CN106979584A - Computer room team control intelligent control method in central air-conditioning monitoring system - Google Patents

Computer room team control intelligent control method in central air-conditioning monitoring system Download PDF

Info

Publication number
CN106979584A
CN106979584A CN201611272625.9A CN201611272625A CN106979584A CN 106979584 A CN106979584 A CN 106979584A CN 201611272625 A CN201611272625 A CN 201611272625A CN 106979584 A CN106979584 A CN 106979584A
Authority
CN
China
Prior art keywords
pump
cooling
computer
host computer
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611272625.9A
Other languages
Chinese (zh)
Inventor
褚如圣
褚如元
方慧丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Yuda Automation Technology Co Ltd
Original Assignee
Hangzhou Yuda Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Yuda Automation Technology Co Ltd filed Critical Hangzhou Yuda Automation Technology Co Ltd
Priority to CN201611272625.9A priority Critical patent/CN106979584A/en
Publication of CN106979584A publication Critical patent/CN106979584A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • F24F11/77Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity by controlling the speed of ventilators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/20709Modifications to facilitate cooling, ventilating, or heating for server racks or cabinets; for data centers, e.g. 19-inch computer racks
    • H05K7/208Liquid cooling with phase change
    • H05K7/20827Liquid cooling with phase change within rooms for removing heat from cabinets, e.g. air conditioning devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/56Remote control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/85Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using variable-flow pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Thermal Sciences (AREA)
  • Computer Hardware Design (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention relates to computer room team control intelligent control method in a kind of central air-conditioning monitoring system, design not good enough technical problem for computer room team control intelligent control method in existing central air-conditioning monitoring system and design.Its main points is that the system setting in the central air-conditioning monitoring system includes administrator mode, linkage pattern, intelligent mode, administrator mode performs operation by the central air-conditioning monitoring system of Central Control Room, when field apparatus puts into " long-range " position, start and stop instruction is sent from Central Control Room, the function of remote centralized management is realized;Linkage pattern is performed a series of equipment linkages by program and operated automatically, and the operation of each equipment is gone to realize by PLC control stations according to the advance artificial selection scheme of equipment, and PLC is automatically controlled according to the program finished in advance;Intelligent mode increases the automatic adding machine and size mian engine changeover function of refrigeration host computer, and calculate heat index, and end load relation between supply and demand according to outdoor temperature humidity on the basis of the function of linkage pattern.

