CN107091961A - Electric power monitoring method and system based on user side - Google Patents

Electric power monitoring method and system based on user side Download PDF

Info

Publication number
CN107091961A
CN107091961A CN201710502407.8A CN201710502407A CN107091961A CN 107091961 A CN107091961 A CN 107091961A CN 201710502407 A CN201710502407 A CN 201710502407A CN 107091961 A CN107091961 A CN 107091961A
Authority
CN
China
Prior art keywords
information
power
preset range
user side
power information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710502407.8A
Other languages
Chinese (zh)
Inventor
马庆峰
王庭钧
刘雪冰
钟成
刘彦君
尚立
张建臣
苏汉
张强
霍胜利
单丽
徐磊
张硕
王卫东
刘欢
张英杰
郭悦
孙淑娟
许玲玲
李美茹
柴小亮
李勇
胡立章
张宏元
由川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yao Hebei Jiahao In Information Polytron Technologies Inc
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Yao Hebei Jiahao In Information Polytron Technologies Inc
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yao Hebei Jiahao In Information Polytron Technologies Inc, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Yao Hebei Jiahao In Information Polytron Technologies Inc
Priority to CN201710502407.8A priority Critical patent/CN107091961A/en
Publication of CN107091961A publication Critical patent/CN107091961A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/02Measuring effective values, i.e. root-mean-square values
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/04Measuring peak values or amplitude or envelope of ac or of pulses
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention is applied to technical field of electric power, and there is provided the electric power monitoring method based on user side and system.This method gathers the first power information of user side power circuit by the power monitoring equipment being arranged on user side power circuit, processing unit is detected to the first power information collected, it will be sent beyond the first power information of the first preset range to information transit node, information transit node obtains the second power information beyond the second preset range from beyond the first power information of the first preset range, and server will be sent to beyond the second power information of the second preset range, server is according to the second power information beyond the second preset range, the power information of user side is monitored, so as to the power information of monitoring power circuit in real time, and compare saving network bandwidth resources, improve the monitoring efficiency to power circuit state and the degree of accuracy, the intellectual monitoring to user side power information can also be realized simultaneously.

