CN107129797A - A kind of drilling construction retaining wall construction material and preparation method thereof - Google Patents

A kind of drilling construction retaining wall construction material and preparation method thereof Download PDF

Info

Publication number
CN107129797A
CN107129797A CN201710327899.1A CN201710327899A CN107129797A CN 107129797 A CN107129797 A CN 107129797A CN 201710327899 A CN201710327899 A CN 201710327899A CN 107129797 A CN107129797 A CN 107129797A
Authority
CN
China
Prior art keywords
parts
drilling
construction
thickener
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710327899.1A
Other languages
Chinese (zh)
Inventor
孙东光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710327899.1A priority Critical patent/CN107129797A/en
Publication of CN107129797A publication Critical patent/CN107129797A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • C09K8/528Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning inorganic depositions, e.g. sulfates or carbonates
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/50Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a kind of drilling construction retaining wall construction material and preparation method thereof, it is related to building material technical field.It is made up of the component of following weight proportion:600 parts of loess, 260 parts of perlite, 200 parts of surface modifier, 76 parts of polymer dispersion powder, 26 parts of cellulose ether, 6 parts of thickener.Its prepare concrete technology step be:Crushed crude pearlite is broken to 0.1mm 0.5mm, excessive particle diameter is avoided to exist, while loess drying and processing, and grinding is to 0.01mm 0.05mm, then the two is proportionally mixed with surface modifier, inorganic mineral powder, dispersant, thickener in batch mixer, prepared by material completes.The present invention is used for the protection to the wall of a borehole during drilling construction, reduces slurries wastage and reduces rock dust in bottom hole deposition, prevents drilling from stepping on hole and bit freezing, it is ensured that Completion of Drilling Hole rate.