Description

Computer room team control intelligent control method in central air-conditioning monitoring system
Technical field
It is computer room team control intelligent control in a kind of central air-conditioning monitoring system the present invention relates to for central air-conditioning monitoring system Method.
Background technology
Central air conditioner system is made up of one or more cold and heat source systems and multiple air handling systems, typically using liquid Vaporize the principle of refrigeration and provide institute's chilling requirement, the thermic load to offset indoor environment for air handling system;Heating is Air handling system provides institute's calorific requirement, to offset indoor environment refrigeration duty.Refrigeration system is central air conditioner system to closing weight The part wanted, it uses species, the method for operation, structure type etc. to directly affects the economy of central air conditioner system in operation Property, high efficiency, reasonability.Existing central air conditioner system typically passes through control system or prison to reach the effect of energy saving Control system is realized and automatically adjusted;Application number 201510593195.X as disclosed in Chinese patent literature, data of publication of application 2015.12.09, denomination of invention " central air-conditioning variable-flow optimizes system ";Its main points be the refrigeration host computer of the system, cooling pump, Refrigerating water pump, heat-exchanger pump are respectively equipped with dynamic controller, cooling pump dynamic throttling instrument, refrigerating water pump dynamic throttling instrument, heat-exchanger pump dynamic Throttle instrument, and is connected respectively by signal switch board with computer;Each bypass duct of water knockout drum and water collector is respectively equipped with electronic Regulating valve and temperature sensor, cooling pump and refrigerating water pump are respectively equipped with flowmeter, differential pressure pickup, temperature sensor, refrigeration master The outlet pipe of machine is provided with temperature sensor, and computer is analyzed data, controls corresponding dynamic throttling instrument and dynamic control Device, and water outlet and water inlet;The temperature in room is adjusted by temperature controller for building manager, and computer passes through fan unit The circuit of pipe is monitored to the temperature of temperature controller.But computer room team control control sets unreasonable in the above method and system, automatic, Artificial control mode effect is poor, and remote control and delays time to control design not good enough, are further improved.
The content of the invention
To overcome above-mentioned deficiency, the purpose of the present invention is to provide computer room group in a kind of central air-conditioning monitoring system to this area Intelligent control method is controlled, it is solved computer room team control intelligent control method in existing central air-conditioning monitoring system and is set for the temperature difference Inconvenience, remote control and delays time to control, and automatic and artificial control mode switching, the technical problem that inconvenience is set.Its purpose It is achieved by the following technical solution.
Computer room team control intelligent control method in a kind of central air-conditioning monitoring system, the control method include refrigeration station computer room, Computer, and its pipeline connection room end, refrigeration station computer room include refrigeration host computer, refrigerating water pump, cooling pump, water collector, point Relevant device, the control program of hydrophone, heat-exchanger pump, and its frequency-conversion control cabinet and signal switch board, computer and computer, and Frequency-conversion control cabinet and signal switch board constitute fuzzy controller, and the control program of computer is central air-conditioning monitoring system, point water Device connects water main, and water main and the outlet pipe of refrigerating water pump, the outlet pipe of refrigeration host computer are connected, and water collector connection backwater is total The water inlet pipe of pipe, return main and refrigerating water pump is connected, the cooling of the outlet pipe of refrigeration host computer, the water inlet pipe of cooling pump and cooling tower The variable frequency pump connection of tower blower fan, the outlet pipe of cooling pump and the water inlet pipe junction of refrigeration host computer are provided with cooling valve, refrigerating water pump Outlet pipe and the outlet pipe junction of refrigeration host computer be provided with freezing valve, heat-exchanger pump is connected with water knockout drum, water collector respectively;Room End includes blower fan, fan coil, building manager and temperature controller, and fan coil is respectively arranged at the air outlet in room, room Temperature controller is inside respectively equipped with, the circuit connection of temperature controller and fan coil, the floor in room is respectively equipped with building manager, blower fan The circuit of coil pipe is connected with building manager respectively, and building manager is connected by signal switch board with computer respectively;
The refrigeration host computer cooling pump, refrigerating water pump, heat-exchanger pump be respectively equipped with dynamic controller, cooling pump dynamic throttling instrument, Refrigerating water pump dynamic throttling instrument, heat-exchanger pump dynamic throttling instrument, and be connected respectively by signal switch board with computer;The water knockout drum Each bypass duct be respectively equipped with electric control valve, each bypass duct difference temperature sensor of water collector, the outfall sewer of cooling pump Provided with flowmeter, temperature sensor, the water inlet manifold of refrigerating water pump is provided with flowmeter, differential pressure pickup, temperature sensor, refrigeration master The outlet pipe of machine and water main are respectively equipped with temperature sensor, above-mentioned electric control valve, temperature sensor, flowmeter, pressure difference Sensor, dynamic throttling instrument and dynamic controller are connected by signal switch board with computer respectively;The computer is to flow Meter, differential pressure pickup, temperature sensor transmission data analyzed, by the frequency converter in frequency-conversion control cabinet to refrigerating water pump, The dynamic throttling instrument of cooling pump, heat-exchanger pump, and the dynamic controller of refrigeration host computer are controlled, by electric control valve to dividing The water outlet of hydrophone is controlled;The temperature in room is adjusted by temperature controller for building manager, and computer passes through blower fan The circuit of coil pipe is monitored to the temperature of temperature controller;