Description

Electric power monitoring method and system based on user side
Technical field
The invention belongs to technical field of electric power, more particularly to electric power monitoring method and system based on user side.
Background technology
Qualified power supply is the basis that electrical equipment is normally run, and alternating current is the sole power of most electrical equipment. Power circuit accident is mainly what is be grounded by imperfect earth, mistake and caused without reasons such as earth leakage protective devices.And to power line The detection on road is generally carried out all by the way of manually detecting, and is manually detected with very big contingency and time Interval, it is impossible to find the hidden danger that power circuit is present in time.
The content of the invention
In view of this, it is existing to solve the embodiments of the invention provide the electric power monitoring method based on user side and system To the problem of power circuit of user side has hidden danger can not be found in time in technology.
The first aspect of the embodiment of the present invention provides a kind of electric power monitoring method based on user side, it is adaptable to including clothes It is engaged in the power monitoring system of device, multiple information transit nodes, how each processing unit and multiple power monitoring equipments, a letter Transit node at least one described processing unit of correspondence and at least one described power monitoring equipment are ceased, the server correspondence is each Individual information transit node, at least one corresponding described power monitoring equipment of a processing unit;Methods described includes:
The first power information of user side power circuit is gathered by the power monitoring equipment being arranged on user side power circuit, And first power information is sent to corresponding processing unit;First power information includes virtual value, the electricity of voltage The peak value of pressure, the fluctuation range of voltage, the virtual value of electric current, the fluctuation range of the peak value of electric current and electric current;
First power information is detected, will be sent to accordingly beyond first power information of the first preset range Information transit node;Wherein, first power information beyond first preset range is the second power information;It is described First preset range is drawn by the history same period for counting the user side average electricity consumption data;
Described information transit node obtains the second power information beyond the second preset range, and by beyond the second preset range Second power information is sent to server;Second preset range is by counting the user side in history same period Each point in time Electricity consumption data draw;
The server is monitored according to the second power information beyond the second preset range to the power information of user side.
Optionally, one positional information of each power monitoring equipment correspondence, each positional information correspondence one first Preset range;It is described that first power information is detected, by beyond first power information of the first preset range Sending to information transit node includes:
With reference to the corresponding positional information of the power monitoring equipment, detect whether first power information exceeds and the position Corresponding first preset range of information;
It will be sent beyond the first power information of the first preset range corresponding with the positional information to information transit node.
Optionally, one positional information of every the second power information correspondence;Described obtain exceeds the second preset range The second power information include:
Obtain current time information;
With reference to current time information, the user side the history time point same period corresponding with current time information electricity consumption data and The corresponding positional information of second power information described in each bar, determines the corresponding second default model of the second power information described in each bar Enclose;
Detect whether the second power information described in each bar exceeds corresponding second preset range.
Optionally, in addition to:
Transit point sends electricity to the corresponding power monitoring equipment of the second power information beyond the second preset range in described information Force information acquisition instructions, the power information acquisition instructions include frequency acquisition, times of collection and power monitoring equipment mark;
The power monitoring equipment gathers the 3rd electric power of user side current time corresponding with the power information acquisition instructions Information;
Transit point receives the 3rd power information in described information, and the 3rd power information is transmitted directly into the clothes Business device;
The server is monitored according to the 3rd power information to the power information of user side, to confirm the 3rd electricity The abnormality of the corresponding power circuit of force information is true anomaly or false anomaly.
Corresponding to the embodiment of the present invention in a first aspect, the second aspect of the embodiment of the present invention, which provides one kind, is based on user The power monitoring system of side, including server, multiple information transit nodes, multiple processing units and multiple power monitoring equipments, One described information transit node at least one described processing unit of correspondence and at least one described power monitoring equipment, the clothes Each information transit node of device correspondence of being engaged in, at least one corresponding described power monitoring equipment of a processing unit;Wherein:
The power monitoring equipment, the first power information for gathering user side power circuit, and first electric power is believed Breath is sent to corresponding processing unit;First power information includes the virtual value, the peak value of voltage, the fluctuation of voltage of voltage Scope, the virtual value of electric current, the fluctuation range of the peak value of electric current and electric current;
The processing unit, for being detected to first power information, by beyond described the first of the first preset range Power information is sent to corresponding information transit node;Wherein, beyond first power information of first preset range For the second power information;First preset range is drawn by the history same period for counting the user side average electricity consumption data;
Described information transit node, for obtaining the second power information beyond the second preset range, and will preset beyond second Second power information of scope is sent to the server;Second preset range is by counting the user side in the history same period The electricity consumption data of Each point in time is drawn;
The server, for according to the second power information for exceeding the second preset range, being carried out to the power information of user side Monitoring.
Optionally, one positional information of each power monitoring equipment correspondence, each positional information correspondence one first Preset range;The power monitoring equipment includes:
First detection unit, for reference to the corresponding positional information of the power monitoring equipment, detecting first power information Whether the first preset range corresponding with the positional information is exceeded;
First information transmitting element, for by beyond the first power information of the first preset range corresponding with the positional information Send to information transit node.
Optionally, one positional information of every the second power information correspondence;Described information transit node includes:
Temporal information acquiring unit, for obtaining current time information;
Determining unit, for combining current time information, the user side in the history time same period corresponding with current time information The corresponding positional information of second power information described in the electricity consumption data and each bar of point, determines the second power information correspondence described in each bar The second preset range;
Second detection unit, for detecting whether the second power information described in each bar exceeds corresponding second preset range.
Optionally, transit point in described information, is additionally operable to corresponding to the second power information beyond the second preset range Power monitoring equipment send power information acquisition instructions, the power information acquisition instructions include frequency acquisition, times of collection and Power monitoring equipment is identified;
The power monitoring equipment, is additionally operable to the of corresponding with the power information acquisition instructions user side current time of collection Three power informations;
