CN107026802A - A kind of method for managing resource and equipment - Google Patents

A kind of method for managing resource and equipment Download PDF

Info

Publication number
CN107026802A
CN107026802A CN201610071143.0A CN201610071143A CN107026802A CN 107026802 A CN107026802 A CN 107026802A CN 201610071143 A CN201610071143 A CN 201610071143A CN 107026802 A CN107026802 A CN 107026802A
Authority
CN
China
Prior art keywords
vnf
capacity
resource
success rate
dilatation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610071143.0A
Other languages
Chinese (zh)
Other versions
CN107026802B (en
Inventor
陈立福
徐日东
张文革
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201610071143.0A priority Critical patent/CN107026802B/en
Priority to PCT/CN2017/071273 priority patent/WO2017128979A1/en
Publication of CN107026802A publication Critical patent/CN107026802A/en
Application granted granted Critical
Publication of CN107026802B publication Critical patent/CN107026802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The embodiments of the invention provide a kind of method for managing resource and equipment, this method includes:Asset management device obtains the state parameter for multiple VNF that E2E networks include, the first resource capacity according to needed for the state parameter determines the first VNF to be expanded and dilatation from the plurality of VNF;If the idling-resource capacity of resource pool is less than the first resource capacity, the asset management device determines from the plurality of VNF that first treats capacity reducing VNF according to the state parameter, and first treats capacity reducing VNF progress capacity reducing processing to this according to the first resource capacity;If the asset management device to this first treat that capacity reducing VNF carries out capacity reducing processing after, the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, then the asset management device carries out dilatation processing to first VNF to be expanded.By the embodiment of the present invention can between each VNF of resource in E2E networks is ensured in the case that idling-resource is not enough equilibrium allocation, so as to improve the service success rate of resource utilization and E2E networks.