Description

A kind of drilling construction retaining wall construction material and preparation method thereof
Technical field
The present invention relates to building material technical field, and in particular to a kind of drilling construction retaining wall construction material and its system Preparation Method.
Background technology
Engineering construction is drilled, and refers to the drilling operation for being used as various engineering constructions.In engineering drilling construction, pine is frequently encountered Dissipate broken, crack solution cavity, sand pebble layer, Landslide deposit layer, the expansion bad ground such as undergauge and water burst.Drilling tool pair in drilling process Beaing vibrations, the washing away of flushing liquor, soaking under the effect such as moistening for hole wall, can cause hole wall to occur collapsing and breaking, resilience undergauge Etc. phenomenon.Brill drilling accident is more when thus creeping into, and drilling efficiency is low, and drilling quality is poor, and drilling cost is higher, can be made when serious Scrapped into drilling, very big difficulty is caused to drilling.In this case, not only influence drilling operation is smoothed out, but also to be disappeared Consuming substantial amounts of human and material resources, financial resources and time is handled.The caving in of bad ground, miss as improving drilling efficiency, reduction The serious hindrance of drilling cost.Therefore, hole wall is effectively protected, prevents from caving in and misses, must be solved as probing production Significant problem.Big multiple-project uses the measure of mud off at present, but run into behind hygroscopic rock stratum will dehydration, and mud for mud Slurry will be attached on the wall of a borehole, cause shrinkage cavity.It is tired that other currently used technique can cause drilling to return slurry to a certain extent Difficulty, this results in drilling rock dust and deposited in bottom hole, and bit will be slowed down by reaching after certain thickness, drilling rod can be caused when serious Break.
In summary, the present invention devises a kind of drilling construction retaining wall construction material and preparation method thereof.
The content of the invention
In view of the shortcomings of the prior art, the present invention seeks to be to provide a kind of drilling construction retaining wall construction material And preparation method thereof, for the protection during drilling construction to the wall of a borehole, reduce slurries wastage and reduce rock dust in bottom hole Deposition, prevents drilling from stepping on hole and bit freezing, it is ensured that Completion of Drilling Hole rate.
To achieve these goals, the present invention is to realize by the following technical solutions:A kind of drilling construction retaining wall is built Material is built, is made up of the component of following weight proportion:560-680 parts of loess, 200-300 parts of perlite, surface modifier 150- 240 parts, 70-80 parts of polymer dispersion powder, 20-30 parts of cellulose ether, 5-6 parts of thickener.
Preferably, a kind of drilling construction retaining wall construction material, is made up of the component of following weight proportion:600 parts of loess, 260 parts of perlite, 200 parts of surface modifier, 76 parts of polymer dispersion powder, 26 parts of cellulose ether, 6 parts of thickener.
Preferably, described perlite is the powdery perlite handled without vitreous, particle diameter is 0.1mm-0.5mm.
Preferably, described surface modifier is mainly a kind of or several in silane coupler and titanate coupling agent Kind.
Preferably, described thickener is mainly aluminium-magnesium silicate.
A kind of preparation method of drilling construction retaining wall construction material, its concrete technology step is:Crushed crude pearlite is broken to 0.1mm-0.5mm, it is to avoid excessive particle diameter is present, while loess drying and processing, and then grinding will to 0.01mm-0.05mm The two and surface modifier, inorganic mineral powder, dispersant, thickener are proportionally mixed in batch mixer, and prepared by material completes.
Beneficial effects of the present invention:The material has that density is low, porous performance, and Huang can be made during drilling construction Soil, perlite are uniformly dispersed in flushing liquor, and borehole fissure, reduction drilling can be blocked when borehole fissure is run into construction The leakage of slurries.The material has loose structure simultaneously, can adsorb the rock dust produced in boring procedure, and due to density compared with It is small smoothly to return slurry, so as to take rock dust out of drilling.When flushing liquor returns to sedimentation basin, under stirring and precipitation, inhale Being attached to the rock dust of perlite can come off, and be deposited in the bottom of sedimentation basin, the reuse of flushing liquor is not influenceed.Make in retaining wall material Used time, retaining wall material can adsorb substantial amounts of water, and being unlikely to dehydration when running into water suction rock stratum is adsorbed onto on hole wall, so as to ensure that The normal drilling of drilling.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, is expanded on further the present invention.
Present embodiment uses following technical scheme:A kind of drilling construction retaining wall construction material, is matched somebody with somebody by following weight The component composition of ratio:600 parts of loess, 260 parts of perlite, 200 parts of surface modifier, 76 parts of polymer dispersion powder, cellulose ether 26 parts, 6 parts of thickener.
It is worth noting that, described perlite is the powdery perlite handled without vitreous, particle diameter is 0.1mm- 0.5mm。
It is worth noting that, described surface modifier be mainly one kind in silane coupler and titanate coupling agent or Person is several.
It is worth noting that, described thickener is mainly aluminium-magnesium silicate.
In addition, a kind of preparation method of drilling construction retaining wall construction material, its concrete technology step is:Perlite is crushed To 0.1mm-0.5mm, it is to avoid excessive particle diameter is present, while loess drying and processing, and grinding is to 0.01mm-0.05mm, then The two is proportionally mixed with surface modifier, inorganic mineral powder, dispersant, thickener in batch mixer, prepared by material completes.
The application method of present embodiment is:The borehole wall-protection material be inorganic powder, in advance by the material according to The ratio of mud 1:1, which adds water, stirs, in drilling construction, using hydraulic pump by retaining wall material by Drill-pipe conveyed to bottom hole, and Slurry is returned to sedimentation basin by drilling rod wall and hole wall intermediate gaps.The stirring being interrupted simultaneously to sedimentation basin, accelerates the heavy of rock dust Form sediment, treat after the completion of rock dust precipitation, retaining wall material is reusable, so repeatedly.It is worth noting that a large amount of in sedimentation basin precipitation Rock dust when, the rock dust of sedimentation basin bottom should be cleared up, it is ensured that rock dust content must not exceed 5% in retaining wall material, otherwise can Influence retaining wall effect.If rock dust content is more than 10% in retaining wall material, it is necessary to change retaining wall material, it is ensured that good construction effect.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (4)

1. the invention discloses a kind of drilling construction retaining wall construction material and preparation method thereof, it is related to building material technology neck Domain.
2. it is made up of the component of following weight proportion:600 parts of loess, 260 parts of perlite, 200 parts of surface modifier is dispersible 76 parts of latex powder, 26 parts of cellulose ether, 6 parts of thickener.
3. its concrete technology step prepared is:Crushed crude pearlite is broken to 0.1mm-0.5mm, it is to avoid excessive particle diameter is present, together When loess drying and processing, and grinding is to 0.01mm-0.05mm, then will the two and surface modifier, inorganic mineral powder, dispersant, Thickener is proportionally mixed in batch mixer, and prepared by material completes.
4. the present invention is used for the protection to the wall of a borehole during drilling construction, reduces slurries wastage and reduction rock dust is heavy in bottom hole Accumulated amount, prevents drilling from stepping on hole and bit freezing, it is ensured that Completion of Drilling Hole rate.
CN201710327899.1A 2017-05-11 2017-05-11 A kind of drilling construction retaining wall construction material and preparation method thereof Pending CN107129797A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710327899.1A CN107129797A (en) 2017-05-11 2017-05-11 A kind of drilling construction retaining wall construction material and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710327899.1A CN107129797A (en) 2017-05-11 2017-05-11 A kind of drilling construction retaining wall construction material and preparation method thereof

Publications (1)

Publication Number Publication Date
CN107129797A true CN107129797A (en) 2017-09-05

Family

ID=59732103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710327899.1A Pending CN107129797A (en) 2017-05-11 2017-05-11 A kind of drilling construction retaining wall construction material and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107129797A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112574724A (en) * 2020-12-10 2021-03-30 中油昆仑管道工程有限公司 Mud for directional drilling through clay layers