Transit point in described information, is additionally operable to receive the 3rd power information, and the 3rd power information is directly transmitted To the server;
The server, is additionally operable to be monitored the power information of user side according to the 3rd power information, to confirm The abnormality for stating the corresponding power circuit of the 3rd power information is true anomaly or false anomaly.
The embodiment of the present invention, user side power line is gathered by the power monitoring equipment being arranged on user side power circuit First power information on road, processing unit is detected to the first power information collected, by beyond the first preset range First power information is sent to information transit node, and information transit node is from beyond the first power information of the first preset range The second power information beyond the second preset range is obtained, and clothes will be sent to beyond the second power information of the second preset range Business device, server is monitored according to the second power information beyond the second preset range to the power information of user side, so that The power information of power circuit can be monitored in real time, and compare saving network bandwidth resources, improve the prison to power circuit state Efficiency and the degree of accuracy are surveyed, while the intellectual monitoring to user side power information can also be realized.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only some of the present invention Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Accompanying drawing obtains other accompanying drawings.
Fig. 1 is the flow chart of the electric power monitoring method provided in an embodiment of the present invention based on user side;
Fig. 2 is the implementation process figure of step S102 in Fig. 1;
Fig. 3 is the implementation process figure of step S103 in Fig. 1;
Fig. 4 is the structured flowchart of the power monitoring system provided in an embodiment of the present invention based on user side.
Embodiment
In describing below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, thoroughly to understand the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details hinders description of the invention.
It should be appreciated that ought be in this specification and in the appended claims in use, term " comprising " indicates described spy Levy, entirety, step, operation, the presence of element and/or component, but be not precluded from one or more of the other feature, entirety, step, Operation, element, component and/or its presence or addition for gathering.
It is also understood that the term used in this description of the invention is merely for the sake of the mesh for describing specific embodiment And be not intended to limit the present invention.As used in description of the invention and appended claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singulative, " one " and "the" are intended to include plural form.
It will be further appreciated that, the term "and/or" used in description of the invention and appended claims is Refer to any combinations of one or more of the associated item listed and be possible to combination, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determining " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one
Fig. 1 shows the implementation process for the electric power monitoring method based on user side that the embodiment of the present invention one is provided, it is adaptable to wrap Include the power monitoring system of server, multiple information transit nodes, how each processing unit and multiple power monitoring equipments, an institute State information transit node at least one described processing unit of correspondence and at least one described power monitoring equipment, the server pair Each information transit node is answered, at least one corresponding described power monitoring equipment of a processing unit is detailed to methods described State as follows:
Step S101, the first electric power for gathering power circuit by the power monitoring equipment being arranged on user side power circuit is believed Breath, is sent to corresponding processing unit.
Wherein, the power monitoring equipment being arranged on user side power circuit can gather the first of user side power circuit Power information.Wherein, first power information includes virtual value, the peak value of voltage, the fluctuation range of voltage, the electric current of voltage Virtual value, the fluctuation range of the peak value of electric current and electric current.
Specifically, power monitoring equipment can include resistance detecting circuit, line sequence/voltage detecting circuit, MCU single-chip microcomputers, Clock/reset circuit and telecommunication circuit.Wherein, MCU single-chip microcomputers connect the power circuit for needing to monitor by resistance detecting circuit, Line sequence/voltage detecting circuit connection power circuit and MCU single-chip microcomputers, clock/reset circuit are connected with MCU single-chip microcomputers respectively, MCU Single-chip microcomputer is also connected with telecommunication circuit.
Resistance detecting circuit can be connected in sequence by high-power resistor, IGCT and optical coupling isolation circuit, high power Resistance connects power circuit, optical coupling isolation circuit connection MCU single-chip microcomputers.Line sequence/voltage detecting circuit is A/D sample circuits, with Power circuit is connected.
The virtual value, peak value, fluctuation range of phases line voltage can be detected by A/D sample circuits, detection neutral voltage Virtual value, peak value, fluctuation range, detect the virtual value of electric current, peak value, fluctuation range, can also detect whether are phase line and zero line Whether misconnection or open circuit and ground wire have connected.MCU single-chip microcomputers control brilliant lock by controlling optical coupling isolation circuit Pipe, controls whether high-power resistor is accessed in circuit by IGCT.When in high-power resistor access resistance, you can pass through line Sequence/voltage detecting circuit accessed before and after magnitude of voltage, and then obtain power circuit decompression percentage, phase line impedence and zero Line impedence.
The power monitoring equipment can at any time be detected to the electricity consumption working condition of power circuit, can pass through ZIGBEE Network transmits the data detected in real time, is not limited by environment and cable, and detection data are effectively analyzed, found in time The circuit questions such as personnel's electric shock, electrical fire, equipment operation exception can be caused, help and pinpoint the problems, help is found out and quickly fixed Position abort situation and reason, eliminate safe hidden trouble, and can recall detection data, help user to realize digitization Electrical Safety With the management of quality, without external power supplys such as batteries, mass data can be stored directly by circuit-under-test power taking, side Just used in the case of no server.
Step S102, the processing unit is detected to first power information, by beyond the first preset range First power information is sent to corresponding information transit node.Wherein, beyond described the first of first preset range Power information is the second power information;First preset range passes through the history same period for counting the user side average electricity consumption data Draw.For example, the first preset range can be average value of the April in former years to electricity consumption data between May.
Wherein, one positional information of each power monitoring equipment correspondence, each positional information correspondence one first is pre- If scope.It should be understood that the power information such as voltage, electric current that different power circuits can be born is not quite similar, therefore can With corresponding first preset range of the information settings such as the model according to the corresponding power circuit of power monitoring equipment positional information.
In the present embodiment, processing unit can be the processor in power monitoring equipment, or power monitoring equipment Outer processor.The first power information is detected by processing unit, by the first electric power letter beyond the first preset range Breath is sent to information transit node, and is not sent for the first power information without departing from the first preset range, so as to save Network bandwidth resources are saved, the monitoring efficiency to power circuit state is improved.
Referring to Fig. 2, in one embodiment, step S102 can be realized by procedure below:
Step S201, with reference to the corresponding positional information of the power monitoring equipment, detects whether first power information exceeds The first preset range corresponding with the positional information.
Wherein, the first preset range includes the preset range of various information in the first power information.For example, the first default model First voltage preset range, first electric current preset range etc. can be included by enclosing.