Description

A kind of method for managing resource and equipment
Technical field
The present invention relates to communication technical field, and in particular to a kind of method for managing resource and equipment.
Background technology
Traditional communication network is made up of diversified physical equipment, and different Networks needs different Physical equipment, with the rapid growth of network size, communication network becomes more and more huger and complexity, this Many problems are brought, the exploitation of such as Added Business is reached the standard grade more slowly, the O&M complexity and cost of system Higher, resource utilization is more low.
Network function virtualization (English:Network Function Virtualization, abbreviation:NFV) skill The proposition of art can be very good to solve the above problems, and NFV technologies can be understood as in telecommunication network system to make The function of each network element is from current specialized hardware platform migration to general commercial goods shelf productses (English: Commercial Off The Shelf, abbreviation:COTS) on server, by each network element in communication network It is transformed into independent application, and flexible deployment is in equipment such as measured server, storage and interchangers On the unified Infrastructure platform of structure.By virtualization technology can by general COTS calculating/storage/ The hardware devices such as network are decomposed into a variety of virtual resources, so that the various applications in upper strata are used, realize using with Decoupling between hardware.
End-to-end (English for having used NFV technologies:End To End, abbreviation:E2E) network, Relative to front end network element overload stream control, rear end network element overload stream control can cause more network resources wastes, E2E The service success rate of network is relatively low;And front end network element overload stream control, during the network element light load of rear end, due to negative Carry lighter network element resources to be not efficiently used, the service success rate of E2E networks can not also be maximized.Though The service success rate of E2E networks can be so improved by way of the direct dilatation of network element to crossing current-carrying control, but It is that this needs the idling-resource in resource pool more sufficient, and resource utilization now is not also high.
The content of the invention
, can be in the not enough feelings of idling-resource the embodiments of the invention provide a kind of method for managing resource and equipment Ensure equilibrium allocation between each VNF in E2E networks of resource under condition, thus improve resource utilization and The service success rate of E2E networks.
First aspect of the embodiment of the present invention provides a kind of method for managing resource, applied to E2E networks, the E2E Network includes multiple VNF and manages the asset management device of the plurality of VNF and resource pool, this method bag Include:
The asset management device obtains the plurality of VNF state parameter, according to the state parameter from the plurality of Dilatation object is determined in VNF, the first VNF to be expanded is designated as, and determine to first VNF to be expanded Resource capacity needed for dilatation, is designated as first resource capacity.
If the current idling-resource capacity of the resource pool does not reach the first resource capacity, the resource management Equipment selects VNF to carry out capacity reducing first, can be determined according to the state parameter from the plurality of VNF Capacity reducing object, is designated as first and treats capacity reducing VNF, and first treats capacity reducing VNF to this according to the first resource capacity Carry out capacity reducing processing.
If this first after after capacity reducing VNF capacity reducings, the idling-resource capacity of the resource pool reaches the first resource Capacity, then the asset management device can carry out dilatation processing to first VNF to be expanded, so as to Ensure equilibrium between each VNF of resource in E2E networks in the case of idling-resource deficiency in resource pool Configuration, and then improve resource utilization and the service success rate of E2E networks.
Optionally, the state parameter includes service success rate, and the asset management device can be according to the plurality of VNF Service success rate determine the first current service success rate of the E2E networks, if first service success rate Less than or equal to default first service success rate, then the asset management device is just more from this according to the state parameter The first resource capacity needed for the first VNF to be expanded and dilatation is determined in individual VNF, only in the E2E The resource when service success rate of network can not meet business demand just to the resource pool is reconfigured.
Optionally, the asset management device to this first treat capacity reducing VNF carry out capacity reducing processing after, or, First VNF to be expanded is carried out after dilatation processing, the plurality of VNF state ginseng can be obtained again Number, and the second current industry of the E2E networks is determined according to the plurality of VNF obtained again service success rate It is engaged in success rate, if now the service success rate of the E2E networks declines obvious, i.e. second service success rate Less than first service success rate, and first service success rate subtracts the difference of second service success rate More than or equal to default first numerical value, then the asset management device is recalled first treats what capacity reducing VNF was carried out to this Capacity reducing processing is handled the first VNF to be expanded dilatations carried out, and capacity reducing processing and dilatation can be handled Retracted, be effectively improved the situation for causing E2E network states to be deteriorated after resource is reconfigured.
Optionally, the asset management device to this first treat capacity reducing VNF carry out capacity reducing processing after, or, First VNF to be expanded is carried out after dilatation processing, failed to understand in the service success rate lifting of the E2E networks When aobvious, i.e., second service success rate is more than or equal to first service success rate, and second business success The difference that rate subtracts first service success rate is less than or equal to default second value, or, in the E2E nets When the service success rate of network has small size decline, i.e., second service success rate is less than first service success rate, And first service success rate subtracts the difference of second service success rate less than or equal to default third value, The asset management device can be delayed preset duration, wait E2E networks to be carried out again after entering steady-working state Resource is reconfigured, and can improve the degree of accuracy that resource is reconfigured, and further improves resource utilization and E2E The service success rate of network.
Optionally, the asset management device to this first treat capacity reducing VNF carry out capacity reducing processing after, the money , can be according to the state parameter again when the idling-resource capacity in source pond is still reached to less than the first resource capacity Select capacity reducing object, be designated as second and treat capacity reducing VNF, and idling-resource capacity according to the resource pool and this One resource capacity second treats capacity reducing VNF capacity reducings to this, this second treat capacity reducing VNF capacity reducings after, if The idling-resource capacity of the resource pool has reached the first resource capacity, then the asset management device to this first VNF to be expanded carry out resource pool after time capacity reducing of dilatation processing, i.e., one idling-resource it is still not enough when can be after Continuous selection VNF capacity reducings, untill the idling-resource capacity of resource pool after capacity reducing reaches requirement.
Optionally, the state parameter includes resources occupation rate, service success rate, service priority and network position Put, the asset management device determined according to the state parameter from the plurality of VNF the first VNF to be expanded and The concrete mode of first resource capacity needed for dilatation can be:
The VNF that the state parameter in the plurality of VNF is met to default dilatation condition is to be expanded as first VNF, and the first resource capacity according to needed for the state parameter of first VNF to be expanded determines dilatation.
Wherein, the default dilatation condition includes the one or more in following dilatation condition:
The resources occupation rate is more than or equal to default first resource occupancy, and the service success rate is less than or equal to Default second service success rate, the service priority is more than or equal to default first service priority, the network Position is rear end.
Optionally, the asset management device determines that first treats capacity reducing according to the state parameter from the plurality of VNF VNF concrete mode can be:
The state parameter in the plurality of VNF is met into the VNF for presetting capacity reducing condition as first and treats capacity reducing VNF。
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, and the service success rate is more than or equal to Default 3rd service success rate, the service priority is less than or equal to default second service priority, the network Position is front end.
Optionally, the asset management device first treats that capacity reducing VNF contracts according to the first resource capacity to this Holding the concrete mode of processing can be:Obtain this and first treat the VM running status run on capacity reducing VNF, Determined including CPU usage and RAM occupancies etc., and according to the first resource capacity and the running status VM to be closed, and the VM to be closed is closed, so that this first treats that capacity reducing VNF discharges part resource, To increase the idling-resource capacity of the resource pool.
Optionally, it is to the first VNF to be expanded concrete modes for carrying out dilatation processing:
VM is created on first VNF to be expanded and/or starts VM, and by the money of the first resource capacity Source is allocated to the VM of the establishment and/or VM of the startup.
Second aspect of the embodiment of the present invention provides a kind of asset management device, applied to E2E networks, the E2E Network includes multiple VNF and manages the asset management device of the plurality of VNF and resource pool, the equipment Including:
Acquisition module, the state parameter for obtaining the plurality of VNF.
Determining module, for determining dilatation object from the plurality of VNF according to the state parameter, is designated as One VNF to be expanded, and determine to the resource capacity needed for the first VNF dilatations to be expanded, it is designated as first Resource capacity.
The determining module, is additionally operable to not reach first resource appearance in the current idling-resource capacity of the resource pool In the case of amount, capacity reducing object is determined from the plurality of VNF according to the state parameter, first is designated as and waits to contract Hold VNF.
Capacity reducing module, for according to the first resource capacity to this first treat capacity reducing VNF carry out capacity reducing processing.
Dilatation module, for first after after capacity reducing VNF capacity reducings, the idling-resource capacity of the resource pool to reach at this In the case of the first resource capacity, dilatation processing is carried out to first VNF to be expanded, so as to Ensure equilibrium between each VNF of resource in E2E networks in the case of idling-resource deficiency in resource pool Configuration, and then improve resource utilization and the service success rate of E2E networks.
Optionally, the state parameter includes service success rate,
The determining module determines the first VNF to be expanded and dilatation according to the state parameter from the plurality of VNF The concrete mode of required first resource capacity can be:
The first current service success rate of the E2E networks is determined according to the plurality of VNF service success rate, and And in the case where first service success rate is less than or equal to default first service success rate, just according to the shape State parameter determines the first resource capacity needed for the first VNF to be expanded and dilatation from the plurality of VNF, Resource just to the resource pool i.e. only when the service success rate of the E2E networks can not meet business demand is entered Row is reconfigured.
Optionally,
The acquisition module, be additionally operable to this first treat capacity reducing VNF capacity reducings after, or, this is first to be expanded After VNF dilatations, the plurality of VNF state parameter is obtained again.
The determining module, is additionally operable to the plurality of VNF service success rate obtained again according to the acquisition module Determine the second current service success rate of the E2E networks.
Wherein, the equipment can also include:
Rollback module, for declining obvious, i.e. second business success in the service success rate of the E2E networks Rate is less than first service success rate, and first service success rate subtracts the difference of second service success rate In the case that value is more than or equal to default first numerical value, recalls and this first is treated at the capacity reducing that capacity reducing VNF is carried out Reason is handled the first VNF to be expanded dilatations carried out, and capacity reducing processing and dilatation can be handled back Move back, be effectively improved the situation for causing E2E network states to be deteriorated after resource is reconfigured.
Optionally, the equipment can also include:
Time delay module, for the E2E networks service success rate lifting it is unobvious, i.e., second business into Power is more than or equal to first service success rate, and second service success rate subtracts first business success The difference of rate is less than or equal to default second value, or, have slightly in the service success rate of the E2E networks Decline, i.e., second service success rate is less than first service success rate, and first service success rate is subtracted In the case that the difference of second service success rate is less than or equal to default third value, be delayed preset duration, Wait E2E networks to enter to carry out resource again after steady-working state and reconfigure, resource can be improved and matched somebody with somebody again The degree of accuracy put, further improves resource utilization and the service success rate of E2E networks.
Optionally,
The determining module, be additionally operable to this first treat capacity reducing VNF capacity reducings after, the idling-resource of the resource pool Capacity still reaches to, less than in the case of the first resource capacity, capacity reducing object be selected again according to the state parameter, It is designated as second and treats capacity reducing VNF.
The capacity reducing module, is additionally operable to idling-resource capacity and the first resource capacity according to the resource pool to this Second treats capacity reducing VNF capacity reducings.
The dilatation module, be additionally operable to this second treat capacity reducing VNF capacity reducings after, if the free time of the resource pool In the case that resource capacity has reached the first resource capacity, dilatation processing is carried out to first VNF to be expanded, It can continue to select VNF capacity reducings when the idling-resource of resource pool is still not enough after i.e. one time capacity reducing, until capacity reducing Untill the idling-resource capacity of resource pool reaches requirement afterwards.
Optionally, the state parameter includes resources occupation rate, service success rate, service priority and network position Put, the determining module determines the first VNF to be expanded and dilatation according to the state parameter from the plurality of VNF The concrete mode of required first resource capacity can be:
The VNF that the state parameter in the plurality of VNF is met to default dilatation condition is to be expanded as first VNF, and the first resource capacity according to needed for the state parameter of first VNF to be expanded determines dilatation.
Wherein, the default dilatation condition includes the one or more in following dilatation condition:
The resources occupation rate is more than or equal to default first resource occupancy, and the service success rate is less than or equal to Default second service success rate, the service priority is more than or equal to default first service priority, the network Position is rear end.
Optionally, the determining module determines that first treats capacity reducing VNF according to the state parameter from the plurality of VNF Concrete mode can be:
The state parameter in the plurality of VNF is met into the VNF for presetting capacity reducing condition as first and treats capacity reducing VNF。