It is characterized in that:System in the central air-conditioning monitoring system, which is set, includes administrator mode, linkage pattern, intelligence Pattern, administrator mode performs operation by the central air-conditioning monitoring system of Central Control Room, according to the work on central air-conditioning monitoring system Skill is drawn, and when field apparatus puts into " long-range " position, is selected the analog picture of corresponding device, is sent start and stop from Central Control Room and refer to Order, realizes the function of remote centralized management;Linkage pattern is performed a series of equipment linkages by program and operated automatically, each equipment Run and go to realize according to the advance artificial selection scheme of equipment by PLC control stations, PLC carries out automatic according to the program finished in advance Control;Intelligent mode increases the automatic adding machine and size mian engine changeover work(of refrigeration host computer on the basis of the function of linkage pattern Can, and heat index, and end load relation between supply and demand can be calculated according to outdoor temperature humidity, operating personnel's decision-making is helped, is realized The automatic adding machine of refrigeration host computer system and beat small machine handoff functionality.
Refrigerating water pump, cooling pump, blower fan of cooling tower, cooling valve, freezing valve are started and stopped under the administrator mode Only operate specific as follows:On the refrigeration system region of key frame window, corresponding refrigerating water pump, cooling pump, cooling tower wind are clicked on The analog picture of machine, cooling valve or freezing valve, ejects corresponding remote control panel picture window;To its this run time and The operating mode of Cumulative Elapsed Time operation is done to be understood, it is necessary to start the equipment in detail, directly presses " remote activation " button;Need Stop the equipment, directly press " long-range to stop " button;There is equipment fault, " failure reset " button please be click.
Refrigeration host computer is started under the administrator mode and stopped operation specific as follows:In the system of key frame window On cooling system region, the analog picture of refrigeration host computer is clicked on, remote control case picture window is ejected;To its run time and operation The operating mode of number of times is done to be understood, it is necessary to start the equipment in detail, directly presses " remote activation " button;Need to stop the equipment, Directly press " long-range to stop " button;There is equipment fault, " failure reset " button please be click.
The linkage pattern be start & shutdown through one key operation, to refrigeration host computer, refrigerating water pump, cooling pump it is operation associated, that is, work as system The valve of cold main frame is reached behind position, starts corresponding refrigerating water pump and cooling pump, and program finally automatically opens up blower fan of cooling tower, specifically Unlatching number of units by procedure judges;The system Booting sequence of the linkage pattern is the starting procedure after one-key start, if Determine the host-initiated time, main frame water intaking valve, refrigerating water pump, cooling pump, refrigeration host computer delay start successively finally start cooling on demand Tower blower fan;System-down flow is the shutdown flow after a key stops, setting pump delay pass time, refrigeration host computer, cooling tower wind Machine, cooling pump, refrigerating water pump, main frame water intaking valve postpone to stop successively.
Realize that equipment automatically switches to standby operation under the linkage pattern after equipment alarm, i.e., under linkage pattern, if Occur starting under some equipment linkage pattern and unsuccessfully alarm, now program automatically switches to run time most short standby machine and opened It is dynamic;If existing unlatching failure, continue to switch until starting shooting successfully, if driving without an equipment, program is automatic Into linkage shutdown procedure, exit linkage and start.
Described next refrigeration host computer of linkage pattern has not reached air-conditioning effect, additional one in " system setting " picture The big main frame of platform and powerful cooling pump and refrigerating water pump carry out again operation associated, one main frame operation of increase, click on " one Key starts " button, you can complete the purpose of one main and auxiliaries operation of increase;Pass through " one-key start " button and " a key The start & shutdown through one key operation of stopping " button, and the time is set in " main frame linkage time table function " region.
In " main frame increase service condition ", " main frame subtracts open shop condition " or " mian engine changeover operation under the intelligent mode " parameter setting " button in condition ", inputs adjustable parameters at blue font.
The temperature adjustment precision of the present invention is high, dynamic property is good, manual or automatic to set convenient, simple to operate;In being suitable as Entreat monitoring air-conditioner in computer room team control intelligent control method, ex hoc genus anne central air-conditioning monitoring system further improvement.
Brief description of the drawings
Fig. 1 is the structure block diagram of the present invention.
Fig. 2 is the principle schematic diagram of the present invention.
Fig. 3 is the key frame window of the present invention.
Fig. 4 is refrigerating water pump, cooling pump, cooling tower, the remote operator panel picture window of refrigeration host computer of the present invention.
Fig. 5 is the remote control case picture window of the refrigeration host computer of the present invention
Fig. 6 is the system setting screen window of the present invention, and figure includes the association of main frame start & shutdown through one key and sets window, main frame one Key start and stop parameter setting window, the association of main frame start & shutdown through one key set window, the association of subsidiary engine start & shutdown through one key to set window, main frame linkage Timetable function window.