For different power circuits, corresponding first preset range is not quite similar.It should be understood that different power lines The power informations such as voltage, electric current that road can be born are not quite similar,
First preset range can be drawn with statistical history data.For example, statistics power circuit each period information of voltage, Current information, then the corresponding value range of the relevant information according to power circuit state when without exception first preset range is set.
The first different preset ranges are set by the power circuit to diverse location information, enabled to power circuit The monitoring of state is more reasonable, accurate and tallies with the actual situation, and improves the accuracy to power circuit status monitoring.
In addition, the first preset range is also related to the date.For example, the power consumption in winter is different from the power consumption of summer, because This, the first preset range of power information corresponding for same power circuit is also not quite similar in the different time.
It should be understood that corresponding first preset range of difference power circuit characterizes the peace of the various information of the power circuit Gamut.For example, the function according to residing for power circuit is different, power circuit can be divided into the first power circuit, the second electric power A variety of power circuits such as circuit, the 3rd power circuit.Wherein, corresponding first preset range of the first power circuit specifically can be with For:Date range, voltage range, current range etc..
It should be noted that be between various information in the first preset range it is interrelated as an entirety, should Safe condition possibly can not be made to power circuit status information individually for a certain information to judge.For example, individually will collection To the corresponding voltage/current information of power circuit be compared with the voltage in corresponding first preset range/electricity scope, When voltage/the power information collected exceeds voltage/electricity scope in corresponding first preset range, then power circuit state is judged It is abnormal, it is also not meet actual conditions, monitors inadequate science.
For these reasons, in the first preset range, the independent preset range and various information of partial information can be included The overall preset range combined.Can be first by the partial information collected and the information in corresponding first preset range Independent preset range individually compared, when needed again by the various information collected with corresponding first preset range The overall preset range of various information is compared.
Step S202, will send to letter beyond the first power information of the first preset range corresponding with the positional information Cease transit node.
Wherein, when detecting that the first power information exceeds corresponding first preset range, first power information is sent out Information transit node is delivered to, to cause information transit node is sent to server after first power information is pre-processed to enter Row power circuit status monitoring, record etc..
Specifically, the first power information can include following several situations beyond corresponding first preset range:
The independent preset range for the information that partial information in first power information exceeds in corresponding first preset range.Example Such as, the individual voltage scope that the information of voltage collected to some power circuit exceeds in corresponding first preset range, then may be used So that corresponding first power information is sent to information transit node;Or, the current information collected to some power circuit surpasses The independent current range gone out in corresponding first preset range, then can send corresponding first power information to information transfer Node.
The overall preset range that full detail in first power information exceeds in corresponding first preset range.For example, The information of voltage and current amplitude information collected to some power circuit is without departing from the list in corresponding first preset range Only voltage range and independent current range, then can be by the various information in first power information and the first preset range Overall preset range is compared, and sends first power information to information transit node when meeting preset requirement.
Wherein, the overall preset range in the first preset range can be configured according to actual conditions.For example, voltage Independent preset range is A1 ~ A2, and the independent preset range of electric current is B1 ~ B2;And the entirety of voltage is preset in overall preset range Scope is A3 ~ A4, and the overall preset range of electric current is B3 ~ B4, the overall preset range of voltage and the overall preset range of electric current Between be, with incidence relation, to show that association between the two is closed for example, can be fitted according to historical data to both System.
It should be noted that each power information harvester can gather power circuit always according to prefixed time interval Power information, and the power information collected is detected, letter will be sent to beyond the power information of the first preset range Cease transit node.The information gathering instruction acquisition power circuit that each power monitoring equipment can be sent according to information transit node Power information, and the power information collected is detected, letter will be sent to beyond the power information of the first preset range Transit node is ceased, and when not receiving the information gathering instruction of information transit node transmission in a dormant state.
In the present embodiment, photovoltaic generation unit can be set on each power monitoring equipment, supplied by photovoltaic generation Electricity work.Therefore each power monitoring equipment is in dormancy when not receiving the information gathering instruction of information transit node transmission State, can save consumption.It is of course also possible to be that each power monitoring equipment is powered by civil power.
Step S103, described information transit node obtains the second power information beyond the second preset range, and will exceed Second power information of the second preset range is sent to server.Second preset range is by counting the user side in history The electricity consumption data of same period Each point in time is drawn.
Wherein it is possible to which the first electric power for gathering power circuit by the power monitoring equipment being arranged on power circuit is believed Breath.Power information in each power information of bar first beyond corresponding first preset range is sent to information transfer by processing unit Node.For ease of statement, the electric power breath in the first power information beyond corresponding first preset range is referred to as the second electric power letter Breath.
The power information of corresponding first preset range how will be exceeded in each power information of bar first on processing unit The process of information transit node is sent to, the related content in step S102 is may be referred to, will not be repeated here.
In the present embodiment, the acquisition is arranged on the second power information tool of the power monitoring equipment collection on power circuit Body can be:Acquisition of information instruction is generated, and described information is obtained into instruction and is sent to each power monitoring equipment, it is each to obtain The power information that individual power monitoring equipment is gathered in preset time period.Wherein, described information obtains instruction and included but is not limited to Station location marker, preset time period of power monitoring equipment etc..Preset time period can be the period before current time, also may be used Think the current time later period.
Each power monitoring equipment is received after information gathering instruction, according in information gathering instruction acquisition preset time period The power information of the power circuit of corresponding position, and it is sent to processing unit, or the electric power that will be gathered in preset time period Information is sent to processing unit.
Wherein, one positional information of every the second power information correspondence.Current time information can be to power circuit Monitoring causes certain influence, such as different time sections, information of voltage and the current information phase not to the utmost that same power circuit is monitored Together.The second power information is pre-processed according to temporal information, to prevent as far as possible or reduce current time information to power line The influence of line state monitoring.
Referring to Fig. 3, the acquisition in this step can be by following beyond the second power information of the second preset range Process is realized:
Step S301, obtains current time information.
