CN107038653A - Cyclization powered operation methods of risk assessment and device - Google Patents

Cyclization powered operation methods of risk assessment and device Download PDF

Info

Publication number
CN107038653A
CN107038653A CN201710251889.4A CN201710251889A CN107038653A CN 107038653 A CN107038653 A CN 107038653A CN 201710251889 A CN201710251889 A CN 201710251889A CN 107038653 A CN107038653 A CN 107038653A
Authority
CN
China
Prior art keywords
power distribution
distribution network
cyclization
value
factor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710251889.4A
Other languages
Chinese (zh)
Inventor
付金生
吴晓虎
梁晓艳
陈勇
邓云照
郭煜昕
尹延麟
张万菊
侯云红
韩正牧
任亮
高顺山
于小舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUANGHUA POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co
State Grid Qinghai Electric Power Co Ltd
Original Assignee
HUANGHUA POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co
State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUANGHUA POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co, State Grid Qinghai Electric Power Co Ltd filed Critical HUANGHUA POWER SUPPLY Co OF STATE GRID QINGHAI ELECTRIC POWER Co
Priority to CN201710251889.4A priority Critical patent/CN107038653A/en
Publication of CN107038653A publication Critical patent/CN107038653A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of cyclization powered operation methods of risk assessment and device, it is related to electrical hazards assessment technology field, this method includes obtaining the network model of the power distribution network of pending cyclization powered operation;Determine position of the cyclization point in the topological structure of power distribution network;According to the position of the network model of power distribution network and cyclization point, the Loop Closing Operation consequence value of power distribution network is determined;The history data of power distribution network is searched from the power distribution network operation data storehouse pre-established;According to history data, the cyclization threat probability values of power distribution network are determined;According to Loop Closing Operation consequence value and cyclization threat probability values, the risk assessment value of the cyclization powered operation risk of power distribution network is determined.The present invention can make risk assessment more rationality objective, and the staff for execution cyclization powered operation provides reliable risk assessment data as reference, improves the reliability of the powered Loop Closing Operation of power distribution network.