Fig. 7 is the system Booting sequence block diagram of the present invention.
The system that Fig. 8 is the present invention stops flow diagram.
Fig. 9 is the main frame service condition picture window of the present invention, including:The small main frame service condition of big main frame increase, Size main frame subtracts out small main frame service condition, main frame significantly and subtracts out big main frame service condition, big mian engine changeover and run to small main frame Condition, small mian engine changeover are to big main frame service condition.
Embodiment
In conjunction with accompanying drawing, the operation principle to the present invention is further described.Shown in Fig. 1-Fig. 9, the central air-conditioner monitoring System in system, which is set, includes administrator mode, linkage pattern, intelligent mode, with the overall energy consumption and refrigeration duty of central air-conditioning Balance as target, realize handpiece Water Chilling Units, chilled water pump, cooling water pump, the energy distribution of water knockout drum, with balanced valve, cooling tower and Control is coordinated by the group of its motor-driven valve, scientifically realizes the Coupled motion control of central air conditioner system in the case of varying duty, automatically Decision-making handpiece Water Chilling Units open number of units and corresponding water pump opens number of units;Meanwhile, the related chilled water pump of chain control, cooling water pump and The equipment such as cooling tower, reach optimal energy-saving effect.The central air-conditioning monitoring system of monitoring computer is in cold group control system Manager provides patterned operation interface, monitors the various important parameters of these equipment in operation interface, and by pair setting The understanding of standby running status, sets or changes all kinds of operational factors.
Computer room team control effect:Improve the operational efficiency of air-conditioning system;System whole energy;The inhabitation air for improving user relaxes Appropriateness;Labor intensity is reduced, operating efficiency is improved;Enhance system diagnostics ability.Computer room team control main feature and function:According to Outdoor temperature or timetable, automatically engage or stop the function of cold team control;Biao Shinei, is transported with rational unit at runtime Row number of units matches customer charge, realizes energy-conservation, Effec-tive Function;The run time of each unit is balanced, extends unit durability;With pair The function of the related chilled water pump of operating unit switch, cooling water pump, cooling tower and the electric butterfly valve specified;Show ancillary equipment and The running status and major parameter of handpiece Water Chilling Units;Realize chain control to chilled water pump, cooling water pump and cooling tower etc., and according to Accident automatic start-stop stand-by equipment;Different stage operating personnel are facilitated to manage, automatic record and print data, graphical prison Control interface vivid.
Administrator mode performs operation by the central air-conditioning monitoring system of Central Control Room, according on central air-conditioning monitoring system Technique is drawn, and operator need not go to carry out traditional push-botton operation before field control cabinet, when field apparatus puts into " long-range " position When putting, the analog picture of corresponding device is selected, start and stop instruction is sent from Central Control Room, realizes the function of remote centralized management.Such as Fig. 3 Shown, " system setting " will be clicked in the System menu column region at the top of key frame window first by being switched to administrator mode; System enters after system setting screen, in the enterprising row mode selection operation of the corresponding button of administrator mode.
4# refrigerating water pumps are started under administrator mode and stopped operation specific as follows:As shown in figure 3, in key frame window On the refrigeration system region of mouth, the analog picture of 4# refrigerating water pumps is clicked on, as shown in figure 4, ejection remote control panel picture window; Detailed understanding is done to the operating condition of the water pump, such as this run time, Cumulative Elapsed Time is set if it is desired to starting this It is standby, directly press " remote activation " button;If desired stop the equipment, directly press " long-range to stop " button;Operation every time, system is all Secondary operation can be carried out to the operation of user, prevent maloperation, if there is equipment fault, " failure reset " button please be click.
1# cooling pumps are started under administrator mode and stopped operation specific as follows:As shown in figure 3, in key frame window On the refrigeration system region of mouth, the analog picture of 1# cooling pumps is clicked on, as shown in figure 4, ejection remote control panel picture window; Detailed understanding is done to the operating condition of the water pump, such as this run time, Cumulative Elapsed Time is set if it is desired to starting this It is standby, directly press " remote activation " button;If desired stop the equipment, directly press " long-range to stop " button;Operation every time, system is all Secondary operation can be carried out to the operation of user, prevent maloperation, if there is equipment fault, " failure reset " button please be click.
1# blower fan of cooling tower is started under administrator mode and stopped operation specific as follows:As shown in figure 3, being drawn main On the refrigeration system region of face-port mouthful, the analog picture of 1# blower fan of cooling tower is clicked on, as shown in figure 4, ejection remote control panel Picture window;Detailed understanding is done to the operating condition of the blower fan, such as this run time, Cumulative Elapsed Time, if it is desired to Start the equipment, directly press " remote activation " button;If desired stop the equipment, directly press " long-range to stop " button;Grasp every time Make, system all can carry out secondary operation to the operation of user, prevent maloperation, if there is equipment fault, please click that " failure is multiple Position " button.