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, and the service success rate is more than or equal to Default 3rd service success rate, the service priority is less than or equal to default second service priority, the network Position is front end.
Optionally, the capacity reducing module can specifically include:
Acquisition submodule, first the VM running status run on capacity reducing VNF is treated for obtaining this, including CPU usage and RAM occupancies etc..
Determination sub-module, for determining VM to be closed according to the first resource capacity and the running status.
Submodule is closed, for the VM to be closed to be closed, so that this first treats capacity reducing VNF releases part Resource, to increase the idling-resource capacity of the resource pool.
Optionally, the dilatation module can specifically include:
Start submodule, for creating VM on first VNF to be expanded and/or starting VM.
Configure submodule, for by the resource distribution of the first resource capacity to the VM of the establishment and/or this open Dynamic VM.
The third aspect of the embodiment of the present invention provides a kind of asset management device, applied to E2E networks, the E2E Network includes multiple VNF and manages the asset management device of the plurality of VNF and resource pool, the equipment Memory including processor, network interface and the executable program code that is stored with, the processor calls this to deposit The executable program code stored in reservoir, the state for obtaining the plurality of VNF by the network interface Parameter, dilatation object is determined according to the state parameter from the plurality of VNF, is designated as the first VNF to be expanded, And determine to the resource capacity needed for the first VNF dilatations to be expanded, it is designated as first resource capacity.
The processor, is additionally operable to not reach the first resource capacity in the current idling-resource capacity of the resource pool When, select VNF to carry out capacity reducing first, can be determined according to the state parameter from the plurality of VNF Capacity reducing object, is designated as first and treats capacity reducing VNF, and first treats capacity reducing VNF to this according to the first resource capacity Carry out capacity reducing processing.
The processor, is additionally operable at this first after after capacity reducing VNF capacity reducings, the idling-resource capacity of the resource pool When reaching the first resource capacity, dilatation processing is carried out to first VNF to be expanded, so as in resource Equilibrium is matched somebody with somebody between ensureing each VNF of resource in E2E networks in the case of idling-resource deficiency in pond Put, and then improve resource utilization and the service success rate of E2E networks.
Optionally, the state parameter includes service success rate, and the processor is according to the state parameter from the plurality of The concrete mode of the first VNF to be expanded and the first resource capacity needed for dilatation is determined in VNF to be:
The first current service success rate of the E2E networks is determined according to the plurality of VNF service success rate, such as Really first service success rate is less than or equal to default first service success rate, then just according to the state parameter from The first resource capacity needed for the first VNF to be expanded and dilatation is determined in the plurality of VNF, is only existed The resource when service success rate of the E2E networks can not meet business demand just to the resource pool is matched somebody with somebody again Put.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, And first according to needed for the state parameter determines the first VNF to be expanded and dilatation from the plurality of VNF Resource capacity;If the current idling-resource capacity of resource pool is less than the first resource capacity, the resource pipe Reason equipment determines that first treats capacity reducing VNF according to the state parameter from the plurality of VNF, and according to this first Resource capacity to this first treat capacity reducing VNF carry out capacity reducing processing, to discharge resource into the resource pool;If The asset management device to this first treat capacity reducing VNF carry out capacity reducing processing after, the idling-resource of the resource pool Capacity is more than or equal to the first resource capacity, then the asset management device is carried out to first VNF to be expanded Dilatation is handled, so as to ensure each in E2E networks of resource in the case where idling-resource is not enough Equilibrium allocation between VNF, and then improve resource utilization and the service success rate of E2E networks.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, institute in being described below to embodiment The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only the present invention Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of E2E network architecture schematic diagrams provided in an embodiment of the present invention;
Fig. 2 is a kind of IMS cloud networks structural representation provided in an embodiment of the present invention;
Fig. 3 is a kind of schematic flow sheet of method for managing resource provided in an embodiment of the present invention;
Fig. 4 is the schematic flow sheet of another method for managing resource provided in an embodiment of the present invention;
Fig. 5 is the schematic flow sheet of another method for managing resource provided in an embodiment of the present invention;
Fig. 6 is a kind of structural representation of asset management device provided in an embodiment of the present invention;
Fig. 7 is the structural representation of another asset management device provided in an embodiment of the present invention;
Fig. 8 is the structural representation of another asset management device provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of the invention, rather than Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creation Property work under the premise of the every other embodiment that is obtained, belong to the scope of protection of the invention.
Referring to Fig. 1, being a kind of E2E network architecture schematic diagrams provided in an embodiment of the present invention.The present embodiment Described in E2E networks, mainly include following functions component:
NFV infrastructure (English:NFV Infrastructure, abbreviation:NFVI), it is responsible for NFV's Virtualization needed for running offer calculates (English:Virtual Computing), virtualization storage (English: Virtual Storage) and virtualization network (English:Virtual Network) etc. virtual resources, including COTS computing hardware (English:Computing Hardware), storage hardware (English:Storage Hardware), the network hardware (English:Network Hardware) etc. bottom hardware, it is and hard to bottom Virtualization layer (the English that part is virtualized:Virtualization Layer).
Virtual network function (English:Virtual Network Function, abbreviation:VNF), refer in NFVI Network function (the English of upper operation:Network Function, abbreviation:NF software) realizes, can be with With assembly management system (English:Element Management System, abbreviation:EMS) it is used to manage Manage single VNF and its characteristic.VNF equivalent to network node entity, i.e., network element (English:Network Element, abbreviation:NE).
NFV is managed and layout (English:Management and Orchestration, abbreviation:MANO), It is responsible for layout, the life cycle management of the physics of support substrate hardware virtualization and/or software resource and VNF Life cycle management.NFV MANO can also be with (the English of the OSS outside NFV frameworks: Operational support system, abbreviation:OSS)/business support system (English:business support System, abbreviation:BSS) interaction, realizes that NFV is serviced according to OSS/BSS service request.
Wherein, the design method of above-mentioned functions component allows to reuse existing solution, such as IP multimedias Subsystem (English:IP Multimedia Subsystem, abbreviation:IMS), can also be with needing what is be connected to show There is OSS/BSS to interact.
Wherein, following functions component is defined inside NFV MANO:
NFV composers (English:NFV Orchestrator, abbreviation:NFVO), it is responsible for the life of Network Cycle management is ordered, Network layout is completed, and across multiple virtualized infrastructure managers (English: Virtualized Infrastructure Manager, abbreviation:VIM NFVI resource layouts).
VNF managers (English:VNF Manager, abbreviation:VNFM), it is responsible for the life of VNF examples Order cycle management, monitor VNF state parameter, such as VNF resources occupation rate, service success rate, Service priority etc., a VNFM, which can be corresponded to, manages single VNF examples or multiple identical or different classes The VNF examples of type, including:VNF is instantiated, VNF configuration NFVI resources, VNF examples update, VNF examples scaling, the termination of VNF examples etc..
VIM, is responsible for control and management NFVI calculating, storage and Internet resources, generally in an operator Infrastructure subdomain in.One VIM with special disposal class NFVI resources or be able to can be managed a variety of The NFVI resources of type, including:Configuration/upgrading/de-provision/recycling of layout NFVI resources, pipe Manage virtual resources (virtualization calculating, virtualization storage, virtualization network) and bottom hardware resource (meter Calculate hardware, storage hardware, the network hardware) association, management bottom hardware resource and software resource (for example Management program) catalogue.
On this basis, this building blocks of function of CTRL can also be defined inside NFV MANO, be can be described as Resource reconfiguration control module, is mainly responsible for realizing the resource reconfiguration algorithm between VNF so that NFVI Resource equilibrium allocation between each VNF.Wherein, this building blocks of function of CTRL can be separately provided, It can be integrally disposed in VNFM or VIM.
It should be noted that NFV MANO can be deployed in general physical network device or physical services On device;Virtual machine (English can also be deployed in:Virtual machine, abbreviation:VM on), such as VNF The VM of upper operation, the embodiment of the present invention is not limited.
So that the E2E networks shown in Fig. 1 are the IMS cloud networks shown in Fig. 2 as an example, the IMS cloud networks include Following network element:Session Border Controller (English:Session Border Controller, abbreviation:SBC), exhale It is conversation control function (English:Call Session Control Function, abbreviation:CSCF), ownership is used Family server (English:Home Subscriber Server, abbreviation:HSS), universal phonetic service server (English:Advanced Telephony Server, abbreviation:) and NFV MANO ATS.Wherein, SBC, CSCF, HSS and ATS are the VNF in the E2E network architectures shown in Fig. 1, and SBC is specially two (SBC1 and SBC2), SBC1, SBC2 are access side (i.e. front end) network element, CSCF, HSS and ATS For core side (i.e. rear end) network element, NFV MANO are deployed on asset management device, for monitor SBC1, SBC2, CSCF, HSS and ATS state parameter, user equipment (English:User Equipment, contracting Write:UE the IMS cloud networks) are accessed by SBC1 or SBC2, it is assumed that the resource pool of the IMS cloud networks Total resources it is certain.
The resource that the asset management device periodically obtains SBC1, SBC2, CSCF, HSS and ATS is accounted for With state parameters such as rate, service success rate, service priority, network sites, and according to SBC1, SBC2, CSCF, HSS and ATS service success rate determine the service success rate of the IMS cloud networks, if the IMS The service success rate of cloud network is less than a certain threshold value (such as 95%), then the asset management device can start pair The resource reconfiguration of the resource pool.Resource of the main angle from resources occupation rate to typical application scenarios below Reconfiguration course is illustrated.
Specifically, if sided access network element overloads, core side network element is idle, the resources occupation rate such as institute of table 1 Show:
Table 1
Network element SBC1 SBC2 CSCF HSS ATS
Resources occupation rate 100% 100% 40% 70% 50%
Then the asset management device can be determined according to the dilatation conditions described of step S302 in preceding embodiment SBC1 and SBC2 is dilatation object, it is assumed that the resource capacity needed for SBC1 and SBC2 dilatations is 4 Individual CPU and 3GB running memory (English:Random Access Memory, abbreviation:RAM), should The idling-resource capacity of resource pool is 1 CPU and 200M RAM, it is clear that idling-resource off-capacity without Method is described to SBC1 and SBC2 dilatations, the asset management device further according to step S303 in preceding embodiment Capacity reducing condition can determine that CSCF is capacity reducing object, to after CSCF capacity reducings if the idle of the resource pool provides Source capacity is still not enough, and now ATS resources occupation rate is minimum, then the asset management device is again to ATS Capacity reducing, until the idling-resource capacity of the resource pool after capacity reducing is more than or equal to 4 CPU and 3GB RAM When, the asset management device may then wait for after an observation cycle to SBC1 and SBC2 dilatations, then Judge the service success rate and/or sided access network element of the IMS cloud networks, core side network element state parameter whether The resource reconfiguration termination condition that step S409 is described in preceding embodiment is met, if it is satisfied, then end pair The resource reconfiguration of the resource pool;If be unsatisfactory for, the asset management device repeats aforesaid operations, The state parameter of service success rate and/or sided access network element, core side network element until the IMS cloud networks is met The resource reconfiguration termination condition.
It is similar, core side network element overload, the resources occupation rate such as institute of table 2 if sided access network element is idle Show:
Table 2
Network element SBC1 SBC2 CSCF HSS ATS
Resources occupation rate 70% 70% 80% 80% 100%
Then the asset management device can determine that ATS is dilatation object according to the dilatation condition, if the resource The idling-resource off-capacity in pond can not can further according to the capacity reducing condition to ATS dilatations, the asset management device Can be first capacity reducing SBC1 (or SBC2) to determine sided access network element SBC1 and SBC2 as capacity reducing object, If idling-resource capacity is still not enough after capacity reducing, then capacity reducing SBC2 (or SBC1), or, Ke Yishi The low SBC of service priority in first capacity reducing SBC1 and SBC2, if idling-resource capacity is still after capacity reducing Deficiency, the then high SBC of capacity reducing service priority again, until the idling-resource capacity after capacity reducing is more than or equal to To the resource capacity needed for ATS dilatations, and to ATS dilatations.
Similar, if core side network element overburden portion, part is idle, and resources occupation rate is as shown in table 3:
Table 3
Network element SBC1 SBC2 CSCF HSS ATS
Resources occupation rate 90% 90% 80% 30% 100%
Then the asset management device can determine that ATS is dilatation object according to the dilatation condition, if the resource The idling-resource off-capacity in pond can not can further according to the capacity reducing condition to ATS dilatations, the asset management device To determine core side network element HSS as capacity reducing object, if the idling-resource capacity after HSS capacity reducings is more than or waited Resource capacity needed for ATS dilatations, then to ATS dilatations.
Similar, if the resources occupation rate of sided access network element and core side network element is all very high, and all exist The network element of overload, resources occupation rate is as shown in table 4:
Table 4
Network element SBC1 SBC2 CSCF HSS ATS
Resources occupation rate 100% 100% 90% 90% 100%
Then the asset management device can determine that the network element ATS that core side is overloaded is dilatation according to the dilatation condition Object, if the idling-resource off-capacity of the resource pool can not to ATS dilatations, due to now core side its The resources occupation rate of its network element is also very high, and the asset management device can determine access further according to the capacity reducing condition Side network element SBC1 and SBC2 are capacity reducing object, can be first capacity reducing SBC1 (or SBC2), if capacity reducing Idling-resource capacity is still not enough afterwards, then capacity reducing SBC2 (or SBC1) again, or, can be first capacity reducing The low SBC of service priority in SBC1 and SBC2, if idling-resource capacity is still not enough after capacity reducing, The high SBC of capacity reducing service priority, expands ATS until the idling-resource capacity after capacity reducing is more than or equal to again Resource capacity needed for holding, and to ATS dilatations.
Similar, if the high network element of service priority is very high all in overload or resources occupation rate, Assuming that HSS service priority is minimum, resources occupation rate is as shown in table 5:
Table 5
Network element SBC1 SBC2 CSCF HSS ATS
Resources occupation rate 90% 90% 90% 90% 100%
Then the asset management device can determine that ATS is dilatation object according to the dilatation condition, if the resource The idling-resource off-capacity in pond can not to ATS dilatations, because HSS service priority is minimum, even if this When HSS resources occupation rate it is also very high, the asset management device can determine core further according to the capacity reducing condition Side network element HSS is capacity reducing object, if the idling-resource capacity after HSS capacity reducings is more than or equal to ATS Resource capacity needed for dilatation, then to ATS dilatations.
Referring to Fig. 3, a kind of money provided for the embodiment of the present invention based on the E2E network architectures shown in Fig. 1 The schematic flow sheet of power supply management method.Wherein, the E2E networks include multiple VNF and manage the plurality of VNF And the asset management device of resource pool, the method for managing resource described in the present embodiment, including:
S301, asset management device obtain multiple VNF state parameter.
Wherein, NFV MANO are deployed with the asset management device, the state parameter can include VNF Resources occupation rate (load).One or more VM is disposed on VNF, VNF can be one by this Or multiple VM complete corresponding Network, VNF according to the VM of deployment quantity, each VM's CPU usage and RAM occupancies, and the VNF parameter such as registration/Session Resources occupancy are calculated and come from The resources occupation rate of body;The portfolio, service success rate, business that the state parameter can also include input are excellent First level.The service priority can be stored in the asset management device, many for this by the asset management device Set during individual VNF distribution business.The state parameter can also include network site, and the asset management device can To determine positions of each VNF in E2E networks by the plurality of VNF sequencing according to business, Front end (accessing side) VNF and rear end (i.e. core side) VNF can be divided into, and set for each VNF Sequence identification is put, the asset management device stores the sequence identification, be that can determine that each according to the sequence identification Positions of the VNF in E2E networks.
Asked specifically, the asset management device periodically can send state parameter acquisition to the plurality of VNF Ask, and receive the plurality of VNF respond the state parameter obtain request and report resources occupation rate, business into The state parameters such as power, service priority, network site, the asset management device can also receive the plurality of The state parameter that VNF is periodically reported, wherein, the cycle can be specifically 10 seconds (English:S), 1 point Clock (English:Min) etc..
Meanwhile, the asset management device can also be periodically according to the E2E Internet resources pond (i.e. NFVI Resource) in CPU usage, the RAM occupancies etc. of bottom hardware obtain the resource occupation feelings of the resource pool Condition, to determine the idling-resource capacity in the resource pool, the cycle can be specifically 5s, 1min etc., the money The idling-resource that source control equipment obtains the cycle of the plurality of VNF state parameter with obtaining in the resource pool holds The cycle of amount can be with identical, can also be different, and for the occurrence embodiment of the present invention in the two cycles Do not limit.
S302, the asset management device determine that first is to be expanded according to the state parameter from the plurality of VNF VNF and the first resource capacity needed for dilatation.
Specifically, the asset management device determines the E2E networks according to the plurality of VNF service success rate First service success rate, first service success rate can be the product of the plurality of VNF service success rate, If first service success rate is less than or equal to default first service success rate (such as 90%), the resource Management equipment determines to start resource reconfiguration of this flow to the resource pool, and then will be somebody's turn to do in the plurality of VNF The VNF that state parameter meets default dilatation condition is used as dilatation object (being designated as the first VNF to be expanded).
Wherein, the default dilatation condition can include the one or more in following dilatation condition:Resource occupation Rate is more than or equal to default first resource occupancy (such as 90%), and service success rate is less than or equal to default the Two service success rates (such as 95%), service priority is more than or equal to default first service priority (i.e. industry Priority of being engaged in is higher), network site is rear end.If network site identical VNF has multiple, business The preferential dilatations of the high VNF of priority, for example, service success rate is less than or equal to the default second business success The VNF that rate and/or resources occupation rate are more than or equal to the default first resource occupancy has multiple, then preferential to expand Hold rear end VNF, if rear end VNF also has multiple, preferential dilatation service priority highest VNF.
Further, the asset management device determines dilatation institute according to the state parameter of first VNF to be expanded Need resource capacity (being designated as first resource capacity), specifically can according to resources occupation rate, service success rate, At least one determination in service priority and network site carries out dilatation needs to first VNF to be expanded First resource capacity, for example, resources occupation rate is higher, service success rate is lower, and service priority is higher, VNF positioned at rear end is more to the first resource capacity needed for its dilatation.Usually, the first resource holds Amount can be the capacity of the resources such as CPU, RAM required when related software is run on a VM and VNF, I.e. dilatation when the asset management device using a VM as dilatation granularity.
In some feasible embodiments, the asset management device can also be in the E2E networks Current-carrying control state (i.e. resources occupation rate is 100%) or resources occupation rate exceed a certain threshold value (such as 97%) VNF quantity exceed predetermined number (such as 3) when, it is determined that starting this flow to the resource pool Resource reconfiguration.The asset management device can also be in current-carrying control state or money in the E2E networks Source occupancy exceed a certain threshold value VNF quantity exceed predetermined number, and the E2E networks business into When power is less than or equal to a certain threshold value, it is determined that starting resource reconfiguration of this flow to the resource pool.I.e. In the embodiment of the present invention, the asset management device can be according to the service success rate of the E2E networks and each At least one in VNF resources occupation rate determines the need for starting resource of this flow to the resource pool Reconfigure.
S303, when resource pool idling-resource capacity be less than the first resource capacity when, the asset management device Determine that first treats capacity reducing VNF from the plurality of VNF according to the state parameter, and according to the first resource capacity To this first treat capacity reducing VNF carry out capacity reducing processing.
If entered specifically, the current idling-resource capacity of the resource pool does not reach to first VNF to be expanded , can not be in the case of dilatation in the resource pool during first resource capacity needed for row dilatation, the resource management is set Standby to carry out dilatation to first VNF to be expanded, now the asset management device can be by the plurality of VNF In the state parameter meet the VNF of default capacity reducing condition and (be designated as first as capacity reducing object and treat capacity reducing VNF).
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:Resources occupation rate is small In or equal to default Secondary resource occupancy (such as 75%), service success rate, which is more than or equal to, presets the 3rd industry Success rate of being engaged in (such as 97%), service priority is less than or equal to default second service priority, and (i.e. business is excellent First level is relatively low), network site is front end.If network site identical VNF has multiple, business is preferential The low preferential capacity reducings of VNF of level, for example, service success rate be more than or equal to default 3rd service success rate and / or resources occupation rate be less than or equal to VNF of the default Secondary resource occupancy and have multiple, then before preferential capacity reducing Hold VNF, if front end VNF also has multiple, the minimum VNF of preferential capacity reducing service priority.
Further, the first resource capacity of the asset management device according to needed for dilatation first is waited to contract to this Hold VNF carry out capacity reducing processing, with cause this first treat capacity reducing VNF discharge part resource, capacity reducing processing Concrete mode can be:The asset management device obtains this and first treats the VM operation that is run on capacity reducing VNF State, includes VM quantity, each VM CPU usage and RAM occupancies etc., and then according to The first resource capacity and the running status determine that the VM to be closed of resource can be discharged, and this is waited to close VM close so that this first treat capacity reducing VNF discharge part resource, to increase the idling-resource of the resource pool Capacity.General, the asset management device can be using a VM as capacity reducing granularity during capacity reducing.
S304, according to the first resource capacity first capacity reducing VNF, which contracts, to be treated to this when the asset management device After appearance processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, the resource Management equipment carries out dilatation processing to first VNF to be expanded.
Specifically, this is first after after capacity reducing VNF capacity reducings, if the current idling-resource capacity of the resource pool reaches The first resource capacity arrived needed for dilatation, then the asset management device can be to first VNF to be expanded Dilatation processing is carried out, the concrete mode of dilatation processing can be:If without on first VNF to be expanded Create but not actuated VM, then the asset management device created on first VNF to be expanded one or Multiple VM, and by the resource distribution of the first resource capacity to one or more VM created, start wound One or more VM built;Created but not actuated VM if existed on first VNF to be expanded, Then the asset management device can start this and create but not actuated VM, by the resource of the first resource capacity This is allocated to have created but not actuated VM.Wherein, while VM starts, the upper related business of VNF, The softwares such as monitoring can also start.
In some feasible embodiments, if this first after capacity reducing VNF capacity reducings release part resource after, The idling-resource capacity of the resource pool is still reached to less than the first resource capacity needed for dilatation, then the resource pipe Reason equipment can obtain the plurality of VNF state parameter again, and according to the plurality of VNF obtained again State parameter capacity reducing object (be designated as second and treat capacity reducing VNF) is determined from the plurality of VNF.Certainly, exist This first after after capacity reducing VNF capacity reducings if state (including service success rate, each VNF of the E2E networks Resources occupation rate etc.) it is no vary widely, then the asset management device can also be utilized directly in step The plurality of VNF obtained in rapid S301 state parameter determines that this second treats capacity reducing VNF.
Further, the asset management device holds according to the idling-resource capacity and the first resource of the resource pool Amount determines to need the resource capacity that is obtained again by capacity reducing, and second treats that capacity reducing VNF is carried out at capacity reducing to this Reason, if this is second after after capacity reducing VNF capacity reducings, the idling-resource capacity of the resource pool has been reached needed for dilatation The first resource capacity, then the asset management device dilatation processing just is carried out to first VNF to be expanded.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool, is somebody's turn to do until the idling-resource capacity of the resource pool is more than or equal to First resource capacity, the asset management device carries out dilatation processing to first VNF to be expanded, so as to In the case of idling-resource deficiency in resource pool between each VNF of guarantee resource in E2E networks Weighing apparatus configuration, and then improve resource utilization and the service success rate of E2E networks.
Referring to Fig. 4, for the embodiment of the present invention based on the E2E network architectures shown in Fig. 1 provide it is another The schematic flow sheet of method for managing resource.Wherein, the E2E networks include multiple VNF and managed the plurality of VNF and resource pool asset management device, the method for managing resource described in the present embodiment, including:
Wherein, step S401~step S403 is identical with step S301~step S303 in preceding embodiment, Here is omitted for the embodiment of the present invention.
S404, the asset management device obtain the plurality of VNF state parameter again.
S405, the asset management device determine E2E according to the plurality of VNF obtained again service success rate Second service success rate of network.
Specifically, this is first after after capacity reducing VNF capacity reducings, due to load balancing again between the plurality of VNF The regular hour is needed, the asset management device can wait the duration in an observation cycle, the observation cycle It can be the cycle for the state parameter for obtaining the plurality of VNF, such as 10s reaches the observation when waiting time During the cycle, the asset management device obtains the plurality of VNF state parameter again, and according to obtaining again The plurality of VNF service success rate determines the second service success rate of the now E2E networks, second business Success rate can be the product of the plurality of VNF service success rate.
S406, the asset management device judge whether second service success rate is less than the first of the E2E networks Service success rate, and first service success rate subtracts the difference of second service success rate more than or equal to pre- If the first numerical value, if so, then performing step S407;If it is not, then performing step S408 and step S409.
Specifically, the asset management device first treats capacity reducing VNF by comparing second service success rate with this First service success rate before capacity reducing determined to this first after after capacity reducing VNF capacity reducings, the E2E networks Whether service success rate is decreased obviously, i.e., first service success rate subtracts the difference of second service success rate Whether value is more than or equal to default first numerical value (such as 3%), if the service success rate of the E2E networks has It is decreased obviously, then performs step S407;If the service success rate of the E2E networks be not decreased obviously or Rise, then perform step S408 and step S409.
S407, the asset management device to this first treat capacity reducing VNF carry out capacity reducing processing carry out rollback behaviour Make.
Specifically, this is first after after capacity reducing VNF capacity reducings, if the service success rate of the E2E networks has substantially Decline, then the asset management device by this first treat the release of capacity reducing VNF capacity reducings resource re-allocate to this One treats capacity reducing VNF, starts the VM to be closed, and cancels and first treats that capacity reducing VNF capacity reducing is handled to this, makes Obtain the E2E networks and return to this as far as possible and first treat state before capacity reducing VNF capacity reducings, with weaken this One treats that capacity reducing VNF capacity reducings cause being decreased obviously for the E2E Network success rates.
S408, according to the first resource capacity first capacity reducing VNF, which contracts, to be treated to this when the asset management device After appearance processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, the resource Management equipment carries out dilatation processing to first VNF to be expanded.
S409, it is more than or equal to first service success rate, and second business when second service success rate The difference that success rate subtracts first service success rate is less than or equal to default second value, or, this second Service success rate is less than first service success rate, and first service success rate subtracts second business success When the difference of rate is less than or equal to default third value, asset management device delay preset duration, and prolonging When during VNF to be expanded and expansion are not determined from the plurality of VNF according to the plurality of VNF state parameter Resource capacity needed for holding.