Description

Cyclization powered operation methods of risk assessment and device
Technical field
The present invention relates to electrical hazards assessment technology field, more particularly, to a kind of cyclization powered operation methods of risk assessment And device.
Background technology
With society and expanding economy, requirement of the user to power supply reliability and the quality of power supply is also being improved, dual power supply Power supply and multiple feed turn into the effective powering mode for improving distribution network reliability.In such a mode, power distribution network one As use " closed loop design, open loop operation " power supply mode, in line maintenance or load switching, pass through Loop Closing Operation, selection Appropriate supply path, reduces customer outage hours to greatest extent, to ensure reliability and flexibility that distribution network powers, The economy of distribution network operation is improved, reduces the influence to user.
However, when not had a power failure the powered Loop Closing Operation for turning electricity to power distribution network, because electric network composition is complex, cyclization Operation needs the factor considered numerous, once do not consider it is thorough in the case of powered cyclization, may make not have a power failure turns electrically operated In loop produce excessive circulation, cause distribution line over-current protection malfunction, and then cause accident of power supply.And dispatcher grasps Technical Analysis means it is also extremely limited, when not stalled electrically operated, can only be judged whether to by conventional experience , so, not only easily there is judgment bias in cyclization, and lacks the analysis of quantization, due to not having systematic theoretical calculation scheme And evaluation criteria, causing the result of practical operation has very big randomness, there is certain operational risk.
For the risk of the above-mentioned more difficult powered Loop Closing Operation of analysis artificial in the prior art, so that powered Loop Closing Operation is reliable The problem of property is poor, not yet proposes effective solution at present.
The content of the invention
In view of this, can it is an object of the invention to provide a kind of cyclization powered operation methods of risk assessment and device Improve the risk of the artificial more difficult powered Loop Closing Operation of analysis in the prior art, asked so that powered Loop Closing Operation reliability is poor Topic.
To achieve these goals, the technical scheme that the embodiment of the present invention is used is as follows:
In a first aspect, the embodiments of the invention provide a kind of cyclization powered operation methods of risk assessment, including:
Obtain the network model of the power distribution network of pending cyclization powered operation;Wherein, network model includes opening up for power distribution network Flutter structure, and the device type in topological structure;
Determine position of the cyclization point in the topological structure of power distribution network;
According to the position of the network model of power distribution network and cyclization point, the Loop Closing Operation consequence value of power distribution network is determined;
The history data of power distribution network is searched from the power distribution network operation data storehouse pre-established;
According to history data, the cyclization threat probability values of power distribution network are determined;
According to Loop Closing Operation consequence value and cyclization threat probability values, the risk of the cyclization powered operation risk of power distribution network is determined Assessed value.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the first of first aspect, wherein, root According to the position of the network model of power distribution network and cyclization point, determining the Loop Closing Operation consequence value of power distribution network includes:
According to the position of the network model of power distribution network and cyclization point, the corresponding severity degree of cyclization powered operation is determined Value, social influence factors and the important sexual factor of load;
According to severity degree value, social influence factors and the important sexual factor of load, the Loop Closing Operation of power distribution network is determined Consequence value.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide second of first aspect Possible embodiment, wherein, according to the position of the network model of power distribution network and cyclization point, determine that cyclization powered operation is corresponding Severity degree value, social influence factors and the important sexual factor of load include:
According to the network model of power distribution network, the loss load of power distribution network, and the corresponding basic score value of loss load are determined And coefficient of region;Basic score value is multiplied with coefficient of region, obtained product value is tight as the corresponding consequence of cyclization powered operation Weight degree value;
According to the network model of power distribution network, determine that power supply quantity, user class and the user's power failure of power distribution network are quick Sensitivity;Corresponding load importance is determined according to the power supply quantity of power distribution network, user class and user's power failure susceptibility Factor;
Directly searched from the social influence database pre-established corresponding with the important sexual factor of load social influence because Element.
With reference to the first possible embodiment of first aspect, the embodiments of the invention provide the third of first aspect Possible embodiment, wherein, according to severity degree value, social influence factors and the important sexual factor of load, determine distribution The Loop Closing Operation consequence value of net includes:
Severity degree value, social influence factors are multiplied with the important sexual factor of load, obtained product value as with The Loop Closing Operation consequence value of power network.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 4th of first aspect kind, wherein, go through The device type factor of history service data including power distribution network, fault category factor, historical data statistical considerations, weather influence because Element, equipment deficiency influence factor, overhaul management factor, repair time factor, site operation factor and control measure factor;
According to history data, determining the cyclization threat probability values of power distribution network includes:
The device type factor, fault category factor, historical data of power distribution network included by history data are counted Factor, weather influence factor, equipment deficiency influence factor, overhaul management factor, repair time factor, site operation factor and control Measure factor processed is multiplied, obtained product value as power distribution network cyclization threat probability values.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 5th of first aspect kind, wherein, root According to Loop Closing Operation consequence value and cyclization threat probability values, the risk assessment value bag of the cyclization powered operation risk of power distribution network is determined Include:
Loop Closing Operation consequence value is multiplied with cyclization threat probability values, obtained product value is powered as the cyclization of power distribution network The risk assessment value of operational risk.
With reference in a first aspect, the embodiments of the invention provide the possible embodiment of the 6th of first aspect kind, wherein, side Method also includes:
Table is divided according to risk class set in advance, the corresponding risk class of risk assessment value is determined, so that work people Member judges whether to cyclization powered operation according to risk class.
