substantial amounts of list, record, easily occurs slipping and mistake.
The content of the invention
The technical problems to be solved by the invention are to overcome the defect of prior art there is provided a kind of photovoltaic plant engineering project KXG, realizes the Life cycle automatic closed loop quality management of photovoltaic module level.
In order to solve the above technical problems, the present invention provides a kind of photovoltaic plant engineering project information management system, including Multiple photovoltaic modulies, server, client, Wireless data receiving device and wireless bar code reading device;Several photovoltaic groups Part photovoltaic module group string in series, several photovoltaic module groups series winding is connected together composition square formation;On each photovoltaic module Bar code is posted, wireless bar code reading device reads the bar code of each photovoltaic module, and transmits to Wireless data receiving device, Wireless data receiving device receives the photovoltaic module barcode scanning information of wireless bar code reading device transmission, and is sent to client, Client uploads onto the server photovoltaic module barcode scanning information, in the information and date storehouse by server by retrieving new typing Some information is compared, and the correctness and uniqueness of information, bar code to photovoltaic module are verified;
The server includes data processing unit, disk array, interchanger;The data processing unit and disk array pass through Hardware internal bus is connected;The data processing unit is used to carry out information management, progress chasing, quality testing to engineering project With generation form;The disk array is used for data in storage management system;The interchanger provides outside WEB for server and connect Mouthful;
The client includes Internet enabled personal PC and web browser;The personal PC provides operation for client Environment, for data processing, upload and user's basic operation;The web browser provides the user Man Machine Interface, uses Engineering project information inquiry, progress chasing, quality testing are carried out in user;
The client creates the engineering project of photovoltaic plant, and the engineering project covers the essential information, product information, work of project Journey progress chasing, follow-up of quality, user by client to item file, budget, operation flow, task distribution, project progress, Quality testing is tracked.
Foregoing Wireless data receiving device is made up of reception antenna and data transmission unit;The wireless data receives dress The barcode scanning information that wireless bar code reading device is received by reception antenna is put, and client is sent to by data transmission unit End.
Foregoing data transmission unit is USB data line.
Foregoing wireless bar code reading device includes laser barcode scanning gun and wireless transport module;The laser barcode scanning gun is used In the bar code of identification photovoltaic module, the information that barcode scanning is obtained is real-time transmitted to wireless data and received by the wireless transport module Device.
Foregoing laser barcode scanning gun possesses function keyboard and liquid crystal display interface.
Foregoing wireless bar code reading device is handheld device.
It is foregoing to set a fiducial for each photovoltaic module group string, laser barcode scanning gun since fiducial according to Order scans the bar code of each photovoltaic module in photovoltaic module group string one by one, and its positional information is entered automatically by management system Row coding and storage, realize " installation site-component numerals " information Rapid input.
The foregoing quality archives that a Life cycle is set up for each photovoltaic module, the quality archives storage exists In disk array, since the production of photovoltaic module, its unique sequence number is recorded;Before dispatching from the factory, the skill of photovoltaic module is recorded Art parameter;In the stage of examining goods, sampling observation date of photovoltaic module, batch, inspection content, assay and to problem component are recorded Disposition;In the construction and installation stage, the installation site of photovoltaic module is recorded;In the O&M stage, the day of photovoltaic module is recorded Normal inspection, cleaning maintenance, replacing spare unit information.
Beneficial effects of the present invention are:
The present invention corresponds the production information of each photovoltaic module, installation site, quality inspection situation, O&M situation, sets up electricity Station equipment quality control data storehouse, realizes the accurate management, tracking and reparation of quality problems, realizes the full life of photovoltaic module The quality management in cycle.
The present invention can lift photovoltaic plant quality, save power plant construction and O&M cost, be that owner and operator provide light The solution that overhead utility engineering project is effectively managed;Managed by the follow-up of quality of the Life cycle to component, save electricity Stand O&M cost, directly improve project yield;By the quality surveillance and closed-loop control to each link, provided for the assets of owner Strong quality assurance.
Brief description of the drawings
Fig. 1 is management system structural representation of the invention;
Fig. 2 is the structural representation of server;
Fig. 3 is the structural representation of wireless bar code reading device;
Fig. 4 is photovoltaic module schematic view of the mounting position.
Embodiment
The invention will be further described below.Following examples are only used for clearly illustrating the technical side of the present invention Case, and can not be limited the scope of the invention with this.
As shown in figure 1, the photovoltaic plant engineering project information management system of the present invention, including multiple photovoltaic modulies 1, clothes Business device 2, client 3, Wireless data receiving device 4, wireless bar code reading device 5.Wherein,
Photovoltaic module is to post bar code on photovoltaic power station power generation minimum unit, each photovoltaic module.
Wireless bar code reading device 5 reads the bar code of each photovoltaic module, and Wireless data receiving device 4 can be received wirelessly The photovoltaic module barcode scanning information that apparatus for reading of bar code 5 is passed back, and client 3 is sent to by USB interface.The kimonos of client 3 Business device 2 is connected by wide area network.
Photovoltaic module barcode scanning information is uploaded onto the server 2 by client 3 in real time, by server 2 by retrieving new typing Existing information is compared in information and date storehouse, and the correctness and uniqueness of information, bar code to photovoltaic module are carried out Verification.
Wireless data receiving device 4 is made up of reception antenna, data transmission unit.Wireless data receiving device 4 is by connecing Receive antenna and receive the barcode scanning information of wireless bar code reading device 5, and client 3 is sent to by data transmission unit.This hair Bright middle data transmission unit is USB data line.
Client 3 includes Internet enabled personal PC, web browser.Personal PC is used to be management system client The function such as running environment and necessary data processing, upload and user's basic operation is provided;Web browser is used to provide the user Man Machine Interface, the work such as project information inquiry, progress chasing, quality testing are carried out for user.
Server 2 is used to be managed the engineering project of photovoltaic plant.
As shown in Fig. 2 server 2 includes data processing unit 21, disk array 22, interchanger 23.Data processing unit 21 are connected with disk array 22 by hardware internal bus;Data processing unit 21 is mainly used in carrying out message tube to engineering project Reason, progress chasing, quality testing, generation form etc.;Disk array 22 is mainly used in data in storage management system;Interchanger 23 It is mainly used in providing outside WEB interfaces for server 2.
As shown in figure 3, wireless bar code reading device 5 includes laser barcode scanning gun 51 and wireless transport module 52.Laser is swept Code rifle 51 can correctly recognize the bar code of whole standards, and with function keyboard, liquid crystal display interface, can provide the user can Depending on changing the selection of the function such as operation interface and scanning, typing.The real-time data transmission that wireless transport module 52 can obtain barcode scanning To client, and do back-end data processing by client transmissions to server and store.
Further, wireless bar code reading device is handheld device.
As shown in figure 4, multiple photovoltaic module group strings 6 in series of photovoltaic module 1, multiple photovoltaic module group series windings are connected on one Rise and constitute square formation 7.Photovoltaic module 1 is minimum generator unit in square formation 7.When user positions photovoltaic module installation site, it is Each photovoltaic module string sets a fiducial, and wireless bar code reading device realizes that photovoltaic module is incremented by based on fiducial " installation site-component numerals " information Rapid input of formula.
In the present invention on the basis of the first photovoltaic module of photovoltaic module group string 6 component, laser barcode scanning gun 51 is from benchmark group Part starts to scan the bar code of each photovoltaic module in photovoltaic module group string 6 one by one in sequence, and automatically right by management system Its positional information is encoded and stored, the installation position that management system will identify that the bar code of photovoltaic module and sequentially increase Confidence ceases, and realizes " installation site-component numerals " information Rapid input.By being compiled to the place in project, square formation, group string Number and positioning, staff photovoltaic module group string original position positioning photovoltaic module group string in the 1st photovoltaic module position Put, system can be according to the origin reference location, the automatic position using other assemblies in incremental record photovoltaic module group string.And by photovoltaic The positional information of component group string is sent to server in real time, and photovoltaic module positional information and photovoltaic module sequence are realized in server Number correspond, the component level information after installation is effectively tracked and is managed.