Wherein, current time information includes but is not limited to date on the same day and current time., can be with for current time information Pass through Network Capture.
Step S302, with reference to current time information, the user side in the history time same period corresponding with current time information The corresponding positional information of second power information described in the electricity consumption data and each bar of point, determines the second power information correspondence described in each bar The second preset range.
Wherein, the second preset range is different from the first preset range in embodiment one, and in different temporal information shadows Under sound, corresponding second preset range of the second power information may be different.Specifically, different power informations may be to electric power The monitoring of line status has a certain impact.
For these reasons, it is necessary to consider influence of the current time information to power circuit state, exist with reference to the user side The electricity consumption data at the history time point same period corresponding with current time information, determines that power circuit status information is corresponding second pre- If scope.For example, the corresponding electricity consumption of user side is designated 001, current time is April 5, then the user side with current time It is current or 4 in April 5 former years that the electricity consumption data at the information corresponding time point history same period, as electricity consumption are designated 001 user The electricity consumption data of two days before and after the moon 5.
It should be understood that corresponding second preset range of difference power circuit characterizes the various power informations of the power circuit Safe range.For example, the function according to residing for power circuit is different, power circuit can be divided into the first power circuit, second A variety of power circuits such as power circuit, the 3rd power circuit.Wherein, corresponding first preset range of the first power circuit specifically may be used Think:Date range, voltage range, current range etc..
It should be noted that be between various information in the second preset range it is interrelated as an entirety, should Safe condition possibly can not be made to power circuit status information individually for a certain information to judge.For example, individually will collection To the corresponding voltage/current information of power circuit be compared with the voltage in corresponding second preset range/electricity scope, When voltage/the power information collected exceeds voltage/electricity scope in corresponding second preset range, then power circuit state is judged It is abnormal, it is also not meet actual conditions, monitors inadequate science.
Step S303, detects whether the second power information described in each bar exceeds corresponding second preset range.
Wherein, the independent preset range of partial information can be included in the second preset range together with various information combinations Overall preset range.First the partial information collected can be preset with the independent of the information in corresponding second preset range Scope is individually compared, when needed again by the various information collected with corresponding second preset range by various information Overall preset range be compared.
Specifically, the second power information can include following several situations beyond corresponding second preset range:
The independent preset range for the information that partial information in second power information exceeds in corresponding second preset range.Example Such as, the individual voltage scope that the information of voltage collected to some power circuit exceeds in corresponding second preset range, then may be used So that corresponding second power information is sent to information transit node;Or, the current information collected to some power circuit surpasses The independent current range gone out in corresponding second preset range, then can send corresponding second power information to information transfer Node.
The overall preset range that full detail in second power information exceeds in corresponding second preset range.For example, The information of voltage and current amplitude information collected to some power circuit is without departing from the list in corresponding second preset range Only voltage range and independent current range, then can be by the various information in second power information and the second preset range Overall preset range is compared, and sends second power information to information transit node when meeting preset requirement.
Wherein, the overall preset range in the second preset range can be configured according to actual conditions.For example, voltage Independent preset range is A5 ~ A6, and the independent preset range of electric current is B5 ~ B6;And the entirety of voltage is preset in overall preset range Scope is A7 ~ A8, and the overall preset range of electric current is B7 ~ B8, the overall preset range of voltage and the overall preset range of electric current Between be, with incidence relation, to show that association between the two is closed for example, can be fitted according to historical data to both System.
It is described will to be sent to server beyond the second power information of the second preset range and can lead in one embodiment Cross procedure below realization:
It will be packaged beyond the second power information described in each bar of corresponding second preset range with the current time information;
Information after encapsulation is sent to the server, to cause the server according to the information after encapsulation to user side electricity Force information is monitored.
Step S303, the server is according to the second power information beyond the second preset range, to the electric power of user side Information is monitored.
Specifically, information transit node is by beyond the power information of each bar second and current time of corresponding second preset range Information issues server after being packaged;Server can be according to current time information and the second power information to power circuit shape State is monitored, and judges whether the second power information received contains the influence of current time information, with to power circuit State is more accurately monitored.
Further, being somebody's turn to do the power circuit monitoring method based on user side can also include:
Transit point sends electricity to the corresponding power monitoring equipment of the second power information beyond the second preset range in described information Force information acquisition instructions, the power information acquisition instructions include frequency acquisition, times of collection and power monitoring equipment mark;
The power monitoring equipment gathers the 3rd electric power of user side current time corresponding with the power information acquisition instructions Information;
Transit point receives the 3rd power information in described information, and the 3rd power information is transmitted directly into the clothes Business device;
The server is monitored according to the 3rd power information to the power information of user side, to confirm the 3rd electricity The abnormality of the corresponding power circuit of force information is true anomaly or false anomaly.
It should be understood that server can meet the second electricity of preparatory condition according to the 3rd power information to pre-processed results The state of the corresponding power circuit of force information is further monitored, and confirms that pre-processed results meet the second electric power of preparatory condition The corresponding power circuit of information is true anomaly or simply accidental situation.
The above-mentioned electric power monitoring method based on user side, passes through the power monitoring equipment being arranged on user side power circuit The first power information of user side power circuit is gathered, processing unit is detected to the first power information collected, will be super The first power information for going out the first preset range is sent to information transit node, and information transit node is from beyond the first preset range The first power information in obtain the second power information beyond the second preset range, and by beyond the second of the second preset range Power information is sent to server, and server is according to the second power information beyond the second preset range, to the electric power of user side Information is monitored, and so as to the power information of monitoring power circuit in real time, and compares saving network bandwidth resources, raising pair The monitoring efficiency of power circuit state and the degree of accuracy, while the intellectual monitoring to user side power information can also be realized.
It should be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention constitutes any limit with its function and internal logic It is fixed.
Embodiment two