Second aspect, the embodiment of the present invention also provides a kind of cyclization powered operation risk assessment device, including:
Model acquisition module, the network model of the power distribution network for obtaining pending cyclization powered operation;Wherein, network mould Type includes the topological structure of power distribution network, and the device type in topological structure;
Position determination module, for determining position of the cyclization point in the topological structure of power distribution network;
Consequence value determining module, for the position of the network model according to power distribution network and cyclization point, determines the conjunction of power distribution network Ring operates consequence value;
Data search module, the history run number for searching power distribution network from the power distribution network operation data storehouse pre-established According to;
Probable value determining module, for according to history data, determining the cyclization threat probability values of power distribution network;
Assessed value determining module, for according to Loop Closing Operation consequence value and cyclization threat probability values, determining the conjunction of power distribution network The risk assessment value of ring powered operation risk.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of the first of second aspect, wherein, after Fruit value determining module includes:
First determining unit, for the position of the network model according to power distribution network and cyclization point, determines cyclization powered operation Corresponding severity degree value, social influence factors and the important sexual factor of load;
Second determining unit, according to severity degree value, social influence factors and the important sexual factor of load, determines distribution The Loop Closing Operation consequence value of net.
With reference to second aspect, the embodiments of the invention provide the possible embodiment of second of second aspect, wherein, dress Putting also includes:
Risk class determining module, for dividing table according to risk class set in advance, determines risk assessment value correspondence Risk class so that staff judges whether to cyclization powered operation according to risk class.
The embodiments of the invention provide a kind of cyclization powered operation methods of risk assessment and device, by obtaining pending conjunction The network model of the power distribution network of ring powered operation, and determine position of the cyclization point in power distribution network, to can determine power distribution network Loop Closing Operation consequence value;By searching the history data of power distribution network, the cyclization threat probability values of power distribution network are can determine;Root Risk assessment value of the power distribution network in cyclization powered operation can be obtained according to Loop Closing Operation consequence value and cyclization threat probability values. With the risk of the artificial more difficult powered Loop Closing Operation of analysis in the prior art so that the problem of powered Loop Closing Operation reliability is poor phase It can determine that power distribution network is powered behaviour in cyclization according to the network model and history data of power distribution network than, the embodiment of the present invention Risk assessment value in work, this mode can make risk assessment more rationality objective, to perform the work of cyclization powered operation Personnel provide reliable risk assessment data as reference, and then improve the reliability of the powered Loop Closing Operation of power distribution network.
Other features and advantages of the present invention will be illustrated in the following description, also, partly be become from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims And specifically noted structure is realized and obtained in accompanying drawing.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before creative work is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 shows a kind of cyclization powered operation methods of risk assessment flow chart that the embodiment of the present invention is provided;
Fig. 2 shows a kind of idiographic flow for cyclization powered operation methods of risk assessment that the embodiment of the present invention is provided Figure;
Fig. 3 shows a kind of structural representation for cyclization powered operation risk assessment device that the embodiment of the present invention is provided Figure;
Fig. 4 shows that a kind of concrete structure for cyclization powered operation risk assessment device that the embodiment of the present invention is provided shows It is intended to.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with accompanying drawing to the present invention Technical scheme be clearly and completely described, it is clear that described embodiment is a part of embodiment of the invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belongs to the scope of protection of the invention.
At present when not had a power failure the powered Loop Closing Operation for turning electricity to power distribution network, mostly by the warp of relevant staff Analysis is tested, judgment bias not only easily occurs, and lacks the analysis of quantization, due to not having systematic theoretical calculation scheme and commenting Estimate standard, causing the result of practical operation has very big randomness, there is certain operational risk.Based on this, A kind of cyclization powered operation methods of risk assessment and device that inventive embodiments are provided, can provide the numerical procedure of theory, energy Enough make risk assessment more rationality objective, the staff for execution cyclization powered operation provides reliable risk assessment data As reference, and then improve the reliability of the powered Loop Closing Operation of power distribution network.The embodiment of the present invention is described in detail below.
Embodiment one:
A kind of cyclization powered operation methods of risk assessment flow chart shown in Figure 1, the appraisal procedure is mainly used in matching somebody with somebody Power network;Including:
Step S102, obtains the network model of the power distribution network of pending cyclization powered operation;Wherein, network model includes matching somebody with somebody The topological structure of power network, and the device type in topological structure;Specifically, from being prerecorded with matching somebody with somebody for power distribution network information The identity information or mark of the power distribution network are inputted in electric network database, to transfer the network model of power distribution network.Wherein, distribution netting index The IEC61850 specifications that can be formulated according to storehouse according to International Electrotechnical Commission are pre-established, and it is 1) object-oriented modeling that its is specific; 2) Abstract Common Service Interface;3) towards real-time service;4) configuration language;5) whole power system unified Modeling.Simultaneously can To cause the network model of power distribution network to visualize using SVG common image standards.And realized when setting up distribution network database Platform software is automatic to change electric network model from distribution SCADA/EMS systems, realizes that parameter and model are non-maintaining.
Step S104, determines position of the cyclization point in the topological structure of power distribution network;
Step S106, according to the position of the network model of power distribution network and cyclization point, determines the Loop Closing Operation consequence of power distribution network Value;