The quality archives of a Life cycle are set up in database for each photovoltaic module, the quality archives storage In disk array 22, the full detail with each photovoltaic module of data base administration is realized.Since the production of photovoltaic module, Its unique sequence number is recorded, source, the date of manufacture of the crystal-silicon battery slice of photovoltaic module can be traced.Before dispatching from the factory, recording light Lie prostrate the technical parameter of component, such as power, operating voltage, operating current, peak power information.In the stage of examining goods, photovoltaic is recorded Sampling observation date, batch, inspection content, assay and the disposition to problem component of component, realize the complete of component level Life cycle closed loop quality management.In the construction and installation stage, the installation site of photovoltaic module is recorded, including affiliated place, side Battle array, group string and it group string in position.In the O&M stage, Daily Round Check, cleaning maintenance, the replacing spare unit of photovoltaic module are recorded Etc. information.When finding quality problems, the installation site of problem component can be accurately positioned, and tracks Back ground Information when it dispatches from the factory, Effective orientation problem, problem analysis, the method for solving problem are provided for operation maintenance personnel, realizes that photovoltaic module is tracked after mounting Its quality problems simultaneously forms effective closed loop management.
The present invention generates random Plan of Double Sampling Inspection on the basis of photovoltaic module information according to sample size, sampling observation level. Testing staff is according to Plan of Double Sampling Inspection, and after being examined to photovoltaic module, system records and generates assay automatically, drastically increases Photovoltaic module detection efficiency.
Using when, user creates the engineering project of photovoltaic plant in the login system of client 3, and the engineering project covers item The modules such as purpose essential information, product information, project progress tracking, follow-up of quality.The engineering that server 2 can be uploaded according to user Project information(Project overview, project map etc.)The administrative template of the project is created, user's use information means carry out project Management.Document tracking is created when engineering project is founded, project feasibility studies, project formality class are cleared a paper, project Construction period construction information, project acceptance inspection stage data are managed collectively.Project phase can be listed automatically in the project acceptance inspection stage Whole data of pass, fully ensure that the integrality of project data, also greatly save the time arrayed data.Also complete simultaneously The archive of project data, will not project data loss.
User can be by client 3 to item file, budget, operation flow, task distribution, project progress, quality testing And the informationization and automatic management of photovoltaic plant are realized in terms of issue track.
The science of component Plan of Double Sampling Inspection can be strengthened using the present invention.Traditional component Plan of Double Sampling Inspection has larger random Property, it is usually taken in the way of pallet is extracted, the sample of sampling observation has certain continuity, it is impossible to fully demonstrate the random of sampling Property.The present invention generates random Plan of Double Sampling Inspection on the basis of module information according to sample size, sampling observation level.Testing staff According to Plan of Double Sampling Inspection, after being examined to component, system records and generates assay automatically, drastically increases component detection effect Rate.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and deformation can also be made, these improve and deformed Also it should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of photovoltaic plant engineering project information management system, it is characterised in that including multiple photovoltaic modulies, server, Client, Wireless data receiving device and wireless bar code reading device;Several photovoltaic modulies photovoltaic module group in series String, several photovoltaic module groups series winding is connected together composition square formation;Bar code, wireless bar code are posted on each photovoltaic module Reading device reads the bar code of each photovoltaic module, and transmits to Wireless data receiving device, and Wireless data receiving device is received The photovoltaic module barcode scanning information of wireless bar code reading device transmission, and be sent to client, client is by photovoltaic module barcode scanning Information is uploaded onto the server, and existing information is compared in the information and date storehouse by server by retrieving new typing, right The information of photovoltaic module, the correctness of bar code and uniqueness are verified;
The server includes data processing unit, disk array, interchanger;The data processing unit and disk array pass through Hardware internal bus is connected;The data processing unit is used to carry out information management, progress chasing, quality testing to engineering project With generation form;The disk array is used for data in storage management system;The interchanger provides outside WEB for server and connect Mouthful;
The client includes Internet enabled personal PC and web browser;The personal PC provides operation for client Environment, for data processing, upload and user's basic operation;The web browser provides the user Man Machine Interface, uses Engineering project information inquiry, progress chasing, quality testing are carried out in user;
The client creates the engineering project of photovoltaic plant, and the engineering project covers the essential information, product information, work of project Journey progress chasing, follow-up of quality, user by client to item file, budget, operation flow, task distribution, project progress, Quality testing is tracked.
2. a kind of photovoltaic plant engineering project information management system according to claim 1, it is characterised in that the nothing Line data sink is made up of reception antenna and data transmission unit;The Wireless data receiving device is connect by reception antenna The barcode scanning information of wireless bar code reading device is received, and client is sent to by data transmission unit.
3. a kind of photovoltaic plant engineering project information management system according to claim 2, it is characterised in that the number It is USB data line according to transmission unit.
4. a kind of photovoltaic plant engineering project information management system according to claim 1, it is characterised in that the nothing Lines bar code reading device includes laser barcode scanning gun and wireless transport module;The laser barcode scanning gun is used to recognize photovoltaic module The information that barcode scanning is obtained is real-time transmitted to Wireless data receiving device by bar code, the wireless transport module.
5. a kind of photovoltaic plant engineering project information management system according to claim 4, it is characterised in that described to swash Light barcode scanning gun possesses function keyboard and liquid crystal display interface.
6. a kind of photovoltaic plant engineering project information management system according to claim 5, it is characterised in that the nothing Lines bar code reading device is handheld device.
7. a kind of photovoltaic plant engineering project information management system according to claim 4, it is characterised in that be each Photovoltaic module group string sets a fiducial, and laser barcode scanning gun scans photovoltaic module one by one in sequence since fiducial The bar code of each photovoltaic module in group string, and its positional information is encoded and stored automatically by management system, realize " peace Holding position-component numerals " information Rapid input.
8. a kind of photovoltaic plant engineering project information management system according to claim 1, it is characterised in that be each Individual photovoltaic module sets up the quality archives of a Life cycle, and the quality archives storage is in disk array, from photovoltaic group The production of part starts, and records its unique sequence number;Before dispatching from the factory, the technical parameter of photovoltaic module is recorded;In the stage of examining goods, note Record sampling observation date, batch, inspection content, assay and the disposition to problem component of photovoltaic module;In construction peace In the dress stage, record the installation site of photovoltaic module;In the O&M stage, record the Daily Round Check of photovoltaic module, cleaning and maintain, change Spare unit information.
CN201710310369.6A 2017-05-05 2017-05-05 Photovoltaic power plant engineering project informatization management system Active CN107146020B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710310369.6A CN107146020B (en) 2017-05-05 2017-05-05 Photovoltaic power plant engineering project informatization management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710310369.6A CN107146020B (en) 2017-05-05 2017-05-05 Photovoltaic power plant engineering project informatization management system

Publications (2)

Publication Number Publication Date
CN107146020A true CN107146020A (en) 2017-09-08
CN107146020B CN107146020B (en) 2021-01-01

Family

ID=59775023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710310369.6A Active CN107146020B (en) 2017-05-05 2017-05-05 Photovoltaic power plant engineering project informatization management system

Country Status (1)

Country Link
CN (1) CN107146020B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108089509A (en) * 2017-12-22 2018-05-29 苏州正易鑫新能源科技有限公司 A kind of photo-voltaic power generation station long-distance management device and system
CN108510088A (en) * 2018-02-28 2018-09-07 广州越创信息科技有限公司 A kind of information system O&M closed loop management system and method
CN108614807A (en) * 2018-04-19 2018-10-02 深圳智润新能源电力勘测设计院有限公司 A kind of method and relevant device of document output
CN109246236A (en) * 2018-10-09 2019-01-18 安徽大恒能源科技有限公司 A kind of method for arranging of commercial style photovoltaic plant
CN109412502A (en) * 2018-10-09 2019-03-01 安徽大恒能源科技有限公司 A kind of commercial style photovoltaic plant
CN109447587A (en) * 2018-10-30 2019-03-08 安徽尚特杰清洁能源集团有限公司 A kind of approaches to IM of photovoltaic plant operation maintenance personnel
CN109462362A (en) * 2018-10-09 2019-03-12 安徽大恒能源科技有限公司 A kind of residents photovoltaic plant
CN109462361A (en) * 2018-10-09 2019-03-12 安徽大恒能源科技有限公司 A kind of method for arranging of residents photovoltaic plant
CN109713787A (en) * 2018-10-09 2019-05-03 安徽大恒能源科技有限公司 A kind of photovoltaic management system
CN110223002A (en) * 2019-06-19 2019-09-10 北京瑞驰菲思工程咨询有限责任公司 Solar energy optical-thermal engineering budget ration management system
CN111709695A (en) * 2020-04-16 2020-09-25 青海绿能数据有限公司 Photovoltaic operation management system
CN113850806A (en) * 2021-11-30 2021-12-28 浙江晶科能源有限公司 Information management method and device in photovoltaic module production process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436266A (en) * 2007-11-16 2009-05-20 中国移动通信集团福建有限公司 Enterprise projector operating and managing system
US8682585B1 (en) * 2011-07-25 2014-03-25 Clean Power Research, L.L.C. Computer-implemented system and method for inferring operational specifications of a photovoltaic power generation system
CN104200339A (en) * 2014-09-25 2014-12-10 天津英利新能源有限公司 Information management method and system for photovoltaic module
CN104503666A (en) * 2015-01-07 2015-04-08 青岛海大新星软件咨询有限公司 Visual drug management device
CN105761021A (en) * 2016-03-14 2016-07-13 张家港协鑫集成科技有限公司 Cell slice tracking information generating method and system, and tracking method and system
US20160275212A1 (en) * 2015-03-19 2016-09-22 Solarcity Corporation Photo-voltaic (pv) modeling tool
CN205721815U (en) * 2016-04-26 2016-11-23 江苏瑞新科技股份有限公司 A kind of photovoltaic module bar code display device based on WLAN
CN106354134A (en) * 2016-09-12 2017-01-25 深圳创动科技有限公司 Maintenance management system of solar panels and maintenance management method of solar panels

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436266A (en) * 2007-11-16 2009-05-20 中国移动通信集团福建有限公司 Enterprise projector operating and managing system
US8682585B1 (en) * 2011-07-25 2014-03-25 Clean Power Research, L.L.C. Computer-implemented system and method for inferring operational specifications of a photovoltaic power generation system
CN104200339A (en) * 2014-09-25 2014-12-10 天津英利新能源有限公司 Information management method and system for photovoltaic module
CN104503666A (en) * 2015-01-07 2015-04-08 青岛海大新星软件咨询有限公司 Visual drug management device
US20160275212A1 (en) * 2015-03-19 2016-09-22 Solarcity Corporation Photo-voltaic (pv) modeling tool
CN105761021A (en) * 2016-03-14 2016-07-13 张家港协鑫集成科技有限公司 Cell slice tracking information generating method and system, and tracking method and system
CN205721815U (en) * 2016-04-26 2016-11-23 江苏瑞新科技股份有限公司 A kind of photovoltaic module bar code display device based on WLAN
CN106354134A (en) * 2016-09-12 2017-01-25 深圳创动科技有限公司 Maintenance management system of solar panels and maintenance management method of solar panels