The motor-driven valve of 1# refrigeration host computers is opened under administrator mode and stops (exemplified by cooling down valve) operation tool Body is as follows:As shown in figure 3, on the refrigeration system region of key frame window, the analog picture that 1# refrigeration host computers cool down valve is clicked on, As shown in figure 4, ejection remote control panel picture window;Detailed understanding is done to the operating condition of the main frame, such as this operation Time, Cumulative Elapsed Time, if it is desired to starting the equipment, directly presses " remote activation " button, if desired stops the equipment, directly Connect and press " long-range to stop " button, operation every time, system all can carry out secondary operation to the operation of user, maloperation be prevented, if going out Existing equipment fault, please click " failure reset " button.
It is that inspecting state (so that 1# freezes failure of pump as an example) operation is specific such as by the device identification when device fails Under:As shown in figure 3, on the refrigeration system region of key frame window, the analog picture of 1# refrigerating water pumps is clicked on, as shown in figure 4, bullet Go out remote control panel picture window;If desired the equipment is overhauled, " repair apparatus " button is directly pressed;If desired coming into operation, this sets It is standby, directly press " come into operation equipment " button.
Host-initiated and stopping are realized under administrator mode, order (by taking the 1# refrigeration host computers as an example) operation of switching on and shutting down is specific It is as follows:When 1# refrigeration host computers to be opened, first confirm that the two valve i.e. 1# cooling valves and 1# freezing valves of main frame have reached position, and And refrigerating water pump, cooling pump, blower fan of cooling tower have been run (ensures that water circulation is run, main frame possesses compressor start up condition) for some time Afterwards, start-up operation then is carried out to main frame again.When 1# refrigeration host computers to be stopped, shutdown operation directly is carried out to main frame, main frame is treated Freezing and the operation of cooling line water circulation are for a period of time after (it is generally necessary to being kept for 15 minutes), it is ensured that the cold and heat energy of main frame Enough to be carried over machine in time, then final step carries out closing valve operation again to the corresponding valve of main frame.If not according to switching on and shutting down Sequentially, frostbite or the cooling line failure of main frame caused by it can not radiate in time for freezing pipeline can be caused to stop to refrigeration host computer Machine.
Refrigeration host computer is started under administrator mode and stopped operation specific as follows:As shown in figure 3, in key frame window On the refrigeration system region of mouth, the analog picture of 1# refrigeration host computers is clicked on;As shown in figure 5, ejection remote control case picture window, Detailed understanding, such as run time, number of run are done to the operating condition of the main frame, if it is desired to starting the equipment, directly pressed " remote activation " button, if desired stops the equipment, directly presses " long-range to stop " button, operates every time, system all can be to user Operation carry out secondary operation, prevent maloperation, if there is equipment fault, " failure reset " button please be click.
If present mode of operation is administrator mode, it is known that now a main frame has not reached air-conditioning effect, real The concrete operations for now increasing a main frame operation are as follows:When main frame is from 8 points of starts in morning, daytime, the temperature of refrigeration host computer was slowly beaten Less than 10 DEG C, hover all the time between 11 DEG C to 12 DEG C, illustrate that the refrigeration duty of entirety is higher, a main frame can not meet work( The demand of rate, now needs artificially to judge refrigeration duty that supply falls short of demand that an additional main frame is run.Transported when needing one main frame of increase During row, it is necessary first to open the corresponding valve of the main frame, including cooling valve, freezing valve, be further added by a cooling pump and put into operation, After a period of time operation (waiting 2 minutes) to be delayed, then increase operation is carried out to main frame.
Linkage pattern is performed a series of equipment linkages by program and operated automatically, and the operation of each equipment is by PLC control station roots Go to realize according to the advance artificial selection scheme of equipment, PLC is automatically controlled according to the program finished in advance.With respect to keeper's mould Formula, linkage pattern can realize refrigeration host computer system and its auxiliary system (valve, refrigerating water pump, cooling pump, and cooling tower wind Machine) a step start stop operation, mitigate the labor intensity of operating personnel, assist operators realize computer room automatic control function.
Linkage pattern realizes that start & shutdown through one key is operated, and sets following equipment:1# refrigeration host computers, 2# refrigerating water pumps, 2# cooling pumps It is operation associated specific as follows:As shown in figure 3, being switched in System menu column region at the top of key frame window, " system is set Put ";System enters after system setting screen, is please " linkage pattern " by model selection;As shown in fig. 6, being set when entering system After picture window, please equipment is chosen according to frame;After the completion of corresponding operation, then enter one-key start and operate, " one please be click on Key start " button, now program be first turned on corresponding two valves of 1# refrigeration host computers.When the valve of refrigeration host computer reaches position Afterwards, start corresponding refrigerating water pump and cooling pump, program finally automatically opens up blower fan of cooling tower, it is specific open number of units by program from It is dynamic to judge, without human intervention.