Step S108, searches the history data of power distribution network from the power distribution network operation data storehouse pre-established;Specifically For according to the network model of power distribution network, the history run number of power distribution network is searched from the power distribution network operation data storehouse pre-established According to.The history data of the power distribution network, and real-time update are recorded in the power distribution network operation data storehouse.Power distribution network is provided with many Individual monitoring point, monitoring point can send the service data collected to server, to update the power distribution network stored in server Transportation database.
Step S110, according to history data, determines the cyclization threat probability values of power distribution network;
Step S112, according to Loop Closing Operation consequence value and cyclization threat probability values, determines the cyclization powered operation of power distribution network The risk assessment value of risk.
In the above method of the present embodiment, the network model of the power distribution network by obtaining pending cyclization powered operation, with And determine position of the cyclization point in power distribution network, to can determine the Loop Closing Operation consequence value of power distribution network;By searching power distribution network History data, can determine the cyclization threat probability values of power distribution network;According to Loop Closing Operation consequence value and cyclization risk probability Value can obtain risk assessment value of the power distribution network in cyclization powered operation.With the artificial powered conjunction of more difficult analysis in the prior art The risk of ring operation, so that powered Loop Closing Operation reliability is compared the problem of poor, the embodiment of the present invention can be according to power distribution network Network model and history data determine risk assessment value of the power distribution network in cyclization powered operation, this mode is provided Theoretical numerical procedure, can make the risk assessment more rationality objective, be provided for the staff that performs cyclization powered operation Reliable risk assessment data improves the reliability of the powered Loop Closing Operation of power distribution network as reference.
A kind of particular flow sheet of cyclization powered operation methods of risk assessment shown in Figure 2, including:
Step S202, obtains the network model of the power distribution network of pending cyclization powered operation;Wherein, network model includes matching somebody with somebody The topological structure of power network, and the device type in topological structure;
Step S204, determines position of the cyclization point in the topological structure of power distribution network;
Step S206, according to the position of the network model of power distribution network and cyclization point, after determining that cyclization powered operation is corresponding Fruit severity values, social influence factors and the important sexual factor of load;
Wherein, severity degree value, social influence factors and the important sexual factor of load are numerical value, and it was specifically determined Journey can refer to as described below:
According to the network model of power distribution network, the loss load of power distribution network, and the corresponding basic score value of loss load are determined And coefficient of region;Basic score value is multiplied with coefficient of region, obtained product value is tight as the corresponding consequence of cyclization powered operation Weight degree value.Specifically, benchmark score value, point of severity degree can be used as by the 50 points of calculating of every 1 megawatt of loss load Value is multiplied by coefficient of region with basic score value and drawn.
According to the network model of power distribution network, determine that power supply quantity, user class and the user's power failure of power distribution network are quick Sensitivity;Corresponding load importance is determined according to the power supply quantity of power distribution network, user class and user's power failure susceptibility Factor;For the load importance factors of responsible consumer, with reference to power supply quantity, whether configuration backup auto-activating device, whether match somebody with somebody Emergency power supply, user are put to factors such as susceptibility, the responsible consumer ranks of power failure from 1.6~4.0 values, user gets over for power failure It is sensitive, have a power failure after the social influence that causes it is bigger the factor value it is bigger.
Directly searched from the social influence database pre-established corresponding with the important sexual factor of load social influence because Element.Wherein, record has the social influence factors corresponding with the important sexual factor of load in social influence database, it will be understood that The important sexual factor of load is higher, and corresponding social influence factors are bigger.
Step S208, severity degree value, social influence factors are multiplied with the important sexual factor of load, obtained product It is worth the Loop Closing Operation consequence value as power distribution network;That is,
The Loop Closing Operation consequence value=important sexual factor of severity degree value * social influence factors * loads
Step S210, searches the history data of power distribution network from the power distribution network operation data storehouse pre-established;History The device type factor of service data including power distribution network, fault category factor, historical data statistical considerations, weather influence factor, Equipment deficiency influence factor, overhaul management factor, repair time factor, site operation factor and control measure factor;
Step S212, by the device type factor, fault category factor, history of the power distribution network included by history data Data statistics factor, weather influence factor, equipment deficiency influence factor, overhaul management factor, repair time factor, site operation Factor is multiplied with control measure factor, obtained product value as power distribution network cyclization threat probability values;That is,
The influence of cyclization threat probability values=device type factor * fault category factor * historical data statistical considerations * weather because Plain * equipment deficiencies influence factor * overhaul managements factor * repair time factor * site operation factor * control measure factors
The acquisition of above-mentioned history data can refer to correlation technique realization, will not be repeated here.
Step S214, Loop Closing Operation consequence value is multiplied with cyclization threat probability values, and obtained product value is as power distribution network Cyclization powered operation risk risk assessment value;That is,
Risk assessment value=Loop Closing Operation consequence value * cyclization threat probability values
Step S216, divides table according to risk class set in advance, determines the corresponding risk class of risk assessment value, with Staff is set to judge whether to cyclization powered operation according to risk class.
For example, risk assessment value is divided as follows:
A. value-at-risk >=1200, are I grade of risk;
B.1200 ﹥ value-at-risk >=600, are II grade of risk;
C.600 ﹥ value-at-risk >=200, are III grade of risk.
These are only can divide other risk class forms in example, concrete application, such as rudimentary risk, intermediate wind Danger, senior risk, highest risk etc., will not be repeated here.
Risk evaluation result can more intuitively be shown to the powered cyclization behaviour of execution power distribution network by the division of risk class The relevant staff of work, can allow staff to have an entirety understanding to the risk for performing Loop Closing Operation, contribute to quick Decide whether to perform powered Loop Closing Operation.In addition, can further include in the above method according to risk class provide whether Perform the suggestion of powered cyclization powered operation.For example, when risk class is senior, then it is not recommended that performing powered cyclization data.