Specifically, the asset management device is by comparing second service success rate and first service success rate Determine whether the service success rate of the E2E networks has substantially to rise or slightly decline, if second business Success rate is more than or equal to first service success rate, and second service success rate subtracts first business The difference of success rate is less than or equal to default second value (such as 5%), then the asset management device determines to be somebody's turn to do The service success rate of E2E networks does not substantially rise.If second service success rate is less than first business Success rate, and first service success rate subtracts the difference of second service success rate less than or equal to default Third value (such as 2%), then the asset management device determine that the service success rate of the E2E networks has slightly Decline.
Further, the service success rate for determining the E2E networks in the asset management device does not substantially rise Or when having small size decline, the asset management device can be delayed preset duration, and the no longer root during being delayed The resource needed for VNF to be expanded and dilatation is determined from the plurality of VNF according to the plurality of VNF state parameter Capacity, that is, suspend capacity reducing to VNF, dilatation, and preset duration can be three times in the plurality of VNF of acquisition State parameter cycle.
Further, the asset management device can carry out capacity reducing determining continuous several times (such as 3 times) When the service success rate of the E2E networks does not still substantially rise or has small size decline after being handled with dilatation In the case of, just be delayed preset duration, and during being delayed no longer according to the plurality of VNF state parameter from this The resource capacity needed for VNF to be expanded and dilatation is determined in multiple VNF, certain erroneous judgement once is prevented And cause capacity reducing of the asset management device pause to VNF, dilatation.
It should be noted that the asset management device still can periodically obtain the plurality of during being delayed The idling-resource capacity of VNF state parameter and the resource pool.
In some feasible embodiments, step S404~step S407 can also be after step S408 Perform, now the asset management device is expanded by comparing second service success rate with first VNF to be expanded After first service success rate before appearance is determined to the first VNF dilatations to be expanded, if the E2E networks Service success rate be decreased obviously, then expansion of the asset management device to being carried out to first VNF to be expanded Hold processing and carry out rollback operation, the resource of the first resource capacity of first VNF to be expanded will be allocated to Release so that the state that the E2E networks are returned to before the first VNF dilatations to be expanded as far as possible, with Weakening the first VNF dilatations to be expanded causes being decreased obviously for the E2E Network success rates.
In some feasible embodiments, step S404~step S407 can be held after step S403 OK, and after step S408 also perform, i.e., the asset management device first is treating that capacity reducing VNF enters to this After the processing of row capacity reducing, and first VNF to be expanded is carried out after dilatation processing, compare the E2E networks Service success rate and the capacity reducing after capacity reducing processing or dilatation processing handle or the dilatation before processing business into Power, determines whether the service success rate of the E2E networks is decreased obviously, if it is, the resource management Equipment carries out rollback operation to capacity reducing processing or dilatation processing, will this first treat that capacity reducing VNF capacity reducings are released The resource put re-allocates to this and first treats capacity reducing VNF, or will be allocated to first VNF to be expanded should The resource release of first resource capacity, causes the E2E network industries to weaken capacity reducing processing or dilatation processing Business success rate is decreased obviously.
Further, when second service success rate and/or the plurality of VNF state parameter meet default resource When reconfiguring termination condition, the asset management device not further according to the plurality of VNF state parameter from the plurality of The resource capacity needed for VNF to be expanded and dilatation is determined in VNF, to terminate in this flow to the resource pool Resource reconfiguration, wherein, the default resource reconfiguration termination condition specifically can again match somebody with somebody including following resource Put the one or more in termination condition:
1) the second service success rate of the E2E networks is more than or equal to default 4th service success rate (for example 98%), i.e., the service success rate to VNF E2E networks after capacity reducing again dilatation is lifted substantially in other words The service success rate of the E2E networks has met the requirements.
2) the plurality of VNF resources occupation rate is respectively less than or equal to default information resources occupancy (for example 90%), i.e., to VNF, the E2E networks are in load balancing state after capacity reducing again dilatation.
3) in the plurality of VNF front end VNF cross current-carrying control (for example resources occupation rate reaches 100%) and its The absolute value of resources occupation rate difference is less than or equal to default 4th numerical value (example between its any two VNF Such as 3%), although that is, to VNF, front end VNF was in current-carrying in the E2E networks after capacity reducing again dilatation Load balancing state is reached between control state but other VNF, now it is also assumed that the E2E networks Load balancing state is in.
4) the plurality of VNF is without releasable resource, and the asset management device can set each VNF to account for Some least resource capacity, if the resource capacity that each current VNF occupies all is least resource capacity, i.e., Make to have VNF resources occupation rate relatively low, also can not capacity reducing again.
5) service success rate that the E2E networks after capacity reducing, dilatation occur in continuous several times (such as 3 times) is compared It is not obviously improved in the service success rate before capacity reducing, dilatation, and/or, continuous several times (such as 3 times) go out The E2E networks are still not reaching to load balancing state after existing capacity reducing, dilatation, and load balancing state specifically may be used 2) and 3) description in thinking.
It should be noted that after this flow terminates to the resource reconfiguration of the resource pool, the resource management is set It is standby to circulate execution step S401~step S409.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool;The asset management device is according to the plurality of VNF obtained again Service success rate determine the second service success rate of the E2E networks, by comparing second service success rate The service success rate of the E2E networks is determined with the first service success rate of the E2E networks obtained before capacity reducing Whether be decreased obviously, if so, then retract to this first treat capacity reducing VNF capacity reducing processing.If it is not, then existing When the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, to first VNF to be expanded Carry out dilatation processing, so as to the idling-resource in resource pool it is not enough in the case of ensure resource in E2E Equilibrium allocation between each VNF in network, and then improve the business success of resource utilization and E2E networks Rate, and capacity reducing processing and dilatation processing can be retracted, being effectively improved after resource is reconfigured causes The situation that E2E network states are deteriorated.The asset management device can also be by comparing second service success rate The service success rate of the E2E networks is determined with the first service success rate of the E2E networks obtained before capacity reducing Whether have and substantially rise or slightly decline, if so, then carrying out VNF to be expanded again after delay a period of time Determination, that is, wait E2E networks to enter and carry out resource again after steady-working state and reconfigure, can improve The degree of accuracy that resource is reconfigured, further improves resource utilization and the service success rate of E2E networks.
Referring to Fig. 5, another provided for the embodiment of the present invention based on the E2E network architectures shown in Fig. 1 The schematic flow sheet of method for managing resource.Wherein, the E2E networks include multiple VNF and managed the plurality of VNF and resource pool asset management device, the method for managing resource described in the present embodiment, including:
Wherein, step S501~step S503 is identical with step S301~step S303 in preceding embodiment, Here is omitted for the embodiment of the present invention.
S504, the asset management device obtain the plurality of VNF state parameter again.
S505, the asset management device are according to the plurality of VNF obtained again state parameter from the plurality of The Secondary resource capacity needed for the second VNF to be expanded and dilatation is determined in VNF.
Specifically, the asset management device to this first after capacity reducing VNF carry out capacity reducing processing after, to prevent this The state (such as service success rate of the E2E networks, each VNF resources occupation rate etc.) of E2E networks Vary widely, can obtain the plurality of VNF state parameter again, and according to obtain again this is more Individual VNF state parameter redefines dilatation object (being designated as the second VNF to be expanded) from the plurality of VNF, The state parameter in the plurality of VNF can be met to the VNF of default dilatation condition second to be expanded as this VNF, the resource capacity according to needed for the state parameter of second VNF to be expanded determines dilatation (is designated as second Resource capacity).
Wherein, the default dilatation condition may refer to the associated description of step S302 in preceding embodiment, herein Repeat no more.
It is understood that second VNF to be expanded can be same with first VNF to be expanded VNF or different VNF.
S506, according to the first resource capacity first capacity reducing VNF, which contracts, to be treated to this when the asset management device After appearance processing, when the idling-resource capacity of the resource pool is more than or equal to the Secondary resource capacity, the resource Management equipment carries out dilatation processing to second VNF to be expanded, first VNF to be expanded is not carried out Dilatation is handled.
Specifically, this is first after after capacity reducing VNF capacity reducings, if the current idling-resource capacity of the resource pool reaches Arrive and the Secondary resource capacity needed for dilatation is carried out to second VNF to be expanded, then the asset management device Dilatation processing can be carried out to second VNF to be expanded.If second VNF to be expanded first is treated with this Dilatation VNF is different VNF, then because dilatation object now is second VNF to be expanded, therefore, The asset management device does not carry out dilatation processing to first VNF to be expanded.
Wherein, the concrete mode of dilatation processing may refer to the associated description of step S304 in preceding embodiment, Here is omitted.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool;The asset management device obtains the plurality of VNF state again Parameter, and dilatation object (being designated as the second VNF to be expanded) is redefined according to the state parameter obtained again With the Secondary resource capacity needed for dilatation, if the idling-resource capacity of the resource pool be more than or equal to this second Resource capacity, then the asset management device is to second VNF progress dilatation processing to be expanded, the weight after capacity reducing It is new to determine dilatation object, selected when can effectively prevent capacity reducing from causing E2E network states to vary widely The inaccurate situation of dilatation object occurs, and improves capacity reducing, the degree of accuracy of dilatation, and then can improve resource profit With rate and the service success rate of E2E networks.
Referring to Fig. 6, being a kind of structural representation of asset management device provided in an embodiment of the present invention.This reality Apply asset management device described in example and be applied to E2E networks, the E2E networks include multiple VNF and The asset management device of the plurality of VNF and resource pool is managed, including:
Acquisition module 601, the state parameter for obtaining the plurality of VNF.
Determining module 602, for determining the first VNF to be expanded from the plurality of VNF according to the state parameter With the first resource capacity needed for dilatation.
Wherein, the state parameter includes resources occupation rate, service success rate, service priority and network site.
Specifically, the determining module 602 can meet the state parameter in the plurality of VNF default dilatation bar The VNF of part determines expansion as the first VNF to be expanded, and according to the state parameter of first VNF to be expanded First resource capacity needed for holding.
Wherein, the default dilatation condition includes the one or more in following dilatation condition.
The resources occupation rate is more than or equal to default first resource occupancy, and the service success rate is less than or equal to Default second service success rate, the service priority is more than or equal to default first service priority, the network Position is rear end.
The determining module 602, is additionally operable to when the idling-resource capacity of the resource pool is less than the first resource capacity When, determine that first treats capacity reducing VNF from the plurality of VNF according to the state parameter.
Specifically, the determining module 602 can meet the state parameter in the plurality of VNF default capacity reducing bar The VNF of part treats capacity reducing VNF as first.
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, and the service success rate is more than or equal to Default 3rd service success rate, the service priority is less than or equal to default second service priority, the network Position is front end.
Capacity reducing module 603, for according to the first resource capacity to this first treat capacity reducing VNF carry out capacity reducing at Reason.
Specifically, the capacity reducing module 603 can include:
Acquisition submodule 6030, first the VM running status run on capacity reducing VNF is treated for obtaining this.
Determination sub-module 6031, for determining VM to be closed according to the first resource capacity and the running status.
Submodule 6032 is closed, for the VM to be closed to be closed.
Dilatation module 604, for according to the first resource capacity first treating capacity reducing VNF to this when the capacity reducing module After progress capacity reducing processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, Dilatation processing is carried out to first VNF to be expanded.
Specifically, the dilatation module 604 can include:
Start submodule 6040, for creating VM on first VNF to be expanded and/or starting VM;
Configure submodule 6041, for by the resource distribution of the first resource capacity to the establishment VM and/ Or the VM of the startup.
In some feasible embodiments, the state parameter includes service success rate,
The determining module 602, is additionally operable to determine the E2E networks according to the plurality of VNF service success rate First service success rate.
The determining module 602 determined according to the state parameter from the plurality of VNF the first VNF to be expanded and The concrete mode of first resource capacity needed for dilatation is:
When the first service success rate of the E2E networks is less than or equal to default first service success rate, according to The state parameter determines the first resource capacity needed for the first VNF to be expanded and dilatation from the plurality of VNF.
In some feasible embodiments,
The acquisition module 601, is additionally operable to obtain the plurality of VNF state parameter again.
The determining module 602, be additionally operable to the plurality of VNF business that is obtained again according to the acquisition module into Power determines the second service success rate of the E2E networks.
Wherein, the asset management device also includes:
Rollback module 605, for when second service success rate be less than first service success rate, and this first When the difference that service success rate subtracts second service success rate is more than or equal to default first numerical value, to this First treats the capacity reducing processing that capacity reducing VNF is carried out or the dilatation processing progress carried out to first VNF to be expanded Rollback operation.