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108089509A (en) * 2017-12-22 2018-05-29 苏州正易鑫新能源科技有限公司 A kind of photo-voltaic power generation station long-distance management device and system
CN108510088A (en) * 2018-02-28 2018-09-07 广州越创信息科技有限公司 A kind of information system O&M closed loop management system and method
CN108614807A (en) * 2018-04-19 2018-10-02 深圳智润新能源电力勘测设计院有限公司 A kind of method and relevant device of document output
CN109246236A (en) * 2018-10-09 2019-01-18 安徽大恒能源科技有限公司 A kind of method for arranging of commercial style photovoltaic plant
CN109412502A (en) * 2018-10-09 2019-03-01 安徽大恒能源科技有限公司 A kind of commercial style photovoltaic plant
CN109462362A (en) * 2018-10-09 2019-03-12 安徽大恒能源科技有限公司 A kind of residents photovoltaic plant
CN109462361A (en) * 2018-10-09 2019-03-12 安徽大恒能源科技有限公司 A kind of method for arranging of residents photovoltaic plant
CN109713787A (en) * 2018-10-09 2019-05-03 安徽大恒能源科技有限公司 A kind of photovoltaic management system
CN109447587A (en) * 2018-10-30 2019-03-08 安徽尚特杰清洁能源集团有限公司 A kind of approaches to IM of photovoltaic plant operation maintenance personnel
CN110223002A (en) * 2019-06-19 2019-09-10 北京瑞驰菲思工程咨询有限责任公司 Solar energy optical-thermal engineering budget ration management system
CN111709695A (en) * 2020-04-16 2020-09-25 青海绿能数据有限公司 Photovoltaic operation management system
CN113850806A (en) * 2021-11-30 2021-12-28 浙江晶科能源有限公司 Information management method and device in photovoltaic module production process

Also Published As

Publication number Publication date
CN107146020B (en) 2021-01-01

Similar Documents

Publication Publication Date Title
CN107146020A (en) A kind of photovoltaic plant engineering project information management system
CN201131037Y (en) Management system for polling base station
CN105825556A (en) Intelligent inspection system
CN101540069B (en) Method for examining and managing thermodynamic system
CN103927860A (en) GPS (Global Position System)-positioned meter reading smart handheld machine and meter reading system
CN102809568A (en) Method and system for monitoring contamination distribution of insulator
CN106600741A (en) Large-sized digital machine room routing inspection method based on QR code and mobile technologies
CN207097042U (en) A kind of electric power apparatus integrated information digitalization management system
CN104156812A (en) Construction project construction site original data acquisition system and acquisition method
CN107516136A (en) Power Line Inspection System
CN101202660A (en) Base station patrol checking administrative system
CN203217621U (en) On-site comprehensive maintenance system of electrical equipment for distribution network
CN101725370A (en) Underground locating and monitoring system
CN101325784A (en) Polling mobile communication terminal, system and method
CN104376495A (en) Wireless monitoring system and method for coal mine electromechanical device overhauling
CN103745190A (en) Two-dimensional code-based performance and monitoring data presentation method
CN103824339A (en) Integrated routing inspection system for power plant
CN103442079A (en) Power transmission and transformation key device management and control system
CN107292557A (en) A kind of asset management terminal
CN108305347A (en) A kind of controller switching equipment inspection operational method
CN206193124U (en) Electrified detecting system of substation equipment
CN206270744U (en) A kind of plastic film industry control system
CN209087002U (en) Inspection device based on two dimensional code and wireless location
CN206133661U (en) Equipment warehouse of thermal power plant stores up management system based on thing networking RFID technique
Bosatelli et al. Enel green Power’s AI tool for anomaly detection on PV plant thermographies collected with UAS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No.532, building 5, No.97, Changping Road, Shahe Town, Changping District, Beijing

Applicant after: Beijing Qingyun Intelligent Technology Development Co.,Ltd.

Address before: No.532, building 5, No.97, Changping Road, Shahe Town, Changping District, Beijing

Applicant before: BEIJINGQINGKONG JIENENG TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.532, building 5, No.97, Changping Road, Shahe Town, Changping District, Beijing

Patentee after: Beijing Qingyun Energy Group Co.,Ltd.

Address before: No.532, building 5, No.97, Changping Road, Shahe Town, Changping District, Beijing

Patentee before: Beijing Qingyun Intelligent Technology Development Co.,Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 5009, podium building, floor 5, No. 69, Zizhuyuan Road, Haidian District, Beijing 102206

Patentee after: Beijing Qingyun Energy Group Co.,Ltd.

Address before: No.532, building 5, No.97, Changping Road, Shahe Town, Changping District, Beijing

Patentee before: Beijing Qingyun Energy Group Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An Information Management System for Photovoltaic Power Station Engineering Projects

Granted publication date: 20210101

Pledgee: Zhongguancun Beijing technology financing Company limited by guarantee

Pledgor: Beijing Qingyun Energy Group Co.,Ltd.

Registration number: Y2024990000145