Further, the above method can also include generation cyclization powered operation Risk Assessment Report, and this report is sent To server so that server is analyzed and handled to this report, be easy to staff have to the running status of power distribution network into The understanding of one step, is adjusted according to this report to power distribution network, to lift the safety and reliability of distribution network operation, and then drops The low cyclization powered operation risk to the power distribution network.
In the above method of the present embodiment, carrying out theory analysis by specific data, there is provided detailed theoretical calculation Scheme and evaluation criteria, assessment mode more rationality are objective, and are easy to the understanding power distribution network of relevant staff's quicklook Cyclization powered operation risk, and then judge whether perform cyclization powered operation, improve the reliability of powered Loop Closing Operation.
Embodiment two:
For a kind of cyclization powered operation methods of risk assessment provided in embodiment 1, the embodiments of the invention provide A kind of cyclization powered operation risk assessment device, a kind of structure of cyclization powered operation risk assessment device shown in Figure 3 Schematic diagram, the device is included with lower module:
Model acquisition module 302, the network model of the power distribution network for obtaining pending cyclization powered operation;Wherein, net Network model includes the topological structure of power distribution network, and the device type in topological structure;
Position determination module 304, for determining position of the cyclization point in the topological structure of power distribution network;
Consequence value determining module 306, for the position of the network model according to power distribution network and cyclization point, determines power distribution network Loop Closing Operation consequence value;
Data search module 308, the history fortune for searching power distribution network from the power distribution network operation data storehouse pre-established Row data;Specifically, for the network model according to power distribution network, distribution is searched from the power distribution network operation data storehouse pre-established The history data of net.
Probable value determining module 310, for according to history data, determining the cyclization threat probability values of power distribution network;
Assessed value determining module 312, for according to Loop Closing Operation consequence value and cyclization threat probability values, determining power distribution network The risk assessment value of cyclization powered operation risk.
In the said apparatus of the present embodiment, the distribution of pending cyclization powered operation is obtained by model acquisition module 302 The network model of net, and position of the cyclization point in power distribution network is determined by position determination module 304, can be true by consequence value Cover half block 306 determines the Loop Closing Operation consequence value of power distribution network;The history run number of power distribution network is searched by data search module 308 According to, can make probable value determining module 310 determine power distribution network cyclization threat probability values;Finally by assessed value determining module 312 Risk assessment of the power distribution network in cyclization powered operation can be obtained according to Loop Closing Operation consequence value and cyclization threat probability values Value.With the risk of the artificial more difficult powered Loop Closing Operation of analysis in the prior art, asked so that powered Loop Closing Operation reliability is poor Topic is compared, and the embodiment of the present invention can determine that power distribution network is supplied in cyclization according to the network model and history data of power distribution network Risk assessment value in electrically operated, this way provides theoretical numerical procedure, can make risk assessment more rationality objective, Staff for execution cyclization powered operation provides reliable risk assessment data as reference, and then improves power distribution network The reliability of powered Loop Closing Operation.
On the basis of Fig. 3, a kind of concrete structure of cyclization powered operation risk assessment device shown in Figure 4 is illustrated Figure, wherein,
Consequence value determining module 306 includes:
First determining unit 3061, for the position of the network model according to power distribution network and cyclization point, determines that cyclization is powered Operate corresponding severity degree value, social influence factors and the important sexual factor of load;
Second determining unit 3062, according to severity degree value, social influence factors and the important sexual factor of load, it is determined that The Loop Closing Operation consequence value of power distribution network.
Said apparatus also includes:Risk class determining module 402, for dividing table according to risk class set in advance, The corresponding risk class of risk assessment value is determined, is powered behaviour so that staff judges whether to cyclization according to risk class Make.
The technique effect of the device that the present embodiment is provided, its realization principle and generation is identical with previous embodiment, is letter Describe, device embodiment part does not refer to part, refers to corresponding contents in preceding method embodiment.
The computer program production of a kind of cyclization powered operation methods of risk assessment and device that the embodiment of the present invention is provided Product, including the computer-readable recording medium of program code is stored, the instruction that described program code includes can be used for before performing Method described in the embodiment of the method for face, implements and can be found in embodiment of the method, will not be repeated here.
In addition, in the description of the embodiment of the present invention, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
If the function is realized using in the form of SFU software functional unit and is used as independent production marketing or in use, can be with It is stored in a computer read/write memory medium.Understood based on such, technical scheme is substantially in other words The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, including some instructions are to cause a computer equipment (can be individual People's computer, server, or network equipment etc.) perform all or part of step of each of the invention embodiment methods described. And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
Finally it should be noted that:Embodiment described above, is only the embodiment of the present invention, to illustrate the present invention Technical scheme, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those within the art that:Any one skilled in the art The invention discloses technical scope in, it can still modify to the technical scheme described in previous embodiment or can be light Change is readily conceivable that, or equivalent substitution is carried out to which part technical characteristic;And these modifications, change or replacement, do not make The essence of appropriate technical solution departs from the spirit and scope of technical scheme of the embodiment of the present invention, should all cover the protection in the present invention Within the scope of.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. a kind of cyclization powered operation methods of risk assessment, it is characterised in that including:
Obtain the network model of the power distribution network of pending cyclization powered operation;Wherein, the network model includes the power distribution network Topological structure, and the device type in the topological structure;
Determine position of the cyclization point in the topological structure of the power distribution network;
According to the position of the network model of the power distribution network and cyclization point, the Loop Closing Operation consequence of the power distribution network is determined Value;
The history data of the power distribution network is searched from the power distribution network operation data storehouse pre-established;
According to the history data, the cyclization threat probability values of the power distribution network are determined;
According to the Loop Closing Operation consequence value and the cyclization threat probability values, the cyclization powered operation wind of the power distribution network is determined The risk assessment value of danger.
2. according to the method described in claim 1, it is characterised in that according to the network model of the power distribution network and cyclization point Position, determining the Loop Closing Operation consequence value of the power distribution network includes:
According to the position of the network model of the power distribution network and cyclization point, determine that the corresponding consequence of cyclization powered operation is serious Degree value, social influence factors and the important sexual factor of load;
According to the severity degree value, the social influence factors and the important sexual factor of the load, the distribution is determined The Loop Closing Operation consequence value of net.
3. method according to claim 2, it is characterised in that according to the network model of the power distribution network and cyclization point Position, determine that the corresponding severity degree value of cyclization powered operation, social influence factors and the important sexual factor of load include:
According to the network model of the power distribution network, the loss load of the power distribution network is determined, and the loss load is corresponding Basic score value and coefficient of region;The basic score value is multiplied with the coefficient of region, obtained product value is used as the cyclization The corresponding severity degree value of powered operation;
According to the network model of the power distribution network, determine that power supply quantity, user class and the user of the power distribution network stop Electrically susceptible sensitivity;Determined according to the power supply quantity of the power distribution network, user class and user's power failure susceptibility corresponding negative Sexual factor is wanted in loading;
Directly searched from the social influence database pre-established corresponding with the important sexual factor of load social influence because Element.
4. method according to claim 2, it is characterised in that according to the severity degree value, the social influence Factor and the important sexual factor of the load, determining the Loop Closing Operation consequence value of the power distribution network includes:
The severity degree value, the social influence factors are multiplied with the important sexual factor of the load, obtained product It is worth the Loop Closing Operation consequence value as the power distribution network.
5. according to the method described in claim 1, it is characterised in that the equipment that the history data includes the power distribution network Type factor, fault category factor, historical data statistical considerations, weather influence factor, equipment deficiency influence factor, overhaul management Factor, repair time factor, site operation factor and control measure factor;
According to the history data, determining the cyclization threat probability values of the power distribution network includes:
By the device type factor of the power distribution network included by the history data, the fault category factor, described It is historical data statistical considerations, the weather influence factor, the equipment deficiency influence factor, the overhaul management factor, described Repair time factor, the site operation factor are multiplied with the control measure factor, and obtained product value is used as the distribution The cyclization threat probability values of net.
6. according to the method described in claim 1, it is characterised in that according to the Loop Closing Operation consequence value and the cyclization risk Probable value, determining the risk assessment value of the cyclization powered operation risk of the power distribution network includes:
The Loop Closing Operation consequence value is multiplied with the cyclization threat probability values, obtained product value is used as the power distribution network The risk assessment value of cyclization powered operation risk.
7. according to the method described in claim 1, it is characterised in that methods described also includes:
Table is divided according to risk class set in advance, the corresponding risk class of the risk assessment value is determined, so that work people Member judges whether to cyclization powered operation according to the risk class.
8. a kind of cyclization powered operation risk assessment device, it is characterised in that including:
Model acquisition module, the network model of the power distribution network for obtaining pending cyclization powered operation;Wherein, the network mould Type includes the topological structure of the power distribution network, and the device type in the topological structure;
Position determination module, for determining position of the cyclization point in the topological structure of the power distribution network;
Consequence value determining module, for the position of the network model according to the power distribution network and cyclization point, it is determined that described match somebody with somebody The Loop Closing Operation consequence value of power network;
Data search module, the history run number for searching the power distribution network from the power distribution network operation data storehouse pre-established According to;
Probable value determining module, for according to the history data, determining the cyclization threat probability values of the power distribution network;
Assessed value determining module, for according to the Loop Closing Operation consequence value and the cyclization threat probability values, it is determined that described match somebody with somebody The risk assessment value of the cyclization powered operation risk of power network.
9. device according to claim 8, it is characterised in that the consequence value determining module includes:
First determining unit, for the position of the network model according to the power distribution network and cyclization point, determines that cyclization is powered Operate corresponding severity degree value, social influence factors and the important sexual factor of load;
Second determining unit, according to the severity degree value, the social influence factors and the important sexual factor of the load, Determine the Loop Closing Operation consequence value of the power distribution network.
10. device according to claim 8, it is characterised in that described device also includes:
Risk class determining module, for dividing table according to risk class set in advance, determines the risk assessment value correspondence Risk class so that staff judges whether to cyclization powered operation according to the risk class.
CN201710251889.4A 2017-04-17 2017-04-17 Cyclization powered operation methods of risk assessment and device Pending CN107038653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710251889.4A CN107038653A (en) 2017-04-17 2017-04-17 Cyclization powered operation methods of risk assessment and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710251889.4A CN107038653A (en) 2017-04-17 2017-04-17 Cyclization powered operation methods of risk assessment and device