Linkage pattern arrange parameter realizes that a key stops after main frame, stops refrigerating water pump, and 5 points of delay after delay half an hour It is as follows that clock stops cooling pump concrete operations:As shown in fig. 6, after into system setting screen window, " main frame start & shutdown through one key is set Put parameter " arrange parameter in a column;In order to realize that delay stops refrigerating water pump in 30 minutes, first it is converted into 1800 seconds, then in red In frame " 1800 " carriage return confirmation is inserted in " refrigerating water pump closes delay " corresponding digital frame;The program of shutdown inside to(for) cooling pump is prolonged The slow time is defaulted as the 1/6 of the refrigerating water pump stop delay time, i.e. 1800*1/6=300 seconds.System Booting sequence as shown in fig. 7, For the starting procedure after one-key start, because the host-initiated time can flexibly set, it is assumed here that the delay start time is 60 seconds, then Operated by " system Booting sequence ":System-down flow is as shown in figure 8, be the shutdown flow after key stopping, because of water pump delay The pass time can flexibly set, it is assumed that delay stops refrigerating water pump after 30 minutes after main frame shutdown, then is operated by " system stopping flow ".
Realize that equipment automatically switches to standby operation concrete operations under linkage pattern after equipment alarm as follows:If in linkage mould Under formula, occur starting under some equipment linkage pattern and unsuccessfully alarm, now to automatically switch to run time most short standby for program Machine startup;If existing unlatching failure, continue to switch until starting shooting successfully, if being driven without an equipment, journey Sequence exits linkage and started automatically into linkage shutdown procedure.Such as:Linkage program needs to open 90KW 2# refrigerating water pumps originally, As a result find that 2# cooling pumps are not started up within a specified time, now occur 2# cooling pump startups in picture and unsuccessfully alarm and carry Show, now program automatically switches to the 1# refrigerating water pumps of same 90KW configuration, if now 1# refrigerating water pumps are still opened and failed, program will Continue to automatically switch to run time most short 180KW big pump, i.e. 3# and 4# refrigerating water pumps;If wherein still have an equipment after Continuous can't afford to drive is come, then program continues to switch, until there is a refrigerating water pump to open successfully, comes if all refrigerating water pumps all can't afford to drive, Because not possessing compressor start up condition, then automatically into linkage shutdown procedure, other all devices having already turned on, above logic journey are closed Sequence is equally applicable to the linkage start of cooling pump and host computer system.
Present mode of operation is linkage pattern, and now a refrigeration host computer has not reached air-conditioning effect, realizes increase by one The concrete operations of platform refrigeration host computer operation are as follows:When main frame opens small main frame 1# from 8 points of morning, daytime refrigeration host computer temperature all the time Beat less than 10 DEG C or so, hover all the time between 11 DEG C to 12 DEG C, illustrate that the refrigeration duty of entirety is higher, a refrigeration host computer is The demand of cold load is can not meet, now needs to add one big main frame in " system setting " picture again and powerful Cooling pump and refrigerating water pump carry out again operation associated.As shown in Figure 6, it is assumed that need increase 2# refrigeration host computers, 3# cooling pumps, 3# cold Freeze pump, then increased equipment be intended to these first and chosen again, " one-key start " button is then clicked on again, you can Complete the purpose of one refrigeration host computer of increase and subsidiary engine operation.
Present mode of operation is linkage pattern, realizes for 8 available machine time in the morning:00, be 11 the unused time in the morning:30, afternoon Available machine time 14:30, be 21 the unused time in the evening:00, concrete operations are as follows:As shown in fig. 6, picture be switched to first " being System is set " in, the time is set in " main frame linkage time table function " region, sets as follows respectively:
Period 1 is:00 point when effective 08~~~11 when 30 points;
Period 2 is:It is effective 14 when 30 points~~~21 when 00 point;
A time 1 and the function of period 2 are enabled, it is necessary to be ticked before corresponding period name.
Intelligent mode is that on the basis of the function of linkage pattern, the automatic adding machine and size main frame for increasing refrigeration host computer are cut Function is changed, and heat index can be calculated according to outdoor temperature humidity, operating personnel's decision-making is helped, automatically determines out size main frame Function.With respect to linkage pattern, intelligent mode can realize refrigeration host computer system according to outdoor temperature humidity and end load relation between supply and demand The automatic adding machine of system really realizes the unattended automation of computer room with small machine handoff functionality, whole process is beaten without human intervention Function.The concrete operations for being switched to intelligent mode are as follows:As shown in figure 3, the System menu column region at the top of key frame window Inside it is switched to " system setting ";System enters after system setting screen, is please " intelligent mode " by model selection, and according to operation Prompting, selection "Yes" is switched to intelligent mode.
Main frame adding machine under intelligent mode, and the determinant of size mian engine changeover condition is:Main frame runs power, main frame Chilled water outlet temperature and water knockout drum outlet temperature, meet the retention time of all conditions.Main frame is set under intelligent mode Plus the operation of machine conditional parameter is as follows:As shown in fig. 6, picture is switched into " system setting " first, as shown in figure 9, clicking on " main " parameter setting " button in machine increase service condition ", wherein blue font are adjustable parameters.Master is set under intelligent mode The operation that machine subtracts machine conditional parameter is as follows:As shown in fig. 6, picture is switched into " system setting " first, as shown in figure 9, clicking on " parameter setting " button in " main frame subtracts open shop condition ", wherein blue font are adjustable parameters.Divided into intelligent mode The operation for putting mian engine changeover conditional parameter is as follows:As shown in fig. 6, picture is switched to " system setting " first, as shown in figure 9, " parameter setting " button in " mian engine changeover service condition " is clicked on, wherein blue font is adjustable parameters.