Corresponding to the electric power monitoring method based on user side described in foregoing embodiments one, Fig. 4 shows that the embodiment of the present invention is carried The power monitoring system based on user side supplied.For convenience of description, it illustrate only part related to the present embodiment.
Reference picture 3, the system includes server 104, multiple information transit nodes 103, multiple processing units 102 and multiple Power monitoring equipment 101, a described information transit node 103 corresponds at least one described processing unit 102 and at least one The power monitoring equipment 101, each information transit node 103 of the correspondence of server 104, a processing unit 102 At least one described power monitoring equipment 101 of correspondence.
The power monitoring equipment 101, the first power information for gathering user side power circuit, and by described first Power information is sent to corresponding processing unit 102;The virtual value of first power information including voltage, the peak value of voltage, The fluctuation range of voltage, the virtual value of electric current, the fluctuation range of the peak value of electric current and electric current.
The processing unit 102, is additionally operable to detect first power information, by beyond the first preset range First power information is sent to corresponding information transit node 103;Wherein, beyond described the of first preset range One power information is the second power information;First preset range passes through the history same period for counting the user side average electricity consumption number According to drawing.
Described information transit node 103, for obtaining the second power information beyond the second preset range, and will be beyond the Second power information of two preset ranges is sent to the server 104;Second preset range is by counting the user side Drawn in the electricity consumption data of history same period Each point in time.
The server 104, for according to the second power information for exceeding the second preset range, believing the electric power of user side Breath is monitored.
Optionally, one positional information of each power monitoring equipment correspondence, each positional information correspondence one first Preset range.The processing unit 102 includes the first detection unit 201 and information transmitting unit 202.First detection unit 201, For with reference to the corresponding positional information of the power monitoring equipment, detecting whether first power information exceeds and the position Corresponding first preset range of information.Information transmitting unit 202, for that will be preset beyond corresponding with the positional information first First power information of scope is sent to information transit node.
Optionally, one positional information of every the second power information correspondence;When described information transit node 103 includes Between information acquisition unit 301, the detection unit 303 of determining unit 302 and second.Temporal information acquiring unit 301, works as obtaining Preceding temporal information.Determining unit 302, goes through for combining current time information, the user side corresponding with current time information The corresponding positional information of second power information described in the electricity consumption data at the history time point same period and each bar, determines the second electricity described in each bar Corresponding second preset range of force information.Second detection unit 303, for detecting whether the second power information exceeds described in each bar Corresponding second preset range.
Optionally, transit point 102 in described information, is additionally operable to the second power information correspondence beyond the second preset range Power monitoring equipment 101 send power information acquisition instructions, the power information acquisition instructions include frequency acquisition, collection time Number and power monitoring equipment mark.The power monitoring equipment 102, is additionally operable to collection corresponding with the power information acquisition instructions User side current time the 3rd power information.Transit point 103 in described information, are additionally operable to receive the 3rd electric power letter Breath, and the 3rd power information is transmitted directly to the server 104.The server 104, is additionally operable to according to described Three power informations are monitored to the power information of user side, to confirm the different of the corresponding power circuit of the 3rd power information Normal state is true anomaly or false anomaly.
The above-mentioned power monitoring system based on user side, passes through the power monitoring equipment being arranged on user side power circuit The first power information of user side power circuit is gathered, processing unit is detected to the first power information collected, will be super The first power information for going out the first preset range is sent to information transit node, and information transit node is from beyond the first preset range The first power information in obtain the second power information beyond the second preset range, and by beyond the second of the second preset range Power information is sent to server, and server is according to the second power information beyond the second preset range, to the electric power of user side Information is monitored, and so as to the power information of monitoring power circuit in real time, and compares saving network bandwidth resources, raising pair The monitoring efficiency of power circuit state and the degree of accuracy, while the intellectual monitoring to user side power information can also be realized.
It is apparent to those skilled in the art that, for convenience of description and succinctly, only with above-mentioned each work( Energy unit, the division progress of module are for example, in practical application, as needed can distribute above-mentioned functions by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that unit is individually physically present, can also two or more units it is integrated in a unit, it is above-mentioned integrated Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.In addition, each function list Member, the specific name of module are also only to facilitate mutually differentiation, is not limited to the protection domain of the application.Said system The specific work process of middle unit, module, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, without detailed description or note in some embodiment The part of load, may refer to the associated description of other embodiments.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and algorithm steps, can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, depending on the application-specific and design constraint of technical scheme.Professional and technical personnel Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
, can be with embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method Realize by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, only a kind of division of logic function there can be other dividing mode, for example when actually realizing Multiple units or component can combine or be desirably integrated into another system, or some features can be ignored, or not perform.Separately A bit, shown or discussed coupling or direct-coupling or communication connection each other can be by some interfaces, device Or INDIRECT COUPLING or the communication connection of unit, can be electrical, machinery or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated module/unit realized using in the form of SFU software functional unit and as independent production marketing or In use, can be stored in a computer read/write memory medium.Understood based on such, the present invention realizes above-mentioned implementation All or part of flow in example method, can also instruct the hardware of correlation to complete, described meter by computer program Calculation machine program can be stored in a computer-readable recording medium, and the computer program can be achieved when being executed by processor The step of stating each embodiment of the method..Wherein, the computer program includes computer program code, the computer program Code can be source code form, object identification code form, executable file or some intermediate forms etc..Computer-readable Jie Matter can include:Can carry any entity or device of the computer program code, recording medium, USB flash disk, mobile hard disk, Magnetic disc, CD, computer storage, read-only storage(ROM, Read-Only Memory), random access memory(RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that described The content that computer-readable medium is included can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as, in some jurisdictions, according to legislation and patent practice, computer-readable medium does not include electric carrier signal and electricity Believe signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to foregoing reality Example is applied the present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme, all should Within protection scope of the present invention.