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1335348A (en) * 2001-06-06 2002-02-13 吴柏志 Oil and water well plugging agent and its producing process
CN101268150A (en) * 2005-09-23 2008-09-17 川汉油田服务有限公司 Slurry compositions and methods for making same
CN102294749A (en) * 2010-06-28 2011-12-28 中国人民解放军68612部队 Rapid slurry producing device
CN103666407A (en) * 2012-09-12 2014-03-26 中国石油化工股份有限公司 Drilling fluid and preparation method thereof
CN105602536A (en) * 2015-11-09 2016-05-25 中国石油化工股份有限公司 Non-acid solution high-strength plugging agent, and preparation method thereof
CN106285524A (en) * 2016-08-26 2017-01-04 陕西陕煤黄陵矿业有限公司 To boring macromolecular mud dreg removing system, method and macromolecular mud under colliery
CN106336861A (en) * 2016-08-30 2017-01-18 董晓 Preparation method of novel plugging agent
CN106398669A (en) * 2016-08-31 2017-02-15 四川上之登新材料有限公司 Method for preparing pressure-bearing blocking agent for drilling fluid

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1335348A (en) * 2001-06-06 2002-02-13 吴柏志 Oil and water well plugging agent and its producing process
CN101268150A (en) * 2005-09-23 2008-09-17 川汉油田服务有限公司 Slurry compositions and methods for making same
CN103382387A (en) * 2005-09-23 2013-11-06 川汉油田服务有限公司 Slurry compositions and methods for making same
CN102294749A (en) * 2010-06-28 2011-12-28 中国人民解放军68612部队 Rapid slurry producing device
CN103666407A (en) * 2012-09-12 2014-03-26 中国石油化工股份有限公司 Drilling fluid and preparation method thereof
CN105602536A (en) * 2015-11-09 2016-05-25 中国石油化工股份有限公司 Non-acid solution high-strength plugging agent, and preparation method thereof
CN106285524A (en) * 2016-08-26 2017-01-04 陕西陕煤黄陵矿业有限公司 To boring macromolecular mud dreg removing system, method and macromolecular mud under colliery
CN106336861A (en) * 2016-08-30 2017-01-18 董晓 Preparation method of novel plugging agent
CN106398669A (en) * 2016-08-31 2017-02-15 四川上之登新材料有限公司 Method for preparing pressure-bearing blocking agent for drilling fluid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地质技术革新展览会资料组: "《地质技术革新展览会技术资料选编 钻探工程》", 30 November 1971, 中国工业出版社 *
晨光化工研究院有机硅编写组: "《有机硅单体及聚合物》", 31 December 1986, 化学工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112574724A (en) * 2020-12-10 2021-03-30 中油昆仑管道工程有限公司 Mud for directional drilling through clay layers

Similar Documents

Publication Publication Date Title
CN101603414B (en) Method for reinforcing wall of drill hole by jet grouting
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN107722954A (en) A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
KR20050114193A (en) A grout carrying out mehtod for paste backfill grouting at the cave
CN102703044A (en) Novel cement slurry plugging fluid
CN104650836A (en) Horizontal well cement paste
CN103485345A (en) Construction method for covering layer closed porthole high-pressure curtain grouting
US2119829A (en) Method of and composition for preventing the loss of drilling fluid in well drilling operations
CN108102619A (en) Anti-drag mud and its preparation and application method
CN105969327B (en) A kind of plugging material and leak stopping slurry for protecting low pressure fracture-type reservoir
CN102703043A (en) Novel plugging material
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN106285524B (en) To drilling macromolecular mud dreg removing system, method and macromolecular mud under coal mine
CN107216070A (en) Efficient anti-erosion channeling control cement slurry system
KR101619218B1 (en) Fiber reinforcement grouting method of construction
CN107129797A (en) A kind of drilling construction retaining wall construction material and preparation method thereof
CN109026011A (en) Huge thickness rich water Denying Formation dolomite shaft of vertical well water-stop curtain controls grouting process
CN102732237B (en) Dry wellbore well cementation cement slurry
CN109235440B (en) Seepage-proofing grouting method for completely weathered granite stratum
CN208534484U (en) One kind is for removing the incrusted structure of cutter head of shield machine
CN204000960U (en) A kind of trade waste landfill yard rock side slope plastic film mulch leakage preventing structure
CN109537612A (en) A kind of porous impact stirring diaphram wall Barrier Technology and its construction method
CN114656941A (en) Well strengthening agent
CN108798678B (en) Wear tunnel freezing hole construction technique
CN108439898B (en) Casing material for grouting horizontal valve pipe of water-rich sand gravel layer on shield top line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905

RJ01 Rejection of invention patent application after publication