Claims (7)

1. a kind of computer room team control intelligent control method in central air-conditioning monitoring system, the control method includes refrigeration station computer room, meter Calculation machine, and its room end that pipeline is connected, refrigeration station computer room include refrigeration host computer, refrigerating water pump, cooling pump, water collector, Fen Shui Relevant device, the control program of device, heat-exchanger pump, and its frequency-conversion control cabinet and signal switch board, computer and computer, Yi Jibian Frequency switch board and signal switch board constitute fuzzy controller, and the control program of computer is central air-conditioning monitoring system, water knockout drum Water main is connected, water main and the outlet pipe of refrigerating water pump, the outlet pipe of refrigeration host computer are connected, and water collector connection backwater is total The water inlet pipe of pipe, return main and refrigerating water pump is connected, the cooling of the outlet pipe of refrigeration host computer, the water inlet pipe of cooling pump and cooling tower The variable frequency pump connection of tower blower fan, the outlet pipe of cooling pump and the water inlet pipe junction of refrigeration host computer are provided with cooling valve, refrigerating water pump Outlet pipe and the outlet pipe junction of refrigeration host computer be provided with freezing valve, heat-exchanger pump is connected with water knockout drum, water collector respectively;Room End includes blower fan, fan coil, building manager and temperature controller, and fan coil is respectively arranged at the air outlet in room, room Temperature controller is inside respectively equipped with, the circuit connection of temperature controller and fan coil, the floor in room is respectively equipped with building manager, blower fan The circuit of coil pipe is connected with building manager respectively, and building manager is connected by signal switch board with computer respectively;
The refrigeration host computer cooling pump, refrigerating water pump, heat-exchanger pump are respectively equipped with dynamic controller, cooling pump dynamic throttling instrument, freezing Pump dynamic throttling instrument, heat-exchanger pump dynamic throttling instrument, and be connected respectively by signal switch board with computer;The water knockout drum it is each Bypass duct is respectively equipped with electric control valve, and each bypass duct difference temperature sensor of water collector, the outfall sewer of cooling pump is provided with Flowmeter, temperature sensor, the water inlet manifold of refrigerating water pump are provided with flowmeter, differential pressure pickup, temperature sensor, refrigeration host computer Outlet pipe and water main are respectively equipped with temperature sensor, above-mentioned electric control valve, temperature sensor, flowmeter, pressure difference sensing Device, dynamic throttling instrument and dynamic controller are connected by signal switch board with computer respectively;The computer is to flowmeter, pressure Gap sensor, the data of temperature sensor transmission are analyzed, by the frequency converter in frequency-conversion control cabinet to refrigerating water pump, cooling The dynamic throttling instrument of pump, heat-exchanger pump, and the dynamic controller of refrigeration host computer are controlled, by electric control valve to water knockout drum Water outlet be controlled;The temperature in room is adjusted by temperature controller for building manager, and computer passes through fan coil Circuit the temperature of temperature controller is monitored;
It is characterized in that:System in the central air-conditioning monitoring system, which is set, includes administrator mode, linkage pattern, intelligent mould Formula, administrator mode performs operation by the central air-conditioning monitoring system of Central Control Room, according to the technique on central air-conditioning monitoring system Draw, when field apparatus puts into " long-range " position, select the analog picture of corresponding device, start and stop instruction is sent from Central Control Room, Realize the function of remote centralized management;Linkage pattern is performed a series of equipment linkages by program and operated automatically, the fortune of each equipment Row goes realization by PLC control stations according to the advance artificial selection scheme of equipment, and PLC is controlled automatically according to the program finished in advance System;Intelligent mode increases the automatic adding machine and size mian engine changeover function of refrigeration host computer on the basis of the function of linkage pattern, And heat index, and end load relation between supply and demand can be calculated according to outdoor temperature humidity, operating personnel's decision-making is helped, refrigeration is realized The automatic adding machine of host computer system and beat small machine handoff functionality.
2. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described Refrigerating water pump, cooling pump, blower fan of cooling tower, cooling valve, freezing valve are started and stopped operation specifically such as under administrator mode Under:On the refrigeration system region of key frame window, corresponding refrigerating water pump, cooling pump, blower fan of cooling tower, cooling valve or cold are clicked on Freeze the analog picture of valve, eject corresponding remote control panel picture window;To its this run time and Cumulative Elapsed Time The operating mode of operation is done to be understood, it is necessary to start the equipment in detail, directly presses " remote activation " button;Need to stop the equipment, Directly press " long-range to stop " button;There is equipment fault, " failure reset " button please be click.
3. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described Refrigeration host computer is started under administrator mode and stopped operation specific as follows:In the refrigeration system region of key frame window On, the analog picture of refrigeration host computer is clicked on, remote control case picture window is ejected;To its run time and the operating mode of number of run Do and understood in detail, it is necessary to start the equipment, directly press " remote activation " button;Need to stop the equipment, directly by " long-range Stop " button;There is equipment fault, " failure reset " button please be click.
4. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described Linkage pattern be start & shutdown through one key operation, to refrigeration host computer, refrigerating water pump, cooling pump operation associated, i.e., the valve when refrigeration host computer Reach behind position, start corresponding refrigerating water pump and cooling pump, program finally automatically opens up blower fan of cooling tower, it is specific open number of units by Procedure judges;The system Booting sequence of the linkage pattern is the starting procedure after one-key start, during setting host-initiated Between, main frame water intaking valve, refrigerating water pump, cooling pump, refrigeration host computer delay start successively finally start blower fan of cooling tower on demand;System It is the shutdown flow after a key stops to shut down flow, the setting pump delay pass time, refrigeration host computer, blower fan of cooling tower, cooling pump, cold Freeze pump, main frame water intaking valve to postpone to stop successively.
5. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described Realize that equipment automatically switches to standby operation under linkage pattern after equipment alarm, i.e., under linkage pattern, if there is some equipment Start under linkage pattern and unsuccessfully alarm, now program automatically switches to run time most short standby machine and started;If continuing to deposit Failure is being opened, then is continuing to switch until starting shooting successfully, if being driven without an equipment, program is shut down automatically into linkage Program, exits linkage and starts.
6. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described Next refrigeration host computer of linkage pattern has not reached air-conditioning effect, one big main frame is added in " system setting " picture and big The cooling pump and refrigerating water pump of power carry out again operation associated, one main frame operation of increase, click on " one-key start " button, The purpose of one main and auxiliaries operation of increase can be completed;Pass through " one-key start " button and the one of " key stopping " button Key start stop operation, and the time is set in " main frame linkage time table function " region.
7. computer room team control intelligent control method in central air-conditioning monitoring system as claimed in claim 1, it is characterised in that described " ginseng under intelligent mode in " main frame increase service condition ", " main frame subtracts open shop condition " or " mian engine changeover service condition " Number is set " button, adjustable parameters are inputted at blue font.
CN201611272625.9A 2016-12-28 2016-12-28 Computer room team control intelligent control method in central air-conditioning monitoring system Pending CN106979584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611272625.9A CN106979584A (en) 2016-12-28 2016-12-28 Computer room team control intelligent control method in central air-conditioning monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611272625.9A CN106979584A (en) 2016-12-28 2016-12-28 Computer room team control intelligent control method in central air-conditioning monitoring system