Time delay module 606, for being more than or equal to first service success rate when second service success rate, and The difference that second service success rate subtracts first service success rate is less than or equal to default second value, or Person, second service success rate is less than first service success rate, and first service success rate subtract this When the difference of two service success rates is less than or equal to default third value, be delayed preset duration.
Wherein, the determining module 602, is additionally operable to during the time delay module is delayed not according to the plurality of VNF State parameter resource capacity needed for VNF to be expanded and dilatation is determined from the plurality of VNF.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool;The asset management device is according to the plurality of VNF obtained again Service success rate determine the second service success rate of the E2E networks, by comparing second service success rate The service success rate of the E2E networks is determined with the first service success rate of the E2E networks obtained before capacity reducing Whether be decreased obviously, if so, then retract to this first treat capacity reducing VNF capacity reducing processing.If it is not, then existing When the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, to first VNF to be expanded Carry out dilatation processing, so as to the idling-resource in resource pool it is not enough in the case of ensure resource in E2E Equilibrium allocation between each VNF in network, and then improve the business success of resource utilization and E2E networks Rate, and capacity reducing processing and dilatation processing can be retracted, being effectively improved after resource is reconfigured causes The situation that E2E network states are deteriorated.The asset management device can also be by comparing second service success rate The service success rate of the E2E networks is determined with the first service success rate of the E2E networks obtained before capacity reducing Whether have and substantially rise or slightly decline, if so, then carrying out VNF to be expanded again after delay a period of time Determination, that is, wait E2E networks to enter and carry out resource again after steady-working state and reconfigure, can improve The degree of accuracy that resource is reconfigured, further improves resource utilization and the service success rate of E2E networks.
Referring to Fig. 7, being the structural representation of another asset management device provided in an embodiment of the present invention.Its In, the asset management device described in the present embodiment is applied to E2E networks, and the E2E networks include multiple VNF and the asset management device for managing the plurality of VNF and resource pool, including:
Acquisition module 701, the state parameter for obtaining the plurality of VNF.
Determining module 702, for determining the first VNF to be expanded from the plurality of VNF according to the state parameter With the first resource capacity needed for dilatation.
The determining module 702, is additionally operable to when the idling-resource capacity of the resource pool is less than the first resource capacity When, determine that first treats capacity reducing VNF from the plurality of VNF according to the state parameter.
Capacity reducing module 703, for according to the first resource capacity to this first treat capacity reducing VNF carry out capacity reducing at Reason.
Dilatation module 704, for according to the first resource capacity first treating capacity reducing VNF to this when the capacity reducing module After progress capacity reducing processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, Dilatation processing is carried out to first VNF to be expanded.
In some feasible embodiments,
The determining module 702, is additionally operable to when the capacity reducing module according to the first resource capacity first treats capacity reducing to this VNF is carried out after capacity reducing processing, when the idling-resource capacity of the resource pool is less than the first resource capacity, root State parameter, which is stated, according to this determines that second treats capacity reducing VNF from the plurality of VNF.
The capacity reducing module 703, is additionally operable to the idling-resource capacity and the first resource capacity pair according to the resource pool This second treat capacity reducing VNF carry out capacity reducing processing.
The dilatation module 704, be additionally operable to when the capacity reducing module according to the idling-resource capacity of the resource pool and this One resource capacity to this second treat capacity reducing VNF carry out capacity reducing processing after, the idling-resource capacity of the resource pool During more than or equal to the first resource capacity, dilatation processing is carried out to first VNF to be expanded.
In some feasible embodiments,
The acquisition module 701, is additionally operable to obtain the plurality of VNF state parameter again.
The determining module 702, is additionally operable to the plurality of VNF state ginseng obtained again according to the acquisition module Number determines the Secondary resource capacity needed for the second VNF to be expanded and dilatation from the plurality of VNF.
The dilatation module 704, is additionally operable to when the capacity reducing module according to the first resource capacity first treats capacity reducing to this VNF is carried out after capacity reducing processing, and the idling-resource capacity of the resource pool is more than or equal to the Secondary resource capacity When, dilatation processing is carried out to second VNF to be expanded, dilatation is not carried out to first VNF to be expanded Processing.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool, if the idling-resource capacity of the resource pool is still not after capacity reducing Foot, then continue to select VNF to carry out capacity reducing;The asset management device obtains the plurality of VNF state again Parameter, and dilatation object (being designated as the second VNF to be expanded) is redefined according to the state parameter obtained again With the Secondary resource capacity needed for dilatation, if the idling-resource capacity of the resource pool be more than or equal to this second Resource capacity, then the asset management device is to second VNF progress dilatation processing to be expanded, the weight after capacity reducing It is new to determine dilatation object, selected when can effectively prevent capacity reducing from causing E2E network states to vary widely The inaccurate situation of dilatation object occurs, and improves capacity reducing, the degree of accuracy of dilatation, and then can improve resource profit With rate and the service success rate of E2E networks.
Referring to Fig. 8, being the structural representation of another asset management device provided in an embodiment of the present invention.Its In, the asset management device described in the present embodiment is applied to E2E networks, and the E2E networks include multiple VNF and the asset management device for managing the plurality of VNF and resource pool, including:Processor 801, net Network interface 802 and memory 803, above-mentioned processor 801, network interface 802 and memory 803 are by total Line 804 is connected, wherein:
The network equipments such as above-mentioned network interface 802 and the plurality of VNF are connected.The number of above-mentioned network interface 802 Amount can be one or more.The type of above-mentioned network interface 802 can be wireline interface, wave point Or combination.Wireline interface can be for example Ethernet interface, and Ethernet interface can be optical interface, Electrical interface or combination, wave point can be for example WLAN (English:Wireless Local Area Network, abbreviation:WLAN) interface, cellular network interface or combination.
Above-mentioned memory 803 can include volatile memory (English:Volatile Memory), for example RAM;Nonvolatile memory (English can also be included:Non-Volatile Memory), such as it is read-only to deposit Reservoir (English:Read-Only Memory, abbreviation:ROM), flash memory (English:Flash Memory), Hard disk (English:Hard Disk Drive, abbreviation:HDD) or solid state hard disc (English:Solid-State Drive, Abbreviation:SSD);The combination of the memory of mentioned kind can also be included.
Above-mentioned processor 801 is used to call the program code stored in memory 803, performs following operation:
Above-mentioned processor 801, the state parameter for obtaining the plurality of VNF by network interface 802.
Above-mentioned processor 801, is additionally operable to determine that first is to be expanded from the plurality of VNF according to the state parameter VNF and the first resource capacity needed for dilatation.
Above-mentioned processor 801, is additionally operable to when the idling-resource capacity of the resource pool is less than the first resource capacity When, determine that first treats capacity reducing VNF from the plurality of VNF according to the state parameter.
Above-mentioned processor 801, is additionally operable to first treat that capacity reducing VNF contracts to this according to the first resource capacity Appearance processing.
Above-mentioned processor 801, be additionally operable to according to the first resource capacity to this first treat capacity reducing VNF carry out After capacity reducing processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, to this First VNF to be expanded carries out dilatation processing.
In some feasible embodiments, the state parameter includes service success rate,
Above-mentioned processor 801, is additionally operable to determine the E2E networks according to the plurality of VNF service success rate First service success rate.
Above-mentioned processor 801 determined according to the state parameter from the plurality of VNF the first VNF to be expanded and The concrete mode of first resource capacity needed for dilatation is:
When the first service success rate of the E2E networks is less than or equal to default first service success rate, according to The state parameter determines the first resource capacity needed for the first VNF to be expanded and dilatation from the plurality of VNF.
Further,
Above-mentioned processor 801, is additionally operable to join by the state that network interface 802 obtains the plurality of VNF again Number, and determine according to the plurality of VNF service success rate the second service success rate of the E2E networks.
Above-mentioned processor 801, is additionally operable to work as second service success rate less than first service success rate, and should It is right when the difference that first service success rate subtracts second service success rate is more than or equal to default first numerical value To the first dilatation processing treated the capacity reducing processing of capacity reducing VNF progress or carried out to first VNF to be expanded Carry out rollback operation.
Further,
Above-mentioned processor 801, is additionally operable to when second service success rate is more than or equal to first business success Rate, and second service success rate subtracts the difference of first service success rate less than or equal to default second number Value, or, second service success rate is less than first service success rate, and first service success rate subtracts When going the difference of second service success rate less than or equal to default third value, be delayed preset duration, and During delay not according to the plurality of VNF state parameter determined from the plurality of VNF VNF to be expanded and Resource capacity needed for dilatation.
In some feasible embodiments,
Above-mentioned processor 801, be additionally operable to according to the first resource capacity to this first treat capacity reducing VNF carry out After capacity reducing processing, when the idling-resource capacity of the resource pool is less than the first resource capacity, according to the state Parameter determines that second treats capacity reducing VNF from the plurality of VNF, and idling-resource capacity according to the resource pool and The first resource capacity to this second treat capacity reducing VNF carry out capacity reducing processing.
Above-mentioned processor 801, is additionally operable in the idling-resource capacity according to the resource pool and the first resource capacity To this second treat capacity reducing VNF carry out capacity reducing processing after, the idling-resource capacity of the resource pool is more than or equal to During the first resource capacity, dilatation processing is carried out to first VNF to be expanded.
In some feasible embodiments, the state parameter includes resources occupation rate, service success rate, industry It is engaged in priority and network site, above-mentioned processor 801 determines the according to the state parameter from the plurality of VNF The concrete mode of one VNF to be expanded and the first resource capacity needed for dilatation is:
The VNF that the state parameter in the plurality of VNF is met to default dilatation condition is to be expanded as first VNF。
First resource capacity according to needed for the state parameter of first VNF to be expanded determines dilatation.
Wherein, the default dilatation condition includes the one or more in following dilatation condition:
The resources occupation rate is more than or equal to default first resource occupancy, and the service success rate is less than or equal to Default second service success rate, the service priority is more than or equal to default first service priority, the network Position is rear end.
Further,
Above-mentioned processor 801 determines that first treats capacity reducing VNF's according to the state parameter from the plurality of VNF Concrete mode is:
The state parameter in the plurality of VNF is met into the VNF for presetting capacity reducing condition as first and treats capacity reducing VNF。
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, and the service success rate is more than or equal to Default 3rd service success rate, the service priority is less than or equal to default second service priority, the network Position is front end.
In some feasible embodiments,
Above-mentioned processor 801 first treats that capacity reducing VNF carries out capacity reducing processing according to the first resource capacity to this Concrete mode is:
Obtain this and first treat the VM running status run on capacity reducing VNF.
VM to be closed is determined according to the first resource capacity and the running status, and the VM to be closed is closed Close.
In some feasible embodiments,
The concrete mode that above-mentioned 801 pairs of processor first VNF to be expanded carries out dilatation processing is:
VM is created on first VNF to be expanded and/or starts VM, and by the money of the first resource capacity Source is allocated to the VM of the establishment and/or VM of the startup.
In the embodiment of the present invention, asset management device obtains the state parameter for multiple VNF that E2E networks include, The E2E networks service success rate be less than preset value when, according to the state parameter from the plurality of VNF really Make the first resource capacity needed for the first VNF to be expanded and dilatation;If the current idling-resource of resource pool Capacity be less than the first resource capacity, then the asset management device according to the state parameter from the plurality of VNF Determine that first treats capacity reducing VNF, and first capacity reducing VNF, which carries out capacity reducing, to be treated to this according to the first resource capacity Processing, to discharge resource into the resource pool, is somebody's turn to do until the idling-resource capacity of the resource pool is more than or equal to First resource capacity, the asset management device carries out dilatation processing to first VNF to be expanded, so as to In the case of idling-resource deficiency in resource pool between each VNF of guarantee resource in E2E networks Weighing apparatus configuration, and then improve resource utilization and the service success rate of E2E networks.
One of ordinary skill in the art will appreciate that all or part of flow in above-described embodiment method is realized, It can be by computer program to instruct the hardware of correlation to complete, described program can be stored in a calculating In machine read/write memory medium, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method. Wherein, described storage medium can for magnetic disc, CD, read-only memory (Read-Only Memory, ) or random access memory (Random Access Memory, abbreviation RAM) etc. ROM.
A kind of method for managing resource and equipment provided above the embodiment of the present invention is described in detail, Specific case used herein is set forth to the principle and embodiment of the present invention, above example Illustrate the method and its core concept for being only intended to help to understand the present invention;Simultaneously for the general of this area Technical staff, according to the thought of the present invention, will change in specific embodiments and applications, In summary, this specification content should not be construed as limiting the invention.