Publications (1)

Publication Number Publication Date
CN107038653A true CN107038653A (en) 2017-08-11

Family

ID=59535644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710251889.4A Pending CN107038653A (en) 2017-04-17 2017-04-17 Cyclization powered operation methods of risk assessment and device

Country Status (1)

Country Link
CN (1) CN107038653A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108304613A (en) * 2017-12-26 2018-07-20 贵州电网有限责任公司 Closed loop network powered operation methods of risk assessment
CN108711851A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 A method of assessment medium voltage distribution network Loop Closing Operation safety
CN109005074A (en) * 2018-09-17 2018-12-14 广东电网有限责任公司 It is connected to the network two-dimensional code generation method, network failure lookup method and device
CN109858823A (en) * 2019-02-15 2019-06-07 广东电网有限责任公司 Main distribution, which has a power failure, plans selection method and device
CN112232696A (en) * 2020-10-29 2021-01-15 广东电网有限责任公司 Management and control method and management and control device for distribution network loop closing operation risk
CN112434946A (en) * 2020-11-25 2021-03-02 国网湖北省电力有限公司咸宁供电公司 Power distribution network loop closing risk value calculation method, equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003162595A (en) * 2001-11-26 2003-06-06 Osaka Gas Co Ltd Activity evaluation system and method
JP2010161913A (en) * 2009-01-09 2010-07-22 Toshiba Corp System and method for design evaluation support of receiving-transformation equipment system
CN102521497A (en) * 2011-12-05 2012-06-27 广东省电力调度中心 Method and system for handling power grid operation risk
CN104156881A (en) * 2014-06-20 2014-11-19 天津大学 Comprehensive power distribution network fault risk assessment method
CN104299116A (en) * 2014-11-14 2015-01-21 国家电网公司 Quantitative evaluation method for security risk of operation of power network
CN105488740A (en) * 2015-12-17 2016-04-13 深圳供电局有限公司 Method and system for evaluating risk grade of operation mode of urban power distribution network

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003162595A (en) * 2001-11-26 2003-06-06 Osaka Gas Co Ltd Activity evaluation system and method
JP2010161913A (en) * 2009-01-09 2010-07-22 Toshiba Corp System and method for design evaluation support of receiving-transformation equipment system
CN102521497A (en) * 2011-12-05 2012-06-27 广东省电力调度中心 Method and system for handling power grid operation risk
CN104156881A (en) * 2014-06-20 2014-11-19 天津大学 Comprehensive power distribution network fault risk assessment method
CN104299116A (en) * 2014-11-14 2015-01-21 国家电网公司 Quantitative evaluation method for security risk of operation of power network
CN105488740A (en) * 2015-12-17 2016-04-13 深圳供电局有限公司 Method and system for evaluating risk grade of operation mode of urban power distribution network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐鹤: "10kV配电网合环转电风险评估方法研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
罗玉春等: "基于EMS的地区电网合环风险评估系统", 《江苏电机工程》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108304613A (en) * 2017-12-26 2018-07-20 贵州电网有限责任公司 Closed loop network powered operation methods of risk assessment
CN108711851A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 A method of assessment medium voltage distribution network Loop Closing Operation safety
WO2019233437A1 (en) * 2018-06-05 2019-12-12 国网上海市电力公司 Method for evaluating security of closed-loop operation of medium-voltage distribution network
CN108711851B (en) * 2018-06-05 2020-06-16 国网上海市电力公司 Method for evaluating safety of medium-voltage distribution network closed-loop operation
CN109005074A (en) * 2018-09-17 2018-12-14 广东电网有限责任公司 It is connected to the network two-dimensional code generation method, network failure lookup method and device
CN109858823A (en) * 2019-02-15 2019-06-07 广东电网有限责任公司 Main distribution, which has a power failure, plans selection method and device
CN112232696A (en) * 2020-10-29 2021-01-15 广东电网有限责任公司 Management and control method and management and control device for distribution network loop closing operation risk
CN112434946A (en) * 2020-11-25 2021-03-02 国网湖北省电力有限公司咸宁供电公司 Power distribution network loop closing risk value calculation method, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN107038653A (en) Cyclization powered operation methods of risk assessment and device
CN105305444B (en) The alarm of distribution comprehensive intelligent and processing method based on allotment integration
CN103701212B (en) A kind of method for monitoring and analyzing for safety and stability control device of electric network and system
CN105245185B (en) A kind of area distribution formula photovoltaic fault diagnosis system and method for accessing power distribution network
CN102938587B (en) Intelligent power grid safety and stability early-warning and control method
CN104331844B (en) A kind of power network construction project investment decision method
WO2019242657A1 (en) Micro-grid reconstruction method and apparatus, micro-grid protection control center, and storage medium
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN102904333B (en) Spare power automatic switching simulation method of power grid
CN107989753A (en) A kind of wind power plant wind power generating set monitoring system and monitoring method based on exploitation map
CN108182485A (en) A kind of power distribution network maintenance opportunity optimization method and system
CN113746138A (en) Energy storage intelligent energy management system applied to wind storage power station
CN106067081A (en) The ground integrated associating methods of risk assessment of a kind of province
CN110676839A (en) Method and system for evaluating reliability of alternating current-direct current hybrid power distribution network
CN111667143A (en) Method for realizing fusion of real-time monitoring data and service management data in power grid dispatching
CN109462223A (en) A kind of power quality and analysis method for reliability based on big data
CN104299056A (en) Distribution network planning basic technology supporting platform
CN108596450B (en) Power grid risk early warning method and system
Wu et al. Preventive control strategy for an island power system that considers system security and economics
CN106329515B (en) A kind of horizontal determination method of electric network reliability based on static reliability probability level
CN107749623B (en) Single-bus tripping and load loss accident grade determination method in double-bus connection mode
CN106444589A (en) 30-degree phase angle difference distributing line loop closing and opening operation system
CN116522746A (en) Power distribution hosting method for high-energy-consumption enterprises
CN104751281B (en) A kind of automatic operating evaluation method of Zinc-Oxide Arrester equipment
Wu et al. Study on risk assessment system of power failure in distribution network of large cities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Fu Jinsheng

Inventor after: Han Zhengmu

Inventor after: Ren Liang

Inventor after: Gao Shunshan

Inventor after: Yu Xiaozhou

Inventor after: Wu Xiaohu

Inventor after: Liang Xiaoyan

Inventor after: Chen Yong

Inventor after: Deng Yunzhao

Inventor after: Guo Yucuan

Inventor after: Yin Yanlin

Inventor after: Zhang Wanju

Inventor after: Hou Yunhong

Inventor before: Fu Jinsheng

Inventor before: Han Zhengmu

Inventor before: Ren Liang

Inventor before: Gao Shunshan

Inventor before: Yu Xiaozhou

Inventor before: Wu Xiaohu

Inventor before: Liang Xiaoyan

Inventor before: Chen Yong

Inventor before: Deng Yunzhao

Inventor before: Guo Yucuan

Inventor before: Yin Yanlin

Inventor before: Zhang Wanju

Inventor before: Hou Yunhong

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811