Publications (1)

Publication Number Publication Date
CN106979584A true CN106979584A (en) 2017-07-25

Family

ID=59340952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611272625.9A Pending CN106979584A (en) 2016-12-28 2016-12-28 Computer room team control intelligent control method in central air-conditioning monitoring system

Country Status (1)

Country Link
CN (1) CN106979584A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642884A (en) * 2017-09-15 2018-01-30 贵州宝智达网络科技有限公司 A kind of central air conditioner energy efficiency management system
CN108361919A (en) * 2018-01-29 2018-08-03 上海科众恒盛云计算科技有限公司 A kind of dual-computer redundancy control system for precision air conditioner
CN109459964A (en) * 2017-09-06 2019-03-12 张勇 Plesichronous automatic running controller
CN110486316A (en) * 2019-08-23 2019-11-22 洛阳北玻台信风机技术有限责任公司 A kind of more industrial big fan centralized control systems
CN111200919A (en) * 2018-11-19 2020-05-26 中国移动通信集团内蒙古有限公司 Cold source BA control system and data center
CN111486644A (en) * 2019-09-29 2020-08-04 盟立自动化科技(上海)有限公司 Energy-saving control system for server room
CN112039205A (en) * 2020-08-28 2020-12-04 国网河南省电力公司技能培训中心 Remote local switch with remote authorization control function and mode control method
CN112875073A (en) * 2021-01-11 2021-06-01 深圳市邦兴科技有限公司 Oil tank heating system, operation method thereof and computer storage medium
CN113483463A (en) * 2021-06-08 2021-10-08 杭州裕达自动化科技有限公司 Intelligent control method for machine room group control in central air-conditioning monitoring system
CN115289607A (en) * 2022-07-18 2022-11-04 珠海格力电器股份有限公司 Main and standby unit control method and device and air conditioning system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201014677Y (en) * 2007-02-14 2008-01-30 广州金关节能科技发展有限公司 Central air-conditioning intelligent group control device
JP2009174851A (en) * 2009-05-11 2009-08-06 Ntt Facilities Inc Air conditioner monitoring system, and air conditioner monitoring method
CN203147984U (en) * 2013-02-26 2013-08-21 上海华电源牌环境工程有限公司 Chilled-water storage energy-saving control system
CN104534617A (en) * 2014-12-08 2015-04-22 北京华电方胜技术发展有限公司 Cold source centralized digital control method based on energy consumption monitoring
CN105135636A (en) * 2015-09-12 2015-12-09 褚如圣 Central air-conditioning variable flow optimization system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201014677Y (en) * 2007-02-14 2008-01-30 广州金关节能科技发展有限公司 Central air-conditioning intelligent group control device
JP2009174851A (en) * 2009-05-11 2009-08-06 Ntt Facilities Inc Air conditioner monitoring system, and air conditioner monitoring method
CN203147984U (en) * 2013-02-26 2013-08-21 上海华电源牌环境工程有限公司 Chilled-water storage energy-saving control system
CN104534617A (en) * 2014-12-08 2015-04-22 北京华电方胜技术发展有限公司 Cold source centralized digital control method based on energy consumption monitoring
CN105135636A (en) * 2015-09-12 2015-12-09 褚如圣 Central air-conditioning variable flow optimization system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张玉梅,时晓玉: "《实用中央空调技术指南》", 30 September 2009 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109459964A (en) * 2017-09-06 2019-03-12 张勇 Plesichronous automatic running controller
CN107642884A (en) * 2017-09-15 2018-01-30 贵州宝智达网络科技有限公司 A kind of central air conditioner energy efficiency management system
CN108361919A (en) * 2018-01-29 2018-08-03 上海科众恒盛云计算科技有限公司 A kind of dual-computer redundancy control system for precision air conditioner
CN108361919B (en) * 2018-01-29 2020-04-24 上海科众恒盛云计算科技有限公司 Dual-machine redundancy control system for precision air conditioner
CN111200919B (en) * 2018-11-19 2022-04-01 中国移动通信集团内蒙古有限公司 Cold source BA control system and data center
CN111200919A (en) * 2018-11-19 2020-05-26 中国移动通信集团内蒙古有限公司 Cold source BA control system and data center
CN110486316A (en) * 2019-08-23 2019-11-22 洛阳北玻台信风机技术有限责任公司 A kind of more industrial big fan centralized control systems
CN110486316B (en) * 2019-08-23 2020-11-03 洛阳北玻三元流风机技术有限公司 Centralized control system for multiple industrial large fans
CN111486644A (en) * 2019-09-29 2020-08-04 盟立自动化科技(上海)有限公司 Energy-saving control system for server room
CN112039205A (en) * 2020-08-28 2020-12-04 国网河南省电力公司技能培训中心 Remote local switch with remote authorization control function and mode control method
CN112039205B (en) * 2020-08-28 2024-02-27 国网河南省电力公司技能培训中心 Remote on-site switch with remote authorization control function and mode control method
CN112875073A (en) * 2021-01-11 2021-06-01 深圳市邦兴科技有限公司 Oil tank heating system, operation method thereof and computer storage medium
CN113483463A (en) * 2021-06-08 2021-10-08 杭州裕达自动化科技有限公司 Intelligent control method for machine room group control in central air-conditioning monitoring system
CN115289607A (en) * 2022-07-18 2022-11-04 珠海格力电器股份有限公司 Main and standby unit control method and device and air conditioning system

Similar Documents

Publication Publication Date Title
CN106979584A (en) Computer room team control intelligent control method in central air-conditioning monitoring system
CN105135636B (en) Central air-conditioning variable-flow optimizes system
CN105444356B (en) A kind of the efficiency Intelligent Optimal control system and its control method of central air conditioner system
CN114440410B (en) Variable flow control method for freezing and cooling water pump based on heat exchange efficiency
CN103423833B (en) Multi-gang air-conditioner progress control method and control device
CN104110782B (en) A kind of water cold storage energy-saving management system of central air conditioner
CN101216207A (en) 26 degree central air-conditioning intelligent energy-saving management system
CN204943795U (en) A kind of central air conditioner room efficiency optimization system
CN109654887B (en) Circulating water cooling system and automatic control method thereof
CN110529417A (en) A kind of automatic on-line of multi-machine parallel connection Systems of Centrifugal Compressor Unit cuts machine operating method
CN105157182A (en) Intelligent management and energy saving system for heat source of base station
CN105115113A (en) Energy efficiency optimizing system of central air-conditioner room
CN104848487B (en) Intelligent maintenance control system and method
CN214536620U (en) Network architecture of air-conditioning and air-water coordination energy-saving control device of subway station
CN104791022A (en) Fuel gas thermal power plant gland seal and vacuum system and start-stop control method thereof
CN203837200U (en) Central air-conditioner overall energy conservation control device
CN109307351A (en) A kind of efficient synthesis energy saving control system for heat pump
CN112682882A (en) Implementation method of green efficient energy-saving refrigeration machine room integrated module
CN105157187A (en) Intelligent base station heat source management energy-saving system
CN112880148A (en) Control method and device for air conditioner, electronic equipment and storage medium
CN107036231A (en) Cooling tower intelligent energy-saving control method in central air-conditioning monitoring system
CN106801975A (en) Refrigeration host computer Intelligentized control method in central air-conditioning monitoring system
CN104566764A (en) Overall energy saving control device of central air conditioner
CN114893886B (en) Integrated energy-saving control system and control method for centralized heating ventilation air conditioner
CN205692007U (en) Wisdom energy management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170725

RJ01 Rejection of invention patent application after publication