Claims (20)

1. a kind of method for managing resource, applied to end-to-end E2E networks, the E2E networks include multiple Virtual network function VNF and the asset management device for managing the multiple VNF and resource pool, its feature It is, methods described includes:
The asset management device obtains the multiple VNF state parameter;
The asset management device determines that first is to be expanded according to the state parameter from the multiple VNF VNF and the first resource capacity needed for dilatation;
When the idling-resource capacity of the resource pool is less than the first resource capacity, the resource management is set It is standby to determine that first treats capacity reducing VNF from the multiple VNF according to the state parameter, and according to described first Resource capacity treats that capacity reducing VNF carries out capacity reducing processing to described first;
When the asset management device according to the first resource capacity treats that capacity reducing VNF contracts to described first After appearance processing, when the idling-resource capacity of the resource pool is more than or equal to the first resource capacity, institute State asset management device VNF to be expanded to described first and carry out dilatation processing.
2. according to the method described in claim 1, it is characterised in that the state parameter includes business success Rate, the asset management device determines that first is to be expanded according to the state parameter from the multiple VNF VNF and the first resource capacity needed for dilatation, including:
The asset management device determines the of the E2E networks according to the multiple VNF service success rate One service success rate;
When the first service success rate of the E2E networks is less than or equal to default first service success rate, institute State asset management device determined according to the state parameter from the multiple VNF the first VNF to be expanded and First resource capacity needed for dilatation.
3. method according to claim 2, it is characterised in that the asset management device is according to described First resource capacity treats after capacity reducing VNF progress capacity reducing processing that methods described also includes to described first:
The asset management device obtains the multiple VNF state parameter again;
The asset management device is according to being determined the multiple VNF obtained again service success rate Second service success rate of E2E networks;
When second service success rate is less than first service success rate, and first service success rate When the difference for subtracting second service success rate is more than or equal to default first numerical value, the resource management is set The standby capacity reducing to treating capacity reducing VNF progress to described first is handled or to the described first VNF progress to be expanded Dilatation processing carries out rollback operation.
4. method according to claim 2, it is characterised in that the asset management device is according to described First resource capacity treats after capacity reducing VNF progress capacity reducing processing that methods described also includes to described first:
When second service success rate is more than or equal to first service success rate, and second business The difference that success rate subtracts first service success rate is less than or equal to default second value, or, it is described Second service success rate is less than first service success rate, and first service success rate subtracts described the When the difference of two service success rates is less than or equal to default third value, the asset management device delay is default Duration, and during delay not according to the multiple VNF state parameter from the multiple VNF really Determine the resource capacity needed for VNF to be expanded and dilatation.
5. according to the method described in claim 1, it is characterised in that methods described also includes:
When the asset management device according to the first resource capacity treats that capacity reducing VNF contracts to described first After appearance processing, when the idling-resource capacity of the resource pool is less than the first resource capacity, the resource Management equipment determines that second treats capacity reducing VNF according to the state parameter from the multiple VNF, and according to institute The idling-resource capacity and the first resource capacity for stating resource pool treat that capacity reducing VNF carries out capacity reducing to described second Processing;
When idling-resource capacity and the first resource capacity of the asset management device according to the resource pool Treated to described second capacity reducing VNF carry out capacity reducing processing after, the idling-resource capacity of the resource pool be more than or During equal to the first resource capacity, asset management device VNF to be expanded to described first carries out dilatation Processing.
6. according to method according to any one of claims 1 to 5, it is characterised in that the state parameter bag Include resources occupation rate, service success rate, service priority and network site, the asset management device according to The state parameter determines the first resource needed for the first VNF to be expanded and dilatation from the multiple VNF Capacity, including:
State parameter described in the multiple VNF is met default dilatation condition by the asset management device VNF is used as the first VNF to be expanded;
The asset management device according to needed for the described first VNF to be expanded state parameter determines dilatation One resource capacity;
Wherein, the default dilatation condition includes the one or more in following dilatation condition:
The resources occupation rate is more than or equal to default first resource occupancy, the service success rate be less than or Equal to default second service success rate, the service priority is more than or equal to default first service priority, The network site is rear end.
7. method according to claim 6, it is characterised in that the asset management device is according to described State parameter determines that first treats capacity reducing VNF from the multiple VNF, including:
State parameter described in the multiple VNF is met default capacity reducing condition by the asset management device VNF treats capacity reducing VNF as first;
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, the service success rate be more than or Equal to default 3rd service success rate, the service priority is less than or equal to default second service priority, The network site is front end.
8. according to method according to any one of claims 1 to 7, it is characterised in that the resource management is set It is standby to treat that capacity reducing VNF carries out capacity reducing processing to described first according to the first resource capacity, including:
The virtual machine VM run on capacity reducing VNF operation shape is treated in the asset management device acquisition described first State;
The asset management device determines VM to be closed according to the first resource capacity and the running status, And close the VM to be closed.
9. according to method according to any one of claims 1 to 8, it is characterised in that the resource management is set Standby VNF to be expanded to described first carries out dilatation processing, including:
The asset management device creates VM on the described first VNF to be expanded and/or starts VM, and will The resource distribution of the first resource capacity is to the VM of the establishment and/or VM of the startup.
10. a kind of asset management device, applied to end-to-end E2E networks, the E2E networks include multiple VNF and the asset management device for managing the multiple VNF and resource pool, it is characterised in that described Equipment includes:
Acquisition module, the state parameter for obtaining the multiple VNF;
Determining module, for determining the first VNF to be expanded from the multiple VNF according to the state parameter With the first resource capacity needed for dilatation;
The determining module, is additionally operable to when the idling-resource capacity of the resource pool holds less than the first resource During amount, determine that first treats capacity reducing VNF from the multiple VNF according to the state parameter;
Capacity reducing module, for treating that capacity reducing VNF is carried out at capacity reducing to described first according to the first resource capacity Reason;
Dilatation module, for according to the first resource capacity treating capacity reducing to described first when the capacity reducing module VNF is carried out after capacity reducing processing, and the idling-resource capacity of the resource pool is more than or equal to the first resource During capacity, VNF to be expanded to described first carries out dilatation processing.
11. equipment according to claim 10, it is characterised in that the state parameter include business into Power, the determining module determines the first VNF to be expanded according to the state parameter from the multiple VNF Concrete mode with the first resource capacity needed for dilatation is:
The first service success rate of the E2E networks is determined according to the multiple VNF service success rate;
When the first service success rate of the E2E networks is less than or equal to default first service success rate, root The first money needed for the first VNF to be expanded and dilatation is determined from the multiple VNF according to the state parameter Source capacity.
12. equipment according to claim 11, it is characterised in that
The acquisition module, is additionally operable to obtain the multiple VNF state parameter again;
The determining module, is additionally operable to the multiple VNF business obtained again according to the acquisition module Success rate determines the second service success rate of the E2E networks;
Wherein, the equipment also includes:
Rollback module, for being less than first service success rate when second service success rate, and it is described When the difference that first service success rate subtracts second service success rate is more than or equal to default first numerical value, To treating the capacity reducing processing that capacity reducing VNF is carried out or the expansion carried out to the described first VNF to be expanded to described first Hold processing and carry out rollback operation.
13. equipment according to claim 11, it is characterised in that the equipment also includes:
Time delay module, for being more than or equal to first service success rate when second service success rate, And second service success rate subtracts the difference of first service success rate less than or equal to default second number Value, or, second service success rate be less than first service success rate, and first business into When the difference that power subtracts second service success rate is less than or equal to default third value, when delay is default It is long;
Wherein, the determining module, is additionally operable to during the time delay module is delayed not according to the multiple VNF state parameter determines the resource capacity needed for VNF to be expanded and dilatation from the multiple VNF.
14. equipment according to claim 10, it is characterised in that
The determining module, is additionally operable to when the capacity reducing module according to the first resource capacity to described first Treat after capacity reducing VNF progress capacity reducing processing, the idling-resource capacity of the resource pool is less than the first resource During capacity, determine that second treats capacity reducing VNF from the multiple VNF according to the state parameter;
The capacity reducing module, is additionally operable to according to the idling-resource capacity of the resource pool and first resource appearance Amount treats that capacity reducing VNF carries out capacity reducing processing to described second;
The dilatation module, be additionally operable to when the capacity reducing module according to the idling-resource capacity of the resource pool and The first resource capacity treated to described second capacity reducing VNF carry out capacity reducing processing after, the sky of the resource pool When not busy resource capacity is more than or equal to the first resource capacity, VNF to be expanded to described first carries out dilatation Processing.
15. the equipment according to any one of claim 10~14, it is characterised in that the state ginseng Number includes resources occupation rate, service success rate, service priority and network site, the determining module according to The state parameter determines the first resource needed for the first VNF to be expanded and dilatation from the multiple VNF The concrete mode of capacity is:
The VNF that state parameter described in the multiple VNF is met to default dilatation condition waits to expand as first Hold VNF;
First resource capacity according to needed for the described first VNF to be expanded state parameter determines dilatation;
Wherein, the default dilatation condition includes the one or more in following dilatation condition:
The resources occupation rate is more than or equal to default first resource occupancy, the service success rate be less than or Equal to default second service success rate, the service priority is more than or equal to default first service priority, The network site is rear end.
16. equipment according to claim 15, it is characterised in that the determining module is according to the shape State parameter determines that first treats that capacity reducing VNF concrete mode is from the multiple VNF:
The VNF that state parameter described in the multiple VNF is met to default capacity reducing condition waits to contract as first Hold VNF;
Wherein, the default capacity reducing condition includes the one or more in following capacity reducing condition:
The resources occupation rate is less than or equal to default Secondary resource occupancy, the service success rate be more than or Equal to default 3rd service success rate, the service priority is less than or equal to default second service priority, The network site is front end.
17. the equipment according to any one of claim 10~16, it is characterised in that the capacity reducing mould Block includes:
Acquisition submodule, for obtaining the described first VM running status for treating to run on capacity reducing VNF;
Determination sub-module, for determining VM to be closed according to the first resource capacity and the running status;
Submodule is closed, for the VM to be closed to be closed.
18. the equipment according to any one of claim 10~17, it is characterised in that the dilatation mould Block includes:
Start submodule, for creating VM on the described first VNF to be expanded and/or starting VM;
Configure submodule, for by the resource distribution of the first resource capacity to the establishment VM and/or The VM of the startup.
19. a kind of asset management device, applied to end-to-end E2E networks, the E2E networks include multiple VNF and the asset management device for managing the multiple VNF and resource pool, it is characterised in that described Equipment includes the memory of processor, network interface and the executable program code that is stored with, and the processor is adjusted With the executable program code stored in the memory, following operation is performed:
The processor, the state parameter for obtaining the multiple VNF by the network interface;
The processor, is additionally operable to determine that first is to be expanded from the multiple VNF according to the state parameter VNF and the first resource capacity needed for dilatation;
The processor, is additionally operable to when the idling-resource capacity of the resource pool is less than the first resource capacity When, determine that first treats capacity reducing VNF from the multiple VNF according to the state parameter, and according to described One resource capacity treats that capacity reducing VNF carries out capacity reducing processing to described first;
The processor, is additionally operable to when the asset management device according to the first resource capacity to described the After one treats that capacity reducing VNF carries out capacity reducing processing, the idling-resource capacity of the resource pool is more than or equal to described During first resource capacity, VNF to be expanded to described first carries out dilatation processing.
20. equipment according to claim 19, it is characterised in that the state parameter include business into Power, the processor determines the first VNF to be expanded according to the state parameter from the multiple VNF Concrete mode with the first resource capacity needed for dilatation is:
The first service success rate of the E2E networks is determined according to the multiple VNF service success rate;
When the first service success rate of the E2E networks is less than or equal to default first service success rate, root The first money needed for the first VNF to be expanded and dilatation is determined from the multiple VNF according to the state parameter Source capacity.
CN201610071143.0A 2016-01-30 2016-01-30 Resource management method and equipment Active CN107026802B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610071143.0A CN107026802B (en) 2016-01-30 2016-01-30 Resource management method and equipment
PCT/CN2017/071273 WO2017128979A1 (en) 2016-01-30 2017-01-16 Resource management method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610071143.0A CN107026802B (en) 2016-01-30 2016-01-30 Resource management method and equipment