Claims (8)

1. a kind of electric power monitoring method based on user side, it is characterised in that the trochanter suitable for including server, multiple information The power monitoring system of point, how each processing unit and multiple power monitoring equipments, a described information transit node correspondence is at least One processing unit and at least one described power monitoring equipment, the server correspondence each information transit node, one Individual at least one described power monitoring equipment of the processing unit correspondence;Methods described includes:
The first power information of user side power circuit is gathered by the power monitoring equipment being arranged on user side power circuit, It is sent to corresponding processing unit;First power information includes virtual value, the peak value of voltage, the fluctuation model of voltage of voltage Enclose, the fluctuation range of the peak value of the virtual value of electric current, electric current and electric current;
The processing unit is detected to first power information, by first electric power letter beyond the first preset range Breath is sent to corresponding information transit node;Wherein, first power information beyond first preset range is second Power information;First preset range is drawn by the history same period for counting the user side average electricity consumption data;
Described information transit node obtains the second power information beyond the second preset range, and by beyond the second preset range Second power information is sent to server;Second preset range is by counting the user side in history same period Each point in time Electricity consumption data draw;
The server is monitored according to the second power information beyond the second preset range to the power information of user side.
2. the electric power monitoring method as claimed in claim 1 based on user side, it is characterised in that each power monitoring equipment pair A positional information is answered, one the first preset range of each positional information correspondence;It is described that first power information is entered Row detection, includes being sent beyond first power information of the first preset range to information transit node:
With reference to the corresponding positional information of the power monitoring equipment, detect whether first power information exceeds and the position Corresponding first preset range of information;
It will be sent beyond the first power information of the first preset range corresponding with the positional information to information transit node.
3. the electric power monitoring method as claimed in claim 1 based on user side, it is characterised in that the every second electric power letter Breath one positional information of correspondence;The acquisition includes beyond the second power information of the second preset range:
Obtain current time information;
With reference to current time information, the user side the history time point same period corresponding with current time information electricity consumption data and The corresponding positional information of second power information described in each bar, determines the corresponding second default model of the second power information described in each bar Enclose;
Detect whether the second power information described in each bar exceeds corresponding second preset range.
4. the electric power monitoring method based on user side as described in any one of claims 1 to 3, it is characterised in that also include:
Transit point sends electricity to the corresponding power monitoring equipment of the second power information beyond the second preset range in described information Force information acquisition instructions, the power information acquisition instructions include frequency acquisition, times of collection and power monitoring equipment mark;
The power monitoring equipment gathers the 3rd electric power of user side current time corresponding with the power information acquisition instructions Information;
Transit point receives the 3rd power information in described information, and the 3rd power information is transmitted directly into the clothes Business device;
The server is monitored according to the 3rd power information to the power information of user side, to confirm the 3rd electricity The abnormality of the corresponding power circuit of force information is true anomaly or false anomaly.
5. a kind of power monitoring system based on user side, it is characterised in that including server, multiple information transit nodes, many Individual processing unit and multiple power monitoring equipments, described information transit node at least one described processing unit of correspondence and extremely A few power monitoring equipment, each information transit node of the server correspondence, a processing unit correspondence is extremely A few power monitoring equipment;Wherein:
The power monitoring equipment, the first power information for gathering user side power circuit, and first electric power is believed Breath is sent to the corresponding processing unit;First power information includes the virtual value, the peak value of voltage, voltage of voltage Fluctuation range, the virtual value of electric current, the fluctuation range of the peak value of electric current and electric current;
The processing unit, is additionally operable to detect first power information, by beyond described the of the first preset range One power information is sent to corresponding information transit node;Wherein, first electric power beyond first preset range is believed Cease for the second power information;First preset range is drawn by the history same period for counting the user side average electricity consumption data;
Described information transit node, for obtaining the second power information beyond the second preset range, and will preset beyond second Second power information of scope is sent to the server;Second preset range is by counting the user side in the history same period The electricity consumption data of Each point in time is drawn;
The server, for according to the second power information for exceeding the second preset range, being carried out to the power information of user side Monitoring.
6. the power monitoring system as claimed in claim 5 based on user side, it is characterised in that each power monitoring equipment pair A positional information is answered, one the first preset range of each positional information correspondence;The processing unit includes:
First detection unit, for reference to the corresponding positional information of the power monitoring equipment, detecting first power information Whether the first preset range corresponding with the positional information is exceeded;
Information transmitting unit, for will be sent beyond the first power information of the first preset range corresponding with the positional information To information transit node.
7. the power monitoring system as claimed in claim 5 based on user side, it is characterised in that the every second electric power letter Breath one positional information of correspondence;Described information transit node includes:
Temporal information acquiring unit, for obtaining current time information;
Determining unit, for combining current time information, the user side in the history time same period corresponding with current time information The corresponding positional information of second power information described in the electricity consumption data and each bar of point, determines the second power information correspondence described in each bar The second preset range;
Second detection unit, for detecting whether the second power information described in each bar exceeds corresponding second preset range.
8. the power monitoring system based on user side as described in any one of claim 5 to 7, it is characterised in that described information Middle transit point, is additionally operable to send power information to the corresponding power monitoring equipment of the second power information beyond the second preset range Acquisition instructions, the power information acquisition instructions include frequency acquisition, times of collection and power monitoring equipment mark;
The power monitoring equipment, is additionally operable to the of corresponding with the power information acquisition instructions user side current time of collection Three power informations;
Transit point in described information, is additionally operable to receive the 3rd power information, and the 3rd power information is directly transmitted To the server;
The server, is additionally operable to be monitored the power information of user side according to the 3rd power information, to confirm The abnormality for stating the corresponding power circuit of the 3rd power information is true anomaly or false anomaly.
CN201710502407.8A 2017-06-27 2017-06-27 Electric power monitoring method and system based on user side Pending CN107091961A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710502407.8A CN107091961A (en) 2017-06-27 2017-06-27 Electric power monitoring method and system based on user side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710502407.8A CN107091961A (en) 2017-06-27 2017-06-27 Electric power monitoring method and system based on user side

Publications (1)

Publication Number Publication Date
CN107091961A true CN107091961A (en) 2017-08-25

Family

ID=59641509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710502407.8A Pending CN107091961A (en) 2017-06-27 2017-06-27 Electric power monitoring method and system based on user side

Country Status (1)

Country Link
CN (1) CN107091961A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254643A (en) * 2018-01-17 2018-07-06 中科创能实业有限公司 Monitoring method and monitoring device
CN113156234A (en) * 2021-03-17 2021-07-23 内蒙古电力(集团)有限责任公司乌海超高压供电局 Power equipment running state detection system
CN113391149A (en) * 2021-06-10 2021-09-14 南方电网科学研究院有限责任公司 Remote monitoring method and system for user load state of smart power grid

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201707390U (en) * 2010-05-27 2011-01-12 吴建国 Power line safety monitor with ZIGBEE wireless communication function
CN102230829A (en) * 2011-06-09 2011-11-02 航天科工深圳(集团)有限公司 Method and system for monitoring cables and sensing terminal
CN103078327A (en) * 2013-02-07 2013-05-01 重庆市电力公司供电服务中心 Power load control method and system
KR20130050054A (en) * 2011-11-07 2013-05-15 영남대학교 산학협력단 Detecting system for disconnection of distribution line
CN106443279A (en) * 2016-11-21 2017-02-22 深圳供电局有限公司 A monitoring method, apparatus and system for operation management abnormity in a power grid
CN106597221A (en) * 2016-12-15 2017-04-26 中国科学院沈阳自动化研究所 Ground grid fault diagnosis method and system
CN106645935A (en) * 2016-12-27 2017-05-10 国网浙江象山县供电公司 Electricity usage monitoring method and system
CN107167656A (en) * 2017-06-12 2017-09-15 国家电网公司 Electricity consumption monitoring method and device based on intelligent electric meter

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201707390U (en) * 2010-05-27 2011-01-12 吴建国 Power line safety monitor with ZIGBEE wireless communication function
CN102230829A (en) * 2011-06-09 2011-11-02 航天科工深圳(集团)有限公司 Method and system for monitoring cables and sensing terminal
KR20130050054A (en) * 2011-11-07 2013-05-15 영남대학교 산학협력단 Detecting system for disconnection of distribution line
CN103078327A (en) * 2013-02-07 2013-05-01 重庆市电力公司供电服务中心 Power load control method and system
CN106443279A (en) * 2016-11-21 2017-02-22 深圳供电局有限公司 A monitoring method, apparatus and system for operation management abnormity in a power grid
CN106597221A (en) * 2016-12-15 2017-04-26 中国科学院沈阳自动化研究所 Ground grid fault diagnosis method and system
CN106645935A (en) * 2016-12-27 2017-05-10 国网浙江象山县供电公司 Electricity usage monitoring method and system
CN107167656A (en) * 2017-06-12 2017-09-15 国家电网公司 Electricity consumption monitoring method and device based on intelligent electric meter

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254643A (en) * 2018-01-17 2018-07-06 中科创能实业有限公司 Monitoring method and monitoring device
CN113156234A (en) * 2021-03-17 2021-07-23 内蒙古电力(集团)有限责任公司乌海超高压供电局 Power equipment running state detection system
CN113391149A (en) * 2021-06-10 2021-09-14 南方电网科学研究院有限责任公司 Remote monitoring method and system for user load state of smart power grid
CN113391149B (en) * 2021-06-10 2022-04-12 南方电网科学研究院有限责任公司 Remote monitoring method and system for user load state of smart power grid

Similar Documents

Publication Publication Date Title
CN103676657B (en) A kind of verification system for satellite Integrated Electronic System
CN205665347U (en) 10kV distribution lines broken string fault detection and positioning system based on three phase voltage electric current
CN107091961A (en) Electric power monitoring method and system based on user side
CN108469725A (en) Clock calibration method and terminal device
CN103486068B (en) The control detecting method of intelligent fan and device, intelligent fan
CN107576871A (en) Demand-side charging equipment of electric automobile security performance remote detection and diagnostic system and method
CN108535759A (en) The remote radiation protecting, monitoring method, apparatus and system at million kilowatt nuclear power station
CN106940414A (en) Power circuit monitoring method and device
CN107167656A (en) Electricity consumption monitoring method and device based on intelligent electric meter
CN107192920A (en) Electric power monitoring method and system based on information transit node
CN102914707B (en) System and method to monitor the operation of a power generation system
CN204422659U (en) A kind of grounding net of transformer substation Transient grounding resistance and the automatic test diagnosis equipment of response
CN205829450U (en) A kind of high voltage transducer power unit and cascaded high-voltage frequency converter
CN111123009A (en) Intelligent substation avalanche testing method and system based on SCD file and terminal equipment
CN110071555A (en) A kind of batteries management system
CN107741543A (en) A kind of distribution power automation terminal protects Model test Method
CN207232351U (en) A kind of alternating-current charging pile electric fault simulation system
CN207636680U (en) Electric power facility local monitoring device and system
CN106771570A (en) One kind is based on information-based statistics electrical energy system
CN207459838U (en) The monitoring of distributed photovoltaic power generation and information collecting device
CN108009068B (en) Information recording method, information recording device and intelligent terminal
CN110855522A (en) Electric energy meter communication quality detection method based on analytic hierarchy process
CN206149291U (en) Transformer station monitoring system
CN110211354A (en) Zinc-Oxide Arrester wireless remote monitoring system
CN205377457U (en) Intelligent substation test system based on RTDS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825