Publications (2)

Publication Number Publication Date
CN107026802A true CN107026802A (en) 2017-08-08
CN107026802B CN107026802B (en) 2020-12-15

Family

ID=59397376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610071143.0A Active CN107026802B (en) 2016-01-30 2016-01-30 Resource management method and equipment

Country Status (2)

Country Link
CN (1) CN107026802B (en)
WO (1) WO2017128979A1 (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108768890A (en) * 2018-05-28 2018-11-06 郑州云海信息技术有限公司 Multi-tenant resource multiplexing method, device and controller in a kind of SDN network
CN108847956A (en) * 2018-05-08 2018-11-20 国家计算机网络与信息安全管理中心 A kind of scalable appearance method and system of multi-dimensional intelligent of telecommunications network safety service VNF
CN109032788A (en) * 2018-06-29 2018-12-18 北京百度网讯科技有限公司 Reserved resource pool dynamic dispatching method, device, computer equipment and storage medium
CN109450684A (en) * 2018-11-09 2019-03-08 北京邮电大学 A kind of network slice systems physical node capacity extensions method and device
WO2019127452A1 (en) * 2017-12-29 2019-07-04 Nokia Technologies Oy Virtualized network functions
WO2019134623A1 (en) * 2018-01-02 2019-07-11 中国移动通信有限公司研究院 Capacity expansion and reduction method, device, apparatus and computer readable storage medium
CN110213064A (en) * 2018-02-28 2019-09-06 中国移动通信有限公司研究院 A kind of scalable appearance method, device and equipment of VNF
WO2019174000A1 (en) * 2018-03-15 2019-09-19 华为技术有限公司 Method and apparatus for service management
CN110474795A (en) * 2019-07-11 2019-11-19 中国平安财产保险股份有限公司 Processing method and processing device, storage medium and the electronic equipment of server capacity
CN111193607A (en) * 2019-09-23 2020-05-22 腾讯云计算(北京)有限责任公司 Method, device and storage medium for transmission resource management
CN111400023A (en) * 2019-01-02 2020-07-10 中国移动通信有限公司研究院 Resource pool redundancy rate adjusting method, device, medium and equipment
CN111416726A (en) * 2019-01-07 2020-07-14 中国移动通信有限公司研究院 Resource management method, sending end equipment and receiving end equipment
CN111464616A (en) * 2020-03-30 2020-07-28 招商局金融科技有限公司 Method, server and storage medium for automatically adjusting number of application load services
CN112737835A (en) * 2020-12-25 2021-04-30 北京浪潮数据技术有限公司 Cloud host business management method and related device
CN112751685A (en) * 2019-10-29 2021-05-04 中国电信股份有限公司 Method, device and system for configuring user plane capacity of network slice
CN113163029A (en) * 2021-05-20 2021-07-23 厦门亿联网络技术股份有限公司 Network session account deployment method, device, terminal, server and storage medium

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10880370B2 (en) 2018-11-27 2020-12-29 At&T Intellectual Property I, L.P. Virtual network manager system
CN110209497B (en) * 2019-05-21 2024-03-19 深圳供电局有限公司 Method and system for dynamically expanding and shrinking host resource
CN110278125B (en) * 2019-06-21 2022-03-29 山东省计算中心(国家超级计算济南中心) Cloud computing resource elasticity evaluation method
CN113434253B (en) * 2021-06-29 2023-08-25 平安科技(深圳)有限公司 Cluster resource scheduling method, device, equipment and storage medium
CN115237610B (en) * 2022-09-26 2023-03-21 城云科技(中国)有限公司 Elastic expansion method and device based on Kubernetes container cloud platform and application

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1946225A (en) * 2006-01-04 2007-04-11 华为技术有限公司 Full distributive resource managing method and system
CN102088719A (en) * 2011-01-24 2011-06-08 中兴通讯股份有限公司 Method, system and device for service scheduling
CN104079503A (en) * 2013-03-27 2014-10-01 华为技术有限公司 Method and device of distributing resources
CN104601492A (en) * 2014-12-29 2015-05-06 上海华为技术有限公司 Method and device for controlling business flow under NFV framework
CN105162716A (en) * 2015-07-28 2015-12-16 上海华为技术有限公司 Flow control method and apparatus under NFV configuration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1946225A (en) * 2006-01-04 2007-04-11 华为技术有限公司 Full distributive resource managing method and system
CN102088719A (en) * 2011-01-24 2011-06-08 中兴通讯股份有限公司 Method, system and device for service scheduling
CN104079503A (en) * 2013-03-27 2014-10-01 华为技术有限公司 Method and device of distributing resources
CN104601492A (en) * 2014-12-29 2015-05-06 上海华为技术有限公司 Method and device for controlling business flow under NFV framework
CN105162716A (en) * 2015-07-28 2015-12-16 上海华为技术有限公司 Flow control method and apparatus under NFV configuration

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11663027B2 (en) 2017-12-29 2023-05-30 Nokia Technologies Oy Virtualized network functions
WO2019127452A1 (en) * 2017-12-29 2019-07-04 Nokia Technologies Oy Virtualized network functions
CN111699659B (en) * 2017-12-29 2023-08-11 诺基亚技术有限公司 Virtualized network functions
CN111699659A (en) * 2017-12-29 2020-09-22 诺基亚技术有限公司 Virtualized network functions
WO2019134623A1 (en) * 2018-01-02 2019-07-11 中国移动通信有限公司研究院 Capacity expansion and reduction method, device, apparatus and computer readable storage medium
CN110213064B (en) * 2018-02-28 2022-07-19 中国移动通信有限公司研究院 VNF capacity expansion and reduction method, device and equipment
CN110213064A (en) * 2018-02-28 2019-09-06 中国移动通信有限公司研究院 A kind of scalable appearance method, device and equipment of VNF
WO2019174000A1 (en) * 2018-03-15 2019-09-19 华为技术有限公司 Method and apparatus for service management
US11567793B2 (en) 2018-03-15 2023-01-31 Huawei Technologies Co., Ltd. Service management method and apparatus
CN108847956B (en) * 2018-05-08 2021-08-17 国家计算机网络与信息安全管理中心 Multi-dimensional intelligent capacity expansion and contraction method and system for telecommunication network security service VNF
CN108847956A (en) * 2018-05-08 2018-11-20 国家计算机网络与信息安全管理中心 A kind of scalable appearance method and system of multi-dimensional intelligent of telecommunications network safety service VNF
CN108768890A (en) * 2018-05-28 2018-11-06 郑州云海信息技术有限公司 Multi-tenant resource multiplexing method, device and controller in a kind of SDN network
CN109032788A (en) * 2018-06-29 2018-12-18 北京百度网讯科技有限公司 Reserved resource pool dynamic dispatching method, device, computer equipment and storage medium
CN109450684A (en) * 2018-11-09 2019-03-08 北京邮电大学 A kind of network slice systems physical node capacity extensions method and device
CN111400023A (en) * 2019-01-02 2020-07-10 中国移动通信有限公司研究院 Resource pool redundancy rate adjusting method, device, medium and equipment
CN111400023B (en) * 2019-01-02 2024-03-22 中国移动通信有限公司研究院 Resource pool redundancy rate adjustment method, device, medium and equipment
CN111416726A (en) * 2019-01-07 2020-07-14 中国移动通信有限公司研究院 Resource management method, sending end equipment and receiving end equipment
CN111416726B (en) * 2019-01-07 2023-04-07 中国移动通信有限公司研究院 Resource management method, sending end equipment and receiving end equipment
CN110474795B (en) * 2019-07-11 2023-04-07 中国平安财产保险股份有限公司 Server capacity processing method and device, storage medium and electronic equipment
CN110474795A (en) * 2019-07-11 2019-11-19 中国平安财产保险股份有限公司 Processing method and processing device, storage medium and the electronic equipment of server capacity
CN111193607B (en) * 2019-09-23 2023-04-07 腾讯云计算(北京)有限责任公司 Method, device and storage medium for transmission resource management
CN111193607A (en) * 2019-09-23 2020-05-22 腾讯云计算(北京)有限责任公司 Method, device and storage medium for transmission resource management
CN112751685A (en) * 2019-10-29 2021-05-04 中国电信股份有限公司 Method, device and system for configuring user plane capacity of network slice
CN112751685B (en) * 2019-10-29 2023-04-07 中国电信股份有限公司 Method, device and system for configuring user plane capacity of network slice
CN111464616A (en) * 2020-03-30 2020-07-28 招商局金融科技有限公司 Method, server and storage medium for automatically adjusting number of application load services
CN112737835A (en) * 2020-12-25 2021-04-30 北京浪潮数据技术有限公司 Cloud host business management method and related device
CN113163029A (en) * 2021-05-20 2021-07-23 厦门亿联网络技术股份有限公司 Network session account deployment method, device, terminal, server and storage medium
CN113163029B (en) * 2021-05-20 2023-06-30 厦门亿联网络技术股份有限公司 Network session account deployment method, device, terminal, server and storage medium

Also Published As

Publication number Publication date
CN107026802B (en) 2020-12-15
WO2017128979A1 (en) 2017-08-03

Similar Documents

Publication Publication Date Title
CN107026802A (en) A kind of method for managing resource and equipment
CN105843670B (en) A kind of cloud platform virtual cluster deployment integration method
Webb et al. Blender: Upgrading tenant-based data center networking
CN111966500B (en) Resource scheduling method and device, electronic equipment and storage medium
DE102015105884B4 (en) Compute nodes and methods for migrating a virtual machine, data center manager for migrating virtual machines, machine-readable storage medium and computing devices
CN104067260B (en) Dynamic construction is for undertaking the methods, devices and systems of one group of calculating node of amount of user effort
US9454408B2 (en) Managing network utility of applications on cloud data centers
CN104601680B (en) A kind of method for managing resource and device
CN108989091A (en) Based on the tenant network partition method of Kubernetes network, storage medium, electronic equipment
CN106133693B (en) Moving method, device and the equipment of virtual machine
US20080263553A1 (en) Dynamic Service Level Manager for Image Pools
CN108614726A (en) Virtual machine creation method and device
CN108337109A (en) A kind of resource allocation methods and device and resource allocation system
US11909603B2 (en) Priority based resource management in a network functions virtualization (NFV) environment
CN102262567A (en) Virtual machine scheduling decision system, platform and method
CN106201661A (en) Method and apparatus for elastic telescopic cluster virtual machine
CN105893113A (en) Management system and management method of virtual machine
EP3117315A1 (en) Management of resource allocation in a mobile telecommunication network
CN111988160B (en) Method and device for deploying virtualized network function
CN106790092A (en) Remote procedure call services end control system and method
CN107003713A (en) Event-driven re-optimization for the logical partition environment of electrical management
CN111213343B (en) Host upgrading method and device
CN107295054A (en) The management method and device of cloud conferencing resource
CN109542580A (en) A kind of method for managing resource, device, equipment and computer readable storage medium
CN108345490A (en) The method and system of virtual machine is disposed in a kind of NFV

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant